Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

Centauri Minerals Mobilizes for First Drilling Program at Rio Grande Gold-Copper Project Since 2013

globenewswire.com

Centauri Minerals Mobilizes for First Drilling Program at Rio Grande Gold-Copper Project Since 2013 VANCOUVER, British Columbia, Oct. 13, 2026 (GLOBE NEWSWIRE) -- Centauri Minerals Inc. (TSX-V: CENT) (“Centauri” or the “Company”) is pleased to provide an update on exploration activities at the Rio Grande gold-copper project (“Rio Grande”) in Salta province of Northern Argentina.

Progress and Execution Highlights Include:

Sam Leung, Chief Executive Officer and Director of Centauri, commented:

"One month into Centauri as a public company, we are pleased with the promising target generation results that support mobilization and ramp-up to drilling at Rio Grande, which is in full swing on the ground in Northern Argentina. Our first priority is drilling at Rio Grande, but we have also begun parallel preparations for exploration across our earlier stage portfolio in the region. Our team appreciates the continuing investor support as we work hard to begin a steady pace of results driven catalysts in the weeks and months ahead.”

Geophysical Program & Drill Target Generation at Rio Grande

In the third quarter of 2026, Centauri completed a 3D Magneto-Telluric (“MT”) survey on Rio Grande which covered an area of approximately 56 km 2 (Figure 1), combined with a reprocessing review of historical geophysics, geochemistry, and geological mapping in order to define drill targets for; (a) shallow areas with near-surface resource expansion potential, and (b) high-priority porphyry targets at depth that aims to confirm the potential of a larger-scale gold-copper-silver system.

Figure 2 is a plan view map that summarizes the results of Centauri’s latest interpretative model which highlights shallow zones of higher resistivity vectoring towards the southwest and northeast of the known mineral resources at Rio Grande. The shallow Phase 1 drilling program will evaluate infill areas where the geological, geochemical, and geophysical data show greater potential to expand the existing Mineral Resource Estimate (MRE), as well as to improve understanding of current estimated pit shell models and where extensions may be possible.

Figure 3 is a sectional view of these consolidated results at Rio Grande, with resistivity signals highlighted. A large low-resistivity (i.e., high-conductivity) target area measuring over 1.3 by 2.0 km appears to be located beneath the currently known ring-shaped mineralization that defines the Rio Grande deposit.

This distribution of low resistivity (i.e., high-conductivity) may relate to a predominantly intrusive setting in the central area which transitions outward to higher resistivity that could be volcano-sedimentary dominated rocks toward the peripheries and/or to alteration zoned concentrically outwards. The 3D inversion modelling presents a central domain of moderate-high resistivity (nominally >100 Ωm) open to the east, partially ringed by moderate-low resistivity (nominally <50 Ωm). Within the central zone, an anomalous body of low resistivity (<30 Ωm) is buried, compatible with a mineralized nucleus of a porphyry-type system. The MT data from the recently completed large survey area supported 1D and 3D inversion modelling that allowed imaging of the resistivity distribution down to a depth of 3 to 4 km.

Centauri’s compilation and targeting work to date, which included a variety of geophysical datasets (ground magnetics, gradient array induced polarization and resistivity survey, MT survey), supports the potential presence of a large porphyry-type body at depth beneath the known ring-shaped deposit area and suggests a potential extension towards the northeast, which must be confirmed with future drilling.

Phase 1 Drill Targets:

As a result of the compilation and targeting work, three main exploration areas have been defined for Phase 1 drilling:

Camp Facilities and Established Infrastructure at Rio Grande

Centauri is completing and upgrading its existing camp at Arita, on the southern margin of the Salar de Arizaro, Salta, approximately 9 km east of the Rio Grande deposit (Figure 1). The site is located in an established mining district neighbouring the Lindero gold mine (Fortuna Mining Corp.), with year-round road access and an airstrip owned by Centauri. In the third quarter of 2026, the camp was put into service to support the 3D MT geophysical program, with some services provided by a local supplier from the village of Tolar Grande. Work is now underway ahead of drilling which includes construction of a new accommodation block for work crews, a new core logging facility, a power generation system, a fuel and waste storage system, a wastewater treatment system, and health and safety services to support the Phase 1 and 2 drilling programs. Centauri continues to prioritize employee hiring from the communities of Tolar Grande and San Antonio de los Cobres. The camp is expected to receive the first drill rigs at site later this month.

For further information, please visit the Centauri website and subscribe to the Centauri news list.

Sam Leung

CEO and Director, Centauri Minerals Inc.

Phone: +1 416 206 4187

Email: sam.leung@centauriminerals.com

Website: www.centauriminerals.com

Qualified Person

The scientific and technical data contained in this news release has been reviewed and approved by Dr. Kevin B. Heather, B.Sc. (Hons), M.Sc, Ph.D, FAusIMM, FGS, Technical Advisor to Centauri Minerals, who serves as the qualified person (QP) under the definitions of National Instrument 43-101.

About Centauri Minerals Inc.

Centauri Minerals Inc. is a mineral exploration company focused on Northern Argentina, a mining region of increasing global significance. Centauri holds a 100%-interest in a portfolio of exploration projects spanning approximately 40,000 hectares in the provinces of Salta, Jujuy, and Catamarca, which was spun-out from Aldebaran Resources Inc. The most advanced is the Rio Grande gold-copper project located in Salta, which has an independent National Instrument 43-101 compliant mineral resource estimate that highlights significant gold, copper and silver quantities. Centauri has offices and facilities in Salta, Argentina and Vancouver, Canada. Centauri trades on the TSX Venture Exchange with the symbol: CENT.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

Certain statements regarding Centauri, including management’s assessment of future-plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve known and unknown risks and uncertainties, most of which are beyond the control of Centauri. Often, but not always, forward-looking statements or information can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate” or “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved.

Specifically, and without limitation, all statements included in this press release that address activities, events or developments that Centauri expects or anticipates will or may occur in the future, including, but not limited to the proposed exploration and development of the Company’s projects described herein, and management’s assessment of future plans and operations and statements with respect to the completion of the anticipated exploration and development programs, may constitute forward-looking statements under applicable securities laws and necessarily involve known and unknown risks and uncertainties, most of which are beyond Centauri’s control. These risks may cause actual financial and operating results, performance, levels of activity and achievements to differ materially from those expressed in, or implied by, such forward-looking statements. Although Centauri believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that such expectations will prove to be correct. The forward-looking statements contained in this press release are made as of the date hereof and Centauri does not undertake any obligation to publicly update or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities law.

Figure 1: Location map of the Rio Grande MT survey area (magenta) in relation to the property boundaries, the Centauri exploration camp, and Fortuna Mining’s Lindero Mine.

Figure 2: Centauri’s Rio Grande Plan View Map. Interpretation of the reprocessed historical, geophysics and new MT resistivity model. Resistivity contours of < 70 ohm·m are shown, as well as the magnetic low contour. The plan view represents a horizontal slice at an elevation of 3,250 m.a.s.l.

Figure 3: Centauri’s Rio Grande section NE-SW displaying resistivity (Area A = ~2km across, Area B = ~2 km across, A+B = 4 km across).

Photos accompanying this announcement are available at https://www.globenewswire.com/NewsRoom/AttachmentNg/258b2ab6-269d-4fad-903a-2a938e8e222b

https://www.globenewswire.com/NewsRoom/AttachmentNg/cf6e2994-8454-4f00-aec5-d36342659c95

https://www.globenewswire.com/NewsRoom/AttachmentNg/e677483b-7cb3-4057-8644-b09d729a9eaf