Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

Form 8-K

sec.gov

8-K — SSR MINING INC.

Accession: 0001104659-26-115173

Filed: 2026-10-13

Period: 2026-10-13

CIK: 0000921638

SIC: 6795 (MINERAL ROYALTY TRADERS)

Item: Regulation FD Disclosure

Item: Other Events

Item: Financial Statements and Exhibits

Documents

8-K — tm2627394d1_8k.htm (Primary)

EX-23.1 — EXHIBIT 23.1 (tm2627394d1_ex23-1.htm)

EX-99.1 — EXHIBIT 99.1 (tm2627394d1_ex99-1.htm)

EX-99.2 — EXHIBIT 99.2 (tm2627394d1_ex99-2.htm)

GRAPHIC (tm2627394d1_ex23-1img001.jpg)

GRAPHIC (tm2627394d1_ex99-1img001.jpg)

GRAPHIC (tm2627394d1_ex99-1img002.jpg)

GRAPHIC (tm2627394d1_ex99-1img01.jpg)

GRAPHIC (tm2627394d1_ex99-1img100.jpg)

GRAPHIC (tm2627394d1_ex99-1img101.jpg)

GRAPHIC (tm2627394d1_ex99-1img102.jpg)

GRAPHIC (tm2627394d1_ex99-1img103.jpg)

GRAPHIC (tm2627394d1_ex99-1img104.jpg)

GRAPHIC (tm2627394d1_ex99-1img105.jpg)

GRAPHIC (tm2627394d1_ex99-1img106.jpg)

GRAPHIC (tm2627394d1_ex99-1img107.jpg)

GRAPHIC (tm2627394d1_ex99-1img108.jpg)

GRAPHIC (tm2627394d1_ex99-1img11.jpg)

GRAPHIC (tm2627394d1_ex99-1img71.jpg)

GRAPHIC (tm2627394d1_ex99-1img72.jpg)

GRAPHIC (tm2627394d1_ex99-1img73.jpg)

GRAPHIC (tm2627394d1_ex99-1img74.jpg)

GRAPHIC (tm2627394d1_ex99-1img75.jpg)

GRAPHIC (tm2627394d1_ex99-1img76.jpg)

GRAPHIC (tm2627394d1_ex99-1img77.jpg)

GRAPHIC (tm2627394d1_ex99-1img78.jpg)

GRAPHIC (tm2627394d1_ex99-1img79.jpg)

GRAPHIC (tm2627394d1_ex99-1img80.jpg)

GRAPHIC (tm2627394d1_ex99-1img81.jpg)

GRAPHIC (tm2627394d1_ex99-1img95.jpg)

GRAPHIC (tm2627394d1_ex99-1img96.jpg)

GRAPHIC (tm2627394d1_ex99-1img97.jpg)

GRAPHIC (tm2627394d1_ex99-1img98.jpg)

GRAPHIC (tm2627394d1_ex99-1img99.jpg)

GRAPHIC (tm2627394d1_ex99-1sp2img01.jpg)

GRAPHIC (tm2627394d1_ex99-1sp2img02.jpg)

GRAPHIC (tm2627394d1_ex99-1sp2img03.jpg)

GRAPHIC (tm2627394d1_ex99-1sp2img04.jpg)

GRAPHIC (tm2627394d1_ex99-1sp2img05.jpg)

GRAPHIC (tm2627394d1_ex99-1sp2img06.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img001.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img002.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img003.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img004.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img005.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img006.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img007.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img008.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img009.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img010.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img011.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img012.jpg)

GRAPHIC (tm2627394d1_ex99-1sp3img013.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img01.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img02.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img03.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img04.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img05.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img06.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img07.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img08.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img09.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img11.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img12.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img13.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img14.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img15.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img16.jpg)

GRAPHIC (tm2627394d1_ex99-1sp4img17.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img001.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img002.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img003.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img004.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img005.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img006.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img007.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img008.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img009.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img010.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img011.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img012.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img013.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img014.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img015.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img016.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img017.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img018.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img019.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img020.jpg)

GRAPHIC (tm2627394d1_ex99-1sp6img021.jpg)

GRAPHIC (tm2627394d1_ex99-2img001.jpg)

GRAPHIC (tm2627394d1_ex99-2img002.jpg)

GRAPHIC (tm2627394d1_ex99-2img003.jpg)

GRAPHIC (tm2627394d1_ex99-2img004.jpg)

GRAPHIC (tm2627394d1_ex99-2img005.jpg)

GRAPHIC (tm2627394d1_ex99-2img006.jpg)

GRAPHIC (tm2627394d1_ex99-2img007.jpg)

GRAPHIC (tm2627394d1_ex99-2img008.jpg)

GRAPHIC (tm2627394d1_ex99-2img009.jpg)

GRAPHIC (tm2627394d1_ex99-2img010.jpg)

GRAPHIC (tm2627394d1_ex99-2img011.jpg)

GRAPHIC (tm2627394d1_ex99-2img012.jpg)

GRAPHIC (tm2627394d1_ex99-2img013.jpg)

GRAPHIC (tm2627394d1_ex99-2img014.jpg)

XML — IDEA: XBRL DOCUMENT (R1.htm)

8-K — FORM 8-K

8-K (Primary)

Filename: tm2627394d1_8k.htm · Sequence: 1

false

0000921638

A1

0000921638

2026-10-13

2026-10-13

iso4217:USD

xbrli:shares

iso4217:USD

xbrli:shares

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

FORM 8-K

CURRENT REPORT

PURSUANT TO SECTION 13 OR 15(d)

OF THE SECURITIES EXCHANGE ACT OF 1934

Date of Report (Date of earliest event reported):

October 13, 2026

SSR

Mining Inc.

(Exact name of Registrant as Specified in Its

Charter)

British

Columbia

(State or Other Jurisdiction of Incorporation)

001-35455

(Commission File Number)

98-0211014

(I.R.S. Employer Identification No.)

6900

E. Layton Ave., Suite

1300, Denver,

Colorado USA

80237

(Address of principal executive offices) (zip

code)

(303)

292-1299

(Registrant’s telephone number, including

area code)

Not Applicable

(Former Name or Former Address, if Changed Since

Last Report)

Check the appropriate box below if the Form 8-K

filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

¨

Written communications pursuant to Rule 425 under the

Securities Act (17 CFR 230.425)

¨

Soliciting material pursuant to Rule 14a-12 under the

Exchange Act (17 CFR 240.14a-12)

¨

Pre-commencement communications pursuant to Rule 14d-2(b)

under the Exchange Act (17 CFR 240.14d-2(b))

¨

Pre-commencement communications pursuant to Rule 13e-4(c)

under the Exchange Act (17 CFR 240.13e-4(c))

Securities registered pursuant to Section 12(b) of the Act:

Title

of each class

Trading

Symbol

Name

of each exchange on which registered

Common

Shares without par value

SSRM

The

Nasdaq Stock Market LLC

Indicate by check mark whether the registrant

is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§ 230.405 of this chapter) or Rule 12b-2

of the Securities Exchange Act of 1934 (§ 240.12b-2 of this chapter).

Emerging growth company ¨

If an emerging growth company, indicate by check

mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting

standards provided pursuant to Section 13(a) of the Exchange Act. ¨

ITEM 7.01. Regulation FD Disclosure.

On October 13, 2026, SSR Mining Inc., a British Columbia corporation

(the “Company”), issued a news release announcing the results of a Technical Report Summary (“TRS”) for the Marigold

Complex in Nevada (the “2026 Marigold TRS”), a copy of which is furnished as Exhibit 99.2 to this Current Report on Form 8-K

and is incorporated by reference herein.

The information presented in Item 7.01 of this Current Report on Form

8-K and Exhibit 99.2 is being furnished and shall not be deemed “filed” for purposes of Section 18 of the Securities

Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liabilities of that section, nor shall

it be deemed incorporated by reference in any filing under the Securities Act of 1933, as amended, or the Exchange Act, regardless

of any general incorporation language in such filing, except as expressly set forth by specific reference in such a filing.

Use of Website as a Channel of Distribution for Material Information

The Company advises investors and the public that it intends to utilize

its corporate website as a channel of distribution for material information in compliance with its disclosure obligations under Regulation

FD, including, but not limited to, press releases, Securities and Exchange Commission filings, earnings announcements, investor presentations,

financial and operational data, and other information regarding the Company, its business, financial condition, and results of operations.

The information the Company posts through this channel may be deemed material. Accordingly, the Company advises investors and the public

to monitor this channel. For more information, visit https://ir.ssrmining.com/.

ITEM 8.01. Other Events.

The Company is hereby filing the 2026 Marigold

TRS prepared in accordance with Subpart 1300 of Regulation S-K. The 2026 Marigold TRS is filed as Exhibit 99.1 to this report, and the

corresponding consent of the qualified person is filed as Exhibit 23.1.

ITEM 9.01. Financial Statements and

Exhibits.

(d) Exhibits

Exhibit

Number

Description of Exhibit

23.1

Consent of Qualified Person for Technical Report Summary on Marigold Complex, Nevada USA.

99.1

Technical Report Summary on Marigold Complex, Nevada, USA.

99.2

News Release, dated October 13, 2026, announcing the results of a Technical Report Summary for Marigold Complex in Nevada, USA.

104

Cover Page Interactive Data File (embedded within the Inline XBRL document)

SIGNATURE

Pursuant to the requirements of the Securities and Exchange Act of

1934, as amended, the Registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

SSR Mining Inc.

By:

/s/ Eric Gunning

Name:

Eric Gunning

Title:

Senior Vice President, General Counsel and Corporate Secretary

Dated: October 13, 2026

EX-23.1 — EXHIBIT 23.1

EX-23.1

Filename: tm2627394d1_ex23-1.htm · Sequence: 2

Exhibit 23.1

SLR International Corporation

165 S. Union Blvd., Suite 888, Lakewood, CO 80228

October 13, 2026

Consent of Qualified

Person

In connection with the SSR

Mining Inc. (the "Company") Current Report on Form 8-K filed with the U.S. Securities and Exchange Commission on October 13,

2026 (the “Form 8-K”), the undersigned consents to:

· the

public filing by the Company of the technical report summary titled “S-K 1300 Technical

Report Summary, Marigold Complex, Nevada, USA” (the “Technical Report Summary”),

with an effective date of May 1, 2026 and dated October 9, 2026, that was prepared in accordance

with Subpart 1300 of Regulation S-K promulgated by the U.S. Securities and Exchange Commission,

as an exhibit to the Form 8-K;

· the

incorporation by reference of the Technical Report Summary in the Form 8-K, the press release

attached as an exhibit to the Form 8-K (the “Press Release”) and in the Company’s

Registration Statements on Form S-8 (File Nos. 333-219848, 333-185498, 333-196116, 333-198092,

333-248813, 333-259280, 333-265661, and 333-283912) (collectively,

the “Registration Statements”);

· the

use of and references to our name in connection with the Technical Report Summary, the Press

Release, the Form 8-K, and the Registration Statements; and

· any

extracts from or a summary of the Technical Report Summary in the Form 8-K, the Press Release

and incorporated by reference in the Registration Statements and the use of any information

derived, summarized, quoted, or referenced from the Technical Report Summary, or portions

thereof, that was prepared by us, that we supervised the preparation of, and/or that was

reviewed and approved by us, that is included or incorporated by reference in the Form 8-K,

the Press Release and the Registration Statements.

SLR International Corporation

is responsible for authoring, and this consent pertains to, the entire Technical Report Summary.

SLR International

Corporation

Per:

/s/ Grant A. Malensek

Grant A. Malensek,

M.Eng., P.Eng.

Technical Director – Mining Advisory

Financial Sector Services (Americas)

1

EX-99.1 — EXHIBIT 99.1

EX-99.1

Filename: tm2627394d1_ex99-1.htm · Sequence: 3

Exhibit 99.1

S-K 1300 Technical

Report Summary

Marigold Complex,

Nevada, USA

SSR Mining Inc.

SLR

Project No.: 138.020810.00001

Effective Date:

May 1, 2026

Signature Date:

October 9, 2026

Prepared by:

SLR International

Corporation

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Cautionary Note Regarding Forward-Looking

Statements:

Certain statements contained in this

report are "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended (the

“Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”),

and are intended to be covered by the safe harbor provided for under these sections. Forward looking statements can be identified with

words such as “may,” “will,” “could,” “should,” “expect,” “plan,”

“anticipate,” “believe,” “intend,” “estimate,” “projects,” “predict,”

“potential,” “continue” and similar expressions, as well as statements written in the future tense. Forward-looking

statements are based on information known at such time and/or with a good faith belief with respect to future events. Such statements

are subject to risks and uncertainties that could cause actual performance or results to differ materially from those expressed in the

forward-looking statements. Many of these risks and uncertainties cannot be controlled or predicted. Given these risks and uncertainties,

readers are cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include, among things: metal

price assumptions, cash flow forecasts, projected capital and operating costs, metal recoveries, mine life and production rates, and

other assumptions used in this report.

Such forward-looking information

and statements are based on a number of material factors and assumptions, including, but not limited to: the inherent speculative nature

of exploration results; the ability to explore; communications with local stakeholders; maintaining community and governmental relations;

status of negotiations of joint ventures; weather conditions at our operations; commodity prices; the ultimate determination of and realization

of Mineral Reserves; existence or realization of Mineral Resources; the development approach; availability and receipt of required approvals,

titles, licenses and permits; sufficient working capital to develop and operate the mines and implement development plans; access to

adequate services and supplies; foreign currency exchange rates; interest rates; access to capital markets and associated cost of funds;

availability of a qualified work force; ability to negotiate, finalize, and execute relevant agreements; lack of social opposition to

our mines or facilities; lack of legal challenges with respect to our properties; the timing and amount of future production; the ability

to meet production, cost, and capital expenditure targets; timing and ability to produce studies and analyses; capital and operating

expenditures; economic conditions; availability of sufficient financing; the ultimate ability to mine, process, and sell mineral products

on economically favorable terms; and any and all other timing, exploration, development, operational, financial, budgetary, economic,

legal, social, geopolitical, regulatory and political factors that may influence future events or conditions. While we consider these

factors and assumptions to be reasonable based on information currently available to us, they may prove to be incorrect.

The above list is not exhaustive

list of the factors that may affect any of the forward-looking statements and information included in this report, and such statements

and information will not be updated to reflect events or circumstances arising after the date of such statements or to reflect the occurrence

of anticipated or unanticipated events.

This technical report summary also

contains financial measures which are not recognized under U.S. generally accepted accounting principles.

i

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table of Contents

1.0   Executive

Summary

1-1

1.1   Summary

1-1

1.2   Economic

Analysis

1-11

1.3   Technical

Summary

1-14

2.0   Introduction

2-1

2.1   Site

Visits

2-1

2.2   Sources

of Information

2-2

2.3   List

of Abbreviations

2-3

3.0   Property

Description

3-1

3.1   Location

3-1

3.2   Land

Tenure

3-3

3.3   Encumbrances

and Royalties

3-14

3.4   Required

Permits and Status

3-15

3.5   Other

Significant Factors and Risks

3-15

4.0   Accessibility,

Climate, Local Resources, Infrastructure and Physiography

4-1

4.1   Accessibility

4-1

4.2   Climate

4-1

4.3   Local

Resources

4-1

4.4   Infrastructure

4-1

4.5   Physiography

4-2

5.0   History

5-1

5.1   Ownership,

Exploration, and Development History

5-1

5.2   Past

Production

5-7

6.0   Geological

Setting, Mineralization, and Deposit

6-1

6.1   Regional

Geology

6-1

6.2   Local

Geology

6-3

6.3   Property

Geology

6-8

6.4   Deposit

Type

6-28

7.0   Exploration

7-1

7.1   Geophysical

and Geochemical Surveys

7-2

7.2   Drilling

7-4

8.0   Sample

Preparation, Analyses, and Security

8-1

8.1   Sample

Preparation and Analysis

8-1

i

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

8.2   Quality

Assurance and Quality Control

8-5

8.3   Sample

Security

8-14

8.4   QP

Opinion

8-15

9.0   Data

Verification

9-1

9.1   Marigold

Database Migration

9-1

9.2   QP

Opinion

9-2

10.0   Mineral

Processing and Metallurgical Testing

10-1

10.1   Marigold

10-1

10.2   Buffalo

Valley

10-5

10.3   QP

Opinion

10-6

11.0   Mineral

Resource Estimates

11-1

11.1   Summary

11-1

11.2   Marigold

11-3

11.3   Buffalo

Valley

11-25

12.0   Mineral

Reserve Estimates

12-1

12.1   Summary

12-1

12.2   Marigold

12-2

12.3   Buffalo

Valley

12-5

13.0   Mining

Methods

13-1

13.1   Geotechnical,

Hydrological, Pit, and Other Design Parameters

13-1

13.2   Pit

Phases and Timing

13-8

13.3   Production

Rates, Mine Life, Dimensions, and Dilution Factors

13-13

13.4   Stripping

Requirements

13-13

13.5   Required

Mining Fleet and Machinery

13-15

13.6   Ore

Control Drilling and Method

13-16

13.7   Drilling

and Blasting

13-17

13.8   Loading

Operations

13-17

13.9   Hauling

Operations

13-18

13.10   Mine

Support

13-32

13.11   Mine

Maintenance

13-32

13.12   Mine

General and Administration

13-33

13.13   Mine

Safety

13-33

13.14   Mine

Dewatering

13-33

13.15   Mine

Workforce

13-37

ii

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

13.16   QP

Opinion

13-37

14.0   Processing

and Recovery Methods

14-1

14.1   Marigold

14-1

14.2   Buffalo

Valley

14-6

14.3   QP

Opinion

14-9

15.0   Infrastructure

15-1

15.1   Marigold

Infrastructure

15-1

15.2   Buffalo

Valley Infrastructure

15-7

15.3   QP

Opinion

15-14

16.0   Market

Studies

16-1

16.1   Marketing

and Metal Prices

16-1

16.2   Contracts

16-1

17.0   Environmental

Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups

17-1

17.1   Summary

17-1

17.2   Marigold

17-1

17.3   Buffalo

Valley

17-6

18.0   Capital

and Operating Costs

18-1

18.1   Capital

Costs

18-1

18.2   Operating

Costs

18-2

19.0   Economic

Analysis

19-1

19.1   Economic

Criteria

19-1

19.2   Cash

Flow Analysis

19-2

19.3   Sensitivity

Analysis

19-4

20.0   Adjacent

Properties

20-1

21.0   Other

Relevant Data and Information

21-1

22.0   Interpretation

and Conclusions

22-1

22.1   Geology

and Mineral Resources

22-1

22.2   Mining

and Mineral Reserves

22-2

22.3   Mineral

Processing

22-4

22.4   Infrastructure

22-6

22.5   Environment

22-7

22.6   Capital

and Operating Costs

22-8

23.0   Recommendations

23-1

23.1   Geology

and Mineral Resources

23-1

iii

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

23.2   Mining

and Mineral Reserves

23-1

23.3   Mineral

Processing

23-2

23.4   Infrastructure

23-2

23.5   Environment

23-3

23.6   Capital

and Operating Costs

23-3

24.0   References

24-1

25.0   Reliance

on Information Provided by the Registrant

25-1

26.0   Date

and Signature Page

26-1

27.0   Appendix

1

27-1

Tables

Table

1-1:   After-Tax Cash Flow Summary

1-13

Table

1-2:   Summary of Marigold Mine and Buffalo Valley Mineral Resources

1-19

Table

1-3:   Summary of Marigold Mineral Reserves Estimate as of May 1, 2026

1-20

Table

1-4:   Capital Costs Summary

1-25

Table

1-5:   Operating Costs Summary

1-26

Table

3-1:   List of Land Package Areas (in hectares)

3-3

Table

3-2:   MMC Surface Lands

3-5

Table

3-3:   MMC-Owned Unpatented Mining Claims within the Marigold Mine Project Area

3-6

Table

3-4:   MMC-Owned Unpatented Mining Claims within the Sterling Project Area

3-7

Table

3-5:   Decker Lease Unpatented Mining Claims

3-10

Table

3-6:   Vek & Andrus Lease Unpatented Mining and Millsite Claims

3-10

Table

3-7:   Euro-Nevada Lease Unpatented Mining Claims

3-11

Table

3-8:   Franco-Nevada Lease Unpatented Mining Claims

3-12

Table

3-9:   Nevada North Lease Unpatented Mining Claims

3-13

Table

3-10:   New Nevada 2006 Unpatented Mining Claims

3-13

Table

3-11:   Hardrock Exploration 2024 Lease Unpatented Mining Claims

3-14

Table

5-1:   Summary of Historical Exploration

5-5

Table

5-2:   Marigold Historical Production from August 1989 to April 1, 2014

5-7

Table

5-3:   Marigold Production from April 1, 2014 to March 31, 2026

5-7

Table

7-1:   Summary of Exploration Completed by SSR

7-1

Table

7-2:   Summary of Drilling at Marigold

7-5

Table

7-3:   Summary of Drilling at Buffalo Valley

7-5

iv

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

7-4:   Summary of Drilling at Trenton Canyon

7-6

Table

8-1:   Analytical Methods for Gold for the Marigold Assay Resource Database

8-3

Table

8-2:   Comparison of Valmy Deposit NN Mean Gold Grades

8-9

Table

8-3:   List of CRM Standards used between 2023 and June 2026

8-11

Table

10-1:   Gold Recovery by Lithology

10-6

Table

11-1:   Summary of Marigold Mine and Buffalo Valley Mineral Resources

11-2

Table

11-2:   Capping and Outlier Restriction Values and Distance for Various Domains

11-5

Table

11-3:   Statistics Raw vs. Composites inside Mineralized Envelope

11-6

Table

11-4:   Variogram Parameters

11-7

Table

11-5:   Block Model Parameters

11-8

Table

11-6:   Block Model Attributes

11-8

Table

11-7:   Search Parameters for In Situ Estimation

11-10

Table

11-8:   Search Parameters for Mineralized Stockpile

11-10

Table

11-9:   Summary of Density for Different Material

11-11

Table

11-10:   Resource Classification Parameters

11-12

Table

11-11:   Estimation Variance Statistics, not depleted

11-17

Table

11-12:   Marigold Resource Pit Parameters and Cut-off Grade

11-21

Table

11-13:   Details of Marigold Mineral Resources Estimate Exclusive of Mineral Reserves as of May 1, 2026

11-22

Table

11-14:   Length Weighted Gold Assays (g/t) Statistics of Raw Samples by Estimation Domain

11-28

Table

11-15:   Capping Values AUBEST (g/t)

11-29

Table

11-16:   Variogram Models (AUBEST)

11-30

Table

11-17:   Length Weighted Gold Assays (g/t) Statistics of Composite Samples by Domain

11-31

Table

11-18:   AUCE Regression Summary Applied to AUFA Values

11-36

Table

11-19:   Block Model Parameters (Mine Grid X, Y, Z in meters)

11-36

Table

11-20:   Estimated Variables

11-37

Table

11-21:   Volumetric Models Generated for Estimation Domaining and Grade Estimation

11-37

Table

11-22:   Estimation Domain Boundary Types

11-39

Table

11-23:   Grade Interpolation Parameters for AUBEST/AUCE

11-40

Table

11-24:   Density Assignments

11-40

Table

11-25:   Classification Rules

11-41

Table

11-26:   Statistical Summary of Gold Grade Estimates (g/t)

11-46

Table

11-27:   Buffalo Valley Resource Pit Parameters and Cut-off Grades

11-51

v

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

11-28:   Details of Buffalo Valley Mineral Resources Estimate Exclusive of Mineral Reserves as of May 1, 2026

11-52

Table

12-1:   Summary of Marigold Mineral Reserves Estimate as of May 1, 2026

12-2

Table

12-2:   Key Economic Parameters for Mineral Reserves Estimate - Marigold

12-4

Table

12-3:   Key Economic Parameters for Mineral Reserves Estimate – Buffalo Valley

12-6

Table

13-1:   Overall Slope Angles by Azimuth – Marigold Mine

13-6

Table

13-2:   Overall Slope Angles by Azimuth – Buffalo Valley Mine

13-7

Table

13-3:   Design Parameters by Each Area – Marigold Mine

13-7

Table

13-4:   Design Parameters by Each Area – Buffalo Valley Mine

13-8

Table

13-5:   Mining Phase Design Summary

13-9

Table

13-6:   Annual Production Schedule Tonnes Mined

13-14

Table

13-7:   Marigold Mining Complex - Fleet Equipment List

13-15

Table

13-8:   LOM Average Maintenance KPI of the MMC Equipment Fleet

13-32

Table

13-9:   RIB Design Criteria – Marigold Mine

13-36

Table

16-1:   Economic Analysis Metal Price Assumptions

16-1

Table

17-1:   Marigold Mine Baseline Studies Supporting the EA

17-2

Table

17-2:   Marigold Mine Environmental Permits for Operation

17-2

Table

17-3:   Marigold Mine Reclamation Cost Estimate/Bond

17-6

Table

17-4:   Baseline Studies Supporting the EIS

17-7

Table

17-5:   Buffalo Valley Environmental Permits for Operation

17-10

Table

18-1:   Capital Costs Summary

18-1

Table

18-2:   Operating Costs Summary

18-2

Table

18-3:   Mine Operating Cost Summary

18-3

Table

18-4:   Process Operating Cost Summary

18-3

Table

18-5:   G&A Operating Cost Summary

18-4

Table

18-6:   Current Workforce

18-4

Table

18-7:   LOM Workforce Levels

18-4

Table

19-1:   After-Tax Cash Flow Summary

19-3

Table

19-2:   After-Tax Sensitivity Analyses

19-5

Table

20-1:   Past Production and Mineral Resources for Adjacent Properties

20-1

Figures

Figure

3-1:   Location Map

3-2

Figure

3-2:   Marigold and Sterling Land Package Map

3-4

vi

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

5-1:   View to the East–Southeast over the Cyanide Leach Tanks from the Marigold Mine prior to World War II

5-1

Figure

5-2:   Location of Marigold Exploration Targets and Mining Areas

5-4

Figure

6-1:   Location of the Marigold Mine in North-Central Nevada within the Basin and Range Physiographic Province

6-1

Figure

6-2:   Location of Marigold and the Battle Mountain Mining District on the Battle Mountain-Eureka Mineral Trend

6-4

Figure

6-3:   Stratigraphic Column for the Marigold Complex

6-7

Figure

6-4:   Plan View Map Showing Distribution of Paleozoic Units at Marigold

6-10

Figure

6-5:   Top Surface of the Valmy Formation with the Current Property Boundary

6-12

Figure

6-6:   Cross Section 11,200N Highlighting Inferred Permian Growth Fault and Associated Antithetic Normal Faults with

a Steep West Dip

6-13

Figure

6-7:   Plan View of the Marigold Mine Area showing the Spatial Distribution of 1.0 g/t Au Grade Shells Over an 8 km

Northerly Trend

6-15

Figure

6-8:   Geologic Map of the Buffalo Valley Mine Area

6-18

Figure

6-9:   Schematic Cross Section Buffalo Valley Deposit

6-20

Figure

6-10:   Geologic Map of Trenton Canyon Area

6-23

Figure

6-11:   Schematic Cross Section through Trenton Canyon

6-27

Figure

6-12:   Model Illustrating Inferred Processes Related to Formation of Carlin-Type Gold Deposits (CTGD) and Distal

Disseminated Silver–Gold Deposits

6-29

Figure

7-1:   Plan View of All Drilling to End of May 2026

7-7

Figure

8-1:   Scatter Plot Between FA Gold Values with AA Finish and Gravimetric Finish

8-6

Figure

8-2:   Q-Q Plot between FA Gold Values with AA Finish and Gravimetric Finish

8-6

Figure

8-3:   Cross-Section with SSR Drill Holes and Historical Drill Holes Along Section 8000N

8-8

Figure

8-4:   Cumulative Normal Distribution Comparing Composites from SSR Drilling and Historical Drilling

8-9

Figure

8-5:   Z-Scores of all CRM Results (2023 – June 2026)

8-11

Figure

8-6:   Field Duplicate HARD Plot for Fire Assay (AuFA)

8-12

Figure

8-7:   Blank Results (January 2023 – June 2026)

8-13

Figure

8-8:   Umpire Analytical Duplicate HARD Plot for Fire Assay (AuFA) of Original vs. Umpire Results

8-14

Figure

10-1:   Column Test Results – Marigold

10-2

Figure

10-2:   Bottle Roll vs. Column Recovery – Marigold

10-2

Figure

10-3:   Exploration Database (2017) AuCN vs AuFA – All Data

10-4

Figure

10-4:   Buffalo Valley Au Recovery by Size for each Lithology

10-6

vii

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

11-1:   Mineralized Envelopes and Dynamic Anisotropy Trend, 10400N, Red Dot area

11-4

Figure

11-2:   Valmy Classification Cross Section (1100N)

11-13

Figure

11-3:   Visual Validation, >= 0.002 opt, Not Depleted, Section -3850N

11-15

Figure

11-4:   Visual Validation, AUKR >= 0.002 (opt), not depleted, Level 4400

11-16

Figure

11-5:   Swath Plot Along East, comparing Assay, Kriged Value and NN

11-18

Figure

11-6:   Swath Plot Along North, comparing Assay, Kriged Value and NN

11-19

Figure

11-7:   Swath Plot Along Elevation, comparing Assay, Kriged Value and NN

11-20

Figure

11-8:   Buffalo Valley Estimation Domains (Plan View Elevation 5100)

11-26

Figure

11-9:   Buffalo Valley Geology (Mine Grid Section -32,400 N)

11-27

Figure

11-10:   Boxplot of AUFA by Domain (grade in opt)

11-32

Figure

11-11:   Boxplot of AUCN by Domain (grade in opt)

11-33

Figure

11-12:   Histograms of AUBEST By Domains (grade in opt)

11-34

Figure

11-13:   Log Probability Plots of AUBEST By Domains (grade in opt)

11-35

Figure

11-14:   Buffalo Valley-Dore Hills Mineralized Shell Boundary Conditions

11-38

Figure

11-15:   FFOZ Boundary Conditions

11-39

Figure

11-16:   Classification – Buffalo Valley Deposit (Looking N at 31550N With a 25’ Window)

11-42

Figure

11-17:   Cross Section Buffalo Valley Deposit (-31550N, $2500 Resource Shell, 25ft Section Window, MII Only)

11-44

Figure

11-18:   Cross Section Buffalo Valley Deposit (-32400N, $2500 Resource Shell, 25ft Section Window, MII Only)

11-45

Figure

11-19:   Swath Plot X for AUBEST

11-48

Figure

11-20:   Swath Plot Y for AUBEST

11-49

Figure

11-21:   Swath Plot Elevation for AUBEST

11-50

Figure

13-1:   End of Mine Life Reserve Pits- Marigold Mine

13-11

Figure

13-2:   End of Mine Life Reserve Pits- Buffalo Valley Mine

13-12

Figure

13-3:   Mine Annual Production Schedule

13-15

Figure

13-4:   End of Production Year 2026 – Marigold Mine

13-19

Figure

13-5:   End of Production Year 2027 – Marigold Mine

13-20

Figure

13-6:   End of Production Year 2028 – Marigold Mine

13-21

Figure

13-7:   End of Production Year 2029 – Marigold Mine

13-22

Figure

13-8:   End of Production Year 2030 – Marigold Mine

13-23

Figure

13-9:   End of Production Year 2031 – Marigold Mine

13-24

Figure

13-10:   End of Production Year 2032 – Marigold Mine

13-25

Figure

13-11:   End of Production Year 2040 (LOM) – Marigold Mine

13-26

viii

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-12:   End of Production Year 2029 – Buffalo Valley Mine

13-27

Figure

13-13:   End of Production Year 2030 – Buffalo Valley Mine

13-28

Figure

13-14:   End of Production Year 2031 – Buffalo Valley Mine

13-29

Figure

13-15:   End of Production Year 2032 – Buffalo Valley Mine

13-30

Figure

13-16:   End of Production Year 2034 – Buffalo Valley Mine

13-31

Figure

13-17:   Marigold Dewatering Well Locations

13-35

Figure

13-18:   Marigold RIB Locations and Monitoring System

13-36

Figure

14-1:   Simplified Marigold Processing Flowsheet

14-1

Figure

14-2:   Average Annual Reagent Consumption

14-5

Figure

14-3:   Marigold Heap Leach Pad Gold Recovery (March 1990 through April 2026)

14-5

Figure

14-4:   Buffalo Valley Process Flowsheet

14-7

Figure

14-5:   Plan View of the Buffalo Valley Process Facility

14-8

Figure

15-1:   Infrastructure Site Map

15-4

Figure

15-2:   Freshwater Well Sites

15-5

Figure

15-3:   LOM Site Schematic Showing Final Pit Limits, OBSA, and Leach Pad

15-6

Figure

15-4:   Buffalo Valley Site Layout

15-8

Figure

15-5:   Buffalo Valley Plan Boundary

15-10

Figure

15-6:   Routing of Marigold to Buffalo Valley Connector Road

15-12

Figure

19-1:   After-Tax Sensitivity Analysis

19-4

Figure

20-1:   Adjacent Properties

20-2

ix

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

1.0 Executive

Summary

1.1 Summary

SLR International Corporation (SLR)

was retained by SSR Mining Incorporated (SSR) to prepare an independent Technical Report Summary (TRS) on the Marigold Complex (Marigold

or the Property), located in Humboldt and Lander counties, Nevada, USA. The Marigold Complex includes the Marigold Mine (including Mackay,

Valmy, and New Millenium) and the Buffalo Valley and Trenton Canyon deposits. SSR holds a 100% interest in the Property through its wholly

owned subsidiary, Marigold Mining Company (MMC).

The purpose of this TRS is to disclose

the results of the Mineral Resource and Mineral Reserve estimates for the Property with an effective date of May 1, 2026. This TRS conforms

to United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants

as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601 (b)(96)

Technical Report Summary. SLR visited the Property from June 10 to 12, 2026.

SSR has a diversified portfolio of operating,

development and exploration assets across the Americas, including four operating mines in the USA, Canada, and Argentina. SSR is listed

on the NASDAQ Global Select Market (NASDAQ:SSRM) and the Toronto Stock Exchange (TSX:SSRM).

SSR’s Marigold Complex is located

approximately five kilometers (km) south–southwest of the town of Valmy, and approximately 24 km northwest of Battle Mountain.

The open pit heap leach gold mine has been in production since 1989 and has produced over five million ounces of gold. The operation

consists of several open pits, overburden storage areas (OBSA), leach pads, a carbon-in-column (CIC) adsorption facility, and a carbon

processing and gold refining facility.

1.1.1 Conclusions

SLR offers the following conclusions

by area.

1.1.1.1 Geology

and Mineral Resources

· The

Mineral Resource estimates for Marigold and Buffalo Valley have been prepared using accepted

industry practices and conform to the requirements of SEC Regulation S-K 1300.

· The

estimates are supported by extensive drilling, validated geological and assay databases,

appropriate metallurgical assumptions, robust estimation methodologies, and reasonable economic

parameters.

· The

assigned Mineral Resource classifications appropriately reflect the level of geological confidence

and estimation uncertainty inherent in each deposit.

· Additional

drilling and ongoing geological studies have the potential to expand the known mineralized

footprint, improve classification confidence, and support future conversion of Mineral Resources

to Mineral Reserves.

· The

Marigold Complex contains two distinct mineral deposit styles. Marigold and Trenton Canyon

are classified as Carlin-type gold deposits, while Buffalo Valley is classified as a distal

disseminated silver-gold deposit associated with felsic porphyry dikes, structural corridors,

and favorable host rocks.

1-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· Geological

understanding of the Marigold Complex is supported by more than three decades of mining operations,

extensive exploration programs, geologic mapping, geophysical surveys, metallurgical testing,

production history, and ongoing resource definition drilling.

· The

current geological interpretations adequately define lithologic, structural, oxidation, alteration,

and mineralization controls and provide a suitable basis for Mineral Resource estimation

and classification.

· Exploration,

delineation, and resource development programs completed by SSR and predecessor operators

have resulted in more than 13,000 drill holes and over 2.6 million meters of drilling across

Marigold, Buffalo Valley, and Trenton Canyon. Recent drilling programs continue to support

resource growth, conversion, and refinement of geological models.

· The

drilling density and spatial distribution of drill holes are sufficient to support the current

geological interpretations and Mineral Resource classifications at both Marigold and Buffalo

Valley.

· The

SLR Qualified Person considers the drilling methods, sampling practices, sample preparation

procedures, analytical methods, quality assurance and quality control programs, and database

management systems to be consistent with accepted industry standards and suitable for Mineral

Resource estimation.

· Independent

verification procedures completed by SLR indicate that the geological, assay, density, and

survey databases are sufficiently accurate, complete, and reliable for use in Mineral Resource

estimation.

· There

are no Measured Resources at the Property.

· The

level of uncertainty has been adequately reflected in the classification of Mineral Resources

for the Property. The MRE presented may be materially impacted by any future changes in the

break-even cut-off grade, which may result from changes in mining method selection, mining

costs, processing recoveries and costs, metal price fluctuations, or significant changes

in geological knowledge.

· The

SLR QP is of the opinion that, with consideration of the recommendations summarized in Sections

1 and 23 of this TRS, any issues relating to all relevant technical and economic factors

likely to influence the prospect of economic extraction can be resolved with further work.

Marigold

· Mineral

Resources were constrained within an optimized open pit shell that reflects reasonable prospects

for eventual economic extraction using a gold price assumption of US$2,500/oz and a reporting

cut-off grade of 0.069 g/t Au.

· Effective

May 1, 2026, the Marigold Mineral Resource estimate exclusive of Mineral Reserves comprises

approximately 125.0 Mt of Indicated Mineral Resources at an average grade of 0.39 g/t Au

and 18.1 Mt of Inferred Mineral Resources at an average grade of 0.30 g/t Au. No Measured

Mineral Resources are reported.

· Validation

and reconciliation reviews demonstrate that the Marigold resource model provides reasonable

predictions of grade and tonnage and is appropriate for mine planning and Mineral Reserve

conversion activities.

1-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· The

SLR QP considers the geological interpretation, estimation methodology, classification criteria,

and validation results to appropriately support the reported Marigold Mineral Resources.

Buffalo Valley

· Mineral

Resources were constrained within optimized pit shells using lithology-specific cut-off grades

ranging from 0.10 g/t Au to 0.32 g/t Au and a gold price assumption of US$2,500/oz.

· Effective

May 1, 2026, the Buffalo Valley Mineral Resource estimate exclusive of Mineral Reserves comprises

approximately 5.6 Mt of Indicated Mineral Resources grading 0.53 g/t Au and 11.2 Mt of Inferred

Mineral Resources grading 0.31 g/t Au. No Measured Mineral Resources are reported.

· Metallurgical

testing confirms that gold recoveries vary by lithology and particle size and supports the

recovery assumptions used in the Mineral Resource estimate.

· The

SLR QP considers the Buffalo Valley geological model, estimation methodology, resource classification

criteria, and metallurgical assumptions to be appropriate for the style of mineralization

and sufficient to support the reported Mineral Resources.

1.1.1.2 Mining

and Mineral Reserves

Marigold

· Marigold

anchors the Complex with 240.44 Mt of Probable Reserves grading 0.46 g/t Au, containing 3.52

Moz. Including stockpiles and leach pad inventory, the total Mineral Reserve estimate is

3.96 Moz. The updated $2,200/oz gold price assumption triggered a 73% increase in contained

gold compared to previous estimates.

· Mining

at Marigold is executed across 15.2 m benches (or 7.6 m for smaller shovels to control dilution)

using automated blasthole sampling, rigorous fire assay-to-cyanide-soluble regression, and

continuous radar slope monitoring. Individual pit stripping varies, averaging 7.4:1 in North

Mackay and 6.2:1 in New Millenium, supported by established geotechnical design criteria

and active dewatering in deeper cutbacks like Mackay and Red Dot Phase 3.

Buffalo Valley

· Buffalo

Valley contributes 45.33 Mt of Probable Reserves grading 0.46 g/t Au, containing 0.67 Moz

of gold. Its lower strip ratio of 3.9:1 helps temper the broader Complex's overall stripping

requirements.

· Located

approximately 15 miles from the main Marigold operation, Buffalo Valley operates as a standalone

satellite facility complete with its own dedicated heap leach facility and separate Overburden

Storage Area (OBSA).

· Mining

at Buffalo Valley is planned using the same bench heights as at the Marigold Mine (15.2 m)

to maintain operational consistency and equipment synergies, enabling the planned transfer

of hydraulic shovels and haul trucks between the two operations.

· Mining

operations at Buffalo Valley are currently unpermitted, with the schedule assuming permitting

activities will be successfully completed to support active production which begins in 2029

for a 5.3-year operational window that slots directly into the middle years of the active

mining timeline.

1-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· Structured

across three distinct geotechnical domains with inter-ramp angles ranging from 32° to

48° governed by structural bedding orientations, Buffalo Valley's operational success

is tightly bound to securing environmental permits ahead of 2029 and adapting proven grade

control and blasting methodologies to its unique sedimentary and dike-controlled lithology.

Integrated Operations

· Backed

by SSR’s extensive operational experience at the site, the Complex benefits from well-established

geotechnical parameters, active site-wide dewatering programs, and sufficient storage capacity

within the expanded OBSA to accommodate the higher LOM waste volumes.

· The

LOM plan targets an expanded average mining rate of 380,000 tpd (peaking at 505,000 tpd),

supporting 15 years of active mining followed by 5 years of processing the heap leach pad

inventory for a total 20-year LOM. During full production years, annual mine production averages

138.3 Mtpa (reaching 165.0 Mtpa over the first seven years), yielding a complex-wide LOM

strip ratio of 5.3:1 (waste-to-ore) over the 15-year active schedule (which includes the

partial start in 2026 and final wind-down in 2040).

· Sustaining

higher material movement and increased stripping requires a major capital fleet expansion,

including a LeTourneau L-1850 loader in 2026 as replacement, a Liebherr 9600-class shovel

in 2027, a second P&H 4100-sized shovel in Q1 2028, and scaling the 300 st haul truck

fleet with 19 additional units to reach a peak of 45 trucks. Rather than requiring an isolated

capital fleet, Buffalo Valley shares equipment synergy with Marigold, allowing two Komatsu

PC7000 hydraulic shovels and 8 to 10 haul trucks to transfer to Buffalo Valley in 2029 for

its duration before returning to Marigold.

· The

Complex operates with a total established workforce of 540 personnel, distributed across

Mine Operations (279), Mine Maintenance (119), Process & Laboratory (61), General &

Administration (51), and Technical Services (30). Success over the 20-year LOM relies on

maintaining disciplined short-term sequencing, executing the 2027–2028 equipment ramp-up

smoothly, successfully securing the Buffalo Valley permit ahead of 2029, and managing workforce

retention and skills training to support elevated material movement without compromising

mechanical availability or slope stability.

· The

LOM production schedule is reasonable and will be supported by robust short-term planning,

sequencing, and operational discipline to be successful.

· An

appropriate mining equipment fleet, maintenance facilities, and workforce are in place, with

various options for additions and replacements estimated to meet the LOM production schedule

requirements.

· The

SLR QP reviewed the assumptions, parameters, and methods used to prepare the Mineral Reserves

Statement and is of the opinion that the Mineral Reserves are estimated and prepared in accordance

with S-K 1300 standards.

1-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

1.1.1.3 Mineral

Processing

Marigold

· The

Marigold processing facilities comprise conventional run-of-mine (ROM) cyanide heap leaching,

CIC adsorption, electrowinning, and refining circuits (ADR) to produce a final precious metal

product. The heap leach pad was originally constructed in 1990 and with ongoing expansions

has operated very consistently throughout the years providing an excellent library of operating

data.

· The

mineralogy of the ore and deportment of the gold along fracture surfaces of the rock rather

than in the rock matrix, provides rapid access of leach solutions to the gold particles and

relatively fast gold extraction independent of rock size. The SLR QP agrees that the ore

is uniquely favorable to ROM heap leaching, which has been employed for the life of the mine.

· Gold

recovery is determined from both historical operating performance and from laboratory column

and bottle roll leach testing. Gold recovery is consistent and is predicted using a relationship

between fire assay and cyanide soluble gold analyses. It is the SLR QP’s opinion that

the Marigold operating practices are consistent with industry standards, and the ROM method

of operation and the methods of determining gold recovery and reagent consumptions are appropriate

for this deposit.

· Average

LOM Au recovery at Marigold is 74% based on production records. The ratio of cyanide soluble

gold to total gold (AuCN/AuFA) using the 2017 database of assay pairs (i.e., samples that

have been assayed using both fire assay and cyanide-soluble gold assay methods) was approximately

0.8 (80%). Using the ratio to determine the actual LOM recovery of 74% results in a factor

of 0.92.

· The

current model to predict Marigold heap leach recovery is Heap Leach Recovery = (AuCN/AuFA)

x 0.92.

· Cumulative

gold production from the Marigold leach pad (through April 2026) is equivalent to 72.7% recovery.

· Gold

recovery from future ore from Marigold, including stockpile and leach pad inventory, is estimated

to be 72.4%, based on a review of historical assay and recovery data, as well as metallurgical

test work on future ore.

· Test

work has been conducted on a variety of Marigold ore samples, including representative pit

samples taken by ore-control geologists, leach pad grab samples from mine production, and

various pit blasthole drill cuttings. Bottle roll test work has also been conducted on exploration

reverse circulation (RC) drill samples to determine expected gold recovery from deposits

that will be mined in the future.

· A

large number of column leach tests and bottle roll tests have been performed on the same

samples to determine the relationship between their results. Column leach test work continues;

however, bottle roll tests can be performed to generate metallurgical data in days rather

than the months that are required for column leach tests.

· Permeability

testing has been performed on ore samples with varying fines content. The testing simulated

compaction under multiple lifts of ore stacked up to 200 m; the current maximum height of

the heap leach pads above the liner elevation is 122 m. Overall, the tested blends demonstrated

relatively consistent permeability on increasing loads over 50 m and acceptable permeabilities

with material blended to a 40% fines to 60% durable ratio. Flow rates for the blends ranged

from 178 L/h/m2 to 284 L/h/m2 under no load. Under 122

m effective height loading, flow rates ranged from 34 L/h/m2 up to 188

L/h/m2. All tests resulted in low, but acceptable permeabilities.

1-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Buffalo Valley

· SSR

designed Buffalo Valley metallurgical testing programs in 2023, 2024, and 2025 to build on

historical information, including new test areas and testing specific lithologies without

blending. The 2024 and 2025 programs also targeted lower-grade composites. Finally, the 2025

program expanded lithologic targets to previously untested units at depth, including base

limestone and a new sulfidic lithology, VDFX.

· Buffalo

Valley mineralization shows a strong crush-size dependence. This dependence is likely due

to gold particles being encapsulated by skarns and other silicate minerals, which can only

be liberated by grinding. A portion of the gold deportment is also refractory to cyanide.

Scanning electron microscope (SEM) analysis shows that arsenopyrite can be a significant

host of submicron gold, even in samples with well-oxidized pyrite. In 200-mesh bottle roll

tests, almost all tests show more than 80% recovery of the contained gold, with only a few

sulfidic-refractory samples.

· The

laboratory test recoveries are scaled to the anticipated production size, either 38 mm

crushed or 304 mm ROM. Individual test recoveries are plotted to generate crush size versus

recovery curves for each lithology. The recoveries are then discounted by 4% to account for

heap leach inefficiency and other scale-up effects. The results are used to determine the

gold recovery for each material type for resource calculations.

1.1.1.4 Infrastructure

Marigold

· Marigold

is readily accessible via Interstate Highway 80 in northern Nevada and is approximately 5 km

south–south-west of Valmy in Humboldt County. The site access road supports two lanes

of traffic and consists of hard packed clay and gravel.

· The

infrastructure facilities at Marigold include ancillary buildings, offices and support buildings,

access roads into the plant site, power distribution, source of fresh water and water distribution,

fuel supply, storage and distribution, waste management and communications. The infrastructure

facilities are sufficient for supporting the current Marigold operations.

· The

power supply for Marigold is provided by NV Energy Inc. via a 120 kV transmission line

to site. Site power draw is 5 MW. After exiting the main substation, power is distributed

through a 25 kV distribution grid. Power supply is consistent and dependable and is

not a limiting factor for current operations.

· Marigold

has sufficient groundwater rights and water well capacity to support the ongoing process

operations. The water is primarily consumed by retention in the heap leach pad, evaporation,

processing operations and dust suppression.

· Marigold

has sufficient disposal capacity and non-consumptive water rights to manage dewatering flows

that are not consumed for operational needs. The water that is not consumed is returned to

the groundwater system through the rapid infiltration basins (RIBs) and considered non-consumptive

use.

1-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· It

is the SLR QP’s opinion that it is reasonable to rely on the information provided by

SSR as outlined above for use in the TRS because the Property has been in operation for a

number of years, and SSR employs professionals and other personnel with responsibility in

these areas that have a good understanding of the operating requirements for the Property.

Buffalo Valley

· The

initial site layout for Buffalo Valley was developed from the Newmont Plan of Operations

acquired as part of the purchase of the property.

· The

need for a connector road from Marigold to Buffalo Valley was confirmed and fully engineered

by WSP during the feasibility study completed by SSR Mining in 2026 (SSR 2026b, the Feasibility

Study).

· Given

the short initial mine life of Buffalo Valley, SSR decided to use the Marigold truck shop

rather than build a new truck shop at Buffalo Valley. No other maintenance facilities are

planned at Buffalo Valley.

· Currently,

the North Peak substation is fed from the existing Marigold Mine substation, which is supplied

by NV Energy. Buffalo Valley will need to construct approximately 14.5 km (9 mi) of

24.9 kV power line from the existing North Peak power line to service the Project site. Line

power will be stepped down to 4,160 V, 480 V, and 110 V as required with power primarily

distributed at 4,160 V or 480 V to motor control centers serving the respective process areas.

· Three

site-area transformers will be required at different locations throughout Buffalo Valley.

The anticipated transformer-connected loads are 6.53 MW, and the calculated demand loads

are 4.61 MW (including the crushing circuit and pit dewatering pumps).

· The

new overhead power line from North Peak to Buffalo Valley will be routed along the new Marigold/Buffalo

Valley connector road.

1.1.1.5 Environment

Marigold

· Specific

federal, state, and local (Humboldt County, Nevada) regulatory and permitting requirements

apply to Marigold, including the following:

o The

Plan of Operations (PoO) permitted via the United States (U.S.) Bureau of Land Management

(BLM)

o The

Water Pollution Control Permit (WPCP) issued by the Nevada Department of Environmental Protection

(NDEP)

o The

temporary discharge permit allowing for the discharge of dewatering water to rapid infiltration

basins (RIBs) issued by NDEP

o The

reclamation permit issued by the Nevada Bureau of Mining Regulation and Reclamation (BMRR)

1-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· MMC

currently holds and is in compliance with active, valid permits for all current facets of

the Marigold mining operation.

· At

present, there are no known environmental issues that impact the ability to extract Mineral

Resources at the Property.

· All

activities associated with Marigold require an approved reclamation plan that includes a

Reclamation Cost Estimate (RCE) for all permitted facilities and activities. This was updated

and approved by federal and state agencies in 2026.

· MMC

is actively engaged with the local communities and stakeholders and there are no outstanding

negotiations or social commitments for the operation of the Marigold mine.

· The

SLR QP’s opinion is that it is reasonable to rely on the information provided by SSR

as outlined above for use in the TRS because significant environmental and social analyses

have been conducted for the Property over an extended period, the Property has been in operation

for a number of years, and SSR employs professionals and other personnel with responsibility

in these areas that have a good understanding of the permitting, regulatory, and environmental

requirements for the Property.

Buffalo Valley

· Specific

federal, state, and local (Humboldt County and Lander County, Nevada) regulatory and permitting

requirements apply to Buffalo Valley, including the following:

o The

exploration PoO permitted via the U.S. BLM (active)

o PoO

for the Buffalo Valley mining operation permitted via the BLM (required)

o The

WPCP issued by the NDEP (required)

o The

temporary discharge permit allowing for the discharge of dewatering water to RIBs issued

by NDEP (required)

o The

reclamation permit issued by the BMRR (required)

· MMC

currently holds and is in compliance with active, valid permits for all current facets of

the exploration operation.

· At

present, there are no known environmental issues that impact the ability to extract Mineral

Resources at the Property.

· Exploration

activities associated with Buffalo Valley require an approved reclamation plan, including

a Reclamation Cost Estimate (RCE) for all permitted facilities and activities. This was updated

and approved by federal and state agencies in 2026.

· The

Buffalo Valley mining operation will require an RCE prior to commencing mining

· MMC

is actively engaged with the local communities and stakeholders and there are no outstanding

negotiations or social commitments for the operation of the mine.

· The

SLR QP’s opinion is that it is reasonable to rely on the information provided by SSR

as outlined above for use in the TRS because significant environmental and social analyses

have been conducted for the Property over an extended period, the Property has been in operation

for a number of years, and SSR employs professionals and other personnel with responsibility

in these areas that have a good understanding of the permitting, regulatory, and environmental

requirements for the Property.

1-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

1.1.1.6 Capital

and Operating Costs

· SSR’s

forecasted capital and operating costs estimates related to the development of Mineral Reserves

are derived from annual budgets and historical actuals over the long life of the current

operation. These estimates were classified by SSR according to the American Association of

Cost Engineers (AACE) classifications as Class 1 with an accuracy range of -3% to -10% to

+3% to +15%.

· Future

growth capital costs are forecast to be $542 million, sustaining capital is forecast to be

$669 million, and reclamation costs are forecast to be $175 million for the life of mine,

for a total life of mine capital costs of $1,385 million.

· Construction

is ongoing for the growth capital projects, including the expansion of the mine fleet and

leach pads, and the development of Buffalo Valley. Costs prior to May 1, 2026, are considered

sunk.

1.1.2 Recommendations

SLR offers the following recommendations

by area.

1.1.2.1 Geology

and Mineral Resources

The SLR QP offers the following recommendations

regarding advancement of the Property and improvement of the Resource model.

1 SSR

has proposed a two-year exploration drilling (2027 and 2028) program with a total budget

of US$10,000,000 to advance development of exploration target areas in Marigold Mine and

Buffalo Valley. The objective of the exploration program will be to target potential gold-bearing

structures to expand the mineralization footprint and convert the current Resource to Reserve.

The SLR QP agrees with the objectives and overall scope of this exploration program.

2 Conduct

an additional infill drilling of 10,000 m drilling at MMC every year, where there are opportunities

to increase orebody knowledge and confidence of Mineral Resource estimates.

3 Continue

pit mapping and use the data to refine structural and redox models.

4 Continue

to carry out preg-rob/LECO assays along the oxide-sulfide boundaries.

1.1.2.2 Mining

and Mineral Reserves

1 Continuously

optimize haulage profiles and pit sequencing across the Complex, prioritizing lower-strip-ratio

phases and targeted interior pit options, to smooth annual ore production profiles, reduce

operational volatility, and mitigate reliance on excessive fleet expansion while providing

an operational buffer against potential permitting delays at Buffalo Valley.

2 Advance

dewatering, depressurization programs, and pore pressure monitoring ahead of active mining

fronts in deeper Marigold pits like Mackay and Red Dot Phase 3 to maintain required slope

stability factors of safety.

3 Advance

geotechnical studies, ongoing groundwater monitoring, and structural modeling at Buffalo

Valley, specifically addressing pitward-dipping bedding in domains 1 through 3 and high-plasticity

clay horizons in the overburden, to ensure stable slope performance.

1-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

4 Maintain

rigorous grade control procedures, blasthole sampling, and fire-assay-to-cyanide-soluble

regressions across active Marigold areas, while establishing equivalent protocols for Buffalo

Valley prior to production.

5 Execute

the planned 2026–2028 fleet expansion and capital additions on schedule (including

the LeTourneau L-1850 loader, Liebherr 9600 shovel, second P&H 4100 shovel, and additional

300 short ton (st) haul trucks) to support the increased LOM mining rate and inter-pit equipment

transfers.

6 Prioritize

equipment maintenance, asset reliability, and proactive workforce retention to manage heavy

utilization rates, aging baseline assets, and the dynamic rotation of the shovel and truck

fleet between Marigold and Buffalo Valley.

1.1.2.3 Mineral

Processing

1 Conduct

regular assessments of the AuCN/AuFA ratio using updated exploration and blast hole data.

2 Continue

to conduct column and bottle roll metallurgical testing on heap leach feed composites to

determine maximum possible gold recovery.

3 Conduct

metallurgical test work on any future ore sources to develop a geometallurgical model including

material properties and metallurgical parameters.

4 Complete

further studies and assessment of heap leach recoverable gold inventory.

5 Complete

targeted technical and metallurgical studies on durable ore materials to better understand

their physical characteristics and leach kinetics, ensuring stacking performance, solution

percolation, and gold recovery reconcile closely with production forecasts.

1.1.2.4 Infrastructure

1 Continue

to maintain the infrastructure facilities in good working order to ensure that critical services

such as power and water management, pumping and storage facilities are fully available for

potential upset conditions.

2 Ensure

the storage volume available in the process ponds is regularly evaluated and increased when

required to maintain regulatory compliance and manage risks associated with increasing water

inventory due to growth of the heap and barren solution pumping capacity.

3 Ensure

that consumptive water rights holdings are periodically re-evaluated relative to the potential

growth in site water demands.

4 Confirm

HLF configuration and remaining capacity, including reconciliation of the current HLF footprint,

stack geometry, ore inventory, approved development limits, and remaining stacking capacity

with the LOM plan, and documentation of the relationship between available HLF capacity and

the Mineral Reserve production schedule.

5 Review,

and update where appropriate, SSR's governance policies related to the HLF, including maintaining

appropriate Engineer of Record (EOR) oversight, defining site ownership and technical responsibilities,

implementing management of change (MOC) procedures, conducting periodic independent reviews,

and incorporating risk assessments into facility management and decision-making.

1-10

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6 Expand

the current Operation, Maintenance, and Surveillance (OMS) framework to include additional

HLF-specific requirements, including inspection and maintenance requirements, performance

monitoring, including continuous survey slope stability monitoring, record keeping, escalation

procedures, and development of risk-based Trigger Action Response Plans (TARPs) for key performance

indicators such as slope performance, seepage, drainage, pond freeboard, and extreme weather

events.

7 Develop

a Design Basis Report (DBR) document for the HLF, including consolidation of key design criteria,

design assumptions, liner configurations, stack geometry limitations, pond containment requirements,

and evaluation of the impacts of the current and planned HLF configuration on facility performance

(e.g., stability, drainage, seepage, solution management, and water balance).

8 Continue

to perform design verification and performance confirmation, including verification that

current operating conditions and ore characteristics remain consistent with the assumptions

used in the original design, and evaluating the implications of any material changes on HLF

performance.

9 Evaluate

options for additional heap leach facilities to allow further optimization of haulage networks.

10 Evaluate

water balance and capacity management, including maintaining a current site-wide HLF water

balance model that incorporates active and planned leach areas, solution inventories, pond

capacities, design storm events, evaporation, draindown, operational freeboard, and closure

assumptions. The model should support operating decisions, capacity evaluations, emergency

planning, and future expansion studies.

1.1.2.5 Environment

1 Progress

the environmental permitting process for Buffalo Valley to ensure approvals are secured ahead

of its scheduled 2029 operational entry, utilizing flexible Marigold internal sequencing

as a direct operational buffer against potential permitting delays.

1.1.2.6 Capital

and Operating Costs

SLR has no recommendations related to

capital and operating costs.

1.2 Economic

Analysis

An

after-tax Cash Flow Projection has been generated from the Life of Mine production schedule and capital and operating cost estimates

and is summarized in Table 1-1. A summary of the key criteria is provided below. The complete cash

flow is presented in Section 27.0 Appendix.

1.2.1 Economic

Criteria

1.2.1.1 Revenue

· Approximately

58,000 tonnes ore per day stacked (approximately 21 Mt per year) at an average stacked grade

of 0.44 g/t Au, for 4.26 Moz contained stacked.

· LOM

stacked ore recovery averages 72.0%, resulting in 3.06 Moz recoverable stacked during mining

(May 1, 2026, through 2040)

1-11

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· LOM

total of 3.34 Moz Au produced at an average of 196 koz per year during stacking. A total

of 392 koz Au are produced during the final five-year rinsing period after mining ceases.

Approximately 272 koz Au are recovered from work-in-progress inventory over the LOM.

· Metal

price: US$3,948 per ounce gold (LOM realized), US$3,710 per ounce gold long term price (2031+).

· Gold

at refinery 99.97% payable.

· Net

Smelter Return includes doré refining, transport, and insurance costs.

· Revenue

is recognized at the time of gold production.

1.2.1.2 Costs

· Mine

life: 20 years, including 2026 (fifteen years of mining and five years of heap leach pad

rinsing).

· Life

of Mine production plan is summarized in Table 13-6.

· LOM

growth capital totals $542.2 million.

· LOM

sustaining capital totals $668.6 million.

· Final

reclamation costs total $174.6 million.

· Average

operating cost, including royalties and offsite costs, over the mine life is $20.27 per tonne

stacked.

1.2.1.2.1 Taxation

and Royalties

Marigold is subject to Nevada Net Proceeds

of Minerals Tax, Nevada property and sales taxes, and U.S. federal income tax. The economic analysis calculates these taxes in accordance

with legislation enacted as of January 1, 2022. Property and sales taxes are accounted for in the operating costs of the mine.

Nevada Gross Proceeds Tax

In 2021, the State of Nevada enacted

Assembly Bill 495, effective July 1, 2021, which is an annual excise tax on gold and silver revenue. Under the bill, the tax rates vary

based on the taxpayer’s Nevada gross revenue. A 0.75% rate is imposed on Nevada gross revenue of more than $20 million but not

more than $150 million in a taxable year (defined as the calendar year). A rate of 1.10% applies to Nevada gross revenue exceeding $150

million in any tax year. The LOM average rate for Marigold Mining Complex during stacking is approximately 1.0% and averages $7.9 million

per year over the fifteen years of mine operation.

Nevada Net Proceeds Tax

The State of Nevada imposes a 5% net

proceeds tax on the value of all minerals extracted in the State. This tax is calculated and paid based on a prescribed net income formula

applied only to income and expenses from mining, disallowing deductions for exploration and related-party financing costs. This tax is

a deductible expense for U.S. federal income tax calculations and averages $17.8 million per year over the fifteen years of mine operation.

1-12

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

US Federal Income Tax

Federal income tax is determined under

regulations that came into effect on January 1, 2022. Under these regulations, which removed alternative minimum tax, the mine is subject

to a federal income tax rate of 21%. SLR utilized Unit of Production depreciation, depletion allowances, and Net Operating Losses (NOL)

as deductions. Total U.S. federal tax payable averages $23.1 million per year over the fifteen years of mine operation.

Royalties

Marigold is subject to a variety of

NSR royalty payments, payable to various parties under the terms of the leases, as described in Section 3. The annual average NSR royalty

payment is about 6.9% of gross revenue and averages $52.3 million per year over the fifteen years of mine operation. Net Smelter Return

(NSR) royalty payments for the Buffalo Valley deposit are fixed at 3.5% of the value of production net of off-site refining costs.

1.2.2 Cash

Flow Analysis

Considering

the Complex on a stand-alone basis, the undiscounted pre-tax cash flow totals $5,747 million over the mine life. The after-tax Net Present

Value (NPV) at a 5% discount rate (midpoint with May 1, 2026, as time zero) is $3,334 million, as shown in Table

1-1.

Table 1-1: After-Tax Cash Flow Summary

Description

LOM

Realized

Market Prices

Au

($/oz) – Average

$3,948

Payable

Metal

Au

(koz)

3,335

Cash

Flow Summary

US$

million

Total

Gross Revenue

13,166

Mining

and Maintenance Cost

(3,741)

Process

Cost

(804)

G

& A Cost

(451)

Refining/Freight

(5)

Mining

Royalties

(903)

NGPT1

(131)

Total

Operating Costs

(6,034)

Operating

Margin (EBITDA)

7,132

Cash

Taxes Payable

(834)

Working

Capital2

0

Operating

Cash Flow

6,298

Development

(Growth) Capital

(542)

1-13

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Description

LOM

Sustaining

Capital

(669)

Total

Closure/Reclamation Capital

(175)

Pre-tax

Free Cash Flow

5,747

Pre-tax

NPV @ 5%

3,878

After-tax

Free Cash Flow

4,913

After-tax

NPV @ 5%

3,334

Notes:

1.

Nevada Gross Proceeds Tax

2.

All working capital adjustments net to zero at end of mine life.

The World Gold Council Adjusted Operating

Cost (AOC) is $1,809/oz Au. The mine life capital unit cost, including sustaining and closure/reclamation, is $253/oz, for an All in

Sustaining Cost (AISC) of $2,062/oz Au. The average annual gold production during operation, excluding rinsing phase, is 196 koz per

year over the fifteen year mine life and 78 koz per year during the five-year rinsing phase.

1.2.3 Sensitivity

Analysis

Project risks can be identified in both

economic and non-economic terms. Key economic risks were examined by running cash flow sensitivities:

· Head

grade

· Metallurgical

recovery

· Gold

price

· Operating

costs

· Capital

costs

After-tax IRR sensitivity over the base

case has been calculated for -20% to +20% variations for head grade, recovery, and gold price and operating and capital costs. The Project

is most sensitive to changes in head grade, metallurgical recovery, and metal price (usually with same magnitude of impact) followed

by operating cost and finally capital costs.

Economics for the operating Marigold

gold mine complex are robust with respect to price, head grade, recovery, capital, and operating costs. The operations benefit from a

long history of experience with mining heap leach gold recovery operations, and higher gold prices than originally planned.

1.3 Technical

Summary

1.3.1 Property

Description

Marigold is located in southeastern

Humboldt County along the Interstate Highway 80 corridor in the northern foothills of the Battle Mountain Range, Nevada, U.S. Activities

at the Property are centered at approximately 40°45′ N Latitude and 117°8′ W Longitude.

1-14

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The Property is situated approximately

five kilometers south–southwest of the town of Valmy, Nevada, at Exit 216 off Interstate Highway 80. Other nearby municipalities

include Winnemucca and Battle Mountain, Nevada, which lie approximately 58 km to the northwest and 24 km to the southeast of the Property,

respectively.

1.3.2 Land

Tenure

The Marigold Complex includes two main

land packages, the Marigold Land Package and the Sterling Land Package, collectively, the Property or project areas.

The Marigold Land Package encompasses

approximately 10,440 hectares (ha), including the properties within the Marigold Mine Plan of Operations (PoO). The Sterling Land Package

(9,169 ha) includes properties associated with the Trenton Canyon Mine and Buffalo Valley Mine.

Land and mineral ownership within the

project areas are within the corridor initially governed by the Pacific Railroad Act of 1862, and, as such, these areas generally have

a “checkerboard” ownership pattern. Mineral claims in Nevada are managed federally by the BLM. SSR holds a 100% interest

in the Property through its wholly-owned subsidiary, MMC. Surface and mineral rights at the Property comprise the following: real property

owned by MMC; unpatented mining claims owned by MMC; and leasehold rights held by MMC with respect to unpatented mining claims, mill

site claims, and certain surface lands.

Some of the leases require MMC to make

certain net smelter return (NSR) royalty payments to the lessors and comply with other obligations, including completing certain work

commitments or paying taxes levied on the underlying properties. The NSR royalty payments are based on the specific gold-extraction areas

and are payable when the corresponding gold ounces are extracted, produced, and sold. The NSR royalty payments vary between 0% and 10.0%

of the value of gold production, net of off-site refining costs, which equates to an annual average ranging from 3.3% to 10.0% and a

weighted average of 6.9% over the life-of-mine (LOM).

1.3.3 History

The first recorded gold production from

the Property near Valmy, Nevada, occurred in 1938 when the Marigold Mining Company, owned by Frank Horton, operated an underground mine

which came to be known as Marigold. The Horton family processed approximately 9,000 t of ore averaging about 6.85 g/t Au before World

War II halted production. In 1943, Mr. Horton’s estate sold its interest in the Property and claims. Several unsuccessful attempts

were made to open and operate the mine before exploration activities began again in 1968.

From 1968 through 1985, several companies

conducted exploration programs in the Marigold area and completed a total of 126 exploratory drill holes. Records document the activities

of Homestake (1968), St. Joe (1979), Decker Exploration (1979), Placer Amex (1979–1980), True North, Marigold Development Company

(MDC) (1981–1983), Welcome North (1984), and Nevada North Resources (USA) Inc. (1985–1986). Other groups that conducted work

in the area include Newmont, Kerr-McGee, SFP Minerals Corporation, Cordex/Rayrock Mines, and Vek/Andrus Associates (partnership between

Vic Kral, Ralph Roberts, Bob Reeve, and Bill Andrus composed of Vek Associates and Andrus Resources Corporation).

The operating partner Cordex, an exploration

syndicate composed of Dome Exploration (U.S.) Ltd., Lacana Gold Inc. (Lacana) and Rayrock Mines, leased the Vek/Andrus Associates claim

block in September 1985 and began a drilling program in November 1985. Drill holes NM-3 and NM-4 intersected 21.3 m of 2.40 g/t Au and

25.9 m of 7.54 g/t Au, respectively. These were the discovery holes for the 8 South (8S) orebody.

1-15

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Following further drilling in the 8S

deposit in the spring of 1986, a joint venture was formed between SFP Minerals and the Cordex group, which consolidated some of the land

holdings over the Marigold area.

In late-1986, the Cordex group leased

other claims, including the historical Marigold mine, Mackay (Top Zone, East Hill, and Red Rock) area from various claim holders.

In March 1988, Rayrock Mines (operating

company for Cordex) made a production decision on the 8S deposit, and, by September 1988, it began stripping on the 8S pit (McGibbon,

2004).

In August 1989, the first gold doré

bar was poured at the Marigold mill.

In March 1992, Rayrock Mines purchased

a two-thirds ownership interest in the Property, and Homestake Mining Company (Homestake), which had taken Lacana’s interest through

previous corporate mergers, held the remaining one third ownership interest in the Property.

In 1994, mining of the 8S deposit was

completed, and the Marigold mill was no longer used to process ore. At this point, Marigold became a ROM heap leach operation.

In March 1999, Glamis Gold Ltd. (Glamis

Gold) purchased all the assets of Rayrock Mines, resulting in Glamis Gold holding a two thirds ownership interest in Marigold, and Homestake

continuing to hold a one third ownership interest. By January 2001, a total of one million ounces of gold had been recovered from the

Property.

In 2006, Glamis Gold merged with Goldcorp

Inc. (Goldcorp), resulting in a Goldcorp subsidiary holding a two-thirds ownership interest in Marigold and being the operator. Homestake,

which had been acquired by Barrick Gold Corporation (Barrick) in 2001, continued to hold the remaining one-third ownership interest.

In 2007, discovery holes were drilled in the Red Dot deposit.

By mid-2009, two million ounces of gold

had been recovered from Marigold.

On April 4, 2014, SSR (formerly Silver

Standard Resources Inc.) completed the acquisition of Marigold from subsidiaries of Goldcorp and Barrick.

In August 2015, Marigold mine acquired

2,844 ha of adjacent land from Newmont. This land included previously mined areas known as the Mud pit, NW pit, and the Valmy pits. Exploration

drilling in the area had been completed by a combination of companies including Hecla Mining Company (Hecla), SFP Minerals, and Newmont.

In June 2019, SSR acquired the Trenton

Canyon and Buffalo Valley properties from Newmont Goldcorp Corporation (Newmont). The Trenton Canyon target is located approximately

four kilometers south of New Millenium and the Buffalo Valley target is located approximately 10 km southwest of New Millenium. Both

properties are included in an 8,900 ha parcel that is contiguous to the south boundary of the Marigold property.

1.3.4 Geological

Setting, Mineralization, and Deposit

Marigold is located in the Battle Mountain

district of north-central Nevada within the Basin and Range physiographic province bounded by Sierra Nevada to the west and the Colorado

Plateau to the east. Paleozoic basement rocks of north-central to north-eastern Nevada generally comprise four distinct tectonostratigraphic

assemblages: the eastern carbonate assemblage; the slope or transitional assemblage; the western siliceous and volcanic assemblage; and

the overlap assemblage (Roberts, 1964). These rocks record a complex history of compressional and extensional tectonics and magmatism

affecting the western margin of North America from the early Paleozoic through present. The Battle Mountain district hosts numerous mineral

occurrences, including porphyry copper–gold, porphyry copper–molybdenum, skarn, placer gold, distal disseminated silver-gold,

and Carlin-type gold systems.

1-16

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The gold deposits at Marigold are best

characterized as Carlin-type deposits and cumulatively define a north-trending alignment of gold mineralized rock more than eight kilometers

long. Gold mineralizing fluids were primarily controlled by fault structure and lithology, with tertiary influence by fold geometry.

Within the Valmy Formation, higher gold grades are observed in the hinge zones of open folds that trend west-northwest and plunge gently.

When viewed down plunge, the undulation of these folds is mimicked by gold mineralized horizons. The deposition of gold was restricted

to fault zones and quartzite dominant horizons within the Valmy Formation and high permeability units within the Antler sequence.

The Buffalo Valley gold deposit is a

distal disseminated silver-gold deposit and formed along a southeast trending zone of felsic porphyry dikes and faults. Gold occurs in

arsenian iron sulfide overgrowths on pyrite in sheeted quartz+sericite+pyrite (QSP) veinlets within the central granodiorite and dacite

porphyry dikes, subparallel to dike margins in the country rock, and within faults (e.g., the Front fault). Outboard of the intrusions,

gold mineralization is stratiform in receptive horizons of Havallah sequence metasedimentary rocks.

Gold mineralization at Trenton Canyon

is best described as a Carlin-type deposit and primarily hosted in a network of transtensional faults locally intruded by Eocene dikes

and sills. Hydrothermal and/or phreatomagmatic breccias within these structures typically contain increased concentrations of gold. Gold

mineralization is well confined to structures, although a small (several meter) halo of lower grade, more disseminated mineralization

may be present. Quartz veining, illite, iron oxides, and iron hydroxides (goethite) are the primary indicators of gold mineralization

where oxidized.

1.3.5 Exploration

Since acquiring the Property in April

2014, SSR has conducted several surface exploration programs including soil sampling, geophysics, and in-fill/delineation drilling.

Reverse Circulation (RC) and Core (Diamond

Drilling-DD) drilling on the Property is the principal method of exploration and delineation of gold mineralization after initial targeting

using soil sampling and geophysical surveys. Drilling can generally be conducted year-round on the Property.

As of the effective date of this TRS,

SSR and its predecessor companies have completed over 2.6 million meters of drilling in approximately 13,000 drillholes across the Marigold,

Buffalo Valley, and Trenton Canyon areas.

Since 2022, exploration at the Property

has focused on the following:

· Exploration

drilling to expand Mineral Resources and Mineral Reserves through systematic step out drilling.

· Infill

drilling to increase the confidence of Mineral Resource estimates, specifically targeting

areas with widely spaced drilling (approximately 35m to 50 m) and around drill holes drilled

prior to 2006 with missing assays.

· Drilling

to confirm the final position of the pit highwall.

1-17

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· Defining

mineralization at Trenton Canyon and Buffalo Valley.

Since the last technical report (SLR

2024), 731 holes have been drilled (663 RC holes and 68 diamond core holes), totaling 157,220 m.

1.3.6 Mineral

Resource Estimates

Mineral

Resources have been classified in accordance with the definitions for Mineral Resources in S-K 1300. SLR has reviewed, audited, and accepted

the Mineral Resource estimates prepared by SSR and Red Pennant Geoscience Consulting (Red Pennant) for Marigold and Buffalo Valley, respectively.

The Mineral Resource estimates are based on block model values developed from assays on the mineralized properties. The Marigold Mine

and Buffalo Valley Mineral Resources as of May 1, 2026, are summarized in Table 1-2.

The Mineral Resource estimates were

completed using Seequent’s Leapfrog Geo (Leapfrog Geo) software for Marigold and Buffalo Valley.

Estimates were validated using standard

industry techniques, including statistical comparisons with composite samples and parallel inverse distance squared (ID2) and nearest

neighbor (NN) estimates, swath plots, and visual reviews in cross-section and plan. A visual review comparing blocks to drill holes was

completed after the block modeling work was performed to ensure general lithologic and analytical conformance and was peer reviewed prior

to finalization.

1-18

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 1-2: Summary of Marigold Mine

and Buffalo Valley Mineral Resources

Deposit

Measured

Mineral

Resources

Indicated

Mineral

Resources

Measured

+ Indicated

Mineral Resources

Inferred

Mineral Resources

Cut-off

Grade

(g/t Au)

Amount

(Mt)

Grade

(g/t Au)

Rec.

(%)

Amount

(Mt)

Grade

(g/t Au)

Rec.

(%)

Amount

(Mt)

Grade

(g/t Au)

Rec.

(%)

Amount

(Mt)

Grade

(g/t Au)

Rec.

(%)

Marigold

0.0

0.000

0.0

125.0

0.39

74.0%

125.0

0.39

74.0%

18.1

0.30

71.6%

0.069

Buffalo

Valley

0.0

0.000

0.0

5.6

0.53

59.1%

5.6

0.53

59.1%

11.2

0.31

64.4%

0.10

to 0.32

Total

0.0

0.000

0.0

130.6

0.40

73.3%

130.6

0.40

73.3%

29.3

0.31

68.8%

Notes:

1.

The Mineral Resource estimate was prepared in accordance with S-K 1300.

2.

The effective date of Mineral Resources at Marigold is May 1, 2026, and the effective date of Mineral

Resources at Buffalo Valley is May 1, 2026.

3.

Marigold Mine is based on an optimized pit shell at a cut-off grade of 0.069 g/t payable gold (gold

assay factored for recovery, royalty, and net  proceeds). Buffalo Valley is based on a cut-off grade of 0.10 g/t to 0.32 g/t contained

gold, depending on material type.

4.

Marigold metallurgical recoveries vary with gold grade. Buffalo Valley metallurgical recoveries

vary with gold grade and lithology.

5.

For Marigold, bulk densities (in t/m3) were assigned by lithologies: alluvium = 2.10,

Havallah = 2.48, Valmy/Antler = 2.4076+(0.0001*DEPTH), and Valmy = 2.64, below 533 m. For Buffalo Valley, bulk densities (in t/m3)

were assigned by lithology, ranging from a low of 2.095 (Overburden) to a high of 2.725 (Basalt).

6.

The Mineral Resources estimate is reported below the as-mined surface as of May 1, 2026, for Marigold,

and below the as-mined surface as of May 1, 2026, for Buffalo Valley.

7.

The point of reference for Mineral Resources is the entry to the carbon columns in the processing

facility.

8.

Mineral Resources are reported exclusive of Mineral Reserves.

9.

SSR has 100% ownership of the Marigold Complex.

10.

Gold grades are given in grams per metric tonne (g/t).

11.

Totals may vary due to rounding.

1-19

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

1.3.7 Mineral

Reserve Estimates

Mineral

Reserves in this TRS are derived from the current Mineral Resources. The Mineral Reserves are reported as contained gold and are based

on open pit mining from Marigold and Buffalo Valley Mines. The Proven and Probable Mineral Reserves for Marigold are estimated as of

May 1, 2026, and summarized in Table 1-3.

Table 1-3: Summary

of Marigold Mineral Reserves Estimate as of May 1, 2026

Proven

Probable

Total

Cut-off

Grade

(g/t)

Metallurgical

Recovery

(%)

Tonnage

(Mt)

Au

Grade

(g/t)

Tonnage

(Mt)

Au

Grade

(g/t)

Tonnage

(Mt)

Au

Grade

(g/t)

Contained

Gold

(Moz)

Marigold

-

-

240.44

0.46

240.44

0.46

3.52

0.069

73.5%

Buffalo

Valley

-

-

45.33

0.46

45.33

0.46

0.67

0.069˟

65.9%

Stockpile

-

-

11.96

0.17

11.96

0.17

0.06

0.069

56.3%

Leach

Pad Inventory

-

-

61.01

0.19

61.01

0.19

0.37

-

65.2%

Total

-

-

358.74

0.40

358.74

0.40

4.63

0.069

71.5%

Notes:

1.

The Mineral Reserve estimate was prepared in accordance with S-K 1300 definitions.

2.

The Marigold Mine Mineral Reserve estimate is based on a metal price assumption of $2,200/oz

gold and is reported at a cut-off grade of 0.069 g/t payable Au (Au assay factored for recovery, royalty, and net proceeds).

3.

˟The Buffalo Valley Mineral Reserve estimate assumes ROM heap leach processing and a gold

price of $2,200/oz. Cut-off grades range from 0.069 to 1.767 g/t payable Au, and metallurgical recoveries range from 3.1% to 79.2%,

both varying by lithology/metallurgical domain.

4.

No mining dilution is applied to the grade of the Mineral Reserves. Dilution intrinsic to the

Mineral Reserves estimate is considered sufficient to represent the mining selectivity considered.

5.

Bulk densities (in t/m3) were assigned by lithologies: alluvium = 2.10, Havallah

= 2.48, Valmy/Antler = 2.4076+(0.0001*DEPTH), and Valmy = 2.64. For Buffalo Valley, bulk densities (in t/m3) were assigned

by lithology ranging from a low of 2.426 (Overburden) to a high of 2.737 (Basalt) with a weighted average of 2.63.

6.

The Property is 100% owned by SSR through its subsidiary MMC.

7.

All ounces reported represent troy ounces, and g/t represents grams per metric tonne.

8.

The point of reference for Mineral Reserves is the entry to the carbon columns in the processing

facility.

9.

Totals may vary due to rounding.

SLR is not aware of any risk factors

associated with, or changes to, any aspects of the modifying factors such as mining, metallurgical, infrastructure, permitting, or other

relevant factors that could materially affect the Mineral Reserve estimate.

1.3.8 Mining

Methods

Marigold Mine is mined using conventional

surface mining methods. The Marigold Mine uses large 300 st mining trucks, and some areas of the pit require long hauls to the leach

pads. The surface operations include:

· Clearing

and grubbing

· Overburden

removal

· Drilling

and blasting

· Loading

and haulage

1-20

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The Mineral Reserve is based on the

ongoing annual average ore production from the Mackay (includes the Red Dot area), Valmy, DG80, North Mackay, and New Millenium areas,

as well as Buffalo Valley – a satellite pit with a planned commencement in 2029 -delivering an average of approximately 200 koz

recovered over the 15 years of active mining.

Mining and processing operations are

scheduled 24 hours per day, and the mine production is scheduled to directly feed the leach pads.

The current LOM plan for the Marigold

Mine and Buffalo Valley Mine provides 20 years of operational life, including 15 years of active mining followed by an additional five

years of processing the heap leach pad inventory. The average stripping ratio from the pits, excluding the stockpile ore, is 5.3 waste

units to 1 unit of ore (5.3:1 stripping ratio).

There are 33 mining pits/phases in the

four mining areas of the Marigold Mine with varying dimensions, with a maximum depth of approximately 460 m attained in the Red Dot pit

area. In addition, the Buffalo Valley area will comprise two additional phases for Buffalo Valley and Ore Hills.

Primary production for all mine pits

includes drilling 22.2 cm diameter blast holes. A production blast hole of 16.7 m depth is drilled. Burden and spacing vary depending

on the material being drilled. The holes are filled with explosives and blasted. A combination of hydraulic excavators and electric shovels

load the broken material into 300 st-payload mining trucks for transport from the pit to the overburden storage areas (OBSAs) and leach

pads.

The major pieces of pit equipment include

electric shovels, hydraulic excavators, front end loaders, haul trucks, drills, bulldozers, and graders. Extensive maintenance facilities

are available at the mine site to service mine equipment.

Marigold

headcount is 540 persons, which includes personnel in mine operations, mine maintenance, geology,

process and laboratory, and general and administration. For the 2027 to 2040 LOM period, the workforce is projected to increase to a

total of 686 personnel, comprising 578 employees and 109 contractors.

1.3.9 Processing

and Recovery Methods

Marigold

The Marigold processing facilities combine

industry standard ROM cyanide heap leaching, recovery of gold from the leach solution using carbon adsorption, desorption, electrowinning,

and refining circuits (ADR) to produce a final precious metal product.

The heap leach pad was originally constructed

in 1990 and has since expanded as required, with ongoing expansion of solution processing facilities to match production rate and leach

area. Approximately 427 hectares of heap leach pads are divided into 27 cells, along with six pregnant (gold-bearing) solution ponds

and two barren solution ponds. There are 17 cells currently active.

ROM ore is delivered from the mine at

a rate of approximately 20 Mt per year to the leach pad by mine haul trucks and stacked in 6 m to 12 m lifts.

Barren leach solution is pumped to the

leach pad by two independent barren solution distribution systems. Combined barren solution flow capacity from the two pumping systems

is 3,400 m3/h. In 2026, upgrades are underway to increase barren solution pumping capacity to 4,540 m3/h.

Drip tubing is used to distribute the barren solution from the main barren solution pipelines to each cell. Solution is applied to the

ore at a rate of 4.6 L/h/m2 to 8.6 L/h/m2 using drip emitters, impact sprinklers, wobblers, or drip

emitters are used to irrigate the side slopes of the heap.

1-21

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Pregnant solution from the leach pad

is collected in the pregnant solution ponds and pumped to the carbon-in-column (CIC) adsorption plant located on the north side of Barren

Pond No. 1 to recover the gold by adsorption. The carbon adsorption circuit consists of seven parallel carbon column trains, each with

five columns. Four new trains are being installed in 2026 to match the barren pumping upgrades currently underway.

Loaded carbon from carbon adsorption

is transported by a dedicated truck to the nearby carbon processing facility where gold is eluted (re-dissolved) from the carbon in two

2.7 t capacity carbon elution vessels. Gold is eluted from the carbon using the Pressure Zadra process where a hot caustic solution at

approximately 140°C is circulated under pressure through the elution column, from bottom to top. The resulting rich gold eluant flows

through two parallel 2.8 m3 electrowinning cells to recover the gold. The barren eluant discharging the electrowinning cells

is recirculated through heat exchangers to the bottom of the elution vessel to strip more gold. The process continues until the majority

of the gold is recovered from the carbon.

The stripped carbon is acid washed with

hydrochloric acid. The acidified carbon is then neutralized with water in the same column. The carbon is discharged from the column and

transferred to the reactivation kiln. The carbon is reactivated as required by heating in a rotary kiln at 750°C. The reactivated

carbon is quenched and screened before being returned to the carbon adsorption circuit to be reloaded with gold.

The plated material (sludge) resulting

from electrowinning is collected in a filter press and then retorted for drying and mercury removal. After retorting, the sludge is mixed

with flux and smelted in a propane fired furnace for final precious metal recovery.

Buffalo Valley

The design of the Buffalo Valley processing

facilities follows the same philosophy as is utilized at Marigold. A multi-cell heap leach pad, designed to accommodate the expected

mining rate up to 14 Mtpa, will be truck-stacked either with ROM or crushed ore in 7.5 m to 12.5 m lifts. Cyanide solution will be applied

to the surface at a nominal rate of 8 L/h/m2, which will percolate through the ore, dissolving precious metals, before being

collected in a drain network at the plastic liner.

Pregnant solution will flow by gravity

directly into a pregnant solution tank, then be pumped to three CIC carbon column trains for adsorption. It was determined that three

9,779 m3/h trains, with five 9,779 m3/h columns per train, provide the best balance of maintenance and production

flexibility.

Loaded carbon from the carbon adsorption

circuit will be transferred to a loaded carbon storage tank, which will then be pumped into a carbon transfer truck and transported to

the Marigold elution facility for acid washing, elution, and reactivation.

Barren carbon will be loaded into the

carbon transfer truck and returned to the Buffalo Valley process plant. Barren carbon will be pumped from the carbon transfer truck into

a barren carbon storage tank before being returned to the adsorption circuit.

Barren process solution will be pumped

to the irrigation system from a barren solution concrete vault using vertical turbine pumps.  After percolating through the ore,

the gold-bearing pregnant leach solution will drain by gravity to a pregnant solution tank, where it will be collected and pumped to

the carbon adsorption circuit for metal recovery.

1-22

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

1.3.10 Infrastructure

Marigold

Marigold is accessible via Interstate

Highway 80 in northern Nevada and is approximately 5 km south-southwest of Valmy in Humboldt County. The site access road supports

two lanes of traffic and consists of hard packed clay and gravel.

The infrastructure facilities at Marigold

include ancillary buildings, offices and support buildings, access roads into the plant site, power distribution, source of fresh water

and water distribution, fuel and reagents supply, storage and distribution, waste management and communications.

The power supply for Marigold is provided

by NV Energy Inc. via a 120 kV transmission line to site. Site power draw is 5 MW. After exiting the main substation, power

is distributed through a 25 kV distribution grid.

Water for Marigold is supplied from

three existing groundwater wells located near the access road to the Property and the site’s network of pit dewatering wells. Marigold

owns groundwater rights and collectively allows up to 3.134 million m3 of water consumption annually for site operations.

Total water consumption by the site has averaged 1.52 million m3 per annum, over the past five years. The water is primarily

consumed by retention in the heap leach pad, evaporation, processing operations and dust suppression.

The following buildings and facilities

are in the main plant and offices area:

· Truck

shop and mobile maintenance warehouse

· Carbon

elution and regeneration / refinery building

· Heap

leach carbon columns

· Wash

bay

· Administration

building and light vehicle (old) shop

· Assay

laboratory

· Metallurgical

laboratory

· Health

& Safety Building

· Radio

Shop

· Motor

control center (MCC)

· Solution

ponds

Additional buildings and facilities

on site include:

· Explosives

magazine

· Leach

pads and solution ponds

· Liquid

cyanide storage tank, truck receiving, and distribution

· Overburden

storage areas

· Operations

ponds (for supplying dust control and drilling)

1-23

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· Rapid

Infiltration Basins (RIBs)

· Site

access building

· Potable

water treatment building

· Process

line-out building

· Crusher

· Radio

shop

· Safety

building

· Hose

shop and storage

· Tire

pad

· Fuel

stations

· Welding

and fabrication shop

· Section

20 line-out building

· Dispatch/MineCare

office and Mine Operations building

· GPS

dispatch receiver

· Diesel

tanks and fueling station

Buffalo Valley

The initial site layout for Buffalo

Valley was developed from the Newmont Plan of Operations acquired as part of the purchase of the property. The need for a Marigold to

Buffalo Valley connector road was confirmed and fully engineered by WSP during the Feasibility Study (SSR 2026b).

SSR conducted trade-off studies to evaluate

site warehouse and haul truck maintenance shop locations. Given the short mine life of Buffalo Valley, SSR decided to use the Marigold

truck shop rather than build a new truck shop at Buffalo Valley. No other maintenance facilities are planned at Buffalo Valley.

Buffalo Valley will need to construct

approximately 14.5 km of 24.9 kV power line from the existing North Peak power line to service the Buffalo Valley site. Line power will

be stepped down to 4,160 V, 480 V, and 110 V as required with power primarily distributed at 4,160 V or 480 V to motor control centers

serving the respective process areas.

Currently, the North Peak substation

is fed from the existing Marigold mine substation, supplied by NV Energy. Three site-area transformers will be required at different

locations throughout Buffalo Valley. The anticipated transformer-connected loads are 6.53 MW, and the calculated demand loads are 4.61

MW (including the crushing circuit and pit dewatering pumps). The new overhead power line from North Peak to Buffalo Valley will be routed

along the new Marigold/Buffalo Valley connector road.

1.3.11 Market

Studies

The Marigold Mine produces gold and

silver contained in doré. Marigold is an active producer and has been for over three decades.

Gold is the principal commodity at the

Marigold Mine and is freely traded at prices that are widely known, so that prospects for sale of any production are virtually assured.

A gold price of $2,200/oz Au was used for estimation of Mineral Reserves and a long-term price of $3,948/oz Au was used for the economic

analysis.

1-24

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

1.3.12 Environmental

Studies, Permitting and Plans, Negotiations, or Agreements with Local Individuals or Groups

Specific federal, state, and local (Humboldt

County, Nevada) regulatory and permitting requirements apply to MMC, including the Plan of Operations (PoO) permitted via the United

States (U.S.) Bureau of Land Management (BLM); the Water Pollution Control Permit (WPCP) issued by the Nevada Department of Environmental

Protection (NDEP); the temporary discharge permit allowing for the discharge of dewatering water to rapid infiltration basins (RIBs)

issued by NDEP; and the reclamation permit issued by the Nevada Bureau of Mining Regulation and Reclamation (BMRR).

MMC currently holds active, valid permits

for all current facets of the mining operation. MMC is currently in compliance with all permits. At present, there are no known environmental

issues that impact the ability to extract Mineral Resources at the Property. All activities associated with MMC require an approved reclamation

plan that includes a Reclamation Cost Estimate (RCE) for all permitted facilities and activities. This was updated and approved by federal

and state agencies in 2026. MMC is actively engaged with the local communities and stakeholders and there are no outstanding negotiations

or social commitments for the operation of the mine.

1.3.13 Capital

and Operating Cost Estimates

SSR’s forecasted capital and operating

cost estimates related to the development of Mineral Reserves are derived from annual budgets and historical actuals over the life of

the current operation. According to the American Association of Cost Engineers (AACE) classifications, these estimates would be Class

1 with an accuracy range of -3% to -10% to +3% to +15%.

LOM

project capital costs, which considers all costs incurred before May 1, 2026, as sunk, are summarized in Table

1-4.

Table  1-4:

Capital Costs Summary

Capital

Costs

Total

($ million)

Growth

CAPEX

542.2

Subtotal

Growth CAPEX

542.2

Mining

Equipment Replacement

98.1

Equipment/Building

Maintenance

436.4

Administration

2.8

Processing/Lab

40.1

Permitting/Geotech

34.1

Exploration

57.2

Subtotal

Sustaining Capital

668.6

Reclamation

174.6

Total

Capital Costs

1,385.4

1-25

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The

LOM (from May 1, 2026) operating costs estimate is $16.78/t of stacked ore, as shown in Table 1-5.

Table 1-5: Operating

Costs Summary

Description

Total

LOM ($ million)*

$/t

stacked*

Mining

and Maintenance

3,741

12.57

(1.99/t moved)

Processing

804

2.70

Site

Support

451

1.51

Total

4,996

16.78

*From

May 1, 2026

1-26

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

2.0 Introduction

SLR International Corporation (SLR)

was retained by SSR Mining Inc. (SSR) to prepare an independent Technical Report Summary (TRS) on the Marigold Complex (Marigold or the

Property), located in Humboldt and Lander counties, Nevada, USA. The Marigold Complex includes the Marigold Mine (including Mackay, Valmy,

and New Millenium) and the Buffalo Valley and Trenton Canyon deposits. SSR holds a 100% interest in the Property through its wholly owned

subsidiary, Marigold Mining Company (MMC).

This TRS conforms to United States Securities

and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300

of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601 (b)(96) Technical Report Summary.

SSR has a diversified portfolio of operating,

development and exploration assets across the Americas, including four operating mines in the USA, Canada, and Argentina. SSR is listed

on the NASDAQ Global Select Market (NASDAQ:SSRM) and the Toronto Stock Exchange (TSX:SSRM).

SSR’s 100% owned Marigold Complex

is an open pit heap leach gold mine operation, which has been in production since 1989 and has produced over five million ounces of gold.

The operation consists of several open pits, overburden storage areas (OBSAs), leach pads, a carbon-in-column (CIC) adsorption facility,

and a carbon processing and gold refining facility.

2.1 Site

Visits

SLR qualified persons (QPs) visited

the site on June 10 to 12, 2026. During the site visit, the SLR QPs received a project overview by site management with specific activities

as follows:

The SLR geology QP toured operational

areas and project offices, inspected various parts of the property and infrastructure, inspected the core handling facility, reviewed

sampling procedures, and interviewed key personnel involved in the collection, interpretation, and processing of geological data and

in the preparation of the Mineral Resource estimates.

The SLR mining QP toured operational

areas and project offices, inspected various parts of the mining operations and infrastructure, and interviewed key personnel involved

in the operations and in the technical services involved in the preparation of the Mineral Reserve estimates and Life of Mine (LOM) plan.

On behalf of the SLR metallurgy QP,

a SLR Principal Metallurgist conducted a site visit of the operational areas and project offices. The site visit tour included the in-operation

heap leach pad, the inactive heap leach cells, the barren and pregnant solution ponds, the carbon-in-columns (CIC) system, and the acid

wash, elution, and regeneration plant. During the tour, the SLR Principal Metallurgist interviewed the operations superintendent, senior

metallurgist, and environmental manager. Based on these conversations, SLR understands that SSR is expanding CIC capacity by adding four

CIC trains and upgrading the barren solution booster pumping system, and that SSR is conducting some debottlenecking in the acid wash,

elution, and regeneration circuit by installing a separate scrubber in the gold room. More copper has recently been present in the doré.

The SLR Principal Metallurgist also met with the chief metallurgist to discuss future column test equipment, planned column testing,

and aspects of the heap leach recovery model.

2-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

2.2 Sources

of Information

During the preparation of this TRS,

discussions were held with personnel from SSR:

· Rex

Brommecker, SVP Exploration and Geology, SSR

· Jonathan

Holden, VP Innovation and Technical Services, SSR

· Matt

Taylor, VP Projects, SSR

· Christa

Zaharias, P.E., Study Director, SSR

· Karthik

Rathnam, Director Resource Geology, SSR

· Stacey

Leclerc, Principal Resource Geologist, SSR

· Brandon

Heser, P.E., Director, Mine Technical Services, SSR

· Ryan

Meany, Senior Mine Engineer, SSR

· David

Christianson, VP FP&A, SSR

· Daniel

Kern, Finance Director, SSR

· Nitin

Laddha, Finance, Manager, SSR

· Allen

Morris, Senior Director, Innovation and Mineral Processing, SSR

· James

Harrold, P.E., Principal Process Engineer, SSR

· Osman

Uludağ, Director Resource Development, SSR

· Jerry

Johnson, Technical Services Manager, SSR

· James

Madson, Superintendent Mine Engineering, SSR

· Jessie

Barto, Environmental Manager, SSR

· Chuck

Yarbrough, Study Manager, SSR

This report is an update of a Technical

Report Summary with a report date of February 12, 2024 (SLR 2024).

This TRS was prepared by SLR QPs. The

TRS is based on information and data supplied to the QPs by SSR and other parties where necessary. The documentation reviewed and other

sources of information are listed at the end of this TRS in Section 24.0 References.

2-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

2.3 List

of Abbreviations

Units of measurement used in this TRS

conform to the metric system or the US Common system. All currency in this TRS is US dollars (US$) unless otherwise noted.

μ

micron

kVA

kilovolt-amperes

μg

microgram

kW

kilowatt

a

annum

kWh

kilowatt-hour

A

ampere

L

liter

bbl

barrels

lb

pound

Btu

British

thermal units

L/s

liters per second

°C

degree

Celsius

L/h/m2

liters per hour per square

meter

C$

Canadian

dollars

m

meter

cal

calorie

M

mega (million); molar

cfm

cubic

feet per minute

m2

square meter

cm

centimeter

m3

cubic meter

cm2

square

centimeter

MASL

meters

above sea level

d

day

m3/h

cubic meters per hour

dia

diameter

mi

mile

dmt

dry

metric tonne

min

minute

dwt

dead-weight

ton

μm

micrometer

°F

degree

Fahrenheit

mm

millimeter

ft

foot

mph

miles per hour

ft2

square

foot

MVA

megavolt-amperes

ft3

cubic

foot

MW

Megawatt

ft/s

foot

per second

MWh

megawatt-hour

g

gram

oz

troy ounce (31.1035 g)

G

giga

(billion)

oz/st, opt

ounce per short ton

gal

US

gallon

ppb

part per billion

g/L

gram

per liter

ppm

part per million

gpm

US

gallons per minute

psia

pound per square inch absolute

g/t

gram

per tonne

psig

pound per square inch gauge

gr/ft3

grain

per cubic foot

RL

relative elevation

gr/m3

grain

per cubic meter

s

second

ha

hectare

st

short ton

hp

horsepower

stpa

short ton per year

h

hour

stpd

short ton per day

Hz

hertz

t

metric tonne

in.

inch

tpa

metric tonne per year

in2

square

inch

tpd

metric tonne per day

J

joule

US$

United States dollar

k

kilo

(thousand)

V

volt

kcal

kilocalorie

W

watt

kg

kilogram

wmt

wet metric tonne

km

kilometer

wt%

weight percent

km2

square

kilometer

yd3

cubic yard

km/h

kilometer

per hour

yr

year

kPa

kilopascal

2-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.0 Property

Description

3.1 Location

Marigold is located in southeastern

Humboldt County along the Interstate Highway 80 corridor in the northern foothills of the Battle Mountain Range, Nevada, U.S. Activities

at the Property are centered at approximately 40°45′ N Latitude and 117°8′ W Longitude.

The

Property (Figure 3-1) is situated approximately five kilometers south–southwest of the town

of Valmy, Nevada, at Exit 216 off Interstate Highway 80. Other nearby municipalities include Winnemucca and Battle Mountain, Nevada,

which lie approximately 58 km to the northwest and 24 km to the southeast of the Property, respectively.

3-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 3-1: Location

Map

3-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.2 Land

Tenure

SSR holds 100% interest in the Property

through its wholly owned subsidiary, Marigold Mining Company (MMC). Surface and mineral rights at the Property comprise real property

owned by MMC; unpatented mining claims owned by MMC; and leasehold rights held by MMC with respect to unpatented mining claims and mill

site claims and surface lands.

The

properties described herein are associated with one of two main land packages, the Marigold Land Package and the Sterling Land Package

(both also referred to as project areas) totalling approximately 19,609 ha (Table 3-1, Figure 3-2).

The Marigold Land Package (10,440 ha) includes the properties within the Marigold Mine PoO. The Sterling Land Package (9,169 ha) includes

properties associated with the Trenton Canyon Mine or Buffalo Valley Mine.

Table 3-1: List

of Land Package Areas (in hectares)

Property

Name

Total

(ha)

Public

(ha)

Private

(ha)

Sterling

Land Package Total

9,169

4,711

4,458

Buffalo

Valley Mine and Exploration

2,331

1,408

923

Trenton

Canyon Mine

1,756

696

1,060

Trenton

Canyon Exploration

1,424

778

646

Sterling

Boundary

3,658

1,829

1,829

Marigold

10,440

5,101

5,339

Total

Land Package (Sterling + Marigold)

19,609

9,812

9,797

Land and mineral ownership within the

PoO are within the corridor initially governed by the Railroad Act, and, as such, these areas generally have a “checkerboard”

ownership pattern. Mineral claims in Nevada are managed federally by the Bureau of Land Management (BLM).

3-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 3-2: Marigold

and Sterling Land Package Map

3-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.2.1 Owned

Real Property

Surface

lands at Marigold owned by MMC are listed in Table 3-2.

Table

3-2: MMC

Surface Lands

Parcel

Number

Hectares

Location

Ownership

Type

Project

Area

010-400-03

259.0

Section

03, T.31N, R.42E

Minerals

Only

Sterling

07-0491-14

194.3

Section

17, T.32N, R.43E

Fee

Simple

Sterling

07-0401-25

65.3

SE1/4

Section 22, T.34N, R.43E

Surface

Only

Marigold

07-0404-10,

07-0404-11, 007-0404-12, 07-0404-13 (Lot 8, Parcel 1-4), 07-0404-05 (Lot 11), 07-0404-06 (Lot 12), 07-0404-09 (Lot 15)

65.7

Section

33, T.34N, R.43E

Surface

Only

Marigold

07-0403-03

(Lot 3)

18.7

Section

33, T.34N, R.43E

Surface

Only

Marigold

07-0403-04

(Lot 4)

18.72

Section

33, T.34N, R.43E

Surface

Only

Marigold

07-0403-07,

07-0403-08, 07-0403-09, 07-0403-10

18.71

Section

33, T.34N, R.43E

Surface

Only

Marigold

07-0461-09

259.0

Section

9, T.33N, R.43E

Surface

Only

Marigold

07-0461-14

259.0

Section

17, T.33N, R.43E

Surface

Only

Marigold

07-0461-42

(Parcel A) and 07-0461-43 (Parcel B)

259.0

Section

21, T.33N, R.43E

Fee

Simple

Marigold

07-0461-44

(Parcel C) and 07-0461-45 (Parcel D)

259.0

Section

29, T.33N, R.43E

Fee

Simple

Marigold

07-0461-39

16.2

Section

16, T.33N, R.43E

Fee

Simple

Marigold

07-0461-41

32.4

Section

30, T.33N, R.43E

Fee

Simple

Marigold

07-0481-06

254.4

Section

1, T.32N, R.42E

Fee

Simple

Marigold

07-0481-11

259.0

Section

11, T.32N, R.42E

Fee

Simple

Sterling

07-0481-13

16.2

Section

12, T.32N, R.42E

Fee

Simple

Marigold

07-0481-17

194.3

Section

15, T.32N, R.42E

Fee

Simple

Sterling

07-0481-19

194.3

Section

13, T.32N, R.42E

Fee

Simple

Sterling

07-0491-02

64.8

Section

6, T.32N, R.43E

Fee

Simple

Marigold

07-0491-03

277.9

Section

5, T.32N, R.43E

Fee

Simple

Marigold

07-0491-07

259.0

Section

7, T.32N, R.43E

Fee

Simple

Sterling

07-0491-09

259.0

Section

9, T.32N, R.43E

Fee

Simple

Sterling

010-200-02

64.8

Section

15, T.32N, R.42E

Fee

Simple

Sterling

010-200-04

64.8

Section

13, T.32N, R.42E

Fee

Simple

Sterling

010-200-10

257.5

Section

25, T.32N, R.42E

Fee

Simple

Sterling

3-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Parcel

Number

Hectares

Location

Ownership

Type

Project

Area

010-200-12

145.7

Section

33, T.32N, R.42E

Fee

Simple

Sterling

010-210-02

64.8

Section

17, T.32N, R.43E

Fee

Simple

Sterling

010-210-06

259.0

Section

21, T.32N, R.43E

Fee

Simple

Sterling

010-210-12

259.0

Section

29, T.32N, R.43E

Fee

Simple

Sterling

010-230-01

8.1

Section

19, T.32N, R.43E

Fee

Simple

Sterling

010-230-03

210.1

Section

19, T.32N, R.43E

Fee

Simple

Sterling

3.2.2 Owned

Unpatented Mining Claims

MMC

owns a total of 347 unpatented mining claims within the Marigold project area, as shown in Table

3-3, and 499 unpatented mining claims within the Sterling (Trenton Canyon and Buffalo Valley) project area, as shown in Table 3-4.

All claims, which are renewed annually

in September of each year, are in good standing until September 1, 2027 (at which time they will be renewed for the following year as

a matter of course). All unpatented mining claims are subject to an annual federal mining claim maintenance fee of $200 per claim plus

approximately $12 per claim for county filing fees to the BLM.

Table 3-3: MMC-Owned

Unpatented Mining Claims within the Marigold Mine Project Area

BLM

Serial Numbers

Claims

Total

Number of Claims

NMC371561

to NMC371573

APRI

# 1 to APRI # 13

13

NMC519580

APRI

# 14

1

NMC552229

APRI

# 15

1

NMC361136

to NMC361161

VAL

#237 to VAL #262

26

NMC600391

to NMC600402

VAL

#1013 to VAL #1024

12

NMC371574

to NMC371609

TYLER

# 1 to TYLER # 36

36

NMC454876

to NMC454911

REMARY

#237 to REMARY #272

36

NMC552228

REMARY

FRACTION

1

NMC359040

to NMC359057

MARY

# 73 to MARY # 90

18

NMC400277

to NMC400288

HS

#123 to HS #134

12

NMC400289

HS

#134A

1

NMC358968

to NMC359003

MARY#

1 to MARY # 36

36

NMC371610

BONZ

# 1

1

NMC371612

BONZ

# 3

1

NMC371614

BONZ

# 5

1

NMC371616

BONZ

# 7

1

3-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

BLM

Serial Numbers

Claims

Total

Number of Claims

NMC371618

to NMC371627

BONZ

# 9 to BONZ # 18

10

NMC371630

to NMC371639

BONZ

# 21 to BONZ # 30

10

NMC451485

to NMC451488

BONZ

# 33 to BONZ # 36

4

NMC487422

REBONZ

# 2

1

NMC487423

REBONZ

# 4

1

NMC487424

REBONZ

# 6

1

NMC487425

REBONZ

# 8

1

NMC487426

to NMC487427

REBONZ

# 19 to REBONZ # 20

2

NMC487428

REBONZ

# 31

1

NMC524363

REBONZ

# 32

1

NMC1112641

to NMC1112686

GINGER

#1 to GINGER #46

46

NMC362237

to NMC362272

LCL

#1 to LCL #36

36

NMC684371

to NMC674382

EJM

#1 to EJM #12

12

NV106305030

to NV106305053

CB

1 to CB 24

24

Total

Number of Claims

347

Notes:

1.

Claims require an annual maintenance fee / renewal notification in September each year.

2.

All claims expire on August 31, 2027 at 11:59:59 A.M.

Table

3-4: MMC-Owned

Unpatented Mining Claims within the Sterling Project Area

BLM

Serial Numbers

(NMC prefix are Legacy Serial Numbers)

Claims

Total

Number of

Claims

NMC408889

to NMC408906

AP

# 1 to AP # 18

18

NMC408907

to NMC408924

AP

# 37 to AP # 54

18

NMC670367

to NMC670368

AP

#9A to AP #10A

2

NMC689220

and NMC689221

AP

1R and AP 3R

2

NMC632168

to NMC632170

AP

200 to AP 202

3

NMC632172

to NMC632173

AP

204 to AP 205

2

NMC689222

to NMC689224

AP

202R, AP 204R to AP 205R

3

NMC663238

AP

207

1

NMC454061

to NMC454096

APTC

# 1 to APTC # 36

36

NMC643209

to NMC643212

Barb

# 1 to Barb # 4

4

NMC1192488

to NMC1192495

BERNAL

1 to BERNAL 8

8

NMC933184

to NMC933201

Calf

1 to Calf 18

18

NMC952352

to NMC952369

CALF

19 to CALF 36

18

NMC639207

to NMC639265

CAPE

#1 to CAPE #59

59

3-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

BLM

Serial Numbers

(NMC prefix are Legacy Serial Numbers)

Claims

Total

Number of

Claims

MC639266

to NMC639268

CAPE

#78 to CAPE #80

3

NMC639271

to NMC639277

CAPE

#83 to CAPE #89

7

NV105732218

to NV105762251

CB

25 to CB 58

34

NMC976967

to NMC976968

FAIR

1 to FAIR 2

2

NMC728801

to NMC728812

FM

97 to FM 108

12

NMC398105

to NMC398112

FOR

# 1 to FOR # 8

8

NMC479569

to NMC479572

FOR

# 9 to FOR # 12

4

NMC663239

to NMC663245

FORTOO

1 to FORTOO 7

7

NMC663248

to NMC663253

FORTOO

10 to FORTOO 15

6

NMC672352

to NMC672353

FORTOO

NO 16 to FORTOO NO 17

2

NMC812860

to NMC812861

FORTOO

18 to FORTOO 19

2

NMC1192496

to NMC1192498

Hatcher

1 to Hatcher 3

3

NMC639282

to NMC639301

HGS

#37 to HGS #56

20

NMC639318

to NMC639320

HGS

#284 to HGS #286

3

NMC639321

to NMC639323

HGS

#288 to HGS #290

3

NMC639324

to NMC639326

HGS

#292 to HGS #294

3

NMC639327,

NMC415697, NMC415698

HGS

#296, HGS #305, HGS #306

3

NMC415702

to NMC415703

HGS

#310 to HGS #311

2

NMC479550,

NMC479551, NMC409749

Karen

# 1, Karen # 3, Karen # 4

3

NMC479552,

NMC409750, NMC479553

Karen

# 5, Karen # 6, Karen # 7

3

NMC409751,

NMC409752

Karen

# 8, Karen # 10

2

NMC1192499

to NMC1192516

KUHN

1 to KUHN 18

18

NMC639365

to NMC639382

MAG

#47 to MAG #64

18

NMC1001050

to NMC1001066

NP

1 to NP 17

17

NMC479554

to NMC409748

Peg

#1 to Peg #10

10

NMC918807

to NMC918826

PEG

1 to PEG 20

20

NMC541209

to NMC541255

PF

# 1 to PF # 47

47

NMC556959

to NMC556963

RCL

#173 to RCL #177

5

NMC1192517

to NMC1192518

TBJ

8A to TBJ 9A

2

NMC216402

to NMC216435

TCL

# 1 to TCL # 34

34

NMC639278

to NMC639281

WP

1 to WP 4

4

Total

Number of Claims

499

Notes:

1.

Claims require an annual maintenance fee / renewal notification in September each year.

2.

All claims expire on August 31, 2027 at 11:59:59 A.M.

3-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.2.3 Leasehold

Rights

MMC holds leasehold rights in each of

the following leases:

· Mineral

Lease Agreement made and entered into as of June 20, 1986, by and between Donald J. Decker

and Suzanne R. Decker, as lessors, Nevada North Resources (USA) Inc., as lessee, and Nevada

North Resources Inc. (as amended, the “Decker Lease”).

· Lease

Agreement made and entered into as of September 15, 1985, by and between Vek Associates,

as lessor, and Rayrock Mines, doing business as Cordex, as lessee (as amended, the “Vek

& Andrus Lease”).

· Lease

Agreement made and entered into as of August 1, 1988, by and between Euro-Nevada Mining Corp.,

Inc., as lessor, and Rayrock Mines, doing business as Cordex, as lessee (as amended, the

“Euro-Nevada Lease”).

· Lease

Agreement made and entered into as of August 1, 2018, by and between the Board of Regents

of the Nevada System of Higher Education on behalf of the University of Nevada, Reno, as

lessor, and Marigold Mining Company, as lessee (the “University of Nevada Lease”).

· Minerals

Lease dated and effective June 17, 1988, by and between SFP Minerals Corporation, as lessor,

and Santa Fe Pacific Mining, Inc., as lessee (the “SFP Lease”).

· Minerals

Lease dated and effective as of February 19, 1986, by and between Southern Pacific Land Company,

as lessor, and SFP Minerals Corporation, as lessee (the “Southern Pacific Land Company

Lease”).

· Minerals

Sublease dated and effective April 30, 1986, by and between SFP Minerals Corporation, as

sublessor, and Santa Fe Pacific Mining, Inc., as sublessee (as amended, the “Southern

Pacific Land Company Sublease” and, together with the Decker Lease, the Vek & Andrus

Lease, the Euro-Nevada Lease, the University of Nevada Lease, the SFP Lease and the Southern

Pacific Land Company Lease, collectively, the “Leases”).

· Minerals

Lease Agreement made and entered into as of June 5, 1987, by and between Donald J. Decker

and Suzanne R. Decker, as lessors, Nevada North Resources (USA) Inc. and Welcome North Mines

(U.S.) Inc., as lessees (the “Franco-Nevada Lease”).

· Minerals

Lease Agreement made and entered into as of December 20, 1994, by and between Nevada North

Resources (USA), Inc., as lessors, and Santa Fe Pacific Gold Corporation, as lessee (the

“Nevada North Lease”).

· Minerals

Lease Agreement made and entered into as of June 1, 2006, by and between Nevada North Resources

(USA), Inc., as lessor, and Newmont USA Limited, d/b/a Newmont Mining Corporation, as lessee

(as amended, the “New Nevada 2006 Lease”)

· Minerals

Lease Agreement made and entered into as of October 16, 2012, by and between New Nevada Resources,

LLC and New Nevada Lands, LLC, as lessors, and Newmont Mining Company, as lessee (the “New

Nevada 2012 Lease”).

· Minerals

Lease Agreement made and entered into as of December 3, 2014, by and between New Nevada Resources,

LLC and New Nevada Lands, LLC, as lessors, and Newmont Mining Company, as lessee (the “New

Nevada 2014 Lease”).

· Exploration

Lease & Option to Purchase Agreement made and entered into as of July 31, 2024, by and

between John Steen, as lessor, and Marigold Mining Company, a Nevada corporation, as lessee

(the “Hardrock Exploration 2024 Lease”).

3-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.2.3.1 Decker

Lease Claims

Pursuant

to the Decker Lease dated June 20, 1986, MMC has leasehold rights to 170 unpatented mining claims, as shown in Table

3-5. The initial term for the Decker Lease was through May 25, 1991, and thereafter, as long as operations continue.

Table

3-5: Decker

Lease Unpatented Mining Claims

BLM

Serial Numbers (1), (2), (3)

Claims

Total

Number of Claims

NMC48409

to NMC48412

RED

# 21 to RED #24

4

NMC48415

to NMC48426

RED

# 27 to RED # 38

12

NMC56187

to NMC56198

RED

# 39 to RED # 50

12

NMC56199

to NMC56216

RED

# 52 to RED # 69

18

NMC271665

to NMC271688

RED

#201 to RED #224

24

NMC271689

to NMC271716

RED

#601 to RED #628

28

NMC365642

to NMC365677

KIT

# 1 to KIT # 36

36

NMC678030

to NMC678047

RED

1801A to RED 1818A

18

NMC678055

to NMC678063

RED

1826A to RED 1834A

9

NMC552226

to NMC552227

RED

# 23A to RED # 24A

2

NMC871541

to NMC871547

NURED

1819 to NURED 1825

7

Total

Number of Claims

170

Notes:

1.

Claims require an annual maintenance fee / renewal notification in September each year.

2.

All claims expire on August 31, 2027 at 11:59:59 A.M.

3.2.3.2 Vek

& Andrus Lease Claims

Pursuant

to the Vek & Andrus Lease dated September 15, 1985, MMC has leasehold rights to 205 unpatented

mining and millsite claims, as shown in Table 3-6. The initial term for the Vek & Andrus Lease was through September 15, 1995, and

may be renewed for up to eight successive ten-year periods, upon giving the lessor prior written notice. The Vek & Andrus Lease was

renewed for its fifth successive ten-year period by providing prior written notice to the lessor on June 11, 2025.

Table 3-6: Vek

& Andrus Lease Unpatented Mining and Millsite Claims

BLM

Serial Numbers (1), (2), (3)

Claims

Total

Number of Claims

NMC271972

to NMC272007

COT

# 1 to COT # 36

36

NMC275733

COT

# 38

1

NMC275750

to NMC275753

COT

# 55 to COT # 58

4

NMC275755

COT

# 60

1

NMC275757

COT

# 62

1

NMC275759

to NMC275767

COT

# 64 to COT # 72

9

3-10

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

BLM

Serial Numbers (1), (2), (3)

Claims

Total

Number of Claims

NMC342068

to NMC342071

COT

# 73 to COT # 76

4

NMC297554

to NMC297571

VAL

# 1 to VAL # 18

18

NMC347463

to NMC347475

VAL

# 19 to VAL # 31

13

NMC297572

to NMC297607

VAL

# 37 to VAL # 72

36

NMC361164

to NMC361172

COT

FRAC # 1 to COT FRAC # 9

9

NMC371559

to NMC371560

COT

# 75A to COT # 76A

2

NMC822614

RECOT

37

1

NMC822615

to NMC822619

RECOT

39 to RECOT 43

5

NMC822620

RECOT

45

1

NMC822621

RECOT

47

1

NMC822622

to NMC822626

RECOT

50 to RECOT 54

5

NMC822627

RECOT

59

1

NMC822628

RECOT

61

1

NMC822629

RECOT

63

1

NMC822630

RECOT

63B

1

NMC822560

to NMC822613 (2)

GMMCMS

1 to GMMCMS 54

54

Total

Number of Claims

205

Notes:

1.

NMC822560 to NMC822613 are Mill Site Claims and require an annual maintenance fee / renewal

notification in September each year.

2.

Claims require an annual maintenance fee / renewal notification in September each year.

3.

All claims expire on August 31, 2027 at 11:59:59 A.M.

3.2.3.3 Euro-Nevada

Lease Claims

Pursuant

to the Euro-Nevada Lease dated August 1, 1988, MMC has leasehold rights to 36 unpatented mining

claims, as shown in Table 3-7. The original term for the Euro-Nevada Lease was five years, and, at the lessee’s option, the Euro-Nevada

Lease may be renewed for up to 10 additional and successive five-year periods, upon giving the lessor prior written notice. The Euro-Nevada

Lease was renewed for its eighth successive five-year period by providing prior written notice to the lessor on May 24, 2023.

Table

3-7: Euro-Nevada

Lease Unpatented Mining Claims

BLM

Serial Numbers (1), (2)

Claims

Total

Number

NMC373649

to NMC373684

SAR#

37 to SAR# 72

36

Total

Number of Claims

36

Notes:

1.

Claims require an annual maintenance fee / renewal notification in September each year.

2.

All claims expire on August 31, 2027 at 11:59:59 A.M.

3-11

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.2.3.4 University

of Nevada Lease Claims

Pursuant

to the University of Nevada Lease dated August 1, 2018, MMC has leasehold rights to property in

Section 19, T.33N., R.43E., Humboldt County, Nevada, identified as Humboldt County Assessor’s parcel number 007 461 19. The initial

term of the University of Nevada Lease is for twenty years, and the lessee may renew the lease for up to two successive ten-year periods

upon providing the lessor with prior written notice.

3.2.3.5 SFP

Lease Claims

Pursuant to the SFP Lease, MMC has leasehold

rights to property in Sections 5, 9, 17, and 31, T.33N., R.43E., Humboldt County, Nevada. The initial term of the SFP Lease was for 20

years or for so long, thereafter, as mining is conducted on a continuous basis.

3.2.3.6 Southern

Pacific Land Company Sublease Claims

Pursuant to the Southern Pacific Land

Company Sublease, MMC has leasehold rights to certain property in Sections 19 and 31, T.34N., R.43E.; Section 7, T.33N., R.43E.; and

Sections 1, 13, and 25, T.33N., R.42E., Humboldt County, Nevada. The initial term of the Southern Pacific Land Company Sublease was for

25 years beginning on April 30, 1986, and for so long, thereafter, as the lessee exercises any rights granted by such sublease.

3.2.3.7 Franco-Nevada

Lease Claims

Pursuant

to the Franco-Nevada Lease, MMC has leasehold rights to 82 unpatented mining claims, as set out in Table

3-8. The initial term for the Franco-Nevada Lease was from June 5, 1987, for a period of 50 years and for so long, thereafter, as the

lessee exercises any rights granted by such lease.

Table

3-8: Franco-Nevada

Lease Unpatented Mining Claims

BLM

Serial Numbers (1), (2)

Claims

Total

Number of Claims

NMC379514

to NMC379585

N-1

to N-72

72

NMC623992

to NMC623995

N-109

to N-112

4

NMC676435

N-20A

1

NMC676436

N-22A

1

NMC676437

to NMC676440

N-28A

to N-31A

4

Total

Number of Claims

82

Notes:

1.

Claims require an annual maintenance fee / renewal notification in September each year.

2.

All claims expire on August 31, 2027 at 11:59:59 A.M.

3-12

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.2.3.8 Nevada

North Lease

Pursuant

to the Nevada North Lease, MMC has leasehold rights to 48 unpatented mining claims, as set out in Table

3-9. The initial term for the Nevada North Lease was from December 20, 1994, for a period of 10 years and for so long, thereafter, as

long as the lessee exercises any rights granted by such lease.

Table

3-9: Nevada

North Lease Unpatented Mining Claims

BLM

Serial Numbers (1), (2)

Claims

Total

Number of Claims

NMC409224

to NMC409235

BC-1

to BC-12

12

NMC409236

to NMC409271

BC-13

to BC-48 (Sterling)

36

Total

Number of Claims

48

Notes:

1.

Claims require an annual maintenance fee / renewal notification in September each year.

2.

All claims expire on August 31, 2027 at 11:59:59 A.M.

3.2.3.9 New

Nevada 2006 Lease Claims

Pursuant

to the New Nevada 2006 Lease, MMC has leasehold rights to 112 unpatented mining claims in Sections 33, T.33N, R.43E, Humboldt County,

Nevada, as set out in Table 3-10. The initial term for the New Nevada 2006 Lease was from June 1,

2006, for a period of 20 years and for so long, thereafter, as long as the lessee exercises any rights granted by such lease.

Table

3-10: New

Nevada 2006 Unpatented Mining Claims

BLM

Serial Numbers (1), (2)

Claims

Total

Number of Claims

NMC750721

to NMC750736

CHU

17 to CHU 32

16

NMC752847

to NMC752882

MB

82 to MB 117

36

NMC780924

to 780959

LOU

1 to LOU 36

36

NMC821539

to NMC821562

BISON

# 1 to BISON # 24

24

Total

Number of Claims

112

Notes:

1.

Claims require an annual maintenance fee / renewal notification in September each year.

2.

All claims expire on August 31, 2027 at 11:59:59 A.M.

3.2.3.10 New

Nevada 2012 Lease

Pursuant to the New Nevada 2012 Lease,

MMC has leasehold rights to property in Sections 33, T.33N, R.43E, Humboldt County, Nevada. The initial term for the New Nevada 2012

Lease was from October 16, 2012, for a period of 20 years and for so long, thereafter, as long as the lessee exercises any rights granted

by such lease.

3.2.3.11 New

Nevada 2014 Lease

Pursuant to the New Nevada 2014 Lease,

MMC has leasehold rights to property in Section 5 T.31N., R.42E.; Sections 9, 21, 27, 29, 31, and a portion of Section 23 T.32N., R42E;

Sections 11, 23, and 35 T.33N, R.42E, Humboldt County, Nevada. The initial term for the New Nevada 2014 Lease was from December 3, 2014,

for a period of 20 years and for so long, thereafter, as long as the lessee exercises any rights granted by such lease.

3-13

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.2.3.1 Hardrock

Exploration 2024 Lease Claims

Pursuant

to the Hardrock Exploration 2024 Lease dated July 31, 2024, MMC has leasehold rights to 20 unpatented mining claims located in Sections

5 and 6, T.33N, R.43E; Sections 31 and 32, T.34N, R.43E, Humboldt County, Nevada, as set out in Table

3-11. The initial term is for a five-year period unless MMC exercises the option to purchase the claims before the end of the term.

Table 3-11: Hardrock

Exploration 2024 Lease Unpatented Mining Claims

BLM

Serial Numbers (1), (2)

Claims

Total

Number of Claims

NV101624003

HARDROCK

# 1A

1

NV101601034

HARD

ROCK # 2

1

NV101479290

HARD

ROCK # 3

1

NV101624004

to NV101624006

HARDROCK

#4A to HARDROCK #6A

3

NV101478479

HARDROCK

# 7

1

NV101608743

HARDROCK

# 8

1

NV101780647

HARDROCK

# 9

1

NV101497377

HARDROCK

# 10

1

NV101452764

HARDROCK

# 11

1

NV101493895

HARDROCK

# 12

1

NV101455533

HARDROCK

#13

1

NV101624007

to NV101624013

HARDROCK

#14 to HARDROCK #20

7

Total

Number of Claims

20

Notes:

1.

Claims require an annual maintenance fee / renewal notification in September each year.

2.

All claims expire on August 31, 2027 at 11:59:59 A.M.

3.3 Encumbrances

and Royalties

Some

of the leases require MMC to make certain net smelter return (NSR) royalty payments to the lessors and comply with certain other obligations,

including completing certain work commitments or paying taxes levied on the underlying properties. These NSR royalty payments are based

on the specific gold-extraction areas and are payable when the corresponding gold ounces are extracted, produced, and sold. The NSR royalty

payments vary between 0% and 10.0% of the value of gold production net of off-site refining costs, which equates to an annual average

ranging from 3.3% to 10.0% and a weighted average of 6.9% over the life-of-mine (LOM). Net Smelter

Return (NSR) royalty payments for the Buffalo Valley deposit are fixed at 3.5% of the value of production net of off-site refining costs.

3-14

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

3.4 Required

Permits and Status

Mining activities at Marigold are authorized

by and conducted under both federal and state regulatory requirements, notably the General Mining Law of 1872, the National Environmental

Policy Act of 1970, and the Federal Land Policy and Management Act of 1976. All requirements are administered by the BLM, along with

applicable statutes and regulations within the Nevada Revised Statutes and Nevada Administrative Code, administered by the Nevada Division

of Environmental Protection.

Further

discussion regarding the Property’s mineral and surface rights, including leasehold rights under the Leases, is provided in Section

3.2. Further discussion regarding permitting requirements with respect to the Property is provided

in Section 17.0. MMC holds active, valid permits for all facets of the current mining operation as required by county, state, and federal

regulations. MMC performs duties on leased lands pursuant to all federal and state requirements, and all the Leases are maintained in

good standing. As part of the Nevada permitting process, MMC engages in concurrent reclamation practices and is bonded for all permitted

features.

3.5 Other

Significant Factors and Risks

SLR

is not aware of any environmental liabilities on the property. SSR Mining Inc. has all required

permits to conduct the proposed work on the property. SLR is not aware of any other significant factors and risks that may affect access,

title, or the right or ability to perform the proposed work program on the property.

3-15

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

4.0 Accessibility,

Climate, Local Resources, Infrastructure and Physiography

4.1 Accessibility

Access to the Property is via a five

kilometer public road (hard-packed clay and gravel) off the Valmy exit (Exit 216) on Interstate Highway 80. The area around the Property

is a well-developed mining area close to necessary, all-season infrastructure and resources.

4.2 Climate

The climate is typical of the Great

Basin region of the western U.S., with temperatures ranging from highs of 40°C in summer to lows of -7°C in winter. Annual precipitation

is relatively low, ranging from 15 cm to 20 cm per year, with approximately 50% of precipitation occurring as snowfall during the months

of December through March.

The climate presents no restrictions

on the operating season, and Marigold operates year-round.

4.3 Local

Resources

The nearby towns of Winnemucca and Battle

Mountain host the majority of the skilled labor workforce. Contractor support, transportation, accommodation, meals, bulk fuel, heavy

equipment rental, and general suppliers are all readily available in these communities as well as in Elko, which is located approximately

142 km east of Marigold and serves as a major hub for mining operations in northern Nevada. Employees are transported to the Property

primarily by contract buses and light-duty vehicles owned by MMC.

4.4 Infrastructure

Marigold has been in continuous operation

since 1989. There is significant existing infrastructure on-site for delivering power and water to the various mine shops, leach pad,

and process and ancillary facilities. The Property is located in a favorable area for natural resource development with significant resources

in place to support the mining industry.

Water for Marigold is supplied from

three existing groundwater production wells located near the access road to the Property and dewatering wells located around the pits.

Marigold owns groundwater rights that collectively allow up to 3.134 million m3 of water consumption annually for site operations.

Total water consumption by the site has averaged 1.52 million m3 over the past five years. The water is primarily consumed

by retention in the heap leach pad, evaporation, processing operations, and dust suppression.

A portion of the site’s dewatering

flows is used for makeup water for process operations and dust suppression. A pipeline has been constructed to connect the dewatering

circuit to the process circuit so the dewatering water can be used as make-up supply water to the process. This connection minimizes

the need to supply makeup water to the process circuit from the three production wells, which will only be used for backup as needed.

A significant amount of the flow from

the dewatering wells is not consumed and is sent to the rapid infiltration basins (RIBs) for infiltration back into the aquifer.

Marigold also owns 0.893 Mm3

annually of surface water storage rights associated with the Trout Creek Dam (J-666). In addition, in October 2019, Marigold was issued

water right permits associated with the activities described in the Plan of Operations – Mackay Optimization Project Amendment,

including permits for the dewatering during mine operations and evaporative losses from a future pit lake that will develop in closure.

4-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The power supply for Marigold is provided

by NV Energy Inc. via a 120 kV transmission line to site. Site power draw is 5 MW. After exiting the main substation, power is distributed

through a 25 kV distribution grid.

The tailings storage facility (TSF)

has been decommissioned and reclaimed. The only remaining activity concerning the TSF is ongoing monitoring.

Details regarding completed, in progress,

and future OBSAs at Marigold can be found in Section 13. The leach pad is discussed in detail in Section 14. Further discussion on the

Property’s infrastructure is provided in Section 15.

4.5 Physiography

Elevations at Marigold range from approximately

1,372 meters above mean sea level (MASL) to 1,890 MASL. Terrain varies from a relatively flat alluvial plain to sloped foothills at the

base of the Battle Mountain Range. Vegetation mainly comprises sagebrush, rabbit brush, and a variety of grasses and forbs. Fauna is

not abundant on the Property primarily due to the lack of surface water and limited forage. No threatened or endangered plant or animal

species have been noted within the Property’s operating area.

4-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

5.0 History

5.1 Ownership,

Exploration, and Development History

The

first recorded gold production from the Property near Valmy, Nevada, occurred in 1938 when the Marigold Mining Company, owned by Frank

Horton, operated an underground mine which came to be known as Marigold. Figure 5-1 shows the Marigold

mine prior to World War II.

Figure 5-1: View

to the East–Southeast over the Cyanide Leach Tanks from the Marigold Mine prior to World War II

Source: SSR 2017

The Horton family processed approximately

9,000 t of ore averaging about 6.85 g/t Au before World War II halted production. In 1943, Mr. Horton’s estate sold its interest

in the Property and claims. Several unsuccessful attempts were made to open and operate the mine before exploration activities began

again in 1968.

From 1968 through 1985, several companies

conducted exploration programs in the Marigold area and completed a total of 126 exploratory drill holes. Records document the activities

of Homestake (1968), St. Joe (1979), Decker Exploration (1979), Placer Amex (1979–1980), True North, Marigold Development Company

(MDC) (1981–1983), Welcome North (1984), and Nevada North Resources (USA) Inc. (1985–1986). Other groups that conducted work

in the area include Newmont, Kerr-McGee, SFP Minerals Corporation, Cordex/Rayrock Mines, and Vek/Andrus Associates (partnership between

Vic Kral, Ralph Roberts, Bob Reeve, and Bill Andrus composed of Vek Associates and Andrus Resources Corporation).

From 1983 through 1984, MDC excavated

a small open pit over the historical Marigold underground workings, producing 2,812 t of ore containing 271 oz of gold (McGibbon 2004).

In 1985, Vek/Andrus Associates drilled

three holes under the supervision of Ralph Roberts in the Section 8 area of the Property, just northeast of the old underground mine.

Roberts invited Andy Wallace of Cordex to view the drilling results, and Wallace was encouraged by the deep level of oxidation, presence

of favorable rock units, anomalous indicator elements, and anomalous gold values. The operating partner Cordex, an exploration syndicate

composed of Dome Exploration (U.S.) Ltd., Lacana Gold Inc. (Lacana) and Rayrock Mines, leased the Vek/Andrus Associates claim block in

September 1985 and began a drilling program in November 1985. Drill holes NM-3 and NM-4 intersected 21.3 m of 2.40 g/t Au and 25.9 m

of 7.54 g/t Au, respectively. These were the discovery holes for the 8 South (8S) orebody (Roberts 2002).

5-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The Property is within the “checkerboard”

railway lands, where the U.S. Government originally awarded the surface, water, and mineral rights for alternate sections (2.5 km2

of land) to the Santa Fe Pacific Railroad as an incentive to develop the transcontinental railway project in the 1860s. Santa Fe Pacific

Railroad eventually became the parent company of SFP Minerals. Following further drilling in the 8S deposit in the spring of 1986, a

joint venture was formed between SFP Minerals and the Cordex group, which consolidated some of the land holdings over the Marigold area.

In late-1986, the Cordex group leased

other claims, including the historical Marigold mine, Mackay (Top Zone, East Hill, and Red Rock) area from various claim holders.

In March 1988, Rayrock Mines (operating

company for Cordex) made a production decision on the 8S deposit, and, by September 1988, it began stripping on the 8S pit (McGibbon

2004).

In August 1989, the first gold doré

bar was poured at the Marigold mill.

In March 1992, Rayrock Mines purchased

a two thirds ownership interest in the Property, and Homestake Mining Company (Homestake), which had taken Lacana’s interest through

previous corporate mergers, held the remaining one third ownership interest in the Property.

In 1994, mining of the 8S deposit was

completed, and the Marigold mill was no longer used to process ore. At this point, Marigold became a run-of-mine (ROM) heap leach operation.

In March 1999, Glamis Gold Ltd. (Glamis

Gold) purchased all the assets of Rayrock Mines, resulting in Glamis Gold holding a two thirds ownership interest in Marigold, and Homestake

continuing to hold a one third ownership interest. In the same year, the Basalt, Antler, and Target II deposits were discovered at the

south end of the Property in Section 31. These deposits were mined and partially backfilled with the unmined East Basalt deposit which

is currently under development as an easterly extension of the original Basalt pit.

By January 2001, a total of one million

ounces of gold had been recovered from the Property. In July 2001, Glamis Gold released a revised NI 43-101 Technical Report (Glamis

Gold 2001) to report the Mineral Resources and Mineral Reserves for Section 31 of the Property.

In 2006, Glamis Gold merged with Goldcorp

Inc. (Goldcorp), resulting in a Goldcorp subsidiary holding a two thirds ownership interest in Marigold and being the operator. Homestake,

which had been acquired by Barrick Gold Corporation (Barrick) in 2001, continued to hold the remaining one third ownership interest.

In 2007, discovery holes were drilled

in the Red Dot deposit.

By mid-2009, two million ounces of gold

had been recovered from Marigold.

On April 4, 2014, SSR (formerly Silver

Standard Resources Inc.) completed the acquisition of Marigold from subsidiaries of Goldcorp and Barrick, and prepared updated Mineral

Resources and Mineral Reserves estimates (Silver Standard 2014).

In August 2015, Marigold mine acquired

2,844 ha of adjacent land from Newmont. This land included previously mined areas known as the Mud pit, NW pit, and the Valmy pits. Exploration

drilling in the area had been completed by a combination of companies including Hecla Mining Company (Hecla), SFP Minerals, and Newmont.

5-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

In June 2019, SSR acquired the Trenton

Canyon and Buffalo Valley properties from Newmont Goldcorp Corporation (Newmont). The Trenton Canyon target is located approximately

four kilometers south of New Millenium, and the Buffalo Valley target is located approximately 10 km southwest of New Millenium.

Both properties are included in an 8,900 ha parcel that is contiguous to the south boundary of the Marigold property

A

summary of the historical exploration work carried out on the Property is shown in Table 5-1. Figure

5-2 presents the exploration targets and mining areas for the Property.

5-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 5-2: Location

of Marigold Exploration Targets and Mining Areas

5-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

5-1: Summary

of Historical Exploration

Year

Property

Company

Exploration

Type

Details

1968–1985

Marigold

Various

exploration and mining groups

Drilling

7,037.2 m

in 126 drill holes.

1985–1999

Marigold

Cordex

and Rayrock Mines

Drilling

335,500.7 m

in 2,358 drill holes.

Geophysics

1989

– CSAMT survey conducted by Quantec Geoscience using Zonge CSAMT System covering 33 EW and NW-SE lines, spaced 300.3 m and

499.9 m. A total of 59.2 km covered.

1997/1999

– CSAMT survey conducted by Zonge Geoscience using Zonge CSAMT System covering 33 EW and NW–SE lines, spaced 300.3 m

and 499.9 m. A total of 51.8 km covered.

1998

– Gravity survey conducted by Zonge Geoscience using Scintrex Gravity Meter, Trimble GPS System survey conducted on 150 m square

grid and data collected from a total of 1,252 stations.

1999

– Induced Polarization conducted by Zonge Geoscience using Zonge IP system, Dipole-Dipole Array, A = 182.9 m, one line N20W.

A total of 3.0 km covered.

1999–2006

Marigold

Glamis

Gold

Drilling

486,648.9

m in 2,506 drill holes.

Geophysics

2004

– Airborne Magnetic conducted by Pearson, deRidder & Johnson, Inc. using Ultra Light System / 75.0 m EW flight lines, 300.3

m NS tie lines. A total of 323.5 km covered.

5-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Year

Property

Company

Exploration

Type

Details

2006–2013

Marigold

Goldcorp

Drilling

528,225.7

m in 1,870 drill holes.

Geophysics

2009

– Magneto-telluric/Induced Polarization survey conducted by Quantec Geoscience, using Quantec Titan System. 11 lines in various

orientations. A total of 46.4 km covered.

2010

– Induced Polarization conducted by Zonge Geoscience using Zonge IP system, Dipole-Dipole Array, A= 150.0 m and 200.0 m, 27

lines EW, spaced 300.3 m –1,499.9 m. A total of 117.5 km covered.

2009–2010

– Review of all geophysical survey data and compilation of Marigold geophysical data by J L Wright Geophysics.

2006–2013

Marigold

Goldcorp

MMI

Survey

2007–2009

– Initial survey in 2007 covered Red Dot area, and, in 2008–2009, most of undisturbed land within Marigold was covered.

A total of 11,493 samples were taken. Samples collected every 15.2 m along 117 EW lines separated by 30.5 m. In 2007, samples were

analyzed for Ag, As, Au, Ba, Cd, Co, Cu, Pb, Pd, Sm, Y, Zn, and Zr. In 2008, Pd was dropped. In 2009, Co, Sm, Y, and Zr were dropped

and replaced with Mg, Sr, and Sb.

1985–2006

Valmy

property

Newmont

(including Hecla and SFP Minerals)

Drilling

109,363

m in 867 drill holes. Data was acquired from Newmont with the acquisition of the 2,844 ha Valmy property in 2015.

1980–2012

Buffalo

Valley and Trenton Canyon

Newmont

(including Fairmile, Hecla and others)

Drilling

1574

RC and Core drill holes for 183,079 m at Buffalo Valley

1,149 RC and Core drill holes for

153,701 m at Trenton Canyon.

1980–2012

Buffalo

Valley and Trenton Canyon

Newmont

(including Fairmile, Hecla and others)

Geophysics

Multiple

geophysical surveys were carried over Buffalo Valley and Trenton Canyon properties by 5 different contractors and Newmont; these

include – Airborne Electromagnetic Survey (AEM), Aero magnetic survey (AMAG), Airborne Radiometric Survey (ARAD), Controlled

Source Audio Magneto-telluric Survey (CSMAT), Gravity (GRAV).

5-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

5.2 Past

Production

5.2.1 Marigold

Gold

recovery at Marigold was initially done by a milling circuit with a carbon-in-leach (CIL) process and then a ROM heap leach process where

the ore was dumped on a lined leach pad and irrigated with a diluted cyanide solution. The tonnes, grade, and contained and recovered

ounces from the start of commercial production in August 1989 to April 1, 2014, is provided in Table

5-2; operations included both milled and leach pad processing. The tonnes, grade, and contained and recovered ounces from April 1, 2014,

when SSR acquired the Complex, to May 1, 2026, is provided in Table 5-3. Processing from April 1, 2014, to date is leach pad only.

The overall average recovery for the

milling circuit was 95%, and it was calculated at 70.6% for the ROM heap leach process for the period August 1989 to May 1, 2026.

Table 5-2: Marigold

Historical Production from August 1989 to April 1, 2014

Process

Type

Tonnes

(Mt)

Au

Grade

(g/t)

Contained

Gold

(koz)

Produced

Gold

(koz)

Leach

Pad

146.1

0.67

3,139

2,265

Milled

4.6

3.13

483

458

Total

150.7

0.75

3,622

2,723

Table 5-3: Marigold

Production from April 1, 2014 to March 31, 2026

Year

Tonnes

(Mt)

Au

Grade

(g/t)

Contained

Gold

(koz)

Gold

Produced

(koz)

2014

11.20

0.60

215

130

2015

20.61

0.44

294

207

2016

23.56

0.46

345

205

2017

25.59

0.35

285

202

2018

27.53

0.37

324

205

2019

25.68

0.40

327

220

2020

23.56

0.39

297

234

2021

20.00

0.41

263

235

2022

18.06

0.56

323

195

2023

21.85

0.45

316

278

2024

27.69

0.28

249

168

2025

19.32

0.39

242

154

2026

(Q1)

4.95

0.26

41

39

Total

269.60

0.41

3,521

2,472

5-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

5.2.2 Trenton

Canyon

The Trenton Canyon property operated

as an open pit ROM heap leach operation from 1996 to 2001 producing approximately 290,000 ounces of gold from the North Peak, West, and

South pits.

5.2.3 Buffalo

Valley

Mining and heap leaching was carried

out on the Buffalo Valley property from 1989 to 1991, producing approximately 50,000 ounces of gold.

5-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6.0 Geological

Setting, Mineralization, and Deposit

The following sections contained in

this TRS have been derived, and in some instances extracted, from documentation (OreWin 2022) and information supplied to SLR by SSR

for review and audit.

6.1 Regional

Geology

Marigold

is located in north-central Nevada within the Basin and Range physiographic province bounded by Sierra Nevada to the west and the Colorado

Plateau to the east (Figure 6-1).

Figure 6-1: Location

of the Marigold Mine in North-Central Nevada within the Basin and Range Physiographic Province

Source: Modified after Hamilton (1987)

Paleozoic basement rocks of north-central

to north-eastern Nevada generally comprise four distinct tectonostratigraphic assemblages: the eastern carbonate assemblage; the slope

or transitional assemblage; the western siliceous and volcanic assemblage; and the overlap assemblage (Roberts 1964).

6-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

In north-central Nevada, western assemblage

rocks are tectonically emplaced over slope and eastern assemblage rocks along the Roberts Mountain thrust, although the legitimacy of

the thrust is disputed (Ketner 2013). Uplift and erosion of the Antler highland in the Pennsylvanian shed clasts of western assemblage

rocks into a foreland basin, forming basal units of the Pennsylvanian-Permian overlap assemblage.

Marine sedimentary rocks and submarine

volcanic rocks accumulated in a basin west of the Antler orogenic belt from the Mississippian to the Permian. These rocks were transported

eastward and structurally emplaced on top of western assemblage and overlap assemblage rocks along the Golconda thrust during the Permo-Triassic

Sonoma orogeny (Roberts 1964). The mechanism for compression resulting in the Sonoma orogeny is controversial, and modern work by Ketner

(2008) has called into question the relationship between the Sonoma orogeny and the Golconda thrust.

Compression during the Jurassic and

Early Cretaceous resulted in subduction of oceanic plate material beneath continental crust of western North America, generating large

volumes of intermediate to felsic melts along a magmatic arc and emplacement of plutons into the Sierra Nevada batholith. Continued compression

resulted in accretion of oceanic arc terrane onto the continental margin, forming thrust belts and ophiolite sequences. Collectively,

these Andean and Cordilleran style compression events are known as the Nevadan orogeny. The Nevadan orogeny resulted in substantial back-arc

shortening and formation of the Luning-Fencemaker fold-thrust belt in Nevada (Wyld et al. 2003). A major mode of felsic plutonism also

occurred in Nevada during the late Jurassic (~155–160 Ma) (du Bray 2007).

Late Jurassic and Cretaceous compression

formed an extensive fold and thrust belt further east in Utah and Wyoming during the Sevier orogeny. Flat-slab subduction of the Farallon

plate underneath North America from the late Cretaceous to Eocene resulted in thick-skinned deformation and uplift of the Rocky Mountains

from New Mexico to British Columbia during the Laramide orogeny. The second major mode of felsic plutonism occurred in Nevada during

this time (~90–95 Ma) (du Bray 2007), associated with porphyry-style base metal mineralization events.

As the Laramide orogeny waned into the

Eocene, there was a major transition from compressional to extensional tectonic regimes in Nevada. Extensional tectonic stresses resulted

in the development of basin and range physiography seen throughout central Nevada. The landform is characterized by a series of horsts

and grabens that created narrow north–north-east oriented ranges separated by flat bottomed valleys. Extension and resultant crustal

thinning are associated with the third major magmatic pulse in Nevada, during which time several porphyry copper–gold systems developed.

In addition, the famous Carlin-type gold deposits (CTGD) of northern Nevada are thought to have formed during this time (~36–42

Ma) (Cline et al. 2005).

Magmatism of andesitic to rhyolitic

affinity dominated from the Late Eocene to Early Miocene with the production of voluminous ash flowsheets, plutons, hypabyssal intrusives

and calderas. Volcanic arc-related andesitic igneous activity continued in western Nevada from early to late Miocene. Further east in

central and eastern Nevada, rift-related bimodal rhyolite and tholeiitic basalt were emplaced in the mid-Miocene and are related to epithermal

silver–gold deposits in the region.

6-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6.2 Local

Geology

The

Property is in the Battle Mountain mining district on the northern end of the Battle Mountain-Eureka trend, a conspicuous lineament of

sedimentary-hosted gold deposits (Figure 6-2). The Battle Mountain district hosts numerous mineral

occurrences, including porphyry copper–gold, porphyry copper–molybdenum (Cu-Mo), skarn, placer gold, distal disseminated

silver-gold, and Carlin-type gold systems.

6-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-2: Location

of Marigold and the Battle Mountain Mining District on the Battle Mountain-Eureka Mineral

Trend

6-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6.2.1.1 Stratigraphy

The Battle Mountain mining district

is underlain by Paleozoic metasedimentary and metavolcanic rocks that are cut by Jurassic, Cretaceous, and Eocene intrusions. Post-mineralization

tuff, volcanic rock, and detritus were deposited and preserved in structural and paleotopographic lows. The oldest rocks in the Battle

Mountain mining district are para-autochthonous Cambro-Ordovician carbonate, clastic, and volcanic rocks in the footwall of the Roberts

Mountain allochthon; these are assigned to the Comus-Preble Formation (Cook 2015). The Comus-Preble Formation comprises fine-grained

siliciclastic turbidite sequences, mudstone, siltstone, limey mudstone, limestone, debris flows, and mafic volcanic flows.

Rocks of the Roberts Mountain allochthon

were thrust eastward during the Devonian-Mississippian Antler orogeny. This event resulted in intense deformation, including folding

and intra-formational thrusting of the metasedimentary units that comprise the Roberts Mountain allochthon. Rocks of the allochthonous

clastic assemblage in the Battle Mountain district were previously separated into the Cambrian Scott Canyon Formation, Cambrian Harmony

Formation, and the Ordovician Valmy Formation, complicating the understanding of Paleozoic tectonic processes affecting the district.

Recent work by Ketner (2008; 2013) proposed the abandonment of the Scott Canyon Formation and reassignment of these rocks to the Valmy

and Harmony Formations. Ketner (2008) demonstrated the Harmony Formation conformably overlies the Valmy Formation, eliminating the necessity

for the Dewitt thrust mapped by Roberts (1964) and Theodore (1991).

Unconformably overlying rocks of the

clastic assemblage is the autochthonous Antler overlap sequence: a Pennsylvanian-Permian package of conglomerate, limestone, siltstone,

and debris flow. Basal Antler sequence rocks were deposited as material eroded off the Antler highland into a foreland basin during the

Antler orogeny. The base of the Antler sequence, the Battle Formation, is a coarse conglomerate up to approximately 220 m thick

(Roberts 1964) that contains clasts derived from the Roberts Mountain allochthon and underlying para-autochthonous rocks. The Battle

Formation was deposited in a fluvial-to-shallow marine environment, with coarse, locally derived boulders at the base and interbedded

limestone and siltstone units toward the top.

Disconformably overlying the Battle

Formation is the Antler Peak Limestone Formation, a package of shallow marine carbonate rocks over 180 m thick at its type locality

(Roberts 1964). The Antler Peak Limestone Formation contains abundant brachiopod, coral, and crinoid fossils. The type of section for

the Antler Peak Limestone Formation is in the Battle Mountain Range at Antler Peak.

The Permian Edna Mountain Formation

disconformably overlies the Antler Peak Formation and consists of locally present basal debris flow and brown weathering phosphatic siltstone

(McGibbon, 2005) at least 120 m thick. Unoxidized Edna Mountain Formation is black in color and difficult to differentiate from

unoxidized siltstone of the Havallah sequence in drill cuttings and in the field.

Allochthonous rocks of the Mississippian-Permian

Havallah sequence were tectonically emplaced over rocks of the Antler sequence, Valmy Formation, and Preble-Comus Formation during the

Permo-Triassic Sonoma orogeny (Theodore 2000; McGibbon 2005). The Havallah sequence includes chert, siltstone, limestone, conglomerate,

sandstone, and submarine volcanic rocks. The total thickness of the sequence is thought to exceed 2.8 km (Roberts 1964).

6-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Igneous Rocks

The oldest igneous rocks in the district

are submarine pillow basalts within the Cambro-Ordovician Preble-Comus and Ordovician Valmy Formations.

Volcanic rocks within the Preble-Comus

are only known from drill core and consist of submarine pillow basalt and volcaniclastic units derived from a continental source. These

rocks are typically highly altered due to their age, submarine emplacement, present surface to near-surface position, and exposure to

hydrothermal systems.

Metabasalt belonging to the Valmy Formation

outcrops in the vicinity of Trout Creek south of the Oyarbide fault. On the east side of the district at Elder Creek, diorite dikes of

Devonian age are inferred based on cross-cutting relationships. Mesozoic igneous rocks include a relatively unaltered Jurassic lamprophyric

dike (Fithian 2015) and an abundance of north-west striking Cretaceous granodiorite and quartz monzonite porphyry dikes and stocks.

Late Cretaceous granodiorite and quartz

monzonite porphyry rocks are associated with molybdenum mineralizing systems at Buckingham, Trenton Canyon, and Buffalo Valley (Doebrich

and Theodore 1996).

Cenozoic igneous activity coincided

with the onset of extensional tectonism throughout the Basin and Range province and normal reactivation of north and north-west striking

faults in the Battle Mountain district (Doebrich and Theodore 1996).

Late Eocene to Early Oligocene granodiorite

to monzogranite intrusive stocks and dikes are associated with copper-gold mineralizing systems in the district, such as those at Converse

and Copper Canyon. Intrusive dikes and sills are typically low relief slope forming units with very little outcrop in part due to argillic

alteration where it has been exposed to hydrothermal fluids.

Tertiary volcanic rocks in the district

are post-mineralization. Oligocene to Miocene rhyolitic tuff and basaltic andesite flows are intercalated with Tertiary gravels and are

locally ridge-forming units. The youngest volcanic rock, Pliocene (2.8–3.3 Ma) basalt, is present south-east of Copper Canyon (Doebrich

and Theodore, 1996).

The

Project stratigraphy is illustrated in Figure 6-3.

6-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-3: Stratigraphic

Column for the Marigold Complex

6-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6.2.2 Structure

Geophysical and isotopic evidence indicate

that broad structural zones within the Battle Mountain-Eureka trend may be related to large-scale tectonic processes affecting the western

margin of North America from the late Proterozoic through Mesozoic (Grauch et al. 2003). These features may be associated with deep crustal

faults that originated as rift or transform faults during Proterozoic breakup of Rodinia, or as faults accommodating late Paleozoic compressional

tectonic events (Grauch et al. 2003). Within the Battle Mountain-Eureka trend, deep crustal normal faults with a north-west, north, and

north-east strike have influenced sedimentation, deformation, magmatism, extension, and mineralization (Grauch et al. 2003).

In the Battle Mountain mining district,

the most prominent surface fault expressions are thrust faults related to Paleozoic-Mesozoic compressional tectonism, and normal faults

related to Cenozoic extensional tectonic regimes. There is evidence of a more cryptic late Paleozoic transtensional fault system throughout

the district, which is potentially late to post-Antler orogeny. These structures do not display significant slip in post-Permian aged

rocks, and as a result are commonly concealed. Structures related to the transtensional fault system are responsible for preservation

of thick wedges of Antler sequence rocks.

The Permo-Triassic Golconda thrust fault

is traceable throughout the entire Battle Mountain range. Onset of the latest crustal extension began in the late Eocene and has continued

sporadically to present. The most prominent extensional faults in the district are the range-bounding normal faults that define the Battle

Mountain range, including the post-mineralization, south-west striking Oyarbide fault (Doebrich and Theodore 1996).

At least four generations of folding

are recorded in Ordovician rocks of the Roberts Mountain allochthon, including tight-to-isoclinal overturned F1 folds with north-west–south-east

fold axes, open and upright F2 folds with west–north-west fold axes, large-scale open and upright F4 folds with north–north-east

fold axes, and roll-over anticline style F5 folds that affect the entire rock package. Fold events F1 and F2 pre-date deposition of Antler

sequence rocks. The F3 fold event is restricted to the Havallah sequence. F4 folds are thought to be related to Mesozoic tectonics and

affect Comus-Preble Formation, Valmy Formation, Antler sequence, and Havallah sequence rocks, while F5 folds appear to affect the entire

rock package including Tertiary rocks.

6.3 Property

Geology

6.3.1 Marigold

6.3.1.1 Property

Stratigraphy

Sedimentary Rocks

Four

packages of Paleozoic sedimentary and metasedimentary rocks are present at Marigold. In ascending tectono-stratigraphic order, they include:

the Cambro-Ordovician Comus-Preble Formation; the Ordovician Valmy Formation of the Roberts Mountain allochthon; the Pennsylvanian-Permian

Antler overlap sequence; and the Mississippian-Permian Havallah sequence of the Golconda allochthon. The distribution of these Paleozoic

units is shown in plan view in Figure 6-4.

There are no Mesozoic sedimentary rocks

in the Marigold mine area; however, approximately two thirds of the Property is covered by Tertiary to Quaternary intercalated gravel

and volcanic material.

6-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Comus-Preble Formation

The assignment of rocks to the Comus-Preble

Formation at Marigold is the result of an extensive effort to explore the depths of the Marigold system. On the basis of lithology and

deformation style, rocks believed to be positioned below the Roberts Mountain Thrust were assigned to the Comus-Preble Formation.

The Comus-Preble Formation consists

of fine-grained siliciclastic turbidite sequences, mudstone, siltstone, limey mudstone, limestone, debris flows, and mafic volcanic flows.

Based on data compiled from downhole televiewer logs, abrupt lithologic change from overlying rocks correlates with a transition from

tight, east-vergent, overturned folds to open folds.

Valmy Formation

The Valmy Formation consists of quartzite,

argillite, and lesser chert and metabasalt, all of which are complexly folded and faulted in the Marigold mine area. The total thickness

of the Valmy Formation is approximately 450 m at Marigold, although true thickness of the section is likely less than 200 m.

Fold deformation in the Valmy Formation

is characterized by tight, east-vergent, and overturned folds. This fold deformation has resulted in shattering of quartzite beds and

ductile deformation of argillite. Where the contact is not eroded or structurally displaced, the top of the Valmy Formation is unconformably

overlain by rocks of Pennsylvanian age. Silurian and Devonian rocks are not present either due to nondeposition or erosion.

Antler Sequence

The Antler overlap sequence is composed

of Pennsylvanian to Permian-aged rocks assigned to three formations: the basal Battle Formation; the Antler Peak Limestone Formation;

and the Edna Mountain Formation. These Formations represent a transgressive sequence of fluvial-to-shallow marine rocks that include

conglomerate, sandstone, limestone, siltstone, and debris flows. There is evidence the Antler sequence was locally deposited into sub-basins

developed by normal offset on growth faults of likely Late Pennsylvanian to Early Permian age.

Antler sequence rocks are relatively

undeformed, except for offset and rotation along Basin and Range normal faults and potentially low-amplitude, long-wavelength (kilometers

to tens of kilometers) F4 folding likely related to Mesozoic deformation. The Antler sequence is in thrust contact with the overlying

and partially contemporaneous Havallah sequence.

Havallah Sequence

The uppermost package of Paleozoic rocks

exposed at Marigold is the Mississippian-Permian Havallah sequence. The Havallah sequence is an assemblage dominated by siltstone, metabasalt,

chert, sandstone, conglomerate, and carbonate rocks. These marine sedimentary rocks were deposited in a fault-bounded deep-water trough

(Ketner 2008) and subsequently obducted over the Antler sequence along the Golconda thrust (Roberts 1964). Fold deformation in the Havallah

sequence is highly variable, ranging from relatively undeformed to tight to isoclinal, overturned and recumbent F3 folds.

6-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-4: Plan

View Map Showing Distribution of Paleozoic Units at Marigold

6-10

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Igneous Rocks

A 2 m interval of an extremely biotite-rich

intrusive rock, interpreted to be lamprophyre, was intersected in a single drill hole approximately 1,100 m below the pre-mining

topography. Even though the rock is relatively unaltered, the lamprophyre is Jurassic in age (160.7 ± 0.1 Ma Ar-Ar of biotite)

(Fithian, 2018) and is age-equivalent to lamprophyre intrusions in northern Nevada.

A series of Late Cretaceous (~92.22

± 0.05 Ma to 97.63 ± 0.05 Ma, CA-TIMS of zircon) (Fithian, 2015) porphyritic quartz-monzonite dikes crosscut the Paleozoic

rock package at Marigold. The intrusions are up to tens of meters wide, and several can be traced along strike for hundreds of meters.

The dikes strike south-east to north–south and are typically steeply dipping. No alteration aureole related to these intrusive

rocks has been identified at Marigold (Fithian 2015). The dikes contain phenocrysts of plagioclase feldspar, biotite, hornblende, and

quartz. The mafic phenocrysts have all been altered to secondary mineral assemblages to varying degrees.

Oligocene (~31.8 ± 0.8, 31.4

± 1.0 Ma) (Theodore 2000) basaltic andesite is present on the Property, and forms a small, mesa-like landform between Trout and

Cottonwood Creeks. The basaltic andesite is crudely columnar in this location.

Late Oligocene to Early Miocene (22.9

± 0.7 Ma) (McKee 2000) post-mineralization rhyolite tuff is intercalated with gravel throughout the Property. The tuff contains

phenocrysts of biotite and is typically altered to white clay. The tuff provides a minimum age of mineralization at Marigold, as it is

unmineralized and immediately overlies the orebody at the 8S deposit (Theodore 2000; McGibbon and Wallace 2000).

6.3.1.2 Property

Structure

The

main structural corridor and apparent primary controlling feature for the localization of the deposits at Marigold is a 1.5 km wide

by >10 km long half graben rotated no more than 045° to the west and bound by east dipping early Permian growth faults and

younger (post-Triassic) east dipping faults. This half graben structure is cut by north-west to north-east striking pre-mineralization

structures with relatively minor offset and a series of south-west striking post-mineralization extensional normal faults parallel to

the Oyarbide fault (Figure 6-5).

Valmy Formation rocks are highly deformed,

with interpreted imbricate low-angle intra-plate thrust faults and at least two generations of pre-Pennsylvanian folding. The first generation

of deformation related to folding of the Valmy Formation, D1, is characterized by tight, east verging folds with approximately north-west–south-east

to north–south striking fold axes. The second deformation event, D2, is defined by open folds with approximately east–west

striking fold axes. Folds of this orientation are best defined on the southernmost part of the property, including the Basalt pit area.

Although D1 and D2 folds are described

individually because of their unique character, it is possible that these fold sets are the product of the same deformation event. The

areas of confluence of D1 and D2 folds are thought to have played a role in the localization of mineralizing fluids.

Argillite

beds within the Valmy Formation deformed plastically while brittle quartzite beds shattered, creating open fracture space amenable for

precipitation of auriferous iron sulfides. Antler sequence rocks are cut by, and rotated along, Early Permian and Cenozoic normal faults.

The timing of the proposed Early Permian growth faults is based on preservation of Battle Formation, Antler Limestone Formation, and

a thicker wedge of Edna Mountain Formation in the hanging wall of east dipping normal faults, with little-to-no appreciable offset of

the overlying Havallah sequence (Figure 6-6).

6-11

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-5: Top

Surface of the Valmy Formation with the Current Property Boundary

6-12

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-6: Cross

Section 11,200N Highlighting Inferred Permian Growth Fault and Associated Antithetic Normal

Faults with a Steep West Dip

6-13

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Rocks of the Antler sequence are deformed

by F4 and F5 folds, which are not easily recognized in the field. Despite the position between two inferred major allochthonous packages,

the Antler sequence does not display more-intense fold deformation akin to F1 and F2 folds.

Havallah sequence rocks were deformed

by thrusting and folding related to compression during the Permo-Triassic Sonoma orogeny. An extensive series of thrust faults and folds

are documented by Theodore (1991) in the Valmy and North Peak quadrangles west of the Marigold mine area.

Deformation of the Havallah sequence

is apparently unrelated to gold mineralization at Marigold. Development of basin and range normal faults and reactivation of Paleozoic

faults during the Cenozoic affected the entire stratigraphic section at Marigold, including displacement of post-mineralization Oligocene

tuff and Quaternary gravel.

6.3.1.3 Property

Mineralization

The

gold deposits at Marigold are considered Carlin-type and cumulatively define a north-trending alignment of gold mineralized rock more

than eight kilometers long (Figure 6-7).

Gold mineralizing fluids were primarily

controlled by fault structure and lithology, with tertiary influence by fold geometry. Within the Valmy Formation, higher gold grades

are observed in the hinge zones of open folds that trend west–north-west and plunge gently. When viewed down plunge, the undulation

of these folds is mimicked by gold mineralized horizons. The deposition of gold was restricted to fault zones and quartzite dominant

horizons within the Valmy Formation and high permeability units within the Antler sequence.

In unoxidized rocks, gold occurs in

arsenic-enriched overgrowths on pre-ore pyrite. Arsenopyrite is also present on pre-ore pyrite grains but is not auriferous. Geochemically,

the gold mineralization event is characterized by elevated arsenic, barium, antimony, and mercury, among others. Gangue minerals include

quartz, arsenopyrite, stibnite, calcite, clay, and barite. Hypogene sulfide minerals do not occur in ore as these gold-bearing phases

are not amenable to heap leaching.

In oxidized rocks, gold occurs natively

in fractures associated with iron oxide. Rocks within the Marigold mine area are oxidized to a maximum depth of approximately 450 m.

The redox boundary is not consistent throughout the property and is substantially influenced by lithology. Shale, argillite, and siltstone

units are frequently unoxidized adjacent to pervasively oxidized quartzite horizons.

A silver and base metal mineralizing

event at Marigold includes a mineral association of chalcopyrite, argentiferous tennantite, galena, and sphalerite. The absolute age

of this event is unclear, although it may be related to late Cretaceous magmatism in the district.

6-14

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-7: Plan

View of the Marigold Mine Area showing the Spatial Distribution of 1.0 g/t Au Grade Shells

Over an 8 km Northerly Trend

6-15

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6.3.1.4 Property

Alteration

Alteration of rocks includes silicification

along mineralizing structures and decalcification of carbonate horizons (primarily in the Antler sequence). Argillic alteration of quartz

monzonite intrusive bodies occurs in fault zones and areas of high hydrothermal fluid flow (Fithian 2015). The intensity of alteration

decreases towards the core of the intrusions.

Studies have demonstrated a spatial

correlation between gold mineralized rock and increased white mica crystallinity index (Kester 2015). There is evidence for large volumes

of quartz precipitation within and outboard of gold mineralized zones, including jasperoid bodies, cryptic silicification, and quartz

vein breccias.

6.3.2 Buffalo

Valley

The Buffalo Valley project is located

approximately 14 km southwest of the Mackay complex at Marigold and eight kilometers southwest of Trenton Canyon on the immediate western

flank of the Battle Mountains. Early works relating to deposit genesis have variably ascribed the Buffalo Valley gold system to distal

disseminated silver-gold, porphyry copper-molybdenum, and gold skarn deposit models. Recent work tends to favor the distal disseminated

silver-gold model as most of the gold mineralization is associated with quartz+sericite+pyrite (QSP) veins and veinlets that postdate

development of the various hornfels and skarn alteration assemblages. The Buffalo Valley deposit is hosted by Eocene felsic dikes and

metasedimentary rocks and basalt of the Mississippian-Permian Havallah sequence that are pervasively altered to skarn and hornfels in

the vicinity of the deposit area.

6.3.2.1 Property

Stratigraphy

Sedimentary Rocks

In

the Buffalo Valley mine area, there are three distinct metasedimentary units of the Havallah sequence (Figure

6-3). The three units are extensively metasomatically altered and metamorphosed proximal to felsic intrusive phases throughout the project

area. The protolith equivalents of the three units are as follows:

· The

lower unit consists of limestone, ribbon chert, and calcareous siltstone. This unit occurs

below the base of the historical open pit and does not crop out in the immediate mine area;

however, it is well documented by deeper drilling.

· The

middle unit consists of interbedded sandstone, siltstone, and chert and is colloquially referred

to as the “sandy” unit by the mine geology group.

· The

upper unit structurally overlies the middle unit and consists of interbedded chert, siltstone,

and limestone. In the mine area, the base of the upper unit is marked by pillow-textured

basalt that appears to be faulted out of the sequence at depth to the west of the mine. The

upper unit is thought to be tectonically thickened due to fold and thrust deformation.

Bedding

in the Buffalo Valley mine area generally dips to the southwest between 40° and 60°. Chemical,

textural, and mineralogical data support interpretation of multi-phase emplacement of felsic intrusions.

6-16

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Intrusive Rocks

Havallah sequence rocks were intruded

and altered by a swarm of northwest striking granodiorite and dacite porphyry dikes in the late Eocene to early Oligocene (Reid et al.

2010). Spatially related to the gold deposit is a porphyry dike system with two primary splays that strike southeast (approximately 140°)

and steeply dip to the southwest. The western dike is described by previous workers as fine-grained granodiorite porphyry while the eastern

dike is described as dacite porphyry. This dike system is continuous along strike for at least one kilometer, although the west dike

appears to coalesce with the east dike near the northwestern extent of the pit. Both east and west dike splays are disrupted by a dacite

porphyry plug south of the historical pit that is chemically similar to a dacite stock east of the pit. A quartz diorite stock and associated

dikes crop out west of the pit area. Small lamprophyre and pebble dikes are also documented by previous workers (Reid et al. 2010).

Volcanic Rocks

Beds

of Cenozoic airfall and ash-flow tuff are intercalated with alluvium and exposed on surface north of the historical pit. Cenozoic strata

are thickened in the immediate hanging wall of the range front fault that defines the western flank of the Battle Mountains and in the

structural block west of the deposit that is downdropped into the geographic Buffalo Valley on the Front fault. The base of the volcanic

tuff sequence is marked by a welded conglomerate that contains subrounded clasts of quartzite and chert (Figure

6-8).

6-17

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

6-8: Geologic

Map of the Buffalo Valley Mine Area

6-18

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6.3.2.2 Property

Structure

The most prominent fault set in the

Buffalo Valley project area are south striking structures that define the range bounding fault system. The structural block that hosts

the Buffalo Valley deposit is bound by the Range Front fault to the east and the moderately dipping (34 to 48 degrees) Front fault to

the west (Seedorff et al. 1991). Bedrock in this block is exposed at surface and may indicate increased transfer of slip to the Front

fault or other subsidiary faults in the vicinity of the deposit. The Front fault is mineralized but also offsets Quaternary alluvium,

constraining the minimum age of initiation to the early Oligocene and latest slip to the Quaternary. Dikes and hydrothermal fluids exploited

dilational SE-striking relay structures related to N-S oriented master fault structures (Rhys 2022; internal communication). This fault

zone is well characterized by a large aeromagnetic anomaly that can be traced for more than seven kilometers (Doebrich and Theodore 1996).

6.3.2.3 Property

Mineralization

The

Buffalo Valley gold deposit formed along a southeast trending zone of felsic porphyry dikes and faults. Gold occurs in arsenian iron

sulfide overgrowths on pyrite in sheeted QSP veinlets within the central granodiorite and dacite porphyry dikes, subparallel to dike

margins in the country rock, and within faults (e.g., the Front fault). Outboard of the intrusion’s gold mineralization is stratiform

in receptive horizons of Havallah sequence metasedimentary rocks (Figure 6-9). In general, gold

concentration decreases with increasing distance from the granodiorite and dacite porphyry dike system. Although most of the gold mineralization

at Buffalo Valley occurs in QSP veinlets that overprint skarn alteration assemblages, a lesser amount of gold is documented as native

grains within garnet and amphibole crystals associated with prograde skarn development (Reid et al. 2010). Minerals associated with gold

mineralization in oxidized zones include scorodite, manganese and iron oxides, calcite, and clay.

6-19

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-9: Schematic

Cross Section Buffalo Valley Deposit

6-20

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6.3.2.4 Property

Alteration

The alteration styles and assemblages

at Buffalo Valley are well documented by Reid et al., 2010 and is, in part, summarized here. The most intense alteration at Buffalo Valley

is focused on the SE-striking relay structures that, in part, controlled Eocene to Oligocene dike emplacement. Proximal to these structures’

limestone and other carbonate-bearing protoliths were altered to prograde exoskarn assemblages including Fe-rich pyroxene, Ca and Fe-rich

garnet, quartz, and calcite. Prograde endoskarn assemblages include Mg-rich pyroxene, actinolite, biotite, quartz, and chlorite. Sulfide

minerals associated with prograde skarn include chalcopyrite, pyrrhotite, sphalerite, galena, and pyrite. Retrograde skarns are manifested

in shallower levels of the deposit and are characterized by potassic alteration assemblages that include shreddy biotite and K-feldspar.

Sulfide minerals associated with retrograde skarn include pyrrhotite, pyrite, and chalcopyrite. A late QSP event overprints skarn and

hornfels and is associated with most of the gold mineralization. Oxidation is the last alteration event to affect the rock package, extending

from surface to depths of over 200 m proximal to the central Buffalo Valley fault system. Oxidation is a critically important process

for liberation of gold nanoparticles locked in arsenian iron sulfide phases.

6.3.3 Trenton

Canyon

The Trenton Canyon property is located

approximately 5 km south of the Marigold deposit and comprises an area of approximately 34 km2. Trenton Canyon is separated

from Marigold by the southwest-striking Oyarbide fault, a range-bounding fault on the northern flank of the Battle Mountains. Gold deposits

at Trenton Canyon are hosted by siliciclastic and carbonate rocks of Cambro-Ordovician and Pennsylvanian-Permian age proximal to potentially

genetically related Eocene felsic dikes. The gold deposits are on the margin of a calc-silicate and hornfels alteration aureole attributed

to emplacement of the Cretaceous Trenton Canyon stock, exposed on surface approximately one kilometer southwest of the historical South

pit.

6.3.3.1 Property

Stratigraphy

The

general lithotectonic stratigraphy of Paleozoic sedimentary rocks exposed at Trenton Canyon is reasonably well constrained (Figure

6-3) by decades of aggregate knowledge of the lithotectonic stratigraphy at the adjacent Marigold mine complex. The succession is underlain

by allochthonous to parautochthonous lower Paleozoic marine slope and basin lithofacies rocks provisionally assigned to the Valmy and

Comus Formations. These rocks are unconformably overlain by Pennsylvanian to Permian, non-marine to marine conglomerate of the Battle

Formation and limestone of the Antler Peak Limestone Formation, both of which belong to the Antler overlap sequence. These two lithotectonic

packages are structurally overridden by the Mississippian to Permian Havallah sequence, which includes submarine basalt, chert, argillite,

sandstone, siltstone, calcareous sandstone, gritstone, and conglomerate of the Golconda allochthon. The paucity of coherent intraformational

lithostratigraphy, due to fold and fault deformation as well as inferred localized deposition during sedimentation, inhibits intraformational

lithostratigraphic correlation on the property scale.

Early Paleozoic Rocks

Use of the term Comus Formation for

rocks at Trenton Canyon is provisional and serves as a placeholder assignment of Cambro-Ordovician rocks atypical of the Valmy Formation

in the district. The formation outcrops very poorly across the property and is best studied along road cuts and where it is present in

open pits. At Trenton Canyon, the Comus Formation is a sequence of siliciclastic and carbonate marine rocks and basalt deposited on the

slope and basal slope of the passive margin. These rocks formed distal to the Comus carbonate seamount to the north, but record influx

of carbonate detritus into the basin at least as far south as Trenton Canyon. The Comus and Valmy Formations are quasi-time equivalent

rock packages and are intercalated at the base of slope. In the district, the Comus Formation is distinguished from the Valmy Formation

by the presence of carbonate and preservation of higher energy features like debris flows, turbidites, slumps and large rip-up clasts.

6-21

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Sedimentary units of the Valmy Formation

are restricted to deep water chert, massive quartz arenite or quartzite, and argillite units that do not display sedimentary features

indicative of higher energy slope facies. The simplistic stratigraphy of the Valmy Formation is a basal massive quartzite that is devoid

of bedding and other sedimentary features. The quartzite unit is overlain by a highly contorted thin to medium bedded green to grey chert.

Above the chert unit is typically a massive pillow basalt unit. This unit is discontinuous across the property and is best observed on

Hollywood Ridge and the North Fork of Trout Creek at Trenton Canyon. The intraformational units of the Valmy Formation are certainly

more complex than described above but broadly adhere to this succession in the vicinity of Trenton Canyon.

There are no known Silurian or Devonian

rocks at Trenton Canyon.

Late Paleozoic Rocks

At the type locality approximately five

kilometers south-southeast of Trenton Canyon, the transgressive Pennsylvanian Battle Formation consists of up to 250 m of alluvial and

marine conglomerate, sandstone, mudstone, and lesser limestone (Saller and Dickinson 1982). All these lithologies are recognized at Trenton

Canyon despite the drastic northwestward thinning of the formation from the type-locality to the footwall of the Oyarbide fault at Relay

Ridge where the strata are either absent or no more than five meters thick. Based primarily on clast composition and sedimentary structures,

five informal map units (Pb1-5) and one marker bed within the Battle Formation at Trenton Canyon are recognized. Mapped relations of

Battle Formation subunits suggest deposition was synchronous with crustal extension in the Pennsylvanian.

The Havallah Sequence is a Mississippian

to Permian sedimentary succession that includes submarine basalt, chert, argillite, sandstone, siltstone, calcareous sandstone, gritstone,

and conglomerate. This succession of clastic marine rocks makes up the Golconda allochthon emplaced during the Sonoma Orogeny. The succession

is highly deformed by tight to isoclinal overturned folds hindering the understanding of intraformational lithostratigraphy.

Igneous Rocks

The

Cretaceous Trenton Canyon stock is the most prominent intrusion on surface in the Trenton Canyon project area. The medium-grained crystalline

monzonite stock has a bulbous surface exposure and weathers recessively. The stock has altered the adjacent country rock resulting in

a contact metamorphic aureole discernable in regional geophysics. Local base metal (Cu-Mo-Ag-Zn) mineralization also occurs along the

periphery of the stock (Figure 6-10).

6-22

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-10: Geologic

Map of Trenton Canyon Area

6-23

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Eocene granodiorite dikes up to several

meters in width also occur within the Trenton Canyon area. The dikes intrude a network of north to northwest striking faults and primarily

dip to the east at approximately 55 degrees but locally exploit south to southeast striking structures with similar to slightly more

inclined dips. Phreatomagmatic textures are observed on dike margins on surface, in road cuts, and in drill core. The breccias primarily

contain irregularly shaped clasts of the intrusion, suggesting a degree of plasticity at the time of brecciation, and lesser quartzite

and argillite clasts in a matrix of igneous rock flour. The dike margins and phreatomagmatic breccias are locally well mineralized. In

addition to phreatomagmatic brecciation, melting and incorporation of country rock is also evident on the margins of some dikes. The

dikes at Trenton Canyon may have played a role in the localization of gold mineralizing fluids as deposit geometry typically mimics the

spatial distribution pattern of the intrusions.

Lamprophyre dikes are also observed

in the project area. The lamprophyres are assumed to be Jurassic in age, based on geochronologic analysis of lamprophyre at Marigold

and the temporal distribution of lamprophyre in northern Nevada. The lamprophyres are medium-grained crystalline, often with a felted

texture and chilled margins. These lamprophyres do not seem to be associated with gold mineralization and are more often observed in

deeper drill holes.

6.3.3.2 Property

Structure

A generalized model of the deformation

history preserved at Trenton Canyon is described below. Sections are in chronological order and describe fault systems from oldest to

youngest. It is important to note that these fault and fold systems likely experienced a complex protracted and reactivated history making

a formal chronologic breakout challenging.

Irregularities in basement architecture

are likely responsible for the development of structural complexities, e.g., stress localization and ramp development during orogenesis.

The surficial expression of these structures is difficult to delineate, though it is interpreted that the large-scale anticlinorium and

imbricated thrust sheets present at Trenton Canyon formed in response to a basement cored irregularity where stress localized during

the emplacement of the Antler allochthon. Later, Cenozoic extension inherited the architecture of the anticlinorium forming a horst-block,

i.e., sets of west and east dipping faults along the strike length of the deposit. The anticlinorium and overprinting horst-block has

an inherent control on mineralization. Understanding the structural style and geometry of the lateral and frontal ramps is critical,

as the frontal ramp domains are likely to have undergone greater structural preparation, thereby enhancing permeability and providing

preferential pathways for mineralizing fluids. Detailed understanding of the internal stratigraphy of the Battle Formation was critical

in demonstrating syn-depositional extension accommodated along NW- and NE- to E–W-trending fault systems..

Expressions of deformation related to

the Antler orogeny include tight F1 folds and internal Valmy Formation thrust faults. In addition, thrust faults exposed on surface at

Trenton Canyon demonstrate the imbricated nature of Cambro-Ordovician rocks interpreted to have formed in quiescent and high energy depositional

environments.

Following Antler orogenesis, deposition

of the Antler overlap sequence occurred in extensional basins along the Antler Highlands. Understanding the internal stratigraphy of

the Battle Formation was instrumental in demonstrating syn-depositional extension along a NW- and NE- to east-west trending fault system.

These Pennsylvanian-age faults preserve proximal growth stratigraphy of the lower Battle Formation subunits and are onlapped by the upper

units. The NW and NE Paleozoic fault system documented at Trenton Canyon displays a complex array of NE to EW transfer zones (or relay

faults) connecting the long NW grain. This complexity in the fault system lends to increased clastic sedimentation at transfer zones.

Due to the fault-tip propagation style of growth stratigraphy displayed in the lower subunits, this fault set is interpreted to be deep-seated

and potentially linked to older basement-cored architectures. The NW long-grain and east-west short-grain are typically gold mineralized,

with grade enhancement at intersections with the Eocene NNE fault set (described below).

6-24

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Quasi-contemporaneous with deposition

of Antler sequence rocks, Havallah sequence rocks formed in the Havallah basin to the west of the Antler highlands. The Sonoma Orogeny

structurally juxtaposed the Havallah sequence east over the Antler overlap sequence and lower Paleozoic assemblages along the Golconda

thrust. Two major Sonoma aged thrust faults are recognized at Trenton Canyon, as well as multiple internal thrusts and folds. The structurally

lowest thrust is the Golconda thrust. The Golconda thrust juxtaposes siltstones and gritstones on top of the Antler Sequence (Battle

Formation and Antler Peak LS Formation). The Willow Creek thrust forms a structurally higher plate, emplacing a deeper-water succession

of green-brown chert and siltstone over the underlying siltstone-gritstone succession. The Willow Creek thrust coalesces with the Golconda

thrust to the south where the siltstone/gritstone unit is structurally removed and the chert/siltstone package is in contact with the

Antler Peak Limestone.

Cretaceous contractional deformation

is interpreted to be recorded by a set of north- trending upright and open folds. Felsic dikes (NW- trending) and stocks intrude the

Battle Mountains at approximately 98 Ma. It is uncertain whether this igneous event is due to the advancing flat subducting Farallon

slab during the Sevier-Laramide orogenies, or if the retro-arc was undergoing extension which introduced peraluminous magmas into the

middle crust.

A major N-S to NNE- SSW fault set at

Trenton Canyon is thought to be related to early Eocene extension. These faults switch polarity from west to east dipping and inherit

their architecture from deformation attributed to the Antler orogeny. The result of this extension is the formation of a horst block

throughout the project area. The most notable N-NNE- trending fault at Trenton Canyon is the Windy Ridge fault system that hosts economic

gold mineralization in the historical West Pit. This fault set is occupied locally by Eocene intrusions.

Post mineral faulting is best demonstrated

by the Oyarbide Fault and associated parallel faults. These structures trend NE–SW and clearly record a younger phase of displacement,

evidenced by the development of topographic facets and offsets to mineralization. Although the most recent fault movement post-dates

gold mineralization, the fault system likely records multiple phases of deformation and appears to be influenced by deeper basement architecture,

with both directly demonstrated and inferred structural connections to basement faults.

Blasthole patterns indicate gold mineralization

in the previously mined South and West pits was localized where principal faults branch into antithetic and synthetic splays and relays.

Enhanced permeability related to curvature of horsetail structures promoted gold mineralization (Rhys, 2022; internal communication).

Folding

The first generation (F1) of folding

observed in the Battle Mountains is a set of tight to isoclinal overturned folds with short wavelengths and high amplitudes, that trend

NW-SE to NNW-SSE. This fold set is recording allochthonous deformation of upper-plate siliciclastic rocks along the Roberts Mountains

Thrust (RMT) during the Antler orogeny. F1 folds primarily deform Valmy Formation chert, argillite, and quartzite; but is not limited

to upper-plate rocks. RMT equivalent thrust faults in the area demonstrate a complex nature of imbricated panels that deform earlier

thrust faults and lower-plate rocks.

6-25

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The

second generation (F2) of folding observed is an open and upright set of folds that trend 250°

to 300° and plunge very shallowly. F2 folds are best observed in the Basalt pit but are documented across Marigold and Trenton Canyon.

Intersections of F2 hinge lines with F1 hinge lines form type-1 fold interference patterns, or domes and basins. This style of fold interference

has led to significant ground preparation of the area and controls the distribution of mineralization. F2 is not observed in the Antler

overlap sequence rocks. Therefore, it is interpreted that F2 is time equivalent with F1 and formed in response to the development of

lateral thrust ramps during the Antler orogenesis.

The third generation (F3) of folding

documented is a set of tight to isoclinal, overturned and recumbent folds that trend approximately north-south. This set is restricted

to allochthonous Havallah sequence rocks emplaced during the Sonoma Orogeny. This deformation event had very little effect on autochthonous

rocks below the Golconda Thrust.

The fourth generation (F4) of folding

is observed on a much larger scale. This folding event formed a set of open broad and upright folds that trend approximately N-NW to

S-SW. F4 folds deform the entire rock package present at Marigold and Trenton Canyon on a Mountain Range scale. This deformation event

is interpreted to be related to Mesozoic tectonics during the Sevier and Laramide orogeneses, though timing constraints are poor.

6.3.3.3 Property

Mineralization

A Cretaceous base metal mineralization

event, interpreted to be associated with emplacement of the Trenton Canyon stock, is characterized by a sulfide association of pyrrhotite,

chalcopyrite, and pyrite in unoxidized samples, and a gangue association of tremolite, calcite, muscovite, diopside, and garnet. This

event pre-dates Eocene gold mineralization at Trenton Canyon, which is characterized by a sulfide association of auriferous arsenic-bearing

iron sulfides and argentiferous tennantite, and a gangue association of quartz, carbonate, phyllosilicates, clays, carbon, and stibnite.

Gold mineralization at the South, West,

and East pit areas is primarily hosted in a network of transtensional faults locally intruded by Eocene dikes and sills. Hydrothermal

and/or phreatomagmatic breccias within these structures typically contain increased concentrations of gold. Gold mineralization is strongly

structurally controlled, although a narrow, several-meter-wide halo of lower-grade disseminated mineralization may be present adjacent

to the mineralized structures. Quartz veins, illite, iron oxides, and iron hydroxides (goethite) are the primary indicators of gold mineralization

where oxidized.

At

Cottonwood Ridge there is a complex interplay of stratigraphic control, intrusive influence, and structure that localizes mineralization.

Relay Ridge mineralization is primarily strata bound but hosted close to the intersection with the regional scale Oyarbide and Havallah

West faults, which likely played a role in enhancing permeability. Oxidation boundaries at Trenton Canyon are complex and influenced

by structure-induced permeability. The inherently low permeability of the Valmy formation results in a relatively shallow supergene phreatic

oxidation/reduction boundary; however, secondary permeability created by faulting enables oxidation at depth. Figure

6-11 is a cross section through Trenton Canyon showing the interplay of faulting, intrusives, mineralization, and oxidation.

6-26

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 6-11: Schematic

Cross Section through Trenton Canyon

6-27

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

6.3.3.4 Property

Alteration

The dominant forms of alteration observed

at Trenton Canyon represent both metasomatic (calc-silicate) and isochemical (hornfels) processes associated with the contact aureole

of the Cretaceous Trenton Canyon stock. Alteration related to the Eocene hydrothermal system locally overprinted the calc-silicate and

hornfels assemblages.

Alteration associated with gold mineralization

is well constrained to fault zones, intrusions, and intrusion margins. Silicification in the form of drusy quartz, quartz stockwork veins

and veinlets is present within and around fault zones. Iron oxides and hydroxides, including goethite, hematite, and limonite, as well

as clays (illite, kaolinite) are associated with these veins. Eocene dikes are quartz, sericite, pyrite (QSP) altered in the deposit

area and often have Liesegang banding where oxidized.

6.4 Deposit

Type

Doebrich and Theodore (1996), Theodore

(1998), and Theodore (2000) described the deposits at Marigold as distal disseminated silver–gold deposits. These deposits are

disseminated equivalents of polymetallic vein deposits, characterized by a geochemical signature that includes silver, gold, lead, manganese,

zinc, copper, antimony, arsenic, mercury, and tellurium (Cox and Singer 1990). Typically, they contain substantially more silver relative

to gold than other types of disseminated gold deposits and may feature supergene enrichment of silver if significantly oxidized.

In Nevada, distal disseminated silver–gold

deposits are proximal to Jurassic, Cretaceous, and mid-Tertiary granitoid intrusions (Hofstra and Cline 2000). A fundamental requirement

of the distal disseminated silver–gold model necessitates a genetic link between silver–gold mineralization and causative

intrusions (Hofstra and Cline 2000); however, no such relationship has been conclusively demonstrated at Marigold (Fithian 2015).

A Carlin-type gold deposit (CTGD) is

a unique type of disseminated, sedimentary rock-hosted gold deposit. The genesis of CTGDs is currently not well understood. In Nevada,

CTGDs occur along several main mineralization trends, including the Carlin trend and Battle Mountain-Eureka trend, and are primarily

hosted by silty carbonate rocks.

Gold in a CTGD occurs in arsenian pyrite

rims on pyrite grains and is associated with arsenic, sulfur, antimony, mercury, and thallium (Cline et al. 2005). There is considerable

debate regarding the source of gold in CTGDs. Leading theories include a magmatic-hydrothermal origin (e.g., Sillitoe and Bonham 1990;

Johnston and Ressel 2004; Ressel and Henry 2006; Muntean et al. 2011) and gold sourced from the sedimentary host package (e.g., Ilchik

and Barton 1997; Emsbo et al. 2003; Large et al. 2011). Even though the genesis of CTGDs remains enigmatic, there is consensus that all

CTGDs in Nevada formed during the Eocene period (42 to 36 Ma) (Cline et al. 2005).

Distal disseminated silver–gold

deposits may share similarities with CTGDs, including orebody morphology, structural setting, and alteration styles, but drastically

differ with respect to alteration zonation, geochemical signature, hypogene mineralogy, and endowment. Distal disseminated silver–gold

deposits show a more definitive magmatic signature than CTGDs that includes zoning of alteration relative to felsic hypabyssal intrusions,

base metal enrichment, significantly higher Ag/Au ratios, and distinctive hypogene ore mineralogy (e.g., base metal sulfides, native

gold and silver, electrum, silver sulfides, and silver sulfosalts; Cox and Singer 1990, Cox 1992, Hofstra and Cline 2000), and are typically

much smaller in terms of gold endowment.

6-28

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

There is increasing support for a model

that proposes a continuum between CTGDs, distal disseminated silver–gold deposits, and epithermal deposits. This model implies

a magmatic source for heat and metal. Marigold and Trenton Canyon show characteristics closer to the CTGD endmember, and Buffalo Valley

shows characteristics closer to the distal disseminated silver-gold endmember.

Figure 6-12 is a diagrammatic representation

of the deposit model.

Figure 6-12: Model

Illustrating Inferred Processes Related to Formation of Carlin-Type Gold Deposits (CTGD)

and Distal Disseminated Silver–Gold Deposits

Source: Muntean and Cline 2018

6-29

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

7.0 Exploration

Since

acquiring the Property in April 2014, SSR has conducted several surface exploration programs, including soil sampling and geophysics,

as summarized in Table 7-1.

Table 7-1: Summary

of Exploration Completed by SSR

Year

Property

Company

Exploration

Type

Details

2014

Marigold

SSR

Geophysics

Magee

Geophysical Services LLC conducted field data collection. The gravity measurements were collected from 1,358 stations using two LaCoste

and Romberg Model-G gravity meters at a grid spacing of 150 m x 150 m. (Magee, 2014). J. L. Wright Geophysics processed and

interpreted the data.

2016

Marigold

SSR

Geophysics

Gravity

survey conducted by Magee Geophysical Services LLC. A total of 1,806 stations were acquired on a 150 m square grid and a 150 m x

300 m staggered grid. Relative gravity measurements were made with LaCoste and Romberg Model-G gravity meters. Topographic surveys

were performed with Trimble Real-Time Kinematic (RTK) and Fast-Static GPS. (Magee, 2016). J. L. Wright Geophysics processed and interpreted

the data.

2020

Marigold

and Trenton Canyon

SSR

Geophysics

Two

reflection seismic lines covering 16.9 km. The lines were surveyed by Riolada Surveying LLC, and Xtreme Drilling completed the shot

holes. Bird Seismic acquired the data, and processing was completed by SubTerraSeis and Wright Geophysics.

2021

Trenton

Canyon

SSR

Geophysics

/ Soil Samples

In

2021, a proprietary airborne hyperspectral dataset was acquired with district-scale coverage. This dataset includes mineral maps

generated from short and long-wave infrared sources. A soil sampling program was completed by North American Exploration on behalf

of SSR Mining, consisting of 3,284 soil samples covering 14.5 km2 of mountainous terrain predominantly east of the

previously mined pits at Trenton Canyon.

2023

Buffalo

Valley, Trenton Canyon, and Marigold

SSR

Geophysics

EarthEx

completed a UAV-borne magnetic survey of the Buffalo Valley, North Peak, and New Millenium areas. The project encompassed 3,324.7

line-km at 25 m line spacing and 250 m tie line spacing with mean terrain clearance of 20 m

7-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Year

Property

Company

Exploration

Type

Details

2024

Buffalo

Valley and Marigold

SSR

Geophysics

Magee

Geophysical Services LLC conducted the field data collection for an infill ground gravity survey. Four LaCoste & Romberg Model-G

gravity meters with a resolution of 0.01 mGal were used to complete the survey. In total, 3,429 stations were added to the dataset.

Data was combined with historic survey data and processed by Terra Resources to produce merged gravity and magnetic surveys across

the property.

2024

Buffalo

Valley and Marigold

SSR

Geophysics

CSAMT

measurements were acquired by Zonge International on 17 lines, for a total of 56.8 line kilometers of data coverage. Four transmitter

dipoles were deployed to cover the survey area, using a scalar array of four electric-field dipoles and a magnetic-field antenna

located at the center. The dipole length (spacing) was 50 m, and data were acquired from 1 to 8,192 Hz for each receiver spread.

Terra Resources processed and interpreted the data.

2025

Marigold

SSR

Soil

Samples

387

soil samples in the northern part of the Marigold property on a 100 m x 100 m offset grid.

7.1 Geophysical

and Geochemical Surveys

7.1.1 Gravity

7.1.1.1 2016

After finalizing the purchase of Valmy

in 2015 (additional Newmont-owned land to the east and west of the previous land boundary), SSR in 2016 expanded the geophysical gravity

survey to include this new ground, resulting in a total of 1,806 additional gravity stations collected on variable station spacing on

a 150 m square grid and a 150 m x 300 m staggered grid. The purpose of the survey was to assist in delineation of structures in the area

in conjunction with geologic mapping and exploration drilling.

7.1.1.2 2019

The acquisition of Buffalo Valley and

Trenton Canyon from Newmont in 2019 resulted in the addition of 952 gravity stations to the Marigold database.

7.1.1.3 2020

In 2020, 766 gravity stations were acquired

by Magee Geophysical Services on a 122 m x 244 m grid at Trenton Canyon. Relative gravity measurements were made with LaCoste

& Romberg Model-G gravity meters. Topographic surveying was performed with Trimble (RTK) and Fast-Static GPS. The gravity survey

is tied to the US Department of Defense gravity base Battle Mountain (DoD reference number 2344-2) via an intermediate base established

on the property.

7-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The Marigold gravity database now contains

a total of 6,665 stations.

7.1.1.4 2024

The

2024 gravity survey was designed to infill gaps between prior surveys and collect data in areas not previously covered to compile a merged

gravity data set across the entire Marigold property. The survey was completed on a 200 m x 200 m offset grid. In

total 3,429 new gravity stations were acquired across the property. The merged data set was completed by MaGee Geophysical Services LLC

and compiled the 2024 data with historical data sets collected between 1994 and 2020. Post processing was completed by Terra Resources

to provide color maps of gravity features.

Gravity measurements were collected

with LaCoste and Romberg Model-G gravity meters with topographic surveying completed with Trimble Real-Time Kinematic (RTK) and Fast-Static

(FS) GPS units. Gravity data were post processed to complete Bouguer gravity (CBG).

7.1.2 CSAMT

(Controlled-Source Audio-frequency Magnetotellurics)

7.1.2.1 2024

In

2024, CSAMT surveys were designed to infill gaps in the historic data to compile a merged data set

across the Marigold property for 3D modeling. In total 56.8 line kilometers of data were collected on 50 m dipole spacing. Four transmitter

dipoles were deployed to cover the survey area, using a scalar array of four electric-field dipoles and one magnetic field antenna located

at the center. Data were acquired from 1-8192 Hz for each receiver spread.

7.1.3 Seismic

In August 2020, two reflection seismic

lines were completed to assess the utility of reflection seismic for imaging structural and lithological domains in a challenging geological

setting. The test program included two lines totaling approximately 16.9 line kilometers (line-km). The survey was conducted by Bird

Seismic of Globe, Arizona, and processed by SubTerraSeis of Reno, Nevada. Results were finalized and interpreted by Wright Geophysics

of Elko, Nevada.

7.1.4 Soil

Sampling

In 2020, North American Exploration

of Layton, Utah, was contracted to collect 3,284 soil samples covering approximately 14.5 km2 at Trenton Canyon.

In 2025, Rangefront Mining Services

collected 387 soil samples in the northern part of the Property on a 100 m x 100 m offset grid.

7.1.5 Drone-based

Magnetic

In 2022 and 2023, EarthEx Geophysical

Solutions of Selkirk, Manitoba, was contracted to complete a drone-based magnetic survey over portions of Buffalo Valley, Trenton Canyon,

and Marigold. Approximately 3,325 line-km were flown at a spacing of 25 m with a mean terrain clearance of 20 m. The purpose of the survey

was to help delineate the structure and intrusions in the area.

7-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

7.2 Drilling

Reverse Circulation (RC) and Core (Diamond

Drilling-DD) drilling on the Property is the principal method of exploration and delineation of gold mineralization after initial targeting

using soil sampling and geophysical surveys. Drilling can generally be conducted year-round on the Property.

As

of the effective date of this TRS, SSR and its predecessor companies have completed over 2.6 million meters of drilling in 13,371 drill

holes across the Marigold, Buffalo Valley, and Trenton Canyon areas, as summarized in Table 7-2,

Table 7-3, and Table 7-4.

Exploration at the Property has focused

on the following:

· Exploration

drilling to expand Mineral Resources and Mineral Reserves through systematic step-out drilling.

· Infill

drilling to increase the confidence of Mineral Resource estimates, specifically targeting

areas with widely spaced drilling (approximately 35 m to 50 m) and around drill holes drilled

prior to 2006 with missing assays.

· Drilling

to confirm the final position of the pit highwall.

· Defining

mineralization at Trenton Canyon and Buffalo Valley.

Since the last technical report (SLR

2024), 731 holes have been drilled (663 RC holes and 68 diamond core holes), totaling 157,220 m.

Figure 7-1 illustrates all drilling

completed by year on the Property as of the effective date of this TRS.

7-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

7-2: Summary

of Drilling at Marigold

Drilling

Program

Company

No.

of RC

Holes

RC

Drilling

(m)

No.

of

Diamond

Holes

Diamond

Drilling

(m)

Total

Holes

Total

Drilling

(m)

1968–1985

Various

exploration and mining groups

126

7,037

126

7,037

1985–1999

Cordex

and Rayrock Mines

2,350

333,325

8

2,176

2,358

335,501

1999–2006

Glamis

Gold

2,498

484,619

8

2,030

2,506

486,649

2006–2013

Goldcorp

1,856

520,163

14

8,063

1,870

528,226

1968–2006

Various1

852

108,326

15

1,037

867

109,363

2014

SSR

116

21,653

1

1,235

117

22,888

2015

SSR

171

39,070

4

4,270

175

43,340

2016

SSR

231

55,147

1

955

232

56,102

2017

SSR

188

54,814

1

1,128

189

55,942

2018

SSR

259

93,276

0

0

259

93,276

2019

SSR

183

63,629

25

10,265

208

73,893

2020

SSR

109

37,955

0

0

109

37,955

2021

SSR

150

52,579

6

1,636

156

52,214

2022

SSR

200

55,628

0

0

200

55,628

2023

SSR

185

40,038

14

3,302

199

43,340

2024

SSR

133

31,236

1

387

134

31,623

2025

SSR

138

34,154

24

5,285

162

39,439

Q1

2026

SSR

51

13,162

4

1,108

55

14,270

Total

Drilling

9,796

2,045,811

126

42,877

9,922

2,086,686

Notes:

1.

Newmont and other mining groups (Valmy property)

Table 7-3: Summary

of Drilling at Buffalo Valley

Drilling

Program

Company

No.

of RC

Holes

RC

Drilling

(m)

No.

of

Diamond

Holes

Diamond

Drilling

(m)

Total

Holes

Total

Drilling

(m)

1980–2011

Newmont

and other mining groups

1,550

178,892

24

4,187

1,574

183,079

2019

SSR

0

0

0

0

0

0

2020

SSR

0

0

0

0

0

0

2021

SSR

0

0

3

837

3

837

2022

SSR

36

14,426

7

3,315

43

17,741

7-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Drilling

Program

Company

No.

of RC

Holes

RC

Drilling

(m)

No.

of

Diamond

Holes

Diamond

Drilling

(m)

Total

Holes

Total

Drilling

(m)

2023

SSR

80

20,822

16

4,745

96

25,567

2024

SSR

104

16,887

13

2,884

117

19,771

2025

SSR

43

7,996

9

1,911

52

9,584

2026

H1

SSR

28

2,462

3

594

31

3,056

Total

Drilling

1,841

241,485

75

18,473

1,916

259,635

Table 7-4: Summary

of Drilling at Trenton Canyon

Drilling

Program

Company

No.

of RC

Holes

RC

Drilling

(m)

No.

of

Diamond

Holes

Diamond

Drilling

(m)

Total

Holes

Total

Drilling

(m)

1991–2011

Newmont

and

other mining groups

1,143

152,792

6

909

1,149

153,701

2019

SSR

64

19,112

0

0

64

19,112

2020

SSR

97

28,840

7

5,902

104

34,742

2021

SSR

86

24,844

3

1,518

89

26,362

2022

SSR

64

18,983

10

3,984

74

22,967

2023

SSR

37

8,232

6

1442

43

9,674

2024

SSR

10

2,931

0

0

10

2,931

Total

Drilling

1,501

255,734

32

13,755

1,533

269,489

7-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 7-1: Plan

View of All Drilling to End of May 2026

7-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

7.2.1 QP

Opinion

The SLR QP is of the opinion that the

drilling and sampling procedures adopted at Marigold are consistent with generally recognized industry best practices. The resultant

drilling pattern is sufficiently dense to interpret the geometry and the boundaries of gold mineralization with confidence. The reverse

circulation (RC) samples were collected by trained personnel using procedures meeting generally accepted industry best practices. The

process was conducted or supervised by suitably qualified geologists.

The SLR QP is of the opinion that the

samples are representative of the source materials, and there is no evidence that the sampling process introduced a bias. Accordingly,

there are no known sampling or recovery factors that could materially impact the accuracy and reliability of drilling results.

7-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

8.0 Sample

Preparation, Analyses, and Security

Exploration activities conducted by

three companies between 1985 and 2013 have contributed to most assays in the Marigold database. Sampling and analytical procedures for

this period are known and documented, and it can be assumed that analytical information acquired prior to 1985 will not affect the current

Mineral Resources, since these sampled volumes collected prior to 1985 have been mined out.

Most of the samples that inform the

resource database were generated from RC drill cuttings. In general, the process for collecting RC samples has changed very little since

1985; however, over time, numerous improvements have been made in sample preparation, security, and analysis. As an operating mine, Marigold

generally follows and continues to follow industry best practice standards.

At the Property, there is an extensive

sample storage facility that preserves raw sample material supporting the resource database. Most of the laboratory pulp reject (since

1987), coarse reject (since 2006), and split diamond drill core are cataloged and stored securely in shipping containers on the Property.

A detailed account of the pre-2014 sampling

and analytical protocols is described in Silver Standard (2014). The following sections in this TRS have been derived, updated, and,

in some instances, extracted from documentation from OreWin (2022) and standard operating procedures (SOPs) supplied to SLR by SSR for

review and audit.

8.1 Sample

Preparation and Analysis

A

summary of historical analytical methods and assay results that comprise the Marigold database is presented in Table

8-1. Except for the Marigold, Pinson, and Dee Mine site laboratories, all laboratories listed in Table 8-1 are commercial laboratories

that were independent from SSR.

Until the end of 1999, fire assay (FA)

with gravimetric finish was the preferred analytical method for determining gold in samples. Since then, all samples have been subjected

to first-pass gold cyanide solution (CN) assay; if results were greater than 0.17 g/t Au, samples were also subjected to either FA determination

with gravimetric finish at the on-site Marigold mine laboratory or FA with atomic absorption (AA) finish and FA with gravimetric finish

for over-limits at commercial laboratories.

All the Newmont-provided samples used

to populate the Valmy area resource database were assayed at various commercial laboratories. The preferred assay method was FA with

AA spectroscopy finish, followed by gold cyanide solution assay on select samples within the mineralized zone.

8-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Since 2014, all exploration samples

from Marigold have been analyzed at American Assay Laboratories (AAL), an ISO 17025 certified facility in Sparks, Nevada. AAL is independent

from SSR. All samples are subjected to first pass FA determination with an AA finish and FA with a gravimetric finish for over-limits.

This is followed by a gold cyanide solution assay with an AA finish for samples with FA values greater than or equal to 0.03 g/t Au.

In 2019 and 2020, Marigold Mine submitted drill samples to Paragon Geochemical Laboratories, a privately held corporation located in

Sparks, Nevada. The analytical procedures utilized are ISO/IEC 17025:2017-accredited and ISO 9001:2015-certified. Samples were prepared

under strictly controlled processes, and 30g aliquots were fire assayed with lead collection. The analytical determinations were with

aqua regia digestion and inductively coupled plasma (ICP) – optical emission spectroscopy (OES) analysis (Au-OES30). Results greater

than 8 g/t were fire-assayed with a gravimetric finish (Au-GR30). Quality control utilizes layers of embedded indicators that are monitored

during operations and used for final certification. Paragon is independent of SSR.

8-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 8-1: Analytical

Methods for Gold for the Marigold Assay Resource Database

Period

Laboratory

Preparation

Analytical

Method

Reported

DL (Au g/t)

1985–1989

Pinson

or Dee Mine site labs

Undocumented

30

g FA, gravimetric finish

0.17

1990–1999

Pinson

or Dee Mine site labs or Inspectorate Labs

Undocumented

30

g FA, gravimetric finish

0.17

1980-2010

(Buffalo Valley Historic)

Multiple

Laboratories

Undocumented

30

g FA, AA finish, and/or 15 g CN assay on select samples

Unknown

1987–1998

(Valmy + Trenton Canyon)

Barringer

Laboratories

Undocumented

30

g FA, AA finish 15 g cyanide gold (CN) assay on select samples

FA:

0.17

CN

assay: 0.17

X-Ray

Assay Laboratories

Undocumented

30

g FA, gravimetric finish 15 g CN assay on select samples

FA:

0.03

CN

assay: 0.03

Rocky

Mountain Geochemical Nevada

Undocumented

30

g FA, gravimetric finish 15 g CN assay on select samples

FA

(AA): 0.03–0.003

CN

assay: 0.03

Chemex

Labs Ltd.

Undocumented

15

g FA, AA finish 30 g FA, gravimetric finish 15 g CN assay on select samples

FA

(AA): 0.06–0.003

CN

assay: 0.03

2000–2004

(Valmy + Trenton Canyon)

Chemex

Labs Ltd.

Dry,

crush, and riffle split for pulverizing; pulverize to 100 µ

All

samples 30 g FA, AA finish 15 g CN assay on select samples

FA

(AA): 0.01

CN

assay: 0.03

2000–2006

Marigold

Mine laboratory

Dry

6–12 hr at 310°F; crush >95% –2 mm; riffle split to collect 250 g – 400 g for pulverizing; pulverize

to >90% –75 µ

All

samples 10 g CN assay, AA finish if CN assay >0.17 g/t, the 2nd pulp split at 30 g FA, gravimetric finish

0.03

American

Assay or Inspectorate Labs

Dry

6–12 hr at 310°F; crush (using jaw and roll) >90% –2 mm; riffle split to collect 500–1,000 g for pulverizing;

pulverize to >90% –100 µ

All

samples 15 g CN assay, AA finish If CN assay >0.17 g/t, the 2nd pulp split at 30 g FA, AA finish over-limits by 30 g FA, gravimetric

finish

0.03

2006–2013

Marigold

Mine laboratory

Dry

6–12 hr at 310°F; crush >95% –2 mm; riffle split to collect 250 g – 400 g for pulverizing; pulverize

to >90% –75µ

All

samples 10 g CN assay, AA finish. If the CN assay >0.17 g/t, the 2nd pulp split at 30 g FA, gravimetric finish

0.03

American

Assay or Inspectorate Labs

Dry

6–12 hr at 310°F; crush (using jaw and roll) >90% –2 mm; riffle split to collect 500 g –1,000 g for

pulverizing; pulverize to >90% –100µ

All

samples 15 g CN assay, AA finish. If CN assay >0.17 g/t, the 2nd pulp split at 30 g FA, AA finish over-limits by 30 g FA, gravimetric

finish

0.03

8-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Period

Laboratory

Preparation

Analytical

Method

Reported

DL (Au g/t)

2014–2023

American

Assay Laboratories

Dry

6–12 hr at 310°F; crush (using jaw and roll) >90% –2 mm; riffle split to collect 500 g – 1,000 g for

pulverizing; pulverize to >90% –100µ

All

samples 30 g FA, AA finish over-limits by 30 g FA, gravimetric finish. If FA >0.03 g/t, the 2nd pulp split at 15 g CN

assay, AA finish

FA:

0.003

CN

assay: 0.03

2019-2020

Paragon

Laboratories

Dry

– 6 to 12 hr at 310°F; crush (using jaw and roll) >90% minus 2 mm; riffle split to collect 500 g to 1,000 g for pulverizing;

pulverize to >85% minus 75µ

All

samples 30 g FA, AA finish Over-limits by 30 g FA, gravimetric finish. If FA >0.03 g/t, the 2nd pulp split at 15 g CN assay, AA

finish

FA,

0.003

CN

assay, 0.03

2023-2026

American

Assay Laboratories

Dry

6–24 hr at 185°F; crush (using jaw and roll) >70% –2 mm; riffle split to collect 250 g–300 g for pulverizing;

pulverize to >85% –75µ

IO-FAAu30

– 30 g sample Au by fire assay and ICP-OES

FA:

0.003-10

IO-CNAu215/AuCN15

– 15g sample to 30 mL of solution Au by cyanide leach with ICP-OES finish 15 g sample digested for 2 hours using 0.3% NaCN

and 0.3% NaOH solution

CN

assay: 0.01-100

ALS

– Only Pulp re-assays

Au-ICP21

– 30g sample Au by fire assay and ICP-AES

FA:

0.001-10;

Au-AA13

– 30g sample Au by cyanide leach with AAS finish 30g sample is added to a closed vessel and agitated for 1 hour 0.25% NaCN/0.05%

NaOH

CN

assay: 0.03-50

Notes:

DL = Detection Limit

8-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

8.2 Quality

Assurance and Quality Control

Quality assurance (QA) consists of evidence

to demonstrate that the assay data have precision and accuracy within generally accepted limits for the sampling and analytical method(s)

used in order to have confidence in a resource estimate. Quality control (QC) consists of procedures used to ensure an adequate level

of quality throughout the collection, preparation, and assay of exploration drilling samples. In general, QA/QC programs are designed

to prevent or detect contamination and allow assaying (analytical), precision (repeatability), and accuracy to be quantified. In addition,

a QA/QC program can disclose the overall sampling-assaying variability of the sampling method itself.

8.2.1 QA/QC

Procedures Pre-2014

8.2.1.1 Historical

Marigold Assay – Analysis of Low Detection Limit

The oldest hole in the Marigold exploration

database dates back to 1968. Over time, QA procedures for the drill hole database have been inconsistent with current industry standards

and best practices.

The lower detection limit for cyanide-soluble

gold assays has changed over time as the ROM cut-off grade has been reduced. Prior to 2009, assay values below detection were entered

into the database as 0.0 oz/t. This data artifact underrepresented the mineralized volume of the Mineral Resources estimate in the low-grade

range of the analytical distribution and contributed to the positive reconciliation experienced at Marigold.

Because the historical QA/QC procedures

at Marigold did not meet current-day best practices, the issue of below-detection-limit analyses in the database was addressed through

a systematic assay program implemented by SSR in 2015 and 2016 (the Assay Program). SSR selected a spatial and temporal representation

of samples from the well-preserved drill hole sample pulps (from the years 1987 to 2013) stored at Marigold. A total of 1,974 samples

collected between 1987 and 2003 were re-assayed for FA with AA finish and gravimetric finish analysis at the ISO 17025-certified AAL

facility in Sparks, Nevada. Drill hole sample pulp material was not available for the period 1968 to 1987.

Of

these 1,974 assay pairs, 1,029 samples were below the as-mined topography and within the mineralized envelopes. This represents 12% of

samples within the mineralized envelope and below the previously estimated mined-out topography, which was set at 0.0 troy ounce per

short ton (opt) or deemed waste. The assay results for both finishes were compared, and the results are presented in Figure

8-1 and Figure 8-2. The scatter in the data is acceptable (R2 = 0.9982), and the reduced major axis (RMA) regression indicates a bias

of 3.7% for all assay pairs below the mined-out topography.

8-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 8-1: Scatter

Plot Between FA Gold Values with AA Finish and Gravimetric Finish

Source: SSR 2023

Figure 8-2: Q-Q

Plot between FA Gold Values with AA Finish and Gravimetric Finish

Source: SSR 2023

8-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Between 2015 and 2016, an Assay Program

was carried out in which a total of 153,023 pulp samples from pre-2009 drill holes reporting a 0.0 opt gold cyanide soluble result and

located within the reserve pits were recovered from storage and analyzed for gold at AAL. Certified standards and blanks were inserted

into the pulp sample list at a rate of one standard in 20 samples and one blank in 50 samples. The samples were analyzed using a one

assay ton (30 g) FA with an AA finish, followed by a gold cyanide solution assay with an AA finish for those samples that returned FA

results of 0.03 g/t or greater.

8.2.1.2 Valmy

Property

As at Marigold, the QA/QC procedures

followed at the Valmy property between 1987 and 1998 did not meet current industry standards and best practices. Newmont began inserting

certified standards in the sample stream in 2000. A total of three QC samples were used, but SSR was unable to evaluate the assay accuracy

without the expected gold values for these samples.

Because

the historical QA/QC procedures for the Valmy property did not meet current industry standards, SSR drilled 8 drill holes within a 200

m by 150 m resource block. A total of 11 historical drill holes were within the same block. The cross-section comparing the SSR drilling

to the historical drilling is presented in Figure 8-3.

The

cumulative normal distribution comparing the SSR drill composites to the composite from the historical drill holes is provided in Figure

8-4.

8-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

8-3: Cross-Section

with SSR Drill Holes and Historical Drill Holes Along Section 8000N

8-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

8-4: Cumulative

Normal Distribution Comparing Composites from SSR Drilling and Historical Drilling

Source: SSR 2018

The

nearest-neighbor (NN) gold-grade model estimates were also compared with assay results from historical drilling and new drilling. To

compare historical Newmont data with SSR data, two NN models were developed: one that estimated only assay results from the historical

database, and the other that used only assay results from the SSR drill holes within the same mineralized envelope. The percentage difference

between historical and SSR results was approximately less than 4% (Table 8-2).

Table

8-2: Comparison

of Valmy Deposit NN Mean Gold Grades

Estimate

Mean

Gold Grade

(g/t)

Nearest

Neighbor with Historical Composites

0.624

Nearest

Neighbor with SSR Composites

0.600

SSR concluded that there was no systematic

error or bias in the accuracy and precision of analytical assays under the historical sampling and assaying methodology compared to current

practices, and that the assays are suitable for use in Mineral Resource estimation.

8.2.1.3 Buffalo

Valley Historical Data

In 2011, before SSR’s acquisition

of the Buffalo Valley property, AMEC Americas Ltd. (AMEC) conducted an audit of Newmont’s Buffalo Valley drill hole database and

found good agreement between the database and the original data sources. The database was comprised of data from numerous drilling campaigns

between 1980 and 2011, with drill holes from multiple campaigns selected for the audit. The drill hole data from Newmont was directly

imported into SSR’s new Seequent MX Deposit (MX Deposit) database.

8-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

8.2.2 QA/QC

Procedures 2014-2026

SSR’s QA/QC protocol involves

the insertion of a certified reference material standard (CRM) every 20th sample, the insertion of a blank sample every 50th

sample, the collection of field duplicates every 50th sample for RC holes, and the re-analysis of returned pulverized material

at the original laboratory, as well as at an umpire laboratory. SSR’s protocol targets the total number of QA/QC samples, comprised

of the above-mentioned sample types, to exceed 15% of the total number of original samples. To simplify plotting, results from 2014-2022

have been excluded from the following sections.

8.2.2.1 Certified

Standards

Results from regular CRM submissions

are used to identify issues with specific sample batches and laboratory biases.

Certified reference materials (CRMs)

were used to evaluate the analytical accuracy and precision of AAL. CRMs were inserted every 20th sample, which represents

5% of the total samples submitted. Three different CRMs were used in any one submission. The CRMs were selected based on the cut-off

grade and gold distribution at the Marigold mine:

· cut-off

grade (0.1 g/t)

· mean

grade (0.45 g/t)

· 90th

percentile (2.3 g/t)

Between

2023 and June 2026, eleven different CRMs, purchased from ROCKLABS, Geo Chem Laboratories, and OREAS were used. CRMs purchased from Ore

Research & Exploration Pty Ltd. were used only for a short period in 2014. The CRMs were assigned sample numbers in sequence with

their accompanying drill samples and inserted into the drill-sample stream. The list of CRMs used between 2023 and June 2026 is shown

in Table 8-3.

Exploration personnel monitor assay

results in real time and import the data into the Geology database. Internal validation checks in the database highlight any certified

standard assay failures. For normally distributed data, 95% of the standard assay results are expected to lie within 2 standard deviations

of the certified value. All samples outside the three-standard-deviation limits were considered failures. Failures trigger a re-run of

five samples above and five samples below the failed standards, including the failed standard.

8-10

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

8-3: List

of CRM Standards used between 2023 and June 2026

CRM

Standard

Years

in Use

Expected

Gold

Value (g/t)

Standard

Deviation (g/t)

No.

of Samples

Assayed

OxB146

2023

0.132

0.006

204

OxB186

2023–2026

0.121

0.003

925

OxE166

2022–2026

0.652

0.016

792

Oxi164

2023–2025

1.79

0.036

895

Oxi177

2023–2026

1.811

0.037

247

OREAS

235b

2024

1.63

0.053

14

OREAS

238b

2024

3.08

0.085

11

OREAS

264

2024

0.307

0.011

13

Total

Samples

2,891

CRM

Z-score assay values received from the lab are routinely plotted temporally to monitor potential analytical drift over time at the main

laboratory (Figure 8-5).

Figure

8-5: Z-Scores

of all CRM Results (2023 – June 2026)

Source: SLR 2026

8-11

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

8.2.2.2 Field

Duplicates

Duplicate samples are used to monitor

preparation, assay precision, and grade variability as a function of sample homogeneity and laboratory error.

Field

duplicate samples were collected every 50th sample, and two sample bags marked “A” or “B” were provided

to collect an original and a duplicate sample. The secondary sample was obtained from the secondary opening in the rotary sampler. Between

2023 and June 2026, 526 duplicate samples were collected and assayed. Absolute relative difference (ARD) was used to estimate precision;

results are presented in Figure 8-6.

Figure

8-6: Field Duplicate HARD Plot for Fire

Assay (AuFA)

Source: SLR 2026

8.2.2.3 Blanks

Blank material is used to assess contamination

or cross-contamination during sample preparation and to identify sample-numbering errors.

The blanks were similar in size to the

RC samples and processed through the same crushing and pulverizing stages as the drill samples. The blank samples were placed in every

50 samples. Blank results exceeding 5 times the lower detection limit (LDL) were typically considered failures requiring further investigation

and possible re-assaying of associated drill samples. The lower detection limit of AAL analyses is 0.0034 g/t, therefore blank samples

assaying in excess of 0.017 g/t were considered to be failures.

Between

2023 and 2026, 1,904 blanks were inserted into the sample stream, with less than 1% resulting in failures. The protocol followed for

failures was to re-prepare and assay five samples above and below the failures. The new assays were entered into the database for the

samples. The assay results for the blank samples between January 2023 and May 2026, are shown in Figure 8-7.

8-12

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

8-7: Blank

Results (January 2023 – June 2026)

Source: SSR 2023.

8.2.2.4 Re-Assay

and Umpire Samples

After completing original assays/analysis,

the primary laboratory returns coarse rejects and pulverized material to Marigold for storage. From the pulverized material, analytical

duplicates are selected for a re-assay (original lab), an umpire assay (second lab), or both. Samples are selected based on their original

grade, such that the secondary assay results form a distribution representative of the grades seen at Marigold. Re-assays are sent back

to the same laboratory that conducted the original assay and are used to monitor precision attributable to the analytical process. Since

2022, re-assays have been completed by American Assay Laboratories, whereas ALS has been used for umpire analysis.

Figure 8-8 shows a HARD plot of the

re-assay samples for the period from 2023 through May 2026, comparing AAL and ALS.

8-13

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

8-8: Umpire Analytical Duplicate HARD Plot

for Fire Assay (AuFA) of Original vs. Umpire Results

Source: SLR 2026.

8.3 Sample

Security

8.3.1 Sample

Security until 2013

The bulk of the data in the Marigold

resource assay database was for samples analyzed at the secure on-site Marigold mine laboratory. Samples shipped off-site were either

delivered to the commercial lab by an MMC Exploration Department geologist or technician, or samples were collected from the mine by

a laboratory employee. All samples were sent with a manifest listing the number of samples included in the shipment. Exploration personnel

were unaware of any instances of tampering with samples either on-site or in transit to a laboratory.

8.3.2 Sample

Security Newmont Projects

Newmont provided scanned copies of drillers’

logs, sample manifest sheets, and signed assay sheets from commercial laboratories and geologist logging sheets for all the drill holes

that inform the resource database for the Valmy and Buffalo Valley properties. Based on the documented evidence, the likelihood of tampering

with the samples either on-site or in transit was negligible.

8.3.3 Security

2014–2026

All exploration samples were collected

from the mine site by employees of the external laboratories (either AAL, Paragon, or ALS). All sample dispatches included a manifest

listing the sample identifiers and the number of samples included in the shipment. AAL/Paragon electronically acknowledged receipt of

the samples within 24 hours of physically reconciling them with the manifest. SSR exploration personnel are unaware of any instances

of tampering with samples either on-site or in transit to a laboratory.

8-14

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

8.4 QP

Opinion

After review, the SLR QP’s opinion

is that the sample preparation, security, and analytical procedures meet industry standards, and that the QA/QC program, as designed

and implemented at Marigold, is in line with industry best practices. Based on data validation and the results of the standard, blank,

and duplicate analyses, SLR believes that the assay and bulk density databases are of high quality and suitable for mineral resource

estimation. SLR is not aware of any drilling, sampling, or recovery factors that could materially impact the accuracy and reliability

of the results. Neither the SSR in-house quality control nor SSR predecessor’s quality control yielded any indication of quality

concerns.

8-15

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

9.0 Data

Verification

Data verification is the process of

confirming that data has been generated in accordance with proper procedures, transcribed accurately from its original source into the

project database, and is suitable for use as described in this TRS.

SLR was not directly involved in the

exploration drilling, logging, and sampling programs that formed the basis for collecting the data used to support the geological model

and MRE for the Property.

9.1 Marigold

Database Migration

Since publishing the 2022 TRS (OreWin

2022), all drill hole data have been migrated to an MX Deposit database and audited by the SLR QP for completeness and validity. Migrated

data were extensively validated by SSR for errors or missing values, comparing old tables to the new. The new database was configured

to streamline the collection, validation, and use of all data, maximizing efficiency and minimizing errors by limiting data handling

and manual entry.

All new drill hole data collected after

the migration, with the exception of lithology logging, were imported directly into the geological database without any keyboard input.

Data validation was conducted after import, but before the locking and subsequent use of the data in any model, analysis, interpretation,

etc. Geologic logging is done directly in the database, with data validation performed weekly.

The verification for the exploration

data collected before SSR acquired Marigold includes the results of AMEC Americas Ltd.’s external review and data verification

to identify any material issues with the database used to generate the Mineral Resource estimate.

SSR subsequently acquired the adjacent

Valmy and Buffalo Valley properties, and the associated data was appended to the Marigold drill hole database.

The appended data for Valmy comprises

collar, downhole survey, lithology, and assay information (provided in comma-delimited digital files) for 867 drill holes drilled by

Newmont, Hecla, and Santa Fe Pacific Corp. Newmont provided this information in hardcopy or scanned versions of the originals, which

were used to verify the database.

MMC’s exploration personnel manually

checked the entire drill hole database against the original documents for data entry errors. Less than 1% of the drill holes had any

issues, and these were subsequently corrected.

As an additional check, SSR acquired

the chip trays for 687 drill holes, pulps from 57 drill holes, and sample rejects from 66 drill holes, of which 5% were reviewed for

lithology and alteration. The original logging was deemed accurate and was used to construct the lithological models.

The collar positions of 43 Valmy drill

holes were verified using differential GPS. Subsequent to AMEC’s 2011 audit of the Buffalo Valley drilling database, SSR verified

the collar location of eight holes drilled by Newmont and one hole drilled by Fairmile that included a drill hole identification marker

in the field. The results showed a maximum variance of 4 m in the X/Y planes (easting and northing) and <1 m in the Z dimension (elevation).

This error shift is less than half the size of a resource model cell and is not material to any resulting estimate. The Valmy and Buffalo

Valley data, as appended, were deemed accurate and precise, and appropriate for resource estimation purposes.

9-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

For data collected after April 2014,

the following verification steps were completed to support the estimation of Mineral Resources:

· The

location of planned drill holes was compared to the location of as-built drill holes in real

time. Regular field checks were completed on the drill and sampling systems.

· Downhole

survey intervals that encountered major deviations were reviewed and validated (AMEC, 2014).

· Precision

and accuracy of laboratory assay results were verified using a QA/QC program that followed

an industry standard protocol using the blind insertion of blanks and certified standards.

· The

elevation of all surveyed drill hole collar coordinates was checked against the original/current/depleted

topographic surface to identify any variations of more than one meter. No discrepancies were

found.

· Profiles

of all mined-out pits, backfilled pits, and OBSA were cross-checked, updated annually, and

incorporated into the current topography.

Assay results for all drill holes are

individually plotted and examined for cyclicity and decay, which are forms of downhole contamination. Any hole with confirmed contamination

will have the contaminated samples removed from resource estimation.

9.1.1 Data

Verification Procedures

SLR was provided with a digital drill

hole database for the Property in a series of Microsoft Excel comma-delimited files (“CSV” format) and Seequent Leapfrog

GEO digital files. The SLR QP used the information provided to validate the Mineral Resource interpolation, tonnage, grade, and classification.

As

part of the data verification procedure, drill data was spot checked and audited by the SLR QP for completeness and validity using standard

database validation tests. In addition, the SLR QP reviewed the QA/QC methods and results, verified assay certificates against the database

assay table, and conducted one site visit, including a review of drill core. No limitations were placed on SLR’s data verification

process. The review of the QA/QC program and results is presented in Section 8.0, Sample Preparation,

Analyses, and Security.

The SLR QP performed the following digital

queries. No significant issues were identified.

· Header

table: searched for incorrect or duplicate collar coordinates and duplicate hole IDs.

· Survey

table: searched for duplicate entries, survey points past the specified maximum depth in

the collar table, and abnormal dips and azimuths.

· Core

recovery table: searched for core recoveries greater than 100% or less than 80%, overlapping

intervals, missing collar data, negative lengths, and data points past the specified maximum

depth in the collar table.

· Lithology:

searched for duplicate entries, intervals past the specified maximum depth in the collar

table, overlapping intervals, negative lengths, missing collar data, missing intervals, and

incorrect logging codes.

9.2 QP

Opinion

The SLR QP was provided unlimited access

for data verification purposes by SSR during this Mineral Resource estimate audit. The SLR QP is of the opinion that database verification

procedures for Marigold comply with industry standards and are adequate for the purposes of Mineral Resource estimation.

9-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

10.0 Mineral

Processing and Metallurgical Testing

10.1 Marigold

When production began at Marigold in

1989, ore was processed primarily with a rod-and-ball-mill grinding circuit with gold recovery by carbon-in-leach (CIL). In March 1990,

heap leaching commenced at Marigold. Since April 1999, all Marigold ore has been processed via truck dump, ROM heap leaching.

Cumulative gold production from the

Marigold leach pad through April 2026 is equivalent to 72.7% recovery.

Gold production data from the leach

pad operation provides the best information for predicting future processing recoveries because the ore type has been consistent since

1999. Gold recovery for future Marigold ore, including stockpile and leach pad inventory, is estimated to be 72.4% based on a review

of historical assay and recovery data as well as metallurgical test work on future ore.

10.1.1 Metallurgical

Test Work

The objectives of metallurgical testing

activities at Marigold are to determine methods to improve gold recovery, to generate information to guide short and long-range production

planning, to optimize reagent additions, and to minimize processing costs. The studies comprise both small column leach (25.4 cm

diameter by 1.2 m high, with minus 51 mm ore) and standard bottle roll leach tests with P100 2 mm samples. Testing

has been performed on a variety of Marigold ores, including representative pit samples taken by ore-control geologists, leach pad grab

samples from mine production, and various pit blasthole drill cuttings. Bottle roll test work (at P100 2mm) has also been

conducted on exploration reverse-circulation (RC) drill samples to determine the expected gold recovery from deposits that will be mined

in the future.

Historical

gold recovery versus gold grade results for all laboratory column tests are shown in Figure 10-1.

In addition to column leach tests, bottle roll tests were completed on the same samples, crushed to P100 2 mm, to develop

a correlation between column and bottle roll results. The relationship is shown in Figure 10-2. The use of bottle roll tests in place

of column leach tests enables more metallurgical tests to be undertaken in a shorter time frame (i.e., days for bottle rolls versus months

for columns).

10-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 10-1: Column Test Results – Marigold

Source: SSR 2023

Figure 10-2: Bottle Roll vs. Column Recovery

– Marigold

Source: SSR 2023

10-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

10.1.1.1 Marigold

Process Optimization Metallurgical Test Work

Additional test work, such as permeability

testing, reagent dosage, solution application rate, and carbon activity, is conducted to optimize the processing variables that are controllable

on a large heap leach pad and plant.

Permeability testing has been performed

on ore samples with varying fines content. The testing simulated compaction under multiple lifts of ore stacked up to 200 m. Overall,

the blends tested demonstrated relatively consistent permeability on increasing loads. Flow rates for the blends ranged from 178.8 L/h/m2

to 284.2 L/h/m2 under no load. Under 122 m effective height loading, flow rates ranged from 34.4 L/h/m2 up to 188

L/h/m2. All tests resulted in low, but acceptable permeabilities.

10.1.1.2 Marigold

Gold Recovery Modeling

Marigold uses two assay methods: fire

assay that measures the total contained gold in a sample (AuFA) and a second method known as ‘cyanide-soluble gold’ (AuCN).

The latter technique generates a value that represents the grade of the ore in terms of the amount of gold in a finely ground sample

that can be dissolved by a strong sodium cyanide solution, or the maximum cyanide soluble gold content.

All Marigold blasthole samples are assayed

for cyanide soluble gold. Samples ending in the numbers 0, 3, and 7 inside ore control shapes are selected for additional fire assay

analysis. Therefore, some samples have two assay values: an AuCN (cyanide soluble) value and an AuFA (fire assay) value. The ratio of

AuCN to AuFA provides the theoretical maximum gold recovery that can be achieved. For example, if the AuFA ore grade is 0.10 g/t,

and the AuCN ore grade is 0.08 g/t, the ratio is 0.08/0.01 = 0.80. This indicates that the maximum gold recovery using cyanide leaching

from this ore sample is 80%.

Test work has demonstrated that, generally,

all ore at Marigold behaves similarly. The ratio of AuCN/AuFA is an important characteristic determined for each ore block in the geologic

model.

The

most recent assessment of the predicted recovery for Marigold ore was conducted in 2017. The 2017 exploration database contains approximately

155,000 pairs of fire assays (field AUFA in the database) and cyanide soluble assays (field AUAA in the database). These assay pairs

represent all the mine ore types. On an individual ore block basis, the ratio AuCN/AuFA includes all the local geological variables for

that ore block (rock type, degree of oxidation, head grade, etc.). The result is the best estimate of maximum recovery. Figure

10-3 shows AuFA plotted against AuCN for all data pairs through 2017.

A best-fit linear regression shows the

AuCN/AuFA ratio is 0.80. The LOM historical leach pad recovery, based on ounces poured, was 74.0% at the time of this analysis.

An adjustment factor can be calculated

using the chemical maximum AuCN/AuFA recovery and the actual pad recovery:

Actual: 74% / Chemical:

80% = 0.92

Therefore, the estimated recovery from

the ROM heap leach can be expressed as:

Heap Leach Recovery

= AuCN / AuFA x 0.92

10-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

10-3: Exploration Database (2017) AuCN vs AuFA – All Data

Source: SSR 2018

10.1.1.3 Marigold

Preg-Rob Test Program

Preg-robbing is the loss of leached

gold cyanide complex from solution by adsorption onto natural carbon contained in the ore. Current control measures to mitigate preg-rob

material issues on the heap leach pad include blasthole analysis and logging, training of shovel operators to identify black rock (preg-rob

material), and ore control routing for segregation of material on the pad. A study is being conducted to assist with further understanding

preg-rob material in the Marigold ore bodies with respect to evaluating current test procedures and the correlation to both leach cycle

time and particle size. This study includes the standardized preg-rob procedure conducted in the Marigold Analytical Lab, coarse bottle

rolls, and a column test with samples containing preg-robbing material.

One of the objectives of this study

is to assess whether the placement of preg-robbing material on the Marigold heap leach facility is being adequately accounted for in

the current AuCN/AuFA ratio and ore control practices. If it is found that preg-robbing material is not being accounted for, then it

will be necessary to assess what additional factors may need to be applied to the metallurgical recovery equation.

The study work program includes the

following test work:

· Standard

preg-rob test with extended leaching times and increased gold spike concentrations.

· Standard

bottle roll procedure using a coarser particle size sample with the addition of goldspike

to mirror the laboratory SOP for preg-rob.

· Standard

column procedure with addition of gold spike in barren solution.

10-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

10.2 Buffalo

Valley

10.2.1 Metallurgical

Test Work

10.2.1.1 Historical

Test Work

The Buffalo Valley deposit has mainly

been analyzed as an oxide heap leach with bottle roll and column leach tests being the most common, though there are some tests conducted

for alternative processing. Mineralogy and geochemical data have also been reliably procured during testing. The results of testing have

shown strong lithological control, with recovery being predicted by different factors in each unit; some are predicted by the cyanide

to fire assay (CN/FA) ratio with no crush size dependency while others rely very strongly on crush size to obtain reasonable recovery.

All units perform similarly when pulverized to 75 µm. Overall, 12 test programs have been conducted since 1982, including 122 x

2 mm bottle roll tests and 96 column tests (52 at 19 mm, 42 at 38 mm, and 2 at 300 mm).

Historical mining (1987 to 1990) primarily

took place in the main dike intrusives above the Greenstone basalt layer. The 1982 KCA test program indicated excellent recovery, 80

to 90% in the near-surface intrusive unit.

Testing commissioned by Fairmile and

Newmont was focused primarily on the continuation of the core of the orebody below the historical mining, in the Sandy sedimentary unit

and Main Dike intrusive unit. While this is the main component of the ore, the spatial coverage away from this region was lacking. Composites

also typically skew to the higher grades which would have been economic at that time, with limited tests performed near the currently

anticipated cutoff grade of 0.1 g/t (0.003 opt).

SSR designed programs in 2023, 2024,

and 2025 to address these issues, spreading the test work away from historical test areas with a focus on targeting specific lithologies

with no blending. The 2024 and 2025 programs also targeted lower grade composites. Finally, the 2025 program expanded the lithological

targets to previously untested units at depth, base limestone and a new sulfidic lithology, VDFX.

10.2.1.2 Gold

Recovery by Size Results

Most of the ore at Buffalo Valley shows

a very strong crush size dependency. This size dependence is likely due to gold particles being encapsulated by skarns and other silicate

minerals. Scanning electron microscope (SEM) evidence shows that moderately size gold particles can be fully covered by garnet and pyroxene

that can only be fully liberated with grinding. This is most evident in samples from the calc-silicate hornfels (CSHF) units in the upper

sediments. There is also a portion of the gold deportment that is refractory to cyanide. From SEM analysis, it is seen that arsenopyrite

can be a significant host of sub-atomic gold, even in samples with well-oxidized pyrite. In P80 74 micron bottle roll tests,

almost all tests show more than 80% recovery of the contained gold, with only a few sulfidic-refractory samples.

The

laboratory test recoveries need to be scaled to the anticipated production size, either 38 mm crushed or 304 mm ROM. The individual

test recoveries are plotted against the log of the P80 particle size in Figure 10-4 to

generate crush size vs recovery curves for each lithology. These are then discounted to 96% to account for heap leach inefficiency and

other scale-up effects. Table 10-1 presents the recovery of contained gold (AuFA) at a crush size of 38 mm or ROM size of 304 mm. Both

of these sizes are conservative and are open for optimization in design and mine planning; Marigold ROM P80 is 144 mm, so

there is an opportunity to increase recovery with drill and blast practices.

10-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Preg-rob testing has been conducted

at most project stages, with minimal preg-rob behavior noted in the assay or bottle roll testing. Organic carbon assays are also very

low for all samples.

Table

10-1: Gold Recovery by Lithology

Metallurgical

Unit

Lithology

AuFA

Recovery (%)

Recovery

Equation by

Size

Crush

(38 mm)

ROM

(304 mm)

Intrusive

Granodiorite

85.73

84.20

88.40

– 1.692 * Log10(x)

Sandy

Sandstone

73.09

68.61

80.94

– 4.966 * Log10(x)

Greenstone

Basalt

34.00

15.09

67.08

– 20.94 * Log10(x)

CSHF

Limestone

Chert

28.60

8.46

63.83

– 22.30 * Log10(x)

SHF

Chert

58.76

48.04

77.51

– 11.87 * Log10(x)

Front

Fault

n/a

76.81

71.79

85.60

– 5.561 * Log10(x)

Limestone

Limestone

39.82

26.82

62.57

– 14.40 * Log10(x)

Figure 10-4: Buffalo Valley Au Recovery by

Size for each Lithology

Source: SSR 2023

10.3 QP

Opinion

The SLR QP opines that the metallurgical

test programs conducted by SSR, along with the historical test reports and extensive operating data and experience with the Marigold

mineralization, are adequate to support the TRS. The Buffalo Valley deposit is more complex than Marigold, and the recoveries of the

seven ore types are dependent on crush size. Recovery curves have been developed for each of the material types, allowing extrapolation

of recoveries from 38 mm to ROM material (304 mm). The method used is standard and acceptable, though there are recovery risks associated

with ROM extrapolation and the definition of ROM size. The deleterious elements in these deposits are mercury and arsenic, which are

mitigated in the carbon regeneration and refining processes.

10-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.0 Mineral

Resource Estimates

11.1 Summary

Mineral

Resources have been classified in accordance with the definitions for Mineral Resources in S-K 1300. SLR has reviewed, audited, and accepted

the Mineral Resource estimates prepared by SSR for Marigold and Buffalo Valley (Table 11-1). The

Mineral Resource estimates are based on block model values developed from assays on the mineralized properties.

The Mineral Resource estimates were

completed using a conventional block modeling approach in Seequent’s Leapfrog EDGE (Leapfrog Geo) software.

Estimates were validated using standard

industry techniques, including statistical comparisons with composite samples and parallel inverse distance squared (ID2) and nearest

neighbor (NN) estimates, swath plots, and visual reviews in cross-section and plan. A visual review comparing blocks to drill holes was

completed after the block modeling work was performed to ensure general lithologic and analytical conformance and was peer reviewed prior

to finalization.

In the opinion of the SLR QP, the resource

evaluation reported herein is an appropriate representation of the gold Mineral Resources found at the Marigold Complex at the current

level of sampling. The SLR QP is of the opinion that, with consideration of the recommendations summarized in Sections 1 and 23 of this

TRS, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be

resolved with further work.

11-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

11-1: Summary of Marigold Mine and Buffalo

Valley Mineral Resources

Deposit

Measured

Mineral

Resources

Indicated

Mineral

Resources

Measured

+ Indicated

Mineral Resources

Inferred

Mineral

Resources

Cut-off

Grade

(g/t Au)

Amount

(Mt)

Grade

(g/t Au)

Rec.

(%)

Amount

(Mt)

Grade

(g/t Au)

Rec.

(%)

Amount

(Mt)

Grade

(g/t Au)

Rec.

(%)

Amount

(Mt)

Grade

(g/t Au)

Rec.

(%)

Marigold

0.0

0.000

0.0

125.0

0.39

74.0%

125.0

0.39

74.0%

18.1

0.30

71.6%

0.069

Buffalo

Valley

0.0

0.000

0.0

5.6

0.53

59.1%

5.6

0.53

59.1%

11.2

0.31

64.4%

0.10

to 0.32

Total

0.0

0.000

0.0

130.6

0.40

73.3%

130.6

0.40

73.3%

29.3

0.31

68.8%

Notes:

1.    The Mineral Resource estimate was prepared in accordance with S-K 1300.

2.

The effective date of Mineral Resources at Marigold is May 1, 2026, and the effective date of Mineral

Resources at Buffalo Valley is May 1, 2026.

3.

Marigold Mine is based on an optimized pit shell at a cut-off grade of 0.069 g/t payable gold (gold

assay factored for recovery, royalty, and net proceeds). Buffalo Valley is based on a cut-off grade of 0.10 to 0.32 g/t contained gold,

depending on material type. Gold price of US $2,500 per ounce was used to generate the optimized pit shell.

4.

Marigold metallurgical recoveries vary with gold grade. Buffalo Valley metallurgical recoveries

vary by gold grade and lithology. Marigold Mine and Buffalo Valley average recovery is 73.7% and 62.6%, respectively.

5.

For Marigold, bulk densities (in t/m3) were assigned by lithologies: alluvium = 2.10,

Havallah = 2.48, Valmy/Antler = 2.4076+(0.0001*DEPTH), and Valmy = 2.64, below 533m. For Buffalo Valley, bulk densities (in t/m3)

were assigned by lithology, ranging from a low of 2.095 (Overburden) to a high of 2.725 (Basalt).

6.

The Mineral Resources estimate is reported below the as-mined surface as of May 1, 2026, for Marigold,

and below the as-mined surface as of May 1, 2026, for Buffalo Valley.

7.

The point of reference for Mineral Resources is the entry to the carbon columns in the processing

facility.

8.

Mineral Resources are reported exclusive of Mineral Reserves.

9.

SSR has 100% ownership of the Marigold Complex.

10.

All ounces reported represent troy ounces, and g/t represents grams per metric tonne.

11.

Totals may vary due to rounding.

11-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.2 Marigold

SSR prepared the Mineral Resource estimate

with an effective date of May 1, 2026. The Mineral Resource estimate is based on all available data for Marigold as of March 17, 2026.

The SLR QP has reviewed and accepted this information for use in this TRS.

Mineral Resources are reported exclusive

of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Due to the uncertainty

associated with Inferred Mineral Resources, it cannot be assumed that all or any part of an Inferred Mineral Resource will be upgraded

to an Indicated or Measured Mineral Resource as a result of continued exploration.

11.2.1 Resource

Database

SSR uses MX Deposit, a commercially

available geology database management system.

The digital drill hole database used

for this estimate contains 9,796 drill holes totaling 2,045,811 m. A total of 19 drill holes, totaling 3,786 m, do not contain assays.

The

project resource database, dated March 17, 2026, comprises collar coordinates, downhole survey data, lithological, and assay results.

The database incorporates all available gold assay and reassay results from Assay Programs conducted in 2015, 2016, and 2025–2026,

as well as the complete dataset for the Valmy property acquired from Newmont. All relevant validation and integrity checks were performed

during data compilation and import. Following data import, the database was further reviewed and validated using the built-in validation

tools within Seequent Leapfrog to identify and resolve any remaining errors or inconsistencies.

11.2.2 Geological

Interpretation

11.2.2.1 Geological

Interpretation

Gold

mineralization at Marigold is closely associated with the intersection of high-angle fault structures

and favorable stratigraphic horizons. Favorable host rocks within the Antler Sequence include the debris-flow

horizon of the Edna Mountain Formation; interbedded limestone, sandstone, siltstone, and conglomerate units of the Antler Peak Formation;

and conglomerate of the Battle Formation. Favorable host rocks within the Valmy Formation include quartzite and interbedded quartzite-argillite.

The geological model was created using

lithological logging data along with mapping. The following formational units were modeled: Havallah, Edna Mountain, Antler Peak Limestone,

Battle Conglomerate, and Valmy. Apart from the major formation units, a few dykes and basalt units were also modeled. Structural trends

were interpreted from logging data, pit mapping, and blasthole information.

The base of the oxidized and transition

zones was interpreted based on geological logging and analytical data.

11.2.2.2 Domain

Models

Geological

interpretation of mineralized envelopes was completed using the Indicator Radial Basis Function (RBF) tool within Leapfrog. Mineralized

envelope was developed using composited (25’) data at a cut-off grade of 0.0025 opt

Au (0.09 g/t) and an iso-value (ISO) probability of 0.435. A gold trend surface was developed using lithology, structures were mapped,

and blasthole information was used to guide the generation of mineralized envelopes.

The

mineralized envelopes exhibit good continuity and can be validated through pit mapping and production data. In areas where the implicit

modeling process either omitted mineralized zones or included waste intervals, manual adjustments were made. Figure

11-1 shows a representative cross-section of the mineralized envelope modeled.

11-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

11-1: Mineralized Envelopes and Dynamic Anisotropy Trend, 10400N, Red Dot area

11-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.2.3 Treatment

of High-Grade Assays

The SLR QP is of the opinion that the

influence of high-grade assays must be reduced or controlled, and that a number of industry best-practice methods can be used to achieve

this goal.

11.2.3.1 Capping

Levels and Outlier Restriction

When assay distributions are positively

skewed or log-normal, erratic high-grade assay values can disproportionately affect the average grade of a deposit. One method for reducing

these outliers' influence on the average grade is to cap them at a specific grade level.

Grade capping is a technique used to

mitigate the potential effect of a small population of high-grade sample outliers on grade estimation.

The spatial distribution of the high-grade

populations suggests that these elevated grades are clustered and are likely associated with high-angle structures and favorable rock

types. These high-grade structures are narrow and difficult to model due to the short-range variability unless close-spaced drilling

is available, and hence these high-grade populations within the mineralized envelopes were capped to 13.71 g/t (0.44 opt) to avoid smearing

of these higher grades.

In addition to capping thresholds, a

secondary approach to reducing the influence of high-grade composites is to restrict the search ellipse dimension (i.e., high yield restriction)

during estimation.

A

few samples with gold grades greater than 0.09 g/t (0.002 opt) that were not included within the mineralized envelopes were estimated

as part of the waste domain using lower cap and outlier restrictions. The capping values and outlier restrictions used are presented

in Table 11-2.

Table

11-2: Capping and Outlier Restriction

Values and Distance for Various Domains

Domain

Clamp

Distance

(% search, 1st pass, 2nd pass)

Cap

Value (g/t)

Within

Mineralized envelopes

N/A

13.71

AUFE

Waste

0.34

g/t – 10% of search

13.71

0.34

g/t – 20% of search

13.71

Mineralized

Dumps

0.34

g/t – 10% of search

13.71

11.2.4 Compositing

The

samples were composited downhole to a length of 7.6 m. Residual lengths less than 3.8m were set to

be distributed equally. The composite length was set to the minimum mining bench height. Composites with Au>=0.09g/t were used to

define the mineralized envelope rather than raw drill hole intercepts, as selective mining is not considered feasible. The summary statistics

comparing the raw and composites inside the mineralized envelope are presented in Table 11-3.

11-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

11-3: Statistics Raw vs. Composites

inside Mineralized Envelope

Statistic

Assays

(g/t)

Composites

(g/t)

Count

274,327

55,058

Mean

0.44

0.44

SD

1.18

0.86

CV

2.67

1.94

Variance

0.04

0.02

Minimum

0.00

0.00

Q1

0.05

0.12

Q2

0.16

0.21

Q3

0.41

0.45

Maximum

190

83

11.2.5 Trend

Analysis

11.2.5.1 Variography

A

back-transformed variogram was used in the estimation of Mineral Resources to describe the spatial

continuity of gold grades, specifically the strength of spatial similarity as a function of separation distance and direction. A variogram

quantifies the variance between data values as a function of their separation distance and orientation.

A variogram was generated from the full

dataset in Seequent Leapfrog EDGE. Structural information derived from geological mapping, together with interpreted structural orientations

based on gold grade distributions, was used to guide the selection of along-strike, across-strike, and down-dip directions for variogram

modeling.

A

single variogram was developed for the whole Marigold deposit, and the parameters are shown in Table

11-4.

11-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

11-4: Variogram Parameters

Type

Plunge

(°)

Trend

(°)

Nugget

Structure

1

Structure

2

Dip

(°)

Azimuth

(°)

Pitch

(°)

Sill

Major

(m)

Semi-

major

(m)

Minor

(m)

Sill

Major

(m)

Semi-major

(m)

Minor

(m)

Spherical

10

335

0.7289

0.2166

21.9

17.7

16.8

0.1221

43.9

38.1

30.5

20

274

149

11-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.2.6 Search

Strategy and Grade Interpolation Parameters

A

regularized whole-block approach was used, assigning each block to the domain containing its centroid.

The Mineral Resource block model was initially constructed in Leapfrog Edge using US Customary units within the local mine coordinate

system and was subsequently converted to metric units for reporting purposes. A summary of the block model extents is provided in Table

11-5. The model attributes are shown in Table 11-6.

Table 11-5: Block Model Parameters

Orientation

Min

(m)

Max

(m)

Extent

(m)

Cell

Size (m)

Number

of Cells

Easting

2,316

8,992

6,675

6.1

1,095

Northing

-2,377

9,906

12,283

7.62

1,612

Elevation

914

2,621

1,707

7.62

224

Table

11-6: Block Model Attributes

Field

Description

AUALL

Gold

grade in situ

AUKR

Gold

grade below current topographic surface

AUPAY

Payable

Au grade below current topographic surface

AUREC

Recoverable

Au grade below current topographic surface

AUPL3

NN

Au gold

CNNN

CN

NN for ore blocks

CAT

Classification,

2 - Ind, 3 - Inf, 4 - not classified

ELEV

Block

bottom Elevation (Bench)

DEPTH

Centroid

depth from original topo

DWT

Ground

water table as of EOY 2025, 1 - above, 2 below

ORE

Current

ore = 1, waste = 10

ORE%

Current

% ore within a block

RCODE

Rock

Code, 1 - Cover, 2 - Havallah, 3 - Antler Peak LS, 4 - Valmy, 6- waste/backfill/mineralized stockpile, 7 - Battle Mountain, 8 - Edna,

9 - Clay Seams, 10 - RD Dyke

REC

Recovery,

decimal (0-1)

REDOX

Redox

surface, 1 - oxidized, 2- transitional, 3 - reduced

ROYL%

Royalty,

%

TCF

Tonnage

factor, ft3 / short ton

TOORG

Original

Topo

TOPO

Topo

as of EOM February 2026, %

TOPOD

Depleted

Topo as of EOM February 2026, %

11-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.2.6.1 Estimation

Domaining

A

histogram of composite grades within the modeled mineralized envelope was generated. The resulting distributions are positively skewed,

with approximately 11% of the bench composites across all domains reporting gold grades below 0.0686 g/t (0.002 opt). These low-grade

composites are interpreted to represent internal dilution within the mineralized envelopes.

Before the blocks were estimated, the

cell model was tagged for the following:

· The

depleted pre-mining topography as of February 28, 2026, was used to tag the percentage of

in situ material, followed by the February 28, 2026, end-of-month surface. The space between

these surfaces was considered an overburden storage area (OBSA), a backfill area, or a mineralized

stockpile.

· The

formation solids were used to tag the RCODE variable in the cell model.

· The

surface developed for the top of the sulfide/transitional zone and oxidized material was

used to tag the REDOX variable in the model.

The cells were then estimated for gold

using ordinary kriging.

The mineralized waste areas, M9 and

8Sx, were identified in 2014 and 2015 and are located below OBSA.

Material

contained within the OBSA was mined during the late 1990s and early 2000s, a period when cut-off

grades were higher than those currently applied. During drilling of the M9 and 8Sx areas, samples collected from the OBSAs were also

assayed for gold, with the majority returning grades above the current cut-off

grade. To verify these results, an additional 37 sonic drill holes were completed in 2016, which confirmed the presence and grade of

gold mineralization within the historical OBSA.

A total of 372 drill holes completed

between 2010 and 2017 within the OBSAs were incorporated into the Mineral Resource estimation. The mineralized material within the historical

OBSAs (referred to as the mineralized stockpile) was constrained using the original and current topographic surfaces. Samples located

within these constraints were selected and composited to 7.62 m bench intervals. Gold grades were subsequently estimated into the block

model using inverse distance squared (ID2) interpolation, applied in two separate estimation passes.

11.2.6.2 Search

Neighborhood Design

The

search parameters used to estimate the cells within the mineralized stockpile are shown in Table

11-7 and Table 11-8.

11-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 11-7: Search Parameters for In Situ

Estimation

Search

Min

No. of

Composites

Max

No. of

Composites

Outlier

Range

(%)

Outlier

Au

(g/t)

Search

Ellipsoid Distance

Search

Orientations

Max

Samples

per Hole

X

Search

(m)

Y

Search

(m)

Z

Search

(m)

Pass

1 within the mineralized envelope

3

6

76.2

45.7

30.5

Dynamic

Anisotropy

2

Pass

2 within the mineralized envelope

1

8

229

137

91.4

Pass

1 outside mineralized envelope

3

6

10

0.343

38.1

22.9

15.2

1

Pass

2 outside mineralized envelope

1

8

20

0.343

228.6

137.2

91.4

Notes: Orientation is based on Au trend

surfaces.

Table 11-8: Search Parameters for Mineralized

Stockpile

Search

Min

No. of

Composites

Max

No. of

Composites

Outlier

Range

(%)

Outlier

Au

(g/t)

Search

Ellipsoid Distance and Orientation

X

Search (m)

Y

Search (m)

Z

Search (m)

Max

Search (m)

X

Axis

Y

Axis

Z

Axis

Pass

1

3

8

10

0.343

91

91

15

91

0

0

0

Pass

2

1

8

20

0.343

150

150

15

150

0

0

0

11-10

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.2.7 Bulk

Density

Bulk density or specific gravity (SG)

is used globally to convert volume to tonnage and, in some cases, to estimate block grade.

A total of 713 core samples were collected

from diamond core drillholes for dry bulk density determinations at the Marigold onsite laboratory. Out of the total of 713 samples,

98 samples represented Antler sequence, 604 samples represented Valmy Formation, and 11 samples were from late Cretaceous intrusives.

The following methodology was used to

measure the bulk density of the half-core samples:

· A

thoroughly dry core sample is weighed in air.

· The

sample is saturated with water, and

· After

saturation, the sample is weighed while suspended in water, and then the saturated sample

is weighed in air.

The three weights (dry in air, saturated

in water, and saturated in air) are then used to calculate the sample's dry bulk density (Silver Standard, 2014).

The

density used in the cell model at depth (from the original topographic surface) for different materials is summarized in Table

11-9.

Table 11-9: Summary of Density for Different

Material

Material

Depth

(m)

Density

(t/m3)

Alluvium/Backfill

>0.00

2.10

Havallah

>0.00

2.48

Valmy/Antler

0.0

to 533

y=2.4076+(0.0001*DEPTH)

Valmy

>533

2.64

11.2.8 Classification

A Mineral Resource is defined as a concentration

or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there

are reasonable prospects for economic extraction. A Mineral Resource is a reasonable estimate of mineralization, considering relevant

factors such as cut-off grade, likely mining dimensions, location, or continuity, that with the assumed and justifiable technical and

economic conditions, are likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralization

drilled or sampled.

Based on this definition of Mineral

Resources, the Mineral Resources estimated in this TRS have been classified according to the definitions below based on geology, grade

continuity, and drill hole spacing.

Measured

Mineral Resource is that part of a mineral resource for which quantity and grade or quality

are estimated based on conclusive geological evidence and sampling. The level of geological certainty associated with a measured mineral

resource is sufficient to allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support

detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured mineral resource has a higher

level of confidence than the level of confidence of either an indicated mineral resource or an inferred mineral resource, a measured

mineral resource may be converted to a proven mineral reserve or to a probable mineral reserve.

11-11

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Indicated

Mineral Resource is that part of a mineral resource for which quantity and grade or quality are

estimated based on adequate geological evidence and sampling. The level of geological certainty associated with an indicated mineral

resource is sufficient to allow a qualified person to apply modifying factors in sufficient detail to support mine planning and evaluation

of the economic viability of the deposit. Because an indicated mineral resource has a lower level of confidence than the level of confidence

of a measured mineral resource, an indicated mineral resource may only be converted to a probable mineral reserve.

Inferred

Mineral Resource is that part of mineral resource for which quantity and grade or quality are

estimated based on limited geological evidence and sampling. The level of geological uncertainty associated with an inferred mineral

resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner

useful for evaluating economic viability. Because an inferred mineral resource has the lowest level of geological confidence of all Mineral

Resources, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an inferred

mineral resource may not be considered when assessing the economic viability of a mining project and may not be converted to a mineral

reserve.

The factors that can affect the uncertainty

associated with each classification of Mineral Resources include, but are not limited to:

· reliability

of sampling data

· confidence

in interpretation

· modeling

of geological and estimation domains

· confidence

in block grade estimates.

The

average distance to the three nearest drill holes was used as a criterion for Mineral Resource classification. Based on the drill spacing

and the interpreted continuity and characteristics of mineralization, the available data does not support the classification of any Mineral

Resources in the Measured category (Table 11-10 and Figure 11-2).

Table

11-10: Resource Classification Parameters

Average

distance to 3 nearest holes

Indicated

(m)

Inferred

(m)

Not

classified (m)

Inside

Envelope

<=

45.7

<

= 67.1

>

67.1

Outside

envelope

<=

22.9

<=

33.5

>

33.5

11-12

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-2: Valmy Classification Cross Section

(1100N)

11-13

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.2.8.1 QP

Comments on Classification

In the SLR QP’s opinion, the classification

of Mineral Resources is reasonable and appropriate for Mineral Resource disclosure, and there is a reasonable expectation that the majority

of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

11.2.9 Estimation

Validation

The Marigold block model estimates were

validated using industry standard techniques, including:

· Local

validation using visual inspections on sections and plans, viewing composites versus block

estimates

· Global

validation by comparison of composite statistics versus block estimates

· Local

validation by comparison of average assay grades with average block estimates along different

directions (swath plots)

SLR reviewed and audited the validation

steps performed by SSR resource geologists and found grade continuity to be reasonable and confirmed that the block grades were reasonably

consistent with local drill hole composite grades.

11.2.9.1 Visual

Inspection

Visual

validation included comparing the composites and the estimated model grades in both plan and section. Plans and sections were also checked

for smearing of grades across stacked ore/mineralized zones, and no smearing was identified. This validates the kriging parameters used

to estimate the cells. A typical cross-section and a plan view with estimated grades are shown in Figure

11-3 and Figure 11-4, respectively.

11-14

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

11-3: Visual Validation, >= 0.002

opt, Not Depleted, Section -3850N

11-15

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-4: Visual Validation, AUKR >=

0.002 (opt), not depleted, Level 4400

11-16

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.2.9.2 Estimation

Statistics

Checks

for global bias were conducted on a domain basis, and the relative percent differences of the kriged mean gold grades were checked against

the Nearest Neighbor (NN) estimates; the difference was less than ±0.021% (Table 11-11).

Table

11-11: Estimation Variance Statistics, not depleted

Classification

Kriging

Au

(g/t)

NN

Au

(g/t)

Variance

(%)

Indicated

and Inferred

0.45

0.45

0.021

11.2.9.3 Swath

Plots

Swath

plots were generated to compare the current model estimate with the previous model, including kriged Au values from the current model,

kriged Au values from the previous model, nearest-neighbor (NN) Au values from the previous model, and 25-ft

Au composites.

These

plots, presented as Figure 11-5, Figure 11-6, and Figure 11-7, demonstrate good correlation.

11-17

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-5: Swath Plot Along East, comparing

Assay, Kriged Value and NN

Source: SSR 2026

Note: Grade in opt and distance in feet.

11-18

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

11-6: Swath Plot Along North, comparing

Assay, Kriged Value and NN

Source: SSR 2026

Note: Grade in opt and distance in feet.

11-19

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

11-7: Swath Plot Along Elevation, comparing

Assay, Kriged Value and NN

Source: SSR 2026

Note: Grade in opt and distance in feet.

11-20

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.2.10 Prospects

of Economic Extraction for Mineral Resources

Mineral Resources must demonstrate reasonable

prospects for economic extraction (RPEE), which generally implies that the quantity and grade estimates meet certain economic thresholds

and that the Mineral Resources are reported at an appropriate cut-off grade, taking into account extraction scenarios.

Metal prices used for reserves are based

on consensus, long-term forecasts from banks, financial institutions, and other sources. For resources, metal prices used are slightly

higher than those for reserves.

A reporting cut-off grade for the Marigold

Mine based on assumed costs for open pit extraction and heap leach processing, and commodity prices that provide a reasonable basis for

establishing the prospects of economic extraction for Mineral Resources was established and reviewed by the SLR QP.

11.2.10.1 Cut-off Grade Estimation and Whittle

Parameters

Mineral

Resources for Marigold were calculated based on a Whittle optimized pit at a payable gold grade of 0.069 g/t (Au assay factored for recovery,

royalty, and net proceeds per cell) using an assumed gold price of $2,500/oz. Input parameters for the Whittle pit optimization are provided

in Table 11-12.

Table 11-12: Marigold Resource Pit Parameters

and Cut-off Grade

Marigold

Unit

Value

Gold

Price

US$/oz

2,500

Gold

Sales, Insurance, Legal, and Social

US$/oz

incl

in Payable Au

Royalties

US$/oz

incl

in Payable Au

Processing

Au Recovery

%

incl

in Payable Au

Payable

Au

%

100.00%

Mining

Dilution

%

1.00

Processing

Cost*

US$/t

2.35

Rehandling

Cost

US$/t

0

Total

US$/t

2.35

Cut-off

Grade – Marginal

g/t

0.05

Internal

Cut-off Used

g/t

0.069

Mining

Cost*

US$/t

1.35*

Cut-off

Grade- Full

g/t

0.078

*

G&A included in both mining and processing costs

11-21

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The gold price of $2,500/oz was selected

after consideration of the pricing information described in Section 16, including the time frame used for the selection and the reasons

for selecting that time frame. The metal price reflects the range of publicly reported price estimates for Mineral Resource cut-offs.

The Marigold Mineral Resource is assumed to be mined by open pit.

By definition, the estimation of Mineral

Resources has considered environmental, permitting, legal, title, taxation, mining, metallurgical, infrastructure, socio-economic, marketing,

and political factors and other constraints, as discussed in various sections of the TRS.

11.2.11 Mineral

Resource Reporting

SLR

is unaware of any current environmental, permitting, legal, title, taxation, socio- economic, marketing, political, or other relevant

factors that could materially affect the Mineral Resources estimate for Marigold (exclusive of Mineral Reserves) as of May 1, 2026, presented

in Table 11-13 .

Table

11-13: Details of Marigold Mineral Resources

Estimate Exclusive of Mineral Reserves as of May 1, 2026

Category

Tonnes

(Mt)

Grade

(g/t Au)

Contained

Metal

(Au Moz)

Cut-off

Grade

(Au g/t)

Metallurgical

Recovery

(%)

Measured

0.0

0.0

0.00

0.069

0.0

Indicated

125.0

0.39

1.57

0.069

74.0%

Total

Measured + Indicated

125.0

0.39

1.57

0.069

74.0%

Inferred

18.1

0.30

0.18

0.069

71.6%

Notes:

1.

The Mineral Resource estimate was prepared in accordance with S-K 1300.

2.

The effective date of Mineral Resources at Marigold is May 1, 2026,

3.

Marigold Mine is based on an optimized pit shell at a cut-off grade of 0.069 g/t payable gold (gold

assay factored for recovery, royalty, and net proceeds).

4.

Marigold metallurgical recoveries vary with gold grade. Marigold Mine’s average recovery is

73.7%.

5.

For Marigold, bulk densities (in t/m3) were assigned by lithologies: alluvium = 2.10,

Havallah = 2.48, Valmy/Antler = 2.4076+(0.0001*DEPTH), and Valmy = 2.64 below 533m .

6.

The Mineral Resources estimate is reported below the as-mined surface as of May 1, 2026, for Marigold.

7.

The point of reference for Mineral Resources is the entry to the carbon columns in the processing

facility.

8.

Mineral Resources are reported exclusive of Mineral Reserves.

9.

SSR has 100% ownership of the Marigold Complex

10.

All ounces reported represent troy ounces, and g/t represents grams per metric tonne.

11.

Totals may vary due to rounding.

11.2.12 Comparison

with Previous Estimates

The 2026 Mineral Resource, exclusive

of Mineral Reserves, has been compared with the previous December 31, 2025 Mineral Resource estimate as reported in SSR’s 2025

Form 10-K filing (SSR 2025) for Marigold Mine.

11-22

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

There has been a decrease in Indicated

contained gold ounces of 167 koz and a reduction in Inferred gold ounces of 233 koz. The change can be attributed to the following:

· Conversion

of Resources to Reserves due to increased reserve prices and infill drilling

· Re-interpretation

of the mineralized envelopes using the most updated drill hole and geological mapping information

11.2.13 Mineral

Resource Uncertainty

Mineral Resources are not Mineral Reserves

and do not have demonstrated economic viability, nor is there certainty that all or any part of the Mineral Resource estimated here will

be converted to Mineral Reserves through further study.

Sources of uncertainty that may affect

the reporting of Mineral Resources include sampling or drilling methods, data processing and handling, geologic modeling, and estimation.

There are sources of uncertainty in the MRE at the Marigold Mine that depend on the assigned classification. The SLR QP has not identified

any relevant technical and/or economic factors that require resolution with regard to the Mineral Resource estimate.

The SLR QP is of the opinion that with

consideration of the recommendations summarized in Sections 1 and 23 of this TRS, any issues relating to all relevant technical and economic

factors likely to influence the prospect of economic extraction can be resolved with further work.

11.2.14 QP

Opinion

In the SLR QP’s opinion, the resource

estimation reported herein is an appropriate representation of the gold Mineral Resources at the current level of drilling and sampling.

The Mineral Resource model is suitable for Mineral Reserve estimation.

The SLR QP reviewed the assumptions,

parameters, and methods used to prepare the Mineral Resources Statement and is of the opinion that the Mineral Resources are estimated

and prepared in accordance with S-K 1300.

11-23

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3 Buffalo

Valley

The Buffalo Valley resource estimation

was conducted by SSR with an effective date of May 1, 2026. The Mineral Resource estimate is based on all available data as of March

17, 2026. The SLR QP has reviewed and accepted this information for use in this TRS.

11.3.1 Resource

Database

The digital drill hole database used

for this estimate contains a total of 1,841 drill holes; 797 additional holes are located in the surrounding Buffalo Valley model but

not used to build the geological model and estimation. SSR uses MX Deposit, a commercially available database management system. The

drill campaigns represented in the data were completed over more than 42 years, from 1980 through to March 17, 2026.

11.3.2 Geological

Interpretation

The Buffalo Valley project area is approximately

2.5 miles long north-south, and 1.7 miles wide east-west.

11.3.2.1 Domains

and Grade Shells

Most of the gold mineralization at Buffalo

Valley is hosted along a system of northwest-trending dikes and faults. Mineralization occurs both adjacent to dikes as well as bedding-parallel

in receptive sedimentary units.

A

total of four mineralized domains were defined for gold estimations and one for the Quaternary alluvium. Figure

11-8 and Figure 11-9 show a plan map and cross-section through the Buffalo Valley pit showing the locations of these domains. Probability

envelopes (at least 40% probability of AUBEST exceeding 0.004 opt) were developed to best constrain the mineralization for estimation:

· FFOZ

– Front Fault ore zone

· Min

BV DH - Mineralized envelope in Buffalo Valley and Dore Hills

· Min

WH – Mineralized in Warthog

· LG

– Material outside Mineralized envelope

· Ovb

– Quaternary alluvium

11-25

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-8: Buffalo

Valley Estimation Domains (Plan View Elevation 5100)

11-26

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-9:

Buffalo Valley Geology (Mine Grid Section -32,400 N)

11-27

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The

drill hole data included fire assay (AUFA) and cyanide soluble (AUCN) intervals (Table 11-14). Most

data consisted of matched pairs (59,263), but 15,995 AUCN values have no corresponding AUFA values.

AUBEST was used for estimation due to

unequal sampling preferences for fire-assay and cyanide-soluble assays. AUBEST prioritizes fire assay values where they exist, and merges

in cyanide soluble assay values where fire assay does not exist. By combining the assays into a single variable, the estimation is informed

by the most robust and slightly conservative information.

The

length-weighted gold assay (g/t) and interval length statistics for sample intervals are summarized in Table

11-14.

Table 11-14:

Length Weighted Gold Assays (g/t) Statistics of Raw Samples by Estimation Domain

Name

Element

Count

Mean

(g/t)

SD

CV

Variance

Min

(g/t)

Median

(g/t)

Max

(g/t)

FFOZ

AUCN

2,497

0.43

0.0393

3.1327

0.0015

0.02

0.14

43.03

AUFA

1,809

0.51

0.0465

3.1381

0.0022

0

0.17

44.5

AUBEST

3,090

0.48

0.0412

2.9671

0.0017

0

0.17

44.5

AUCE

3,090

0.41

0.0377

3.1543

0.0014

0

0.14

43.03

Interval

Length

3,194

4.8561

1.5723

0.3238

2.4722

0.1

5

58.5

Min_BV_DH

AUCN

21,222

0.53

0.0587

3.8255

0.0034

0

0.14

119.25

AUFA

21,064

0.65

0.0641

3.3705

0.0041

0

0.17

125.11

AUBEST

27,102

0.62

0.0624

3.4558

0.0039

0

0.17

125.11

AUCE

27,102

0.5

0.0546

3.7717

0.003

0

0.14

119.25

Interval

Length

27,491

4.7002

1.2744

0.2711

1.624

0.1

5

80

Min_WH

AUCN

2,110

0.38

0.0272

2.4748

0.0007

0.02

0.17

29.35

AUFA

4,023

0.46

0.0428

3.1783

0.0018

0

0.22

83.8

AUBEST

4,040

0.46

0.0427

3.1629

0.0018

0

0.22

83.8

AUCE

4,040

0.33

0.0228

2.3593

0.0005

0.01

0.17

29.35

Interval

Length

4,055

4.8917

2.1777

0.4452

4.7426

1

5

135

LG

AUCN

49,429

0.08

0.0085

3.5106

0.0001

0

0.03

15.09

AUFA

81,127

0.07

0.0105

5.1572

0.0001

0

0.03

60

AUBEST

89,786

0.07

0.0102

4.7683

0.0001

0

0.03

60

AUCE

89,786

0.06

0.007

3.8985

0

0

0.03

15.09

Interval

Length

93,186

4.8493

1.7135

0.3533

2.9359

0.1

5

200

11-28

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3.3 Treatment

of High-Grade Assays

11.3.3.1 Capping

Levels

When the assay distribution is positively

skewed or log-normal, erratic high-grade assay values can disproportionately affect the average grade of a deposit. One method for reducing

these outliers' influence on the average grade is to cap them at a specific grade level.

Grade capping is a technique used to

mitigate the potential effect of a small population of high-grade sample outliers on grade estimation. These high-grade samples are not

considered representative of the general population and are therefore capped to a level more representative of the general data population.

Although subjective, grade capping is a common industry practice when estimating grades for deposits with significant grade variability.

In the absence of production data to calibrate the capping level, inspection of the assay distribution can be used to estimate a “first

pass” cutting level.

Grade capping values were assigned by

reviewing log histograms for the metal values for each domain. Capping values were determined to limit the upper range of estimation

data to a level where the histogram maintains a reasonable structure.

For

example, the capping values for AUBEST are summarized by estimation domain in Table 11-15.

Table 11-15:

Capping Values AUBEST (g/t)

Domain

AUBEST

(g/t)

FFOZ

2.74

Min_BV_DH

10.29

Min_WH

2.06

LG

0.51

11.3.4 Compositing

The composite for all estimations is

set to 7.62 m to represent a bench height composite for the anticipated mining.

Compositing was applied on the basis

that if residual end intervals for a domain intercept are shorter than 50% of the standard composite length, then the residual lengths

are distributed over the entire intercept, reducing the bias risk for last composites in holes.

11.3.5 Trend

Analysis

11.3.5.1 Variography

Gold

variograms were developed for each lithology domain using normal scores (NS) in Leapfrog EDGE. The NS variograms were back-transformed

to real space for estimation purposes. Orientations were rotated into local ‘variable orientation’ to conform to the local

environment. Variogram models for AUBEST are summarized in Table 11-16. All variogram models are

spherical.

11-29

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 11-16:

Variogram Models (AUBEST)

Variogram Name

Rotation

Nugget

Structure 1

Structure 2

Dip

Dip Azi.

Pitch

Sill

Major (m)

Semi-major (m)

Minor (m)

Sill

Major (m)

Semi-major (m)

Minor (m)

AuBEST in BV_DH 2026_1: Transformed Variogram Model

85

235

67

0.001066

0.000343

7.62

7.62

4.57

0.00006

30.48

30.48

12.19

AuBEST in FFOZ 2026_1: Transformed Variogram Model

45

270

173

0.000344

0.000116

13.50

7.62

4.57

0.000123

51.30

30.48

8.48

AuBEST in LG 2026_1: Transformed Variogram Model

86

61

110

0.000013

0.000005

12.19

6.10

4.57

0.000004

27.43

18.29

16.76

AuBEST in WH 2026_1: Transformed Variogram Model

89

85

108

0.000348

0.000092

6.10

6.10

4.57

0.000034

30.48

30.48

12.19

11-30

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3.6 Exploratory

Data Analysis

Length-weighted

gold statistics are summarized in Table 11-17

Table 11-17:

Length Weighted Gold Assays (g/t) Statistics of Composite Samples by Domain

Domain

Element

Count

Mean

(g/t)

SD

CV

Min

(g/t)

Median

(g/t)

Max

(g/t)

FFOZ

AUCN

516

0.431

0.0252

2.0011

0.017

0.192

12.706

AUFA

372

0.513

0.0280

1.8696

0.003

0.233

13.356

AUBEST

639

0.476

0.0256

1.8487

0.003

0.211

13.356

AUCE

639

0.410

0.0237

1.9814

0.010

0.178

12.706

AUBEST_CAP

639

0.429

0.0159

1.2746

0.003

0.211

2.743

Interval

Length

639

4.8561

4.8140

0.2083

0.1

5

58.5

Min_BV_DH

AUCN

4,223

0.528

0.0349

2.2650

0.017

0.229

29.651

AUFA

4,015

0.656

0.0381

1.9923

0.003

0.288

31.625

AUBEST

5,270

0.623

0.0375

2.0658

0.003

0.268

31.625

AUCE

5,270

0.500

0.0326

2.2376

0.003

0.219

29.651

AUBEST_CAP

5,270

0.603

0.0297

1.6899

0.003

0.268

10.286

Interval

Length

5,270

4.7002

4.2824

0.1815

0.1

5

80

Min_WH

AUCN

435

0.369

0.0184

1.7085

0.027

0.204

9.943

AUFA

803

0.457

0.0240

1.8047

0.019

0.267

19.354

AUBEST

807

0.458

0.0240

1.7959

0.019

0.268

19.354

AUCE

807

0.329

0.0150

1.5580

0.021

0.192

9.943

AUBEST_CAP

807

0.409

0.0240

1.7959

0.019

0.268

2.057

Interval

Length

807

4.8917

3.4327

0.1419

1

5

135

LG

AUCN

9,791

0.081

0.0048

2.0210

0.003

0.047

6.231

AUFA

15,941

0.069

0.0058

2.8967

0.002

0.034

14.229

AUBEST

17,820

0.072

0.0057

2.7060

0.002

0.040

14.229

AUCE

17,820

0.060

0.0040

2.2893

0.003

0.034

6.231

AUBEST_CAP

17,820

0.064

0.0023

1.2127

0.002

0.040

0.514

Interval

Length

17,820

4.8493

3.0339

0.1248

0.1

5

200

Figure 11-10 and Figure 11-11 show the

boxplots for fire assay and cyanide soluble gold on four domains representing one lithological population in the Front Fault Ore Zone

(FFOZ), the material within a probability shell of greater than 0.4 of AUBEST grade of at least 0.1028 g/t (0.003 opt) within the Buffalo

Valley/Dore Hills area (Min_BV_DH), similarly constrained material within the Warthog area (Min_WH), and the remaining low grade (LG)

material outside of the mineralized shells.

11-31

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-10:

Boxplot of AUFA by Domain (grade in opt)

Source: SSR 2026

11-32

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-11:

Boxplot of AUCN by Domain (grade in opt)

Source: SSR 2026

11-33

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The

naïve histograms for AUBEST inside probability greater than 0.47 of AUBEST grade at least 0.1244 g/t (0.004 opt) for the four domains

are shown in Figure 11-12. The log probability plots for AUBEST are shown in Figure 11-13.

Figure 11-12:

Histograms of AUBEST By Domains (grade in opt)

Source: SSR 2026

11-34

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-13:

Log Probability Plots of AUBEST By Domains (grade in opt)

Source: SSR 2026

11-35

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The

AUCE variable is built from AUCN assays where they exist and regressed AUFA assays as available. The regressions were applied by lithology

and are summarized in Table 11-18.

Table 11-18:

AUCE Regression Summary Applied to AUFA Values

Lithology

Variable

Slope

Intercept

Base

limestone

AUFA

0.80812

-0.002337

Crosscut

west

AUFA

0.75895

-0.000129

East

stock

AUFA

0.8714

0.000014

East

stock dike 1

AUFA

0.97863

-0.000518

East

stock dike 3

AUFA

0.90019

-0.000025

Hav

Basalt

AUFA

0.92026

-0.000572

Main

dike east

AUFA

0.82324

-0.000204

Main

dike west

AUFA

0.69406

-0.000432

Overburden

AUFA

0.7142

0.000082

Sandy

unit

AUFA

0.83864

-0.000204

SH

AUFA

0.91817

-0.00049

Upper

sed unit

AUFA

0.8341

-0.000672

Other

AUFA

0.70766

0.000235

11.3.7 Search

Strategy and Grade Interpolation Parameters

Resource

estimation was completed within an area encompassing the deposit with block model geometry and extents as presented in Table

11-19 using Leapfrog EDGE software with US Customary units. A parent block size of 6.10 m in the X (across strike) by 7.62 m in the Y

(along strike) directions by 7.62 m in the Z (vertical) direction was chosen for the model.

Table 11-19:

Block Model Parameters (Mine Grid X, Y, Z in meters)

BV_20x25x25

2026_1 Parameter

X

(m)

Y

(m)

Z

(m)

Extents

Block

6.10

7.62

7.62

Base

Point

-5,028.95

-11,002.74

1,920.15

Boundary

5,028.95

4,084.12

1,280.10

Rotation

Azimuth

Dip

Pitch

0

0

0

The

estimated variables in the cell model are listed in Table 11-20.

11-36

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 11-20:

Estimated Variables

Element

Variable

Name

Description

Domains

Remarks

Au

AuBEST

Au

Fire Assay Merged with Au Cyanide Leachable

Lithology/Au-grade

shell-based

Estimated

from composite values of AUFA with missing values replaced with cyanide leachable assays where

they exist.

AUCE

Au

Cyanide Leachable Equivalent

Lithology/Au-grade

shell-based

Calculated

from AUCN with missing values replaced with cyanide leachable assay equivalent values calculated using cyanide leachable –

fire assay regressions.

AUFA

Au

Fire Assay

Lithology/Au-grade

shell-based

Estimated

directly from Au fire assay composite data

AUCN

Au

Cyanide Leachable

Lithology/Au-grade

shell-based

Estimated

directly from Au cyanide leachable composite data

Cu

CU

Cu

grades

Lithology/Cu-grade

shell-based

Estimated

from ICP composites

S

STOT

S

grades

Lithology/S-grade

shell-based

Estimated

from LECO composites

TCF

TCF

Bulk

density (ft3 / st)

Lithology-based

Assigned

from averages of relevant domain

11.3.7.1 Estimation

Domaining

Six

3D volumetric models were constructed to serve as estimation domains, as listed in Table 11-21.

Table 11-21:

Volumetric Models Generated for Estimation Domaining and Grade Estimation

Model

Name

Target

Number

of

Components

Construction

Elements

Buffalo

Valley Live Model

AUFA/AUBEST/AUCN/AUCE

14

lithologies

Buffalo

Valley Live Model NOTOPO

AUFA/AUBEST/AUCN/AUCE

14

lithologies

Mineralization

Model 2026_1

AUBEST/AUCE

5

lithologies/Au

grade shell domains

Cu_2026_1

Cu

ppm

4

lithologies/Cu

grade shell domains

Topo

Model

topography

2

topography

Mineralization

Model

STOT

ppm (LECO)

3

grade

isoshells

11-37

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3.7.2 Contact

Analysis

Contact analysis for exploration composites

was used to investigate the extension of the hard or soft domain boundaries.

The

boundary analysis graph for the Mineralized Au domain representing Buffalo Valley – Dore Hills is interpreted as suitable for hard

boundary estimation and is shown in Figure 11-14.

Figure 11-14:

Buffalo Valley-Dore Hills Mineralized Shell Boundary Conditions

Source: SSR 2026

Note: Distance is given in feet; grade

is given in ounce per short ton.

The

boundary analysis graph for the Front Fault Ore Zone into the surrounding mineralized domain is interpreted as suitable for soft 1.52

m boundary estimation and is shown in Figure 11-15.

11-38

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-15:

FFOZ Boundary Conditions

Source: SSR 2026

Note: Distance is given in feet; grade

is given in ounce per short ton.

Boundary conditions are often ambiguous

due to the large size of the mineralized domains due to the very low cutoff grade defining them. Consequently, domain boundaries with

ambiguous character were assigned hard boundaries.

The

types of boundaries used by domain are outlined in Table 11-22.

Table 11-22:

Estimation Domain Boundary Types

Domain

Boundary

Type

Range

(m)

FFOZ

Soft

1.52

Min_BV_DH

Hard

0

Min_WH

Hard

0

LG

Hard

0

OVB

Hard

0

11-39

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3.7.3 Search

Neighborhood Design

An initial estimate for AUBEST was carried

out using the relevant variogram range as the upper limit. This was found to be too restrictive, and subsequently, estimates were made

to a range limit of twice the variogram range.

Most domains were estimated with variable

search and variogram orientations based on the local lithological and grade trends. Some domains with limited or ambiguous data were

estimated using fixed orientations.

A minimum of three and a maximum of

12 composites, drawn from a maximum of two composites per drill hole, were used for estimation. This ensured that at least two holes

were used for estimating each block.

Grade

interpolation parameters for the kriging estimators for AUBEST are summarized in Table 11-23.

Table 11-23:

Grade Interpolation Parameters for AUBEST/AUCE

Domain

Ellipse

Ranges

Ellipsoid

Directions

Variable

Orientation

Sample

Limits

Max

(m)

Int

(m)

Min

(m)

Dip

Dip

Azi.

Pitch

Min

Max

Max

Samples

per Hole

BV_DH

200

200

80

Variable

Orientation BV_DH

3

12

2

FFOZ

330

200

50

Variable

Orientation FFOZ

3

12

2

LG

180

120

100

Variable

Orientation BV_DH_Warthog Blend

3

12

2

Ovb

920

760

100

6

270

155

None

3

12

2

WH

200

200

80

Variable

Orientation Warthog

3

12

2

11.3.8 Bulk

Density

Table 11-24 shows the density assigned

by geological formation. The average density for each formation has been assigned to blocks. Lithologies with no data have been assigned

to be 2.564 t/m3 and in the absence of updates, the density for the dump material was assigned to be 1.908 t/m3.

Table 11-24:

Density Assignments

Name

Density

(t/m3)

Base

limestone

2.610

Crosscut

west

2.688

Hav

Basalt

2.725

11-40

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Name

Density

(t/m3)

Overburden

2.095

Sandy

unit

2.564

Cs

2.679

Sh

2.608

Default

2.564

Dump

1.908

11.3.9 Classification

Mineral

Resources have been classified in accordance with the definitions presented in Section 11.2.8. Classification

of the Mineral Resources reported in this TRS is based on the QP's assessment of geological confidence, grade continuity, data quality,

and drill hole spacing. Based on these factors, Mineral Resources have been categorized as Measured, Indicated, or Inferred

Mineral

Resource material was classified using criteria based on the average distance to the closest three informing composites as summarized

in Table 11-25.

Table 11-25:

Classification Rules

Material

Measure

Threshold

Outcome

Mineralized

Stockpile

Not

in Resources

In

Situ

Average

distance to 3 closest composites

<=

27.43m

Indicated

Average

distance to 3 closest composites

27.43<x<=39.62

Inferred

All

other mineralized material

>39.62

Not

in Resources

11-41

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-16:

Classification – Buffalo Valley Deposit (Looking N at 31550N With a 25’ Window)

11-42

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3.9.1 QP

Comments on Classification

In the SLR QP’s opinion, the classification

of Mineral Resources is reasonable and appropriate for Mineral Resource disclosure, and there is a reasonable expectation that the majority

of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

11.3.10 Estimation

Validation

The Buffalo Valley block model estimates

were validated using industry standard techniques, including:

· Local

validation using visual inspections on sections and plans, viewing composites versus block

estimates.

· Global

validation by comparison of composite statistics versus block estimates.

· Local

validation by comparison of average assay grades with average block estimates along different

directions (swath plots).

The SLR QP found grade continuity to

be reasonable and confirmed that the block grades were reasonably consistent with local drill hole composite grades.

11.3.10.1 Visual

Inspection

The

block model estimates were reviewed by W-E and N-S sections and reasonably conform to the composite data. Examples for AUBEST, in the

W-E sections, are shown in Figure 11-17.

11.3.10.2 Estimation

Statistics

The

statistical summary of gold grade estimates is summarized in Table 11-26.

11-43

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-17:

Cross Section Buffalo Valley Deposit (-31550N, $2500 Resource Shell, 25ft Section Window, MII Only)

11-44

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-18:

Cross Section Buffalo Valley Deposit (-32400N, $2500 Resource Shell, 25ft Section Window, MII Only)

11-45

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 11-26:

Statistical Summary of Gold Grade Estimates (g/t)

Domain

AUBEST

Composites

NN

Estimates

ID2

Estimates

OK

Estimates

Count

Mean

Variance

Min

Max

Mean

Variance

Min

Max

Mean

Variance

Min

Max

Mean

Variance

Min

Max

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

FFOZ

1,613

0.470

0

0.003

13.356

0.269

0

0.003

2.743

0.200

0

0.013

2.658

0.216

0

0.017

2.203

Min_BV_DH

888

0.621

0

0.003

31.625

0.534

0

0.006

10.286

0.429

0

0.017

8.538

0.438

0

0.017

5.201

Min_WH

58

0.459

0

0.019

19.354

0.354

0

0.017

2.057

0.155

0

0.017

2.049

0.172

0

0.017

5.904

LG

225

0.072

0

0.002

14.229

0.018

0

0.002

0.514

0.017

0

0.002

0.506

0.017

0

0.003

0.359

11-46

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3.10.3 Swath

Plots

Swath plots were generated for strategic

domains and for the global estimates and grade patterns they are reasonable in comparison with the composite data and alternative estimation

methods (inverse distance squared and nearest neighbor).

Swath

plots for AUBEST estimates in the Buffalo Valley – Dore Hills Mineralized shell domain is shown in Figure

11-19 to Figure 11-21, inclusive. The black line represents composite data, purple = Kriged estimates, green = inverse distance to the

second power and red represents nearest neighbor. The grey histogram represents the number of blocks per swath.

11-47

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-19:

Swath Plot X for AUBEST

Source: SSR 2026

Note: grade in opt and distance in feet.

11-48

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-20:

Swath Plot Y for AUBEST

Source: SSR 2026

Note: grade in opt and distance in feet.

11-49

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 11-21:

Swath Plot Elevation for AUBEST

Source: SSR 2026

Note: grade in opt and distance in feet.

11-50

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3.11 Prospects

of Economic Extraction for Mineral Resources

Mineral Resources must demonstrate reasonable

prospects for economic extraction (RPEE), which generally implies that the quantity and grade estimates meet certain economic thresholds

and that the Mineral Resources are reported at an appropriate cut-off grade, taking into account extraction scenarios.

Metal prices used for reserves are based

on consensus, long-term forecasts from banks, financial institutions, and other sources. For resources, metal prices used are slightly

higher than those for reserves.

A reporting cut-off grade for the Buffalo

Valley deposit based on assumed costs for open-pit extraction and heap leach processing and commodity prices that provide a reasonable

basis for establishing the prospects of economic extraction for Mineral Resources was established and reviewed by the SLR QP.

11.3.11.1 Cut-Off Grade Estimation with Whittle Optimization

Parameters

Mineral

Resources for Buffalo Valley were calculated based on an optimized pit using a regularized block model set to the parent block size of

7.62 m in the X (across strike) by 7.62 m in the Y (along strike) by 7.62 m in the Z (vertical) at cut-off grades based on lithology

type using an assumed gold price of $2,500/oz. Input parameters for optimization are provided in Table

11-27.

Table 11-27:

Buffalo Valley Resource Pit Parameters and Cut-off Grades

Parameters

(*)

Unit

Value

Gold

Price

US$/oz

2,500

Refining

US$/oz

1.43

Royalties

3.5%

Processing

Au Recovery

%

3.1%

– 81.0%

Payable

Au

%

100.00%

Mining

Dilution

%

1

Processing

Cost*

US$/t

ore

2.66

Mining

Cost*

US$/t

ore

1.76

Cut-off

Grade - Full

g/t

0.1g/t

– 0.32g/t

*

Mineral Resources for Buffalo Valley were calculated using a Hexagon MinePlan-optimized pit and a regularized block model at cut-off

grades based on lithology type, factored for recovery, royalty, and net proceeds, with an assumed gold price of $2,500/oz.

The gold price of $2,500/oz was selected

after consideration of the pricing information described in Section 16, including the time frame used for the selection and the reasons

for selecting that time frame. The metal price reflects the range of publicly reported price estimates for Mineral Resource cut-offs.

The Marigold Mineral Resource is assumed to be mined by open pit.

11-51

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

By definition, the estimation of Mineral

Resources has considered environmental, permitting, legal, title, taxation, mining, metallurgical, infrastructure, socio-economic, marketing,

and political factors and other constraints, as discussed in various sections of the TRS.

11.3.12 Mineral

Resource Reporting

Mineral

Resources are reported from Minesight software using a regularized block model. SLR is unaware of any current environmental, permitting,

legal, title, taxation, socio- economic, marketing, political, or other relevant factors that could materially affect the Mineral Resources

estimate for Marigold (exclusive of Mineral Reserves) as of May 1, 2026, presented in Table 11-28.

Table 11-28:

Details of Buffalo Valley Mineral Resources Estimate Exclusive of Mineral Reserves as of May 1, 2026

Category

Tonnes

(Mt)

Grade

(g/t Au)

Contained

Metal

(Moz Au)

Cut-off

Grade

(g/t Au)

Metallurgical

Recovery

(%)

Measured

0.0

0.0

0.00

0.10

to 0.32

0.0%

Indicated

5.6

0.53

0.09

0.10

to 0.32

59.1%

Total

Measured + Indicated

5.6

0.53

0.09

0.10

to 0.32

59.1%

Inferred

11.2

0.31

0.11

0.10

to 0.32

64.4%

Notes:

1.

The Mineral Resource estimate was prepared in accordance with S-K 1300.

2.

The effective date of Mineral Resources at Buffalo Valley is May 1, 2026.

3.

Buffalo Valley is based on a cut-off grade of 0.10 to 0.32 g/t contained gold, depending on material

type.

4.

Buffalo Valley metallurgical recoveries vary by gold grade and lithology. Buffalo Valley's average

recovery is 62.6%.

5.

For Buffalo Valley, bulk densities (in t/m3) were assigned by lithology, ranging from

a low of 2.095 (Overburden) to a high of 2.725 (Basalt).

6.

The Mineral Resources estimate is reported below the as-mined surface as of May 1, 2026, for Buffalo

Valley.

7.

The point of reference for Mineral Resources is the entry to the carbon columns in the processing

facility.

8.

Mineral Resources are reported exclusive of Mineral Reserves.

9.

SSR has 100% ownership of the Marigold Complex.

10.

All ounces reported represent troy ounces, and g/t represents grams per metric tonne.

11.

Totals may vary due to rounding.

11.3.13 Comparison

with Previous Estimate

The 2026 Mineral Resource exclusive

of Mineral Reserves has been compared with the previous December 31, 2025 Mineral Resource estimate as reported in SSR’s 2025 Form

10-K filing (SSR 2025) for Buffalo Valley.

There has been an increase in Indicated

contained gold ounces of 24 koz and an increase in Inferred gold ounces of 64 koz. The change can be attributed to the following:

· Conversion

of Resources to Reserves due to increased reserve prices and infill drilling

· Re-interpretation

of the mineralized envelopes using the most updated drill hole and geological mapping information

11-52

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

11.3.14 Mineral

Resource Uncertainty

Mineral Resources are not Mineral Reserves

and do not have demonstrated economic viability, nor is there certainty that all or any part of the Mineral Resource estimated here will

be converted to Mineral Reserves through further study.

Sources of uncertainty that may affect

the reporting of Mineral Resources include sampling or drilling methods, data processing and handling, geologic modeling, and estimation.

There are sources of uncertainty in the MRE for the Buffalo Valley deposit that depend on the assigned classification. The SLR QP has

not identified any relevant technical and/or economic factors that require resolution with regard to the Mineral Resource estimate.

11.3.15 QP

Opinion

The SLR QP reviewed the assumptions,

parameters, and methods used to prepare the Mineral Resources Statement and is of the opinion that the Mineral Resources are estimated

and prepared in accordance with S-K 1300.

The SLR QP is of the opinion that, with

consideration of the recommendations summarized in Sections 1 and 23 of this TRS, any issues relating to all relevant technical and economic

factors likely to influence the prospect of economic extraction can be resolved with further work.

11-53

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

12.0 Mineral

Reserve Estimates

12.1 Summary

The

Mineral Reserve estimate (MRE) for Marigold and Buffalo Valley, as of May 1, 2026, was completed by the site technical department, and

is presented in Table 12-1.

The SLR QP reviewed the assumptions,

parameters, and methods used to prepare the Mineral Resources Statement and is of the opinion that the Mineral Resources are estimated

and prepared in accordance with the U.S. Securities and Exchange Commission (US SEC) Regulation S-K subpart 1300 rules for Property Disclosures

for Mining Registrants (S-K 1300).

The SLR QP considers that the knowledge

of the deposit setting, lithologies, structural controls on mineralization, and the mineralization style and setting is sufficient to

support the MRE to the level of classification assigned.

The SLR QP considers that the integration

of the reserve cut-off grade, operational cost parameters, metallurgical recoveries, and practical mine plan shapes including engineered

pit designs and pushbacks, effectively established the economic viability of the Mineral Reserve. These parameters accurately delineate

the portions of the Measured and Indicated Mineral Resources that can be mined and processed economically, which aligns with the bulk-mineable,

disseminated nature of the gold mineralization at the Property.

The level of uncertainty has been adequately

reflected in the classification of Mineral Resources for the Property. The MRE presented may be materially impacted by any future changes

in the break-even cut-off grade, which may result from changes in mining method selection, mining costs, processing recoveries and costs,

metal price fluctuations, or significant changes in geological knowledge.

12-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 12-1:

Summary of Marigold Mineral Reserves Estimate as of May 1, 2026

Proven

Probable

Total

Cut-

off

Grade

(g/t)

Metallurgical

Recovery

(%)

Tonnage

(Mt)

Au

Grade

(g/t)

Tonnage

(Mt)

Au

Grade

(g/t)

Tonnage

(Mt)

Au

Grade

(g/t)

Contained

Gold

(Moz)

Marigold

-

-

240.44

0.46

240.44

0.46

3.52

0.069

73.5%

Buffalo

Valley

-

-

45.33

0.46

45.33

0.46

0.67

0.069˟

65.9%

Stockpile

-

-

11.96

0.17

11.96

0.17

0.06

0.069

56.3%

Leach

Pad Inventory

-

-

61.01

0.19

61.01

0.19

0.37

-

65.2%

Total

-

-

358.74

0.40

358.74

0.40

4.63

0.069

71.5%

Notes:

1.

The Mineral Reserve estimate was prepared in accordance with S-K 1300 definitions.

2.

The Marigold Mine Mineral Reserve estimate is based on a metal price assumption of $2,200/oz gold

and is reported at a cut-off grade of 0.069 g/t payable Au (Au assay factored for recovery, royalty, and net proceeds).

3.

°The Buffalo Valley Mineral Reserve estimate assumes ROM heap leach processing and a gold price

of $2,200/oz. Cut-off grades range from 0.069 to 1.767 g/t payable Au, and metallurgical recoveries range from 3.1% to 79.2%, both varying

by lithology/metallurgical domain.

4.

No mining dilution is applied to the grade of the Mineral Reserves. Dilution intrinsic to the Mineral

Reserves estimate is considered sufficient to represent the mining selectivity considered.

5.

Bulk densities (in t/m3) were assigned by lithologies: alluvium = 2.10, Havallah = 2.48,

Valmy/Antler = 2.4076+(0.0001*DEPTH), and Valmy = 2.64. For Buffalo Valley, bulk densities (in t/m3) were assigned by lithology

ranging from a low of 2.426 (Overburden) to a high of 2.737 (Basalt) with a weighted average of 2.63.

6.

The Property is 100% owned by SSR through its subsidiary MMC.

7.

All ounces reported represent troy ounces, and g/t represents grams per metric tonne.

8.

The point of reference for Mineral Reserves is the entry to the carbon columns in the processing

facility.

9.

Totals may vary due to rounding.

The SLR QP is unaware of any current

environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially

affect the Mineral Reserves estimate as of May 1, 2026.

This section describes the methodology

and parameters used to estimate the Mineral Reserves for Marigold and Buffalo Valley. The Mineral Reserves estimate as of May 1, 2026,

considers all information used in the Mineral Resources estimate as of May 1, 2026, as presented in Section 11.

12.2 Marigold

12.2.1 Conversion

to Mineral Reserves

Mineral

Reserves have been classified in accordance with the U.S. Securities and Exchange Commission (US SEC) Regulation S-K subpart 1300

rules for Property Disclosures for Mining Registrants (S-K 1300). The Mineral Reserves estimate is summarized in Table

12-1.

Pit optimizations were run on the Mineral

Resources cell model using Pseudoflow algorithm to generate optimal pit limits based on block value at a range of gold prices.

The ultimate pits and subsequent phase

designs were developed from the $2,200/oz optimization runs. The gold price assumption was based on an internal assessment of recent

market prices, long-term forward curve prices, and consensus among analysts regarding price estimates.

12-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

At Marigold, inter-ramp angles (IRAs)

for the final pit design are between 35° and 38° in mined fill and range between 45° and 49° in rock.

Mining costs are based on historical

values and budgeted costs that include an incremental haulage component using estimated haul cycle times and pit depths. Processing and

general and administrative (G&A) costs were estimated based on historical values and budgeted costs. Estimated sustaining capital

costs, royalties, severance taxes, and reclamation costs were also included in the optimization costs.

The Mineral Reserves for Marigold were

estimated using the as-mined surface at May 1, 2026, with the following assumptions and parameters:

· There

are no Measured Resources in the Mineral Resources model. Indicated Mineral Resources within

the final pit design are converted to Probable Mineral Reserves. Inferred Mineral Resources

are not considered in the Mineral Reserves estimation.

· The

mining recovery is 100% within the pit design.

· The

Mineral Resources were not diluted. Internal dilution included in the Mineral Resource estimate

is considered adequate.

· The

Mineral Reserves estimate assumes that mining operations will continue to use the current

Marigold mining methods, as described in Section 13.

· The

estimated cut-off grade was 0.069 g/t (0.002 opt) payable Au (Au assay factored

for recovery, royalty, and net proceeds).

· The

leach pad inventory of 0.374 Moz Au is included in the Mineral Reserves, in addition to the

material that is placed on top of the leach pads.

12.2.1.1 Stockpiles

On the surface of the mining phase areas

8S Extension (8Sx) and M7 are historical OBSA from material mined during the late 1990s and early 2000s when cut-off grades were higher

than the current cut-off grades. While drilling the HideOut and 8Sx targets, samples from these OBSA were also assayed for gold, with

a majority of these samples returning gold values higher than the current cut-off grade. To confirm the grades, 37 sonic drill holes

were drilled in 2016. These drill holes confirmed the gold grades in the historical OBSA, hereinafter referred to as “mineralized

stockpiles” or “stockpiles”.

12.2.2 Cut-off

Grade

The

estimated cut-off grade for Mineral Reserves was based on a $2,200/oz gold price. The gold price of $2,200/oz was selected following

current industry guidelines and corporate strategy. The metal price is representative of the range of price estimates publicly reported

for Mineral Reserve cut-offs. Factors used to estimate the cut-off grade are outlined in Table 12-2,

and include refining charges, royalties, and net proceeds tax. Operating costs were based on historical costs and budgeted estimates.

An

average recovery rate of 72.6% was used to estimate the cut-off grade based on the average of model recoveries from an audit completed

by SLR in January 2026, noting that individual block recoveries are determined using the model formula presented in Table

12-2.

12-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 12-2:

Key Economic Parameters for Mineral Reserves Estimate - Marigold

Parameters

Unit

Marigold

Value

Gold

Price

US$/oz

2,200

Gold

Sales, Insurance, Legal and Social

US$/oz

N/A1

Royalties

US$/oz

0–10%

(0–220)1

Total

Selling Cost

US$/oz

0–10%

(0–220)1

Processing

Au Recovery

%

AuCN/AuFA

* 0.921

Payable

Au

%

100.0%

Mining

Dilution

%

1.00

Processing

Cost

US$/t

2.16

Sustaining

CAPEX

US$/t

0.18

Operational

Support (G&A)

US$/t

0.17

Total

US$/t

2.53

Marginal

Cut-off Grade

g/t

0.061

Rounded

Cut-Off Grade2

g/t

0.069

Notes:

1.

The cut-off grade is calculated based on the AUPAY variable from the Mineral Resource Block Model.

The processing recovery is included in the AUPAY variable as AUCN/AUFA * 0.92 (both are Nearest Neighbor estimates), Refining Charges,

Royalties and Net Proceeds Tax.

2.

The laboratory assay methods have three decimal precision, rounding the last number where relevant.

This results in the cut-off being rounded down to 0.002 opt (0.069 g/t).

3.

The total cost structure itemizes processing, sustaining capital, and operational support costs

separately as shown in the table above.

4.

The Mining Costs are based on historical values, coded into a script using a Python library

to calculate costs.

12.2.3 Royalties,

Net Proceeds and Excise Tax

NSR royalty payments vary between 0%

and 10% of the value of production net of off-site refining costs, which is equal to an annual average range of 3.3% to 10% and a weighted

average of 6.9% over the LOM.

The State of Nevada imposes a yearly

tax on the net proceeds of all mining operations conducted within the state, plus a yearly property tax on all fixed and mobile equipment

used by the mining operation. The net proceeds tax is based on the income from the sale of all products from the mine minus: the royalties;

mine, plant, and administration expenses sourced in the State of Nevada; development expenses paid during the year; prescribed depreciation

of tangible assets according to set, pre-defined classifications contained in state regulations; and reclamation expenditures incurred

during the year of the tax. A net proceeds tax of 5% was applied to the Mineral Reserves estimation.

In 2021, the State of Nevada enacted

Assembly Bill 495, effective July 1, 2021, which is an annual excise tax on gold and silver revenue. Under the bill, the tax rates vary

based on the taxpayer’s Nevada gross revenue. A 0.75% rate is imposed on Nevada gross revenue of more than $20 million; however,

not more than $150 million in a taxable year (defined as the calendar year). A rate of 1.10% applies to Nevada gross revenue exceeding

$150 million in any tax year. The LOM average rate for Marigold is approximately 1.0%.

12-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

12.2.4 Dilution

No mining dilution was applied to the

grade of the blocks. Dilution intrinsic to the Mineral Resources model is considered sufficient to represent the stated mining selectivity.

12.2.5 Mining

Recovery

Mining recovery was assumed to be 100%

of the Indicated Mineral Resources. Inferred Mineral Resources were assigned as waste.

12.2.6 Comparison

with Previous Estimates

The Mineral Reserve estimate has been

compared to the previous December 31, 2025 Mineral Reserve estimate as reported in SSR’s 2025 Form 10-K filing (SSR 2026), which

was based on the EOY 2025 pit surface. Comparison of the current Mineral Reserve with the 2025 Mineral Reserve shows a net increase in

contained gold of 1,668 koz (+73%) in the Proven and Probable categories. Changes have occurred from mine depletion, minor resource model

updates, minor cost assumption changes, and most significantly, an increase in the gold price assumption from $1,700/oz to $2,200/oz

combined with infill and resource conversion drilling, with new areas added to Reserves including DG 80, New Millennium, and Red Dot

phase extensions.

12.2.7 QP

Opinion

The SLR QP reviewed the assumptions,

parameters, and methods used to prepare the Mineral Reserves Statement and is of the opinion that the Mineral Reserves are estimated

and prepared in accordance with the U.S. Securities and Exchange Commission (US SEC) Regulation S-K subpart 1300 rules for Property Disclosures

for Mining Registrants (S-K 1300).

The total Probable Mineral Reserves

at the Marigold Mine including stockpiles are estimated to be 252.4 Mt grading 0.44 g/t Au, containing 3.58 Moz Au. Buffalo Valley is

an additional 45.3 Mt grading 0.46 g/t Au, containing 0.67 Moz Au. The total Mineral Reserve is 358.7 Mt grading 0.40 g/ Au containing

4.63 Moz Au including 61.0 Mt grading 0.19 g/t Au containing 0.37 Moz Au of the Leach Pad inventory. The Marigold Mine Mineral Reserves

support a LOM over 20 years of operational life, including fifteen years of active mining followed by an additional five years of processing

the heap leach pad inventory, which currently contains 374 koz of gold. The 15 year period of active mining includes Buffalo Valley in

the scheduling, for which mining starts in 2029 and lasts 5.3 years.

12.3 Buffalo

Valley

12.3.1 Conversion

to Mineral Reserves

Mineral

Reserves have been classified in accordance with the U.S. Securities and Exchange Commission (US SEC) Regulation S-K subpart 1300

rules for Property Disclosures for Mining Registrants (S-K 1300). The Mineral Reserves estimate is summarized in Table

12-1.

Pit optimizations were run on the Mineral

Resources cell model using Pseudoflow algorithm to generate optimal pit limits based on block value at a range of gold prices.

The ultimate pits and subsequent phase

designs were developed from the $2,200/oz optimization runs. The gold price assumption was based on an internal assessment of recent

market prices, long-term forward curve prices, and consensus among analysts regarding price estimates.

12-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

At Buffalo Valley, inter-ramp angles

(IRAs) for the final pit design are 34° in mined fill and range between 32° and 48° in rock at Buffalo Valley.

Mining costs are based on historical

values of Marigold mine and budgeted costs that include an incremental haulage component using estimated haul cycle times and pit depths.

Processing and general and administrative (G&A) costs were estimated based on historical values and budgeted costs. Estimated sustaining

capital costs, royalties, severance taxes, and reclamation costs were also included in the optimization costs.

The Mineral Reserves for Buffalo Valley

were estimated using the topographical surface at May 1, 2026 (incorporating historical as-mined surfaces), with the following assumptions

and parameters:

· There

are no Measured Resources in the Mineral Resources model. Indicated Mineral Resources within

the final pit design are converted to Probable Mineral Reserves. Inferred Mineral Resources

are not considered in the Mineral Reserves estimation.

· The

mining recovery is 100% within the pit design.

· The

Mineral Resources were not diluted. Internal dilution included in the Mineral Resource estimate

is considered adequate.

· The

Mineral Reserves estimate assumes that mining operations will continue to use the current

Marigold mining methods, as described in Section 13.

· The

estimated cut-off grade was 0.069 g/t (0.002 opt) payable Au (Au assay factored

for recovery, royalty, and net proceeds).

12.3.2 Cut-off

Grade

The

estimated cut-off grade for Mineral Reserves was based on a $2,200/oz gold price. The gold price of $2,200/oz was selected following

current industry guidelines and corporate strategy. The metal price is representative of the range of price estimates publicly reported

for Mineral Reserve cut-offs. Factors used to estimate the cut-off grade are outlined in Table 12-3,

and include refining charges, royalties, and net proceeds tax. Operating costs were based on historical costs and budgeted estimates.

An average recovery rate of 66.5% was

used to estimate the cut-off grade based on the average of model recoveries for ROM heap leach processing.

Table 12-3:

Key Economic Parameters for Mineral Reserves Estimate – Buffalo Valley

Parameters

Unit

Buffalo

Valley Value

Gold

Price

US$/oz

2,200

Gold

Sales, Insurance, Legal and Social

US$/oz

N/a

Royalties

US$/oz

3.5%

(77)

Total

Selling Cost

US$/oz

3.5%

(77)

Processing

Au Recovery

%

3.1%–79.2%

Payable

Au

%

100.0%

Mining

Dilution

%

1.00

Processing

Cost

US$/t

2.16

12-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Parameters

Unit

Buffalo

Valley Value

Sustaining

CAPEX

US$/t

1.08

Operational

Support (G&A)

US$/t

0.17

Total

US$/t

3.74

Marginal

Cut-off Grade

g/t

0.069

Rounded

Cut-Off Grade2

g/t

0.069

Notes:

1.

The cut-off grade is calculated based on the AUKR variable from the Mineral Resource Block Model.

This represents the majority cut-off; refer to the Mineral Reserve table 12-1 notes for domain specific ranges.

2.

The processing cost includes sustaining capital and full site reclamation costs.

3.

The mining costs are based on historical values of the current Marigold Mine, coded into a script

using a Python library to calculate costs.

12.3.3 Royalties,

Net Proceeds and Excise Tax

Net Smelter Return (NSR) royalty payments

for the Buffalo Valley deposit are fixed at 3.5% of the value of production net of off-site refining costs.

State-level taxation, including the

Nevada Net Proceeds Tax (applied at 5% for the Mineral Reserves estimation) and the Nevada Assembly Bill 495 annual excise tax, is governed

under the same statutory framework described for the Marigold mine. A 0.75% rate is imposed on Nevada gross revenue of more than $20

million, however, not more than $150 million in a taxable year (defined as the calendar year). A rate of 1.10% applies to Nevada gross

revenue exceeding $150 million in any tax year. The LOM average rate for Marigold is approximately 1.0%.

12.3.4 Dilution

The methodology and assumptions regarding

mining dilution for the Buffalo Valley deposit are identical to those applied at the Marigold mine.

12.3.5 Mining

Recovery

The mining recovery assumptions and

application for the Buffalo Valley deposit are identical to those described for the Marigold mine.

12.3.6 Comparison

with Previous Estimates

The Mineral Reserve estimate has been

compared to the previous December 31, 2025 Mineral Reserve estimate as reported in SSR’s 2025 Form 10-K filing (SSR 2026). Comparison

with the December 31, 2025 Mineral Reserves shows a net increase in contained gold of 107 koz (+19%) in the Proven and Probable Categories.

The key change is attributable to the increase in the metal price assumption from $1,700/oz in December 2025 to $2,200/oz for the current

TRS declaration.

The total Probable Mineral Reserves

at the Buffalo Valley mine are estimated to be 45.3 million tonnes grading 0.46 g/t Au containing 0.67 Moz Au. Buffalo Valley is not

yet permitted and is planned to contribute for 5.3 years of the total 15 years of active mining of the Marigold Complex, starting in

2029.

12-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

12.3.7 QP

Opinion

The SLR QP reviewed the assumptions,

parameters, and methods used to prepare the Mineral Reserves Statement and is of the opinion that the Mineral Reserves are estimated

and prepared in accordance with the U.S. Securities and Exchange Commission (US SEC) Regulation S-K subpart 1300 rules for Property Disclosures

for Mining Registrants (S-K 1300).

12-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

13.0 Mining

Methods

Marigold uses standard open pit mining

methods. Loading operations are currently performed using one electric shovel and three hydraulic shovels. Waste and ore haulage is performed

with a fleet of 300 st payload primary haul trucks.

The previous LOM plan averaged a sustained

mining rate of approximately 238,000 tonnes per day (tpd) with a max of 296,000 tpd and an active mine life of approximately 9 years.

The LOM plan presented in this updated TRS has increased the mining rate to an average of 380,000 tpd with a peak of 505,000 tpd. The

LOM has also increased to 15 years of active mining, without considering leach pad drawdown. The increase in daily rates is attributed

to additional fleet purchases starting with 300 st payload haul trucks in 2027 and culminating in an additional P&H 4100-sized shovel

purchase in Q1 2028. There will also be a Liebherr 9600-class front shovel added in 2027, and various support equipment. These additions

eliminate the need for a separate fleet, which was originally thought necessary at Buffalo Valley.

Loading operations are currently performed

using one electric shovel and three hydraulic shovels. Waste and ore haulage is performed with a fleet of 300 st payload primary haul

trucks.

The mine conducts conventional drilling

and blasting activities with a free face trim row blast to ensure stable wall rock conditions. Electronic detonators are used to control

the timing of the blasthole detonation.

Drilling and blasting occur on benches

with a height of 15.2 m. One grade control sample is taken from each blasthole with the sub-drilling excluded. Mining occurs on the full

bench height (15.2 m) when pre-stripping waste or mining ore areas with the electric shovel. When using the smaller hydraulic shovels,

mining is done on a bench height of 7.6 m to minimize the dilution that would otherwise occur from dozing a 15.2 m high face to these

smaller shovels. Blasting is done with an ammonium nitrate and fuel oil (ANFO) blend and a sensitized ANFO emulsion. The ore control

mark-out procedure includes blast movement analysis for 90% of ore production blasts.

The Marigold geotechnical management

plan (GMP) includes highwall monitoring using three radar systems, which provide full coverage for the Mackay pit, the largest pit, or

which can be deployed in the smaller pits, if required. Routine monitoring of OBSA, leach pads, and inactive pits using INSAR (interferometric

synthetic-aperture radar) data is performed by a third party on a monthly basis.

Equipment maintenance is performed on

site for all equipment. There are no contract mining operations on site, other than for blasting as detailed in Section 13.7.

13.1 Geotechnical,

Hydrological, Pit, and Other Design Parameters

Geotechnical design criteria for the

Marigold operation are based on historical slope performance, ongoing geotechnical monitoring, geotechnical drilling programs, laboratory

testing, structural characterization, hydrogeologic investigations, and site-specific slope stability analyses. Open pit slope designs

are developed according to lithology, structural orientation, groundwater conditions, and rock mass quality, with inter-ramp slope angles

(45° to 49°) varying by geotechnical domain and wall orientation. The primary host rock across much of the operation remains

the Valmy Formation, which generally supports steeper slope configurations where structural conditions are favorable. More recent investigations

have demonstrated that locally flatter slopes may be required in areas affected by adverse structural conditions, weak clay horizons,

altered tuff units, or elevated groundwater conditions.

13-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Since the previous TRS (SLR 2024), additional

geotechnical investigations have been completed for the 5N1, 5N2, H1, Red Dot Phase 3, M7, and New Millenium mining areas. These programs

included geotechnical core drilling, laboratory testing, televiewer surveys, structural mapping, groundwater monitoring, pore pressure

assessments, and limit equilibrium slope stability analyses. The results have been incorporated into pit design, mine planning, geotechnical

risk management, and groundwater control strategies. Collectively, the studies indicate that planned pit slopes satisfy applicable design

acceptance criteria when appropriate operational controls and groundwater management practices are maintained.

The Marigold GMP remains the primary

framework for managing geotechnical risks and is continuously updated as mining progresses. Slope performance is monitored using radar

systems that provide continuous coverage of active mining areas and allow geotechnical personnel to identify and respond to developing

instabilities. Monitoring is supplemented by routine field inspections, geological mapping, geotechnical reconciliation, and groundwater

monitoring. Threshold movement criteria are established for monitored slopes and are integrated with operational response procedures.

Groundwater

management remains an important component of slope design and mine planning. Mining below the regional groundwater table continues to

be supported through active dewatering and depressurization programs. Recent pore pressure sensitivity analyses completed for Red Dot

Phase 3 demonstrated that current groundwater conditions satisfy applicable slope stability criteria, although the analyses confirmed

that slope stability remains sensitive to increases in pore pressure, particularly within upper slope areas. Continued groundwater monitoring

and depressurization programs are therefore maintained to support long-term slope performance. The Plan of Operations (PoO) Amendment

approved in 2019 permitted dewatering to allow mining below the water table. The mine dewatering plan is discussed in Section 13.14.

Haul roads, overburden storage areas,

and leach pad facilities continue to be designed in accordance with established site criteria.

Haul road and ramp widths are designed

for two-way traffic that accommodates 300 st class haul trucks. The total road width, including berms and ditches, is 36.4 m.

The roads follow topography external to the pit and do not exceed a 10% grade. Ramps inside the pits are also designed at a 10% maximum

grade.

Waste rock is placed in lifts of 15.2

m to 45.5 m high, with benches left on the outside edges to accommodate the final OBSA 3:1 slope design. There have been no OBSA

stability issues on the Property. Sufficient storage capacity for waste rock material has been identified to support the mining production

and LOM.

The leach pad is built with lifts of

6.1 m to 12.2 m high, with benches left on the outside edges for a final 3:1 slope pushdown. The leach pad is generally permitted

to a 152.4 m height above the plastic liner at the base. As each new leach pad cell is designed and permitted, a geotechnical analysis

is completed. There have been no leach pad stability issues on the Property.

No significant geotechnical stability

issues have been identified in OBSAs or leach pad facilities during the reporting period.

13-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

13.1.1 Open

Pit Geotechnical Reports Review

Since completion of the previous Technical

Report Summary, several geotechnical investigations have been completed to support slope design, groundwater management, and mine planning

activities. Significant studies completed during this period include the following:

· CNI

Analysis of Soil Slopes – H1, 5N1, and 5N2 (CNI 2021)

· CNI

Red Dot Phase 3 Pore Pressure Sensitivity Analysis (CNI 2024)

· CNI

Preliminary M7 Analysis Results (CNI 2025)

· WSP

Preliminary Pit Slope Design Recommendations for the New Millenium Expansion (WSP 2026a)

· Marigold

Waste Rock Dump Slope Stability Assessment (SSR 2026).

These studies incorporated geotechnical

drilling, laboratory testing, structural characterization, groundwater assessments, geotechnical logging, televiewer surveys, and limit

equilibrium analyses. The study results have been integrated into pit and waste dump design criteria, groundwater management strategies,

and mine planning activities.

13.1.1.1 Overview

of Geotechnical Report Review

Recent investigations confirmed that

geotechnical performance across the Marigold operation is governed by a combination of rock mass characteristics, structural controls,

groundwater conditions, and the occurrence of localized weak materials. The principal geotechnical risks vary by mining area and include

weak clay horizons within alluvial materials, altered tuff units, adverse bedding orientations, fault zones, and groundwater pressures.

Investigations completed in the northern

pit areas (5N1, 5N2, and H1) identified significant clay horizons and localized tuff units within the alluvial sequence. Stability analyses

demonstrated that these materials represent the primary controls on soil slope performance and may require reduced inter-ramp slope angles

relative to historical Marigold designs. The studies concluded that slope stability in these areas is highly dependent on the geometry,

continuity, and orientation of clay and tuff units.

A pore pressure sensitivity assessment

completed for Red Dot Phase 3 confirmed that all evaluated slope sections currently satisfy the applicable design factor of safety (FoS)

criteria. The analyses demonstrated that groundwater conditions remain an important control on long-term slope performance and support

continuation of site dewatering and groundwater monitoring programs.

The M7 geotechnical program included

drilling, structural characterization, geotechnical logging, and slope stability analyses. Results indicate that the current slope design

satisfies required design acceptance criteria. The primary geotechnical concern identified for M7 is adverse pitward-dipping bedding

along portions of the eastern wall, which may contribute to localized bench-scale instability. Groundwater conditions were found to be

below planned mining elevations and are not expected to adversely affect slope stability under current assumptions.

The New Millenium geotechnical investigation

included eleven geotechnical drill holes, laboratory testing, structural characterization, kinematic assessments, and slope stability

analyses. The investigation concluded that acceptable slope performance can be achieved using sector-specific slope criteria. Structural

controls, faulting, altered tuff horizons, and locally weak rock mass conditions were identified as the principal geotechnical design

considerations. Preliminary recommendations support inter-ramp slope angles of approximately 46° to 49° within bedrock sectors

and approximately 30° within alluvial and tuff materials.

13-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Overall, the recent geotechnical investigations

support the current mine planning assumptions and indicate that pit slope performance can be effectively managed through site-specific

slope design criteria, groundwater management, ongoing monitoring, and periodic updates to geologic and geotechnical models.

The

current operations at Marigold Mine mostly focus on the interim pit phases. There has been minimal mining to the final highwall in the

Mackay Pit area over the last few years, with the notable exception of the east wall, which has a lower IRA due to expected west-dipping

bedding conditions. The vast majority of the west interim walls are designed shallower than the 45°

to 49° overall slope angle (OSA). Blasting typically uses a production presplit pattern; however, trim shots are used to protect

the integrity of the ramp when mining the first few benches of each phase.

The batter compliance data is skewed

by delays in the compliance measurements, which occur after mining has advanced through the area. However, in practice, much of the rill

is mined out by shovel mining with dozer support as required. For final highwalls, trim blasting is used rather than production presplit

patterns.

13.1.1.2 Buffalo

Valley Geotechnical Design Criteria

Buffalo Valley is located approximately

8 mi south of the Marigold operation and forms part of the greater Marigold Complex. A geotechnical feasibility study was completed by

Call & Nicholas, Inc. (CNI) in 2025 and 2026 to support mine planning and slope design for the Buffalo Valley deposit. The investigation

included geotechnical drilling, televiewer surveys, geotechnical logging, laboratory testing, hydrogeologic assessment, structural interpretation,

and two-dimensional and three-dimensional slope stability analyses.

Geologic conditions at Buffalo Valley

are broadly similar to those encountered elsewhere within the Marigold district and are dominated by Havallah sequence sedimentary rocks,

limestone, metabasalt, intrusive rocks, and overburden deposits. Geotechnical investigations identified bedding orientation as the principal

control on slope stability. Three geotechnical domains were established based on structural orientation, and pit slope designs were developed

using sector-specific criteria that account for bedding orientation, groundwater conditions, and local geologic characteristics.

Groundwater conditions were incorporated

into slope stability analyses using site hydrogeologic models and monitoring data. Investigations also identified localized high-plasticity

clay horizons within portions of the overburden sequence that may influence slope performance where exposed in future pit walls. Continued

groundwater monitoring, geotechnical drilling, and refinement of geologic and structural models were recommended as project development

advances.

Overall slope stability analyses demonstrated

that the recommended pit designs satisfy the adopted design acceptance criteria following localized slope optimization where required.

Recommended inter-ramp slope angles generally range from approximately 32° to 48° depending on geotechnical domain and wall orientation,

while overburden slopes are limited to a maximum continuous slope height of approximately 122 m (400 ft). The study concluded that acceptable

slope performance can be achieved through implementation of the recommended slope design criteria and ongoing geotechnical monitoring

programs.

13-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

13.1.2 Overburden

Storage Facility Stability

A comprehensive overburden storage facility

slope stability assessment was completed in 2026 for seven OBSAs, including CNNWTC, M8, North Dump-5N, NWTC, RD1, Resort Dump, and SWTC

(SSR 2026). The assessment utilized two-dimensional limit equilibrium analyses of both existing as-built OBSA configurations and the

planned M8 ultimate configuration.

Under expected-average waste rock strength

assumptions, all evaluated waste dumps demonstrated overall factors of safety at or above, or marginally below, the adopted acceptance

criterion of 1.3. The M8 OBSA represented the controlling as-built condition and was the only evaluated facility to exhibit a factor

of safety marginally below the adopted criterion (FoS = 1.254); accordingly, ongoing monitoring, waste placement controls, and periodic

geotechnical reassessment were recommended, while no specific design modifications were identified in this assessment. The North Dump-5N,

NWTC, and SWTC facilities exhibited the highest stability margins under the evaluated loading conditions.

The planned M8 ultimate design was assessed

separately and demonstrated improved stability relative to the existing configuration. The analyses concluded that the planned geometry

satisfies the adopted slope stability acceptance criteria under expected material strength assumptions, although stability remains sensitive

to waste rock quality, seismic loading assumptions, and groundwater conditions.

The assessment concluded that the existing

waste rock storage facilities generally exhibit acceptable overall stability under current operating conditions and provide a suitable

basis for long-term mine planning. Recommendations include continued monitoring of active OBSA, ongoing waste rock characterization,

maintenance of groundwater monitoring programs, periodic reassessment of dump stability, and implementation of material placement practices

that preferentially place weaker and finer-grained material within interior dump areas while reserving more competent material for exterior

slope construction. Particular attention should continue to be directed toward the M8 facility because of its comparatively lower stability

margin and ongoing development.

The QP has reviewed the 2026 slope stability

assessment prepared by WSP personnel (WSP 2026a), considers the methodologies and assumptions to be appropriate, and concurs with the

conclusions and recommendations presented herein.

13.1.3 Pit

Optimizations and Designs

Pit optimizations and subsequent pit

designs were completed by personnel from MMC and corporate SSR in April 2026 using the updated Mineral Reserve gold price (US$2,200/oz)

and updated block model. Pit optimization analyses incorporated current geotechnical design criteria developed from historical operating

experience and updated geotechnical investigations completed across the operation. Sector-specific slope configurations reflecting bedrock

conditions, structural controls, groundwater considerations, and localized weak materials were incorporated where applicable. Optimized

pit shells and final designs were developed using slope design criteria considered appropriate for the geologic, hydrogeologic, and geotechnical

conditions anticipated within each mining area

Optimizations

used the Pseudoflow algorithm. Marigold personnel developed operating mining costs for the existing mining fleet during the pit optimization

process. Ore and waste haulage costs were incorporated into the block model. The mining cost for the pit shells was based on the total

mining cost net of haulage mining costs, which are presented in Table 12-2 and Table 12-3.

13-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

For the Marigold mine, the ROM leach

recovery model, as developed by SSR, was also incorporated into the Mineral Resources cell model. To facilitate the calculations and

the Mineral Resources tabulations, variables were incorporated into the model for recovered gold [gold x recovery] and payable

gold [gold x recovery x (1–royalty)]. Payable gold cut-off grades were established at 0.069 g/t Au and 0.104 g/t Au,

respectively, for incremental cut-off and breakeven cut-off. Incremental cut-off is based on pit rim routing, so the only mining cost

change is the increment between the ore and waste mining costs. Breakeven cut-off includes the ore mining cost.

For the Buffalo Valley deposit, ROM

heap leach recoveries, which were derived from metallurgical test work, and a fixed royalty of 3.5% were incorporated to calculate cut-off

grades across various lithological and metallurgical domains. Resulting cut-off grades range from 0.069 g/t Au to 1.767 g/t Au for

incremental cut-off, and 0.102 g/t Au to 2.6065 g/t Au for breakeven cut-off, reflecting the variability in domain-specific recovery

and cost parameters.

The mining costs for the evaluation

include sustaining capital costs as well as costs associated with the Marigold analytical laboratory as most of the on-site laboratory

work involves assaying production blastholes for ore control. The processing costs also include sustaining capital and the full site

reclamation costs.

Overall

slope angles used in the optimization are presented in Table 13-1 and Table 13-2.

Table

13-1: Overall

Slope Angles by Azimuth – Marigold Mine

Pit

Slope Angle

(Degrees)

Area 1: Red Dot / Mackay / Terry Zone (TZ) / 8Sx

Area 1 – All Pits in Reserves

45–49

East Wall Mackay

45

Fill Material

35

Area 2: Valmy N / Valmy S / Mud

Area 2 – All Pits in Reserves

45–48

West Wall

45

Fill Material

35

Area 3: East Basalt / Battle Cry

Area 3 – All Pits in Reserves

45–49

East Wall

45

Fill Material

35–38

Notes:

1.     Area 1:

Created a 90° envelope at 45° IRA to account for the shear zone.

2.     Area 2:

Created a 30° envelope North and South at 45° IRA for the shear zone running through Valmy North and Valmy South.

3.     Area

3: Exploration encountered Tuff in the region, leading to a flatter 38° slope in certain areas.

13-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

13-2: Overall

Slope Angles by Azimuth – Buffalo Valley Mine

BV

Pit

Slope

Angle

(Degrees)

Area

1: Domain 1

Area

1 – All Pits in Reserves

40–48

Fill

Material

34

Area

2: Domain 2

Area

2 – All Pits in Reserves

36–48

Fill

Material

34

Area

3: Domain 3

Area

3 – All Pits in Reserves

32–48

Fill

Material

34

Notes:

1.

Area 1: Created a 90° envelope at 45° IRA to account for the shear zone.

2.

Area 2: Created a 30° envelope North and South at 45° IRA for the shear zone running

through Valmy North and Valmy South.

3.

Domain 1 mean dip 51°; pitward-dipping bedding present.

4.

Domain 2 mean dip 44°; pitward-dipping bedding present.

5.

Domain 3 mean dip 37°; bedding dipping into wall.

6.

Eight critical cross-sections were analyzed on the new recommended rosettes; Recommendations

were based on adverse bedding dipping pitward along the east and southeast walls.

Table 13-3 and Table 13-4 also shows

the design parameters for each area with the exact bench width, slope angle, face angle, and rosette bearing for Marigold Mine and Buffalo

Valley Mine, respectively.

Table

13-3: Design

Parameters by Each Area – Marigold Mine

By

Zone

Bearing

Bench

Width

Slope

Angle

(IRA)

Face

Angle

Red

Dot M7&9 (Mackay); 5N; East Basalt; Battle Cry and Antler (New Millenium)}

10°–40°

32.3

47

74

40°–130°

31.8

45

70

130°–160°

32.3

47

74

160°–210°

30.7

48

74

210°–270°

32.3

47

74

270°–360°

29.1

49

74

Valmy

North, Valmy South and Mud

15°–165°

30.7

48

74

165°–195°

31.8

45

70

195°–345°

30.7

48

74

345°–360°

35.7

45

74

Fill/Alluvium

n/a

- Slope Code 3

45.3

34

60

13-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

13-4: Design

Parameters by Each Area – Buffalo Valley Mine

By

Zone

Bearing

Bench

Width

Slope

Angle

(IRA)

Face

Angle

Buffalo

Valley – Domain 1/SLOPE 1

- CNI Update FEB 2026

0°–20°

24.8

48

68

20°–50°

27.4

44

64

50°–100°

28.3

40

58

100°–360°

24.8

48

68

Buffalo

Valley – Domain 2/SLOPE 2

– CNI Update FEB 2026

0°–100°

24.8

48

68

100°–160°

33.8

36

55

160°–360°

28.3

40

58

Buffalo

Valley – Domain 3/SLOPE 3

- CNI Update FEB 2026

0°–20°

24.8

48

68

20°–50°

28.3

40

58

50°–110°

30.0

32

45

110°–360°

24.8

48

68

Several pit optimizations were run at

different gold prices. The $2,200/oz gold price pit shell was selected as a guide to develop the ultimate pit and subsequent pit phase

designs.

Berm/catch bench widths range from 7.2

m to 8.2 m in rock and from 7.2 m to 15.4 m in fill and are designed for every 15.2 m bench height.

13.2 Pit

Phases and Timing

The Marigold Mine pit optimization for

the LOM plan used a Pseudoflow algorithm with an internal recoverable gold value of 0.069 g/t. The optimized pit was used to guide

the ultimate pit design, which includes access and takes into account geotechnical considerations for designed highwall angles.

The overall Marigold Mine design has

four distinct areas: the main Mackay pit (includes the Red Dot and DG80 areas), the North Mackay pits, the Valmy pits, and New Millenium

area pits.

The Mackay ultimate pit is an expansion,

consolidation, and deepening below the water table of four existing pits into a single pit of approximately 4.9 km long, 1.7 km

wide, and 460 m deep. It contains more than 60% of the Marigold Mine Mineral Reserve tonnage. For sequencing purposes, the ultimate

pits are designed into 15 logical development stages.

Similarly, the Buffalo Valley Mine pit

optimization used a Pseudoflow algorithm with a cut-off grade of 0.069 g/t, the outcome of which guided the ultimate pit design, which

incorporates access and geotechnical considerations. The Buffalo Valley Mine has two distinct areas: the main Buffalo Valley pit and

the Dore Hills pit area to the north.

Tonnages

for each mining phase are shown in Table 13-5. Figure 13-1 and Figure 13-2 show the end of mine

life reserve pits for the Marigold Mine and Buffalo Valley Mine, respectively.

13-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

13-5: Mining

Phase Design Summary

Phase

Name

Waste

Tonnes

(kt)

Ore

Tonnes

(kt)

Total

Tonnes

(kt)

Strip

Ratio

Marigold

5N3

41,588

3,755

45,343

11.1

8Sext

67,047

8,730

75,777

7.7

Antler

Ph1

93,499

10,488

103,987

8.9

Antler

Ph2

63,615

15,910

79,525

4.0

DG80

Ph1

15,331

59

15,390

259.1

DG80

Ph2

135,253

5,422

140,675

24.9

DG80

Ph3

1,918

218

2,136

8.8

DG80

Ph4

118,058

43,118

161,176

2.7

EB1

46,633

1,369

48,002

34.1

EB2

17,090

2,585

19,675

6.6

EB3

21,067

8,708

29,775

2.4

M7

112,315

21,568

133,883

5.2

M7

Old

213

63

275

3.4

Mud1

4,232

614

4,846

6.9

Mud2

753

412

1,165

1.8

RD2

7,183

7,912

15,095

0.9

RD3a

918

918

RD3b

9,422

9,422

RD3c

13,438

29

13,467

471.2

RD3d

10,735

10,735

RD3e

25,679

780

26,459

32.9

RD3f

7,062

688

7,750

10.3

RD3g

6,732

5,234

11,966

1.3

RD3h

6,173

5,797

11,971

1.1

RD3i

2,657

5,068

7,725

0.5

RD3j

4,525

8,422

12,947

0.5

RD4a

103,489

771

104,260

134.3

RD4b

101,998

46,072

148,070

2.2

RD5

126,619

9,480

136,099

13.4

TZ

101,666

16,019

117,684

6.3

VN

13,502

5,354

18,856

2.5

13-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Phase Name

Waste

Tonnes

(kt)

Ore

Tonnes

(kt)

Total

Tonnes

(kt)

Strip

Ratio

VS

54,742

10,663

65,405

5.1

VSext

72,146

7,090

79,236

10.2

Marigold

Total

1,407,297

252,398

1,659,695

5.6

Buffalo

Valley

Buffalo

Valley

169,643

43,841

213,484

3.9

Dore

Hills

6,258

1,491

7,750

4.2

Buffalo

Valley Total

175,902

45,332

221,234

3.9

Notes:

1.

Totals may not match due to rounding.

13-10

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-1: End

of Mine Life Reserve Pits- Marigold Mine

13-11

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-2: End

of Mine Life Reserve Pits- Buffalo Valley Mine

13-12

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

13.3 Production

Rates, Mine Life, Dimensions, and Dilution Factors

Mining is scheduled 24 hours per day,

363 days per year on a rotation of two 12-hour shifts. The current mine plan provides approximately 20 years of operational life, including

fifteen years of active mining followed by an additional five years of processing the heap leach pad.

The haul fleet will expand from thirty

300 st class units at the end of 2026 to a peak of 45 trucks. This updated LOM includes 19 additional trucks starting in 2027, retiring

the remaining older Hitachi Trucks by mid year 2027 and an additional LeTourneau 1850 front end loader in 2026, a Liebherr 9600 class

front shovel in 2027, and a second P&H 4100 sized shovel in Q1 2028. Buffalo Valley is planned to start in 2029, which is based on

the anticipated permitting timeline. Initially a separate fleet was considered for mining Buffalo Valley; however, procuring additional

trucks and loading units in 2027 allows for accelerated waste stripping in Marigold and provides enough equipment to maintain Marigold

and mine Buffalo Valley with the same fleet. Equipment planned for Buffalo Valley mining is estimated to be two hydraulic shovels and

8 to 10 trucks over the span of the 5.3 year mine life. When mining at Buffalo Valley is complete, the fleet will then return to Marigold.

The average sustained total material

mining rate is 165.0 Mtpa over the first seven years (starting 2027), with the full production years of mining averaging 138.3 Mtpa (excluding

part of 2026 and the final year 2040) as the tonnage drops off in later years. Average payable gold production over the 15 years of mining

is approximately 200,000 ounces per year.

The Marigold Mine mineralized zones

are structurally controlled and strike in a generally northern direction. They vary in width throughout the Property from one meter or

less up to 40 m long and 49 m wide.

The Buffalo Valley mineralized zones

are structurally controlled by northwest-trending dikes and faults. Mineralization occurs both adjacent to dikes and within favorable

sedimentary units and varies in thickness and continuity throughout the deposit.

In the LOM model, there is no dilution

or mining loss added to the Mineral Reserves for planning and scheduling. Based on the chosen mining method and size of equipment used,

dilution intrinsic to the Mineral Resource model is considered sufficient, and a mining recovery of 100% is considered achievable in

this kind of deposit. This assumption is supported by historical reconciliation data and is consistent with previous Technical Report

Summaries (TRS) and Mineral Resources and Mineral Reserves (MRMR) declarations.

13.4 Stripping

Requirements

Increasing the reserve gold price from

$1,700/oz to $2,200/oz to reflect current market conditions increased the Mineral Reserve at the Marigold Complex as well as the associated

waste required for extraction. The increase in material volume was not proportional between ore and waste, resulting in an increase in

the life-of-mine strip ratio from 4.0:1 to 5.3:1 (waste to ore), including Buffalo Valley. The additional waste tonnes, together with

longer haul distances required to accommodate expanded overburden storage areas, increased the mining fleet requirements.

Stripping

requirements over the life of the North Mackay pit area averaged 7.4:1; the stripping ratio for New Millenium is 6.2:1; and the stripping

requirements for the other two areas, Mackay and Valmy, are planned to be slightly higher, bringing the average up. The Buffalo Valley

strip ratio is 3.9:1, which lowers the overall average. Table 13-6 and Figure 13-3 show the annual

production schedule for the LOM, including ore tonnes mined, waste tonnes mined, and strip ratio.

13-13

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The pit areas mentioned above comprise

the following pits:

· Mackay

Area: Red Dot phases (RD5/RD4/RD3/RD2/), DG80, M7, and M7 old

· Valmy

Area: Valmy North (VN), Valmy South (VS), Valmy South Extension (VSExt), Mud1 and Mud 2

· Mackay

North Area: 8S Extension (8S Ext) and Terry Zone (TZ) and 5N

· New

Millenium Area: East Basalt (EB1 & EB2 & EB3) and Antler (Ant Ph1 & Ant Ph2)

Buffalo Valley is a satellite pit from

the rest of the Marigold Complex

Table

13-6: Annual

Production Schedule Tonnes Mined

Year

Ore

(kt)

Au

Grade

(g/t)

Waste

(kt)

Total

(kt)

Strip

Ratio

2024

TRS Total

(kt)

2026(1)

11,891

0.406

51,102

62,993

4.3

63,635

2027

20,903

0.512

107,186

128,089

5.1

100,083

2028

20,812

0.486

162,640

183,452

7.8

111,117

2029

22,849

0.646

139,565

162,414

6.1

93,524

2030

14,178

0.593

162,766

176,944

11.5

93,089

2031

20,240

0.397

143,355

163,595

7.1

76,606

2032

27,442

0.320

137,893

165,335

5.0

50,639

2033

24,325

0.442

150,610

174,935

6.2

-

2034

24,047

0.446

118,262

142,308

4.9

-

2035

23,541

0.380

87,126

110,667

3.7

-

2036

25,589

0.394

74,364

99,952

2.9

-

2037

20,301

0.330

73,901

94,203

3.6

-

2038

16,367

0.422

83,655

100,022

5.1

-

2039

18,182

0.381

77,554

95,736

4.3

-

2040

7,064

0.804

13,218

20,283

1.9

-

Total(2)

297,730

0.445

1,583,198

1,880,929

5.3

588,693

Notes:

1.

2026 Totals are for the period between May and December 2026.

2.

Totals may not match due to rounding.

13-14

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-3: Mine

Annual Production Schedule

Source: SSR 2026

Notes:

1. 2026

totals are for the period between May and December 2026.

13.5 Required

Mining Fleet and Machinery

The

equipment list for the mining fleet is presented in Table 13-7, and includes both the existing fleet

and the additional equipment required to support the LOM plan. Sustaining capital is not planned within the last five years of the LOM

plan because it is assumed that equipment life can be stretched out and replacements are difficult to justify near the end of the Property

life, as demonstrated by the operation’s long history. The sustaining capital replacement costs are included in the reserve optimization

calculation costs. Capital costs are discussed in Section 18.1. As of the date of this TRS, MMC does not employ contract mining services,

except with respect to blasting, as discussed in Section 0.

Table

13-7: Marigold

Mining Complex - Fleet Equipment List

Number

of Items

Equipment

Name and Class

Existing

Fleet

1

P&H

4100 XPC electric shovel

2

Komatsu

PC7000 hydraulic shovels

1

Hitachi

EX5500 hydraulic shovel

1

Caterpillar

992-wheel loader

5

Hitachi

EH5000 300 st haul trucks

26

Komatsu

930E 300 st haul trucks

1

Caterpillar

789B haul truck

13-15

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Number of Items

Equipment

Name and Class

3

Caterpillar

789B water trucks

3

Ingersoll

Rand DML drills

3

Atlas

Copco PV271 drills

4

Caterpillar

834- and 854-wheel dozers

3

Lube / fuel

trucks

1

Caterpillar

637 scraper

1

Caterpillar

789 Lowboy heavy hauler

1

Caterpillar

D8 Track Dozers

5

Caterpillar

D10 Track Dozers

2

Caterpillar

D11 Track Dozer

3

Caterpillar

16H and 16M Motor Graders

1

Caterpillar

18M Motor Graders

Growth

/ Fleet Additions

1

Electric

shovel (P&H 4100 XPC or equivalent)

1

Hydraulic

Shovel (Liebherr 9600 or equivalent)

1

Letourneau

L1850 Front Loader

4

Track

Dozer (Kom 375A-8 or CAT D10T2)

3

Rubber

Tire Dozer (CAT WD854 or equivalent)

3

Surface

Drill (Atlas Copco PV 271 or equivalent)

2

Water

Truck (HD1500 or equivalent)

3

Grader

(Komatsu 955 or CAT 18M or equivalent)

19

300

st Trucks (930E or equivalent)

13.6 Ore

Control Drilling and Method

Blasthole sampling is used to define

ore zones. A grade control sample is taken every 15.2 m of drilling. The sample is manually collected from a cross-section of the cone

of drill cuttings. The procedure includes removal of the sub-drill material. Ore Control personnel periodically audit the performance

of the blast hole samplers and provide feedback on compliance to standard.

Benches are mined at a height of 15.2 m

with an electric or hydraulic shovel in stripping and bulk ore mining areas. If ore is encountered in the stripping areas on the 15.2 m

benches, it is mined at that bench height to maintain pit productivity.

Each blasthole sample is analyzed for

gold at the on-site laboratory facility. A cyanide digestion is performed on each sample to determine the quantity of cyanide soluble

gold contained in the sample. The cyanide digestion only provides a measure of cyanide soluble gold within a sample, not total gold.

At Marigold, about one in every five blasthole samples containing 0.10 g/t (0.003 opt) cyanide soluble gold is assayed for

total gold content using fire assay (FA) with an AA finish. Samples from each ore polygon delineated by ore control are selected for

fire assay based on the grade distribution for the polygon tonnage and targeting one sample per every 2,000 st of ore. The FA results

(Au g/t) from the blastholes in the pit area, and cyanide soluble assay results (Au g/t) are used to determine a fire-assay-to-cyanide-soluble

regression for the pit area. This regression is applied to all remaining cyanide soluble assays in the blast to calculate a total gold

value contained in each blasthole.

13-16

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Fire assay grades associated with each

blasthole are entered into the grade control (blasthole) model. The blast pattern is then converted to a blasthole cell model with cell

sizes of 3.05 m x 3.05 m x 7.6 m. The blasthole data is kriged using ordinary kriging (OK) in two

dimensions on the bench. If there is sufficient volume above the cut-off grade to make a mineable shape of ore, this shape is blocked

out and surveyed in the pit (indicated by ore flags for mining) to be sent to the leach pad for processing.

The ore control practices described

herein represent the current operating methodology at the Marigold Mine. For Buffalo Valley, ore control drilling, sampling, grade control

modeling, and ore delineation procedures will be developed prior to the planned start of mining in 2029 and are expected to be generally

consistent with Marigold's established practices, subject to modification based on the specific geological and operational requirements

of the Buffalo Valley deposit.

13.7 Drilling

and Blasting

Blasthole drilling is performed with

three Atlas Copco PV271 rigs that drill with both rotary and hammer drill bits as well as three Ingersoll Rand DML rigs that drill with

hammer bits. Three additional Atlas Copco PV271 or equivalent drills will be added to the fleet in 2027. The rigs drill 22.2 cm

diameter blastholes. The PV271 rigs can drill to 16.8 m in a single pass. The DML rigs can drill to 10.4 m in a single

pass.

The normal explosive is a heavy ANFO

(blend of ANFO and emulsion), which is placed by a combination of both contractor and Marigold employees. An emulsion product is also

used for wet holes to manage groundwater in the winter and fall and help break up the rock in areas of the pit that are more difficult

to dig.

The blast patterns are adjusted for

rock conditions. Typically, the patterns are 6.7 m x 7.8 m for the 15.2 m benches. To help break the toe of

the bench, 1.5 m of sub drilling is added to each hole. The ore host rock generally breaks easily with blasting, and this provides

a good ROM leach feed to the pad. Electronic detonators are used to control the timing of the blasthole detonation. The typical fragmentation

is P80 20.3 cm.

A trim blast is performed around the

limits of the mining on final highwall configurations. This configuration is a four-row pattern that is shot to a free face to minimize

blast damage and vibration into the highwalls. A new crest and catch bench, ranging in width from 6.7 m to 9.1 m depending on the highwall

angle, are formed every 15.2 vertical meters of mining.

13.8 Loading

Operations

Loading operations are performed with

one electric P&H 4100 XPC rope shovel with a 52.8 m3 dipper, two diesel hydraulic Komatsu PC7000 hydraulic shovels,

and one diesel hydraulic Hitachi EX5500 shovel. Double-sided loading is typically used where there is adequate working room. Digging

faces are defined by ore control and are marked in the field with flags and on maps that are provided to the operators. All loading units

are equipped with a high-precision digging screen that is a component of the Modular Dispatch system. The screen, located in the operator’s

cab, updates in real time to show the location and grade of the ore material being mined. Dig boundaries are typically adjusted to allow

for movement associated with blasting.

13-17

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

To accommodate the increase in reserves,

additional equipment was added to the fleet to address the increase in strip ratio and higher targeted production rates. A LeTourneau

1850 front loader, a Liebherr 9600 class front shovel, and a second P&H 4100 will provide the required additional loading capacity.

In 2029, the two Komatsu PC 7000 shovels will relocate to Buffalo Valley for approximately 5 years.

13.9 Hauling

Operations

Excavated

rock is loaded into haul trucks and sent to either an OBSA or a leach heap, based on the average gold grade of the material. Waste rock

is hauled to the multiple OBSA locations or to previously mined-out areas for backfilling pits. Pit backfilling, where not mandated by

permit to eliminate pit lakes in certain satellite pits, has positive impacts at Marigold: it reduces costs associated with haulage distance

and helps address the lack of areas for waste rock storage space due to permitting restrictions and current land position. Backfilling

plans are reviewed and adjusted to minimize the potential for sterilizing future mineralization. Minimizing the waste haulage distance

to the nearest facility improves mining productivity and minimizes haulage costs. Ore is hauled to the leach pad facility and stacked

in lifts for processing. Select year-end positions for mining and OBSA are presented in Figure 13-4

through Figure 13-11 for the Marigold Mine, and Figure 13-12 through Figure 13-16 for the Buffalo Valley Mine.

MMC has a mixed fleet of Hitachi and

Komatsu 300 st class haulage trucks for ore and waste haulage, which will be shared with Buffalo Valley when mining begins there in 2029.

The Hitachi trucks will gradually be phased out once all added trucks are in production, with retirement planned no later than 2029.

A Modular Dispatch system is used to

optimize fleet management at the Marigold Mine, and a dedicated or expanded dispatch solution may be required for the standalone Buffalo

Valley operation when mining commences there.

Annually, from December to February,

there is snow, fog, and freezing temperatures at the Property. However, there is a minimal amount of haulage downtime due to the weather

in most years.

13-18

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-4: End

of Production Year 2026 – Marigold Mine

13-19

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-5: End

of Production Year 2027 – Marigold Mine

13-20

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-6: End

of Production Year 2028 – Marigold Mine

13-21

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-7: End

of Production Year 2029 – Marigold Mine

13-22

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-8: End

of Production Year 2030 – Marigold Mine

13-23

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-9: End

of Production Year 2031 – Marigold Mine

13-24

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-10: End

of Production Year 2032 – Marigold Mine

Note: Grid in Local Mine Coordinates.

13-25

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-11: End

of Production Year 2040 (LOM) – Marigold Mine

13-26

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-12: End

of Production Year 2029 – Buffalo Valley Mine

13-27

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-13: End

of Production Year 2030 – Buffalo Valley Mine

13-28

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-14: End

of Production Year 2031 – Buffalo Valley Mine

13-29

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-15: End

of Production Year 2032 – Buffalo Valley Mine

13-30

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-16: End

of Production Year 2034 – Buffalo Valley Mine

13-31

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

13.10 Mine

Support

Mine support functions are performed

using different quantities and types of equipment. These include water trucks, dozers, and graders as well as other non-operated ancillary

equipment such as the radar highwall monitoring units. Mine support functions include ripping leach pads after a panel is completed,

monitoring slope stability, maintaining roads and access points, and developing exploration drill pads. This work is completed with a

fleet of Caterpillar D8, D10, and D11 class track dozers and Caterpillar 18, 16H, and 18M motor graders.

Current

mine support fleet numbers are included in Table 13-7

13.11 Mine

Maintenance

Mine maintenance is an integral function

of the mining operations and relates to the day-to-day upkeep of the mining equipment. Activities such as preventive maintenance, equipment

rebuilds and fixing equipment on breakdowns are all included in the mine maintenance function. The objective is to provide efficient

maintenance of the mining fleet, thereby increasing reliability and availability of the equipment through effective strategies, planning,

and continuous improvement. High levels of equipment availability and reliability facilitate operational and delivery performance, resulting

in asset intensity reduction, and reduced direct operational and maintenance costs.

Equipment

maintenance is performed onsite for all mining equipment. The Marigold Complex has all the infrastructure required for maintaining the

fleet described in Table 13-7 and has an adequate maintenance workforce to ensure the equipment

are able to meet the requirements of the operations.

Table 13-8 shows the LOM average key

performance indicators (KPI) of the fleet used at Marigold Mine.

Table

13-8: LOM

Average Maintenance KPI of the MMC Equipment Fleet

Mine

Equipment

Availability

(%)

Use

of Availability

(%)

Drills

81.84%

69.63%

Loading

Equipment

Hitachi

5500

85.4%

88.0%

Komatsu

PC7000

75.4%

87.8%

Electric

Shovel

86.1%

87.3%

LeTourneau

1850

82.8%

87.2%

Liebherr

9600 class

88.2%

87.8%

Electric

Shovel #2

86.4%

87.8%

Hauling

Equipment

EH5000

ACII (5 Trucks)

55.1%

83.9%

930E-4

(14 Trucks)

82.5%

83.8%

930E-5

(12 Trucks)

82.5%

83.8%

930E-5

New (19 Trucks)

86.8%

83.8%

13-32

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Mine Equipment

Availability

(%)

Use

of Availability

(%)

CAT

789

69.1%

25.03%

Support

Equipment

Dozers

83.8%

81.4%

Graders

74.0%

65.5%

RTD

82.4%

74.5%

Water

Truck

86.1%

66.8%

Loader

(992)

79.5%

66.8%

Scraper

73.3%

3.3%

The current fleet is to be maintained

with replacement units (930E Haul Trucks and Drills being the major equipment to be replaced) as the current equipment reaches its maximum

operating hours. In general, the major mining equipment requirement scales down with production, towards the end of the LOM plan.

13.12 Mine

General and Administration

Mine G&A refers to all day-to-day

supervision and engineering support of mining operation activity. Expenses included in the mine G&A are mine salary labor charges

and fringe benefits, mine office supplies, safety supplies, equipment rentals and leases, light-vehicle tires, miscellaneous contract

services, travel expenses, training, and tax and freight charges.

13.13 Mine

Safety

MMC has one mine rescue and emergency

response team, which is trained to competently assess accident conditions and fight fires. There is one ambulance and one small fire

truck available onsite and a rescue trailer that is used in emergencies. The Property is set up with hydrants and appropriate connectors,

hoses, and wrenches at strategic locations. For mobile equipment fires, the Property is set up with large water trucks equipped with

water cannons.

MMC also has access to and can call

either the Valmy Fire Department (5 km away) or Battle Mountain Fire Department (24 km away), when required. There is a monthly

training session for the MMC rescue team to ensure effective participation in any recovery operations in the event of a mine incident.

13.14 Mine

Dewatering

13.14.1 Marigold

The Marigold Mine Plan of Operations

(PoO) – Mackay Optimization Project Amendment Record of Decision (RoD) in October 2019 allowed mining to be carried out below the

water table in the expanded Mackay pit. The approved dewatering system incorporated a pit dewatering design by Piteau Associates, consisting

of a series of dewatering wells located around the periphery of the ultimate pit to extract water for mine operations and infiltration.

Infiltration is by means of a series of rapid infiltration basins (RIBs) located in an area of deep alluvium cover approximately five

kilometers north of the operations area. The dewatering system and RIBs are authorized under Water Pollution Control Permit (WPCP) NEV2022118.

A total of 14 RIBs have been authorized, and eight have been constructed. The eight RIBs have been operating reliably with no reported

issues and require only minimal operational maintenance. Additional RIBs may be constructed based on dewatering needs.

13-33

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The dewatering was developed in stages

with the initial design incorporating 14 dewatering wells and currently planned to only run 10 wells, each with a nominal sustainable

pumping rate of 113.5 m3/h. The Marigold dewatering system is currently operating with 10 optimized wells around the

Red Dot and Terry Zone, producing a combined rate of 1,000 m³/h, or an average of 100 m³/h per pump. The 2025 groundwater

model calibration aligns closely with observed water levels and indicates that the existing system will remain effective. With WW-11

and WW-19 completed in 2025, additional well development has been deferred until 2027, when two additional dewatering wells are proposed,

but not yet permitted. There is potential for three further dewatering wells to be added in later years to support the LOM as planned

pit expansions will interfere with the existing well network and the pit floor elevations go deeper than originally planned when designing

the dewatering network. These three additional dewatering wells have also not yet been permitted.

Figure 13-17 shows existing well sites

at Marigold Mine. New wells are developed in advance of the mining elevations required to support the LOM plan.

Some dewatering water is diverted for

mine use with the majority delivered by pipeline to the RIB field north of the mine for infiltration. The RIBs are located in areas of

thick alluvium which facilitates rapid infiltration back into the aquifer and also provides the benefit of attenuation of naturally occurring

arsenic in the groundwater before it reaches the existing water table. An attenuation study was conducted and approved showing that water

treatment will not be necessary prior to infiltration (Piteau 2020a, 2020b).

Rapid

Infiltration Basins (RIBs) were initially permitted and constructed in 2022 to verify infiltration performance and support final design

of the dewatering discharge system. Subsequent operating experience has confirmed RIB performance and informed design refinements for

additional basin construction. As of 2025, eight operable RIB cells are available for managing excess mine dewatering water, with operating

records demonstrating sustained infiltration performance, adequate freeboard, and effective capacity to manage site dewatering discharges.

Updated design criteria are summarized in Table 13-9, and the current RIB layout is shown on Figure

13-18.

13-34

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

13-17: Marigold

Dewatering Well Locations

Source: SSR 2026.

13-35

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

13-9: RIB

Design Criteria – Marigold Mine

RIB

Cell Design Attribute

Unit

Dimensions

Basin

floor length

m

210

Basin

floor width

m

59

Basin

crest length

m

247

Basin

crest width

m

106

Minimum

basin depth

m

6.1

Excavation/dump

slope

H:V

3:1

Minimum

spacing between cells

m

122

Access

road width

m

7.3

Infiltration

capacity

m/day

0.43

Infiltration

capacity per cell

m3/min

3.8

Cell

availability

%

50

Figure

13-18: Marigold

RIB Locations and Monitoring System

Source: SSR 2026.

13-36

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

13.14.2 Buffalo

Valley

WSP’s ‘Preliminary Dewatering

Plan Technical Memorandum’ (WSP 2026b) outlines a pit dewatering strategy for the Buffalo Valley Mine Project based on hydrogeologic

assessment, groundwater modeling, and a risk-based management approach. The plan recommends five deep dewatering wells located outside

the pit crest to maintain groundwater control and dry mining conditions throughout the approximately seven-year mine life, with pumping

commencing at a combined rate of 1,250 gpm and decreasing over time as drawdown is achieved. Performance will be evaluated through a

monitoring network of nine piezometers, with quarterly reporting and adaptive management measures, including supplemental wells and accelerated

dewatering if required. Surplus water not required for operations will be directed to three RIB cells, each capable of receiving the

full dewatering discharge of up to 1,250 gpm. Expected discharge to the RIBs may reach approximately 700 gpm and average about 200 gpm,

while modeling based on an 800 gpm infiltration rate predicted a groundwater mound of approximately 0.6m (2 ft) beneath the facility.

The RIBs provide a mechanism for returning excess water to the aquifer, supporting groundwater sustainability and reducing the need for

additional groundwater extraction. Together with the 110-million-gallon Operations Pond, which provides more than 100 days of water supply

at peak operational demand, these facilities form a flexible and resilient water management system capable of supporting both dewatering

and operational water requirements throughout the Buffalo Valley LOM.

13.15 Mine

Workforce

The current mining workforce totals

540, and is summarized as follows:

· Mine

Operations – 279

· Mine

Maintenance – 119

· Process

& Laboratory – 61

· Technical

Services – 30

· General

& Administration – 51

To support the Buffalo Valley expansion,

total workforce requirements are projected to peak at 686 persons, representing an increase of 146 personnel as detailed further in Section

18.

13.16 QP

Opinion

The SLR QP has reviewed the mining methods,

fleet selection, equipment performance parameters, infrastructure requirements, mine workforce, and dewatering strategies presented in

this section for both the Marigold Mine and the Buffalo Valley deposit.

It is the QP’s opinion that:

· The

mining methods, pit designs, and operational plans are appropriate for the deposit characteristics

and align with current industry standards and successful operating practices at the Marigold

Complex.

· The

equipment fleet sizing, productivity estimates, and maintenance key performance indicators

(KPIs) are reasonable, well-supported by historical operating data, and capable of meeting

the production schedules defined in the LOM plan.

· The

dewatering strategies and water management infrastructure—including well networks,

rapid infiltration basins (RIBs), and storage facilities—are adequately engineered

to maintain dry operating conditions, though future permits will need to be secured as scheduled

to support advanced LOM pit expansions.

13-37

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· Overall,

the data, parameters, and methodologies utilized to develop the mining methods chapter including

the integration of the Buffalo Valley deposit, provide a sound operational and technical

basis for supporting the Mineral Reserves estimate in accordance with S-K 1300 guidelines.

13-38

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

14.0 Processing

and Recovery Methods

14.1 Marigold

The Marigold processing facilities combine

industry-standard ROM cyanide heap leaching and recovery of gold from the leach solution using carbon adsorption, desorption, electrowinning,

and refining to produce a final precious metal (doré) product.

A

simplified process flow diagram of the Marigold heap leaching facilities is provided in Figure 14-1.

Figure

14-1: Simplified

Marigold Processing Flowsheet

Source: SSR 2023.Heap Leach Pad Description

14-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The heap leach pad was originally constructed

in 1990 and has since expanded as required, with ongoing expansion of solution processing facilities to match production rate and leach

area. The leach pad area is divided into cells of specific sizes for inventory and irrigation control. Approximately 427 ha of heap leach

pad (divided into 27 cells), six pregnant solution holding ponds, one storm water event pond, and two barren solution ponds have been

constructed at Marigold. There are 17 cells currently active. Permitted stacking heights for heap leach Cells 1 to 10 are 106 m, and

for Cells 11 to 27 are 122 m high.

The existing and authorized heap leach

cells and ancillary facilities include Cells 1 through 27.

Associated process ponds, stormwater

ponds, conveyance ditches, carbon column trains, storage tanks, and plant facilities.

14.1.1 Process

Descriptions

14.1.1.1 Ore

Stacking on Leach Pad

ROM ore is delivered from the mine at

a rate of approximately 20 Mtpa to the leach pad by mine haul trucks and stacked in lifts of approximately 6 m to 12 m. Dry

quicklime (CaO) at approximately 1.2 kg/t ore is added for pH control to the ore in loaded haul trucks from lime storage silos and delivery

chutes located on the side of the haul road prior to dumping on the heap leach. Mixing is accomplished by end dumping and spreading of

the material with a dozer. The fresh ore is ripped and cross-ripped to a depth of at least 1.3 m using a dozer with a long shank to break

up compacted pad surface material to enhance percolation prior to placement of leach solution distribution piping.

14.1.1.2 Leaching

The available leach pad area is divided

into cells with separate drainages for inventory and irrigation control. The heap leach operating parameters include quantity and lift

height of ore placed, barren solution (a very low gold grade cyanide leach solution) irrigation rate per unit area, duration of irrigation

(leach cycle), and time between lifts to manage future ore placement. Barren solution is applied selectively to each cell. At any given

time, approximately 65 ha of pad area is being leached, with other areas draining or being made ready to accept ore for the next lift.

Barren leach solution is pumped to the

leach pad by two independent barren solution distribution systems. Combined barren solution flow capacity from the two pumping systems

is 3,400 m3/h; upgrades are underway to increase the pumping capacity to 4,540 m3/h. A series of header and sub-header

pipelines supplying irrigation drip tubing are used to distribute the barren solution from the main barren solution pipelines to each

cell. Solution is applied to the ore at a rate of 4.6 L/h/m2 to 8.6 L/h/m2 using drip emitters. Impact sprinklers,

wobblers, or drip emitters are used to irrigate the side slopes of the heap.

The barren solution percolates through

the ore, collecting precious metals, and exits the heap material at one of several collection areas as pregnant solution. Upon exiting

the heap, the pregnant solution is routed to the pregnant solution ponds.

Leaching is conducted concurrently with

ore stacking to allow progressive lifts to be constructed and operated in a similar manner. The ratio of ore stacked to ore being leached

is maintained to provide the amount of solution applied and retention time required for the leach cycle. The pH and cyanide concentrations

are adjusted to 10.5 and 300 g (NaCN)/t solution, respectively. in either the barren solution pond or by injection into the barren solution

line at the toe of the heap.

14-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

14.1.1.3 Description

of Ponds

Solution management consists of six

authorized pregnant solution ponds (Pregnant Ponds No. 1 to 6) and one storm water event pond, which are interconnected with synthetic-lined

channels. Pregnant Pond No. 1 is only used during significant events. There are also two barren solution ponds (Barren Pond No. 1 and

2), which are interconnected with a synthetic-lined channel. The process solution ponds have been designed to hold the working volume

of solution while maintaining a two-foot freeboard after a 100-year storm event and 24-hour power outage. Construction is currently underway

to expand pond 6 into a new pond 7 to allow for additional storage of process water at the higher barren pumping rates.

Ancillary facilities include solution

pumps and piping, two separate sodium cyanide addition facilities, two sodium hydroxide addition systems (barren solution pH adjustment),

and four locations for antiscalant addition.

14.1.1.4 Carbon

Adsorption

Pregnant

solution from the leach pad is collected in the pregnant solution ponds and pumped to the CIC adsorption plant

located on the north side of Barren Pond No. 1 to recover the gold. The CIC adsorption plant consists of seven parallel trains of carbon

columns, each with five columns. In 2026, four new trains are being added to process the higher pregnant solution return rates expected

by the barren pumping upgrades. Each train is designed to process 450 m3/h of pregnant solution. Column discharge solution

reports to the barren ponds, where fresh and reclaim water is added to maintain the appropriate water balance, before the solution is

recycled back to the leach pad. The plant also contains carbon storage tanks, a liquid cyanide storage tank, and a liquid caustic soda

storage tank.

14.1.1.5 Carbon

Elution and Electrowinning

Loaded carbon from carbon adsorption

is transported by a dedicated truck to the carbon processing facility where gold is eluted (re-dissolved) from the carbon in two 2.7

t capacity carbon elution vessels. Gold is eluted from the carbon using the Pressure Zadra process, where a hot caustic solution at approximately

140°C and with a pH of 13 or greater is circulated through the elution column, from bottom to top, under pressure. The resulting

gold-rich eluate flows from the top of the column to a rich electrolyte tank, from which it is pumped through two parallel 2.8 m3

electrowinning cells to recover the gold. The barren eluant discharging the electrowinning cells is recirculated through heat exchangers

to the bottom of the elution vessel to strip more gold. The process continues until most of the gold is recovered from the carbon.

14.1.1.6 Carbon

Regeneration

The

eluted carbon is acid washed in an acid wash column with hydrochloric acid to remove carbonate scale and inorganics. The acidified carbon

is then neutralized with water in the same column. The carbon is discharged from the column and transferred to the reactivation kiln.

The carbon is reactivated, as required, by heating in a rotary kiln at 750°C. The reactivated

carbon is quenched and screened before being returned to the carbon adsorption circuit to be reloaded with gold.

14.1.1.7 Refining

The

plated material (sludge) resulting from electrowinning is collected in a filter press and then retorted for drying and mercury removal.

After retorting, the sludge is mixed with flux and smelted in a propane fired furnace for final precious metal doré

recovery.

14-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

14.1.1.8 Ventilation

Ventilation from the strip circuit pregnant

and barren solution tanks, electrowinning cells, retort, and smelting furnace is directed to a deep bed scrubber (sulfur-impregnated

activated carbon) where any vaporized mercury is recovered prior to exhaust.

The kiln discharge is vented to a wet

scrubber that uses water mist to condense mercury and recover it as elemental mercury. After demisting, the air is also passed through

sulfur-impregnated carbon to recover any remaining vaporized mercury prior to exhaust.

14.1.2 Planned

Upgrade Projects

Several ongoing improvement projects

are listed:

· With

the increasing height of the heap leach pads and distance from the primary pump locations,

barren booster pumps are planned to be installed to maintain solution flow rates at 3,180

m3/hr. Upgrades are currently underway to increase near-term pumping capacity

to 4,540 m3/hr while maintaining the ability to route appropriate volumes of barren

solution to higher areas of the pad in the future.

· Installation

of mobile telemetry and instrumentation, as well as telemetry on primary pregnant and barren

flowmeters, is planned to be able to remotely monitor individual area barren application

rates.

· Modification

of CIC bubble plates to assist with equalizing solution distribution across the column and

increasing flow rate of solution through the CICs while maintaining the carbon inventory

in the columns and adsorption efficiencies.

14.1.3 Reagents

Reagent

consumption rates are within industry norms for the types of ores processed. Average annual unit consumption rates of the reagents for

the period 2010 to April 2026 are shown in Figure 14-2. The increase in lime and antiscalant consumption

during 2025 and 2026 represents increasing ore production and higher sulfide content in the ore.

14-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

14-2: Average

Annual Reagent Consumption

Source: SSR 2026

14.1.4 Gold

Recovery

From

March 1990 through April 2026, gold recovery from the heap leach pad is 72.7%. This recovery was achieved with 90- to 120-day primary

leach cycles and an overall mass-of-solution to mass-of-ore ratio of 1.29:1. The Marigold project-to-date heap leach gold recovery trend

from March 1990 through April 2026 from the Marigold heap leach is shown in Figure 14-3.

Figure

14-3: Marigold

Heap Leach Pad Gold Recovery (March 1990 through April 2026)

Source: SSR 2026

14-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

14.2 Buffalo

Valley

The

design of the Buffalo Valley processing facilities follows the same philosophy as is utilized at Marigold.

A multi-cell heap leach pad, designed to accommodate the expected mining rate up to 14 Mtpa, will be truck-stacked either with ROM or

crushed ore in 7.5 m to 12.5 m lifts. Cyanide solution will be applied to the surface at a nominal rate of 8 L/h/m2,

and approximately 300 g NaCN/t of solution will percolate through the ore, dissolving precious metals, before being collected in a drain

network at the plastic liner.

Pregnant

solution will flow by gravity directly into a pregnant solution tank, then be pumped to three CIC carbon column trains for adsorption.

It was determined that 3 x 9,997 m3/h trains, with 5 x 9,997 m3/h columns per train, provide the best balance of maintenance and production

flexibility. Construction of the third train can be delayed until year 3 to support production in year 4 of the LOM, or it can be omitted

if production at the end of the LOM is slowed. A process flow diagram and a layout of the CIC circuit are shown in Figure

14-4 and Figure 14-5, respectively.

Loaded carbon from the carbon adsorption

circuit will be transferred to a loaded carbon storage tank, which will then be pumped into a carbon transfer truck and transported to

the Marigold elution facility for acid washing, elution, and reactivation.

Barren carbon will be loaded into the

carbon transfer truck and returned to the Buffalo Valley process plant.  Barren carbon will be pumped from the carbon transfer truck

into a barren carbon storage tank before being returned to the adsorption circuit.

Barren process solution will be pumped

to the irrigation system from a barren solution concrete vault using vertical turbine pumps. After percolating through the ore, the gold-bearing

pregnant leach solution will drain by gravity to a pregnant solution tank, where it will be collected and pumped to the carbon adsorption

circuit for metal recovery.

Process solution ponds, including a

Process and Stormwater Pond, have been designed to allow for variable solution flow and to collect contact solution from storm events

or upset conditions. Solution collected will be used as make up solution to the process. Solution from the ponds can either be pumped

back to the Barren vault or directly back to the heap leach.

14-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 14-4: Buffalo Valley Process Flowsheet

14-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 14-5: Plan View of the Buffalo Valley

Process Facility

14-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

14.3 QP

Opinion

The Marigold Mine is a conventional

ROM heap leach operation that has been operating since 1990. The ore has been very consistent during this period. SSR operators track

solution grades, metal recoveries, and reagent consumption daily, and future recoveries are projected from operating data, cyanide-soluble

gold analyses, and supplemental column leach testing. Upgrades to the barren solution pumping system and carbon columns are being installed

to support a planned increase in mine production and ore placement. The QP has reviewed the LOM mining schedule and solution application

rates, and both are within the designed ranges.

The adjacent Buffalo Valley heap-leach

project was also reviewed by the QP. The Buffalo Valley process facilities will be designed and operated similarly to Marigold, leveraging

Marigold personnel and experience. SSR has developed a feasibility study for the Buffalo Valley Project (SSR 2026b). Key design considerations

are included in the TRS.

14-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

15.0 Infrastructure

15.1 Marigold

Infrastructure

15.1.1 Site

Access, Power, and Water

15.1.1.1 Site

Access

Marigold is accessible via Interstate

Highway 80 in northern Nevada and is approximately five kilometers south–southwest of Valmy in Humboldt County. The site access

road supports two lanes of traffic and consists of hard-packed clay and gravel.

15.1.1.2 Power

The

power supply for Marigold is provided by NV Energy Inc. via a 120 kV transmission line to site. Site power draw is 5 MW. After

exiting the main substation, power is distributed through a 25 kV distribution grid. The location of the main electrical substation

is shown in Figure 15-1.

15.1.1.3 Operations

Water Supply

Water

for Marigold is supplied by three groundwater production wells located near the site access road and ten dewatering wells located around

the perimeter of the mining operations. Flows from the dewatering wells are used to supplement the production wells when needed, and

the remainder of the flows are routed to the RIBs. Well locations are shown in Figure 15-2 for the

production wells and in Figure 13-17 for the dewatering wells.

Additional

details on the existing and planned mine dewatering infrastructure is provided in Section 13.14.

Water is used across the operation for

process makeup, dust suppression, and other operational needs such as drilling and equipment washing. MMC holds groundwater rights authorizing

annual consumptive use of up to 3.14 million m³ under the Marigold Plan of Operations. These water rights are limited

to points of use located within the Clovers Hydrographic Basin. Historical total water use by the site (2021 to 2025) has averaged 1.52 million m³

per year, corresponding to an average water intensity of 0.07 m³ per tonne stacked on the heap leach facility. Under the TRS

mine plan, the peak annual water consumption is projected to reach approximately 2.55 million m³ in 2030.

Discussion

of the extraction and infiltration of pit water is included in Section 13.14.

15-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

15.1.2 Buildings

and Facilities

15.1.2.1 Buildings

and Facilities in Main Plant and Offices Area

The

buildings and facilities described below are located in the main plant and offices area, as shown in Figure

15-1:

· Truck

shop and mobile maintenance warehouse: The Marigold truck shop complex is located near the

mine entrance. It is a four-bay shop sized for 300 st class haul trucks. The shop contains

a tool crib, oil and lubricant bulk storage, ten offices, locker rooms, training room, and

warehouse. A covered warehouse storage yard is located adjacent to the admin building complex.

· Mill

building: The mill building consists of facilities supporting the metal recovery operations,

including the refinery and metallurgical laboratory. Adjacent to the mill building is the

thickener water storage tank and remaining CIL tanks from the 1989 flowsheet. Liquid cyanide

is delivered by truck to a storage tank adjacent to the ADR plant.

· Crushing

plant: The crushing plant is used to produce stemming for blastholes, road material, and

over liner for heap leach pad. The crusher is a remnant from the 1989 flowsheet.

· Heap

leach carbon columns: The heap leach carbon columns are an integral part of the gold recovery

process, which is detailed in Section 14.

· Wash

bay: The wash bay is located next to the truck shop and consists of one covered bay. The

wash bay building also contains a settling pond for water recycling.

· Administration

building and light vehicle (old) shop: The main administration building encompasses most

site-support departments and includes a small warehouse facility, core shed, the shovel and

drill shop (former truck shop), light-vehicle maintenance bay and the assay laboratory. The

assay laboratory supports ongoing mine operations, including grade control and gold solution

analysis. Adjacent to this building are trailers that provide additional office space.

· Motor

control center (MCC): The MCC houses controls for the pumps and boosters for the barren and

pregnant solution ponds.

· Lime

storage silos: Located on the side of the haul road prior to dumping on the heap leach.

15.1.2.2 Additional

Buildings and Facilities on Site

Additional buildings and facilities

on site include:

· Site

access building

· Potable

water treatment building

· Process

line-out building

· Radio

shop

· Safety

building

· Hose

shop and storage

· Tire

pad

· Fuel

stations

15-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

15.1.2.3 Additional

Facilities on Section 20

Additional

facilities are located on Section 20, which is identified in Figure 15-3 as the Mine Ops area. These

facilities include:

· Welding

and fabrication shop

· Dispatch/MineCare

office and mine operations line-out building

· GPS

dispatch receiver

· Diesel

tanks and fueling station

15.1.3 Explosives

Magazine

The explosives magazine is located a

safe distance from the plant and the office area.

15.1.4 Tailings

Storage Facility and Water Diversion

The Tailings Storage Facility (TSF)

was decommissioned and reclaimed. The only remaining activity concerning the TSF is ongoing monitoring.

The Trout Creek water diversion structure

and flood control dam is located west of the former Basalt Pit. It is designed for a 100-year storm event.

15.1.5 Leach

Pads and Solution Ponds

The

leach pad is discussed in detail in Sections 14, and its location is shown in Figure 15-3.

Details

on the barren and pregnant solution ponds can be found in Section 14.0.

15.1.6 Overburden

Storage Areas

Details

on completed, in progress, and future overburden storage area (OBSA) are included in Section 13.0.

The general location of planned and current OBSA is shown in Figure 15-3.

15-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 15-1: Infrastructure Site Map

15-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 15-2: Freshwater Well Sites

15-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

15-3: LOM Site Schematic Showing Final

Pit Limits, OBSA, and Leach Pad

15-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

15.2 Buffalo

Valley Infrastructure

15.2.1 Site

Layout

The

initial site layout for Buffalo Valley was developed from the Newmont Plan of Operations, acquired as part of the property purchase,

and was refined throughout the study phases of the Project. The Plan of Operations site layout is shown in Figure

15-4. SSR determined that it is more economical to perform truck maintenance and parts warehousing at Marigold, with haul trucks returning

to Marigold for periodic maintenance. The Mine Ops ponds are sized to meet the facility's process make-up water requirements. Haul roads

and light vehicle access roads throughout the site have been included in the design.

15-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 15-4: Buffalo Valley Site Layout

15-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

15.2.2 Plan

Boundary

The

proposed Buffalo Valley property boundary was finalized during the Feasibility Study (SSR 2026b) and is shown in Figure

15-5.

15-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

15-5: Buffalo Valley Plan Boundary

15-10

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

15.2.3 Marigold

to Buffalo Valley Connector Road

The

Marigold to Buffalo Valley connector road was fully engineered by WSP during the Feasibility Study (SSR 2026b). The road route and design

are shown in Figure 15-6.

15-11

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure

15-6: Routing of Marigold to Buffalo Valley Connector Road

15-12

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

15.2.4 Maintenance

Facilities

SSR conducted trade-off studies to evaluate

site warehouse and haul truck maintenance shop locations and the cost difference between using the current shop at Marigold and constructing

a new shop at BV. Given Buffalo Valley's short mine life, SSR decided to use the Marigold truck shop rather than build a new one at Buffalo

Valley. No other maintenance facilities are planned at Buffalo Valley.

15.2.5 Fuel

A fuel depot will be installed on the

access road south of the operations mobile offices, first-aid and medical offices, and the vehicle staging and laydown area, as shown

on the Buffalo Valley Site Layout.

15.2.6 Water

Supply

Water

is supplied to Buffalo Valley from pit dewatering infrastructure, including five deep wells and three RIBs. Dewatering well locations

are shown in Figure 15-4.

15.2.7 Power

Buffalo Valley will need to construct

approximately 14.5 km of 24.9 kV power line from the existing North Peak substation to service the Buffalo Valley site. Line power will

be stepped down to 4,160 V, 480 V, and 110 V as required with power primarily distributed at 4,160 V or 480 V to motor control centers

serving the respective process areas.

Power usage for the process and process-related

infrastructure was determined from the mechanical equipment load list. Equipment power demands under normal operation were estimated

using operating availability and load estimates to determine average energy usage and cost.

15.2.7.1 North

Peak Substation Connection

Currently, the North Peak substation

is fed from the existing Marigold Mine substation, supplied by NV Energy. The feeder to the North Peak substation is connected to an

existing 15/20/25 MVA power substation transformer. The current 24.9 kV power line can be extended from the transition point at

North Peak to supply power to Buffalo Valley. Buffalo Valley is approximately 9.6 km (6 mi) southwest of North Peak.

The power line feeding the North Peak

substation from the Marigold substation may need to be upgraded in the future, depending on the need for additional crushing and whether

the pit dewatering pumps are included in the design. The cost of this upgrade was included in the project economics for all scenarios

that included the crusher and/or pit dewatering.

Three site-area transformers will be

required at different locations throughout Buffalo Valley. The anticipated transformer-connected loads are 6.53 MW, and the calculated

demand loads are 4.61 MW (including the crushing circuit and pit dewatering pumps). The new overhead power line from North Peak to Buffalo

Valley will be routed along the new Marigold-Buffalo Valley connector road.

15.2.8 Explosives

Magazine

The explosives magazine is located a

safe distance to the east of the plant and the office area and to the north of the open pit.

15-13

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

15.3 QP

Opinion

The infrastructure supporting the Marigold

Mine is well established, well maintained, and has been operating for many years. Infrastructure for the new Buffalo Valley Mine has

been developed by leveraging the existing Marigold infrastructure, including the power supply, which is connected to Marigold through

the North Peak substation, and maintenance facilities, reducing the number of facilities required at Buffalo Valley. The SLR QP agrees

that this is a practical approach, especially during the early stages of mine operation and the relatively short mine life. Infrastructure

elements, such as specific maintenance facilities, can be added as required as the mine develops.

15-14

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

16.0 Market

Studies

The Marigold Complex produces gold and

silver contained in doré. Marigold is an active producer and has been for over three decades.

16.1 Marketing

and Metal Prices

Gold

is the principal commodity at the Marigold Complex and is freely traded at prices that are widely known, so that prospects for sale of

any production are virtually assured. Metal prices for the economic analysis were based on the latest available consensus industry metal

price forecast and compared to those used in other published studies. The metal prices selected are shown below in Table

16-1.

Table

16-1: Economic Analysis Metal Price

Assumptions

Metal

Price

Units

2026

2027

2028

2029

2030

Long-Term

Gold

$/oz

4,637

4,794

4,616

4,355

3,991

3,710

Doré poured on-site is stored

in a vault until it is securely transported by road freight to a refinery where it is refined into gold bullion. The bullion is sold

by SSR to banks that specialize in the purchase and sale of gold bullion.

No external consultants or market studies

were directly relied on to assist with the sales terms and commodity price projections used in this TRS.

16.2 Contracts

There are a number of acceptable refineries

with the capacity to refine doré. Currently, SSR has entered into a non-exclusive refining agreement with Asahi Refining USA,

Inc., and the terms and conditions of this contract, which include transportation and refining costs, are within industry norms.

16-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

17.0 Environmental

Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups

17.1 Summary

Specific federal, state, and local (Humboldt

County and Lander County, Nevada) regulatory and permitting requirements apply to MMC. MMC currently holds active, valid permits for

all facets of the mining operation at Marigold and is in the process of obtaining permits for mining operations at Buffalo Valley. There

is currently an exploration permit for Buffalo Valley. MMC is currently in compliance with all permits at both sites. At present, there

are no known environmental or social issues that impact the ability to extract Mineral Resources at the Property.

All activities associated with MMC require

an approved reclamation plan that includes a Reclamation Cost Estimate (RCE) for all permitted facilities and activities. The RCE for

Marigold was updated and approved by federal and state agencies in 2026. Permitted activities at Buffalo Valley are limited to exploration,

and the RCE was updated and approved in 2025. The permitting process for Buffalo Valley, based on of the recent Feasibility Study and

growth plan, has begun with the development of a Plan of Operations (PoO), accompanied by environmental baseline studies and an RCE being

submitted to BLM and Nevada Division of Environmental Protection–Bureau of Mining Regulation and Reclamation (NDEP-BMRR) in May

2026.

MMC maintains ongoing engagement with

local communities, stakeholders, and regulatory agencies. Based on information available at the Effective Report Date, there are no outstanding

negotiations or social commitments expected to materially affect current operations or future development of the Project.

17.2 Marigold

17.2.1 Environmental

Studies

Significant portions of Marigold Mine

exist on public lands administered by the BLM. As a result, the majority of environmental studies related to mining activities were conducted

under the BLM authority as part of the National Environmental Policy Act (NEPA) regulations, which require various degrees of environmental

impact analyses dictated by the scope of the proposed action. The Marigold Mine has undergone several significant NEPA actions in the

normal course of operational planning; the most recent was the PoO – Valmy Development Project (the PoO Amendment), approved in

2023, to permit the future mining in the Valmy and New Millenium pits.

The

environmental baseline studies to support the Environmental Assessment (EA) process for the PoO Amendment were initiated in 2021. A list

of the baseline studies and reports is shown in Table 17-1. Previous baseline studies to support

the permitting of Marigold Mine in 2015 included, but was not limited to, socioeconomics, air quality, cultural and archaeological resources,

hydrogeology, hydrology, geochemistry, and wildlife.

17-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 17-1: Marigold Mine Baseline Studies

Supporting the EA

Study

Media

Documents/Reports

Included Baseline Studies and Data Compiled for Marigold Mine Valmy Development EA

Hydrology/Water

Quality/Geochemistry

Hydrogeologic

Assessment, Geochemical Testing Workplan

Air

Quality

Air

Quality Assessment

Flora/Fauna

Golden

Eagles Surveys, Sage Grouse Surveys

Socio-Economic

Social

Baseline Assessment

Cultural

Resources

Cultural

Resource Survey

Following the approval of the PoO, MMC

obtained approval for modifications to State permits to incorporate the Valmy Development Project in 2024. The Environmental Assessment

conducted by BLM resulted in a Finding of No Significant Impact (FONSI) in 2024 as well.

17.2.2 Project

Permitting

Specific

federal, state, and local (Humboldt County, Nevada) regulatory and permitting requirements apply to Marigold Mine. The primary permits

for Marigold Mine operations include the PoO permitted via the BLM; the Water Pollution Control Permits (WPCP) issued by NDEP-BMRR; and

the reclamation permit issued by the NDEP-BMRR. MMC currently holds active, valid permits for all facets of the mining operation, including,

but not limited to, those permits listed in Table 17-2.

Table 17-2: Marigold Mine Environmental Permits

for Operation

Agency

Permit

Name

Permit

Number

Status

Bureau

of Land Management (BLM)

Plan

of Operations

NVN065034

Active

Nevada

Division of Environmental Protection –Bureau of Mining Regulation and Reclamation

(NDEP-BMRR)

Water

Pollution Control Permit (including Petroleum Contaminated Soils Permit)

NEV0088040

NEV2022118

Active

NDEP-BMRR

Reclamation

Permit

#0108

Active

Nevada

Division of Environmental Protection –Bureau of Water Pollution Control (NDEP-BWPC)

Stormwater

General Discharge Permit

NVR300000

Active

Nevada

Division of Environmental Protection –Bureau of Air Pollution Control

(NDEP-BAPC)

Title

V Air Quality Operating Permit

AP1041-2967.01

Active

NDEP-BAPC

Class

II Air Quality Operating Permit

AP1041-3666

Active

NDEP-BAPC

Mercury

Operating Permit to Construct: Phase II air)

AP1041-2254

Active

17-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Agency

Permit

Name

Permit

Number

Status

Nevada

Department of Wildlife (NDOW)

Industrial

Artificial Pond Permit

41564

Active

United

States Environmental Protection Agency (EPA)

EPA/RCRA

ID

NVD986766954

Active

United

States Army Corps of Engineers

Not

Required

No

jurisdictional waters delineated (June 2025)

NA

United

States Bureau of Alcohol, Tobacco and Firearms

Explosives

Permit

9-NV-013-20-9F-00359

Active

United

States Fish and Wildlife Service (USFWS)

Long-term

Eagle Incidental Take Permit

MBPER10876492

Active

Federal

Communications Commission Permit

Radio

Communications Equipment Authorization

WNPA726

Active

Nevada

Division of Environmental Protection –Bureau of Sustainable Materials Management

(NDEP-BSMM)

Class

III Landfill Waiver

SW1764

Active

SW1824

Active

SW1912

Active

Nevada

State Fire Marshal

Hazardous

Materials Permit (State of Nevada)

125911

Active

Nevada

Division of Environmental Protection –Bureau of Safe Drinking Water

(NDEP-BSDW)

Potable

Water Permit

HU-1103-NTNC

Active

NDEP-BWPC

Septic

Permit

GNEVOSDS09-0016

Active

GNEVOSDS09-0252

Active

United

States Department of Transportation

Hazardous

Materials Storage and Transportation Registration

061521550469DF

Active

Nevada

Board of Regulation of Liquefied Petroleum Gas

Liquefied

Petroleum Gas – Class 5 License

5-3482-01

Active

Nevada

Division of Water Resources (NDWR)

Trout

Creek Dam Permit

J-666

Active

NDWR

Water

Rights

83256

(Certificate 583)

Active

2324

(Certificate 584)

Active

86582

Active

86583

Active

86584

Active

86585

Active

87235-87242

Active

76425S01

Active

76425S02

Active

76425S03

Active

88986

Active

90787

Active

91141

– Central Permit

Active

90788

Active

Humbolt

County Board of Commissioners

County

Conditional Use Permit

UH-15-07

Active

17-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

17.2.3 Environmental

Impacts

MMC

is currently in compliance with all permits presented in Table 17-2. At present, there are no known

environmental issues that impact the ability to extract Mineral Resources at the Property. Specifically, no threatened or endangered

species are known to exist at the site; there are no year-round watercourses on the Property; groundwater impacts due to mining have

are being managed and all environmental regulations and permit conditions are continuously being met. Cultural resource surveys have

been conducted across the Property, and an approved program of avoidance, distance buffer and mitigation measures are in place as part

of the existing PoO.

Overburden is managed in several designated

surface storage areas within the Property boundary, which are concurrently reclaimed to 3:1 slopes, when the sequence of mining operations

allows, and then covered with growth medium and re-vegetated with native seed mixes. When possible, pits are backfilled with overburden.

The majority of overburden encountered at the Marigold Mine is oxide in nature and exhibits sufficient net neutralizing capacity to be

classified as non-acid generating, as confirmed through ongoing quarterly geochemical characterization and monitoring. There are no overburden

areas with observed erosional or stability concerns.

The Marigold Tailings Storage Facility

operated from 1989 to 1999 and has since been fully reclaimed and revegetated. The facility is no longer regulated as a dam by the Nevada

State Engineer, and reclamation bonding has been substantially released following successful closure activities. A final vegetation bond

release request has been submitted (MMC, 2025), with full bond release anticipated upon regulatory approval. In 2026, Marigold was awarded

the Nevada Division of Minerals’ Excellence in Mine Reclamation Award for the successful reclamation of the Tailings Storage Facility.

17.2.4 Environmental

Monitoring and Reporting

Environmental

monitoring and reporting programs are conducted in accordance with applicable permits and regulatory requirements, as summarized in Table

17-5. These programs include monitoring of groundwater quantity and quality, surface water, stormwater quality, air quality, including

fugitive dust, geochemistry, vegetation, and wildlife. Monitoring results are reported to state and federal regulatory agencies, as required,

to document compliance with applicable permit conditions and regulatory obligations. Regulatory compliance inspections are conducted

periodically by agencies such as BLM and the Nevada Division of Environmental Protection (NDEP). The Nevada Department of Wildlife (NDOW)

may also conduct inspections or site visits, as needed, related to wildlife and habitat management matters.

17-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

17.2.4.1 Cyanide

Management

Sodium Cyanide is an essential reagent

in the MMC gold recovery process and is managed in accordance with applicable regulatory requirements and industry best practices. The

operation is certified under the International Cyanide Management Code (ICMC), which establishes standards for the safe manufacture,

transport, storage, handling, use, and disposal of cyanide. Cyanide management is supported through specialized management systems, employee

and contractor training, routine inspections and monitoring, and periodic independent audits to verify compliance and continuous improvement.

17.2.5 Community

Relations and Social Responsibilities

There are currently no outstanding negotiations

or social requirements regarding operations at Marigold Mine. Federal and state permitting processes, including those conducted under

NEPA, provide opportunities for public participation through comment periods and public meetings. Recent permitting activities have generated

limited community concern, and local government agencies have generally been supportive of continued mining operations at MMC.

MMC maintains ongoing engagement with

local communities and stakeholders, including the communities of Battle Mountain, Winnemucca and Elko, local government representatives,

land users, and other interested parties. Permitting processes also provide opportunities for participation by Tribal Nations and other

interested stakeholders where applicable. Mine management routinely engages with stakeholders to provide operational updates and discuss

community interests, including requests for donations, sponsorships, educational initiatives, and other forms of community support.

Community engagement and outreach programs

are well established and include educational activities, community investment initiatives, and regular communication regarding mine operations

and future development plans. Based on information available at the Effective Date, there are no stakeholder issues, tribal concerns,

negotiations, or social commitments that are expected to materially affect current operations, Mineral Resources, Mineral Reserves, or

future development of the Project.

17.2.6 Mine

Closure Requirements

All activities associated with Marigold

Mine require an approved reclamation plan that includes an RCE for all permitted facilities and activities. MMC engages in concurrent

reclamation practices during operations in an effort to reduce disturbance footprints and reclamation bonding liability. Closure planning

is integrated into the life-of-mine planning process and is periodically reviewed and updated to reflect operational changes, regulatory

requirements, and closure objectives.

State regulatory requirements mandate

a formal closure plan be filed two years before the facility initiates closure. Both BLM and the State require a closure plan and tentative

plan for permanent closure as part of normal NEPA and operating permit requirements respectively. MMC has filed and maintained these

closure plans, which, in conjunction with standard reclamation and re-vegetation of all disturbed areas, include discussions on removal

of most infrastructure, monitoring, and notably long-term heap leach drain down solution management. The currently approved closure plan

describes a series of evaporation cells to manage long-term solution drain down following an approximate two-year period of active solution

volume reduction through evaporation for the MMC.

17-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The

RCE for Marigold Mine was updated in 2026, and reclamation bonding estimates/liabilities are based on published third-party cost estimates

to reclaim all permitted features at the Property. BLM, NDEP, and BMRR review and approve the bond estimate, and BLM holds the financial

instruments providing the bond backing. The reclamation bond was updated in 2026 and approved by all parties, resulting in a total bond

amount of US$102,236,696. Current bonds are presented in Table 17-3.

Table

17-3: Marigold Mine Reclamation Cost

Estimate/Bond

Agency

Bond

Reference

Financial

Assurance Mechanism

Amount

(US$)

BLM

NVB106296569001804

Surety

Bond

$61,800,000

BLM

NVB106296570

Surety

Bond

$21,700,000

BLM

NVB106726444

Surety

Bond

$20,000,000

Total

$103,500,000

17.2.7 QP

Opinion

The SLR QP’s opinion is that it

is reasonable to rely on the information provided by SSR as outlined above for use in the TRS because significant environmental and social

analyses have been conducted for the Property over an extended period, the Property has been in operation for a number of years, and

SSR employs professionals and other personnel with responsibility in these areas that have a good understanding of the permitting, regulatory,

and environmental requirements for the Property.

17.3 Buffalo

Valley

17.3.1 Environmental

Studies

Buffalo Valley exists on public lands

administered by the BLM and private land controlled by MMC. As a result, the majority of environmental studies related to mining activities

were and are conducted under the BLM authority as part of NEPA regulations, which require various degrees of environmental impact analyses

dictated by the scope of the proposed action.

The

environmental baseline studies to support the Environmental Impact Statement (EIS) process for the PoO and the State permitting process

were initiated in 2024. These baseline studies included, but were not limited to, socioeconomics, air quality, cultural and archaeological

resources, hydrogeology, hydrology, geochemistry, wildlife, and vegetation. A list of the baseline studies and reports is shown in Table

17-4.

17-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 17-4: Baseline Studies Supporting the

EIS

Study

Media

Documents/Reports

Included Baseline Studies and Data Compiled for Buffalo Balley EIS

Geology/Geochemistry

Hydrology

Buffalo

Valley Baseline Hydrologic Characterization Report, Seep and Spring Survey

Jurisdictional

Delineation

Aquatic

Resources Delineation Report (No jurisdictional waters delineated)

Hydrogeology

Buffalo

Valley Baseline Hydrogeologic Characterization Report

Vegetation

2024

Biological Baseline Survey Report

Wildlife

2024

Biological Baseline Survey Report, 2025 Supplemental Biological Baseline Survey Report

Air

Quality

Buffalo

Valley Mine Project NEPA Air Quality Impact Analysis Report

Cultural

Resources

Class

III Cultural Survey

Paleontology

Paleontological

Resources Evaluation of the Proposed Buffalo Valley Mine Project

Socioeconomics

2025

Social and Economic Value Assessment, Buffalo Valley Project

Visual

Resources

Visual

Resources Baseline Report

Land

Use

Visual

Resources Baseline Report

Grazing

and Hunting

2025

Social and Economic Value Assessment, Buffalo Valley Project

17.3.1.1 Geology/Geochemistry

Buffalo Valley is bound by the Havallah

Hills to the north, the Buffalo Mountains to the northwest, the Tobin Range to the west, and the Battle Mountain Range to the east. Surface

geology in the vicinity of the Project includes quaternary alluvial materials in the valley to the west and exposures of a Paleozoic

bedrock assemblage consisting primarily of the Permian Havallah Formation on the foothills of the Battle Mountain Range to the east.

The mineral deposit is localized within

the upper portion of the Havallah sequence, which has been intruded by granodiorite dikes associated with skarn alteration processes.

Mineralization is characterized by both skarn-type and distal-disseminated gold, consistent with regional metallogenic models observed

throughout north-central Nevada. The deposit occurs within a fault-bounded structural block that is separated from the main Battle Mountain

block to the east by a prominent west-dipping, north–south-trending normal range-front fault. A subsidiary range-front fault bounds

the block on the west side, further defining the structural setting of the deposit (Buffalo Valley Mine Plan of Operations and Nevada

Reclamation Permit Application, SSR, 2026).

17.3.1.2 Hydrology

Buffalo Valley is considered a closed

drainage. Surface water runoff ultimately flows toward a dry playa lake, south of the Buffalo Valley project area. The valley is dominated

by ephemeral streams. A jurisdictional determination was prepared for the Buffalo Valley project area. An Aquatic Resources Delineation

Report was prepared on June 26, 2024, in which approximately 1,980 m2 (1,638 linear meters) of intermittent stream were identified

to be present within the Buffalo Valley project area. The United States Army Corps of Engineers, Sacramento District (USACE) concurred

with the delineation report identifying the intermitted steam as not being a Water of the United States (WOTUS) regulated under Section

404 of the Clean Water Act or under Section 10 of the Rivers and Harbors Act. No WOTUS are present within the Buffalo Valley project

area.

17-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Seep and Spring surveys were conducted

within a 6.4 km radius of the Buffalo Valley project area in July 2024 and within an 8.0 km radius of the Buffalo Valley project area

in May and October 2025. A total of 54 sites were surveyed in the fall of 2025.

17.3.1.3 Hydrogeology

Precipitation, in the form of rainfall

and snowmelt, is the primary source of aquifer recharge to the groundwater system at the Buffalo Valley project area. Recharge of groundwater-bearing

units is understood to take place in mountain block bedrock and eventually into the Buffalo Valley alluvium via vertical infiltration

in permeable soils and fractures. Groundwater elevations in the area range from approximately 1402 to 1630 MASL6.4 km buffer around a

collective boundary consisting of the Buffalo Valley project area, the Marigold Mine project area, and the Trenton Canyon Exploration

Area. Ten known leks were surveyed and in total, the amount of observed male GRSG in the Buffalo Valley project area between 2024 and

2025 increased by 15, from 52 males in 2024 to 67 males in 2025. Female counts in the same period decreased, with six found in 2024 and

two in 2025 (Greater Sage Grouse Lek Monitoring Report, ERM, 2025). MMC will work with the State of Nevada Sagebrush Ecosystem Program

administered by NDOW to develop the necessary mitigation measures and obtain the necessary credits for work within this habitat type.

The Pinyon Jay is a BLM special status

species. Surveys were conducted in 2024 resulting in three flocks being observed in the survey area. Pinyon Jay surveys were conducted

in 2025 resulting in no pinyon jays being observed visually or aurally during these surveys (2025 Supplemental Biological Baseline Survey

Report, Nexus, 2025). An additional round of surveys was conducted in 2025. During the surveys, approximately four to five pinyon jays

were observed. No breeding behavior was exhibited by the observed pinyon jays during all studies.

Aquatic Species

Fisheries and benthic macroinvertebrate

surveys were conducted in 2024 at five sites: Willow Creek, Trenton Creek, Trout Creek, North Fork of Trout Creek, and Cottonwood Creek.

No fish or suitable habitat was identified within the Buffalo Valley project area (2024 Biological Baseline Survey Report, Nexus, 2025).

Springsnail are BLM special status species.

Surveys were conducted within four miles of the Buffalo Valley project area in 2024. Of the 44 surface water features located within

the project area, 34 were surveyed for springsnails (10 of the sites were dry or had an insufficient amount of water). None of the sites

where springsnails were documented are within the Buffalo Valley project area (2024 Biological Baseline Survey Report, Nexus, 2025).

Mammals

Four bat surveys were conducted throughout

2024. The presence of 13 bat species was observed (2024 Biological Baseline Survey Report, Nexus, 2025), all of which are special status

species.

Pygmy rabbit is a BLM special status

species. Surveys were conducted within the Buffalo Valley project area in 2024 and 2025. No pygmy rabbits or their tracks, burrows, or

pellets were observed during the 2024 or 2025 surveys (2024 Biological Baseline Survey Report, Nexus, 2025 and 2025 Supplemental Biological

Baseline Survey Report, Nexus, 2025).

Reptiles

Special status reptile surveys were

completed in 2024. A total of four different species were incidentally observed, including desert horned lizard, Great Basin gopher snake,

sagebrush lizard, and western fence lizard. Sagebrush lizard and western fence lizard within the Buffalo Valley project area. No special

status reptiles were observed within the Buffalo Valley project area (2024 Biological Baseline Survey Report, Nexus, 2025).)

17-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

17.3.1.4 Air

Quality

The facility-wide potential process

source emissions are less than the 226.8 tonne (250 ton) per year threshold (40 CFR § 52.21). Therefore, the Project is considered

a minor source for New Source Review. In addition, the facility-wide potential process source emissions are also below the 90.7 tonne

(100 ton) per year threshold for the Title V program. The Project will be considered a minor source, which is not subject to Title V

permitting. The predicted maximum total ambient concentrations resulting from Project emissions (including background concentration)

for all the pollutants and averaging periods are below the applicable National Ambient Air Quality Standards (Buffalo Valley Mine Project

NEPA Air Quality Impact Analysis Report, Air Sciences, 2026).

17.3.1.5 Cultural

Resources

A Class III cultural survey has been

completed for the Project, and a Historic Properties Treatment Plan has been submitted to BLM and the State Historic Preservation Office

(SHPO) for their review and approval. Mitigation of cultural sites will be completed, as necessary, and in coordination with BLM and

SHPO.

17.3.1.6 Paleontology

A paleontological resources assessment

to determine the Project’s potential adverse effects on paleontological resources either at the surface or in the subsurface was

completed in 2024. This paleontological resource investigation consisted of a desktop review of the most recent geologic mapping, relevant

scientific literature, BLM Potential Fossil Yield Classification mapping, museum records of the Nevada State Museum, and online collections

data from the University of California Museum of Paleontology. Based on the results of the study, geology in the Buffalo Valley project

area is not likely to preserve paleontological resources. Therefore, no negative impact is anticipated on significant fossil-bearing

areas.

17.3.1.7 Socioeconomics

A social and economic assessment was

conducted in 2025. Development of Buffalo Valley is anticipated to sustain current socioeconomic conditions and the construction phase

is anticipated to have a primarily positive impact as presented in (2025 Social and Economic Value Assessment ERM, 2025).

17.3.1.8 Visual

Resources

Visual resources survey and analysis

were conducted in 2024 to be utilized throughout the NEPA process.

17.3.2 Project

Permitting

Specific

federal, state, and local (Humboldt & Lander County, Nevada) regulatory and permitting requirements apply to Buffalo Valley. Buffalo

Valley currently has an exploration permit issued by BLM and has begun the federal and State permitting processes. The primary permits

for Buffalo Valley operations will include the PoO permitted by BLM via a Record of Decision (ROD); WPCPs issued by NDEP-BMRR; and the

reclamation permit issued by NDEP-BMRR. The federal and State permitting process were initiated with the submittal of the PoO in May

2026. The anticipated permits and authorizations required for Buffalo Valley operations are listed in Table

17-5.

17-9

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 17-5: Buffalo Valley Environmental Permits

for Operation

Agency

Permit

Name

Permit

Number

Status

BLM

Exploration

Permit

NVNV106035326

Active

BLM

Plan

of Operations

NVNV106161773

(legacy serial number NVN-067047)

Required

NDEP-BMRR

Water

Pollution Control Permit (including Petroleum Contaminated Soils Permit)

Required

NDEP-BMRR

Water

Pollution Control Permit Dewatering Rapid Infiltration Basin

Required

NDEP-BMRR

Reclamation

Permit

Required

NDEP-BWPC

Stormwater

General Discharge Permit

Required

NDEP-BAPC

Minor

Source Class II Air Quality Operating Permit

Required

NDOW

Industrial

Artificial Pond Permit

Required

United

States Bureau of Alcohol, Tobacco and Firearms

Explosives

Permit

Required

United

States Army Corps of Engineers

Not

Required

No

jurisdictional waters delineated (June 2025)

NA

USFWS

Incidental

Take Permit

Required

NDEP-BWPC

Septic

Permit

Required

Federal

Communications Commission Permit

Radio

Communications Equipment Authorization

NDEP-BSDW

Potable

Water Permit

Required

NDEP-BSMM

Class

III Landfill Waiver

Required

Nevada

State Fire Marshal

Hazardous

Materials Permit (State of Nevada)

Required

NDWR

Water

Rights

93717

Active

Lander

County Board of Commissioners

County

Conditional Use Permit

Required

Building

Permits

Required

County

Road Use and Maintenance Permit/Agreement

Required

Humbolt

County Board of Commissioners

Special

Use Permit (for specific facilities)

Required

17-10

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

17.3.3 Environmental

Impacts

MMC is currently in compliance with

the exploration permit at Buffalo Valley. At present, there are no known environmental issues that impact the ability to extract Mineral

Resources at the Property.

17.3.4 Environmental

Monitoring and Reporting

Environmental monitoring and reporting

at Buffalo Valley supporting the permitting process have been completed and submitted with the PoO. MMC conducts environmental monitoring

and reporting in accordance with its approved operating, reclamation & closure, and environmental permits, including monitoring required

under the exploration PoO, and reclamation permit. Baseline environmental studies supporting the mine operations permitting effort are

completed. However, monitoring of groundwater, surface water, and some biological studies are voluntarily ongoing to support baseline

data collection for future permitting actions or project modifications. MMC also maintains community and environmental stewardship programs

as part of its ongoing environmental management system; these programs are separate from regulatory baseline study requirements and do

not represent outstanding commitments that are expected to materially affect the operation.

17.3.5 Community

Relations and Social Responsibilities

There are currently no outstanding negotiations

or social requirements regarding operations at MMC. Federal and state permitting processes, including those conducted under NEPA, provide

opportunities for public participation through comment periods and public meetings. Recent permitting activities have generated limited

community concern, and local government agencies have generally been supportive of MMC’s planned operations at Buffalo Valley.

There are four federally recognized

tribes in Humboldt and Lander Counties: The Battle Mountain Band Colony, part of the Te-Moak Tribe of Western Shoshone, the Winnemucca

Indian Colony, the Summit Lake Paiute Tribe, and the Fort McDermitt Paiute Shoshone Tribe. Invitations for formal consultation will be

conducted as a government-to-government (tribes to BLM) basis during the NEPA process.

17.3.6 Mine

Closure Requirements

All activities associated with Buffalo

Valley require an approved reclamation plan that includes an RCE for all permitted facilities and activities. The reclamation plan is

presented in the PoO and was developed to meet federal and State standards. Where possible, reclamation will occur concurrently with

operations. The post-closure land use proposed aligns with current land uses including mineral exploration and development, other natural

resource development, livestock grazing, wildlife habitat, hunting, and dispersed recreation.

17-11

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Open Pit

The pit slopes prohibit the reclamation

practice of growth media placement and revegetation due to access logistics and safety concerns. As such, there are no plans to attempt

soil placement or revegetation within the open pit. MMC is requesting a reclamation exemption under NAC 519A.250 for the open pit. Access

to the open pit will be precluded by the construction of post-mining safety barriers. These barriers will be located at access points

and on ramps present at the time of closure to prevent entrance. Pit berms will be constructed along the perimeter of the pit, where

necessary, to limit public access and deter livestock and signage will be placed at intervals along the berms. Pit benches will erode

and fail over time which should effectively break up linear features and create naturally appearing scree and talus slopes.

Upon cessation of mining and dewatering

activities, and precluding the placement of pit backfill, a lake will form in the Buffalo Valley Pit. MMC’s water rights are of

sufficient quantity to cover the post-closure consumptive use associated with evaporation from the pit lake in the case that the pit

is not backfilled.

Heap Leach Facility

The Heap Leach Facility will be constructed

in 7.62 m nominal lifts to a maximum permitted height of 152.5 m. The lifts will be dumped at angle of repose and later re-sloped to

meet the final closure design slope angle of 1 m horizontal to 0.3 m vertical (1H:0.3V) configuration resulting in minimal recontouring

requirements to final stable landform. Following operation, the facility will be capped with a store and release cover and revegetated.

The process solution management pond will be converted to an evaporation cell once the appropriate draindown flow rate has been achieved.

Prior to that, loaded carbon will be removed from Buffalo Valley and transferred to the Marigold Mine for processing.

Overburden Storage Areas

At closure, the Overburden and Storage

Areas will be regraded to a 3H:1V slope or flatter and capped with six inches of growth media and revegetated. If a petroleum contaminated

storage pad is developed in the Overburden Storage Area, the area will be capped with a two foot cover and six inches of growth media

and revegetated.

Roads, Yards and Infill Areas

All haul and operational roads, yards,

and infill areas including the Buffalo Valley to Marigold Connector Road, will be reclaimed after operations, and when no longer needed

for monitoring and maintenance. Roads, culverts, and road crossings areas will be ripped to reduce compaction and regraded to prevent

collection of stormwater and promote runoff and generally re-establish pre-mine flow paths. Soil materials will be removed from the berms

and redistributed on the deep ripped and regraded roads prior to revegetation.

Rapid Infiltration Basins

Prior to reclamation, any dewatering

water present in the Rapid Infiltration Basins (RIBs) will be allowed to infiltrate and backfilled with material previously excavated

and stockpiled in nearby berms. The surface will be regraded to blend in with the surrounding topography. Six inches of growth media

will be placed over the backfilled area and revegetated.

Buildings and Structures

Buildings and support facilities will

be reclaimed during the closure period. Buildings and support structures necessary for the reclamation will remain until these facilities

are closed and reclaimed. The main procedures for facility and buildings consist of decommissioning, site demolition, equipment salvaging

and disposal off-site in an appropriate facility.

17-12

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Reclamation Cost Estimate

The RCE for the Buffalo Valley exploration

permit, NVNV106035326, was updated in May 2025 and is $934,758, resulting in a surety bond in that amount.

The RCE for Buffalo Valley operations

was developed in 2025 and reclamation bonding estimates/liabilities were developed utilizing the Standardized Reclamation Cost Estimator

(SRCE) version 1.4.1 and 2025 unit rated provided by NDEP. The RCE is $46,068,611 including direct, indirect and post-closure monitoring

cost estimates.

17.3.7 QP

Opinion

The SLR QP’s opinion is that it

is reasonable to rely on the information provided by SSR as outlined above for use in the TRS because significant environmental and social

analyses have been conducted for the Property over an extended period, the Property has been in operation for a number of years, and

SSR employs professionals and other personnel with responsibility in these areas that have a good understanding of the permitting, regulatory,

and environmental requirements for the Property.

17-13

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

18.0 Capital

and Operating Costs

SSR’s forecasted capital and operating

costs estimates related to the development of Mineral Reserves are derived from annual budgets and historical actuals over the long life

of the current operation. According to the American Association of Cost Engineers (AACE) classifications, these estimates would be Class

1 with an accuracy range of -3% to -10% to +3% to +15%.

18.1 Capital

Costs

Growth,

sustaining, and reclamation capital costs are summarized in Table 18-1. Growth CAPEX includes capital

associated with growth-related activities, including the development of Buffalo Valley and other growth initiatives. Sustaining CAPEX

includes capital expenditures associated with activities from mining through ore placement on the heap leach pad, based on an average

LOM total material movement rate of approximately 380,000 tpd over the 15-year mining phase, as well as final reclamation costs.

All capital costs incurred prior to

May 1, 2026, are considered sunk costs.

Table

18-1: Capital Costs Summary

Capital

Costs

Total

($ million)

Growth

CAPEX

542.2

Subtotal

Growth CAPEX

542.2

Mining

Equipment Replacement

98.1

Equipment/Building

Maintenance

436.4

Administration

2.8

Processing/Lab

40.1

Permitting/Geotech

34.1

Exploration

57.2

Subtotal

Sustaining Capital

668.6

Reclamation

174.6

Total

Capital Costs

1,385.4

18.1.1 Growth

Capital

Under the World Gold Council (WGC) guidance

on non-GAAP metrics, capital expenditures associated with a major project at an existing operation can be classified as growth capital

where the project is expected to provide a material benefit to the operation. The WGC defines a material benefit as an expected increase

of at least 10% in one or more of the following measures:

· Annual

or LOM production relative to current levels;

· Net

present value (NPV) relative to the remaining LOM NPV prior to inclusion of the project;

or

· Mineral

reserves relative to the reported reserves prior to inclusion of the project.

18-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The LOM growth capital of $542.2 million

includes capital expenditures associated with the major leach pad expansion and related infrastructure at Marigold, development of Buffalo

Valley, and the major expansion of the Marigold mining fleet. In total, about $35 million in contingency is included in the growth capital.

These investments support the development and mining of Buffalo Valley and enable execution of the larger Marigold pit shell associated

with the $2,200 per ounce gold reserve price.

18.1.2 Sustaining

Capital

Sustaining capital costs include the

following:

· Replacement

of mining equipment as it reaches its economic life during the remaining nine years of mining.

The majority of the mining equipment replacement costs relates to replacing haul trucks and

excavators, but it also covers drills and mine support equipment.

· Major

equipment rebuilds and component replacement. In order to maintain equipment availability

for the extended equipment lives, major equipment is programmed for rebuilds at set points

during its economic life.

· Administration

costs such as light vehicle purchases and various site infrastructure improvements.

· Ongoing

cost associated with process infrastructure.

· Permitting

costs mainly associated with dewatering infrastructure (wells, pipelines, rapid infiltration

basins) that are required to lower the water table in advance of planned mine development.

· Exploration/Mine

Development costs are mainly capitalized drilling to better refine the grade estimates in

the orebody that will be mined during the LOM.

18.1.3 Reclamation

and Closure

The costs associated with reclamation

and closure activities at Marigold were estimated to be $174.6 million (real May 1, 2026 dollars), with the majority of the costs incurred

from 2038 to 2050.

18.2 Operating

Costs

As the Property has been in operation

for a number of years, the level of project definition for the operating cost estimates is very high. Given the available project performance

data and the high project definition, no contingency was included in the cost estimate. The QP considers the operating cost estimate

to be in the accuracy range of +/-15%.

The

LOM operating costs estimate, inclusive of Buffalo Valley and Marigold, is $16.78/t of stacked ore, as shown in Table

18-2.

Table 18-2: Operating Costs Summary

Description

Total

LOM ($ million)*

$/t

stacked*

Mining

and Maintenance

3,741

12.57

(1.99/t moved)

Processing

804

2.70

Site

Support

451

1.51

Total

4,996

16.78

*From

May 1, 2026

18-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

18.2.1 Mining

& Maintenance

The

LOM mine operating cost estimate is shown in Table 18-3 and covers activities from mining to placing

ore on the heap pad at an average LOM mining rate of approximately 380,000 tpd moved over the 15-year mining phase.

Table 18-3: Mine Operating Cost Summary

Description

$/t

moved

Labor

0.68

Fuel

0.44

GET(1)

0.06

Tires

0.14

Explosives

0.13

All

Others

0.55

Total

1.99

Notes:

1Ground engaging tools

Diesel is the largest non-labor input

for operating costs at Marigold. Diesel prices for the economic analysis were based on the latest available consensus forward-looking

price forecasts and compared to those used in other published studies. Near-term diesel prices average approximately $4.00/gallon before

normalizing to $3.00/gallon over the long-term.

18.2.2 Processing

Processing

costs over the LOM include all costs required to recover the gold from the rock after it is mined and placed on the leach pad. This includes

the cost of chemicals to process the ore, pumping costs to get the barren solution to the leach pad, pumping costs to get the pregnant

solution to the carbon columns for gold recovery after it returns from the leach pad, and the costs associated with the extraction of

the gold from the carbon to produce the final doré product shipped from Marigold. The processing cost estimate is shown in Table

18-4 for an average stacking rate of approximately 58 ktpd and includes costs for the LOM, including the 15-year mine life and the final

5-year rinsing phase of the heap leach pad, which starts in 2041 after mining operations has ceased.

Table

18-4: Process Operating Cost Summary

Description

$/t

ore stacked

Labor

0.70

Operating

Supplies & Maintenance

1.67

Total

Services & Misc.

0.34

Total

2.70

18.2.3 G&A

G&A

costs for the LOM include accounting and site administration, warehousing, safety, human resources, and environmental. These costs, presented

in Table 18-5, are related to supporting the operations groups in the mine, maintenance, and processing

departments.

18-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table

18-5: G&A Operating Cost Summary

Description

$/t

stacked

Labor

0.54

Supplies/Services

0.97

Total

1.51

18.2.4 Workforce

Summary

The

current Marigold workforce totals 540 persons, consisting of 100 salaried and 440 hourly employees (who are not unionized) as of the

effective date of this TRS. The breakdown by department is shown in Table 18-6.

Table 18-6: Current Workforce

Hourly

FTE

Salary

FTE

Total

Mine

267

12

279

Plant

49

12

61

Maintenance

102

17

119

G&A

15

36

51

Tech

Services

7

23

30

Total

440

100

540

The LOM workforce at the Marigold Complex

is expected to increase in the near term as mining activities commence at Buffalo Valley (BV) in 2029 and remain elevated through the

completion of BV mining in 2034.

Following the completion of mining at

BV, the workforce is expected to decline and remain relatively stable throughout the remaining Marigold mining operations from 2035 through

2040. Upon completion of mining at Marigold, the workforce is expected to decrease significantly during the subsequent five-year heap

leach pad drain-down period.

The

Marigold full time equivalent (FTE) workforce for the years 2023 to 2026 (actuals) and the LOM plan (projected) is summarized in Table

18-7.

Table

18-7: LOM Workforce Levels

Hourly

FTE

Salary

FTE

Total

2023

Actual

395

83

478

2024

Actual

388

88

476

2025

Actual

400

89

489

2026

Actual

440

100

540

2027

to 2040 Projected

578

109

686

18-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

19.0 Economic

Analysis

An

after-tax Cash Flow Projection has been generated from the Life of Mine production schedule and capital and operating cost estimates

and is summarized in Table 19-1. A summary of the key criteria is provided below. The complete cash

flow is presented in Section 27.0 Appendix.

19.1 Economic

Criteria

19.1.1 Revenue

· Approximately

58,000 tonnes ore per day stacked (approximately 21 Mt per year) at an average stacked grade

of 0.44 g/t Au, for 4.26 Moz contained stacked.

· LOM

stacked ore recovery averages 72.0%, resulting in 3.06 Moz recoverable stacked during mining

(May 1, 2026 through 2040)

· LOM

total of 3.34 Moz Au produced at an average of 196 koz per year during stacking. A total

of 392 koz Au are produced during the final five-year rinsing period after mining ceases.

Approximately 272 koz Au are recovered from work-in-progress inventory over the LOM.

· Metal

price: US$3,948 per ounce gold (LOM realized), US$3,710 per ounce gold long term price (2031+).

· Gold

at refinery 99.97% payable.

· Net

Smelter Return includes doré refining, transport, and insurance costs.

· Revenue

is recognized at the time of gold production.

19.1.2 Costs

· Mine

life: 20 years, including 2026 (fifteen years of mining and five years of heap leach pad

rinsing).

· Life

of Mine production plan is summarized in Table 13-6.

· LOM

growth capital totals $542.2 million

· LOM

sustaining capital totals $668.6 million

· Final

reclamation costs total $174.6 million.

· Average

operating cost, including royalties and offsite costs, over the mine life is $20.27 per tonne

stacked.

19.1.3 Taxation

and Royalties

Marigold is subject to Nevada Net Proceeds

of Minerals Tax, Nevada property and sales taxes, and U.S. federal income tax. The economic analysis calculates these taxes in accordance

with legislation enacted as of January 1, 2022. Property and sales taxes are accounted for in the operating costs of the mine.

19.1.3.1 Nevada

Gross Proceeds Tax

In 2021, the State of Nevada enacted

Assembly Bill 495, effective July 1, 2021, which is an annual excise tax on gold and silver revenue. Under the bill, the tax rates vary

based on the taxpayer’s Nevada gross revenue. A 0.75% rate is imposed on Nevada gross revenue of more than $20 million but not

more than $150 million in a taxable year (defined as the calendar year). A rate of 1.10% applies to Nevada gross revenue exceeding $150

million in any tax year. The LOM average rate for Marigold during stacking is approximately 1.0% and averages $7.9 million per year over

the fifteen years of mine operation.

19-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

19.1.3.2 Nevada

Net Proceeds Tax

The State of Nevada imposes a 5% net

proceeds tax on the value of all minerals extracted in the State. This tax is calculated and paid based on a prescribed net income formula

applied only to income and expenses from mining, disallowing deductions for exploration and related-party financing costs. This tax is

a deductible expense for U.S. federal income tax calculations and averages $17.8 million per year over the fifteen years of mine operation.

19.1.3.3 US

Federal Income Tax

Federal income tax is determined under

regulations that came into effect on January 1, 2022. Under these regulations, which removed alternative minimum tax, the mine is subject

to a federal income tax rate of 21%. SLR utilized Unit of Production depreciation, depletion allowances, and Net Operating Losses (NOL)

as deductions. Total U.S. federal tax payable averages $23.1 million per year over the fifteen years of mine operation.

19.1.3.4 Royalties

Marigold is subject to a variety of

NSR royalty payments, payable to various parties under the terms of the leases, as described in Section 3. The annual average NSR royalty

payments is about 6.9% of gross revenue and averages $52.3 million per year over the fifteen years of mine operation. Net Smelter Return

(NSR) royalty payments for the Buffalo Valley deposit are fixed at 3.5% of the value of production net of off-site refining costs.

19.2 Cash

Flow Analysis

Considering

the Complex on a stand-alone basis, the undiscounted pre-tax cash flow totals $5,747 million over the mine life. The after-tax Net Present

Value (NPV) at a 5% discount rate (midpoint with May 1, 2026, as time zero) is $3,334 million, as shown in Table

19-1.

19-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 19-1: After-Tax Cash Flow Summary

Description

LOM

Realized

Market Prices

Au

($/oz) – Average

$3,948

Payable

Metal

Au

(koz)

3,335

Cash

Flow Summary

US$

million

Total

Gross Revenue

13,166

Mining

and Maintenance Cost

(3,741)

Process

Cost

(804)

G

& A Cost

(451)

Refining/Freight

(5)

Mining

Royalties

(903)

NGPT1

(131)

Total

Operating Costs

(6,034)

Operating

Margin (EBITDA)

7,132

Cash

Taxes Payable

(834)

Working

Capital2

0

Operating

Cash Flow

6,298

Development

(Growth) Capital

(542)

Sustaining

Capital

(669)

Total

Closure/Reclamation Capital

(175)

Pre-tax

Free Cash Flow

5,747

Pre-tax

NPV @ 5%

3,878

After-tax

Free Cash Flow

4,913

After-tax

NPV @ 5%

3,334

Notes:

1.

Nevada Gross Proceeds Tax

2.

All working capital adjustments net to zero at end of mine life.

19-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

The World Gold Council Adjusted Operating

Cost (AOC) is $1,809/oz Au. The mine life capital unit cost, including sustaining and closure/reclamation, is $253/oz, for an All in

Sustaining Cost (AISC) of $2,062/oz Au. The average annual gold production during operation, excluding rinsing phase, is 196 koz per

year over the fifteen year mine life and 78 koz per year during the five year rinsing phase.

19.3 Sensitivity

Analysis

Project risks can be identified in both

economic and non-economic terms. Key economic risks were examined by running cash flow sensitivities:

· Head

grade

· Metallurgical

recovery

· Gold

price

· Operating

costs

· Capital

costs

After-tax

IRR sensitivity over the base case has been calculated for -20% to +20% variations for head grade, recovery, and gold price and operating

and capital costs. The sensitivities are shown in Figure 19-1 and Table 19-2. The Project is most

sensitive to changes in head grade, metallurgical recovery, and metal price (usually with same magnitude of impact) followed by operating

cost and finally capital costs.

Economics for the operating Marigold

gold mine complex are robust with respect to price, head grade, recovery, capital, and operating costs. The operations benefit from a

long history of experience with mining heap leach gold recovery operations, and higher gold prices than originally planned.

Figure

19-1: After-Tax Sensitivity Analysis

19-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Table 19-2: After-Tax

Sensitivity Analyses

Variance

Head

Grade

(g/t Au)

NPV

at 5%

($ millions)

-20%

0.36

1,609

-10%

0.40

2,471

0%

0.44

3,334

+10%

0.49

4,196

+20%

0.53

5,058

Variance

Gold

Recovery

(%)

NPV

at 5%

($ millions)

-20%

57.6

1,609

-10%

64.8

2,471

0%

72.0

3,334

+10%

79.2

4,196

+20%

86.4

5,058

Variance

LOM

Avg. Metal Prices

($/oz Au)

NPV

at 5%

($ millions)

-20%

3,158

1,609

-10%

3,553

2,471

0%

3,948

3,334

+10%

4,342

4,196

+20%

4,737

5,058

Variance

Operating

Costs

($/t)

NPV

at 5%

($ millions)

-20%

13.42

4,060

-10%

15.10

3,697

0%

16.78

3,334

+10%

18.46

2,970

+20%

20.13

2,607

Variance

Capital

Costs

($ millions)

NPV

at 5%

($ millions)

-20%

1,252

3,440

-10%

1,319

3,387

0%

1,385

3,334

+10%

1,452

3,280

+20%

1,519

3,227

19-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

20.0 Adjacent

Properties

The

SLR QP has not independently verified this information and this information is not necessarily indicative of the mineralization at the

Marigold Complex.

Marigold

is located near the northern limits of a regional belt of ore deposits commonly referred to as the Battle Mountain-Eureka trend. This

north–northwest striking alignment of mines and prospects. It is the second most prolific gold belt in Nevada after the Carlin

trend, and it includes variants of Carlin-Type Gold Deposits (CTGD), distal type sediment hosted deposits as well as skarn and copper–gold

porphyry systems.

Three

major gold deposits lie adjacent to the SSR property. Nevada Gold Mines’ Phoenix mine is approximately 22 km south of the Buffalo

Valley deposit, i-80 Gold Corp’s Lone Tree mine is approximately 7 km northwest of Marigold, and Roxmore Resources Inc.’s

Converse project is approximately 6 km west of Marigold. There are also several inactive mines and exploration and/or development projects

that can be found within a 19 km radius of the property.

Reported

production and Mineral Resources for these adjacent properties are presented in Table 20-1.

Table 20-1: Past

Production and Mineral Resources for Adjacent Properties

Property

Owner

Years

of

Production

Gold

Produced

(Moz)

Stated

Mineral Resources and Mineral Reserves

Mineral

Reserves

Measured

and

Indicated

Mineral

Resources

Inferred

Mineral

Resources

Phoenix1

Nevada

Gold Mines

2006–Present

unknown

3.25

Moz gold

(0.58 g/t)

0.37

Mt copper (0.18%)

7.15

Moz gold

0.37

Moz gold

Lone

Tree Complex2

i-80

Gold Corp.

1991–2012

unknown

n/a

428

koz at 1.73g/t

2.77

Moz at 1.64 g/t

Converse3

Roxmore

Resources Inc.

–

–

n/a

2.162 Moz

3.035

Moz

Notes:

1.

Barrick Gold Corporation. 2026.

2.

i-80 Gold Corp. 2024.

3.

SLR. 2026.

Phoenix

mine is currently operated by Nevada Gold Mines and is a polymetallic Au-Cu-Ag porphyry system that has been in production since 2006.

The mine includes various deposit types, all structurally controlled by northwest trending faults.

Lone

Tree is considered a distal-disseminated deposit that may be genetically related to a porphyry-type system; mineralization was structurally

controlled by north–northwest trending faults.

At

Converse, gold mineralization is hosted within a skarn that developed within the Havallah Formation. No production has occurred at Converse

to date.

A

plan map of mine properties adjacent to Marigold is presented in Figure 20-1.

20-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Figure 20-1: Adjacent

Properties

20-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

21.0 Other

Relevant Data and Information

No

additional information or explanation is necessary to make this TRS understandable and not misleading.

21-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

22.0 Interpretation

and Conclusions

SLR

offers the following conclusions by area.

22.1 Geology

and Mineral Resources

· The

Mineral Resource estimates for Marigold and Buffalo Valley have been prepared using accepted

industry practices and conform to the requirements of SEC Regulation S-K 1300.

· The

estimates are supported by extensive drilling, validated geological and assay databases,

appropriate metallurgical assumptions, robust estimation methodologies, and reasonable economic

parameters.

· The

assigned Mineral Resource classifications appropriately reflect the level of geological confidence

and estimation uncertainty inherent in each deposit.

· Additional

drilling and ongoing geological studies have the potential to expand the known mineralized

footprint, improve classification confidence, and support future conversion of Mineral Resources

to Mineral Reserves.

· The

Marigold Complex contains two distinct mineral deposit styles. Marigold and Trenton Canyon

are classified as Carlin-type gold deposits, while Buffalo Valley is classified as a distal

disseminated silver-gold deposit associated with felsic porphyry dikes, structural corridors,

and favorable host rocks.

· Geological

understanding of the Marigold Complex is supported by more than three decades of mining operations,

extensive exploration programs, geologic mapping, geophysical surveys, metallurgical testing,

production history, and ongoing resource definition drilling.

· The

current geological interpretations adequately define lithologic, structural, oxidation, alteration,

and mineralization controls and provide a suitable basis for Mineral Resource estimation

and classification.

· Exploration,

delineation, and resource development programs completed by SSR and predecessor operators

have resulted in more than 13,000 drill holes and over 2.6 million meters of drilling across

Marigold, Buffalo Valley, and Trenton Canyon. Recent drilling programs continue to support

resource growth, conversion, and refinement of geological models.

· The

drilling density and spatial distribution of drill holes are sufficient to support the current

geological interpretations and Mineral Resource classifications at both Marigold and Buffalo

Valley.

· The

SLR Qualified Person considers the drilling methods, sampling practices, sample preparation

procedures, analytical methods, quality assurance and quality control programs, and database

management systems to be consistent with accepted industry standards and suitable for Mineral

Resource estimation.

· Independent

verification procedures completed by SLR indicate that the geological, assay, density, and

survey databases are sufficiently accurate, complete, and reliable for use in Mineral Resource

estimation.

· There

are no Measured Resources at the Property.

22-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· The

level of uncertainty has been adequately reflected in the classification of Mineral Resources

for the Property. The MRE presented may be materially impacted by any future changes in the

break-even cut-off grade, which may result from changes in mining method selection, mining

costs, processing recoveries and costs, metal price fluctuations, or significant changes

in geological knowledge.

· The

SLR QP is of the opinion that, with consideration of the recommendations summarized in Sections

1 and 23 of this TRS, any issues relating to all relevant technical and economic factors

likely to influence the prospect of economic extraction can be resolved with further work.

22.1.1 Marigold

· Mineral

Resources were constrained within an optimized open pit shell that reflects reasonable prospects

for eventual economic extraction using a gold price assumption of US$2,500/oz and a reporting

cut-off grade of 0.069 g/t Au.

· Effective

May 1, 2026, the Marigold Mineral Resource estimate exclusive of Mineral Reserves comprises

approximately 125.0 Mt of Indicated Mineral Resources at an average grade of 0.39 g/t Au

and 18.1 Mt of Inferred Mineral Resources at an average grade of 0.30 g/t Au. No Measured

Mineral Resources are reported.

· Validation

and reconciliation reviews demonstrate that the Marigold resource model provides reasonable

predictions of grade and tonnage and is appropriate for mine planning and Mineral Reserve

conversion activities.

· The

SLR QP considers the geological interpretation, estimation methodology, classification criteria,

and validation results to appropriately support the reported Marigold Mineral Resources.

22.1.2 Buffalo

Valley

· Mineral

Resources were constrained within optimized pit shells using lithology-specific cut-off grades

ranging from 0.10 g/t Au to 0.32 g/t Au and a gold price assumption of US$2,500/oz.

· Effective

May 1, 2026, the Buffalo Valley Mineral Resource estimate exclusive of Mineral Reserves comprises

approximately 5.6 Mt of Indicated Mineral Resources grading 0.53 g/t Au and 11.2 Mt of Inferred

Mineral Resources grading 0.31 g/t Au. No Measured Mineral Resources are reported.

· Metallurgical

testing confirms that gold recoveries vary by lithology and particle size and supports the

recovery assumptions used in the Mineral Resource estimate.

· The

SLR QP considers the Buffalo Valley geological model, estimation methodology, resource classification

criteria, and metallurgical assumptions to be appropriate for the style of mineralization

and sufficient to support the reported Mineral Resources.

22.2 Mining

and Mineral Reserves

22.2.1 Marigold

· Marigold

anchors the Complex with 240.44 Mt of Probable Reserves grading 0.46 g/t Au, containing 3.52

Moz. Including stockpiles and leach pad inventory, the total Mineral Reserve estimate is

3.96 Moz. The updated $2,200/oz gold price assumption triggered a 73% increase in contained

gold compared to previous estimates.

22-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· Mining

at Marigold is executed across 15.2 m benches (or 7.6 m for smaller shovels to control dilution)

using automated blasthole sampling, rigorous fire assay-to-cyanide-soluble regression, and

continuous radar slope monitoring. Individual pit stripping varies, averaging 7.4:1 in North

Mackay and 6.2:1 in New Millenium, supported by established geotechnical design criteria

and active dewatering in deeper cutbacks like Mackay and Red Dot Phase 3.

22.2.2 Buffalo

Valley

· Buffalo

Valley contributes 45.33 Mt of Probable Reserves grading 0.46 g/t Au, containing 0.67 Moz

of gold. Its lower strip ratio of 3.9:1 helps temper the broader Complex's overall stripping

requirements.

· Located

approximately 15 miles from the main Marigold operation, Buffalo Valley operates as a standalone

satellite facility complete with its own dedicated heap leach facility and separate Overburden

Storage Area (OBSA).

· Mining

at Buffalo Valley is planned using the same bench heights as at the Marigold Mine (15.2 m)

to maintain operational consistency and equipment synergies, enabling the planned transfer

of hydraulic shovels and haul trucks between the two operations.

· Mining

operations at Buffalo Valley are currently unpermitted, with the schedule assuming permitting

activities will be successfully completed to support active production which begins in 2029

for a 5.3-year operational window that slots directly into the middle years of the active

mining timeline.

· Structured

across three distinct geotechnical domains with inter-ramp angles ranging from 32° to

48° governed by structural bedding orientations, Buffalo Valley's operational success

is tightly bound to securing environmental permits ahead of 2029 and adapting proven grade

control and blasting methodologies to its unique sedimentary and dike-controlled lithology.

22.2.3 Integrated

Operations

· Backed

by SSR’s extensive operational experience at the site, the Complex benefits from well-established

geotechnical parameters, active site-wide dewatering programs, and sufficient storage capacity

within the expanded OBSA to accommodate the higher LOM waste volumes.

· The

LOM plan targets an expanded average mining rate of 380,000 tpd (peaking at 505,000 tpd),

supporting 15 years of active mining followed by 5 years of processing the heap leach pad

inventory for a total 20-year LOM. During full production years, annual mine production averages

138.3 Mtpa (reaching 165.0 Mtpa over the first seven years), yielding a complex-wide LOM

strip ratio of 5.3:1 (waste-to-ore) over the 15-year active schedule (which includes the

partial start in 2026 and final wind-down in 2040).

· Sustaining

higher material movement and increased stripping requires a major capital fleet expansion,

including a LeTourneau L-1850 loader in 2026 as replacement, a Liebherr 9600-class shovel

in 2027, a second P&H 4100-sized shovel in Q1 2028, and scaling the 300 st haul truck

fleet with 19 additional units to reach a peak of 45 trucks. Rather than requiring an isolated

capital fleet, Buffalo Valley shares equipment synergy with Marigold, allowing two Komatsu

PC7000 hydraulic shovels and 8 to 10 haul trucks to transfer to Buffalo Valley in 2029 for

its duration before returning to Marigold.

22-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· The

Complex operates with a total established workforce of 540 personnel, distributed across

Mine Operations (279), Mine Maintenance (119), Process & Laboratory (61), General &

Administration (51), and Technical Services (30). Success over the 20-year LOM relies on

maintaining disciplined short-term sequencing, executing the 2027–2028 equipment ramp-up

smoothly, successfully securing the Buffalo Valley permit ahead of 2029, and managing workforce

retention and skills training to support elevated material movement without compromising

mechanical availability or slope stability.

· The

LOM production schedule is reasonable and will be supported by robust short-term planning,

sequencing, and operational discipline to be successful.

· An

appropriate mining equipment fleet, maintenance facilities, and workforce are in place, with

various options for additions and replacements estimated to meet the LOM production schedule

requirements.

· The

SLR QP reviewed the assumptions, parameters, and methods used to prepare the Mineral Reserves

Statement and is of the opinion that the Mineral Reserves are estimated and prepared in accordance

with S-K 1300 standards.

22.3 Mineral

Processing

22.3.1 Marigold

· The

Marigold processing facilities comprise conventional run-of-mine (ROM) cyanide heap leaching,

CIC adsorption, electrowinning, and refining circuits (ADR) to produce a final precious metal

product. The heap leach pad was originally constructed in 1990 and with ongoing expansions

has operated very consistently throughout the years providing an excellent library of operating

data.

· The

mineralogy of the ore and deportment of the gold along fracture surfaces of the rock rather

than in the rock matrix, provides rapid access of leach solutions to the gold particles and

relatively fast gold extraction independent of rock size. The SLR QP agrees that the ore

is uniquely favorable to ROM heap leaching, which has been employed for the life of the mine.

· Gold

recovery is determined from both historical operating performance and from laboratory column

and bottle roll leach testing. Gold recovery is consistent and is predicted using a relationship

between fire assay and cyanide soluble gold analyses. It is the SLR QP’s opinion that

the Marigold operating practices are consistent with industry standards, and the ROM method

of operation and the methods of determining gold recovery and reagent consumptions are appropriate

for this deposit.

· Average

LOM Au recovery at Marigold is 74% based on production records. The ratio of cyanide soluble

gold to total gold (AuCN/AuFA) using the 2017 database of assay pairs (i.e., samples that

have been assayed using both fire assay and cyanide-soluble gold assay methods) was approximately

0.8 (80%). Using the ratio to determine the actual LOM recovery of 74% results in a factor

of 0.92.

· The

current model to predict Marigold heap leach recovery is Heap Leach Recovery = (AuCN/AuFA)

x 0.92.

22-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· Cumulative

gold production from the Marigold leach pad (through April 2026) is equivalent to 72.7% recovery.

· Gold

recovery from future ore from Marigold, including stockpile and leach pad inventory, is estimated

to be 72.4%, based on a review of historical assay and recovery data, as well as metallurgical

test work on future ore.

· Test

work has been conducted on a variety of Marigold ore samples, including representative pit

samples taken by ore-control geologists, leach pad grab samples from mine production, and

various pit blasthole drill cuttings. Bottle roll test work has also been conducted on exploration

reverse circulation (RC) drill samples to determine expected gold recovery from deposits

that will be mined in the future.

· A

large number of column leach tests and bottle roll tests have been performed on the same

samples to determine the relationship between their results. Column leach test work continues;

however, bottle roll tests can be performed to generate metallurgical data in days rather

than the months that are required for column leach tests.

· Permeability

testing has been performed on ore samples with varying fines content. The testing simulated

compaction under multiple lifts of ore stacked up to 200 m; the current maximum height of

the heap leach pads above the liner elevation is 122 m. Overall, the tested blends demonstrated

relatively consistent permeability on increasing loads over 50 m and acceptable permeabilities

with material blended to a 40% fines to 60% durable ratio. Flow rates for the blends ranged

from 178 L/h/m2 to 284 L/h/m2 under no load. Under 122

m effective height loading, flow rates ranged from 34 L/h/m2 up to 188

L/h/m2. All tests resulted in low, but acceptable permeabilities.

22.3.2 Buffalo

Valley

· SSR

designed Buffalo Valley metallurgical testing programs in 2023, 2024, and 2025 to build on

historical information, including new test areas and testing specific lithologies without

blending. The 2024 and 2025 programs also targeted lower-grade composites. Finally, the 2025

program expanded lithologic targets to previously untested units at depth, including base

limestone and a new sulfidic lithology, VDFX.

· Buffalo

Valley mineralization shows a strong crush-size dependence. This dependence is likely due

to gold particles being encapsulated by skarns and other silicate minerals, which can only

be liberated by grinding. A portion of the gold deportment is also refractory to cyanide.

Scanning electron microscope (SEM) analysis shows that arsenopyrite can be a significant

host of submicron gold, even in samples with well-oxidized pyrite. In 200-mesh bottle roll

tests, almost all tests show more than 80% recovery of the contained gold, with only a few

sulfidic-refractory samples.

· The

laboratory test recoveries are scaled to the anticipated production size, either 38 mm

crushed or 304 mm ROM. Individual test recoveries are plotted to generate crush size versus

recovery curves for each lithology. The recoveries are then discounted by 4% to account for

heap leach inefficiency and other scale-up effects. The results are used to determine the

gold recovery for each material type for resource calculations.

22-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

22.4 Infrastructure

22.4.1 Marigold

· Marigold

is readily accessible via Interstate Highway 80 in northern Nevada and is approximately 5 km

south–south-west of Valmy in Humboldt County. The site access road supports two lanes

of traffic and consists of hard packed clay and gravel.

· The

infrastructure facilities at Marigold include ancillary buildings, offices and support buildings,

access roads into the plant site, power distribution, source of fresh water and water distribution,

fuel supply, storage and distribution, waste management and communications. The infrastructure

facilities are sufficient for supporting the current Marigold operations.

· The

power supply for Marigold is provided by NV Energy Inc. via a 120 kV transmission line

to site. Site power draw is 5 MW. After exiting the main substation, power is distributed

through a 25 kV distribution grid. Power supply is consistent and dependable and is

not a limiting factor for current operations.

· Marigold

has sufficient groundwater rights and water well capacity to support the ongoing process

operations. The water is primarily consumed by retention in the heap leach pad, evaporation,

processing operations and dust suppression.

· Marigold

has sufficient disposal capacity and non-consumptive water rights to manage dewatering flows

that are not consumed for operational needs. The water that is not consumed is returned to

the groundwater system through the rapid infiltration basins (RIBs) and considered non-consumptive

use.

· It

is the SLR QP’s opinion that it is reasonable to rely on the information provided by

SSR as outlined above for use in the TRS because the Property has been in operation for a

number of years, and SSR employs professionals and other personnel with responsibility in

these areas that have a good understanding of the operating requirements for the Property.

22.4.2 Buffalo

Valley

· The

initial site layout for Buffalo Valley was developed from the Newmont Plan of Operations

acquired as part of the purchase of the property.

· The

need for a connector road from Marigold to Buffalo Valley was confirmed and fully engineered

by WSP during the feasibility study completed by SSR Mining in 2026 (SSR 2026b, the Feasibility

Study).

· Given

the short initial mine life of Buffalo Valley, SSR decided to use the Marigold truck shop

rather than build a new truck shop at Buffalo Valley. No other maintenance facilities are

planned at Buffalo Valley.

· Currently,

the North Peak substation is fed from the existing Marigold Mine substation, which is supplied

by NV Energy. Buffalo Valley will need to construct approximately 14.5 km (9 mi) of

24.9 kV power line from the existing North Peak power line to service the Project site. Line

power will be stepped down to 4,160 V, 480 V, and 110 V as required with power primarily

distributed at 4,160 V or 480 V to motor control centers serving the respective process areas.

22-6

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

· Three

site-area transformers will be required at different locations throughout Buffalo Valley.

The anticipated transformer-connected loads are 6.53 MW, and the calculated demand loads

are 4.61 MW (including the crushing circuit and pit dewatering pumps).

· The

new overhead power line from North Peak to Buffalo Valley will be routed along the new Marigold/Buffalo

Valley connector road.

22.5 Environment

22.5.1 Marigold

· Specific

federal, state, and local (Humboldt County, Nevada) regulatory and permitting requirements

apply to Marigold, including the following:

o The

Plan of Operations (PoO) permitted via the United States (U.S.) Bureau of Land Management

(BLM)

o The

Water Pollution Control Permit (WPCP) issued by the Nevada Department of Environmental Protection

(NDEP)

o The

temporary discharge permit allowing for the discharge of dewatering water to rapid infiltration

basins (RIBs) issued by NDEP

o The

reclamation permit issued by the Nevada Bureau of Mining Regulation and Reclamation (BMRR)

· MMC

currently holds and is in compliance with active, valid permits for all current facets of

the Marigold mining operation.

· At

present, there are no known environmental issues that impact the ability to extract Mineral

Resources at the Property.

· All

activities associated with Marigold require an approved reclamation plan that includes a

Reclamation Cost Estimate (RCE) for all permitted facilities and activities. This was updated

and approved by federal and state agencies in 2026.

· MMC

is actively engaged with the local communities and stakeholders and there are no outstanding

negotiations or social commitments for the operation of the Marigold mine.

· The

SLR QP’s opinion is that it is reasonable to rely on the information provided by SSR

as outlined above for use in the TRS because significant environmental and social analyses

have been conducted for the Property over an extended period, the Property has been in operation

for a number of years, and SSR employs professionals and other personnel with responsibility

in these areas that have a good understanding of the permitting, regulatory, and environmental

requirements for the Property.

22.5.2 Buffalo

Valley

· Specific

federal, state, and local (Humboldt County and Lander County, Nevada) regulatory and permitting

requirements apply to Buffalo Valley, including the following:

o The

exploration PoO permitted via the U.S. BLM (active)

o PoO

for the Buffalo Valley mining operation permitted via the BLM (required)

o The

WPCP issued by the NDEP (required)

22-7

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

o The

temporary discharge permit allowing for the discharge of dewatering water to RIBs issued

by NDEP (required)

o The

reclamation permit issued by the BMRR (required)

· MMC

currently holds and is in compliance with active, valid permits for all current facets of

the exploration operation.

· At

present, there are no known environmental issues that impact the ability to extract Mineral

Resources at the Property.

· Exploration

activities associated with Buffalo Valley require an approved reclamation plan, including

a Reclamation Cost Estimate (RCE) for all permitted facilities and activities. This was updated

and approved by federal and state agencies in 2026.

· The

Buffalo Valley mining operation will require an RCE prior to commencing mining.

· MMC

is actively engaged with the local communities and stakeholders and there are no outstanding

negotiations or social commitments for the operation of the mine.

· The

SLR QP’s opinion is that it is reasonable to rely on the information provided by SSR

as outlined above for use in the TRS because significant environmental and social analyses

have been conducted for the Property over an extended period, the Property has been in operation

for a number of years, and SSR employs professionals and other personnel with responsibility

in these areas that have a good understanding of the permitting, regulatory, and environmental

requirements for the Property.

22.6 Capital

and Operating Costs

· SSR’s

forecasted capital and operating costs estimates related to the development of Mineral Reserves

are derived from annual budgets and historical actuals over the long life of the current

operation. These estimates were classified by SSR according to the American Association of

Cost Engineers (AACE) classifications as Class 1 with an accuracy range of -3% to -10% to

+3% to +15%.

· Future

growth capital costs are forecast to be $542 million, sustaining capital is forecast to be

$669 million, and reclamation costs are forecast to be $175 million for the life of mine,

for a total life of mine capital costs of $1,385 million.

· Construction

is ongoing for the growth capital projects, including the expansion of the mine fleet and

leach pads, and the development of Buffalo Valley. Costs prior to May 1, 2026, are considered

sunk.

22-8

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

23.0 Recommendations

SLR

offers the following recommendations by area.

23.1 Geology

and Mineral Resources

The

SLR QP offers the following recommendations regarding advancement of the Property and improvement of the Resource model.

1 SSR

has proposed a two-year exploration drilling (2027 and 2028) program with a total budget

of US$10,000,000 to advance development of exploration target areas in Marigold Mine and

Buffalo Valley. The objective of the exploration program will be to target potential gold-bearing

structures to expand the mineralization footprint and convert the current Resource to Reserve.

The SLR QP agrees with the objectives and overall scope of this exploration program.

2 Conduct

an additional infill drilling of 10,000 m drilling at MMC every year, where there are opportunities

to increase orebody knowledge and confidence of Mineral Resource estimates.

3 Continue

pit mapping and use the data to refine structural and redox models.

4 Continue

to carry out preg-rob/LECO assays along the oxide-sulfide boundaries.

23.2 Mining

and Mineral Reserves

1 Continuously

optimize haulage profiles and pit sequencing across the Complex, prioritizing lower-strip-ratio

phases and targeted interior pit options, to smooth annual ore production profiles, reduce

operational volatility, and mitigate reliance on excessive fleet expansion while providing

an operational buffer against potential permitting delays at Buffalo Valley.

2 Advance

dewatering, depressurization programs, and pore pressure monitoring ahead of active mining

fronts in deeper Marigold pits like Mackay and Red Dot Phase 3 to maintain required slope

stability factors of safety.

3 Advance

geotechnical studies, ongoing groundwater monitoring, and structural modeling at Buffalo

Valley, specifically addressing pitward-dipping bedding in domains 1 through 3 and high-plasticity

clay horizons in the overburden, to ensure stable slope performance.

4 Maintain

rigorous grade control procedures, blasthole sampling, and fire-assay-to-cyanide-soluble

regressions across active Marigold areas, while establishing equivalent protocols for Buffalo

Valley prior to production.

5 Execute

the planned 2026–2028 fleet expansion and capital additions on schedule (including

the LeTourneau L-1850 loader, Liebherr 9600 shovel, second P&H 4100 shovel, and additional

300 short ton (st) haul trucks) to support the increased LOM mining rate and inter-pit equipment

transfers.

6 Prioritize

equipment maintenance, asset reliability, and proactive workforce retention to manage heavy

utilization rates, aging baseline assets, and the dynamic rotation of the shovel and truck

fleet between Marigold and Buffalo Valley.

23-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

23.3 Mineral

Processing

1 Conduct

regular assessments of the AuCN/AuFA ratio using updated exploration and blast hole data.

2 Continue

to conduct column and bottle roll metallurgical testing on heap leach feed composites to

determine maximum possible gold recovery.

3 Conduct

metallurgical test work on any future ore sources to develop a geometallurgical model including

material properties and metallurgical parameters.

4 Complete

further studies and assessment of heap leach recoverable gold inventory.

5 Complete

targeted technical and metallurgical studies on durable ore materials to better understand

their physical characteristics and leach kinetics, ensuring stacking performance, solution

percolation, and gold recovery reconcile closely with production forecasts.

23.4 Infrastructure

1 Continue

to maintain the infrastructure facilities in good working order to ensure that critical services

such as power and water management, pumping and storage facilities are fully available for

potential upset conditions.

2 Ensure

the storage volume available in the process ponds is regularly evaluated and increased when

required to maintain regulatory compliance and manage risks associated with increasing water

inventory due to growth of the heap and barren solution pumping capacity.

3 Ensure

that consumptive water rights holdings are periodically re-evaluated relative to the potential

growth in site water demands.

4 Confirm

HLF configuration and remaining capacity, including reconciliation of the current HLF footprint,

stack geometry, ore inventory, approved development limits, and remaining stacking capacity

with the LOM plan, and documentation of the relationship between available HLF capacity and

the Mineral Reserve production schedule.

5 Review

SSR's governance policies related to the HLF, including maintaining appropriate Engineer

of Record (EOR) oversight, defining site ownership and technical responsibilities, implementing

management of change (MOC) procedures, conducting periodic independent reviews, and incorporating

risk assessments into facility management and decision-making.

6 Expand

the current Operation, Maintenance, and Surveillance (OMS) framework to include additional

HLF-specific requirements, including continuous survey slope stability monitoring, record

keeping, escalation procedures, and development of risk-based Trigger Action Response Plans

(TARPs) for key performance indicators such as slope performance, seepage, drainage, pond

freeboard, and extreme weather events.

7 Develop

a Design Basis Report (DBR) document for the HLF, including consolidation of key design criteria,

design assumptions, liner configurations, stack geometry limitations, pond containment requirements,

and evaluation of the impacts of the current and planned HLF configuration on facility performance

(e.g., stability, drainage, seepage, solution management, and water balance).

8 Perform

design verification and performance confirmation, including verification that current operating

conditions and ore characteristics remain consistent with the assumptions used in the original

design, and evaluating the implications of any material changes on HLF performance.

23-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

9 Evaluate

water balance and capacity management, including maintaining a current site-wide HLF water

balance model that incorporates active and planned leach areas, solution inventories, pond

capacities, design storm events, evaporation, draindown, operational freeboard, and closure

assumptions. The model should support operating decisions, capacity evaluations, emergency

planning, and future expansion studies.

23.5 Environment

1 Progress

the environmental permitting process for Buffalo Valley to ensure approvals are secured ahead

of its scheduled 2029 operational entry, utilizing flexible Marigold internal sequencing

as a direct operational buffer against potential permitting delays.

23.6 Capital

and Operating Costs

SLR

has no recommendations related to capital and operating costs.

23-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

24.0 References

AACE

International. 2012. Cost Estimate Classification System – As applied in the Mining and Mineral Processing Industries, AACE International

Recommended Practice No. 47R-11, 17 p.

AMEC

Americas Ltd. 2014. Marigold Drill Hole Deviation Study. Memorandum, Prepared for Silver Standard Resources Inc., Dated 21 May 2014.

Barrick

Gold Corporation. 2026. Annual Report 2025. February 2026.

Call

& Nicholas Inc (CNI). 2019a. Slope Stability Study of the Red Dot Design, Marigold Mine, July 2019.

CNI.

2021. Analysis of Soil Slopes – H1, 5N1, and 5N2. Technical Memorandum. 04 October 2021.

CNI.

2024. Red Dot Phase 3 Pore Pressure Sensitivity Analysis. Presentation. December 16, 2024.

CNI.

2025. Marigold Preliminary M7 Analysis Results, Version 3. June 25, 2025.

Carver,

J.N., Rathnam, K., Rice, T., and Yeomans, T.J. 2018. NI 43-101 Technical Report on the Marigold Mine, Humboldt County, Nevada, USA,

31 July 2018.

Cline,

J.S., Hofstra, A.H., Muntean, J.L., Tosdal, R.M., and Hickey, K.A. 2005. Carlin-type gold deposits in Nevada: Critical geologic characteristics

and viable models, Economic Geology 100th Anniversary Volume, p. 451–484.

CNI.

2021a. Marigold Mine Site Visit Recommendations 6–7 July 2021. August 5, 2019.

CNI.

2021b. Analysis of Soil Slopes – H1, 5N1 and 5N2, October 2021.

Cook,

H. E. and Taylor, M. E. 1977. Comparison of continental slope and shelf environments in the Upper Cambrian and lowest Ordovician of Nevada,

in The Society of Economic Paleontologists and Mineralogists, Special Publication No. 25 pp. 51 – 81.

Cook,

H.E. and Corboy, J.J. 2004. Great Basin Paleozoic carbonate platform; facies, facies transitions, depositional models, platform architecture,

sequence stratigraphy, and predictive mineral host models; field trip guidebook; metallogeny of the Great Basin Project, 17–22 August

2003, 135 p.

Cook,

H.E. 2015. The Evolution and Relationship of the Western North American Paleozoic Carbonate Platform and Basin Depositional Environments

to Carlin-type Gold Deposits in the Context of Carbonate Sequence Stratigraphy, in Pennel, W.M., and Garside, L.J., eds., New Concepts

and Discoveries, Geological Society of Nevada Symposium Proceedings, Reno/Sparks, Nevada, May 2015, v. 1, p. 1-80.

Cox,

D.P. and Singer, D.A. 1990. Descriptive and grade-tonnage models for distal-disseminated Ag-Au deposits: A supplement to U.S. Geological

Survey Bulletin 1693, U.S. Geological Survey Open-File Report 90-282, 7 p.

Cox,

D.P. 1992. Descriptive model of distal-disseminated Ag-Au, U.S. Geological Survey Bulletin 2004, 19 p.

Davis,

B.M. 1997, Some Methods of Producing Interval Estimates for Global and Local Resources: SME Preprint 97-5, 4p.

24-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Doebrich,

J.L. and Theodore, T.G. 1996. Geologic History of the Battle Mountain Mining District, Nevada, and Regional Controls on the Distribution

of Mineral Systems in Coyner, A.R., and Faney, P.L., eds., Geology and Ore Deposits of the American Cordillera, Geological Society of

Nevada, Symposium Proceedings, Reno/Sparks, Nevada, April 1995, pp. 453-483.

du

Bray, E.A. 2007. Time, space, and composition relations among northern Nevada intrusive rocks and their metallogenic implications, Geosphere,

v.3, p. 381–405.

Emsbo,

P., Hofstra, A.H., Lauha, E.A., Griffin, G.L., and Hutchinson, R.W. 2003. Origin of high-grade gold ore, source of ore fluid components,

and genesis of the Meikle and neighboring Carlin-type deposits, northern Carlin trend, Nevada, Economic Geology, v. 98, p. 1069–

1100.

Fithian.

2015. Geology, Geochemistry, and Geochronology of the Marigold Mine, Battle Mountain-Eureka Trend, Nevada, M.Sc. Thesis, Golden, Colorado,

Colorado School of Mines, 120 p.

Fithian,

M.T., Holley, E.A., and Kelly, N.M., 2018, Geology of gold deposits at the Marigold mine, Battle Mountain district, Nevada: Reviews in

Economic Geology, v. 20, p. 121–155.

Glamis

Gold Ltd. 2001. Glamis Marigold Mine Millenium Project Section 31 Technical Report and Reserve Summary for the Glamis Marigold Mine July

2001. (Revised).

Grauch

V.J.S., Rodriguez B. D., and Wooden J.L. 2003. Geophysical and Isotopic Constraints on Crustal Structure Related to Mineral Trends in

North-Central Nevada and Implications for Tectonic History Economic Geology, April 2003, v. 98, pp. 269-286.

Hamilton,

W. 1987. Crustal extension in the Basin and Range Province, southwestern United States, in Coward, M.P., Dewey, J.F., and Handcock, P.L.,

eds., Continental Extensional Tectonics, Geological Society Special Publication No. 28, pp. 155-176.

Harrold,

J. 2023, Trenton Canyon Historic Met Recovery, Memorandum, July 14, 2023.

Hofstra,

A.H. and Cline, J.S., 2000. Characteristics and models for Carlin-type gold deposits, Reviews in Economic Geology, v. 13, p. 163–220.

Ilchik,

R.P. and Barton, M.D. 1997. An amagmatic origin of Carlin-type gold deposits, Economic Geology, v. 92, p. 269-288.

Johnston,

M.K. and Ressel, M.W. 2004. Carlin-type and distal disseminated Au-Ag deposits: Related distal expressions of Eocene intrusive centers

in north-central Nevada in Controversies on the origin of World-class gold deposits, Part 1: Carlin-type gold deposits in Nevada, by

J.L. Muntean, J. Cline, M.K. Johnston, M.W. Ressel, E. Seedorff, and M.D. Barton: Society of Economic Geologists Newsletter, v. 59, p.

12-14.

Kester,

M. 2015. On infrared absorption band position variation as a result of gold mineralization in a distal disseminated gold deposit at the

Marigold Mine, Humboldt Co., Nevada, Senior Thesis, South Dakota School of Mines and Technology, 29 p.

Ketner,

K.B. 2008. The Inskip Formation, the Harmony Formation, and the Havallah Sequence of Northwestern Nevada—An Interrelated Paleozoic

Assemblage in the Home of the Sonoma Orogeny. US Department of the Interior U.S. Geological Survey. Professional Paper 1757.

24-2

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Ketner,

K.B. 2013. Stratigraphy of Lower to Middle Paleozoic Rocks of Northern Nevada and the Antler Orogeny US Department of the Interior U.S.

Geological Survey. Professional Paper 1799.

Knight

Piésold Ltd. (KPL). 2014. Marigold Mine – Review of Rock Mechanic Considerations, dated 24 July 2014. REF. NO. NB101-201/24.

Vancouver, British Columbia, Canada.

Large,

R.R., Bull, S.W., and Maslennikov, V.V. 2011. A carbonaceous sedimentary source-rock model for Carlin-type and orogenic gold deposits,

Economic Geology, v. 106, p. 331–358.

Magee

Geophysical Services LLC. 2014. Gravity Survey over the Marigold Mine Property, Humboldt County, Nevada. August 2014.

Magee

Geophysical Services LLC. 2016. Gravity Survey over the Marigold Mine Property, Humboldt County, Nevada. September 2016.

McClelland

Laboratories, Inc. 2023. Preliminary Report on Buffalo Valley Drill Core Composites – Metallurgical Testing, MLI Job No. 4906,

for SSR Mining, July 19, 2023.)

McGibbon,

D H. 2005. Geology of the Antler and Basalt Gold Deposits, Glamis-Marigold mine, Humboldt County, Nevada, in Rhoden, H.N., Steininger,

R.C., and Vikre, P.G., eds., Geological Society of Nevada Symposium 2005: Window to the World, Reno, Nevada, May 2005, pp. 399–409.

McGibbon,

D.H. 2004. Marigold Summary and Tour Guide (Internal report), pp. 1-3.

McGibbon,

D.H. and Wallace, A.B. 2000. Geology of the Marigold Mine area: in Theodore, T.G., 2000, Geology of pluton-related gold mineralization

at Battle Mountain, Nevada; Monographs in Mineral Resource Science No. 2: Center for Mineral Resources, Tucson, Arizona, pp. 222–240.

McKee,

E.H. 2000. Potassium-argon chronology of Cretaceous and Cenozoic igneous activity, hydrothermal alteration, and mineralization, in Theodore,

T.G., Geology of pluton-related gold Mineralization at Battle Mountain, Nevada, Monographs in Mineral Resource Science, no. 2, p. 121–143.

Muntean,

J.L. and Cline, J.S. 2018, Diversity of Carlin-Style Gold Deposits: Reviews in Economic Geology, v. 20, p. 1-5

Muntean,

J.L., Cline, J.S., Simon, A.C., and Longo, A.A. 2011. Magmatic-hydrothermal origin of Nevada’s Carlin-type gold deposits, Nature

Geoscience, v. 4, p. 122–127. (

OreWin.

2022. Marigold 2021 Technical Report Summary, September 2022. Filed on EDGAR/available at https://www.sec.gov/edgar.

Pells

Sullivan Meynink (PSM) 2021. Geotechnical Review: Marigold Gold Project. Internal memo by PSM Consult Pty Limited.

Piteau

Associates Engineering Ltd. (Piteau). 2020a. Marigold Rapid Infiltration Basis Arsenic Attenuation Study. August 2020.

Piteau.

2020b. Marigold RIB Area Alluvial Characterization. October 2020.

Piteau.

2021. Marigold Mine Mackay Pit Dewatering System Design 4180-R03, January 2021.

Reid,

R.F., Nicholes, J., Kofoed, R., McComb, J. and Sechrist, K.J., Buffalo Valley Gold Mine: Porphyry copper, gold skarn or distal disseminated

precious-metal deposit, in Steininger, Roger, and Pennell, Bill, eds., Great Basin evolution and

metallogeny: Geological Society of Nevada Symposium, May 14-22, 2010 [Proceedings], p. 637-656.

24-3

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Ressel,

M.W., and Henry, C.D., 2006. Igneous Geology of the Carlin Trend, Nevada: Development of the Eocene Plutonic Complex and Significance

for Carlin-Type Gold Deposits, Economic Geology, v. 101, p. 347-383.

Roberts,

R.J. 2002. A Passion for Gold, an Autobiography. University of Nevada press 1st Edition. Reid, R.F.

Roberts,

R.J. 1964. Stratigraphy and Structure of the Antler Peak Quadrangle, Humboldt and Lander Counties, Nevada: U.S. Geological Survey Professional

Paper 459-A, 93 pp.

Saller,

A. and Dickinson, W. 1982. Alluvial to marine facies transition in the Antler overlap sequence, Pennsylvanian and Permian of North-central

Nevada: Journal of Sedimentary Research, v. 52, p. 925-940.

Samal,

A.R., Arthur, B., Gates, P. 2025. Technical Report on the Mineral Resource Estimates for the Lone Tree Deposit, Nevada, Prepared for

i-80 Gold Corp. Effective Date December 31, 2024. March 28, 2025.

Sillitoe,

R.H. and Bonham, H.F. 1990. Sediment-hosted gold deposits: Distal products of magmatic-hydrothermal systems, Geology, v. 18, p. 157–161.

Silver

Standard. 2014. NI 43-101 Technical Report on the Marigold Mine, Humboldt County, Nevada, Marigold Mining Company, November 19, 2014,

p. 233

SLR.

2024. Technical Report Summary on the Marigold Complex, Nevada, USA, SLR Project No.: 138.21581.00002, Prepared for SSR Mining Inc.,

February 12, 2024, p.268

SLR.

2026. NI 43-101 Technical Report on the Preliminary Economic Assessment, Effective Date May 2, 2026. Prepared for Roxmore Resources Inc.

May 29, 2026.

SSR

Mining Inc. 2023. Form 10-K. Annual Report for the Fiscal Year Ended December 31, 2022. Filed on EDGAR on February 22, 2023.

SSR.

2026. Slope Stability Assessment of Waste Rock Dumps, Marigold Mine. April 3, 2026.

SSR.

2026b. Marigold Mining Company Buffalo Valley Feasibility Study Report (Draft). Revision B. August 7, 2026

Theodore,

T. G. 1991a. Preliminary geologic map of the North Peak Quadrangle, Humboldt and Lander counties, Nevada. USGS Open-File Report. 91-429.

Theodore,

T. G. 1991b. Preliminary geologic map of the Valmy Quadrangle, Humboldt and Lander counties, Nevada. USGS Open-File Report. 91-430.

Theodore,

T.G. 2000. Geology of Pluton-related Gold Mineralization at Battle Mountain, Nevada. Tucson, Arizona: centre for Mineral Resources, the

University of Arizona.

US

Securities and Exchange Commission. 2018. Regulation S-K, Subpart 229.1300, Item 1300 Disclosure by Registrants Engaged in Mining Operations

and Item 601 (b)(96) Technical Report Summary.

Wallace,

A.R., Ludington, S., Mihalasky, M.J., Peters, S.G., Theodore, T.G., Ponce, D.A., John, D.A., and Berger, B.R. 2004. Assessment of

metallic mineral resources in the Humboldt River Basin, northern Nevada, U.S. Geological Survey Bulletin 2218, 309 p. (Wallace, 2004)

Waterton

Global Resource Management website. 2018. www.watertonglobal.com

24-4

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

Wright,

James L. 2016. Marigold Property Gravity Survey.

Wright,

James L. 2020. Marigold Property Gravity Survey – 2020 GIS Database, prepared for Silver Standard, April 18, 2020, p. 18

WSP.

2026a. Preliminary Pit Slope Design Recommendations for the New Millenium Expansion, Marigold Mine, Nevada. Technical Memorandum. March

16, 2026.

WSP.

2026b. Preliminary Dewatering Plan Technical Memorandum. Prepared for SSR. March 20, 2026.

Wyld,

S.J., Rogers, J.W., and Copeland, P. 2003. Metamorphic Evolution of the Luning-Fencemaker Fold-Thrust Belt, Nevada: Illite Crystallinity,

Metamorphic Petrology, and 40Ar/39Ar Geochronology, The Journal of Geology, v. 111, p. 17-38.

Zoback,

M.L., McKee, E.H., Blakely, R.J., and Thompson, G.A. 1994. The Northern Nevada rift: Regional tectonomagmatic relations and middle Miocene

stress direction, Geological Society of America Bulletin, v. 106, p. 371-38.

24-5

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

25.0 Reliance

on Information Provided by the Registrant

This

TRS has been prepared by SLR for SSR. The information, conclusions, opinions, and estimates contained herein are based on:

· Information

available to SLR at the time of preparation of this TRS.

· Assumptions,

conditions, and qualifications as set forth in this TRS.

· Data,

reports, and other information supplied by SSR and other third party sources.

For

the purpose of this TRS, SLR has relied on ownership information provided by SSR Mining, Inc.'s Land Manager and Permit Compliance Advisor,

as reflected in various land tenure and mining claim title reports, in the Executive Summary and Section 3. SLR has not researched property

title or mineral rights for the Property as we consider it reasonable to rely on SSR’s legal counsel, who is responsible for maintaining

this information.

SLR

has relied on SSR for guidance on applicable taxes, royalties, and other government levies or interests, applicable to revenue or income

from the Property in the Executive Summary and Section 19. As the Property has been in operation for over ten years, SSR has considerable

experience in this area.

The

Qualified Persons have taken all appropriate steps, in their professional opinion, to ensure that the above information from SSR is sound.

Except

as provided by applicable laws, any use of this TRS by any third party is at that party’s sole risk.

25-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

26.0 Date

and Signature Page

This

report titled “S-K 1300 Technical Report Summary” with an effective date of May 1, 2026 was prepared and signed by:

(Signed)

SLR International Corporation

Dated

at Lakewood, CO

October

9, 2026

SLR

International Corporation

26-1

SSR Mining Inc. | Marigold Complex October 9, 2026

S-K 1300 Technical Report Summary SLR Project No.: 138.020810.00001

27.0 Appendix

1

27-1

EX-99.2 — EXHIBIT 99.2

EX-99.2

Filename: tm2627394d1_ex99-2.htm · Sequence: 4

Exhibit 99.2

SSR MINING | PAGE 1

News Release

October 13, 2026

SSR MINING ANNOUNCES 20-YEAR LIFE OF MINE PLAN FOR MARIGOLD

BASED ON EXPANDED 4.6 MILLION OUNCE MINERAL RESERVE

• NPV5% OF $3.3 BILLION AND $3.8 BILLION AT CONSENSUS AND SPOT PRICES, RESPECTIVELY

• MARIGOLD AVERAGES ANNUAL PRODUCTION OF 231,000 OUNCES OF GOLD FROM 2027 TO 2031

• LIFE OF MINE GOLD PRODUCTION TOTALS 3.3 MILLION OUNCES AT AN AVERAGE ALL-IN SUSTAINING COST (“AISC”) OF $2,062 PER

OUNCE SOLD (1, 2)

• SSR MINING’S U.S. PORTFOLIO NOW ANCHORED BY TWO MULTI-DECADE ASSETS IN MARIGOLD AND CC&V HOSTING TOTAL

COMBINED GOLD MINERAL RESERVES OF 7.3 MILLION OUNCES, WITH AN ADDITIONAL 6.5 MILLION OUNCES OF M&I RESOURCES

AND 2.3 MILLION OUNCES INFERRED

DENVER – SSR Mining Inc. (Nasdaq/TSX: SSRM) (“SSR Mining”, the “Company”, “we”, “us”, or “our”) announces the

results of a Technical Report Summary (“TRS”) for the Marigold Gold Complex (“Marigold”) in Nevada, USA (the “2026

Marigold TRS”).

Highlights of the 2026 Marigold TRS: (1,2)

• After-tax NPV5% of $3.3 billion at consensus gold prices averaging $3,948 per ounce over the 20-year life of mine

• Average annual gold production of 231,000 ounces over the five-year period from 2027 to 2031, 201,000 ounces

through 2040, and 169,000 ounces over the 20-year life of mine

o Over the period of active mining, annual after-tax operating cash flow and after-tax free cash flow averages $354

million and $273 million, respectively, based on consensus gold prices

• Gold Mineral Reserves at Marigold total 4.6 million ounces, an increase of 43% from the 3.2 million ounces at year-end

2025, with a significant Mineral Resource base demonstrating additional potential for longer-term upside

o Measured & Indicated Mineral Resources, exclusive of Mineral Reserves, total 1.7 million ounces of gold as

compared to the 1.8 million ounces of M&I Resources as of year-end 2025

o Inferred Mineral Resources are an additional 0.3 million ounces of gold as compared to the 0.5 million ounces as

of year-end 2025

• Inclusive of mined depletion, gold Mineral Reserves in the 2026 Marigold TRS increased significantly as

compared to the 2024 TRS, while Indicated and Inferred Mineral Resources remained materially unchanged

over the same time period

o The gold prices used in the calculation of Marigold Mineral Reserves and Mineral Resources are $2,200/oz and

$2,500/oz, respectively

• 2026 Marigold TRS incorporates the maiden life of mine plan for the Buffalo Valley project (“Buffalo Valley”) with 0.7

million ounces of gold Mineral Reserves and first production expected in 2029

o Growth capital investment over the life of mine totals $542 million, including the development of Buffalo Valley and

its stand-alone heap leach facility, as well as fleet additions to support a 33% increase in overall mining rates at

Marigold to an average of 138 million tonnes per annum

o Investment in fleet modernization and expansion will improve productivity and operational flexibility to support the

multi-decade mine life at Marigold

(1) The Company reports non-GAAP financial measures including after-tax free cash flow to manage and evaluate its operating performance at its mines. See “Non-GAAP Financial Measures” at the end of this press release for an explanation of these financial measures and a reconciliation of these financial measures to

operating cash flow, which is the most comparable GAAP financial measure.

(2) The calculations of average annual gold production use 2027 as Year 1, since 2026 represents a partial year of operation in the TRS. From 2027 onwards, life of

mine gold production at Marigold is 3.2 million ounces at an AISC of $2,005 per ounce sold.

SSR MINING | PAGE 2

Rod Antal, Executive Chairman of SSR Mining, said, “Today’s updated life of mine plan reinforces Marigold’s position as a

premier, multi-decade asset in the United States. Over the next three years, we plan to invest in Marigold to modernize the

operation for future success through fleet and heap leach pad expansions that aim to improve its operational flexibility and

reliability.

Importantly, over the next five years we expect Marigold will average more than 230,000 ounces of gold production annually,

aligned with the prior TRS expectations and supporting average annual gold production of approximately 360,000 ounces

from our U.S. assets over that period. Longer-term, the mine is expected to average 200,000 ounces of gold production

annually through 2040, delivering a more than 50% increase in life of mine production over the prior mine plan.

Investing in organic growth is one of the key pillars of our capital allocation strategy, and this TRS provides a clear pathway

for us to execute on that strategy and create value for shareholders. This new mine plan increases Mineral Reserves by

43% as compared to year-end 2025 while Indicated and Inferred Resources remain essentially unchanged, demonstrating

our track record of exploration and resource development success while highlighting further potential for additional mine life

extension in the future.”

The TRS, with an effective date of May 1, 2026, has been prepared in accordance with S-K 1300 and will be available on

October 13, 2026 on the Company’s website and on a Current Report on Form 8-K to be filed with the U.S. Securities and

Exchange Commission (“SEC”).

SSR MINING | PAGE 3

Figure 1: 2026 Marigold TRS – Production Summary (in koz)

Table 1: 2026 Marigold TRS – Key Metrics

(3)

Five-Year Profile Active Mining Total Mine Life

Unit 2027 – 2031 2027 – 2040 2027 – 2050

Total Gold Production Au koz 1,153 2,816 3,208

Average Annual Gold Production Au koz 231 201 169

Total Operating Cash Flow (GAAP) $M $2,353 $4,955 $5,978

Total Capital Costs (GAAP) (4) $M $817 $1,133 $1,231

Total Free Cash Flow (non-GAAP) (5) $M $1,536 $3,822 $4,747

Average Annual Free Cash Flow $M $307 $273 $253

Cost of Sales (GAAP) $/oz sold $1,990 $1,959 $1,793

Cash Costs (non-GAAP) (5) $/oz sold $1,991 $1,960 $1,795

All-In Sustaining Costs (non-GAAP) (5) $/oz sold $2,279 $2,183 $2,005

(3) Five-Year Profile metrics are from 2027 to 2031, Active Mining metrics are from 2027 to 2040 and Total Mine Life metrics are summed over the period of 2027 to

2050. Average Total Mine Life metrics are calculated over the period 2027 to 2045, as residual heap leaching concludes in 2045.

(4) Total capital costs include sustaining capital, development capital, and reclamation.

(5) The Company reports non-GAAP financial measures including after-tax free cash flow and All-In Sustaining Cost (“AISC”) per ounce sold to manage and evaluate

its operating performance at its mines. All cash flow figures are presented after tax. See “Non-GAAP Financial Measures” at the end of this press release for an

explanation of these financial measures and a reconciliation of these financial measures to operating cash flow and cost of sales, which are the most comparable

GAAP financial measures. Cost of sales excludes depreciation, depletion, and amortization.

Table 2: 2026 Marigold TRS – After-Tax NPV Sensitivity

LOM Average

Gold Price $/oz $3,158 $3,553 Base Case (6) $4,342 $4,737

Sensitivity % -20% -10% — +10% +20%

NPV5% $M $1,609 $2,471 $3,334 $4,196 $5,058

(6) Base Case gold price assumption averages $3,948/oz over the life of mine, including the long-term gold price of $3,710/oz starting in 2031. See “assumptions” at

the end of this press release for a summary of gold prices used in the 2026 Marigold TRS.

SSR MINING | PAGE 4

Marigold Mineral Reserves and Mineral Resources (“MRMR”) (7)

Marigold is located in southeastern Humboldt County, Nevada, United States on the Battle Mountain-Eureka trend,

approximately 5 kilometers south-southwest of the town of Valmy, Nevada. The Marigold Complex includes the Marigold

Mine and the Buffalo Valley and Trenton Canyon deposits. Buffalo Valley is located approximately 24 kilometers southwest

of the main infrastructure at Marigold. Since commencing operations in 1989, Marigold has produced over 5 million ounces

of gold.

Table 3: 2026 Marigold TRS – MRMR as of May 1, 2026

(100% attributable) Tonnes (Mt) Grade (g/t) Gold (Moz)

Total P+P Reserves 359 0.40 4.63

M&I Mineral Resources 131 0.40 1.66

Inferred Mineral Resources 29 0.31 0.29

Combining Marigold with the Company’s CC&V gold mine in Colorado established SSR Mining as the third largest gold

producer in the USA. Both operations now feature multi-decade mine lives and host significant Mineral Resource bases to

support potential for future growth and extension.

Figure 2: SSR Mining – MRMR by U.S. Asset

Marigold CC&V USA Consolidated

(7) Please see “Supplemental Mineral Reserve and Mineral Resource Information” at the end of this press release for additional details. Mineral Resources are

exclusive of Mineral Reserves. Numbers may not add due to rounding.

Figure 3: SSR Mining – Combined U.S. Production Profile

0

50

100

150

200

250

300

350

400

450

500

2027E 2028E 2029E 2030E 2031E 2032E 2033E 2034E 2035E 2036E 2037E 2038E 2039E 2040E 2041E 2042E

Gold Production (koz)

Marigold Gold Production (2026 TRS) CC&V Gold Production (2025 TRS)

SSR MINING | PAGE 5

2026 Marigold TRS Overview

Geological understanding of the Marigold Complex is supported by more than three decades of mining operations, extensive

exploration programs, geologic mapping, geophysical surveys, metallurgical testing, production history, and ongoing

resource definition drilling.

Mining & Processing

The 2026 Marigold life of mine plan features 15 years of active mining and 20 years of total production, inclusive of heap

leach pad rinsing and drawdown. The Marigold Complex mine plan outlined in the 2026 Marigold TRS has five distinct areas

of mining: the main Mackay pit (including the Red Dot and DG80 areas), the North Mackay pits, the Valmy pits, the New

Millennium area, and Buffalo Valley. A separate mining fleet of 8 to 10 trucks and two hydraulic shovels was initially

considered for Buffalo Valley, however, procuring additional trucks and loading units in 2027 allows for accelerated waste

stripping at Marigold ahead of initial development at Buffalo Valley. Peak fleet size in the 2026 Marigold TRS is 45 haul

trucks, six shovels and two loaders. This expanded fleet is then adequate to operate both Marigold and Buffalo Valley

simultaneously over the life of mine and enables increased flexibility in mine planning going forward.

On average, the operating period from 2026 to 2040 includes average mining rates of approximately 380,000 tonnes per

day (138.3 million tonnes per annum) with a life of mine strip ratio of 5.3:1. Stacking rates are expected to average

approximately 20 million tonnes per annum at Marigold over the life of mine, while the Buffalo Valley heap leach facility is

designed to accommodate stacking rates of up to 14 million tonnes per annum. The life of mine gold recovery across

Marigold and Buffalo Valley is 72% over an average of 90 to 120 day leach cycle, with an average stacked grade of 0.44

grams per tonne. Life of mine gold production totals 3.34 million ounces, including approximately 0.3 million ounces of

current work-in-progress inventory recovered over the life of mine.

The Buffalo Valley heap leach facility will be constructed and operated in a manner very similar to the main Marigold facility.

Run of mine ore will be truck stacked in 7.5 meter to 12.5 meter lifts. Following heap leaching, pregnant solution will be

pumped into three Carbon-in Column (CIC) trains for adsorption. Loaded carbon from the adsorption circuit will be

transported to the Marigold elution facility for final recovery, with barren carbon then transported back to the Buffalo Valley

facility. Buffalo Valley will require upgrades to the road connecting to main Marigold facilities, and will require the construction

of approximately 14.5 kilometers of power line from the existing North Peak power line to service the project site.

Table 4: 2026 Marigold TRS – Operating Metrics Summary

Unit Life of Mine

Total Material Mined Mt 1,881

Average Daily Mining Rate ktpd 380

Total Ore Mined Mt 298

Total Waste Mined Mt 1,583

Strip Ratio W:O 5.3:1

Total Ore Processed Mt 298

Average Daily Processing Rate ktpd 58

Ore Grade Stacked g/t 0.44

Contained Gold Stacked koz 4,255

Gold Recovery % 72%

SSR MINING | PAGE 6

Infrastructure

The Marigold Complex is accessed via a five kilometer public road connected to the U.S. Interstate Highway 80. Marigold

is grid connected, while water for operations is supplied by three existing groundwater production wells. Mine dewatering

wells are used to supplement production wells when needed. Where possible, operations at Buffalo Valley will leverage

existing infrastructure at Marigold, including the maintenance facilities and administrative offices. A tailings storage facility

(TSF) is present at Marigold but has been decommissioned since operations transitioned solely to heap leaching.

Operating Costs

Forecasted operating cost estimates related to the development of the 2026 Marigold TRS are derived from annual budgets

and historical actuals over the long life of the current operation. The life of mine operating cost estimate for the Marigold

Complex is $16.78 per tonne of stacked ore. Life of mine operating costs in the 2026 Marigold TRS do not account for non-cash inventory movements and other minor non-cash items that impact the Company’s calculation of cash costs and AISC.

Table 5: 2026 Marigold TRS – Mine Operating Cost Summary

Operating Costs Life of Mine ($M) Stacked ($/Tonne)

Mining & Maintenance $3,741 $12.57 ($1.99/t moved)

Processing $804 $2.70

G&A $451 $1.51

Total Costs $4,996 $16.78

Labor and diesel are the two largest components of operating costs at Marigold. Diesel prices for the economic analysis

were based on the latest available consensus forward-looking price forecasts and compared to those used in other

published studies. Near-term diesel price assumptions in the 2026 Marigold TRS average approximately $4.00/gallon before

normalizing to $3.00/gallon over the long-term. The effective NSR royalty on the Marigold property in the 2026 Marigold

TRS is approximately 6.9%, while the effective NSR royalty for the Buffalo Valley deposit is fixed at 3.5% over the life of

mine.

Figure 4: 2026 Marigold TRS – Cost Breakdown

SSR MINING | PAGE 7

Capital Costs

Total life of mine capital outlined in the 2026 Marigold TRS is $1,385 million, including $669 million in sustaining capital.

Sustaining capital costs include:

• Replacement of mining equipment as it reaches its economic life during the active mining period. The majority of

the mining equipment replacement costs relate to replacing haul trucks and excavators, as well as drills and mine

support equipment

• Major equipment rebuilds and component replacement to sustain equipment availability over the life of mine

• Administration costs and various site infrastructure improvements

• Ongoing cost associated with process infrastructure

• Permitting costs mainly associated with dewatering infrastructure (wells, pipelines, rapid infiltration basins) that are

required to manage the water table in advance of planned mine development

Table 6: 2026 Marigold TRS – Total Capital Breakdown (2026+)

Capital Costs Life of Mine ($M)

Development Capital $542

Sustaining Capital $669

Reclamation $175

Total Capital $1,385

The life of mine growth capital at Marigold totals $542 million, including all capital associated with major leach pad expansion

at Marigold, development of Buffalo Valley, and the expansion of the Marigold mining fleet. These investments support the

development and mining of Buffalo Valley, as well as enable the execution of the extended Marigold life of mine plan.

Table 7: 2026 Marigold TRS – Growth Capital Breakdown (2026+)

Description Life of Mine ($M) Amount (%)

Mining Equipment – Expansion $265 49%

Heap Leach Facilities – Expansion $57 11%

Buffalo Valley Development $220 40%

Growth Capital Costs as of May 1, 2026 $542 100%

The costs associated with reclamation and closure activities at Marigold are estimated to be $175 million, with the majority

of these costs incurred from 2038 to the end of the current life of mine plan.

Additional Potential for Upside at Marigold

The 2026 Marigold TRS outlines 1.7 million ounces of gold Indicated Mineral Resources, exclusive of Mineral Reserves,

and an additional 0.3 million ounces of gold Inferred Mineral Resources across the Marigold Complex. These Mineral

Resources represent potential opportunities for future conversion to Mineral Reserves. Mineral Resources in the 2026

Marigold TRS were calculated using a gold price assumption of $2,500/oz.

SSR Mining continues to invest in resource development and exploration drilling across the Marigold Complex to evaluate

future growth potential, particularly through the continued expansion of currently defined Mineral Reserve pits. In 2026, SSR

Mining planned for more than 10 kilometers of drilling on brownfield targets across the property, including in the

underexplored southern end of the property where new discoveries could support further heap leach expansions to further

optimize ore and waste movements.

Additionally, potential increases to the gold price assumptions used in the calculation of Mineral Reserves and Resources

could add to current MRMR totals at Marigold in the future.

SSR MINING | PAGE 8

Figure 5: SSR Mining’s Proven M&A Track Record (8)

Marigold Seabee CC&V

(8) Acquisition Value includes initially announced acquisition price, subsequent property acquisitions and the present value of contingent payments; Current values

are rounded; “Realized Cash” means revenue less cost of sales, exploration, evaluation, and reclamation expenditures, cash care and maintenance, capital

expenditures and taxes; See “Non-GAAP Financial Measures” at the end of this press release for additional details. Analyst NAV based on broker consensus

research as of October 5, 2026.

Assumptions

All figures are in U.S. dollars, unless otherwise noted. The gold price used in the calculation of Mineral Reserves was $2,200

per ounce and the gold price used in the calculation of Mineral Resources was $2,500 per ounce. The TRS is based on

gold prices of: 2026 - $4,637/oz; 2027 - $4,794/oz; 2028 - $4,616/oz; 2029 - $4,355/oz; 2030 - $3,991/oz; and long-term -

$3,710/oz. Diesel price assumptions used in the TRS were: $4.00/gal for 2027 and 2028, $3.50/gal in 2029 and $3.00/gal

long-term. All references to tonnage in this press release are in metric tonnes unless otherwise noted. Key assumptions

used in the preparation of the TRS are subject to risks and uncertainties described under “Cautionary Note Regarding

Forward-Looking Information and Statements”.

Marigold Technical Report Summary

The Marigold TRS is expected to be included as an exhibit to our Current Report on Form 8-K that is filed with the SEC by

October 13, 2026 and will be available for review on EDGAR at sec.gov at that time. This press release does not purport to

be a complete summary of the Marigold TRS and is qualified in its entirety by reference to the Marigold TRS that we will file

with the SEC. You should read this press release in conjunction with the Marigold TRS, including the qualifications and

limitations described therein, as there may be information in the Marigold TRS that may be important.

About SSR Mining

SSR Mining Inc. is a free-cash-flow-focused gold and silver mining company and the third-largest gold producer in the

United States. SSR Mining has a diversified portfolio of operating, development and exploration assets across the Americas,

including four operating mines in the USA, Canada, and Argentina. In 2026, SSR Mining is expected to produce between

450,000 and 535,000 Gold Equivalent Ounces. The Company is headquartered in Denver, Colorado and is listed under the

ticker symbol SSRM on the Nasdaq Stock Market and the Toronto Stock Exchange.

For more information, please visit: www.ssrmining.com.

E-Mail: invest@ssrmining.com

Phone: +1 (888) 338-0046

SSR MINING | PAGE 9

Cautionary Note Regarding Forward-Looking Information and Statements:

Except for statements of historical fact relating to us, certain statements contained in this news release constitute forward-looking

statements, forward-looking information, future oriented financial information, or financial outlooks (collectively “forward-looking

information”) within the meaning of applicable securities laws. Forward-looking information may be contained in this document and our

other public filings. Forward-looking information relates to statements concerning our outlook and anticipated events or results and in

some cases, can be identified by terminology such as “may”, “will”, “could”, “should”, “expect”, “plan”, “anticipate”, “believe”, “intend”,

“estimate”, “projects”, “predict”, “potential”, “continue” or other similar expressions, as well as statements written in the future tense or that

are not historical facts.

Forward-looking information in this news release includes any statements concerning, among other things: all information related to the

Company’s Marigold operations, including forecasts and outlook; preliminary cost reporting in this document; timing, production,

operating, cost, and capital expenditure guidance; our operational and development targets and catalysts and the impact of any

suspensions on operations; growth initiatives, the results of any gold reconciliations; the ability to discover additional oxide gold ore; the

generation of free cash flow and returning cash to shareholders, including via share repurchases or dividends; matters relating to proposed

exploration; communications with local stakeholders; maintaining community and government relations; negotiation and completion of

transactions; commodity prices; Mineral Resources, Mineral Reserves, conversion of Mineral Resources, realization of Mineral Reserves,

and the existence or realization of Mineral Resource estimates; the development approach; the timing and amount of future production;

the timing of studies, announcements, and analysis; the timing of construction and development of proposed mines and process facilities;

capital and operating expenditures; economic conditions; availability of sufficient financing; exploration plans; receipt of regulatory

approvals; timing and impact surrounding suspension or interruption of operations as a result of regulatory requirements or actions by

governmental authority; and any and all other timing, exploration, development, operational, financial, budgetary, economic, legal, social,

environmental, regulatory, and political matters that may influence or be influenced by future events or conditions. The estimation of

mineral resources is inherently uncertain and involves subjective judgments about many relevant factors. The accuracy of any such

estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and

geological interpretation (including estimated future production from Marigold, the anticipated tonnages and grades that will be mined and

the estimated level of recovery that will be realized), which may prove to be unreliable and depend, to a certain extent, upon the analysis

of drilling results and statistical inferences that may ultimately prove to be inaccurate.

Such forward-looking information is subject to various risks and uncertainties and based on a number of material factors and assumptions,

which could cause actual results and experience to differ materially from anticipated results or expectations expressed in this news

release, including, but not limited in any manner to, those disclosed from time to time in our reports filed with the SEC on EDGAR,

including the “Risk Factors” section of our most recent Annual Report on Form 10-K and subsequent Quarterly Reports on Form 10-Q,

as applicable, and the Canadian securities regulatory authorities on SEDAR+, and include: the assumptions made in respect of the

Company’s Marigold operations; the inherent speculative nature of exploration results; the ability to explore; local and global political and

economic conditions; governmental and regulatory requirements and actions by governmental authorities, including changes in

government policy, government ownership requirements, changes in environmental, tax and other laws or regulations and the

interpretation thereof; communications with local stakeholders; maintaining community and governmental relations; status of negotiations

of joint ventures; weather conditions at our operations; commodity prices; the ultimate determination of and realization of Mineral

Reserves; existence or realization of Mineral Resources; the development approach; availability and receipt of required approvals, titles,

licenses and permits; sufficient working capital to develop and operate the mines and implement development plans; access to adequate

services and supplies; foreign currency exchange rates; interest rates; access to capital markets and associated cost of funds; availability

of a qualified work force; ability to negotiate, finalize, and execute relevant agreements; the Company’s ability to efficiently integrate

acquired mines and businesses and to manage the costs related to any such integration, or to retain key technical, professional or

management personnel; lack of social opposition to our mines or facilities; lack of legal challenges with respect to our properties; the

timing and amount of future production; the ability to meet production, cost, and capital expenditure targets; timing and ability to produce

studies and analyses; capital and operating expenditures; economic conditions; availability of sufficient financing; the ultimate ability to

mine, process, and sell mineral products on economically favorable terms; and any and all other timing, exploration, development,

operational, financial, budgetary, economic, legal, social, geopolitical, regulatory and political factors that may influence future events or

conditions. While we consider these factors and assumptions to be reasonable based on information currently available to us, they may

prove to be incorrect.

The above list is not exhaustive of the factors that may affect any of the Company’s forward-looking information. You should not place

undue reliance on forward-looking information. Forward-looking information are based on certain key expectations and assumptions

made by us. Although we believe that the expectations and assumptions on which such forward-looking information are based are

reasonable, undue reliance should not be placed on the forward-looking information because we can give no assurance that they will

prove to be correct. Other than as required by law, we do not intend, and undertake no obligation to update any forward-looking information

to reflect, among other things, new information or future events. The information contained on, or that may be accessed through, our

website is not incorporated by reference into, and is not a part of, this document.

SSR MINING | PAGE 10

Qualified Persons

The scientific and technical information concerning our mineral projects in this news release have been reviewed and verified by SLR

International Corporation, a “qualified person” under subpart 1 of Regulation S-K 1300 (“S-K 1300”) and National Instrument 43-101 –

Standards of Disclosure for Mineral Projects (“NI 43-101”). For a description of the key assumptions, parameters and methods used to

estimate Mineral Reserves and Mineral Resources included in this news release, as well as data verification procedures and a general

discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, sociopolitical,

marketing or other relevant factors, please review the Technical Report Summaries for the properties discussed in this news release,

which are available under the Company’s corporate profile on EDGAR at www.sec.gov.

Supplemental Mineral Reserve and Mineral Resource Information

Marigold’s Mineral Reserves and Mineral Resources have been classified in accordance with the definitions for Mineral Resources in S-K 1300. Mineral Resources are presented on a project basis and have an effective date of May 1, 2026. Mineral Reserves and Mineral

Resources have been reported on a 100% basis as SSR Mining wholly owns the property.

The TRS contains detailed descriptions of data verification, sampling and assay procedures, quality assurance and quality control

measures, key assumptions, parameters, risks and other factors supporting the mineral resource and mineral reserve estimates and the

economic analysis.

Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources

may be materially affected by environmental, permitting, legal, title, market or other relevant issues. The deposit has been classified as

Indicated and Inferred based on drill spacing appropriate to the deposit and mineralization style. The quantity and grade of reported

Inferred resources are uncertain in nature, and there has not been sufficient work to define these Inferred Mineral Resources as Indicated

or Measured resources. There is no certainty that any part of a mineral resource will ever be converted into mineral reserves.

The following tables provide a summary of Mineral Reserves and Mineral Resources for Marigold with an effective date of May 1, 2026

as included within the 2026 Marigold TRS:

Proven Probable Proven + Probable Metallurgical

Tonnage Au Grade Gold Tonnage Au Grade Gold Tonnage Au Grade Gold Recovery

(Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (%)

Marigold — — — 240.4 0.46 3.52 240.4 0.46 3.52 73.5%

Buffalo Valley — — — 45.3 0.46 0.67 45.3 0.46 0.67 65.9%

Stockpile — — — 12.0 0.17 0.06 12.0 0.17 0.06 56.3%

Leach Pad Inventory — — — 61.0 0.19 0.37 61.0 0.19 0.37 65.2%

Total — — — 358.7 0.40 4.63 358.7 0.40 4.63 71.5%

(1) The Mineral Reserve estimate was prepared in accordance with S-K 1300 definitions.

(2) The Marigold Mine Mineral Reserve estimate is based on a metal price assumption of $2,200/oz gold and is reported at a cut-off grade of 0.069 g/t payable Au

(Au assay factored for recovery, royalty, and net proceeds).

(3) The Buffalo Valley Mineral Reserve estimate assumes ROM heap leach processing and a gold price of $2,200/oz. Cut-off grades range from 0.069 to 1.767 g/t

payable Au, and metallurgical recoveries range from 3.1% to 79.2%, both varying by lithology/metallurgical domain.

(4) No mining dilution is applied to the grade of the Mineral Reserves. Dilution intrinsic to the Mineral Reserves estimate is considered sufficient to represent the

mining selectivity considered.

(5) Bulk densities (in t/m3) were assigned by lithologies: alluvium = 2.10, Havallah = 2.48, Valmy/Antler = 2.4076+(0.0001*DEPTH), and Valmy = 2.64. For Buffalo

Valley, bulk densities (in t/m3) were assigned by lithology ranging from a low of 2.426 (Overburden) to a high of 2.737 (Basalt) with a weighted average of 2.63.

(6) The Property is 100% owned by SSR through its subsidiary MMC.

(7) All ounces reported represent troy ounces, and g/t represents grams per metric tonne.

(8) The point of reference for Mineral Reserves is the entry to the carbon columns in the processing facility.

(9) Totals may vary due to rounding.

Measured Indicated Measured + Indicated Inferred

Tonnage Au Grade Gold Tonnage Au Grade Gold Tonnage Au Grade Gold Tonnage Au Grade Gold

(Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz)

Marigold — — — 125.0 0.39 1.57 125.0 0.39 1.57 18.1 0.30 0.18

Buffalo Valley — — — 5.6 0.53 0.09 5.6 0.53 0.09 11.2 0.31 0.11

Total — — — 130.6 0.40 1.66 130.6 0.40 1.66 29.3 0.31 0.29

(10)The Mineral Resource estimate was prepared in accordance with S-K 1300.

(11)The effective date of Mineral Resources at Marigold is May 1, 2026, and the effective date of Mineral Resources at Buffalo Valley is May 1, 2026.

(12)Marigold Mine is based on an optimized pit shell at a cut-off grade of 0.069 g/t payable gold (gold assay factored for recovery, royalty, and net proceeds). Buffalo

Valley is based on a cut-off grade of 0.10 to 0.32 g/t contained gold, depending on material type.

(13)Marigold metallurgical recoveries vary with gold grade. Buffalo Valley metallurgical recoveries vary with gold grade and lithology.

(14)For Marigold, bulk densities (in t/m3) were assigned by lithologies: alluvium = 2.10, Havallah = 2.48, Valmy/Antler = 2.4076+(0.0001*DEPTH), and Valmy = 2.64,

below 533m. For Buffalo Valley, bulk densities (in t/m3) were assigned by lithology, ranging from a low of 2.095 (Overburden) to a high of 2.725 (Basalt).

(15)The Mineral Resources estimate is reported below the as-mined surface as of May 1, 2026, for Marigold, and below the as-mined surface as of May 1, 2026, for

Buffalo Valley.

(16)The point of reference for Mineral Resources is the entry to the carbon columns in the processing facility.

(17)Mineral Resources are reported exclusive of Mineral Reserves.

SSR MINING | PAGE 11

(18)SSR Mining has 100% ownership of the Marigold Complex.

(19)Gold grades are given in grams per metric tonne (g/t).

(20)Totals may vary due to rounding.

For Information regarding CC&V’s Mineral Reserves and Mineral Resources, refer to Item 2. Properties in the Company’s Annual Report

on Form 10-K for the year ended December 31, 2025 filed on February 17, 2026 and the Technical Report Summary included as an

exhibit to our Annual Report on Form 10-K.

The following tables provide a summary of Mineral Reserves and Mineral Resources for CC&V for the year ended December 31, 2025

as included within the Company’s Annual Report:

Proven Probable Proven + Probable Metallurgical

Tonnage Au Grade Gold Tonnage Au Grade Gold Tonnage Au Grade Gold Recovery

(kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz) (%)

CC&V (OP) 105,440 0.44 1,480 46,566 0.41 607 152,006 0.43 2,087 52%

CC&V (Stockpile) — — — 68,205 0.26 564 68,205 0.26 564 47%

Total 105,440 0.44 1,480 114,771 0.32 1,171 220,211 0.37 2,651 50%

(1) The Mineral Reserve estimate was prepared in accordance with S-K 1300 definitions

(2) CC&V Mineral Reserves are reported at a cut-off grade for crush leach is 0.10g/t Au extractable cyanide soluble (factored for recovery) and run of mine leach is

0.069 g/t Au extractable cyanide soluble (factored for recovery).

(3) Metallurgical recoveries vary by lithology and oxidation state and ranges between 24.8-94.9% .

(4) No mining dilution is applied to the grade of the Mineral Reserves. Dilution intrinsic to the Mineral Reserves estimate is considered sufficient to represent the

mining selectivity considered.

(5) The point of reference for Mineral Reserves is the entry to the carbon columns in the processing facility.

(6) Leach Pad Inventory of 360 koz represents work-in-process gold and is 100% recoverable over the LOM.

(7) Totals may vary due to rounding.

Measured Indicated Measured + Indicated Inferred

Tonnage Au Grade Gold Tonnage Au Grade Gold Tonnage Au Grade Gold Tonnage Au Grade Gold

(kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz)

CC&V (OP) 157,034 0.49 2,456 149,020 0.43 2,078 306,054 0.46 4,534 149,352 0.41 1,963

CC&V (Stockpile) — — — 32,028 0.26 272 32,028 0.26 272 — — —

Total 157,034 0.49 2,456 181,048 0.40 2,350 338,082 0.44 4,805 149,352 0.41 1,963

(8) The Mineral Resource estimate was prepared in accordance with S-K 1300.

(9) CC&V Mineral Resources are reported based on $2,000/oz gold price. Mineral Resources estimate was prepared in accordance with S-K 1300.

(10)Mineral Resource estimate is based on an optimized pit shell. CC&V Mineral Resources are reported at a gold cut-off grade for crush leach of 0.10 g/t gold

extractable cyanide soluble (factored for metallurgical recovery) and run for mine leach of 0.069 g/t gold extractable cyanide soluble (factored for metallurgical

recovery).

(11)Metallurgical recoveries vary with gold grade, range between 24.8-94.9%.

(12)Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

(13)The point of reference for Mineral Resources is the entry to the carbon columns in the processing facility.

(14)Totals may vary due to rounding.

SSR MINING | PAGE 12

Cautionary Note Regarding Non-GAAP Measures

We have included certain non-GAAP performance measures throughout this document to assist in understanding our financial results.

These performance measures are employed by us to measure our operating and economic performance internally and to assist in

decision-making, as well as to provide key performance information to senior management. We believe that, in addition to measures

prepared in accordance with GAAP, certain investors and other stakeholders will find this information useful to evaluate our operating and

financial performance; however, these non-GAAP performance measures do not have any standardized meaning. These performance

measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of

performance prepared in accordance with GAAP. Our definitions of our non-GAAP financial measures may not be comparable to similarly

titled measures reported by other companies. These non-GAAP measures should be read in conjunction with our condensed consolidated

interim financial statements.

Cash costs, AISC per ounce sold, and free cash flow are Non-GAAP Measures with no standardized definition under U.S. GAAP.

Non-GAAP Measure - Cash Costs and AISC

Cash Costs and All-In Sustaining Costs (“AISC”) per payable ounce of gold and respective unit cost measures are non-U.S. GAAP metrics

developed by the World Gold Council to provide transparency into the costs associated with producing gold and provide a standard for

comparison across the industry. The World Gold Council is a market development organization for the gold industry.

The Company uses cash costs per ounce of precious metals sold and AISC per ounce of precious metals to monitor its operating

performance internally. The most directly comparable measure prepared in accordance with GAAP is cost of sales. The Company believes

this measure provides investors and analysts with useful information about its underlying cash costs of operations and the impact of by-product credits on its cost structure. The Company also believes these are relevant metrics used to understand its operating profitability.

When deriving the cost of sales associated with an ounce of precious metal, the Company includes by-product credits, which allows

management and other stakeholders to assess the net costs of gold and silver production.

AISC includes total cost of sales incurred at the Company's mining operations, which forms the basis of cash costs. Additionally, the

Company includes sustaining capital expenditures, sustaining mine-site exploration and evaluation costs, reclamation cost accretion and

amortization, and general and administrative expenses. This measure seeks to reflect the ongoing cost of gold and silver production from

current operations; therefore, growth capital is excluded. The Company determines sustaining capital to be capital expenditures that are

necessary to maintain current production and execute the current mine plan. The Company determines growth capital to be those

payments used to develop new operations or related to projects at existing operations where those projects will materially benefit the

operation.

The Company believes that AISC provides additional information to management and stakeholders that provides visibility to better define

the total costs associated with production and better understanding of the economics of the Company's operations and performance

compared to other producers. In deriving the number of ounces of precious metal sold, the Company considers the physical ounces

available for sale after the treatment and refining process, commonly referred to as payable metal, as this is what is sold to third parties.

The following tables provide a reconciliation of Cost of sales to cash costs and AISC used in the 2026 Marigold TRS:

(in thousands, unless otherwise noted) 2027 – 2031 2027 – 2040 2027 – 2045

Cost of sales (GAAP) (1) $ 2,293,943 $ 5,513,569 $ 5,752,463

Treatment and refining charges $ 1,253 $ 3,351 $ 4,315

Cash costs (non-GAAP) $ 2,295,195 $ 5,516,920 $ 5,756,778

Sustaining capital $ 332,622 $ 569,533 $ 572,033

Reclamation cost accretion and amortization $ - $ 58,124 $ 101,536

Total AISC (non-GAAP) $ 2,627,817 $ 6,144,577 $ 6,430,348

Gold sold (oz) 1,152,882 2,815,000 3,207,423

Cost of sales per gold ounces sold $ 1,990 $ 1,959 $ 1,793

Cash cost per gold ounce sold $ 1,991 $ 1,960 $ 1,795

AISC per gold ounce sold $ 2,279 $ 2,183 $ 2,005

(1) Excludes depreciation, depletion, and amortization.

SSR MINING | PAGE 13

Non-GAAP Measure - Free Cash Flow and Mine Site Free Cash Flow

The Company uses free cash flow and mine site free cash flow to supplement information in its condensed consolidated financial

statements. The most directly comparable financial measure prepared in accordance with GAAP to free cash flow is cash provided by

operating activities and the most directly comparable financial measure prepared in accordance with GAAP to mine site free cash flow is

mine segment revenue. The Company believes that in addition to measures prepared in accordance with GAAP, certain investors and

analysts use this information to evaluate the ability of the Company to generate cash flow after capital investments and build the

Company's cash resources and, with respect to one of its mine segments, to evaluate the cash generated from a mine. The Company

calculates free cash flow by deducting cash capital spending from cash generated by operating activities. The Company does not deduct

payments made for business acquisitions. The Company calculates mine site free cash flow by deducting cost of sales, exploration,

evaluation, and reclamation expenditures, cash care and maintenance, capital expenditures and taxes from revenue from a particular

segment.

The following table provides a reconciliation of cash provided by operating activities to free cash flow as shown in Table 1:

(in millions of U.S. dollars) Consensus Gold Prices

Five-Year Profile Active Mining Total Mine Life (2) Total Mine Life (2)

2027 – 2031 2027 – 2040 2027 – 2045 2027 – 2050

Operating cash flow after taxes (GAAP) $ 2,353 $ 4,955 $ 5,983 $ 5,978

Total capital costs $ (817) $ (1,133) $ (1,179) $ (1,231)

Total free cash flow after taxes (non-GAAP) $ 1,536 $ 3,822 $ 4,804 $ 4,747

Number of years 5 14 19 24

Average operating cash flow after taxes (GAAP) $ 471 $ 354 $ 315 $ 249

Average total capital costs (including closure/reclamation costs) $ (163) $ (81) $ (62) $ (51)

Average free cash flow after taxes (non-GAAP) $ 307 $ 273 $ 253 $ 198

(2) Total Mine Life metrics are summed over the period of 2027 to 2050. As residual heap leaching concludes in 2045, average operating cash flow, capital costs

and free cash flow over the “Total Mine Life” period calculated between 2027 – 2045.

The Company uses mine site free cash flow to supplement information in its condensed consolidated financial statements. The Company

calculates mine site free cash flow as revenue less cost of sales, exploration, evaluation, and reclamation expenditures, cash care and

maintenance, capital expenditures and taxes. We believe presenting asset level revenue minus large cash expenditures will be useful for

investors because it represents a view of how much cash is actually generated and spent that is directly attributable to a specific site.

The following table provides a calculation of mine Site Free Cash Flow for Marigold, Seabee and CC&V since acquisition through June

30, 2026:

(in millions of U.S. dollars) Since Acquisition

Marigold Seabee CC&V

Revenue (GAAP) $ 4,455 $ 1,655 $ 765

Cost of sales $ (2,395) $ (660) $ (255)

Exploration & reclamation $ (115) $ (110) $ (20)

Care & maintenance $ — $ (25) $ —

Capital expenditure $ (730) $ (320) $ (70)

Mine site free cash flow before taxes (non-GAAP) $ 1,215 $ 540 $ 420

Taxes (3) $ (160) $ (140) $ (75)

Mine site after tax free cash flow (non-GAAP) $ 1,055 $ 400 $ 345

(3) Represents federal and state taxes paid since acquisition

SSR MINING | PAGE 14

2026 Marigold TRS – Life of Mine Cash Flow Model (4,5)

Operating Summary Total / Avg May 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 2049 2050

Total Ore Mined (kt) 297,731 11,891 20,903 20,812 22,849 14,178 20,240 27,442 24,325 24,047 23,541 25,589 20,301 16,367 18,182 7,064 — — — — — — — — — —

Total Waste Mined (kt) 1,583,200 51,102 107,186 162,640 139,565 162,766 143,356 137,893 150,610 118,262 87,127 74,364 73,902 83,655 77,554 13,218 — — — — — — — — — —

Total Material Mined (kt) 1,880,931 62,993 128,089 183,452 162,414 176,944 163,596 165,336 174,936 142,308 110,668 99,953 94,203 100,022 95,736 20,283 — — — — — — — — — —

Stripping Ratio (W:O) 5.3 4.3 5.1 7.8 6.1 11.5 7.1 5.0 6.2 4.9 3.7 2.9 3.6 5.1 4.3 1.9 — — — — — — — — — —

Total Ore Processed (kt) 297,731 11,891 20,903 20,812 22,849 14,178 20,240 27,442 24,325 24,047 23,541 25,589 20,301 16,367 18,182 7,064 — — — — — — — — — —

Gold Grade, Stacked (g/t) 0.44 0.41 0.51 0.49 0.65 0.59 0.40 0.32 0.44 0.45 0.38 0.39 0.33 0.42 0.38 0.80 — — — — — — — — — —

Average Recovery, Gold (%) 72% 75% 74% 72% 73% 71% 69% 68% 68% 72% 71% 73% 70% 76% 75% 76% — — — — — — — — — —

Payable Gold, Total (koz) 3,335 128 170 281 243 280 179 205 221 231 207 198 150 157 158 135 148 100 68 46 31 — — — — —

Financial Summary — — — — — — — — — — — — — — — — — — — — — — — — — —

Gold Gross Revenue ($M) $13,166 $592 $817 $1,295 $1,059 $1,116 $665 $762 $821 $855 $768 $734 $556 $582 $587 $500 $550 $371 $251 $169 $114 — — — — —

Operating Costs ($M) ($6,029) ($277) ($400) ($528) ($492) ($464) ($411) ($416) ($429) ($445) ($405) ($385) ($337) ($351) ($313) ($139) ($82) ($57) ($42) ($33) ($25) — — — — —

Refining and Freight Cost ($M) ($5) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) ($0) — — — — —

EBITDA ($M) $7,132 $315 $417 $767 $567 $651 $254 $346 $393 $410 $363 $348 $219 $230 $274 $361 $468 $314 $208 $136 $89 — — — — —

Depreciation & Depletion ($M) ($3,171) ($105) ($186) ($307) ($283) ($286) ($187) ($235) ($242) ($225) ($180) ($157) ($124) ($124) ($122) ($105) ($168) ($56) ($38) ($25) ($17) — — — — —

Earnings Before Taxes ($M) $3,961 $210 $231 $460 $284 $366 $67 $112 $150 $185 $183 $192 $95 $107 $152 $255 $300 $258 $171 $111 $72 — — — — —

Federal & State Tax ($M) ($834) ($2) ($31) ($53) ($69) ($79) ($60) ($27) ($39) ($46) ($43) ($40) ($31) ($22) ($28) ($44) ($67) ($63) ($41) ($27) ($17) ($5) — — — —

Net Income ($M) $3,127 $208 $200 $407 $215 $287 $7 $84 $112 $139 $140 $152 $64 $85 $124 $212 $233 $195 $129 $84 $55 ($5) — — — —

AT Operating Cash Flow ($M) $6,298 $320 $384 $708 $498 $568 $194 $317 $352 $363 $318 $307 $187 $209 $244 $304 $395 $283 $168 $110 $73 ($5) $1 ($1) ($0) $0

Total Capital ($M) ($1,385) ($133) ($343) ($270) ($74) ($67) ($62) ($40) ($51) ($45) ($20) ($24) ($19) ($48) ($33) ($36) ($9) ($17) ($11) ($6) ($3) ($11) ($25) ($13) ($2) ($2)

AT Free Cash Flow ($M) $4,913 $187 $41 $438 $424 $501 $132 $277 $301 $318 $298 $283 $169 $161 $211 $268 $386 $266 $157 $104 $70 ($16) ($24) ($13) ($2) ($2)

Non-GAAP Reconciliation

Cost of Sales ($M, GAAP) $6,029 $277 $400 $528 $492 $464 $411 $416 $429 $445 $405 $385 $337 $351 $313 $139 $82 $57 $42 $33 $25 — — — — —

Treatment & Refining ($M) $5 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 — — — — —

Cash Costs ($M, non-GAAP) $6,034 $277 $400 $528 $492 $464 $411 $416 $429 $445 $405 $386 $338 $351 $313 $139 $82 $57 $42 $33 $25 — — — — —

Sustaining Capital ($M) $669 $97 $80 $91 $43 $57 $62 $36 $34 $44 $19 $21 $17 $33 $18 $17 $1 $1 $1 $1 $1 — — — — —

Reclamation ($M) $175 — — — — — — $1 $1 $1 $1 $3 $2 $15 $15 $20 $8 $17 $10 $6 $3 $11 $25 $13 $2 $2

AISC ($M, non-GAAP) $6,877 $374 $480 $619 $535 $521 $473 $452 $464 $490 $425 $409 $356 $399 $346 $176 $91 $74 $53 $39 $28 $11 $25 $13 $2 $2

(4) All cash flow figures are presented after tax (“AT”). Free cash flow is calculated as operating cash flow less capital costs. The summary above does not include non-cash inventory adjustments and other minor non-cash items that impact the Company’s calculation of cash costs and AISC.

(5) Figures represented in this table may not recalculate due to rounding.

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex23-1img001.jpg · Sequence: 8

Binary file (3879 bytes)

Download tm2627394d1_ex23-1img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img001.jpg · Sequence: 9

Binary file (32500 bytes)

Download tm2627394d1_ex99-1img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img002.jpg · Sequence: 10

Binary file (7565 bytes)

Download tm2627394d1_ex99-1img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img01.jpg · Sequence: 11

Binary file (1423 bytes)

Download tm2627394d1_ex99-1img01.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img100.jpg · Sequence: 12

Binary file (144352 bytes)

Download tm2627394d1_ex99-1img100.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img101.jpg · Sequence: 13

Binary file (120788 bytes)

Download tm2627394d1_ex99-1img101.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img102.jpg · Sequence: 14

Binary file (121061 bytes)

Download tm2627394d1_ex99-1img102.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img103.jpg · Sequence: 15

Binary file (251521 bytes)

Download tm2627394d1_ex99-1img103.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img104.jpg · Sequence: 16

Binary file (242592 bytes)

Download tm2627394d1_ex99-1img104.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img105.jpg · Sequence: 17

Binary file (244617 bytes)

Download tm2627394d1_ex99-1img105.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img106.jpg · Sequence: 18

Binary file (132062 bytes)

Download tm2627394d1_ex99-1img106.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img107.jpg · Sequence: 19

Binary file (127950 bytes)

Download tm2627394d1_ex99-1img107.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img108.jpg · Sequence: 20

Binary file (106863 bytes)

Download tm2627394d1_ex99-1img108.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img11.jpg · Sequence: 21

Binary file (68200 bytes)

Download tm2627394d1_ex99-1img11.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img71.jpg · Sequence: 22

Binary file (54419 bytes)

Download tm2627394d1_ex99-1img71.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img72.jpg · Sequence: 23

Binary file (73125 bytes)

Download tm2627394d1_ex99-1img72.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img73.jpg · Sequence: 24

Binary file (120616 bytes)

Download tm2627394d1_ex99-1img73.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img74.jpg · Sequence: 25

Binary file (110942 bytes)

Download tm2627394d1_ex99-1img74.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img75.jpg · Sequence: 26

Binary file (113628 bytes)

Download tm2627394d1_ex99-1img75.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img76.jpg · Sequence: 27

Binary file (73494 bytes)

Download tm2627394d1_ex99-1img76.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img77.jpg · Sequence: 28

Binary file (76918 bytes)

Download tm2627394d1_ex99-1img77.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img78.jpg · Sequence: 29

Binary file (55453 bytes)

Download tm2627394d1_ex99-1img78.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img79.jpg · Sequence: 30

Binary file (31540 bytes)

Download tm2627394d1_ex99-1img79.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img80.jpg · Sequence: 31

Binary file (78428 bytes)

Download tm2627394d1_ex99-1img80.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img81.jpg · Sequence: 32

Binary file (354819 bytes)

Download tm2627394d1_ex99-1img81.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img95.jpg · Sequence: 33

Binary file (216264 bytes)

Download tm2627394d1_ex99-1img95.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img96.jpg · Sequence: 34

Binary file (257370 bytes)

Download tm2627394d1_ex99-1img96.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img97.jpg · Sequence: 35

Binary file (81737 bytes)

Download tm2627394d1_ex99-1img97.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img98.jpg · Sequence: 36

Binary file (73249 bytes)

Download tm2627394d1_ex99-1img98.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1img99.jpg · Sequence: 37

Binary file (110829 bytes)

Download tm2627394d1_ex99-1img99.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp2img01.jpg · Sequence: 38

Binary file (69326 bytes)

Download tm2627394d1_ex99-1sp2img01.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp2img02.jpg · Sequence: 39

Binary file (97309 bytes)

Download tm2627394d1_ex99-1sp2img02.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp2img03.jpg · Sequence: 40

Binary file (35575 bytes)

Download tm2627394d1_ex99-1sp2img03.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp2img04.jpg · Sequence: 41

Binary file (86147 bytes)

Download tm2627394d1_ex99-1sp2img04.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp2img05.jpg · Sequence: 42

Binary file (57570 bytes)

Download tm2627394d1_ex99-1sp2img05.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp2img06.jpg · Sequence: 43

Binary file (94638 bytes)

Download tm2627394d1_ex99-1sp2img06.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img001.jpg · Sequence: 44

Binary file (287550 bytes)

Download tm2627394d1_ex99-1sp3img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img002.jpg · Sequence: 45

Binary file (281894 bytes)

Download tm2627394d1_ex99-1sp3img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img003.jpg · Sequence: 46

Binary file (294963 bytes)

Download tm2627394d1_ex99-1sp3img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img004.jpg · Sequence: 47

Binary file (226395 bytes)

Download tm2627394d1_ex99-1sp3img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img005.jpg · Sequence: 48

Binary file (220653 bytes)

Download tm2627394d1_ex99-1sp3img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img006.jpg · Sequence: 49

Binary file (260542 bytes)

Download tm2627394d1_ex99-1sp3img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img007.jpg · Sequence: 50

Binary file (259538 bytes)

Download tm2627394d1_ex99-1sp3img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img008.jpg · Sequence: 51

Binary file (268539 bytes)

Download tm2627394d1_ex99-1sp3img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img009.jpg · Sequence: 52

Binary file (139821 bytes)

Download tm2627394d1_ex99-1sp3img009.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img010.jpg · Sequence: 53

Binary file (427325 bytes)

Download tm2627394d1_ex99-1sp3img010.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img011.jpg · Sequence: 54

Binary file (65201 bytes)

Download tm2627394d1_ex99-1sp3img011.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img012.jpg · Sequence: 55

Binary file (64501 bytes)

Download tm2627394d1_ex99-1sp3img012.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp3img013.jpg · Sequence: 56

Binary file (198069 bytes)

Download tm2627394d1_ex99-1sp3img013.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img01.jpg · Sequence: 57

Binary file (26377 bytes)

Download tm2627394d1_ex99-1sp4img01.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img02.jpg · Sequence: 58

Binary file (31541 bytes)

Download tm2627394d1_ex99-1sp4img02.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img03.jpg · Sequence: 59

Binary file (20777 bytes)

Download tm2627394d1_ex99-1sp4img03.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img04.jpg · Sequence: 60

Binary file (21243 bytes)

Download tm2627394d1_ex99-1sp4img04.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img05.jpg · Sequence: 61

Binary file (18210 bytes)

Download tm2627394d1_ex99-1sp4img05.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img06.jpg · Sequence: 62

Binary file (26558 bytes)

Download tm2627394d1_ex99-1sp4img06.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img07.jpg · Sequence: 63

Binary file (21648 bytes)

Download tm2627394d1_ex99-1sp4img07.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img08.jpg · Sequence: 64

Binary file (21154 bytes)

Download tm2627394d1_ex99-1sp4img08.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img09.jpg · Sequence: 65

Binary file (23919 bytes)

Download tm2627394d1_ex99-1sp4img09.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img11.jpg · Sequence: 66

Binary file (288921 bytes)

Download tm2627394d1_ex99-1sp4img11.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img12.jpg · Sequence: 67

Binary file (274538 bytes)

Download tm2627394d1_ex99-1sp4img12.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img13.jpg · Sequence: 68

Binary file (82907 bytes)

Download tm2627394d1_ex99-1sp4img13.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img14.jpg · Sequence: 69

Binary file (113345 bytes)

Download tm2627394d1_ex99-1sp4img14.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img15.jpg · Sequence: 70

Binary file (47319 bytes)

Download tm2627394d1_ex99-1sp4img15.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img16.jpg · Sequence: 71

Binary file (44477 bytes)

Download tm2627394d1_ex99-1sp4img16.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp4img17.jpg · Sequence: 72

Binary file (52922 bytes)

Download tm2627394d1_ex99-1sp4img17.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img001.jpg · Sequence: 73

Binary file (377495 bytes)

Download tm2627394d1_ex99-1sp6img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img002.jpg · Sequence: 74

Binary file (335501 bytes)

Download tm2627394d1_ex99-1sp6img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img003.jpg · Sequence: 75

Binary file (27422 bytes)

Download tm2627394d1_ex99-1sp6img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img004.jpg · Sequence: 76

Binary file (465540 bytes)

Download tm2627394d1_ex99-1sp6img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img005.jpg · Sequence: 77

Binary file (450962 bytes)

Download tm2627394d1_ex99-1sp6img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img006.jpg · Sequence: 78

Binary file (463280 bytes)

Download tm2627394d1_ex99-1sp6img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img007.jpg · Sequence: 79

Binary file (452449 bytes)

Download tm2627394d1_ex99-1sp6img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img008.jpg · Sequence: 80

Binary file (440916 bytes)

Download tm2627394d1_ex99-1sp6img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img009.jpg · Sequence: 81

Binary file (453679 bytes)

Download tm2627394d1_ex99-1sp6img009.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img010.jpg · Sequence: 82

Binary file (443861 bytes)

Download tm2627394d1_ex99-1sp6img010.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img011.jpg · Sequence: 83

Binary file (445751 bytes)

Download tm2627394d1_ex99-1sp6img011.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img012.jpg · Sequence: 84

Binary file (347399 bytes)

Download tm2627394d1_ex99-1sp6img012.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img013.jpg · Sequence: 85

Binary file (354835 bytes)

Download tm2627394d1_ex99-1sp6img013.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img014.jpg · Sequence: 86

Binary file (294076 bytes)

Download tm2627394d1_ex99-1sp6img014.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img015.jpg · Sequence: 87

Binary file (359438 bytes)

Download tm2627394d1_ex99-1sp6img015.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img016.jpg · Sequence: 88

Binary file (292678 bytes)

Download tm2627394d1_ex99-1sp6img016.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img017.jpg · Sequence: 89

Binary file (354346 bytes)

Download tm2627394d1_ex99-1sp6img017.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img018.jpg · Sequence: 90

Binary file (221243 bytes)

Download tm2627394d1_ex99-1sp6img018.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img019.jpg · Sequence: 91

Binary file (160476 bytes)

Download tm2627394d1_ex99-1sp6img019.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img020.jpg · Sequence: 92

Binary file (87469 bytes)

Download tm2627394d1_ex99-1sp6img020.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-1sp6img021.jpg · Sequence: 93

Binary file (41261 bytes)

Download tm2627394d1_ex99-1sp6img021.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img001.jpg · Sequence: 94

Binary file (250418 bytes)

Download tm2627394d1_ex99-2img001.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img002.jpg · Sequence: 95

Binary file (123614 bytes)

Download tm2627394d1_ex99-2img002.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img003.jpg · Sequence: 96

Binary file (182113 bytes)

Download tm2627394d1_ex99-2img003.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img004.jpg · Sequence: 97

Binary file (159127 bytes)

Download tm2627394d1_ex99-2img004.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img005.jpg · Sequence: 98

Binary file (225202 bytes)

Download tm2627394d1_ex99-2img005.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img006.jpg · Sequence: 99

Binary file (201119 bytes)

Download tm2627394d1_ex99-2img006.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img007.jpg · Sequence: 100

Binary file (223970 bytes)

Download tm2627394d1_ex99-2img007.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img008.jpg · Sequence: 101

Binary file (212004 bytes)

Download tm2627394d1_ex99-2img008.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img009.jpg · Sequence: 102

Binary file (389494 bytes)

Download tm2627394d1_ex99-2img009.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img010.jpg · Sequence: 103

Binary file (317623 bytes)

Download tm2627394d1_ex99-2img010.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img011.jpg · Sequence: 104

Binary file (170468 bytes)

Download tm2627394d1_ex99-2img011.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img012.jpg · Sequence: 105

Binary file (274067 bytes)

Download tm2627394d1_ex99-2img012.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img013.jpg · Sequence: 106

Binary file (212508 bytes)

Download tm2627394d1_ex99-2img013.jpg

GRAPHIC

GRAPHIC

Filename: tm2627394d1_ex99-2img014.jpg · Sequence: 107

Binary file (187615 bytes)

Download tm2627394d1_ex99-2img014.jpg

XML — IDEA: XBRL DOCUMENT

XML

Filename: R1.htm · Sequence: 109

v3.26.3

Cover

Oct. 13, 2026

Cover [Abstract]

Document Type

8-K

Amendment Flag

false

Document Period End Date

Oct. 13, 2026

Entity File Number

001-35455

Entity Registrant Name

SSR

Mining Inc.

Entity Central Index Key

0000921638

Entity Tax Identification Number

98-0211014

Entity Incorporation, State or Country Code

A1

Entity Address, Address Line One

6900

E. Layton Ave.

Entity Address, Address Line Two

Suite

1300

Entity Address, City or Town

Denver

Entity Address, State or Province

CO

Entity Address, Postal Zip Code

80237

City Area Code

303

Local Phone Number

292-1299

Written Communications

false

Soliciting Material

false

Pre-commencement Tender Offer

false

Pre-commencement Issuer Tender Offer

false

Title of 12(b) Security

Common

Shares without par value

Trading Symbol

SSRM

Security Exchange Name

NASDAQ

Entity Emerging Growth Company

false

X

- Definition

Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.

+ References

No definition available.

+ Details

Name:

dei_AmendmentFlag

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Area code of city

+ References

No definition available.

+ Details

Name:

dei_CityAreaCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Cover page.

+ References

No definition available.

+ Details

Name:

dei_CoverAbstract

Namespace Prefix:

dei_

Data Type:

xbrli:stringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.

+ References

No definition available.

+ Details

Name:

dei_DocumentPeriodEndDate

Namespace Prefix:

dei_

Data Type:

xbrli:dateItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.

+ References

No definition available.

+ Details

Name:

dei_DocumentType

Namespace Prefix:

dei_

Data Type:

dei:submissionTypeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 1 such as Attn, Building Name, Street Name

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine1

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 2 such as Street or Suite number

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine2

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the City or Town

+ References

No definition available.

+ Details

Name:

dei_EntityAddressCityOrTown

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Code for the postal or zip code

+ References

No definition available.

+ Details

Name:

dei_EntityAddressPostalZipCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the state or province.

+ References

No definition available.

+ Details

Name:

dei_EntityAddressStateOrProvince

Namespace Prefix:

dei_

Data Type:

dei:stateOrProvinceItemType

Balance Type:

na

Period Type:

duration

X

- Definition

A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityCentralIndexKey

Namespace Prefix:

dei_

Data Type:

dei:centralIndexKeyItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Indicate if registrant meets the emerging growth company criteria.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityEmergingGrowthCompany

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.

+ References

No definition available.

+ Details

Name:

dei_EntityFileNumber

Namespace Prefix:

dei_

Data Type:

dei:fileNumberItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Two-character EDGAR code representing the state or country of incorporation.

+ References

No definition available.

+ Details

Name:

dei_EntityIncorporationStateCountryCode

Namespace Prefix:

dei_

Data Type:

dei:edgarStateCountryItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityRegistrantName

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityTaxIdentificationNumber

Namespace Prefix:

dei_

Data Type:

dei:employerIdItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Local phone number for entity.

+ References

No definition available.

+ Details

Name:

dei_LocalPhoneNumber

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 13e

-Subsection 4c

+ Details

Name:

dei_PreCommencementIssuerTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14d

-Subsection 2b

+ Details

Name:

dei_PreCommencementTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Title of a 12(b) registered security.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b

+ Details

Name:

dei_Security12bTitle

Namespace Prefix:

dei_

Data Type:

dei:securityTitleItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the Exchange on which a security is registered.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection d1-1

+ Details

Name:

dei_SecurityExchangeName

Namespace Prefix:

dei_

Data Type:

dei:edgarExchangeCodeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14a

-Subsection 12

+ Details

Name:

dei_SolicitingMaterial

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Trading symbol of an instrument as listed on an exchange.

+ References

No definition available.

+ Details

Name:

dei_TradingSymbol

Namespace Prefix:

dei_

Data Type:

dei:tradingSymbolItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Securities Act

-Number 230

-Section 425

+ Details

Name:

dei_WrittenCommunications

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration