Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

Form 8-K

sec.gov

8-K — Paramount Gold Nevada Corp.

Accession: 0001193125-26-278471

Filed: 2026-06-23

Period: 2026-06-17

CIK: 0001629210

SIC: 1000 (METAL MINING)

Item: Regulation FD Disclosure

Item: Other Events

Item: Financial Statements and Exhibits

Documents

8-K — d161084d8k.htm (Primary)

EX-23.1 (d161084dex231.htm)

EX-99.1 (d161084dex991.htm)

EX-99.2 (d161084dex992.htm)

GRAPHIC (g161084dsp11.jpg)

GRAPHIC (g161084dsp115_.jpg)

GRAPHIC (g161084g03g18.jpg)

GRAPHIC (g161084g0618052738802.jpg)

GRAPHIC (g161084g0618074827912.jpg)

GRAPHIC (g161084g0618074828763.jpg)

GRAPHIC (g161084g0618074829188.jpg)

GRAPHIC (g161084g0618074829490.jpg)

GRAPHIC (g161084g0618074830086.jpg)

GRAPHIC (g161084g0618074830432.jpg)

GRAPHIC (g161084g0618074831053.jpg)

GRAPHIC (g161084g0618074831319.jpg)

GRAPHIC (g161084g0618074832009.jpg)

GRAPHIC (g161084g0618074832495.jpg)

GRAPHIC (g161084g0618080058301.jpg)

GRAPHIC (g161084g0618080059141.jpg)

GRAPHIC (g161084g0618080100184.jpg)

GRAPHIC (g161084g0618080102100.jpg)

GRAPHIC (g161084g0618110709066.jpg)

GRAPHIC (g161084g0618110709620.jpg)

GRAPHIC (g161084g0618110709949.jpg)

GRAPHIC (g161084g0618110710295.jpg)

GRAPHIC (g161084g0618110710642.jpg)

GRAPHIC (g161084g0618110710979.jpg)

GRAPHIC (g161084g0618131905468.jpg)

GRAPHIC (g161084g0618131905785.jpg)

GRAPHIC (g161084g12g12.jpg)

GRAPHIC (g161084g13g13.jpg)

GRAPHIC (g161084g14g14.jpg)

GRAPHIC (g161084g15g15.jpg)

GRAPHIC (g161084g16g16.jpg)

GRAPHIC (g161084g17g17.jpg)

GRAPHIC (g161084g41r48.jpg)

GRAPHIC (g161084g76r56.jpg)

GRAPHIC (g161084g93b33.jpg)

GRAPHIC (g161084g93p68.jpg)

GRAPHIC (g161084snap117.jpg)

GRAPHIC (g161084snap118.jpg)

GRAPHIC (g161084snap118a.jpg)

GRAPHIC (g161084snap119.jpg)

GRAPHIC (g161084snap122.jpg)

GRAPHIC (g161084snap123.jpg)

GRAPHIC (g161084snap124.jpg)

GRAPHIC (g161084snap125.jpg)

GRAPHIC (g161084snap138.jpg)

GRAPHIC (g161084snap139.jpg)

GRAPHIC (g161084snap143.jpg)

GRAPHIC (g161084snap148.jpg)

GRAPHIC (g161084snap150.jpg)

GRAPHIC (g161084snap152.jpg)

GRAPHIC (g161084snap154.jpg)

GRAPHIC (g161084snap163.jpg)

GRAPHIC (g161084snap171.jpg)

GRAPHIC (g161084snap172.jpg)

GRAPHIC (g161084snap174.jpg)

GRAPHIC (g161084snap174a.jpg)

GRAPHIC (g161084snap174b.jpg)

GRAPHIC (g161084snap175.jpg)

GRAPHIC (g161084snap175a.jpg)

GRAPHIC (g161084snap175b.jpg)

GRAPHIC (g161084snap176.jpg)

GRAPHIC (g161084snap178.jpg)

GRAPHIC (g161084snap189.jpg)

GRAPHIC (g161084snap190.jpg)

GRAPHIC (g161084snap212.jpg)

GRAPHIC (g161084snap236.jpg)

GRAPHIC (g161084snap237.jpg)

GRAPHIC (g161084snap237a.jpg)

GRAPHIC (g161084snap238.jpg)

GRAPHIC (g161084snap242.jpg)

GRAPHIC (g161084snap245.jpg)

GRAPHIC (g161084snap245a.jpg)

GRAPHIC (g161084snap9.jpg)

XML — IDEA: XBRL DOCUMENT (R1.htm)

8-K

8-K (Primary)

Filename: d161084d8k.htm · Sequence: 1

8-K

false 0001629210 0001629210 2026-06-17 2026-06-17

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

FORM 8-K

CURRENT REPORT

Pursuant to Section 13 or 15(d)

of the Securities Exchange Act of 1934

Date of Report (Date of earliest event reported): June 17, 2026

Paramount Gold Nevada Corp.

(Exact name of Registrant as Specified in Its Charter)

Nevada

001-36908

98-0138393

(State or Other Jurisdiction

of Incorporation)

(Commission

File Number)

(IRS Employer

Identification No.)

665 Anderson Street

Winnemucca, Nevada

89445

(Address of Principal Executive Offices)

(Zip Code)

Registrant’s Telephone Number, Including Area Code: 775 625-3600

(Former Name or Former Address, if Changed Since Last Report)

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

Securities registered pursuant to Section 12(b) of the Act:

Title of each class

Trading

Symbol(s)

Name of each exchange

on which registered

Common Stock, $0.01 Par Value Per Share

PZG

NYSE American LLC

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§ 230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§ 240.12b-2 of this chapter).

Emerging growth company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Item 7.01 Regulation FD Disclosure.

On June 17, 2026, Paramount Gold Nevada Corp. (the “Company”) issued a press release announcing the results of a Technical Report Summary Initial Assessment, prepared in accordance with subpart 1300 of Regulation S-K, for its 100%-owned Sleeper Gold Project located in Humboldt County, Nevada. A copy of the press release is furnished as Exhibit 99.1 to this Current Report on Form 8-K and is incorporated herein by reference.

This report, including Exhibit 99.1, contains forward-looking statements that are subject to risks and uncertainties that could cause actual results to differ materially. Additional information regarding these risks is set forth in Exhibit 99.1 and in the Company’s filings with the Securities and Exchange Commission. The Company undertakes no obligation to update any forward-looking statement except as required by law.

The information furnished under this Item 7.01, including the referenced exhibit, shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933, except as shall be expressly set forth by reference to such filing.

Item 8.01 Other Events

On June 17, 2022, Paramount Gold Nevada Corp. (the “Company”) announced that it had completed a technical report summary, effective as of April 29, 2026, which had been prepared in accordance with the requirements of subpart 1300 of Regulation S-K, for its Sleeper Gold Project (the “Report”). The Report and the corresponding consent of the “Qualified Person” are filed as Exhibits 99.2 and 23.1, respectively, to this Current Report on Form 8-K and are incorporated herein by reference.

Item 9.01 Financial Statements and Exhibits.

(d) Exhibits.

Exhibit

Number

Description

23.1

Consent of Qualified Person - SLR International Corporation

99.1

Press release of Paramount Gold Nevada Corp. dated June 17, 2026.

99.2

Technical Report Summary for the Sleeper Gold Project effective April 29, 2026.

104

Cover Page Interactive Data File (embedded within the Inline XBRL document)

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

Paramount Gold Nevada Corp.

Date: June 23, 2026

By:

/s/ Rachel Goldman

Rachel Goldman, Chief Executive Officer

EX-23.1

EX-23.1

Filename: d161084dex231.htm · Sequence: 2

EX-23.1

SLR International Corporation

165 S.

Union Blvd., Suite 888, Lakewood, CO 80228

Exhibit 23.1

June 23, 2026

Consent of Qualified Person

SLR International Corporation (“SLR”), in connection with the Paramount Gold Nevada Corp. Current Report on Form 8-K (the “Form 8-K”), consents to:

i.

the filing of the technical report summary titled “S-K 1300

Technical Report Summary, Sleeper Gold Mine, Humboldt County, Nevada” (the “TRS”), dated June 17, 2026, as an exhibit to and referenced in the Form 8-K;

ii.

the incorporation by reference of the TRS in the Registration Statements on Form

S-3 (333-275376) and Form S-8 (No. 333-205024,

No. 333-262857 and No. 333-291058) (the “Registration Statements”);

iii.

the use of and references to our name in connection with the TRS, Form

8-K, and the Registration Statements; and

iv.

the information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared

by us, that we supervised the preparation of, and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and the Registration Statements.

SLR International Corporation is responsible for authoring, and this consent pertains to all sections of the TRS.

SLR International Corporation

Per:

/s/ Grant A. Malensek

Grant A. Malensek, P.Eng.

Technical Director – Mining Advisory

Financial Sector

Services (Americas)

1

EX-99.1

EX-99.1

Filename: d161084dex991.htm · Sequence: 3

EX-99.1

Exhibit 99.1

Paramount Gold Announces Positive Initial Assessment of the Sleeper Gold Project

After-Tax NPV of $402M and IRR of 45% ($3,600/oz gold)

After-Tax NPV of $867M and IRR of 66% ($4,700/oz gold)

Winnemucca, Nevada – June 17, 2026 – Paramount Gold Nevada Corp. (NYSE American: PZG) (“Paramount” or the

“Company”) announced today the results of an Initial Assessment prepared in accordance with S-K 1300 (the “Assessment” or “Study”) for its 100%-owned Sleeper Gold Project

(“Sleeper” or the “Project”), a past-producing gold mine located in Humboldt County, Nevada. All figures are in U.S. Dollars.

The

Assessment evaluates the potential restart of the historic Sleeper Mine through the processing of existing waste rock dumps and mining of in situ oxide and mixed Mineral Resources utilizing conventional

open-pit mining and a 30,000 tonne per day crush-agglomerate-heap-leach processing facility with Merrill-Crowe recovery.

The Project demonstrates strong economics, based on assumed metal prices of $3,600 per ounce gold and $48 per ounce silver, including an after-tax net present value (NPV) at an 8% discount rate of $402 million, an after-tax internal rate of return (IRR) of 44%, and a payback period of approximately 1.4

years.

The Assessment includes sensitivity analysis to higher commodity prices amongst other inputs. Assuming metal prices of $4,700 per ounce gold and

$80 per ounce silver, the Project’s after-tax NPV (8%) increases to $867 million, with an IRR of 66% and a payback period of 1.2 years.

Over a 17-year mine life, the Assessment projects average annual gold production of approximately 65,000 ounces and

total payable gold production of approximately 1.1 million ounces.

The use of existing mineralized surface material and existing infrastructure

contributes to the Project’s strong economics by reducing upfront capital requirements and leads to the expected, short payback period. Approximately 47 million tonnes of mineralized waste dump material containing approximately 420,000

recoverable ounces of gold are included in the mine plan, representing a significant, lower-cost source of early production and cash flow prior to initiation of open pit mining. The economic analysis considers only oxide and mixed mineralized

material amenable to heap leaching, and does not include sulfide mineralization, which will be evaluated in subsequent studies.

PARAMOUNT GOLD NEVADA

CORP.

665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233

1

Rachel Goldman, Chief Executive Officer of Paramount, stated:

“The Sleeper Initial Assessment outlines an exciting restart opportunity, with strong projected returns, a short payback period and a 17-year mine life. In the first five years alone, the Project has a very low strip ratio of 0.74:1 and is expected to produce approximately 348,000 ounces of gold and 1.33 million ounces of silver, generating after-tax cash flow of approximately $514 million in the Base Case and $826 million in the Upside Case.

Building on these results, Sleeper offers further excellent optionality. The Project can advance toward a production restart, while additional surface

materials not yet included in this Assessment will be evaluated for inclusion in future study updates. There exists meaningful potential to convert additional resource ounces and expand the surface sources of heap-leachable inventory. The longer we

can extend that phase of operations, the stronger the overall project economics become.

Additionally, with no significant exploration conducted at

Sleeper in over two decades, we see substantial upside through a focused exploration program across our large land position.

The Study reinforces our

view that Sleeper is well positioned for redevelopment and has the potential to become an important producing asset for Paramount. We look forward to updating these results as we continue to advance the Project.”

The following table summarizes key metrics from the Assessment, including an upside case at higher metal prices.

SUMMARY OF INITIAL ASSESSMENT METRICS

METRIC

BASE CASE

($3,600/oz GOLD)

UPSIDE CASE†

($4,700/oz GOLD)

Project Economics

After-tax NPV (8%)

$

402M

$

867M

After-tax IRR

45%

66%

Payback

1.4 years

1.2 years

Production Profile

Average Annual Gold Production

65 koz

Average Annual Silver Production

205 koz

Total Payable Gold

1.101 Moz

Total Payable Silver

3.376 Moz

Mine Life

17 years

Capital and Cost Structure (Base Case)

Initial Capital

$201M

PARAMOUNT GOLD NEVADA

CORP.

665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233

2

Sustaining Capital

$343M

Closure Capital

$52M

Cash Costs*

$

2,048/oz

$

1,987/oz

All-in sustaining costs**

$

2,407/oz

$

2,346/oz

NOTES:

Production and capital cost metrics are unchanged across both price cases.

*

Cash costs consist of mining costs, dewatering costs, processing costs, mine-level G&A, refining charges

and royalties, net of by-product credits.

**

AISC includes cash costs plus sustaining capital and closure costs, net of silver by-product credits, at the project level. Corporate G&A is not included. The reported AISC reflects the benefit of low-cost ounces already stacked on the existing heap

leach pads, which require minimal additional spending to recover. As these legacy ounces are depleted and replaced with newly mined material, unit costs are expected to gradually normalize toward long-term levels.

The following table compares the Project’s economics over the first five years of operations to the full 17-year

mine life. Over the life of the mine, the Project is expected to produce approximately 1.10 million ounces of gold and 3.38 million ounces of silver, generating cumulative after-tax cash flow of

approximately $918 million in the Base Case and $1.93 billion in the Upside Case.

BASE CASE AND UPSIDE CASE: FIRST FIVE YEARS COMPARED TO

LIFE OF MINE

First Five Years

Life of Mine (LOM)

Units

Base Case,

$3,600

Upside

Case,

$4,700

Base

Case,

$3,600

Upside

Case,

$4,700

Mineralized Tonnes Mined

kt

51

51

175

175

Waste Tonnes Mined

kt

37

37

266

266

Total Tonnes Mined

kt

88

88

442

442

Strip Ratio

Waste: Ore

0.74

0.74

1.52

1.52

Gold Production

koz

348

348

1,101

1,101

Silver Production

koz

1,329

1,329

3,376

3,376

Mining Costs

US$

/t

$

2.24

$

2.24

$

2.53

$

2.53

Pit Dewatering

US$

/t

$

0.33

$

0.33

$

0.59

$

0.59

Processing Costs

US$

/t

$

5.55

$

5.55

$

5.55

$

5.55

G&A Costs

US$

/t

$

0.52

$

0.52

$

0.52

$

0.52

After-tax Cash Flow

US$

M

$

514

$

826

$

918

$

1,928

Cumulative Cash Flow

US$

M

$

307

$

619

$

918

$

1,928

All-in sustaining costs**

US$

/oz

$

1,854

$

1,934

$

2,407

$

2,346

After-tax IRR

%

41

%

63

%

45

%

66

%

After-tax NPV at 8%

US$

M

$

190

$

403

$

402

$

872

PARAMOUNT GOLD NEVADA

CORP.

665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233

3

MINERAL RESOURCE ESTIMATE (METRIC)

The Mineral Resource estimate presented below reflects updated geological interpretations, revised economic parameters, and updated metallurgical recovery

assumptions. The estimate includes in situ oxide, mixed and sulfide mineralization, as well as surface material contained in waste rock dumps, heap leach pads, and the tailings storage facility, which is classified as Inferred. The Project hosts

1.99 million ounces of gold in Measured and Indicated Mineral Resources and an additional 2.30 million ounces of gold in Inferred Mineral Resources, compared to 1.90 million ounces and 1.21 million ounces, respectively, in the

2023 Mineral Resource estimate. This represents an increase of approximately 5% in Measured and Indicated Resources and 90% in Inferred Resources, significantly expanding the Project’s resource base and future growth potential.

Category

Tonnes

(Mt)

Au

g/t

Au

Moz

Ag

g/t

Ag

Moz

Measured

5.5

0.492

0.09

3.487

0.62

Indicated

179.2

0.330

1.90

3.842

22.1

Measured & Indicated

184.7

0.335

1.99

3.832

22.8

Inferred

238.0

0.301

2.30

3.403

26.0

NOTES:

1.

The definitions for Mineral Resources in S-K 1300 were followed for

Mineral Resources

2.

The Mineral Resource estimate is reported on a 100% ownership basis.

3.

The point of reference for the Mineral Resource is before the crusher (in situ).

4.

Open Pit Mineral Resources are reported at a cut-off grade ranging from

0.074 g/t to 0.217 g/t Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.

5.

The optimized pit shell and cut-off grades were generated by assuming

metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of $2.40/t moved for open pit, processing costs of $5.51/t oxide/mixed and $10.44 sulfide

processed, and general and administrative costs of $0.46/t processed

6.

Minimal mining width was 60 m for oxide/mixed material and 20m for sulfide material

7.

Mineral Resources are estimated using a long-term gold price of $3,100 per ounce

8.

Bulk density ranges from 1.5 t/m3 in the tailings storage area to 2.7 t/m3 for in situ material

9.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

10.

Numbers may not add due to rounding.

The Sleeper Mine produced approximately 1.66 million ounces of gold and 2.3 million ounces of silver between 1986 and 1996 and benefits from

existing infrastructure, established site access, extensive historical operating data, and a large land position in one of the world’s premier mining jurisdictions.

RECOMMENDED ADVANCEMENT PROGRAM

The Assessment

recommends an $8.7 million advancement program designed to improve resource confidence classifications, enhance metallurgical and geotechnical confidence, complete environmental baseline studies, advance permitting activities, optimize

heap-leach design through engineering studies, and support the completion of a pre-feasibility study.

PARAMOUNT GOLD NEVADA

CORP.

665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233

4

In parallel, the Company plans to initiate permitting for infill drilling targeting surface material, which

includes the historic heap leach pads and tailings storage facility at Sleeper. This work will support future resource updates and contribute to subsequent pre-feasibility or feasibility studies. Permitting is

expected to be straightforward and timely, as the proposed activities fall within the scope of the existing Plan of Operations.

The updated S-K 1300 Technical Report Summary for the Sleeper Gold Project will be available on the Company’s website and filed with the U.S. Securities and Exchange Commission on Form

8-K. The report will also be included in the Company’s next Annual Report on Form 10-K.

Qualified Persons

The

S-K 1300 Technical Report Summary Initial Assessment was prepared by SLR International Corporation (“SLR”). The scientific and technical information from the technical report summary and contained

in this news release has been reviewed and verified by the QP of SLR, who is independent of Paramount Gold Nevada Corp. within the meaning of S-K 1300.

About Paramount Gold Nevada Corp.

Paramount Gold Nevada

Corp. is a U.S.-focused exploration and development company advancing a portfolio of high-quality gold assets. The Company holds a 100% interest in approximately 50,000 acres across its portfolio, including the Grassy Mountain and Sleeper projects.

Grassy Mountain is an advanced-stage development project in Malheur County, Oregon. Sleeper is a past-producing development project in Humboldt County,

Nevada, one of the world’s premier mining jurisdictions, with a large land position.

About SLR Consulting

SLR Consulting is a global consulting firm providing integrated technical, advisory, environmental, and sustainability services to mining and investment

clients. SLR supports projects across the entire lifecycle, from exploration and development through operations and closure. (www.slrconsulting.com)

For further information, please contact:

Rachel Goldman

CEO and Director

rachel@paramountnevada.com

844.488.2233

Investor Relations

IR@paramountnevada.com

844.488.2233

PARAMOUNT GOLD NEVADA

CORP.

665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233

5

Safe Harbor for Forward-Looking Statements

This release and related documents may include “forward-looking statements” and “forward-looking information” (collectively,

“forward-looking statements”) pursuant to applicable United States and Canadian securities laws. Paramount’s future expectations, beliefs, goals, plans or prospects constitute forward-looking statements within the meaning of the

United States Private Securities Litigation Reform Act of 1995 and other applicable securities laws. Words such as “believes,” “plans,” “anticipates,” “expects,” “may,”

“continue,” “intend,” “estimates,” “potential,” “budget,” “scheduled,” “project,” and similar expressions, or the negatives of, such words and phrases, or statements

that certain actions, events or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved, are intended to identify forward-looking statements,

although these words may not be present in all forward-looking statements. Forward-looking statements included in this news release include, without limitation, statements with respect to the timing and success of the permitting of the Grassy

Mountain Gold Project and the Sleeper Gold Project, and the results of the Sleeper Initial Assessment. Forward-looking statements are based on the reasonable assumptions, estimates, analyses and opinions of management made in light of its experience

and its perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be

incorrect. Management believes that the assumptions and expectations reflected in such forward-looking statements are reasonable. Assumptions have been made regarding, among other things: the conclusions made in the Sleeper Initial Assessment; the

conclusions made in the feasibility study for the Grassy Mountain Gold Project (the “FS”); the quantity and grade of resources included in resource estimates; the accuracy and achievability of projections included in the FS;

Paramount’s ability to carry on exploration and development activities, including construction; the timely receipt of required approvals and permits; the price of silver, gold and other metals; prices for key mining supplies, including labor

costs and consumables, remaining consistent with current expectations; work meeting expectations and being consistent with estimates and plant, equipment and processes operating as anticipated. There are a number of important factors that could

cause actual results or events to differ materially from those indicated by such forward-looking statements, including, but not limited to: uncertainties involving interpretation of drilling results; environmental matters; the ability to obtain

required permitting; equipment breakdown or disruptions; additional financing requirements; the completion of a definitive feasibility study for the Sleeper Gold Project; discrepancies between actual and estimated mineral reserves and mineral

resources, between actual and estimated development and operating costs, between actual and estimated timing of production and development, between estimated and actual production; and the other factors described in Paramount’s disclosures as

filed with the U.S. Securities and Exchange Commission, and the Ontario, British Columbia and Alberta Securities Commissions.

Please see “Risks

Factors” in the Form 10-K filed by Paramount for the fiscal year ended June 30, 2025, for more information regarding risks pertaining to the Company, which is available on EDGAR at

www.sec.gov/edgar. Readers are encouraged to carefully review these risk factors as well as the Company’s other filings with the U.S. Securities and Exchange Commission. All forward-looking statements contained in this press release speak only

as of the date of this press release or as of the dates specified in such statements. Except as required by applicable law, Paramount disclaims any intention or obligation to update any forward-looking statements as a result of developments

occurring after the date of this document.

PARAMOUNT GOLD NEVADA

CORP.

665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233

6

EX-99.2

EX-99.2

Filename: d161084dex992.htm · Sequence: 4

EX-99.2

Exhibit 99.2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table of Contents

1.0

Executive Summary

1-1

1.1

Summary

1-1

1.2

Economic Analysis

1-9

1.3

Technical Summary

1-28

2.0

Introduction

2-1

2.1

Site Visits

2-3

2.2

Sources of Information

2-3

2.3

List of Abbreviations

2-4

3.0

Property Description

3-1

3.1

Location

3-1

3.2

Land Tenure

3-3

3.3

Encumbrances

3-7

3.4

Royalties

3-7

3.5

Required Permits and Status

3-7

3.6

Other Significant Factors and Risks

3-9

4.0

Accessibility, Climate, Local Resources, Infrastructure, and Physiography

4-1

4.1

Accessibility

4-1

4.2

Climate

4-1

4.3

Local Resources and Infrastructure

4-1

4.4

Physiography

4-4

5.0

History

5-1

5.1

Early Mining – Awakening District (Pre-1982)

5-1

5.2

Ownership

5-1

5.3

Exploration and Development History

5-3

5.4

Past Production

5-6

6.0

Geological Setting, Mineralization, and Deposit

6-1

6.1

Regional Geology

6-1

6.2

Local Geology

6-5

6.3

Mineralization

6-10

6.4

Deposit Types

6-13

7.0

Exploration

7-1

7.1

Exploration

7-1

i

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

7.2

Drilling

7-2

7.3

Hydrogeology Data

7-8

7.4

Geotechnical Data

7-13

8.0

Sample Preparation, Analyses, and Security

8-1

8.1

Sample Method and Approach

8-1

8.2

Sample Preparation and Analysis

8-2

8.3

Quality Assurance and Quality Control

8-6

8.4

Sample Security

8-22

8.5

QP Opinion

8-23

9.0

Data Verification

9-1

9.1

RESPEC Data Validation

9-1

9.2

SLR Data Verification

9-2

9.3

QP Opinion

9-2

10.0

Mineral Processing and Metallurgical Testing

10-1

10.1

Introduction

10-1

10.2

Nature and Extent of Metallurgical Testing and Analytical Procedures

10-1

10.3

Sample Representativeness

10-2

10.4

Testing Laboratories

10-3

10.5

Relevant Metallurgical Results

10-3

10.6

Recovery Assumptions and Basis for Estimation

10-5

10.7

QP Opinion - Adequacy of Data

10-11

11.0

Mineral Resource Estimates

11-1

11.1

Summary

11-1

11.2

Resource Database

11-6

11.3

Geological Interpretation

11-6

11.4

Resource Assays

11-13

11.5

Treatment of High-Grade Assays

11-13

11.6

Compositing

11-14

11.7

Spatial Analysis

11-16

11.8

Bulk Density

11-17

11.9

Block Models

11-18

11.10

Search Strategy and Grade Interpolation Parameters

11-20

11.11

Reasonable Prospects for Economic Extraction for Mineral Resources

11-21

11.12

Classification

11-27

ii

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.13

Block Model Validation

11-28

11.14

Sensitivity to Reporting Cut-off

11-37

11.15

Comparison with Previous Estimate

11-38

11.16

Mineral Resource Reporting

11-40

12.0

Mineral Reserve Estimates

12-1

13.0

Mining Methods

13-1

13.1

Geotechnical Studies

13-1

13.2

Mine Design

13-1

13.3

Waste Rock Storage Facilities Design

13-6

13.4

Mining Method

13-8

13.5

Life of Mine Plan

13-10

13.6

Contract Mining Discussion

13-13

13.7

Mine Infrastructure

13-15

13.8

Mine Equipment

13-17

13.9

Mine Personnel

13-20

14.0

Processing and Recovery Methods

14-1

14.1

Selected Processing Strategy

14-1

14.2

Proposed Process Description

14-1

14.3

Plant Throughput and Design Basis

14-2

14.4

Energy, Water, Process Materials, and Personnel

14-2

14.5

Suitability of the Selected Method

14-2

15.0

Infrastructure

15-1

15.1

Access Roads

15-3

15.2

Leach Pad

15-3

15.3

Buildings and Facilities

15-5

15.4

Power Supply and Distribution

15-6

15.5

Water

15-7

15.6

Accommodation Camp

15-9

16.0

Market Studies and Contracts

16-1

16.1

Markets

16-1

16.2

Contracts

16-1

17.0

Environmental Studies, Permitting and Plans, and Social or Community Impact

17-1

17.1

Site Environmental Conditions and Monitoring Programs

17-1

17.2

Waste and Tailings Disposal, Site Monitoring, and Water Management

17-3

iii

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

17.3

Project Permitting

17-5

17.4

Social or Community Requirements

17-7

17.5

Mine Closure Requirements and Summary

17-8

17.6

QP Opinion

17-8

18.0

Capital and Operating Costs

18-1

18.1

Capital Costs

18-1

18.2

Operating Costs

18-2

19.0

Economic Analysis

19-1

19.1

Base Case

19-1

19.2

Alternative Case - Measured and Indicated Only

19-10

20.0

Adjacent Properties

20-1

21.0

Other Relevant Data and Information

21-1

21.1

Sleeper PFS - Project Overview and Execution Philosophy

21-1

21.2

Project Development Strategy

21-1

21.3

Workstreams and Scope of Activities

21-2

21.4

Schedule and Critical Path

21-5

21.5

Procurement and Contracting Strategy

21-6

21.6

Sulfide Mineralization – Future Work Programs

21-6

21.7

Risk Management

21-8

21.8

Conclusion

21-9

22.0

Interpretation and Conclusions

22-1

22.1

Geology and Mineral Resources

22-1

22.2

Mining and Mineral Reserves

22-2

22.3

Mineral Processing

22-2

22.4

Infrastructure

22-3

22.5

Environment

22-3

22.6

Capital and Operating Costs

22-3

22.7

Risks

22-4

23.0

Recommendations

23-1

23.1

Geology and Mineral Resources

23-1

23.2

Mining and Mineral Reserves

23-3

23.3

Mineral Processing

23-3

23.4

Infrastructure

23-3

23.5

Environment

23-4

iv

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

23.6

Capital and Operating Costs

23-4

24.0

References

24-1

25.0

Reliance on Information Provided by the Registrant

25-1

26.0

Date and Signature Page

26-1

27.0

Appendix 1 List of Claims

27-1

28.0

Appendix 2 Cash Flow Summaries

28-1

Tables

Table 1-1:

Proposed Sleeper 2026-2027 Exploration Budget

1-6

Table 1-2:

Sleeper Base Case Production Physicals Summary

1-11

Table 1-3:

Federal and State Tax Summary

1-12

Table 1-4:

Royalties Summary

1-12

Table 1-5:

Total Life of Mine Metrics – Base Case

1-15

Table 1-6:

Base Case All-in Sustaining Costs Composition

1-16

Table 1-7:

Base Case After-Tax Sensitivity Analyses

1-17

Table 1-8:

Sleeper Alternative Case Production Physicals Summary

1-20

Table 1-9:

Federal and State Tax Summary

1-21

Table 1-10:

Royalties Summary

1-21

Table 1-11:

Total Life of Mine Metrics – Alternative Case (Measured and Indicated Only)

1-24

Table 1-12:

Alternative Case All-in Sustaining Costs

Composition

1-25

Table 1-13:

Alternative Case After-Tax Sensitivity Analyses

1-27

Table 1-14:

Summary of Mineral Resources Estimate – April 29, 2026

1-31

Table 3-1:

Sleeper – Summary of Claim Holdings

3-3

Table 3-2:

Property Holding Costs

3-7

Table 3-3:

Royalty Agreement Summary

3-7

Table 3-4:

Sleeper - Key BLM and State Permits in Place

3-8

Table 3-5:

Sleeper Reclamation Bonds

3-9

Table 5-1:

Sleeper Gold Mine – Total Annual Production (1986–1996)

5-6

Table 7-1:

Drill Hole Database

7-3

Table 7-2:

Hydrostratigraphic Unit Hydraulic Properties

7-10

Table 7-3:

Monthly Water Balance for the Calibrated Pit Lake Numerical Model

7-10

Table 7-4:

Evolution of Pit Lake Water Quality

7-11

Table 7-5:

Groundwater Sample Distribution

7-12

Table 7-6:

Exceedances of USEPA Water Quality Standards in Dewatering Discharge

7-12

v

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 8-1:

Summary Counts of Sleeper QA/QC Analysis (X-Cal and

Paramount)

8-8

Table 8-2:

Paramount Gold Certified Reference Material

8-9

Table 8-3:

Summary of Sleeper Gold Results for CRMs 2010–2013

8-10

Table 8-4:

Gold Failure Details 2010–2013

8-10

Table 8-5:

Summary of Sleeper Silver Results for CRMs 2010–2013

8-12

Table 8-6:

Summary of Results X-Cal Historical and Paramount Field

Duplicates

8-17

Table 8-7:

X-Cal Blank Samples 2003–2007

8-20

Table 8-8:

X-Cal Blank Failures and Preceding Sample

2003–2007

8-20

Table 8-9:

Blank Materials Used in Paramount QA/QC Program

8-21

Table 10-1:

Metallurgical Reports Reviewed

10-1

Table 10-2:

Laboratory Accreditation Summary

10-3

Table 10-3:

Recovery Assumptions and Process Basis by Material Type

10-7

Table 11-1:

Summary of Mineral Resources Estimate – April 29, 2026

11-5

Table 11-2:

Summary of Drill Hole Data used in Mineral Resource Estimation

11-7

Table 11-3:

Sleeper In Situ Gold and Silver Capping Levels by Domain

11-14

Table 11-4:

Sleeper In Situ Gold Composite by Domain

11-16

Table 11-5:

Sleeper In Situ Silver Composite by Domain

11-17

Table 11-6:

Sleeper Density Values by Lithology

11-19

Table 11-7:

Summary of In Situ Block Model Extents

11-20

Table 11-8:

Summary of Waste Rock Dumps and Heap Leach Block Model Extents

11-20

Table 11-9:

Summary of TSF Block Model Extents

11-20

Table 11-10:

Sleeper Estimation Parameters by Domain

11-22

Table 11-11:

Sleeper Cut-off Grade Parameters by Domain

11-25

Table 11-12:

Summarized Methodology for Resource Classification

11-28

Table 11-13:

Summary of Composite vs Block Model Mean Au (ppm) Oxide/Mixed Pit – In Situ

11-29

Table 11-14:

Summary of Composite vs Block Model Mean Au (ppm) Sulfide Pit – In Situ

11-30

Table 11-15:

Summary of Composite vs Block Model Mean Au (ppm) Dumps

11-30

Table 11-16:

Summary of Composite vs Block Model Mean Au (ppm) Heaps and TSF

11-31

Table 11-17:

Open Pit Grade vs Tonnage for Measured + Indicated Resources (Oxide/Mixed Pit

Constrained)

11-38

Table 11-18:

Detailed Summary of Mineral Resources by Area – April 29, 2026

11-42

Table 13-1:

Geotechnical Design Criteria

13-1

Table 13-2:

Mine Design Parameters

13-5

Table 13-3:

WRSF Design Parameters

13-6

vi

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 13-4:

Drilling and Blasting Parameters

13-8

Table 13-5:

Mining Method and Equipment Summary

13-10

Table 13-6:

Process Feed from Existing Dumps to the Crusher

13-11

Table 13-7:

Process Feed from Open Pit to the Crusher

13-11

Table 13-8:

Mining Inventory Processed by Year

13-12

Table 13-9:

Base Case Open Pit Production Schedule

13-12

Table 13-10:

Primary Fleet Estimate

13-17

Table 13-11:

Equipment Diesel Consumption Estimate

13-19

Table 13-12:

Diesel Storage Comparisons

13-19

Table 13-13:

Recommended Diesel Storage Arrangements

13-20

Table 15-1:

Estimated Power Load by Area

15-7

Table 16-1:

Economic Analysis Metal Price Assumptions

16-1

Table 17-1:

Required or Potentially Required Permits

17-6

Table 18-1:

LOM Capital Cost Estimate

18-1

Table 18-2:

LOM Capital Cost Estimate by Major Area

18-2

Table 18-3:

LOM Average Unit Operating Costs

18-2

Table 18-4:

Sleeper Workforce (Year 3)

18-3

Table 19-1:

Sleeper Base Case Production Physicals Summary

19-2

Table 19-2:

Federal and State Tax Summary

19-3

Table 19-3:

Royalties Summary

19-3

Table 19-4:

Total Life of Mine Metrics – Base Case

19-6

Table 19-5:

Base Case All-in Sustaining Costs Composition

19-8

Table 19-6:

Base Case After-Tax Sensitivity Analyses

19-9

Table 19-7:

Sleeper Alternative Case Production Physicals Summary

19-11

Table 19-9:

Royalties Summary

19-12

Table 19-10:

Total Life of Mine Metrics – Alternative Case (Measured and Indicated Only)

19-15

Table 19-11:

Alternative Case All-in Sustaining Costs

Composition

19-16

Table 19-12:

Alternative Case After-Tax Sensitivity Analyses

19-18

Table 23-1:

Proposed Sleeper 2026-2027 Exploration Budget

23-2

Figures

Figure 1-1:

Mine Production Profile by Material Movement – Base Case

1-13

Figure 1-2:

Process Production Profile and Head Grade – Base Case

1-13

vii

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 1-3:

Annual Processing Gold Production and Head Grade Profile – Base Case

1-14

Figure 1-4:

Base Case Project After-Tax Metrics Summary

1-15

Figure 1-5:

Base Case After-Tax Sensitivity Analysis

1-19

Figure 1-6:

Mine Production Profile by Material Movement – Alternative Case

1-22

Figure 1-7:

Process Production Profile and Head Grade – Alternative Case

1-22

Figure 1-8:

Annual Processing Gold Production and Head Grade Profile

1-23

Figure 1-9:

Alternative Case Project After-Tax Metrics

Summary

1-24

Figure 1-10:

Alternative Case After-Tax Sensitivity Analysis

1-28

Figure 3-1:

Location Map

3-2

Figure 3-2:

Sleeper Tenement Map

3-5

Figure 6-1:

Regional Geology

6-3

Figure 6-2:

Cross Section of Regional Geology

6-4

Figure 6-3:

Stratigraphic Column

6-7

Figure 6-4:

Local Geology

6-8

Figure 6-5:

Cross Section of Local Geology

6-9

Figure 6-6:

Schematic Model of Low-Sulfidation Epithermal

System

6-11

Figure 7-1:

Drill Hole Location Map

7-5

Figure 8-1:

Gold Control Chart for MEG-Au.09.02

8-11

Figure 8-2:

X-Cal Core Preparation Duplicates, Relative Differences

2003-2007

8-13

Figure 8-3:

X-Cal Core Preparation Duplicates, Relative Differences

2003-2007

8-14

Figure 8-4:

X-Cal Gold RC Field Duplicates, Relative Differences

2003-2007

8-14

Figure 8-5:

X-Cal Gold RC Field Duplicates, Absolute Values of the

Relative Differences 2003-2007

8-15

Figure 8-6:

Paramount RC Field Duplicates, Relative Differences 2010-2013

8-18

Figure 8-7:

Paramount Core Field Duplicates, Relative Differences 2010-2013

8-19

Figure 8-8:

X-Cal Gold in Blanks and Preceding Samples

2003–2007

8-20

Figure 8-9:

Gold Values of Paramount Coarse Blanks and Preceding Samples

8-21

Figure 10-1:

Comparison of Reported Metallurgical Recovery Results

10-9

Figure 10-2:

Material Specific Reagent Consumption and IA Heap Leach Recovery Assumptions by Material

Type

10-10

Mineral Resources are classified in accordance with S-K 1300 definitions (Figure 11-1: Sleeper Mineral Resource Domains

11-2

Figure 11-1:

Sleeper Mineral Resource Domains

11-3

Figure 11-2:

Sleeper Geologic Model Cross Section

11-8

Figure 11-3:

Sleeper Mineralization Model Cross Section

11-10

viii

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-4:

Sleeper Alteration Model Cross Section

11-12

Figure 11-5:

Histogram of Sample Lengths in the Estimation Domains

11-14

Figure 11-6:

Sleeper Material Type/Area Distribution Map

11-23

Figure 11-7:

East-West Cross Section Oxide Pit

11-31

Figure 11-8:

East-West Cross Section Sulfide Pit

11-32

Figure 11-9:

Swath Plots in the X, Y, and Z Directions – Waste Rock Dumps

11-34

Figure 11-10:

Swath Plots in the X, Y, and Z Directions – Heap Pads

11-35

Figure 11-11:

Swath Plots in the X, Y, and Z Directions – TSF

11-36

Figure 11-12:

Open Pit Grade Tonnage Curve for Measured + Indicated Mineral Resources

11-38

Figure 13-1:

Initial Mine Topography

13-3

Figure 13-2:

Oxide Pit Cross Section 4,576,271 N

13-4

Figure 13-3:

Final Pit Design and Waste Storage Facility Design

13-7

Figure 14-1:

Crushing & Agglomeration Process Flow Sheet

14-3

Figure 14-2:

Process Plant Flow Sheet

14-4

Figure 15-1:

Infrastructure Layout

15-2

Figure 19-1:

Mine Production Profile by Material Movement – Base Case

19-4

Figure 19-2:

Process Production Profile and Head Grade – Base Case

19-5

Figure 19-3:

Annual Processing Gold Production and Head Grade Profile – Base Case

19-5

Figure 19-4:

Base Case Project After-Tax Metrics Summary

19-6

Figure 19-5:

Base Case After-Tax Sensitivity Analysis

19-10

Figure 19-6:

Mine Production Profile by Material Movement – Alternative Case

19-13

Figure 19-7:

Process Production Profile and Head Grade – Alternative Case

19-13

Figure 19-8:

Annual Processing Gold Production and Head Grade Profile

19-14

Figure 19-9:

Alternative Case Project After-Tax Metrics

Summary

19-15

Figure 19-10:

Alternative Case After-Tax Sensitivity Analysis

19-19

Appendix Tables

Table 31-1:

Base Case Cash Flow Summary

28-2

Table 31-2:

Alternative Case Cash Flow Summary

28-6

ix

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

1.0

Executive Summary

1.1

Summary

SLR International Corporation (SLR) was retained by Paramount Gold Nevada Corp. (PGN, Paramount Gold, or the Company) to prepare an independent Technical

Report Summary (TRS) on the Sleeper Gold Mine (Sleeper or the Project), located in Humboldt County, Nevada, USA. The purpose of this TRS is to provide an Initial Assessment to support Mineral Resource disclosure. This TRS conforms to the United

States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants

Engaged in Mining Operations (S-K 1300) and Item 601(b)(96) Technical Report Summary.

Paramount Gold is a

U.S.-domiciled precious metals exploration and development company engaged in the acquisition, exploration, and development of gold and silver projects in the United States. The company’s principal assets include the Sleeper Gold Mine in

Nevada and the Grassy Mountain Gold Project in Oregon, as well as additional exploration properties in the western United States. Paramount Gold is publicly listed on the NYSE exchange under the ticker symbol PZG and maintains its corporate offices

in Winnemucca, Nevada.

Paramount Gold holds a 100% interest in the Sleeper Gold Mine, which includes the historical Sleeper open-pit gold mine and a large surrounding claim block totaling 2,474 unpatented mining claims covering approximately 44,917 acres (approximately 18,178 hectares) in Humboldt County, Nevada. The Sleeper mine was

operated by AMAX Gold Inc. (AMAX) from 1986 through 1996, producing approximately 1.66 million ounces (Moz) of gold and 2.3 Moz of silver from open-pit mining and heap leaching and milling operations.

The Project is currently at the Initial Assessment (IA) stage, and as such, the level of engineering, geological definition, and metallurgical

characterization remains preliminary. The Mineral Resources for the Project comprise in situ oxide and mixed material, in situ sulfide material, and material from existing waste rock dumps, heap leach pads (HLPs), and tailing storage facilities

(TSFs). The development concept considered in the cash flow analysis presented in this TRS contemplates the restart of mining and processing operations with a focus on those Mineral Resources amenable to heap leaching, i.e., existing waste rock

dumps and in situ oxide and mixed mineralized material. Additional work is required to develop the cash flow analysis for the sulfide Mineral Resources, including the heap leach and tailings material.

The existing waste rock dumps were generated during prior mining operations conducted under substantially lower gold prices, which led to the application of

higher cut-off grades (COGs) at the time of mining. Consequently, material that was classified as waste under historical economic conditions contains grades that are potentially economic under current or

reasonably foreseeable gold price assumptions and processing technologies. This reclassification to Mineral Resources forms a key component of the Project’s economic rationale.

To support this evaluation, the waste rock dumps have been subject to initial drilling, sampling, and assaying programs, supplemented by preliminary

metallurgical test work. These programs have been designed to characterize the grade distribution, material variability, and metallurgical response of the dump material, including leachability and recovery potential. While these datasets provide an

important foundation for the current assessment, they remain limited in scope and density relative to that required for higher-confidence classifications, and additional work will be required to support future Mineral Resource estimation,

metallurgical modeling, and process design.

1-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

In parallel, the Project concept includes recovery of in situ oxide and mixed mineralized material remaining

in the vicinity of the historical pit. These materials are considered amenable to conventional surface mining methods and heap leach processing, consistent with prior operations at Sleeper, although additional drilling, metallurgical testing, and

engineering studies will be required to confirm recoveries, processing parameters, and economic viability.

Overall, the Project represents a brownfields

redevelopment opportunity, leveraging existing site disturbance, historical data, and previously mined material inventories; however, given the early stage of evaluation, all assumptions related to mineralization, processing performance, and

economic outcomes should be considered preliminary and subject to refinement through subsequent phases of study. The development concept assumes a nominal processing rate of approximately 30,000 tonnes per day (tpd), utilizing conventional open pit

mining, crushing and agglomeration, cyanide heap leaching, and Merrill-Crowe zinc precipitation to recover gold and silver.

The Base Case economic

analysis presented in this TRS evaluates the potential economic viability of processing Measured, Indicated, and Inferred Mineral Resources. The Base Case mining inventory comprises the following:

Approximately 47 million tonnes (Mt) of waste rock dump material, classified as Inferred Mineral Resources,

grading approximately 0.28 g/t gold (Au)

In situ oxide and mixed mineralized material including approximately 2 Mt Measured Resources grading 0.29 g/t Au,

78 Mt Indicated Resources grading 0.26 g/t Au, and 49 Mt Inferred Resources grading 0.24 g/t Au.

Overall, the Base Case

production schedule includes approximately 55% of Inferred Resources as part of the economic analysis. An Alternative Case was considered that included only in situ Measured and Indicated Resources in the economic analysis.

1.1.1

Conclusions

1.1.1.1

Geology and Mineral Resources

The geological interpretation and deposit model are appropriate, internally consistent, and aligned with a low-sulfidation epithermal system, with mineralization strongly controlled by fault architecture and lithological contrasts.

Mineralization exhibits high spatial variability, with discontinuous high-grade veins embedded within a laterally

and vertically continuous low-grade stockwork domain, which comprises most of the tonnage.

The Mineral Resource estimate has been prepared in accordance with S-K

1300 and CIM (2019) Best Practice Guidelines, supported by appropriate domain modeling, compositing, grade capping, interpolation, and validation workflows.

The estimate is constrained within optimized open-pit shells

demonstrating Reasonable Prospects for Economic Extraction (RPEE,) based on reasonable mining, processing, and economic assumptions, including a long-term gold price of US$3,100/oz.

The drilling database is large and generally adequate (approximately 4,300+ drill holes); however, gaps in

historical metadata, incomplete records, and exclusion of unverifiable data introduce uncertainty, which is appropriately reflected in classification.

1-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Historical drilling is predominantly vertical RC, which adequately defines bulk-tonnage mineralization but limits

confidence in true geometry and continuity of steeply dipping high-grade structures.

The QA/QC and sampling protocols, while variable in early historical programs, are considered sufficient overall

due to:

Exclusion of unreliable or unsupported data from the Mineral Resource Estimate (MRE)

Validation of assay datasets through statistical analysis, capping, compositing, and multi-method estimation

checks

Use of industry-standard QA/QC review and data screening prior to estimation. Accordingly, the QP considers the

analytical dataset valid and appropriate to support the MRE, with remaining uncertainties reflected in classification.

The oxidation model has been reviewed and corrected for inconsistencies and is considered appropriate for current

estimation; however, localized coding issues indicate moderate residual uncertainty where metallurgical assumptions are sensitive.

Exploration datasets (geophysical, geochemical, geological) are well integrated and effective for targeting,

defining structural corridors, and mineralized trends extending beyond historically mined areas.

Mineralization remains open along strike, at depth, and beneath cover, with identified targets considered

conceptual but supported by integrated datasets.

Compared to the 2023 estimate, the 2026 MRE shows a material increase in tonnage and contained metal, driven by:

Inclusion and delineation of surface materials (existing waste rock dumps, heap leach pads, and tailings storage

facility);

Expanded pit shells under higher gold price assumptions (US$3,100/oz versus approximately US$1,800/oz); and

Updated geological interpretation and database validation.

This increase in tonnage is accompanied by a moderate reduction in average grade, consistent with inclusion of

marginal material and not indicative of estimation bias.

1.1.1.2

Mining and Mineral Reserves

There is no current geotechnical information for the pit slopes. Current pit slope assumptions may be optimized

once geotechnical information has been collected and incorporated into the pit design.

The current Base Case life of mine (LOM) plan includes a significant proportion of Inferred Mineral Resources

(approximately 55%). The next stage of the Project will require converting Inferred Resources to Indicated Resources to reduce the project risk.

Pit slope design assumes dry (i.e., dewatered) walls. Pit dewatering needs to start early enough for the open-pit mining operation to begin.

There is potential to extend the mine life with the addition of a sulfide pit. To include the sulfide pit in the

LOM plan, additional metallurgical test work and block modeling will be required.

1-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

1.1.1.3

Mineral Processing

Metallurgical test work supports heap leaching with Merrill-Crowe recovery for oxide, mixed, and selected

waste-rock materials, and flotation with off-site toll treatment or concentrate sale for sulfide, existing heap leach pad (HLP), and existing tailings material.

The Base Case economic analysis is restricted to the heap-leach scenario, which is supported by the most

complete, representative, and internally consistent metallurgical dataset.

The proposed Base Case processing facility is a 30,000 tpd conventional crush–agglomerate–heap-leach

operation employing Merrill-Crowe recovery. Design parameters include crushing to approximately P80 19 mm and agglomeration using cement and/or lime.

Facilities oxide material demonstrates the strongest metallurgical response to heap leaching, with additional

oxide, mixed, and selected waste-dump composites also supporting inclusion in the heap-leach feed blend.

Gold and silver recovery assumptions for the heap-leach case are derived primarily from column leach testing,

with conservative assumptions applied where only bottle-roll or limited test data exist.

Sulfide, HLP, and tailings materials represent future processing opportunities via flotation. Recoveries have

been reduced by 12% to account for toll-milling deductions and downstream treatment charges.

No silver recovery is currently attributed to the flotation scenario; silver is treated as upside potential

pending further metallurgical test work and commercial assessment.

The heap leach flowsheet is a commercially proven, low-risk processing route appropriate for IA-level planning.

Preliminary test work of the flotation option as a processing method for the sulfide material and existing HLP

and TSF material is sufficient for the declaration of Mineral Resources; however, additional variability testing, concentrate characterization, and commercial evaluation are required to advance this option.

1.1.1.4

Infrastructure

Access to the mine site is reliable via frequently traveled and maintained public infrastructure from Winnemucca,

Nevada.

Access and haul roads constructed on site will be designed and constructed in a manner sufficient to facilitate

required on-site vehicular movement

The proposed heap leach pad has been sited based on terrain, environmental, and operational bases and has been

adequately sized to accommodate 175 Mt of agglomerated mineralized material.

The pregnant solution and barren solution ponds have been located in proximity to the leach pad to take advantage

to native slopes and have been sized to accommodate operational solution flow rates.

The storm event pond has been located adjacent to the process ponds and has been sized to accommodate the 100-year 24-hour storm volume.

1-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Rapid infiltration basins have been designed to accommodate infiltration from pit dewatering efforts at an

average rate of 4,542 m3/hr (20,000 US gallons per minute [gpm]).

No accommodation camp has been included in the proposed infrastructure as the town of Winnemucca is within

commuting distance and hosts a knowledgeable mining industry labor force.

1.1.1.5

Environment

There are no known significant environmental issues at the site, and the former mine is in an advanced state of

closure with post-closure monitoring and minor operational and maintenance activities being conducted.

The regulatory environment is well developed, and the environmental permitting path forward for the mine plan

presented in this TRS is generally well understood.

1.1.1.6

Capital and Operating Costs

Preliminary capital and operating cost estimates have been prepared for the proposed mining operation based on a

conceptual processing rate of approximately 30,000 tpd.

For the Base Case, initial capital costs required to restart mining operations are estimated to be approximately

US$201 million, with sustaining capital estimated at approximately US$342 million over the life of mine.

Life-of-mine operating costs for

the Base Case are estimated to average approximately US$13.03 per tonne processed, resulting in an estimated all-in sustaining cost of approximately US$2,407 per ounce of gold produced.

1.1.1.7

Risks

The economic analysis presented in the Base Case as part of this TRS includes a material proportion of Inferred

Mineral Resources within the mine plan and associated cash flow. The Inferred Mineral Resources are included at the beginning of the life-of-mine plan by mining existing

dumps in the economic analysis, which introduces significant uncertainty.

1.1.2

Recommendations

The SLR QPs offer the following recommendations by discipline:

1.1.2.1

Geology and Mineral Resources

1

Conduct the following drilling and exploration programs:

a)

Infill drilling to support conversion of Inferred to Indicated Mineral Resources (in situ and surface

materials) by conducting systematic infill drilling within pit-constrained in situ domains and within surface material domains (dumps, heap leach pads, and TSF) to increase data density and improve confidence

in grade continuity, tonnage, and material variability, consistent with S-K 1300 classification criteria.

b)

Targeted infill drilling within established mineralization domains to increase drill density within defined

grade domains to better constrain grade variability and continuity, particularly in areas where current spacing limits classification.

1-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

c)

Additional drilling and geological logging to improve confidence in oxide, mixed, and sulfide boundaries, which

directly influence metallurgical assumptions applied in the MRE.

2

Geology and Mineral Resource Estimate

a)

Maintain domain-controlled drilling and sampling protocols to ensure all new data collection aligns with the

current geological, mineralization, and estimation domain framework to support direct integration into future MRE updates.

b)

Incorporate new data into updated geological interpretations and block models to support iterative improvement

of the Mineral Resource estimate in accordance with S-K 1300 reporting requirements.

c)

Acquire additional bulk density measurements across in situ and surface material domains where current density

assignments are based on limited data, to improve tonnage estimates.

d)

Focus drilling within the existing Mineral Resource footprint by prioritizing data acquisition in areas where

incremental drilling is most likely to materially improve classification, rather than expanding the resource footprint at this stage.

3

Quality Assurance and Quality Control

a)

Implement consistent QA/QC protocols for future work. Apply standardized QA/QC procedures (sampling, insertion

rates, documentation) to ensure all new data meets S-K 1300 and CIM (2019) requirements and supports classification upgrades.

b)

Recommend investigation of incomplete database information and update the database through investigation of

historic files

To advance the Project, the QP recommends that Paramount Gold undertake a

two-phase exploration and data validation program totaling $8.52 million, as summarized in Table 1-1.

The goal is to support upgrading Inferred Mineral Resources to the Indicated category, validate key project assumptions regarding density and metallurgy, and

continue delineation in underexplored areas.

This budget reflects a disciplined yet robust investment to de-risk

the MRE, validate key technical assumptions (density, metallurgical recovery), and support a potential future Preliminary Feasibility Study (PFS). The recommended work is expected to materially enhance the geological understanding and economic

viability of the Sleeper Project.

The two phases of the work program are independent of each other.

Table 1-1: Proposed Sleeper 2026-2027 Exploration Budget

Activity

Details

Estimated Cost

(US$ 000)

Phase 1 – Surface and In Situ Resource Definition, QA/QC Implementation, and

Metallurgical Studies

ESG Permitting

Exploration and Environmental Permits for Phase 1 drilling

25

Sonic Drilling

Up to 30 holes (4000 ft) of sonic drilling at $90/ft focused on obtaining metallurgical samples from Waste dumps, TSF and HL pads

360

RC Drilling

Up to 500 holes (50,000 ft) of RC drilling in Waste dumps, HL pads at $50/ft

2,500

1-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Activity

Details

Estimated Cost

(US$ 000)

Core drilling

Confirmation core drilling of up to 10,000 ft at $120/ft (HQ/NQ core)

1,200

Bulk Density Sampling

Collection and testing of up to 200 core and/or pit samples across all domains

12

Geochemical Assays

Assaying of approximately 15,000 samples incl. duplicates, standards, and blanks

750

QA/QC Program Implementation

Establish certified sample control and auditing protocols

100

Metallurgical Testing

Leach testing of mineralized core for recovery studies

750

Technical Staff & Supervision

Field geologist, QA/QC lead, database tech

300

Total Phase 1

5,997

Phase 2 – Project Development Scoping

ESG Permitting

Exploration and Environmental Permits for Phase 2 Geotech

25

Ground Support Geotechnical Testing

Geotech and analysis studies for Ground Support

250

Heap Leach Pad Geotechnical Testing and Design

Geotech and design engineering studies for Heap Leach Pad

600

Mining and Process Design & Engineering Analysis

Process design and engineering cost analysis and modeling

400

Environmental Baseline Studies

Hydrogeology, cultural, flora/fauna baseline for mine permitting

800

Stakeholder Engagement & Permitting Prep

Initial outreach, permitting roadmap

100

Technical Oversight & Contingency (10%)

Includes legal, overhead, permitting scope prep

218

Reporting and Independent Review

S-K 1300 PFS update and QP

sign-off

350

Total Phase 2

2,723

Grand Total

8,740

1.1.2.2

Mining and Mineral Reserves

1

Collect geotechnical information and develop geotechnical studies to support the pit design slopes for the next

stage of the project.

2

Ensure the open-pit mining sequence is closely coordinated with the open-pit dewatering plan.

3

Continue the analysis of the sulfide pit as an opportunity after the oxide pit mining.

1-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

1.1.2.3

Mineral Processing

1.

Complete additional variability column leach testing on oxide, mixed, and waste rock dump domains to confirm

recovery, leach kinetics, and reagent consumption across the planned heap leach feed range.

2.

Confirm provisional recovery assumptions for Sleeper oxide, Sleeper mixed, and West Wood mixed material with

representative column leach test work.

3.

Refine crush-size and agglomeration test work to confirm the selected

coarse-crush heap leach design basis and optimize cement and lime addition by material type.

4.

Expand reagent-consumption testing to better define sodium cyanide, lime, and cement demand for oxide, mixed,

and waste rock dump materials, particularly where existing results indicate variable or elevated consumable requirements.

5.

Complete additional column leach testing on selected waste rock dump materials to refine recovery assumptions

by dump area and improve confidence in domain-based economic modeling.

6.

Complete additional deleterious-element and precipitate-quality testing for Hg, As, Sb, and sulfur to confirm

mercury management requirements and refine refinery and operating cost assumptions.

7.

Complete flotation variability, optimization, and locked-cycle test work on representative sulfide, HLP and

tailings composites to confirm recovery, consumable requirements, concentrate quality, and the suitability of an off-site toll-treatment or concentrate-sale route.

1.1.2.4

Infrastructure

1

Evaluate site-wide water balance and discharge requirements.

2

Perform a hydrogeological evaluation to support PFS level engineering of the rapid infiltration basin.

3

Confirm power requirements and supply availability.

4

Develop site-specific design criteria for the HLP and perform field investigations and laboratory testing to

support advancing the HLP design.

5

Develop a PFS level HLP design that incorporates site specific data into the engineering calculations and

analysis for such items as grading plan, slope stability analysis, water balance, settlement, and closure.

1.1.2.5

Environment

1.

Complete updated baseline studies in accordance with National Environmental Policy Act of 1969 (NEPA) and

applicable guidelines.

2.

Engage early with local stakeholders and tribes and develop a stakeholder outreach plan.

3.

Develop a permitting strategy and timeline.

1-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

1.1.2.6

Capital and Operating Costs

1

Move the dewatering from an “Allowance” to a full ‘Engineered System’, e.g., calibrated

groundwater model; staged dewatering sequencing; pumping lift curves by pit phase; transient inflow modeling; wellfield spacing and drawdown analysis; contingency pumping scenarios; and power demand modeling for peak pumping periods.

2

Re-evaluate the crushing/agglomeration

trade-off, e.g., variability column testing; permeability testing; compaction testing; fines migration testing; cement consumption optimization; lift-height testing; and irrigation optimization.

3

Tighten the heap leach pad phasing strategy, e.g., minimizing initial lined acreage; maximizing early vertical

expansion; deferring later phases; reducing early pond construction; and sequencing underdrain installation.

4

Lock down power infrastructure requirements early, e.g., actual condition of transmission line; substation

rebuild requirements; transformer replacement needs; utility interconnect requirements; and backup generation philosophy.

5

Validate the contractor mining strategy, i.e., obtain budgetary contractor bids; benchmark Nevada owner-mining

versus contractor-mining; validate bank cubic meter (bcm) assumptions; stress-test diesel escalation; and stress-test productivity losses from wet conditions.

6

Refine the estimate by:

a)

Improving mine haulage and re-handle modeling.

b)

Tightening reagent consumption assumptions.

c)

Adding more detailed closure escalation and water management costs.

1.2

Economic Analysis

The economic analysis presented in this IA considers the processing of the in situ oxide and mixed Mineral Resources and the Mineral Resources in the existing

waste rock dumps only.

The economic analyses contained in this TRS are preliminary in nature and are based, in part, on Inferred Mineral Resources that

are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as Mineral Reserves. It is important to note that, unlike Mineral Reserves, Mineral Resources do not have demonstrated

economic viability, and there is no certainty that the economic projections presented in this IA will be realized.

Taxes and revenues are assumed.

Discounted cash flow analyses are based on assumed production rates and revenues from available Mineral Resources.

SLR notes that the economic analysis

presented in this section is based on revenue from gold and silver only. After-tax cash flow projections have been generated from the Base Case and the Alternative Case LOM production schedules and capital and

operating cost estimates, as summarized in the sub-sections that follow.

1-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

1.2.1

Base Case

The Project’s Base Case is based on a production plan with a mine life of 17 years and includes a mineralized material inventory of approximately:

Approximately 47 million tonnes (Mt) of waste rock dump material, classified as Inferred Mineral Resources,

grading approximately 0.28 g/t gold (Au)

In situ oxide and mixed Mineral Resources including approximately 2 Mt Measured Resources grading 0.29 g/t Au, 78

Mt Indicated Resources grading 0.26 g/t Au, and 49 Mt Inferred Resources grading 0.24 g/t Au.

The Base Case mineralized material

inventory includes approximately 95.6 Mt of Inferred Mineral Resources containing 788 koz of gold and 6,484 koz of silver, representing approximately:

55% of the total Base Case tonnage.

54% of the total Base Case gold ounces.

41% of the total Base Case silver ounces.

The remaining material in the mined inventory is from Measured and Indicated Mineral Resources. A summary of the Base Case criteria is provided below.

1.2.1.1

Economic Criteria

1.2.1.1.1

Revenue

Mine life: 17 years.

LOM production and processing plans as summarized in Table 13-9 and Table

13-8, respectively.

30,000 tpd mineralized material stacked (approximately 10.8 Mt per year), average stacked grade of 0.26 g/t Au

and silver grade of 2.79 g/t Ag (ROM, crushed, and stockpile mine plan).

Mine life averages 65,000 ounces per year of gold recovered and 205,000 ounces per year of silver recovered from

the mine plan, with LOM stacked process gold recovery averaging 75.8% and silver recovery averaging 22.1%.

Total 1.11 Moz of gold recovered, and 3.5 Moz of silver recovered over the LOM operation.

The summary of the physicals in the financial model is listed in Table

1-2. It has been estimated that 420 koz of gold and 2,952 koz of silver are in waste rock dumps and are accounted for in the financial model over the first five years of Leach Pad operations.

Gold and silver payable at the refinery are assumed at 99.95% Au payable and 97.0% Ag payable

Gold and silver prices are based on analyst consensus price forecasts from the end of March 2026. For the

economic analysis it was assumed:

Y1: US$4,000/oz Au and US$59.00/oz Ag

Y2 to Y17: US$3,600/oz Au and US$48.00/oz Ag

Resulting in LOM net realized prices of:US$3,618/oz Au and US$48.70/oz Ag

Net Smelter Return (NSR) includes doré refining, transport, and insurance costs.

NSR royalty assumed at 3%. The property is subject to different royalties between 0.5% and 3%, and for modeling

purposes was assumed at an overall 3%

1-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Revenue is recognized at the time of gold and silver production.

Non-cash inventory adjustments are not included in the SLR cash flow

model.

LOM net revenue is US$4,014 million (after royalty, transportation, and refining charges)

Table 1-2: Sleeper Base Case Production Physicals Summary

Physicals

Value

Total Mineralized Material Stacked (kt)

175,445

Max Process Rate (tpd)

30,000

Au Head Grade (g/t)

0.26

Ag Head Grade (g/t)

2.79

Contained Au (koz)

1,459

Contained Ag (koz)

15,721

Average Recovery, Au

75.8

%

Average Recovery, Ag

22.1

%

Recovered Au (koz)

1,106

Recovered Ag (koz

3,481

Payable Au (koz)

1,101

Payable Ag (koz)

3,376

Avg Annual Au - LOM (koz / yr)

65

Avg Annual Ag Sales - LOM (koz / yr)

199

1.2.1.1.2

Costs

Pre-production period assumes 24 months (Year -1 to Year -2).

Initial (Growth) and development capital costs total US$201 million

Mine life sustaining capital totals US$343 million

Final reclamation costs from after year 17 total US$52.4 million.

Mine life capital totals US$596 million.

Average LOM operating cost is US$13.03 per tonne stacked.

Open pit operating costs of US$2.53 per tonne mined (US$6.37 per tonne stacked). Includes out-of-scope mining operations.

Dewatering operating costs of US$0.59 per tonne stacked.

Processing operating costs of US$5.55 per tonne stacked.

Site services & general and administrative (G&A) costs of US$5.6 million per year for years of

full production (LOM average of US$0.52 per tonne stacked).

Life of Mine production plan as summarized in Table 13-9.

1.2.1.1.3

Taxation and Royalties

The federal and state income taxes are summarized in Table 1-3.

1-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 1-3: Federal and State Tax Summary

Tax Type

Rate

Federal Corporate Income Tax

21.0%

Nevada Corporate Income Tax

5.0% of federal taxable income

Royalties and Severance Fees

Based on ore extracted (state-regulated).

A total of five NSR royalties apply to future mineral production from portions of the Project. These royalties are summarized

in Table 1-4.

Table 1-4: Royalties Summary

Royalty Holder

Royalty Terms

Snyder Syndicate

1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, AL SS, AND ALL BLUE.)

Franco-Nevada U.S. Corporation

2% NSR on minerals produced from all 2,474 claims

Evolving Gold / Quinton Hennigh

2% NSR royalty on all SS and all SP claims.

Dry Lake Placer Association

3% NSR on Dry Lake Placer claims

ICN Resources Ltd.

0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims

For the economic analysis and financial modeling purposes, an overall 3% NSR royalty rate was assumed over the LOM.

1.2.1.2

Cash Flow Analysis

SLR has prepared its own unlevered after-tax LOM cash flow model based on the information contained in this TRS to

confirm the physical and economic parameters of the Project.

The Project’s Base Case economics have been evaluated using the discounted cash flow

method, considering annual processed tonnages and the associated gold and silver grades. The process gold and silver recoveries, gold and silver price forecasts, operating costs, refining and transportation charges, royalties, and initial and

sustaining capital expenditures were also considered.

The Project, as currently designed, has variations in the mining and processing amounts over its

planned 17-year life. These variations are shown in Figure 1-1, Figure 1-2, and Figure

1-3.

1-12

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 1-1: Mine Production Profile by Material Movement –

Base Case

Figure 1-2: Process Production Profile and Head Grade – Base Case

1-13

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 1-3: Annual Processing Gold Production and Head Grade

Profile – Base Case

The economic analysis demonstrates that the Project’s Mineral Resources have reasonable prospects for economic

extraction at the LOM net average realized prices of US$3,618/oz Au and US$48.70/oz Ag, and with long-term prices of US$3,600/oz Au and US$48.00/oz Ag, and that further advancement of Project studies is warranted.

A base discount rate of 8% has been applied in this TRS for the Project. This rate is considered reasonable for evaluating a precious metals project at a

preliminary level of project definition, such as Sleeper. Discounted present values of annual cash flows are summed to arrive at the Mine’s Base Case NPV.

Considering the Project’s Base Case on a stand-alone basis, the Project’s pre-tax NPV at an 8% discount

rate is approximately US$505 million, and the pre-tax internal rate of return (IRR) is approximately 51.3%. The Project’s after-tax NPV at an 8% discount is

approximately US$402 million, the after-tax IRR is approximately 44.5%, and the payback period is approximately 1.4 years from the start of production.

The LOM undiscounted pre-tax cash flow totals approximately US$1,132 million, and the LOM undiscounted after-tax cash flow totals approximately US$918 million.

SLR has also run a stand-alone economic analysis for the

Project using flat resource metal prices of US$3,100/oz Au and US$34/oz Ag, and the analysis demonstrates that the Project’s Mineral Resources also have reasonable prospects for economic extraction at these prices.

The Project’s after-tax free cash flow profile and gold payable metal per year are presented in Figure 1-4.

1-14

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 1-4: Base Case Project

After-Tax Metrics Summary

Table 1-5 shows the LOM total metrics for the Sleeper mine as currently designed.

Due to the length of the mine life, the full annual cash flow model is presented in Appendix 2.

Table 1-5:

Total Life of Mine Metrics – Base Case

Item

Units

Base Case Values

Realized Market Prices

Au Price

US$/oz

$

3,618

Ag Price

US$/oz

$

48.70

Payable Gold

koz

1,101

Payable Silver

koz

3,376

Total Gross Revenue

US$ million

4,147

Mining Cost

US$ million

(1,117

)

Dewatering Costs

US$ million

(104

)

Process Cost

US$ million

(974

)

G & A Cost

US$ million

(92

)

Refining/Freight

US$ million

(8

)

Royalties

US$ million

(124

)

Total Operating Costs

US$ million

(2,418

)

Operating Margin (EBITDA)

US$ million

1,728

Federal Income Tax

US$ million

(134

)

1-15

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Item

Units

Base Case Values

State Tax - Nevada Mining Tax

US$

million

(80

)

Working Capital

US$

million

0

Operating Cash Flow

US$

million

1,514

Development (Initial) Capital

US$

million

(201

)

Sustaining Capital

US$

million

(343

)

Closure/Reclamation Capital

US$

million

(52

)

Total Capital

US$

million

(596

)

Pre-tax Free Cash Flow

US$

million

1,132

Pre-tax NPV @ 5%

US$

million

670

Pre-tax NPV @ 8%

US$

million

505

Pre-Tax IRR

%

51.3

%

Pre-Tax Payback

years

1.3

After-tax Free Cash Flow

US$

million

918

After-tax NPV @ 5%

US$

million

539

After-tax NPV @ 8%

US$

million

402

After-Tax IRR

%

44.5

%

After-Tax Payback

years

1.4

Note: Numbers may not add due to rounding.

The Project’s World Gold Council Adjusted Operating Cost (AOC) net of Ag by-product credits is US$2,048/oz Au

payable. The mine life sustaining capital costs are US$359/oz Au payable, for an All-in Sustaining Cost (AISC) net of Ag by-products credits of US$2,407/oz Au payable.

The average annual gold sales during operations are approximately 64,746 payable ounces. Table 1-6 shows the AISC

build-up.

Table 1-6: Base Case

All-in Sustaining Costs Composition

Item

Total LOM

($ million)

Unit Cost

($/oz Au)

Mining

1,117

1,015

Dewatering

104

94

Process

974

885

Site G&A

92

83

Subtotal Site Costs

2,286

2,077

Refining/Freight

8

8

Mining Royalties

124

113

1-16

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Item

Total LOM

($ million)

Unit Cost

($/oz Au)

Total Cash Costs before by-product

credits

2,418

2,197

Ag By-Product Credit

(164

)

(149

)

Total Cash Costs net of by-product

credits

2,254

2,048

Sustaining Capital Cost

343

311

Closure/Reclamation Costs

52

48

Total Sustaining Costs

395

359

Total All-in Sustaining Costs

2,649

2,407

Note: Numbers may not add due to rounding.

The AISC calculated in the cash flow analysis reflects the benefit of low-cost ounces already stacked on the heap leach

pads, compared to AISC estimated in a steady-state model that assumes current input costs. Much of Sleeper’s near-term production comes from material mined and placed in prior years, when gold prices, fuel, and consumable costs were lower.

These ounces require minimal additional spending to recover, resulting in lower realized cash costs. As these legacy ounces are depleted and replaced with newly mined material, unit costs are expected to gradually normalize toward long-term levels.

1.2.1.3

Sensitivity Analysis

The Project’s Base Case risks can be identified in both economic and non-economic terms. Key economic risks were

examined by running cash flow sensitivities:

Metal prices

Head grade

Metallurgical Recovery

Operating costs

Pre-production and sustaining capital costs

Where possible, the after-tax NPV 8% sensitivities relative to the Base Case have been calculated for -20% to +20% variations in head grade and recovery, and -20% to +30% in metal prices. Operating and capital cost sensitivities have been calculated at -15% to +35% variations. The sensitivities are shown in Table 1-7 and Figure 1-5.

Table 1-7: Base Case After-Tax Sensitivity Analyses

Variance

Head Grade

(g/t Au)

NPV at 8%

(US$ 000)

80%

0.21

91,329

90%

0.23

249,814

100%

0.26

402,353

110%

0.28

554,310

120%

0.31

706,171

1-17

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Variance

Recovery

(% Au)

NPV at 8%

(US$ 000)

80%

60.7

%

91,329

90%

68.2

%

249,814

100%

75.8

%

402,353

110%

83.4

%

554,310

120%

91.0

%

706,171

Variance

Metal Prices

(US$/oz Au)

NPV at 8%

(US$ 000)

80%

$

2,880

90,637

90%

$

3,240

249,505

100%

$

3,600

402,353

110%

$

3,960

554,614

131%

$

4,700

866,553

Variance

Operating Costs

(US$/t)

NPV at 8%

(US$ 000)

85%

$

11.07

523,205

93%

$

12.05

462,780

100%

$

13.03

402,353

118%

$

15.31

259,020

135%

$

17.59

102,091

Variance

Capital Costs

(US$ 000)

NPV at 8%

(US$ 000)

85%

$

506,652

460,155

93%

$

551,357

431,254

100%

$

596,062

402,353

118%

$

700,372

334,916

135%

$

804,683

267,480

1-18

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 1-5: Base Case

After-Tax Sensitivity Analysis

1.2.2

Alternative Case - Measured and Indicated Only

1.2.2.1

Economic Criteria

The Alternative Case assumes a production schedule based exclusively on Measured and Indicated Mineral Resources, resulting in a mineralized material inventory

of 62.4 Mt and a projected mine life of seven years. A summary of the Measured and Indicated Only Case criteria is provided below.

1.2.2.1.1

Revenue

Mine life: 7 years.

30,000 tpd mineralized material stacked (approximately 10.8 Mt per year), average stacked grade of 0.27 g/t Au

and silver grade of 3.83 g/t Ag (ROM, crushed, and stockpile mine plan).

Mine life averages 58,500 ounces per year of gold recovered and 200,000 ounces per year of silver recovered from

the mine plan, with LOM stacked process gold recovery averaging 74.3% and silver recovery averaging 18.1%.

Total 410 koz of gold recovered, and 1,396 koz of silver recovered over the LOM operation.

Gold and silver payable at the refinery are assumed at 99.95% Au payable and 97% Ag payable

1-19

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Gold and silver prices are based on analyst consensus price forecasts from the end of March 2026. For the

economic analysis was assumed:

Y1: US$4,000/oz Au and US$59.00/oz Ag

Y2 to Y7: US$3,600/oz Au and US$48.00/oz Ag

Resulting in LOM net realized prices of:US$3,622/oz Au and US$48.00/oz Ag

Net Smelter Return (NSR) includes doré refining, transport, and insurance costs.

NSR royalty assumed at 3%. The property is subject to different royalties between 0.5% and 3%, and for modeling

purposes was assumed at an overall 3%

Revenue is recognized at the time of gold and silver production.

Non-cash inventory adjustments are not included in the SLR cash flow

model.

LOM net revenue is US$1,493 million (after royalty, and transportation, and refining charges).

Table 1-8: Sleeper Alternative Case Production Physicals Summary

Physicals

Value

Total Mineralized Material Stacked (kt)

62,447

Max Process Rate (tpd)

30,000

Au Head Grade (g/t)

0.27

Ag Head Grade (g/t)

3.83

Contained Au (koz)

552

Contained Ag (koz)

7,697

Average Recovery, Au

74.3

%

Average Recovery, Ag

18.1

%

Recovered Au (koz)

410

Recovered Ag (koz

1,396

Payable Au (koz)

408

Payable Ag (koz)

1,354

Avg Annual Au Sales - LOM (koz / yr) – full production

64

Avg Annual Ag Sales - LOM (koz / yr) – Full production

218

1.2.2.1.2

Costs

Pre-production period: assumes at 24 months (Year -1 to Year -2).

Initial (Growth) and development capital costs total US$335 million.1

Mine life sustaining capital totals US$120 million

1

Note that, in the Alternative Case, only in situ Measured and Indicated Mineral Resources are included in the

mining inventory. The existing waste dumps are not included in the LOM plan for the Alternative Case because they are currently classified as Inferred Mineral Resources. As dewatering of the in situ Mineral Resources must start before mining, the

rapid infiltration basins cost and the dewatering costs are Initial Capital Costs for the Alternative Case rather than Sustaining Capital as in the Base Case.

1-20

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Final reclamation costs from after year 7 total US$18.7 million.

Mine life capital totals US$473 million.

Average LOM operating cost is US$11.87 per tonne stacked.

Open pit operating costs of US$2.59 per tonne mined (US$5.03 per tonne stacked). Includes out-of-scope mining operations.

Dewatering operating costs of US$0.73 per tonne stacked.

Processing operating costs of US$5.55 per tonne stacked.

Site services & general and administrative (G&A) costs of US$5.6 million per year for years of

full production (LOM average of US$0.56 per tonne stacked).

1.2.2.1.3

Taxation and Royalties

The federal and state income taxes are summarized in Table 1-9.

Table 1-9: Federal and State Tax Summary

Tax Type

Rate

Federal Corporate Income Tax

21.0%

Nevada Corporate Income Tax

5.0% of federal taxable income

Royalties and Severance Fees

Based on ore extracted (state-regulated).

A total of five NSR royalties apply to future mineral production from portions of the Project. These royalties are summarized

in Table 1-10.

Table 1-10: Royalties Summary

Royalty Holder

Royalty Terms

Snyder Syndicate

1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, AL SS, AND ALL BLUE.)

Franco-Nevada U.S. Corporation

2% NSR on minerals produced from all 2,474 claims

Evolving Gold / Quinton Hennigh

2% NSR royalty on all SS and all SP claims.

Dry Lake Placer Association

3% NSR on Dry Lake Placer claims

ICN Resources Ltd.

0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims

For the economic analysis and financial modeling purposes, an overall 3% NSR royalty rate was assumed over the LOM.

1.2.2.2

Cash Flow Analysis

SLR has prepared its own unlevered after-tax LOM cash flow model based on the information contained in this TRS to

confirm the physical and economic parameters of the Project.

The Project’s Alternative Case economics have been evaluated using the discounted cash

flow method, considering annual processed tonnages and the associated gold and silver grades. The process gold and silver recoveries, gold and silver price forecasts, operating costs, refining and transportation charges, royalties, and initial and

sustaining capital expenditures were also considered.

1-21

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The Project, as currently designed, has variations in the mining and processing amounts over its planned 7-year life. These variations are shown in Figure 1-6, Figure 1-7, and Figure 1-8.

Figure 1-6: Mine Production Profile by Material Movement – Alternative Case

Figure 1-7: Process Production Profile and Head Grade – Alternative Case

1-22

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 1-8: Annual Processing Gold Production and Head Grade

Profile

The economic analysis demonstrates that the Project’s Mineral Resources have reasonable prospects for economic

extraction, at the LOM net average realized prices of US$3,622/oz Au and US$48.40/oz Ag, with long-term prices of US$3,600/oz Au and US$48.00/oz Ag, and that further advancement of Project studies is warranted.

A base discount rate of 8% has been applied in this TRS for the Project. This rate is considered reasonable for evaluating a precious metals project at a

preliminary level of project definition, such as Sleeper. Discounted present values of annual cash flows are summed to arrive at the Mine’s Base Case NPV.

Considering the Project’s Alternative Case on a stand-alone basis, the Project’s pre-tax NPV at an 8%

discount rate is approximately US$59 million, and the pre-tax internal rate of return (IRR) is approximately 11.5%. The Project’s after-tax NPV at an 8%

discount is approximately US$31 million, the after-tax IRR is approximately 9.9%, and the payback period is approximately 4.9 years from the start of production.

The LOM undiscounted pre-tax cash flow totals approximately US$279 million, and the LOM undiscounted after-tax cash flow totals approximately US$232 million.

The Project’s

after-tax free cash flow profile and gold payable metal per year are presented in Figure 1-9.

1-23

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 1-9: Alternative Case Project After-Tax Metrics Summary

Table 1-11 shows the LOM total metrics for the Project’s Alternative Case.

The full annual cash flow model is presented in Appendix 2.

Table 1-11: Total Life of Mine Metrics –

Alternative Case (Measured and Indicated Only)

Item

Units

Base Case Values

Realized Market Prices

Au Price

US$/oz

$

3,622

Ag Price

US$/oz

$

48.40

Payable Gold

koz

408

Payable Silver

koz

1,354

Total Gross Revenue

US$ million

1,542

Mining Cost

US$ million

(314

)

Dewatering Costs

US$ million

(45

)

Process Cost

US$ million

(347

)

G & A Cost

US$ million

(35

)

Refining/Freight

US$ million

(3

)

Royalties

US$ million

(46

)

Total Operating Costs

US$ million

(790

)

Operating Margin (EBITDA)

US$ million

752

Federal Income Tax

US$ million

(12

)

1-24

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Item

Units

Base Case Values

State Tax - Nevada Mining Tax

US$ million

(34

)

Working Capital

US$ million

0

Operating Cash Flow

US$ million

705

Development (Initial) Capital

US$ million

(335

)

Sustaining Capital

US$ million

(120

)

Closure/Reclamation Capital

US$ million

(19

)

Total Capital

US$ million

(473

)

Pre-tax Free Cash Flow

US$ million

279

Pre-tax NPV @ 5%

US$ million

124

Pre-tax NPV @ 8%

US$ million

59

Pre-Tax IRR

%

11.5

%

Pre-Tax Payback

years

4.7

After-tax Free Cash Flow

US$ million

232

After-tax NPV @ 5%

US$ million

91

After-tax NPV @ 8%

US$ million

31

After-Tax IRR

%

9.9

%

After-Tax Payback

years

4.9

Note:Numbers may not add due to rounding.

The Project’s World Gold Council Adjusted Operating Cost (AOC) net of Ag by-product credits is US$1,778/oz Au

payable. The mine life sustaining capital costs are US$339/oz Au payable, for an All-in Sustaining Cost (AISC) net of Ag by-products credits of US$2,117/oz Au payable.

The average annual gold sales during operations are approximately 64,267 payable ounces. Table 1-12 shows the

AISC build-up.

Table 1-12: Alternative Case All-in Sustaining Costs Composition

Item

Total LOM

($

million)

Unit Cost

($/oz Au)

Mining

314

770

Dewatering

45

111

Process

347

850

Site G&A

35

86

Subtotal Site Costs

741

1,817

Refining/Freight

3

8

1-25

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Item

Total LOM

($

million)

Unit Cost

($/oz Au)

Mining Royalties

46

113

Total Cash Costs before by-product

credits

790

1,938

Ag By-Product Credit

(65

)

(161

)

Total Cash Costs net of by-product

credits

725

1,778

Sustaining Capital Cost

120

293

Closure/Reclamation Costs

19

46

Total Sustaining Costs

138

339

Total All-in Sustaining Costs

863

2,117

Note: Numbers may not add due to rounding.

1.2.2.3

Sensitivity Analysis

The project’s Alternative Case risks can be identified in both economic and non-economic terms. Key economic

risks were examined by running cash flow sensitivities:

Metal prices

Head grade

Metallurgical Recovery

Operating costs

Pre-production and sustaining capital costs

Where possible, the after-tax NPV 8% sensitivities relative to the Alternative Case have been calculated for -20% to +20% variations in head grade and recovery, and -20% to +30% in metal prices. Operating and capital cost sensitivities have been calculated at -15% to +35% variations. The sensitivities are shown in Table 1-13 and Figure 19-10.

1-26

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 1-13: Alternative Case

After-Tax Sensitivity Analyses

Variance

Head Grade

(g/t Au)

NPV at 8%

(US$000)

80%

0.22

(140,512

)

90%

0.25

(54,187

)

100%

0.27

31,106

110%

0.30

106,275

120%

0.33

180,559

Variance

Recovery

(% Au)

NPV at 8%

(US$000)

80%

59.4

%

(140,512

)

90%

66.9

%

(54,187

)

100%

74.3

%

31,106

110%

81.7

%

106,275

120%

89.2

%

180,559

Variance

Metal Prices

(US$/oz Au)

NPV at 8%

(US$000)

80%

$

2,880

(140,868

)

90%

$

3,240

(54,363

)

100%

$

3,600

31,106

110%

$

3,960

106,424

131%

$

4,700

258,552

Variance

Operating Costs

(US$/t)

NPV at 8%

(US$000)

85%

$

10.09

87,662

93%

$

10.98

59,481

100%

$

11.87

31,106

118%

$

13.94

(44,879

)

135%

$

16.02

(122,212

)

Variance

Capital Costs

(US$000)

NPV at 8%

(US$000)

85%

$

401,924

90,847

93%

$

437,387

60,977

100%

$

472,851

31,106

118%

$

555,600

(38,591

)

135%

$

638,349

(108,288

)

1-27

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 1-10: Alternative Case

After-Tax Sensitivity Analysis

1.3

Technical Summary

1.3.1

Property Description

The Sleeper Gold Mine is in Humboldt County in north-central Nevada, approximately 42 km (26 mi) northwest of the city of Winnemucca, Nevada. The Project

is situated within Desert Valley along the western flank of the Slumbering Hills within the Basin and Range physiographic province. The property includes the historical Sleeper open pit, associated waste rock storage facilities, former process plant

areas, and surrounding exploration targets.

The Project is being evaluated as a restart operation focused on processing of existing waste rock dumps and

mining of in situ oxide and mixed mineralized material within and adjacent to the historical pit. These materials are considered suitable for heap leach processing with Merrill-Crowe recovery.

1.3.2

Land Tenure

The Sleeper property consists of a block of unpatented lode mining claims, together with associated surface rights covering portions of Townships 36 through 40

North and Ranges 34 and 35 East, Mount Diablo Base and Meridian, Humboldt County, Nevada.

The property comprises approximately 2,474 unpatented mining

claims, approximately 18,178 hectares (44,917 acres). The claims are held by Paramount Gold Nevada Corp (Paramount Gold). through its wholly owned subsidiaries of Sleeper Mining Company LLC and South

1-28

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Sleeper Mining Company LLC. All claims are in good standing with the U.S. Bureau of Land Management and Humboldt County as of the date of this report.

1.3.3

History

The Sleeper deposit was discovered in the early 1980s and subsequently developed by AMAX Gold Inc. Mining operations commenced in 1986 and continued through

1996.

During this period, the Sleeper mine produced approximately 1.66 million ounces of gold and approximately 2.3 million ounces of silver

from the open pit mining operations. Ore was processed through both conventional milling and heap leach processing circuits. Following the closure of mining operations in 1996, the site underwent reclamation activities; however, substantial volumes

of mineralized material remain within existing waste rock dumps and oxide mineralized zones adjacent to the pit.

Subsequent exploration and technical

studies conducted by Paramount Gold and previous operators have identified the potential to reprocess historical surface materials and recover additional gold from remaining oxide and mixed mineralization.

1.3.4

Geological Setting, Mineralization, and Deposit

The Sleeper deposit is a low-sulfidation epithermal gold-silver system hosted within Miocene volcanic rocks typical of

the northern Nevada volcanic field. Mineralization occurs within a sequence of rhyolitic flows, volcanic breccias, and ash-flow tuffs that have been affected by hydrothermal alteration and silicification.

Gold mineralization occurs as disseminated and fracture-controlled mineralization associated with hydrothermal brecciation, silicification, and

quartz-adularia veining. Near-surface oxidation of sulfide minerals has produced oxide and mixed mineralization amenable to cyanide heap-leach processing.

1.3.5

Exploration

Exploration activities at the Sleeper property have included geological mapping, geochemical sampling, geophysical surveys, and diamond and reverse circulation

drilling. Since mine closure, exploration has focused on delineating oxide and mixed mineralization and on evaluating the gold content of existing waste rock dump, heap leach pads, and tailings. Drilling has identified gold mineralization in oxide

and mixed zones, and sampling of existing waste rock dumps indicates that portions of this material contain measurable gold.

1.3.6

Mineral Resource Estimates

The Mineral Resource estimate for the Sleeper Gold Mine (Table 1-14) was developed using a three-dimensional block

modeling approach incorporating validated drilling data, geological and oxidation domain modeling, compositing, grade capping, and domain-controlled interpolation. The estimate has been independently reviewed by the SLR QP and is compliant with SEC

Regulation S-K 1300 and prepared in accordance with CIM (2019) Best Practice Guidelines. Mineral Resources include both in situ mineralization constrained within an optimized open-pit shell demonstrating RRPEE and surface materials, including waste rock dumps, heap leach pads, and tailings storage facilities. The estimate is based on appropriate mining, processing, metallurgical, and

economic assumptions and supersedes prior disclosures for the Project.

1-29

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Measured Mineral Resources total 5.5 Mt at 0.492 g/t Au and 3.487 g/t Ag, containing 0.09 Moz Au

and 0.62 Moz Ag. Indicated Mineral Resources total 179.2 Mt at 0.330 g/t Au and 3.842 g/t Ag, containing 1.90 Moz Au and 22.1 Moz Ag. Measured and Indicated Mineral Resources combined total 184.7 Mt at 0.335 g/t Au and 3.832 g/t Ag, containing 1.99

Moz Au and 22.8 Moz Ag, with average metallurgical recoveries of approximately 70.0% for Au and 7.5% for Ag.

Inferred Mineral Resources total 238.0 Mt at

0.301 g/t Au and 3.403 g/t Ag, containing 2.30 Moz Au and 26.0 Moz Ag, including 89.7 Mt of surface materials (waste rock dumps, heap leach pads, and tailings storage facilities) at 0.327 g/t Au and 4.738 g/t Ag.

1-30

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 1-14: Summary of Mineral Resources Estimate –

April 29, 2026

Category

Tonnage

(000 t)

Grade

(g/t Au)

Grade

(g/t Ag)

Contained

Metal

(000 oz Au)

Contained

Metal

(000 oz Ag)

Metallurgical

Au Recovery

(%)

Metallurgical

Ag Recovery

(%)

Measured Oxide/Mixed Pit (non-sulfide)

2,004

0.293

3.019

19

195

75.2

%

17.1

%

Measured Oxide/Mixed Pit (sulfide)

178

0.316

4.307

2

25

70.6

%

0.0

%

Measured Sulfide Pit

3,347

0.621

3.724

67

401

66.5

%

0.0

%

Total Measured In Situ

5,528

0.492

3.487

88

620

69.8

%

6.2

%

Indicated Oxide/Mixed Pit (non-sulfide)

77,899

0.261

3.613

653

9,049

74.2

%

17.3

%

Indicated Oxide/Mixed Pit (sulfide)

15,941

0.328

4.934

168

2,529

68.7

%

0.0

%

Indicated Sulfide Pit

85,336

0.393

3.848

1,078

10,558

66.5

%

0.0

%

Total Indicated In Situ

179,176

0.330

3.842

1,900

22,135

70.1

%

7.5

%

Total Measured + Indicated In Situ

184,704

0.335

3.832

1,987

22,755

70.0

%

7.5

%

Inferred Dumps

46,893

0.279

1.941

420

2,927

77.1

%

44.6

%

Inferred Heap Leach

31,600

0.301

8.363

306

8,497

40.0

%

0.0

%

Inferred TSF

11,165

0.599

6.221

215

2,233

50.1

%

0.0

%

Total Inferred Surface

89,658

0.327

4.738

942

13,657

60.6

%

23.3

%

Inferred Oxide/Mixed Pit (non-sulfide)

48,656

0.235

2.384

367

3,729

76.6

%

14.4

%

Inferred Oxide/Mixed Pit (sulfide)

4,960

0.286

3.543

46

565

68.9

%

0.0

%

Inferred Sulfide Pit

94,761

0.311

2.657

948

8,095

66.5

%

0.0

%

Total Inferred In Situ

148,377

0.285

2.597

1,361

12,390

69.9

%

4.7

%

Total Inferred Surface + In Situ

238,035

0.301

3.403

2,303

26,047

97.9

%

8.8

%

1-31

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Notes:

1.

The definitions for Mineral Resources in S-K 1300 were followed for

Mineral Resources

2.

The Mineral Resource estimate is reported on a 100% ownership basis.

3.

The point of reference for the Mineral Resource is before the crusher (in situ).

4.

Open Pit Mineral Resources are reported at a cut-off grade ranging from

0.074 g/t to 0.217 g/t Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.

5.

The optimized pit shell and cut-off grades were generated by assuming

metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of US$2.40/t moved for open pit, processing costs of $5.51/t oxide/mixed and $10.44

sulfide processed, and general and administrative costs of $0.46/t processed

6.

Minimal mining width was 60 m for oxide/mixed material and 20 m for sulfide material

7.

Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce

8.

Bulk density ranges from 1.5 t/m3 in the tailings storage

area to 2.7 t/m3 for in situ material

9.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

10.

Numbers may not add due to rounding.

1-32

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

1.3.7

Mineral Reserve Estimates

There are no defined Mineral Reserves for the Sleeper Gold Mine as of the date of this TRS.

1.3.8

Mining Methods

Mining operations are planned as a conventional open pit operation using drill, blast, load, and haul methods on benches. Mining will be performed by a

third-party mining contractor. The mining fleet is expected to consist of diesel-powered hydraulic excavators and/or front-end loaders, supported by haul trucks typical of modern open pit mining operations in

Nevada. Mining activities will include both the rehandling of existing waste rock dump material and the extraction of in situ oxide and mixed mineralized material considered amenable to heap leaching and Merrill-Crowe recovery.

The Initial Assessment (IA) economic analysis considers only leachable mineralized material, including oxide and mixed material within the pit limits and

existing waste rock dump material. Existing waste rock dump material is currently estimated at approximately 47 Mt grading approximately 0.28 g/t gold, while in situ oxide and mixed mineralized material totals approximately 129 Mt grading

approximately 0.25 g/t gold. Sulfide mineralization, as well as material contained within the tailings storage facility (TSF) and heap leach pad (HLP), demonstrates RPEE; however, additional metallurgical testing, engineering studies, environmental

review, and economic evaluation are required before these materials can be considered for inclusion in the IA economic analysis.

The Base Case mine plan

considers Measured, Indicated, and Inferred Mineral Resources. Inferred Mineral Resources account for approximately 55% of the total mining inventory and are considered too speculative geologically to have the economic considerations applied to them

that would enable them to be categorized as Mineral Reserves. There is no certainty that the results of the Base Case economic analysis will be realized.

An Alternative Case was also evaluated comprising Measured and Indicated Mineral Resources only, excluding all Inferred Mineral Resources from the mine plan

and economic analysis.

1.3.9

Processing and Recovery Methods

Processing of mined material is planned using conventional crushing, agglomeration, and cyanide heap leach processing, followed by Merrill-Crowe zinc

precipitation for recovery of gold and silver.

The conceptual processing rate for the operation is approximately 30,000 tpd. Heap leach processing will

involve stacking crushed material on lined leach pads and applying cyanide solution to dissolve precious metals.

To date, metallurgical test work at

Sleeper has included historical bottle roll and column leach testing on oxide, mixed, waste rock dump, and selected sulfide materials; flotation testing on sulfide and existing tailings composites; and later

bio-oxidation, pressure oxidation, mineralogical, and comminution testing on selected refractory or sulfide-bearing materials. Overall, the work supports heap leach evaluation for oxide, mixed, and waste

materials, and flotation-based evaluation for tailings, HLP, and sulfide materials.

For the oxide, mixed, and waste rock dump material groups included in

the heap leach case, applied recoveries range from 65.0% Au to 83.9% Au and 8.1% Ag to 54.6% Ag. For the existing HLP and tailings, and sulfide material groups evaluated under the flotation and toll-milling case, applied gold recoveries range from

50.0% Au to 71.2% Au. No silver recovery is applied to the flotation case at this stage, and silver remains upside potential pending additional metallurgical and commercial evaluation.

1-33

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

For oxide, mixed, and waste rock dump material within the Measured and Indicated Resource categories,

estimated recoveries of approximately 70% Au and 7.5% Ag were applied.

1.3.10

Infrastructure

Existing infrastructure at the Sleeper property includes exploration offices, equipment maintenance shops, water management ponds, monitoring wells, and a

network of access roads constructed during historical mining operations.

Electrical power is available via an existing

120-kV transmission line serving the region. Water supply for operations will be sourced from groundwater within the Desert Valley hydrographic basin under existing water rights.

1.3.11

Market Studies

Gold and silver produced from the proposed operation would be recovered as doré bars through the Merrill-Crowe process and transported to third-party

refineries for final metal recovery.

Gold and silver are internationally traded commodities with established global markets. Market studies are therefore

not considered necessary for the Project’s evaluation.

1.3.12

Environmental Studies, Permitting and Plans, Negotiations, or Agreements with Local Individuals or Groups

Historical mining operations at Sleeper were conducted under permits issued by federal and state regulatory agencies, including the

U.S. Bureau of Land Management and the Nevada Division of Environmental Protection.

Future development of the Project will require updated environmental

studies, permitting, and regulatory approvals associated with the restart of mining operations. These will include updates to existing permits and approvals for mine operations, water management, and heap leach processing facilities.

The project area is in a sparsely populated region with limited nearby residential development. Consultation with regulatory agencies and local stakeholders

will continue throughout the permitting process.

1.3.13

Capital and Operating Cost Estimates

The capital and operating cost estimates for the IA were developed by SLR using a combination of first-principles estimating, benchmarking against comparable

operations, and available contractor quotations, with all costs expressed in Q2 2026 US dollars and based on metric tonnes. Consistent with AACE International Class 5 scoping-level estimates, the cost estimates reflect a preliminary level of

engineering definition with an expected accuracy range of approximately ±50%. The capital costs include a 25% contingency.

For the Base Case,

total LOM capital costs are estimated at approximately $596 million, including $201 million in initial growth and development capital, $343 million in sustaining capital, and approximately $52 million allocated for reclamation

and closure activities. Initial capital requirements are reduced through the use of contract mining and phased heap leach pad development. Sustaining capital is dominated by pit dewatering expenditures totaling approximately $139 million over

the LOM. Additional sustaining expenditures are associated with staged heap leach pad expansions occurring in years 6, 9, and 12, as well as ongoing infrastructure and indirect costs.

1-34

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Average LOM operating costs are estimated at approximately $13.03/t processed, including mining, dewatering,

processing, and general and administrative costs. Open pit mining costs are estimated at $2.40/t mined, with total mining costs averaging $6.37/t processed after accounting for waste movement, rehandling requirements, and out-of-scope contractor allowances. Processing costs are estimated at $5.55/t processed and reflect a relatively simple crushing, heap leach, and Merrill-Crowe flowsheet.

Primary consumable costs include power at approximately $0.085/kWh based on NV Energy Northern Nevada industrial tariffs,

off-highway diesel at approximately $3.50 per US gallon, propane at approximately $2.25 per US gallon, sodium cyanide at approximately $2,650 per tonne delivered, and quicklime at approximately $375 per tonne.

The proposed operation is expected to employ approximately 210 to 220 personnel during steady-state operations using a conventional four-crew, 12-hour shift rotation to support continuous 24-hour-per-day mining and processing activities.

Staffing requirements are moderated by the use of large 150 t class haul trucks, contractor mining, and a relatively simple processing flowsheet; however, additional personnel are required to support significant pit dewatering activities.

Approximately 75% of the workforce is expected to reside in Humboldt County, Nevada, with the balance drawn from surrounding regions on a drive-in/drive-out basis

without the use of an on-site accommodation camp.

1-35

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

2.0

Introduction

SLR International Corporation (SLR) was retained by Paramount Gold Nevada Corp. (PGN, Paramount Gold, or the Company) to prepare an independent Technical

Report Summary (TRS) on the Sleeper Gold Mine (Sleeper or the Project). The purpose of this TRS is to provide an Initial Assessment to support Mineral Resource disclosure. This TRS conforms to the United States Securities and Exchange

Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601(b)(96) Technical Report Summary.

Paramount Gold is a U.S.-domiciled precious metals exploration

and development company engaged in the acquisition, exploration, and development of gold and silver projects in the United States. The company’s principal assets include the Sleeper Gold Mine in Nevada and the Grassy Mountain Gold Project in

Oregon, as well as additional exploration properties in the western United States. Paramount Gold is publicly listed on the NYSE exchange under the ticker symbol PZG and maintains its corporate offices in Winnemucca, Nevada.

Paramount Gold holds a 100% interest in the Sleeper Gold Mine, which includes the historical Sleeper open-pit gold

mine and a large surrounding claim block totaling 2,474 unpatented mining claims covering approximately 44,917 acres (approximately 18,178 hectares) in Humboldt County, Nevada. The Sleeper mine was operated by AMAX Gold Inc. (AMAX) from 1986 through

1996, producing approximately 1.66 million ounces (Moz) of gold and 2.3 Moz of silver from open-pit mining and heap leaching and milling operations.

The Project is currently at the Initial Assessment (IA) stage, and as such, the level of engineering, geological definition, and metallurgical

characterization remains preliminary. The Mineral Resources for the Project comprise in situ oxide and mixed material, in situ sulfide material, and material from existing waste rock dumps, heap leach pads (HLPs), and tailing storage facilities

(TSFs). The development concept considered in the cash flow analysis presented in this TRS contemplates the restart of mining and processing operations with a focus on those Mineral Resources amenable to heap leaching, i.e., existing waste rock

dumps and in situ oxide and mixed mineralized material. Additional work is required to develop the cash flow analysis for the sulfide Mineral Resources, including the heap leach and tailings material.

The existing waste rock dumps were generated during prior mining operations conducted under substantially lower gold prices, which led to the application of

higher cut-off grades (COGs) at the time of mining. Consequently, material that was classified as waste under historical economic conditions contains grades that are potentially economic under current or

reasonably foreseeable gold price assumptions and processing technologies. This reclassification to Mineral Resources forms a key component of the Project’s economic rationale.

To support this evaluation, the waste rock dumps have been subject to initial drilling, sampling, and assaying programs, supplemented by preliminary

metallurgical test work. These programs have been designed to characterize the grade distribution, material variability, and metallurgical response of the dump material, including leachability and recovery potential. While these datasets provide an

important foundation for the current assessment, they remain limited in scope and density relative to that required for higher-confidence classifications, and additional work will be required to support future Mineral Resource estimation,

metallurgical modeling, and process design.

2-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

In parallel, the Project concept includes recovery of in situ oxide and mixed mineralized material remaining

in the vicinity of the historical pit. These materials are considered amenable to conventional surface mining methods and heap leach processing, consistent with prior operations at Sleeper, although additional drilling, metallurgical testing, and

engineering studies will be required to confirm recoveries, processing parameters, and economic viability.

Overall, the Project represents a brownfields

redevelopment opportunity, leveraging existing site disturbance, historical data, and previously mined material inventories; however, given the early stage of evaluation, all assumptions related to mineralization, processing performance, and

economic outcomes should be considered preliminary and subject to refinement through subsequent phases of study. The development concept assumes a nominal processing rate of approximately 30,000 tonnes per day (tpd), utilizing conventional open pit

mining, crushing and agglomeration, cyanide heap leaching, and Merrill-Crowe zinc precipitation to recover gold and silver.

The Base Case economic

analysis presented in this TRS evaluates the potential economic viability of processing Measured, Indicated, and Inferred Mineral Resources. The Base Case mining inventory comprises the following:

Approximately 47 million tonnes (Mt) of waste rock dump material, classified as Inferred Mineral Resources,

grading approximately 0.28 g/t gold (Au)

In situ oxide and mixed mineralized material including approximately 2 Mt Measured Resources grading 0.29 g/t Au,

78 Mt Indicated Resources grading 0.26 g/t Au, and 49 Mt Inferred Resources grading 0.24 g/t Au.

The Base Case production schedule

includes approximately 55% of Inferred Resources as part of the economic analysis. An Alternative Case was considered that included only in situ Measured and Indicated Resources in the economic analysis.

Unlike Mineral Reserves, Mineral Resources do not have demonstrated economic viability. The economic analysis contained in this TRS is preliminary in nature

and is based, in part, on Inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that economic

forecasts on which this Initial Assessment is based will be realized.

Terms of Reference and Purpose

This Technical Report Summary has been prepared for Paramount Gold Nevada Corp. in accordance with the requirements of Regulation S-K 1300 for disclosure of Mineral Resources, exploration results, and initial assessments for mining properties.

The

purposes of this TRS are listed:

Summarize the geology, mineralization, exploration history, and technical studies conducted on the Project.

Present the results of an IA evaluating the potential economic viability of processing existing waste rock dump

material and in situ oxide and mixed mineralization.

Provide disclosure of Mineral Resources, mining methods, processing methods, infrastructure, and economic

assumptions consistent with S-K 1300 disclosure standards.

This TRS supersedes all previously

filed TRS for the Sleeper Gold Mine and is an update to the most recent TRS titled, “Technical Report Summary for the Sleeper Gold-Silver Project, Humboldt County, Nevada, USA” with an effective date of June 30, 2023, prepared for

Paramount Gold Nevada Corp. by RESPEC Company LLC., dated August 31, 2023 (RESPEC 2023).

2-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

2.1

Site Visits

The Qualified Persons (QPs) responsible for the preparation of this TRS include professionals from SLR with relevant expertise in geology, mining engineering,

metallurgy, and economic evaluation.

Personal inspections of Sleeper were completed by SLR QPs on April 2, 2026, and May 17, 2024. During the

April 2, 2026, site visit, the SLR mining and geology QPs reviewed the historical mine site, surface geology, waste rock dump areas, exploration facilities, and infrastructure relevant to the Project evaluation. During the May 17, 2024,

site visit, the SLR heap leach QP reviewed the historical mine site, waste rock dump areas, exploration facilities, and infrastructure relevant to the Project evaluation. The Environmental QP has visited the site several times over the past five

years, including the most recent visit on January 27, 2026, at which time all permitted facilities were reviewed.

2.2

Sources of Information

During the preparation of this TRS, discussions were held with personnel from PGN:

Rachel Goldman, CEO, Paramount Gold Nevada Corp.

Michael McGinnis, CPG, Owner’s Representative, Paramount Gold Nevada Corp.

Carlo Buffone, CFO, Paramount Gold Nevada Corp.

This TRS has been prepared using information and data obtained from multiple sources, including:

Historical technical reports and feasibility studies for the Sleeper Gold Mine

Company reports, internal studies, and databases provided by Paramount Gold Nevada Corp.

Geological, metallurgical, and engineering studies prepared by previous operators and consultants

Publicly available technical publications and regulatory filings

Site visits and technical discussions with Paramount Gold personnel

Where appropriate, data sources are referenced within the relevant sections of this report.

The documentation reviewed and other sources of information are listed at the end of this TRS in Section 24.0 References.

2-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

2.3

List of Abbreviations

Units of measurement used in this TRS conform to the metric system, unless otherwise noted. All currency in this TRS is US dollars (US$) unless otherwise

noted.

µ

micron

kVA

kilovolt-amperes

µg

microgram

kW

kilowatt

a

annum

kWh

kilowatt-hour

A

ampere

L

litre

bbl

barrels

lb

pound

Btu

British thermal units

L/s

litres per second

°C

degree Celsius

m

metre

C$

Canadian dollars

M

mega (million); molar

cal

calorie

m2

square metre

cfm

cubic feet per minute

m3

cubic metre

cm

centimetre

MASL

metres above sea level

cm2

square centimetre

m3/h

cubic metres per hour

d

day

mi

mile

dia

diameter

min

minute

dmt

dry metric tonne

µm

micrometre

dwt

dead-weight ton

mm

millimetre

°F

degree Fahrenheit

mph

miles per hour

ft

foot

MVA

megavolt-amperes

ft2

square foot

MW

megawatt

ft3

cubic foot

MWh

megawatt-hour

ft/s

foot per second

oz

Troy ounce (31.1035g)

g

gram

oz/st, opt

ounce per short ton

G

giga (billion)

ppb

part per billion

gal

US gallon

ppm

part per million

g/L

gram per litre

psia

pound per square inch absolute

gpm

US gallons per minute

psig

pound per square inch gauge

g/t

gram per tonne

RL

relative elevation

gr/ft3

grain per cubic foot

s

second

gr/m3

grain per cubic metre

st

short ton

ha

hectare

stpa

short ton per year

hp

horsepower

stpd

short ton per day

hr

hour

t

metric tonne

Hz

hertz

tpa

metric tonne per year

in.

inch

tpd

metric tonne per day

in2

square inch

US$

United States dollar

kcal

kilocalorie

V

volt

kg

kilogram

W

watt

km

kilometre

wmt

wet metric tonne

km2

square kilometre

wt%

weight percent

km/h

kilometre per hour

yd3

cubic yard

kPa

kilopascal

yr

year

2-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

3.0

Property Description

3.1

Location

The Sleeper Gold Mine, a material exploration property of Paramount Gold, is located in Desert Valley at the western base of the Slumbering Hills within the

Awakening Mining District, Humboldt County, Nevada, United States. The Company holds the rights to explore, develop, and mine the property through its 100% ownership of unpatented lode mining claims (the Property). The Property lies approximately 42

kilometers (km) (26 miles [mi]) northwest of Winnemucca, Nevada, and is centered at approximately latitude 41°20’03” North and longitude 118°03’10” West. The location of the Property is illustrated in Figure 3-1 and is shown on the Jackson Well 7.5-minute quadrangle published by the United States Geological Survey. The main historical Sleeper mine workings are located near these

coordinates.

3-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 3-1: Location Map

3-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

3.2

Land Tenure

The Property comprises 2,474 unpatented federal lode mining claims covering approximately 18,178 hectares (approximately 44,917 acres) in Humboldt County,

Nevada. The claims are administered by the U.S. Bureau of Land Management (BLM) under the provisions of the Mining Law of 1872. Paramount Gold Nevada Corp., through its wholly owned subsidiaries Sleeper Mining LLC and New Sleeper LLC, holds 100%

ownership of the claims that make up the Project.

Ownership of unpatented mining claims conveys the right to explore, develop, and mine locatable

minerals subject to compliance with federal and state regulations. The surface estate remains under the title of the United States Government and is managed by the BLM. Surface use associated with exploration and mining activities is subject to

applicable environmental and land management regulations.

Paramount Gold’s latest Title Report was completed in December 2023, and the land

position has not been altered since. The properties subject to this 2023 Title Report Update include all the Claims.

The Property consists of contiguous

unpatented lode and placer mining claims covering portions of Sections 35 through 36 in Township 40 North, Range 34 East; Sections 3 through 10, 11, 14 through 23, and 25 through 36 in Township 40 North, Range 35 East; Sections 1 through 2, 11

through 14, 23 through 26, and 35 through 36 in Township 39 North, Range 34 East; Sections 1 through 12, 16 through 22, and 28 through 33 in Township 39 North, Range 35 East; Sections 1, 2, 11, and 12 in Township 38 North, Range 34 East; Sections 9,

16, 19 through 21, 28, and 32 through 34 in Township 38 North, Range 35 East; Sections 24, and 35 through 36 in Township 37 North, Range 34 East; Sections 1 through 5, 8, 9, 15 through 17, and 27 through 28 in Township 37 North, Range 35 East;

Sections 2 through 3, in Township 36 North, Range 34 East, Mount Diablo Base and Meridian, Humboldt County, Nevada. Surface rights for the unpatented claims are owned by the United States Government.

3.2.1

Mining Claims

The Project consists of four primary claim groups totaling 2,474 unpatented lode mining claims. These claim groups were assembled through a series of

acquisitions and claim-staking programs from 2010 to 2021.

Table 3-1: Sleeper – Summary of Claim

Holdings

Claim Group (SUB CLAIM NAMES)

Number of

Claims

Approximate Surface

Area

(Hectares)

(Acres)

Sleeper Gold Mine (AW, CR, DAY, DRYLAKE, ELECTRUM, FREE GOLD, LAM, LLY, MORNING, MORNING STAR, NA,

NEW ALMA, NEW EVENING, NEW SNOWSTORM, PDSLP, SK, SLEEPER, SS, VIRGINIA, YORK)

1,044

6,544

16,171

Dunes (Blue No., SP, SS)

394

2,997

7,405

Mimi (MIMI)

884

7,383

18,243

South Sleeper (RO, SH)

152

1,254

3,098

Total

2,474

18,178

44,917

3-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Section 27.0 provides a complete list of individual mining claims that comprise the Property.

Federal and State Mining Law Framework

Federal laws

governing mining activities on public lands in the United States are primarily contained in Title 30 of the United States Code (USC), “Mineral Lands and Mining,” and Title 43 of the United States Code, Chapter 35, “Federal Land

Policy and Management Act” (FLPMA). Implementing regulations for these statutes are contained in Title 43 of the Code of Federal Regulations (CFR), “Public Lands.”

Nevada state laws applicable to mining operations are primarily contained in the Nevada Revised Statutes (NRS), particularly Chapters 512 through 520, and in

the Nevada Administrative Code (NAC), primarily Chapter 517.

Federal mining claim law applicable to claims located on federal lands is based on the

General Mining Law of 1872, formally titled “An Act to Promote the Development of Mineral Resources of the United States”. Federal regulations governing mining claims and surface disturbance are implemented through provisions in

30 USC, 43 USC, and 43 CFR, as well as corresponding Nevada statutes, including NRS 517.

Approximately 85 percent of the land area within the State

of Nevada is federally owned. Most of these lands are administered by federal agencies, including the BLM, the United States Forest Service (USFS), the United States Department of Energy (DoE), and the United States Department of Defense. Large

areas of land administered by the Bureau of Land Management and the Forest Service remain open to mineral exploration and to the location of mining claims under the General Mining Law.

3-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 3-2: Sleeper Tenement Map

3-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Federal Requirements for Exploration and Mining Activities

Regulations administered by the BLM governing surface disturbance and reclamation are contained in 43 CFR 3809. These regulations require that exploration

activities involving disturbance of five acres or less be conducted under a Notice of Intent submitted to the appropriate BLM Field Office (43 CFR 3809.1-1 through

3809.1-4).

A Plan of Operations (POO) must be submitted and approved for mining or processing activities, as well

as for exploration activities that will disturb more than five acres. A Plan of Operations is also required for bulk sampling programs where 1,000 short tons or more of presumed ore are proposed to be removed (43 CFR 3802.1 through 3802.6; 43 CFR 3809.1-4 and 3809.1-5).

BLM regulations further require that operators post

reclamation bonds sufficient to ensure reclamation of disturbances caused by activities exceeding casual use (43 CFR 3809.500 through 3809.560).

Federal Mining Claim Location and Maintenance Requirements

Federal regulations (43 USC 1744; 43 CFR 3833.1-2) require that the locator of a mining claim, mill site, or tunnel

site file a copy of the notice or certificate of location with the appropriate State Office of the Bureau of Land Management. This filing must include a map showing the claim location and must be completed within 90 days after the claim is located.

Failure to complete this filing within the required period renders the claim void.

The certificate of location must include:

The name and current mailing address of the claim owner or owners

The type of claim

The legal location of the claim, including township, range, section, and quarter section

The accompanying map must correspond to the claim location requirements established under Nevada state law.

Federal law (30 USC 28f; 43 CFR 3833.1-5) also requires payment of an annual claim maintenance

fee to the Bureau of Land Management. This fee must be paid to the appropriate BLM State Office on or before September 1 of each year. During the initial assessment year (the year in which the claim is located), the maintenance fee must be paid

at the time the notice of location is filed with the BLM. Failure to pay the claim maintenance fee results in the claim being declared void.

Nevada

State Requirements

Nevada law also requires claim holders to file documentation demonstrating continued intent to hold mining claims. Under NRS

517.230, on or before November 1 of each year, the claimant, or an authorized representative, must record with the County Recorder a Notice of Intent to Hold if annual assessment work is not being performed.

This affidavit must include the following:

Name and mailing address of the claimant

Name of the mining claim

Bureau of Land Management serial number (if assigned)

3-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Statement affirming the claimant’s intention to maintain the claim

The Notice of Intent to Hold establishes the claimant’s intent to maintain the claim from 12:00 pm on September 1 of the previous year through

11:59 am on September 1 of the current year.

3.3

Encumbrances

Unpatented mining claims require annual maintenance fees paid to the BLM as well as county recording fees. As of the Effective Date of this report, claim

maintenance fees have been paid in full through August 31, 2026.

Table 3-2: Property Holding Costs

Cost Category

Annual Cost

(US$)

Notes

Annual Claim Fees

494,800

BLM maintenance fees ($200/claim)

County Recording Fees

37,110

Humboldt County recording costs (approximately $15/claim)

Total Annual Holding Cost

531,910

Estimated annual property holding cost

3.4

Royalties

A total of five net smelter return (NSR) royalties apply to future mineral production from portions of the Project. These royalties are summarized in Table 3-3.

Table 3-3: Royalty Agreement Summary

Royalty Holder

Royalty Terms

Montezuma

1% NSR on ALL RO and SH claims (South Sleeper)

Geologix

1% NSR on ALL RO and SH claims (South Sleeper)

Snyder Syndicate

1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, ALL SS, AND ALL BLUE.)

Franco-Nevada U.S. Corporation

2% NSR on minerals produced from all 2,474 claims

Evolving Gold / Quinton Hennigh

2% NSR royalty on all SS and all SP claims.

Dry Lake Placer Association

3% NSR on Dry Lake Placer claims

ICN Resources Ltd.

0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims

3.5

Required Permits and Status

The permits are summarized in Table 3-4 represent the principal BLM and State of Nevada authorizations for exploration,

reclamation, historical operations, and ongoing site maintenance at the Property as of the report’s Effective Date. The summary preserves the permit numbers, bond references, and compliance details from the source material and is intended to

support a concise yet complete permit section in the technical report.

3-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

3.5.1

Key BLM and State Permits in Place

Table 1 summarizes the key BLM and State permits identified as being in place as of the Effective Date of the report. These permits are associated with

exploration, mine operations, air quality, reclamation, water management, solid waste, and related site activities.

Table 3-4: Sleeper—Key BLM and State Permits in Place

Permit / Authorization

Permit Number

Regulatory

Agency

Notes/Scope

Exploration Reclamation Permit

#0219

Nevada Division of Environmental Protection / Nevada Division of Minerals

Exploration reclamation authorization maintained for exploration disturbance and associated reclamation obligations.

Exploration Plan of Operations

#NVN077104

BLM

Federal exploration plan covering exploration activities and related surface disturbance.

Sleeper Mine

#NVN064100

BLM

Mine-level federal authorization associated with the Sleeper Mine operations area.

Class II Air Quality Operating Permit – Surface Area Disturbance

#AP1041-2831

State of Nevada

Air quality operating permit associated with surface disturbance activities.

Mine Reclamation Permit

#0037

State of Nevada

Legacy permit maintained from prior mining activities for future reactivation flexibility.

Water Pollution Control Permit

#NEV50006

State of Nevada

Water pollution control authorization maintained from prior operations.

Ground Water Appropriation Permits

#53228, #53231, and #53236

State of Nevada

Groundwater rights and appropriation permits applicable to the project area.

Hazardous Materials Permit

#30473; FDID #08250; Facility #1168-2326

State / Local

Hazardous materials registration and related compliance records for the site.

Class III Solid Waste Landfill Waiver

#SWMI-08-10

State of Nevada

Waiver associated with the site landfill / solid waste management function.

Industrial Artificial Pond Permit

#S34480

State of Nevada

Industrial pond authorization maintained from prior operating conditions.

Mine Plan of Operations

#N64100

BLM

Mine plan maintained for historical operations and future updating if production is reinitiated.

3-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

In addition to the principal permits listed above, the property maintains numerous other permits associated

with previous mining activities. These legacy permits are retained to facilitate future updates should a decision be made to reinitiate production at the site. Ongoing maintenance of these permits includes monthly, quarterly, and annual monitoring

and reporting, as applicable.

3.5.2

Reclamation Bonds

Table 3-5 summarizes the reclamation bonds associated with the principal

BLM-authorized activities. The BLM Nevada State Office currently holds both bonds, and the current bond obligation was approved on October 9, 2020. The bond amounts are reviewed every three years.

Table 3-5: Sleeper Reclamation Bonds

Bond Number

Principal

Covered

Authorization

Current

Obligation

(US$)

Purpose

NVB000444

New Sleeper Gold LLC

NVN077104

345,044

Surface reclamation coverage for the Sleeper Gold Exploration Plan.

NVB000330

Sleeper Mining Company LLC

NVN064100

3,966,373

Surface reclamation coverage for operations conducted under the Sleeper Mine authorization.

3.5.3

Compliance and Permit Status

According to the source material, Paramount Gold is currently in compliance with all issued permits and is in the process of renewing those permits that

require renewal. The bonds held by the BLM provide surface reclamation coverage for operations conducted by the relevant principals under NVN064100 and NVN077104, respectively.

The current bond obligation was approved on October 9, 2020, and is reviewed every three years. Permit maintenance activities include monthly, quarterly,

and annual monitoring and reporting. Retaining legacy permits from previous mining activities is intended to simplify future permit updates if production is restarted.

3.6

Other Significant Factors and Risks

The SLR QP is not aware of any environmental liabilities on the property. Paramount Gold has, or can obtain, all the required permits to conduct the proposed

work on the property. The SLR QP is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the proposed work program on the property.

3-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

4.0

Accessibility, Climate, Local Resources, Infrastructure, and Physiography

4.1

Accessibility

The Sleeper Gold Mine is in Humboldt County in north-central Nevada, approximately 42 km (26 mi) northwest of Winnemucca, Nevada, which lies along

Interstate 80, the principal east–west transportation corridor across northern Nevada connecting Reno, Nevada, and Salt Lake City, Utah. Access to the project area is provided by Nevada State Highway 95, approximately 51 km (32 mi) north of

Winnemucca, and Nevada State Highway 140, approximately 23 km (14 mi) west toward the project area. The property is connected to the paved highway network by Sod House Road, a maintained gravel road that provides direct access to the mine site and

surrounding exploration areas. Interstate 80 parallels the Union Pacific transcontinental railroad, providing efficient transportation of bulk materials and mining consumables to Winnemucca and the surrounding mining district. The project area can

be reached year-round by vehicle under typical weather conditions, given the region’s generally dry climate and moderate winter snowfall.

4.2

Climate

The Sleeper Gold Mine is in Desert Valley at the western base of the Slumbering Hills in Humboldt County, Nevada. The project area lies within the Basin and

Range physiographic province at an elevation of approximately 1,300 m (about 4,265 ft) above sea level. The regional climate is characteristic of the semi-arid high desert of northern Nevada, with relatively low annual precipitation, large daily

temperature variations, and generally clear skies throughout much of the year. Winters are typically cool to cold, with average daytime temperatures in January of approximately 6°C to 8°C and nighttime temperatures commonly declining to

approximately -7°C to -9°C, although colder temperatures may occur during periodic Arctic air incursions. Snowfall occurs intermittently during winter storm

events; however, snow accumulations at the valley floor are generally modest and short-lived, typically melting within several days.

Average annual

precipitation in the Desert Valley area is approximately 130 mm to 150 mm per year (about 5 to 6 inches), with most precipitation occurring during winter and early spring frontal systems. Summers are generally warm to hot during the day, with

temperatures often exceeding 30°C, while nighttime temperatures typically cool significantly due to the dry desert air and elevation. Summer precipitation is relatively limited and typically occurs as isolated convective thunderstorms associated

with late-season Great Basin monsoonal activity. Overall, the area is characterized by low humidity, high evaporation rates, and sparse high-desert vegetation. Because of the relatively dry climate, moderate winter snowfall, and the absence of

prolonged severe weather conditions, the Sleeper property area is considered favorable for year-round exploration, development, and mining operations, with only minor seasonal impacts on access or operational efficiency.

4.3

Local Resources and Infrastructure

The Project lies within a region with a long history of mining activity. The historical Sleeper mine was operated by AMAX from 1986 to 1996 as a large open-pit

gold and silver operation. The previous operation required the development of significant mining infrastructure, including haul roads, processing facilities, water supply systems, electrical distribution systems, and support

4-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

facilities, demonstrating that the area can support large-scale mining operations. Several facilities remain on-site and are currently utilized to support

exploration activities, including office space, equipment maintenance facilities, and storage areas used for drilling and exploration programs.

The

nearest regional service center is Winnemucca, Nevada, located approximately 42 km southeast of the property. The city of Winnemucca is the county seat of Humboldt County and has a population of approximately 8,400 people. The city functions as a

primary commercial and logistical hub for mining operations throughout north-central Nevada and provides access to equipment suppliers, fuel distribution, heavy equipment maintenance facilities, drilling and blasting contractors, warehousing,

lodging, medical services, and other industrial support services commonly required by mining projects.

Transportation and Access

Regional access to the Sleeper property is provided by Interstate 80, which passes through Winnemucca and serves as the principal east–west

transportation corridor across northern Nevada. Interstate 80 provides direct connections to major mining centers, including Elko, Nevada and Salt Lake City, Utah, to the east and Reno, Nevada, to the west.

An extensive network of historical mine haul roads, exploration access roads, and drill roads exists throughout the property, resulting from mining activities

conducted between 1986 and 1996 and subsequent exploration programs. These roads provide access to the historical open pit, heap-leach pads, waste-rock facilities, and exploration targets throughout the Sleeper district. Depending on the development

scenario, portions of this road network may require upgrading or rehabilitation to support future operations.

Electrical Power

Electrical power in northern Nevada is supplied by regional utilities through a network of high-voltage transmission lines serving numerous mining operations.

Transmission infrastructure in the broader region commonly includes 69-kV, 120-kV, and 230-kV lines that connect mines and industrial facilities to the regional grid operated by NV Energy. Typical overhead transmission lines in the region consist of

aluminum-conductor steel-reinforced (ACSR) cables mounted on steel or wooden monopole structures spaced approximately 90 m to 135 m apart, with structure heights typically ranging from about 17 m to 25 m, depending on terrain and span requirements.

Transmission corridors commonly occupy rights-of-way approximately 27 m wide.

Historical mining operations at Sleeper required electrical power for

mining equipment, ore processing facilities, pumping systems, and general site infrastructure. Historically, electrical power to the project area was supplied by an existing 120-kV transmission line

approaching the property from the north, operated by Harney Electric Cooperative. Future operations could utilize regional transmission connections, combined with on-site substations and electrical distribution systems similar to those used at other

open-pit mining operations in northern Nevada.

Airports and Air Transportation

The closest airport to the project area is Winnemucca Municipal Airport, approximately 10 km southwest of Winnemucca. The airport has a primary asphalt runway

approximately 2,134 m (7,000 ft) in length and supports general aviation and charter aircraft used by mining companies operating in the region. The nearest airports offering scheduled commercial airline service are Reno–Tahoe International

Airport, approximately 260 km southwest of the project area, and Elko Regional Airport, approximately 200 km east of the project area.

4-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Workforce and Mining Services

Northern Nevada is one of the most active gold-mining regions in the world and hosts numerous large mining operations. As a result, the region supports a

well-established mining workforce, including equipment operators, geologists, engineers, mechanics, electricians, and other skilled trades. Many workers employed at regional mines reside in Winnemucca or nearby communities. The presence of multiple

operating mines has also resulted in the establishment of numerous mining contractors and equipment suppliers capable of supporting exploration programs, construction activities, and large-scale mining operations.

Services available in Winnemucca and the surrounding region include heavy equipment repair facilities, fuel distribution, drilling and blasting contractors,

industrial construction contractors, mining equipment suppliers, and transportation and logistics companies. These services support both existing mining operations and exploration activities throughout Humboldt County and the broader northern Nevada

mining district.

Sources of Water

Water for the

previous operations was obtained from groundwater sources within the Desert Valley basin, supplemented by pit dewatering systems during mining operations. Paramount Gold currently holds water rights associated with the Project.

General Infrastructure

Much of the previous mining

infrastructure has been reclaimed following the mine’s closure in 1996; however, several facilities remain available to support exploration and future development. The property’s subdued topography provides suitable areas for the

construction of mine infrastructure, including processing facilities, heap leach pads, waste rock storage areas, and associated operational infrastructure.

Existing infrastructure at the Sleeper site is listed below:

Exploration and administrative office building

Heavy equipment maintenance shop (four-bay truck shop)

Dewatering well service shop

Truck maintenance facilities

Diesel storage and fuel tanks

Electrical transmission and distribution lines

Groundwater monitoring wells

Water management ponds

Administrative and storage buildings

On-site landfill area

Existing mine haul roads and exploration access roads

4-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

4.4

Physiography

The Project is in north-central Nevada within the Basin and Range physiographic province, a region characterized by alternating north–south trending

mountain ranges and broad alluvial valleys formed by extensional tectonics. The Sleeper property lies primarily within Desert Valley and along the western flank of the Slumbering Hills, a low mountain range that forms the eastern boundary of the

valley. Elevations in the immediate project area average approximately 1,300 m above sea level (masl) (about 4,265 feet above mean sea level [fasl]) on the valley floor, increasing eastward into the Slumbering Hills where elevations exceed

approximately 1,700 masl. The terrain surrounding the historical Sleeper open pit consists of gently sloping alluvial fans, pediments, and low bedrock ridges, which transition into steeper volcanic uplands within the Slumbering Hills. Relief within

the immediate mine area is generally moderate, with local elevation differences of several hundred meters between the valley floor and adjacent uplands.

Desert Valley is a broad internally drained basin typical of northern Nevada, formed by fault-bounded mountain ranges and filled with unconsolidated alluvial

and lacustrine sediments derived from surrounding highlands. Surface drainage in the project area is limited and largely ephemeral, consisting of intermittent washes and small drainage channels that flow only during seasonal precipitation or

localized storm events. These ephemeral drainages typically flow westward across the valley floor and dissipate into alluvial sediments, forming no perennial streams. Vegetation in the area is characteristic of Great Basin high-desert shrubland,

dominated by sagebrush, rabbitbrush, and scattered grasses adapted to semi-arid conditions. The relatively subdued topography of the valley floor, combined with sparse vegetation and arid conditions, provides favorable terrain for the development of

large open-pit mining operations, heap leach facilities, and associated infrastructure. Overall, the physiography of the Sleeper property is typical of the northern Nevada Basin and Range region and presents

few significant natural constraints to exploration, development, or mining activities.

4-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

5.0

History

5.1

Early Mining – Awakening District (Pre-1982)

The Sleeper Gold Mine is in the Awakening Mining District. Gold mineralization in the district was recognized well before the discovery of the Sleeper deposit.

Early mining activity in the district dates to the early 1900s, with production associated primarily with gold-bearing quartz veins hosted in metasedimentary rocks.

Significant production began in the 1930s from the Jumbo and Alma mines in the Slumbering Hills, approximately 6 km southeast of the eventual Sleeper pit.

Narrow quartz–adularia veins were mined by underground and small open pit methods. Historical compilations report that the Awakening District produced approximately 26,262 ounces of gold between 1932 and 1958. Numerous historical shafts,

adits, and prospect pits occur within a few kilometers of the Sleeper deposit, indicating widespread early exploration activity.

5.2

Ownership

5.2.1

AMAX Gold Inc. Discovery and Mining (1982–1996)

The modern history of the Sleeper deposit began in 1982 when John Wood, an exploration geologist with AMAX, recognized iron-oxide staining in an outcrop during

aerial reconnaissance. AMAX conducted geological mapping, geochemical sampling, and drilling programs between 1982 and 1984.

A breakthrough occurred in

late 1984 when a step-out drill hole intersected approximately 102 m of silicified breccia averaging approximately 27.87 g/t gold and 61.7 g/t silver. The discovery hole confirmed the presence of a

high-grade epithermal gold system and led to rapid project advancement. AMAX formally announced the Sleeper gold discovery in February 1985. Regulatory approvals for the mine’s construction were granted later in 1985. Mining began in January

1986, and mill commissioning commenced the following month. The first gold bar was poured on March 26, 1986, only slightly more than a year after the discovery announcement.

The operation processed oxide mineralization using both milling and heap-leaching circuits. Initial mine plans projected modest production, but actual

production greatly exceeded expectations due to exceptionally high grades encountered early in the Sleeper vein system. Gold production during 1986 reached approximately 126,000 ounces, with operating costs reported at less than US$60 per ounce.

Production increased to approximately 159,000 oz in 1987 and approximately 230,000 oz in 1988. The mine was widely recognized as one of the lowest-cost

gold producers in the world during the late 1980s. AMAX later added heap-leach facilities to process lower-grade oxide material.

In 1994, AMAX merged

with Cyprus Minerals to form Cyprus Amax Minerals Company. Mining at Sleeper continued until 1996, when operations were suspended. Total historical production from the Sleeper mine is approximately 1.66 Moz Au and 2.3 Moz Ag. Approximately

1,219,880 Moz Au were recovered from milling operations and approximately 438,609 Moz Au from heap-leach processing.

5-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Following closure, groundwater began filling the open pit, forming a pit lake. AMAX accelerated the filling

of the open pit to prevent the formation of acidic water. Processing facilities and crushing equipment have since been removed, and the former mill area has been reclaimed.

5.2.2

X-Cal Resources Ltd. and Joint Venture Exploration (1993–2010)

X-Cal Resources Ltd (X-Cal) began assembling a land package in the district in 1993 when it acquired property around

the Alma Mine through an agreement with Leland York. Surface mapping and sampling identified several areas of anomalous gold mineralization. Additional claims were acquired in 1994 and 1995, extending X-Cal’s holdings to the boundary of the

AMAX Sleeper property.

In April 1996, X-Cal and AMAX entered into a joint venture agreement to explore the Sleeper property and the surrounding land

package. In 1997, X-Cal entered into an option agreement with Placer Dome Inc. (Placer Dome). During a 40-day review period, Placer Dome conducted data compilation, completed an aeromagnetic survey, and drilled 47 holes totaling approximately 13,323

m (43,710 ft) of reverse circulation (RC) drilling and of diamond core drilling. The option ultimately expired after revised terms could not be negotiated.

Kinross Gold Corp. (Kinross) acquired AMAX’s interest in the Sleeper project. Between 1998 and 2003, X-Cal negotiated several agreements with Kinross

regarding ownership of the property.

On January 9, 2004, X-Cal and New Sleeper Gold Corp. (New Sleeper Gold) formed a 50/50 joint venture and

acquired Kinross’s 50% interest in the Sleeper property. New Sleeper Gold assumed management of the Project and funded extensive exploration programs between 2004 and 2005. These programs included approximately 29,780 m (97,704 ft) of

drilling, consisting of sonic, reverse-circulation, and diamond-core drilling, as well as trenching, induced polarization and magnetotelluric geophysical surveys, gravity surveys, soil-gas surveys, geological mapping, and geochemical sampling.

In May 2006, X-Cal acquired New Sleeper Gold’s 50% interest in the joint venture, consolidating 100% ownership of the Sleeper project.

5.2.3

Paramount Gold Nevada Corp. (2010–Present)

In August 2010, Paramount Gold and Silver Corp. acquired all outstanding shares of X-Cal Resources Ltd. through a plan of arrangement. Following the

acquisition, Paramount Gold Corp. began renewed exploration drilling at Sleeper in October 2010.

In 2011, Paramount Gold Corp. acquired the Dunes Project

claims located south of the Sleeper deposit from ICN Resources Ltd. (ICN). In 2012, additional claims known as the Mimi Project were staked adjacent to the historical Sleeper mine.

In connection with the acquisition of Paramount Gold and Silver Corp. by Coeur Mining, Inc., the Nevada assets were spun out into a separate publicly traded

company, Paramount Gold Nevada Corp., in 2015. Paramount Gold Nevada Corp. now controls the Project through its subsidiaries, Sleeper Mining LLC and New Sleeper LLC.

Additional claims known as the South Sleeper (RO and SH groups) were acquired in 2021, expanding the overall property. The Sleeper Gold Mine currently

comprises a large district-scale land position comprising 2,474 unpatented federal mining claims administered by the BLM. The Project is an advanced exploration and redevelopment project centered on the historical open pit mine and numerous

surrounding exploration targets within the Awakening Mining District.

5-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

5.3

Exploration and Development History

5.3.1

Historical Drilling (1983–2010)

Drilling at the Project has been conducted intermittently since the early 1980s by multiple operators and forms the primary basis for the current geological,

structural, and grade interpretation of the deposit. Initial drilling programs undertaken by AMAX between 1983 and 1995 established the core of the drilling database. Subsequent exploration and evaluation programs were completed by Placer Dome, X-Cal, New Sleeper Gold, and others through approximately 2010.

The historical drilling database is extensive and

represents the majority of drilling completed at the Project. Reverse circulation (RC) drilling predominates, accounting for approximately 95% of all drill holes and meters drilled, with most holes oriented vertically, reflecting the exploration and

production objectives of early-stage development. Later programs incorporated angled diamond core drilling to better define structural controls, vein orientations, and the geometry of higher-grade

mineralization. These core programs significantly improved geological control, particularly in areas characterized by steeply dipping vein systems and structurally controlled mineralization. Integration of RC and core datasets has enabled the

development of a refined geological and structural model, including the recognition of multiple vein sets, hydrothermal breccias, and stratigraphically controlled mineralized domains. However, portions of the historical database are incomplete, with

missing hole metadata, survey information, and total depths for certain programs. These limitations have been considered by the QP in evaluating data reliability and Mineral Resource classification.

Modern exploration commenced with AMAX in April 1982, following reconnaissance identification of iron staining. Surface mapping, geochemical sampling, and

drilling culminated in a late-1984 step-out hole intercepting 102 m averaging 27.87 g/t Au (0.81 oz/st Au) and 61.7 g/t silver, including a high-grade quartz-electrum vein with visible gold. Discovery was announced in February 1985, construction was approved in August 1985, and mining began in January 1986. The

mill was commissioned in February 1986, and first gold was poured on March 26, 1986. Between 1986 and 1996, production totaled approximately 1.66 Moz of gold and 2.3 Moz of silver. During the 1983–1995 period, AMAX completed 3,668 drill

holes totaling 509,043 m and conducted an IP/resistivity survey in 1987. Mining concluded in 1996.

In 1989, NGM reportedly drilled nine holes totaling

438 m; however, SLR is unaware of NGM’s full name or of any relationship, if any, between NGM and AMAX. No information is available regarding NGM’s drilling contractors, drill rig types, sample collection procedures, or collar and down-hole survey methods.

From 1996 to 1997, under the X-Cal/AMAX joint

venture, work focused on data compilation, mapping, surface geochemistry, and geophysics. Between 1993 and 1997, X-Cal collected 7,599 soil samples and 2,480 rock samples and completed 140 RC holes totaling

27,700 m. QA/QC procedures established during this period formed the basis for protocols adopted in later programs.

In 1997, Placer Dome optioned the

property, conducted a comprehensive database review, and completed a high-resolution airborne magnetic survey (50 m line spacing with 2 m readings). Placer Dome drilled 47 holes totaling 13,323 m, including RC and RC/core combination holes. During

this period, Mineral Resources Development Inc. (MRDI) evaluated tailings and heap-leach pads using six auger holes in tailings (7.6 m to 10.7 m depth), two RC holes, and three auger holes in leach pads.

5-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Between 1998 and 2003, X-Cal focused on consolidating and evaluating

tailings and heap-leach materials. This work included ten auger holes drilled into tailings in 1999, 83 sonic holes completed in 2002 (9.1 m to 10.7 m depth with 1.52 m sampling intervals), and a gravity survey conducted in 2003 on 500 m line

spacing with 200 m stations. Sampling and analytical procedures were generally consistent with industry standards, although documentation from early programs is incomplete.

In January 2004, New Sleeper Gold acquired Kinross’ 50% interest and entered into a joint venture with X-Cal.

Between 2004 and 2005, exploration and development activities included 29,780 m of drilling (comprising 17,028.9 m core, 11,373.6 m RC, and 688.8 m sonic drilling), trenching, IP, magnetotelluric (MT), gravity surveys,

soil-gas surveys (Hg and O₂/CO₂), surface mapping, geochemical sampling, and aerial photography. During this period, mill and crusher facilities were removed and reclaimed. Joint funding commenced

in August 2005, and X-Cal acquired full ownership in May 2006.

From 2004 to 2007, integrated interpretation of

magnetic, gravity, IP, and MT datasets refined the understanding of structural controls on mineralization. Magnetic inversion modeling in 2005 identified mineralization within a magnetic low bounded by magnetic highs, while gravity surveys completed

between 2003 and 2005 delineated density contrasts and major structural trends. Soil-gas and geochemical anomalies further highlighted concealed structures. QA/QC procedures applied during this period were

consistent with industry practice.

Between 2003 and 2007, X-Cal drilled an additional 47,347 m, including 30 core

holes (9,027 m), 133 RC holes (35,546 m), eight RC/core combination holes (2,776 m), and one hole of unknown type. Drilling, sampling, and QA/QC procedures implemented in 2006 and refined in 2007 became standard for subsequent programs. Work during

this period also included structural interpretation, target generation, blasthole modeling, and continued evaluation of tailings and heap-leach materials. Subsequent exploration drilling included 69 drill

holes totaling 18,041 m by New Sleeper Gold between 2004 and 2005, followed by an additional 34 holes (6,636 m) completed by Evolving Gold in 2008, and by Montezuma Mines, 11 holes (1,940 m) between 2011 and 2012. Evolving Gold also conducted

gravity, IP/resistivity, and ground magnetic surveys between 2007 and 2008, while Montezuma completed ground magnetics (2009–2010) and gravity/IP surveys (2011–2012). Some drill hole locations from these programs were not incorporated

into the historical drilling database due to unresolved drill hole location surveys. In 2021, Paramount Gold conducted an exploration RC drilling program focused on the Range Front target area southeast of the pit in the hills east of the South

Dump. Drilling of 6 RC holes totaling 2,644 m was completed.

5.3.2

Historical Geophysical and Surface Exploration Programs

5.3.2.1

Airborne Geophysical Surveys (1980s–1997)

Airborne geophysical surveys were conducted during several phases of exploration from the 1980s through the late 1990s, culminating in a detailed aeromagnetic

survey completed in 1997. This survey utilized closely spaced east–west and north–south flight lines, approximately 50 m apart, with high-frequency data acquisition along the lines. The airborne magnetic data were used to identify

lithologic variations and structural features, including volcanic units, intrusive bodies, and fault zones. Magnetic highs were interpreted to be associated with volcanic, hypabyssal, and metasedimentary rock units, providing important context for

geological interpretation and exploration targeting. These airborne datasets provided regional-scale coverage of the property and were instrumental in defining large-scale structural trends and lithologic domains that guided subsequent ground-based

exploration and drilling programs.

5-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

5.3.2.2

Ground Geophysical Surveys (1980s–2012)

Ground-based geophysical surveys were conducted from the early 1980s through 2012 and included magnetic, gravity, IP, resistivity, and MT methods. Ground

magnetic surveys were used to refine interpretations derived from airborne data and to provide higher-resolution mapping of local structures and lithologic contacts. Gravity surveys conducted throughout this period, including early programs and

later expansions, were used to define basin geometry, bedrock topography, and density contrasts associated with lithologic and alteration variations. These data were particularly important in identifying structural features beneath post-mineral

cover and in constraining the geometry of the basin hosting the Sleeper deposit. Electrical geophysical methods, including induced polarization and resistivity surveys conducted during multiple phases of exploration, including the 2004–2005

joint venture period, were used to detect chargeability anomalies and resistivity contrasts associated with sulfide mineralization, silicification, and hydrothermal alteration. MT surveys conducted during this period provided insight into deeper

conductivity structures and regional controls on hydrothermal fluid pathways.

5.3.2.3

Surface Geochemical Programs (1980s–2012)

Surface geochemical sampling programs were conducted from the early 1980s through 2012 and included extensive soil and rock-chip sampling campaigns across the

property. Soil geochemical programs, comprising more than 11,000 samples collected over multiple phases, were designed to identify anomalous concentrations of gold and pathfinder elements, particularly in areas of shallow alluvial cover.

Rock-chip sampling programs were used to verify mineralization exposed at surface and to characterize lithologic units and alteration zones. The integration

of geochemical data with geological mapping and geophysical interpretations enabled the delineation of coherent mineralized trends and target areas for follow-up drilling.

5.3.2.4

Soil Gas and Specialized Geochemical Surveys (2004–2005)

During the 2004–2005 joint venture exploration programs, specialized soil gas surveys were conducted, including mercury vapor and O₂/CO₂

measurements. These techniques were applied to detect subtle geochemical signatures associated with concealed mineralization and hydrothermal activity, particularly in areas where conventional soil geochemistry was less effective due to cover

conditions. These data were integrated with other exploration datasets to refine target generation.

5.3.3

Geological Mapping and Trenching (1980s–2005)

Geological mapping programs were conducted throughout the property’s exploration history, beginning in the early 1980s and continuing through later

campaigns, including the 2004–2005 joint venture period. These programs focused on defining lithologic units, alteration assemblages, and structural features across the property.

Trenching programs, particularly those conducted during the 2004–2005 period, were used to expose bedrock beneath shallow cover and to allow direct

observation and sampling of mineralized zones. These activities supported refinement of the geological model and validation of geochemical and geophysical anomalies.

The integration of these historical geophysical and surface exploration programs resulted in the identification of multiple mineralized trends and

structurally controlled zones across the property. Several of these trends, including those associated with volcanic contacts and major structural corridors, have not been extensively drill tested and remain prospective for additional mineralization

5-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

5.4

Past Production

Table 5-1 combines gold production from both the mill and heap-leach circuits operated by AMAX Gold Inc. at the Sleeper

Mine. Silver production was primarily recovered from mill operations. Totals correspond with reported cumulative production of approximately 1.66 Moz of gold and approximately 2.3 Moz of silver.

Table 5-1: Sleeper Gold Mine – Total Annual Production (1986–1996)

Year

Mill Gold

(000 oz)

Heap Gold

(000 oz)

Total Gold

(000 oz)

Mill Silver

(000 oz)

Heap Silver

(000 oz)

Total Silver

(000 oz)

1986

132.6

4.9

137.6

93.1

11.4

104.5

1987

152.8

16.8

169.6

131.3

38.8

170.1

1988

170.6

56.7

227.3

173.4

74.3

247.7

1989

196.3

57.9

254.3

245.0

97.2

342.2

1990

191.1

53.6

244.7

269.7

120.8

390.5

1991

121.1

62.6

183.7

183.2

108.0

291.2

1992

78.3

61.7

140.0

130.0

122.0

252.0

1993

51.3

48.9

100.2

157.7

98.5

256.2

1994

70.9

36.2

107.1

59.6

83.8

143.3

1995

54.7

27.3

82.1

47.7

51.0

98.7

1996

12.0

12.0

9.9

9.9

Totals

1,219.9

438.6

1,658.5

1,490.8

815.6

2,306.4

Avg. Metallurgical Recovery (%)

89.6

42.9

43.4

39.5

5-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

6.0

Geological Setting, Mineralization, and Deposit

The information presented herein has been reviewed, edited, and, where appropriate, directly derived from RESPEC (2023) and Wilson and SRK (2012). The

geological framework, mineralization models, and deposit interpretations have been evaluated by SLR for completeness, internal consistency, and technical reasonableness.

6.1

Regional Geology

The Project is located within the northern Basin and Range Province of Nevada, a region characterized by extensional tectonics, high-angle normal faulting, and

widespread Cenozoic magmatism. The regional geologic framework comprises the following (Figure 6-1 and Figure 6-2):

Mesozoic metasedimentary basement rocks of the Auld Lang Syne Group

Cretaceous granitic intrusive rocks

Overlying Tertiary volcanic sequences, including bimodal basaltic and rhyolitic units

Basin-fill sediments associated with post-mineral extensional deformation

The Project is situated along the western flank of the Slumbering Hills within the western portion of the Northern Nevada Rift (NNR), a northwest-trending mid-Miocene geologic province extending from southeastern Oregon to southeastern Nevada. As described in RESPEC (2023) and Wilson and SRK (2012), the NNR is characterized by bimodal basalt–rhyolite

volcanism, extensional tectonics, and a documented spatial association with low-sulfidation epithermal gold-silver mineralization (John 2001).

Available geological information indicates that the NNR developed during a period of regional extension beginning in the

mid-Miocene (approximately 17 Ma), expressed by high-angle normal faulting and associated volcanic activity. These structural and magmatic features are widely recognized as key controls on epithermal mineral

systems in northern Nevada. The association between mineralization and this tectono-magmatic framework at the Project is based on regional analogs and published studies and should be considered interpretive.

Pre-Tertiary rocks in the Slumbering Hills consist of metasedimentary rocks of the Auld Lang Syne Group and Cretaceous

granitic intrusions, consistent with descriptions in both source reports. The metasedimentary sequence has been interpreted as part of an early Mesozoic back-arc basin assemblage that was subsequently deformed

and metamorphosed to greenschist facies during late Jurassic contraction associated with the Luning–Fencemaker thrust system.

Tertiary volcanic and

volcaniclastic rocks unconformably overlie the pre-Tertiary basement and locally intrude it. As described in the Wilson and SRK report (2012), many of these volcanic units are interpreted to represent outflow

facies of the McDermitt volcanic field and related caldera complexes to the north. Volcanic rocks hosting mineralization at Sleeper are interpreted to have been derived from a local volcanic center; however, the extent, timing, and configuration of

this source remain open to interpretation.

Quaternary pediment gravels and aeolian deposits occur west of the Slumbering Hills and locally cover portions

of the Project area, limiting bedrock exposure and influencing surface geological mapping and exploration methods.

6-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The regional structural framework is dominated by northwest- to north-northeast–trending high-angle

normal faults, which control basin development and are interpreted to have provided conduits for hydrothermal fluid flow. Basin and Range extension is also expressed by tilting of structural blocks. District-scale interpretations in the Wilson and

SRK report (2012) suggest a northeast-trending arch or anticline within the northern Slumbering Hills, characterized by opposing limb dips; however, this feature is inferred from regional mapping and remains conceptual.

The association between extensional faulting, bimodal volcanism, and epithermal mineralization is supported by regional studies and both technical reports;

however, the specific structural and lithologic controls on mineralization at the Property remain interpretive and subject to refinement with additional geological and drilling data.

6-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 6-1: Regional Geology

6-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 6-2: Cross Section of Regional Geology

6-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

6.2

Local Geology

At the local scale, the Sleeper Gold-Silver Project is situated along the western flank of the Slumbering Hills within Desert Valley, where the geological

framework has been significantly modified by Basin and Range extensional tectonics. The present-day configuration reflects substantial displacement along north- to northeast-trending normal faults, which have

down-dropped the volcanic and basin-fill sequences by approximately 900 m to 1,000 m (3,000 ft to 3,300 ft) relative to the exposed basement rocks in the adjacent uplifts. In addition to these dominant structures, northwest-striking faults are

present and are interpreted as reactivated regional structural trends, contributing to a complex structural architecture that exerts primary control over lithological distribution and mineralization.

The stratigraphic framework at the property comprises Mesozoic basement rocks overlain by a sequence of Tertiary volcanic and volcaniclastic units. The

basement consists of the Auld Lang Syne Group, composed of slate, phyllite, quartzite, and calcareous metasedimentary rocks that have undergone deformation and low-grade metamorphism to greenschist facies, and

which are locally intruded by Cretaceous granodioritic to monzonitic bodies. These rocks form the structural footwall to the principal mineralized system. Overlying the basement is a succession of Miocene volcanic rocks, which serve as the primary

host sequence for mineralization.

The volcanic stratigraphy begins with a basal sequence of intermediate-composition volcaniclastic rocks and minor flow

units, which are overlain by dacitic to basaltic lava flows and associated flow breccias. This sequence is succeeded by felsic pyroclastic units, including pumiceous lapilli tuffs, and culminates in the emplacement of the Sleeper rhyolite. The

Sleeper rhyolite, consisting of flows, domes, dikes, and sills characterized by quartz-eye textures and sanidine phenocrysts, represents the principal host to gold-silver mineralization and is interpreted to

have played a critical role in the development of the hydrothermal system. Post-mineral volcanic units, including peralkaline ash-flow tuffs, overlie the mineralized sequence and are interpreted to post-date

mineralization.

Structurally, the deposit is dominated by a west-dipping, range-bounding normal fault that juxtaposes the Mesozoic basement rocks in the

footwall against the Miocene volcanic sequence in the hanging wall. This structure is interpreted to have served as the principal conduit for hydrothermal fluids and represents the first-order control on mineralization. Secondary structures within

the hanging wall, including splays, vein arrays, and fault intersections, create localized zones of enhanced permeability and are closely associated with the distribution of mineralized veins, breccias, and stockwork zones. The resulting structural

framework is hierarchical, with primary faults controlling the overall geometry of the system and secondary structures governing local mineralization patterns and grade distribution.

At the property scale, the Sleeper deposit is defined by a well-developed mineralized system comprising a central zone of historically mined high-grade

quartz–adularia veins surrounded by halos of stockwork and breccia-hosted mineralization, which transition outward into peripheral zones of lower-grade mineralization (Figure 6-3, Figure 6-4, and Figure 6-5).

The deposit extends approximately 1,500 m to 1,700 m

along strike, is on the order of 600 m in width, and has a vertical extent exceeding 600 m from near-surface to depth. This geometry reflects the combined influence of structural controls and lithological competency contrasts, which together

governed the development of permeability and fluid flow within the hydrothermal system.

6-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Following historical mining, the geological setting is characterized by extensive envelopes of low-grade stockwork mineralization that surround and underlie the previously mined high-grade vein systems. Remnant mid- to high-grade zones persist beneath and adjacent to

mined areas, representing down-dip and along-strike extensions of the primary vein systems as well as mineralization associated with secondary structural zones. Additional mineralization is recognized at

targets such as West Wood, where hydrothermal breccia-hosted mineralization is associated with structural complexity and possible intrusive influences, indicating that the mineralizing system remains open and locally underexplored.

The Qualified Person notes that geological continuity is generally well defined within the broader low-grade stockwork

domains, which form laterally and vertically continuous mineralized envelopes suitable for bulk-tonnage evaluation. In contrast, high-grade vein-hosted mineralization is discontinuous and strongly controlled by structural features, resulting in

significant spatial variability. This variability is an inherent characteristic of the deposit and represents an important consideration in geological modeling and Mineral Resource estimation. The overall geological interpretation is considered

robust and appropriate for the current level of study and is consistent with CIM (2014) Definition Standards, CIM (2019) Best Practice Guidelines, and SEC Regulation S-K 1300 reporting requirements.

6-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 6-3: Stratigraphic Column

6-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 6-4: Local Geology

6-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 6-5: Cross Section of Local Geology

6-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

6.3

Mineralization

Mineralization at the Sleeper Gold-Silver Project is characteristic of a low-sulfidation epithermal system (Figure 6-6) developed within a Miocene volcanic center and spatially associated with a major west-dipping, range-bounding normal fault. Gold and silver mineralization occurs predominantly within the hanging-wall volcanic

sequence, particularly within the Sleeper rhyolite and underlying basaltic units, and reflects a structurally controlled hydrothermal system with multiple phases of fluid flow and mineral deposition.

6-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 6-6: Schematic Model of

Low-Sulfidation Epithermal System

6-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Mineralization at Sleeper comprises four principal styles that collectively define the deposit architecture:

(i) quartz–adularia vein systems, which host the highest grades and represent the primary fluid conduits; (ii) hydrothermal breccias, which occur in structurally prepared zones and locally host moderate- to high-grade mineralization;

(iii) stockwork veinlets and disseminated mineralization, which form a broad, lower-grade halo surrounding higher-grade structures; and (iv) alluvial or placer mineralization, derived from erosion of primary mineralized zones and preserved

in post-mineral sedimentary units. These styles reflect a continuum of hydrothermal processes ranging from focused fluid flow in discrete structures to more diffuse fluid dispersion into the surrounding host rocks.

Gold and silver mineralization is spatially and genetically linked to the structural framework of the deposit. The principal control is the regional-scale

normal fault system, which provided the primary conduit for hydrothermal fluids and established the hanging-wall domain in which mineralization is concentrated. Secondary controls include hanging-wall splays, vein arrays, and structural

intersections, which created localized zones of enhanced permeability. These structural features governed the distribution of mineralization and are directly associated with the development of high-grade veins, breccia bodies, and vein swarms. The

interaction between structure and lithology, particularly within competent rhyolitic units, played a critical role in focusing fluid flow and controlling mineral deposition.

The mineralization exhibits a clear relationship between style and grade distribution. High-grade mineralization is localized within quartz–adularia

vein systems that may extend along strike over significant distances but are typically limited in width and continuity. Bonanza veins were as much as 4 to 5 m wide. Although disrupted by post-ore faulting, the

reconstructed strike length of bonanza veins were quite consistent along strike for distances of more than 200 m. These veins can locally exceed 100 g/t Au, particularly within bonanza-grade shoots, although

such grades are spatially restricted. Mid-grade mineralization is typically associated with hydrothermal breccias and structurally controlled vein swarms, where grades generally range from approximately 3 g/t

Au to 34 g/t Au. These zones represent transitional domains between high-grade vein systems and the broader mineralized envelope. Low-grade mineralization occurs as pervasive stockwork veinlets and

disseminations, generally grading less than 3 g/t Au, but forming the bulk of the tonnage within the current Mineral Resource.

Mineralogically, the

system is dominated by quartz–adularia gangue assemblages with associated electrum, pyrite, and marcasite, consistent with deposition from near-neutral pH hydrothermal fluids under low-sulfidation

epithermal conditions. Alteration is characterized by strong silicification associated with veins and breccias, adularia alteration indicative of boiling conditions, and weaker argillic to sericitic halos in surrounding wall rocks. Distal propylitic

alteration is locally developed and reflects background fluid–rock interaction outside the main mineralized zones.

The geometry and continuity of

mineralization reflect the underlying structural controls. Mineralized zones extend over a strike length of approximately 1.5 km to 2.0 km, widths of several hundred meters to over 1 km, and vertical extents exceeding 600 m. However, continuity

varies significantly by mineralization style, with high-grade veins exhibiting limited lateral and vertical continuity relative to the more continuous, lower grade stockwork domains. This results in a deposit characterized by a highly heterogeneous

grade distribution, with localized high-grade zones embedded within a large, lower-grade mineralized envelope.

Following historical mining, the remaining

mineralization is dominated by lower-grade stockwork material, down-dip extensions of previously mined high-grade veins, and secondary structural zones hosting moderate-grade mineralization. Discrete zones

such as the West Wood area demonstrate the continued presence of structurally controlled, higher-grade mineralization associated with hydrothermal breccias and intrusive-related features.

6-12

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

6.4

Deposit Types

The Project is classified as a low-sulfidation epithermal gold-silver deposit developed within a middle Miocene

volcanic center in an extensional tectonic environment. This classification is supported by the observed geological, mineralogical, structural, and alteration characteristics, including quartz–adularia vein systems, hydrothermal breccias,

stockwork mineralization, and associated alteration assemblages typical of epithermal systems formed at shallow crustal levels.

Low-sulfidation epithermal deposits are formed from near-neutral pH hydrothermal fluids, typically derived from magmatic sources and circulating through structurally prepared volcanic sequences. At Sleeper,

mineralization is spatially associated with a major west-dipping, range-bounding normal fault and related structural splays, which provided the principal conduits for hydrothermal fluid flow. The deposit is hosted predominantly within Miocene

basaltic and rhyolitic volcanic rocks, with the Sleeper rhyolite representing the primary host lithology. The structural and lithological framework is consistent with the development of an epithermal system in an extensional volcanic setting, where

repeated fault movement and magmatism facilitated fluid migration and metal deposition.

The mineralization at Sleeper exhibits the key features of low-sulfidation epithermal systems, including banded quartz–adularia veins, chalcedonic silica, and hydrothermal breccias, with associated gold occurring primarily as electrum. Sulfide mineralization is

generally limited to pyrite and marcasite, reflecting relatively low sulfur fugacity conditions compared to high-sulfidation systems. The alteration assemblage is dominated by silicification and adularia, with subordinate argillic to sericitic halos

and distal propylitic alteration, consistent with deposition from low-temperature hydrothermal fluids under boiling and fluid-mixing conditions.

The deposit displays a well-developed vertical and lateral zonation typical of epithermal systems. High-grade mineralization occurs in structurally controlled

quartz–adularia veins and associated breccias within the central portion of the system, representing zones of focused fluid flow and boiling. These zones transition outward and downward into intermediate grade breccias and vein swarms, and

ultimately into broad envelopes of low-grade stockwork and disseminated mineralization. This zonation reflects decreasing fluid flux and permeability away from the principal structural conduits and is

consistent with established genetic models for low-sulfidation epithermal deposits.

The overall geometry and

scale of the Sleeper system are also consistent with this deposit type, with mineralization extending over approximately 1.5 km to 2.0 km along strike, several hundred meters in width, and more than 600 m vertically. The system comprises a

combination of discrete high-grade vein structures and a large, lower-grade mineralized envelope, reflecting both focused and diffuse hydrothermal processes. The presence of alluvial or placer mineralization derived from erosion of primary

mineralized zones further supports the interpretation of a shallow-level epithermal system that has undergone post-mineral erosion and sediment redistribution.

6-13

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

7.0

Exploration

Exploration at the Project comprises an extensive, multi-decade dataset integrating drilling, geochemical sampling, geological mapping, and a wide range of

geophysical surveys completed by multiple operators from the early 1980s through 2013. The deposit was discovered beneath shallow alluvial cover through drilling, and subsequent programs have included more than 4,400 drill holes, extensive soil and

rock geochemical datasets, and numerous geophysical surveys, including gravity, airborne and ground magnetics, induced polarization (IP), resistivity, magnetotelluric (MT), and seismic methods

7.1

Exploration

7.1.1

Paramount Gold Geophysical Surveys (2010–2013)

7.1.1.1

Overview (2010–2013)

Following the acquisition of the Project in 2010, Paramount Gold undertook a series of targeted geophysical surveys between 2010 and 2013 to enhance the

understanding of the structural and lithologic framework controlling mineralization. These surveys were designed to complement and refine the extensive historical geophysical database and were interpreted by a qualified geophysical consultant in the

context of both newly acquired and legacy datasets. The primary objective of this work was to delineate structural corridors, identify lithologic contrasts, and define alteration patterns associated with the hydrothermal system.

7.1.1.2

Gravity Survey (2012)

In 2012, Paramount Gold completed a detailed ground gravity survey over the southern portion of the property. The survey was conducted between late March and mid-April 2012 and comprised approximately 1,019 gravity stations collected on variable grid spacing, including 100 m and 200 m grids, supplemented by wider-spaced reconnaissance stations.

Gravity measurements were acquired using LaCoste & Romberg Model-G gravity meters, with station locations

surveyed using Trimble Real-Time Kinematic (RTK) and Fast-Static GPS methods to ensure accurate positioning and elevation control. The dataset was processed to Complete Bouguer Anomaly using a range of assumed densities, with a representative

density of approximately 2.35 g/cm³ applied based on prior work in the area. Terrain corrections were applied over multiple radii extending to regional scales, and the processed data were gridded and filtered to generate regional, residual, and

horizontal gradient products suitable for structural interpretation.

Interpretation of the gravity data identified three north–south–trending

structural corridors extending more than 30 km southward from the Sleeper deposit. These features define a series of basin and horst geometries and are interpreted to represent fundamental controls on the distribution of mineralization and the

architecture of the hydrothermal system.

7.1.1.3

Induced Polarization and Electrical Surveys (2012–2013)

Induced polarization (IP) and associated resistivity surveys were conducted during the 2012–2013 period to further investigate subsurface chargeability

and resistivity contrasts. These surveys were designed to identify zones of sulfide mineralization, silicification, and hydrothermal alteration that may not be evident from surface observations or magnetic data.

7-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The IP data were integrated with gravity and magnetic datasets to refine interpretations of subsurface

structures and alteration zones. Chargeability anomalies identified through these surveys were interpreted as zones of disseminated sulfides and hydrothermal activity, providing additional drilling targets and contributing to the overall

understanding of mineralization controls.

7.1.1.4

Data Integration and Interpretation (2010–2013)

All geophysical datasets acquired by Paramount Gold between 2010 and 2013 were integrated with historical geophysical, geological, and drilling data to produce

a coherent interpretation of the property-scale structural framework. The combined dataset allowed for improved delineation of major structural trends, basin geometry, and potential mineralized corridors extending beyond the limits of historical

mining.

This integrated interpretation confirmed that the Sleeper deposit is situated within a structurally complex setting characterized by major

north–south structural corridors and associated secondary structures that control the localization of high-grade vein systems and broader zones of disseminated mineralization. The results of the Paramount Gold geophysical programs have

therefore provided a critical foundation for ongoing exploration targeting, particularly in areas beneath post-mineral cover and along underexplored structural trends.

7.1.2

Exploration Targeting – QP Comment

Exploration targeting at Sleeper is based on integrating geological, geochemical, and geophysical datasets, with particular emphasis on structural controls and

the distribution of hydrothermal alteration. High-grade mineralization is interpreted to be localized along steeply dipping structural zones and associated vein systems, while broader zones of lower-grade mineralization occur within

stratigraphically controlled envelopes surrounding these structures.

Geophysical data, particularly gravity and IP surveys, have played a critical role

in identifying structural corridors, basin architecture, and potential alteration zones beneath the cover. These features provide key vectors for exploration, particularly in areas beyond the limits of historical mining and drilling. Targets include

down-dip and along-strike extensions of known vein systems, structurally controlled high-grade zones, and underexplored areas beneath post-mineral cover, including West Wood within the broader mineralized

halo.

The QP emphasizes that these exploration targets are conceptual and based on geological interpretation supported by available data. There has been

insufficient exploration to define Mineral Resources in these areas, and it is uncertain whether further exploration will result in the delineation of additional Mineral Resources.

7.2

Drilling

Drilling at the Project has been conducted by numerous operators over several decades and has served as the primary source of geological and grade information

supporting the current understanding of the deposit. As of the effective date of this Technical Report, Paramount Gold and the Project’s predecessor owners have completed approximately 4,400 drill holes totaling about 638,000 m of drilling

completed between 1983 and 2021 by multiple operators (Table 7-1 and Figure 7-1). Drilling methods are dominated by Reverse Circulation (RC), with limited core and sonic

drilling incorporated in later programs. Some historical drilling records lack complete information, including hole type and total depth for certain programs, and these data gaps introduce uncertainty that has been considered in the evaluation of

the dataset and Mineral Resource classification.

7-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 7-1: Drill Hole Database

Year

Operator /Property

Program /Area

Drill

Type

Number of

Drill Holes

Total Depth

Drilled (m)

1983–2010

Unknown

Exploration

RC

20

780

1983–1995

AMAX

Exploration / Production

RC

3,668

509,043

1989

NGM

Exploration

RC

9

438

1997

Placer Dome

Exploration

RC

47

13,323

1996–1997

X-Cal

Exploration

RC

140

27,700

1998–2003

X-Cal*

Exploration

RC

83

N/A

2003–2007

X-Cal

Exploration

RC

169

47,169

2004–2005

New Sleeper Gold

Exploration

RC

69

18,363

2007–2008

Evolving Gold*

Exploration

RC

34

6,636

2009–2012

Montezuma Mines*

Exploration

RC

11

1,940

2010–2021

Paramount Gold

Exploration

RC

155

29,752

Waste Rock Dump

RC

65

2,397

SONIC

9

261

Heap Leach Pad

CORE

40

978

TSF

SONIC

83

825

Total

4,596

659,605

Note: * reported historical drilling not contained in Mineral Resource Database

Reconciliation of historically reported drilling totals with the drill hole database provided to SLR indicates that, while the

datasets are broadly consistent in overall scale and principal contributors, differences exist due to incomplete, missing, or unverified data within the database available for review and use in the Mineral Resource Estimate (MRE).

AMAX drilling (3,668 holes; approximately 509,000 m), which comprises most of the dataset, is fully reconciled between sources and serves as the primary basis

for the database. NGM (9 holes; 438 m) and Placer Dome (47 holes; 13,323 m) drilling was also consistent across datasets and was considered complete.

Discrepancies were identified between historical drilling records and the drill hole database provided to SLR for the

X-Cal, Paramount Gold, and related programs. Historical records indicate that X-Cal completed 394 drill holes, including 83 holes drilled between 1998 and 2003 for which

total depths are not reported. The database provided to SLR includes 309 X-Cal holes totaling 74,869 m. Consequently, a portion of the X-Cal drilling—primarily

from the 1998–2003 program—was excluded from the Mineral Resource Estimate (MRE) due to insufficient or unverifiable supporting information.

Historical documentation also indicates that Evolving Gold drilled 34 holes totaling 6,636 m between 2007 and 2008, and Montezuma Mines drilled 11 holes

totaling 1,940 m between 2009 and 2012. These drill holes were not included in the database provided to SLR and were therefore excluded from the MRE.

7-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

A similar variance is noted for Paramount Gold drilling. Records report 155 drill holes totaling 29,752 m,

whereas the database provided to SLR contains 136 holes totaling 23,756 m. The exclusion of 13 holes (approximately 3,300 m) reflects the absence of complete or verifiable supporting data at the time of review. As this drilling is relatively recent,

the omission is noted as a limitation on overall data completeness.

In contrast, New Sleeper Gold drilling shows consistency between datasets, with 69

drill holes reported and only a minor variance of approximately 300 m in total drilled length, which is not considered material. The 20 drill holes classified as “Unknown” (780 m) are present in both datasets; however, due to the lack of

ownership attribution and supporting metadata, their use remains limited and subject to further verification.

Overall, the historically reported dataset

comprises 4,596 drill holes totaling 656,960 m, compared to 4,455 drill holes (exploration, waste rock dumps, heap leach pads and TSF) totaling 645,033 m in the database provided to SLR, resulting in a net shortfall of 215 drill holes totaling

14,584 m. These differences are primarily attributable to incomplete X-Cal and Paramount Gold datasets. Consistent with S-K 1300 and CIM (2019) guidance, the QP has

excluded data that could not be verified or adequately supported and considers the remaining dataset sufficient to support the current Mineral Resource classification, while recognizing that the excluded data represent a limitation on overall data

completeness.

7-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 7-1: Drill Hole Location Map

7-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

7.2.1

Paramount Gold (2010–2021)

Drilling conducted by Paramount Gold Nevada Corp. and Silver Corp. between 2010 and 2021 represents the most recent phase of systematic exploration at the

Project and was undertaken to validate historical data, refine the geological model, and test extensions of known mineralization. A total of 136 drill holes comprising approximately 23,756 m were included in the drill hole database provided to SLR

and used in the Mineral Resource Estimate (MRE). Drilling was primarily focused on the Sleeper deposit core area and surrounding zones, including structurally controlled targets and underexplored areas such as West Wood and areas beneath

post-mineral cover.

7.2.1.1

2010 Drilling

The 2010 program comprised 14 drill holes totaling approximately 4,123 m and represents the initial phase of Paramount Gold’s drilling following

acquisition of the project. This program focused on the central Sleeper deposit, including areas within and adjacent to the historical open pit, with the objective of validating historical drilling results and confirming the continuity of known

mineralization. Limited step-out drilling also tested extensions of mineralization along the primary structural trends associated with the Sleeper vein system.

7.2.1.2

2011 Drilling

The 2011 program was the largest of the Paramount Gold campaigns, comprising 93 drill holes totaling approximately 9,028 m. During this phase, drilling focused

on expanding mineralization within the broader low-grade halo surrounding the historical high-grade vein systems, as well as testing along-strike and down-dip extensions

of the principal structures. Additional drilling targeted peripheral zones, including the West Wood area and other structurally controlled targets interpreted to host hydrothermal breccias and vein-related mineralization.

7.2.1.3

2012 Drilling

The 2012 program included 19 drill holes totaling approximately 6,158 m and was designed to follow up on targets generated from the 2011 drilling and

concurrent geophysical surveys. Drilling focused on structurally controlled zones identified through gravity and IP data, including areas south of the historical pit and beneath post-mineral cover. The program emphasized refining the geometry of

mineralized zones and testing newly identified structural corridors interpreted to control mineralization.

7.2.1.4

2013 Drilling

The 2013 program comprised 10 drill holes totaling approximately 4,448 m and represents the final phase of Paramount Gold’s drilling during this period.

Drilling was more selective and focused on priority targets identified from previous programs, including infill and step-out drilling in the core deposit area and targeted testing of structurally controlled

zones and peripheral exploration areas.

7.2.1.5

2021 Drilling

The 2021 program consisted of 6 RC exploration holes drilled to the southeast of the open pit. A total of 2,645 m were drilled. One of the holes was an RC pre-collar in the West Wood zone. However, the planned core tail portion of the hole was never initiated due to budgeting issues at the time.

7-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

7.2.2

Drill Hole Orientation

Historical drilling at the Project was predominantly completed using vertical reverse circulation (RC) drill holes, reflecting the early focus on delineating

near-surface mineralization and supporting open-pit mine development. This approach was appropriate for defining the broad, laterally continuous low-grade mineralized

envelope; however, vertical drilling provides limited control on the true thickness and geometry of steeply dipping structures.

Subsequent drilling

programs incorporated angled holes, particularly core drilling, to better define the orientation and continuity of steeply dipping vein systems, hydrothermal breccias, and structurally controlled zones. Drill hole orientations and intercept

relationships indicate that high-grade mineralization is commonly associated with steeply dipping structures, and angled drilling was therefore required to adequately characterize these features and support geological modeling.

Paramount Gold drilling (2010–2021) continued to utilize primarily RC methods with a combination of vertical and locally angled holes, targeting both

confirmation of historical mineralization and improved definition of structural controls. Drill orientations were selected to test down-dip and along-strike extensions of known mineralized zones and to

evaluate targets identified through integrated geological and geophysical interpretation.

The QP considers that, while the predominance of vertical

drilling in the historical dataset introduces some uncertainty in defining true thickness and structural geometry, the incorporation of angled drilling and the overall drilling density provides an adequate basis for interpreting mineralization

continuity and supporting the current Mineral Resource Estimate.

7.2.3

Drill Hole Collar Surveys

Drill hole collar locations for historical and more recent drilling programs were established using survey methods consistent with industry practices at the

time of drilling. Early drilling campaigns (1980s–1990s) generally relied on conventional ground survey techniques, including optical and manual methods, which may be subject to greater positional uncertainty relative to modern standards.

More recent programs, including those conducted during the 2000s and by Paramount Gold Nevada Corp. between 2010 and 2013, utilized improved survey

techniques, including differential Global Positioning System (GPS) methods, providing greater spatial accuracy for collar positioning. Collar coordinates were compiled into a centralized database and, where possible, validated against historical

records and mapping.

For certain historical drill holes, survey control data are incomplete or lack documentation regarding survey methodology and

accuracy. In accordance with S-K 1300 requirements and CIM (2019) Best Practice Guidelines, the QP has assessed these limitations and considers that the overall collar dataset is sufficiently reliable to

support Mineral Resource estimation, with associated uncertainties addressed during the Mineral Resource estimation process.

7.2.4

Drill Hole Coordinate System

Drill hole collar locations at the Project have been recorded using multiple coordinate systems over time, reflecting changes in surveying practices and data

management by successive operators.

7-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

During initial exploration in the early 1980s, AMAX established a local mine grid coordinate system based on

a truncated State Plane system referenced to NAD27, Western Nevada Zone, in feet. This local grid was defined such that local coordinates of X = 0 and Y = 0 correspond to State Plane coordinates of X = 640,000 ft and Y = 2,390,000 ft, respectively.

This coordinate system remained in use for all drilling and data management activities through August 2004.

In August 2004, X-Cal converted all relevant project data, including drill hole collar locations, to the Universal Transverse Mercator (UTM) coordinate system, NAD27, Zone 11, in meters. The transformation included the

establishment of a local mine grid reference tied to UTM coordinates (local Mine Grid X = 0 corresponding to UTM Easting 410,125.39 m and local Mine Grid Y = 0 corresponding to UTM Northing 4,573,808.38 m).

All drilling completed after this conversion, including the Paramount Gold drilling programs (2010–2021), was surveyed directly in UTM NAD27 Zone 11

coordinates (meters). Paramount Gold did not resurvey historical drill hole collars, as many locations had been disturbed by mining or reclamation activities. Instead, collar data were compiled from historical records, including drill logs and

electronic databases.

A review of the collar dataset indicates that most historical collar coordinates were transcribed into electronic format during the

X-Cal conversion and show good agreement between original mine grid records and UTM-transformed coordinates.

In accordance with S-K 1300 and CIM (2019) Best Practice Guidelines, the QP considers the coordinate system

transformation and compilation process to be appropriate for Mineral Resource estimation, with any residual uncertainty associated with historical collar locations addressed through data validation procedures and the Mineral Resource estimation

process.

7.2.5

QP Comment – Drilling Data Considerations and Limitations

While the overall drilling database is extensive, certain portions of the historical drilling record are incomplete or lack detailed documentation regarding

drilling methods, sampling procedures, and survey control. Some historical programs, although conducted by reputable operators, do not include sufficient supporting information on data-acquisition protocols, which introduces uncertainty and

implications for the confidence and classification of Mineral Resources.

Despite these limitations, the QP considers that the available drilling data,

when integrated with geological interpretation and supported by more recent drilling and validation work, provides an adequate basis for the current Mineral Resource estimates. Continued drilling, particularly using modern standards and oriented

core techniques, is expected to further refine the geological model, improve confidence in structural interpretations, and support potential future upgrades in resource classification.

7.3

Hydrogeology Data

The Project is located along the eastern margin of Desert Valley in Humboldt County, Nevada, where basin-fill alluvium overlies a sequence of Mesozoic and

Cenozoic bedrock units. The hydrogeologic system is well characterized based on pre-mining investigations, extensive dewatering records from mine operations (1985–1996), and post-closure monitoring data collected since 1996. SLR has reviewed

numerous technical reports prepared over the past three decades, including documents submitted to state and federal regulatory agencies such as the Nevada Division of Environmental Protection (NDEP), Bureau of Mining Regulation and Reclamation

(BMRR), and the BLM.

7-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Since the Sleeper pit has previously been dewatered by a network of dewatering wells (61 drilled over the

mine life), there is an extensive physical and chemical hydrogeological database collected from these dewatering wells and a supporting network of monitoring wells (68 installed over the mine life). At full capacity, the dewatering system discharged

87,200 m3/day (16,000 US gallons per minute [gpm]) from 12 pumping wells installed into the bedrock and 28 interceptor wells installed in the basal gravel aquifer.

7.3.1

Physical Hydrogeology

Hydrostratigraphic units generally consist of layered lacustrine clays, silts, and sands overlying alluvial gravel, followed by faulted rhyolite bedrock. The

lacustrine sands (known locally as the intermediate sands) are interpreted to have been beach deposits on the shores of periglacial Lake Lahontan. The intermediate sands were de-watered under an induced

hydraulic gradient from the intermediate sands into the basal alluvial gravel. As such, no dewatering wells were installed in the intermediate sands (WMC 1995).

The basal gravel is the primary aquifer and the main source of recharge to the pit lake. The basal gravel is thin to

non-existent on the east wall of the pit. Approximately 70% of the discharged groundwater was extracted from the basal gravel aquifer (WMC 2005). Groundwater discharged from the interceptor wells (installed in

the basal gravel on the west side of the pit) is intercepted prior to discharging to the pit.

Faults transecting the rhyolite bedrock have been found to

be generally non-transmissive and effectively compartmentalize groundwater flow in the bedrock. There is a fracture zone underlying the base of the pit (below 1,087 masl), known as the Deep Fracture System

(DFS), that was targeted to complete bedrock wells. Approximately 22 % of the discharged groundwater was extracted from DFS bedrock wells (WMC 2005). Generally, de-pressurizing the deep fracture system

induced downward flow from fractures above and allowed for efficient dewatering of the bedrock pit walls and floor.

However, in zones where pressurized

shallow fracture (PSF) systems were found not to be connected to the DFS and were at risk of de-stabilizing the pit walls, additional bedrock wells were installed. Approximately 9% of the discharged

groundwater was discharged from PSF bedrock wells (WMC 2005).

A total of approximately 30 dewatering wells were operational at any one time. Some

redundancy was built into the dewatering well network to allow for well and pump maintenance; as such, 61 dewatering wells were drilled over the mine life (WMC 2005). Approximately

5,450 m3/day (1,000 gpm) of the discharged water was used for mine operation (heap process water, mill operations, and dust control), while the remainder was discharged into a temporary

wetland comprised of engineered and permitted dyke structures that impounded 47 Mm3 (3,800 acre-feet) of water located in the middle of the Desert Valley (WMC 2005). Of the discharged water,

approximately 40% infiltrated into the subsurface, while the remainder evaporated (WMC 2005). The discharge system consisted of 4.8 km of conveyance channel and 17.7 km of containment dyke and required excavation, placement, and compaction of

264,000 m3 (350,000 yd3) of material.

Basal gravel and bedrock aquifer properties have been reasonably assessed and presented in Table 7-2.

7-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 7-2: Hydrostratigraphic Unit Hydraulic Properties

Hydrostratigraphic Unit

Hydraulic

Conductivity (m/s)

Specific Storage

ft-1

Specific

Yield

Lacustrine Deposits

4E-8 to 2E-5

2E-5 to 3E-3

0.1 to 0.15

Basal Gravel Aquifer

1E-5 to 1E-4

5E-5 to 5E-4

0.1 to 0.2

Volcanic Bedrock

4E-7

3E-7

0.0001

Source: WMC 1995.

Using the hydraulic properties presented above, a three-dimensional numerical model using

MODFLOW-USG was calibrated with a 90% to 95% correlation coefficient to measured piezometric heads in the aquifers (Piteau 2021). The monthly water balance of the calibrated model is presented in Table 7-3.

Table 7-3: Monthly Water Balance for the Calibrated Pit Lake Numerical

Model

Month

Water Level

Elevation

(masl)

Surface Area

of Open

Water

(m2)

Precipitation

(m3/day)

Evaporation

(m3/day)

Lake Water

Balance

(m3/day)

October

1,248

655,290

255

1,739

-1484

November

1,248

655,290

245

940

-696

December

1,248

655,290

250

576

-326

January

1,248

655,290

190

603

-413

February

1,248

655,290

120

875

-755

March

1,248

655,290

228

1,755

-1,527

April

1,248

655,290

315

2,076

-1,761

May

1,248

655,290

456

2,913

-2,457

June

1,248

655,290

163

3,755

-3,592

July

1,248

655,290

65

4,076

-4,011

August

1,248

655,290

38

2,870

-2,832

September

1,248

655,290

92

2,755

-2,663

Source: Piteau 2021.

The water balance is consistent with a net evaporative loss whereby there is no significant recharge to the subsurface.

The model was run under two climactic scenarios: 1) current climactic conditions and 2) assuming a 15% increase in evapotranspiration. The model showed that,

under each scenario, the pit lake was a regional groundwater receptor, that the pit lake was not recharging aquifers in any direction, and that it would continue to do so for at least 100 years into the future. The physical hydrogeology data

collected to date and the calibrated model show that physical hydrogeology at Sleeper is reasonably well understood.

7-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

7.3.2

Hydrogeochemistry

A database comprising 24 years of quarterly monitoring of pit lake water quality has been developed. The data set includes depth profiling within the pit lake.

Since the pumps were turned off in 1996, the pit lake water quality has consistently improved (Table 7-4). Except for isolated exceedances of fluoride, the 2020 pit lake water quality generally met the Nevada

Profile III Reference values.

While the mine was operational, a groundwater quality database was developed consisting of groundwater samples collected

from exploration drill holes, groundwater monitoring wells and dewatering wells distributed as outlined in Table 7-5.

No formal quality assurance/quality control (QA/QC) system was implemented in the characterization of groundwater and pit lake quality.

Groundwater quality reported from each hydrostratigraphic unit was generally diagnostic of that hydrostratigraphic unit. Generally, groundwater at the margins

of the basin was younger calcium -bicarbonate type water, whereas groundwater at the center of the basin was older and trended toward a sodium-chloride type water. Since the groundwater quality from each hydrostratigraphic unit is diagnostic, the

influence of leakage across hydrostratigraphic unit boundaries can be qualitatively determined. Based on hydrogeochemical data, as dewatering progressed, an increasing percentage of the groundwater discharge originates from the basal gravel aquifer

but also an increasing percentage is older water originating from the center of the basin (WMC 1995).

Exceedances of U.S. Environmental Protection Agency

(USEPA) water quality standards in the discharged groundwater to the temporary wetland are presented in Table 7-6.

Table 7-4: Evolution of Pit Lake Water Quality

Analyte

1996 Lake

2008 Lake

1Q2011

1Q2014

1Q2020

Alkalinity (total)

nr

62.9

53

66

75

pH (pH units)

1.9

7.6

7.78

7.77

7.27

Antimony

0.12

<0.003

0.002

<0.002

<0.0025

Arsenic

31.8

0.002

0.005

0.006

0.01

Cadmium

0.12

<0.002

<0.002

<0.002

<0.0020

Chloride

178

280

280

280

310

Copper

9.01

0.007

0.002

<0.002

<0.0020

Iron

1,348

<0.05

<0.1

<0.1

<0.20

Lithium

nr

nr

nr

nr

<0.20

Magnesium

253

52

57

59

60

Manganese

27.7

0.098

0.074

0.063

0.05

Molybdenum

nr

nr

nr

nr

<0.040

Nickel

16.1

0.06

0.045

0.034

<0.050

Nitrate

0.53

0.3

<0.5

<0.5

<0.1

Phosphorus

nr

nr

nr

nr

<1.0

Potassium

32

24

29

29

31

7-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Selenium

0.02

0.006

<0.01

<0.01

<0.0050

Sodium

241

330

340

350

390

Strontium

nr

nr

nr

nr

1

Sulfate

6,366

1,330

1,300

1,400

1,400

Thallium

1.37

0.002

0.003

0.002

0.002

Tin

nr

nr

nr

nr

<0.20

Total Dissolved Solids

9,000

2,480

2,600

2,600

2,700

Uranium

nr

nr

nr

nr

<0.0050

Vanadium

nr

nr

nr

nr

<0.020

Zinc

39.5

0.015

0.06

0.05

<0.040

Source: Piteau 2021.

Notes:

nr

analyte concentration not reported

<

less than the method detection indicated

All concentrations (except pH) are reported as mg/litre unless otherwise indicated

Table 7-5: Groundwater Sample Distribution

Source

Total Number of Samples Collected

Lahontan Clays

66

Intermediate Sand

20

Basal Gravel Aquifer

57

Bedrock

14

Regional Monitoring Locations

73

Composite Dewatering Discharge

38

Source: WMC 1995.

Table 7-6: Exceedances of USEPA Water Quality Standards in Dewatering Discharge

Primary

Drinking Water

Irrigation

Livestock

Watering

Aquatic Life

Wildlife

Propagation

Dewatering Discharge

Arsenic

Selenium

TDS

Fluorine

Boron

None

Fluorine

Arsenic

Boron

Copper

Zinc

Bicarbonate

Alkalinity

Source: WMC 1995.

Notes:

TDS total dissolved solids

7-12

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

7.4

Geotechnical Data

No relevant geotechnical data have been collected by Paramount Gold recently, and the authors are not aware of any existing geotechnical data. The SLR QP

recommends that Paramount Gold compile relevant historical geotechnical data.

7-13

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

8.0

Sample Preparation, Analyses, and Security

This section has been reviewed and edited by SLR and is derived, where applicable, from RESPEC (2023) and Wilson and SRK (2012). SLR reviewed the

information for completeness, internal consistency, and compliance with SEC Regulation S-K 1300, CIM (2019) Best Practice Guidelines.

The review covered sampling methods, sample preparation and analytical procedures, QA/QC protocols, and sample security practices. Supporting documentation,

including original sampling records, full QA/QC datasets, and laboratory certificates, was not available for independent verification; therefore, the review relies on information presented in the source reports.

The SLP QP considers the sampling, preparation, analytical, and security practices to be consistent with industry standards for the deposit type and period of

work. Despite data limitations, the information is sufficient to support the Mineral Resource Estimate, with uncertainties addressed through data validation and reflected in the Mineral Resource classification.

8.1

Sample Method and Approach

Sampling at the Project was completed by multiple operators between 1983 and 2013 and forms the basis of the geological and assay database supporting the MRE.

Sampling methods evolved over time; however, the overall approach is considered appropriate for the style of mineralization and consistent with industry practice.

8.1.1

Historical (1983–2010)

Historical sampling was conducted by AMAX (1983–1995), NGM (1989), Placer Dome (1997), X-Cal (1996–2007),

and New Sleeper Gold (2004–2005). Approximately 95% of the drill hole database comprises RC drilling. RC samples were collected at the rig using cyclone and splitter systems to produce representative subsamples at regular intervals, designed

to capture lithologic and mineralization variability.

During the AMAX period, sampling focused on near-surface bulk-tonnage mineralization, predominantly

using vertical drill holes. Documentation is limited; however, methods are consistent with industry practice for the period. NGM and Placer Dome used similar RC-based approaches with limited documentation but

no identified deviations from standard practice.

X-Cal and New Sleeper Gold implemented more structured

procedures, including cyclone and splitter sampling, systematic labeling and tracking, and field duplicates at approximately 150 ft intervals. Limited diamond drilling was completed in structurally complex areas; core was logged and sampled by

lithology, alteration, and mineralization, and split with half retained.

Sampling targeted both the low-grade

mineralized envelope and higher-grade structurally controlled mineralization associated with veins and hydrothermal breccias. Where coarse gold was suspected, a metallic screen fire assay was used to address sampling bias.

8.1.2

Paramount Gold (2010–2021)

Sampling during the Paramount Gold and Silver Corp. programs (2010–2021) represents the most recent data collection phase and was completed to validate

historical data, refine the geological model, and test extensions of mineralization A total of 155 drill holes (29752 m) were sampled, primarily using RC drilling methods similar to those used in earlier programs.

8-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

RC samples were collected at the rig using cyclone and splitter systems at regular intervals. Intervals were

defined from geological logging to capture mineralization associated with vein systems, hydrothermal breccias, and disseminated zones within the broader low-grade envelope. Sampling covered the main Sleeper

deposit and peripheral targets, including structurally controlled zones and areas beneath post-mineral cover such as West Wood.

Paramount applied

standardized procedures for sample collection, labeling, and tracking, using trained personnel to maintain sample integrity. Methods were consistent with earlier programs to maintain database continuity. Where coarse gold was suspected, a metallic

screen fire assay was applied.

8.1.3

QP Comment

Sampling methods across all programs are appropriate for the mineralization style and intended data use. Documentation for early programs is limited; however,

later programs by X-Cal, New Sleeper Gold, and Paramount demonstrate adherence to industry-standard practices.

In

the opinion of the QP, the sampling approach is adequate to support the MRE, with uncertainties from historical practices addressed through data validation and Mineral Resource classification.

8.2

Sample Preparation and Analysis

8.2.1

Historical (1983–2010)

8.2.1.1

Sampling, Handling, and Chain of Custody

Sample preparation and analytical procedures for historical drilling at the Project were completed by AMAX, NGM, Placer Dome,

X-Cal, and New Sleeper Gold. Documentation has improved since the late 1990s. Early programs (1983–1997) lacked detailed records of sample handling, chain of custody, and laboratory protocols. Although

conducted by established operators and consistent with industry practice at the time, supporting documentation, including laboratory certificates and QA/QC records, was not available for independent verification.

Later programs, particularly X-Cal (1996–2007) and New Sleeper Gold (2004–2005), implemented more

structured handling and chain-of-custody procedures. Samples were collected at drill sites and transported to commercial laboratories in accordance with documented

protocols, thereby improving traceability and control.

8.2.1.2

Sample Preparation

Sample preparation during later historical programs was completed at commercial laboratories, primarily ALS Chemex (ALS Global or ALS), which is located in

Elko, Nevada. Procedures followed standard workflows, including drying (if required), whole-sample crushing, subsampling, and pulverization to produce a pulp for analysis, ensuring homogeneity and minimizing bias.

Prepared pulps were retained by the laboratory or returned to the site for storage and potential verification.

8-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

8.2.1.3

Analytical Methods

Gold was analyzed primarily by fire assay, the industry-standard method. Routine samples used fire assay with atomic absorption finish. Samples with elevated

gold or suspected coarse gold were analyzed by metallic screen fire assay to address nugget effects and improve accuracy.

Selected samples were analyzed

for multiple elements using aqua regia or four-acid digestion followed by ICP techniques to support geological interpretation and mineralization characterization.

8.2.1.4

Laboratory Accreditation and Quality Systems

Analytical work during the historical programs was completed by independent commercial laboratories, primarily ALS Chemex (ALS Global) and, during the New

Sleeper Gold programs, American Assay Laboratories (AAL), located in Sparks, Nevada.

ALS Global operates laboratories accredited to ISO/IEC 17025,

requiring validated methods, calibrated instrumentation, and quality management systems to support analytical accuracy, precision, and reproducibility. Specific certification numbers for the Elko and Vancouver facilities were not provided; however,

ALS laboratories are widely recognized as ISO-accredited.

AAL is accredited to ISO/IEC 17025:2017 by the

International Accreditation Service (IAS) (Laboratory No. TL-536). The accreditation scope includes sample preparation, fire-assay for gold, and multi-element analysis by acid digestion and fusion. AAL

maintains a formal quality management system and applicable regulatory approvals, including from the Nevada Division of Environmental Protection.

8.2.1.5

Sample Retention

Pulps generated during sample preparation were typically returned to the site for storage and potential re-analysis.

The use of established laboratories and standard methods supports dataset reliability; however, incomplete documentation for early programs remains a limitation in data evaluation and Mineral Resource classification.

8.2.2

Paramount Gold (2010–2021)

Sample preparation and analytical procedures during the Paramount Gold and Silver Corp. drilling programs (2010–2021) followed documented protocols

outlined in the 2023 Technical Report (RESPEC 2023) and reflect a controlled workflow from drill-site collection through laboratory analysis at accredited facilities.

8.2.2.1

Sampling, Handling, and Chain of Custody

Samples were transported by drill contractors from drill sites to the Paramount logging facility at the Sleeper site near Winnemucca, Nevada. Drill core was

placed in core boxes, marked in feet, and transported daily for logging, where depths were converted to meters. Core boxes were photographed and placed on logging tables prior to logging.

Paramount geologists logged lithology, alteration, mineralization, and structural features, including fault intersections, lineations, fractures, veins, and

bedding. Sample intervals were defined on geological boundaries to separate lithologies and mineralization styles, typically not exceeding 1.52 m (5 ft) and aligned with drilling runs where possible. Mineralized features were marked to ensure

representative sampling.

Samples were assigned unique numeric identifiers. Tags were placed in core boxes and sample bags, with all numbers recorded in

tag books. Sample numbering excluded drill hole, depth, and location to prevent bias.

8-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Core was sampled at a dedicated station. The competent core was cut with a diamond saw; the broken core was

split manually. One-half was bagged, and the remaining half was retained. Sampling technicians recorded sample numbers, intervals, and dates.

Sample bags were stored in a secure facility until shipment. Samples were organized sequentially, including QA/QC materials, inventoried, and placed in sealed

rice bags with numbered seals. Each shipment contained samples from a single drill hole. Submittal forms documented shipment details, sample numbers, analyses, and duplicate requirements and were provided in hard copy and electronic format.

Reverse Circulation (RC) Drilling

Reverse circulation

(RC) samples were collected at the drill rig using a cyclone system and placed in cloth bags within five-gallon buckets to capture coarse and fine fractions. Each sample was assigned a unique numeric identifier, with records linking the sample

number to drill hole, depth, and interval.

Sample bags were tied, placed in crates, and stored at the drill site or in secured areas behind locked gates

at the Sleeper site. Samples were handled to preserve integrity and prevent contamination or loss.

Before shipment, samples were arranged sequentially,

including blanks, CRMs, and duplicates. Batches were verified and photographed as part of QA/QC.

Samples were transported to the laboratory by ALS

personnel. Shipment dates and counts were recorded on handling forms, maintaining the chain of custody from drill site to laboratory receipt.

Sonic

Drilling

Sonic drilling samples were collected from the drill pipe and placed in plastic bags labeled with the ending footage and orientation. Samples

were transported to the Paramount facility and arranged sequentially on logging tables.

A geologist logged the samples and converted measurements to

meters. Each 1 m interval was transferred into one or two sealed plastic bags (approximately 45.7 cm × 61 cm) for shipment.

Samples were placed in

bins with nailed lids and transported to McClelland Laboratories, typically on the day of collection, minimizing degradation or contamination. At McClelland, samples were logged, split, and coarse crushed before transfer to ALS Chemex for final

preparation and analysis.

Chain of Custody Controls

Across all drilling methods (RC, sonic, core), chain-of-custody procedures

included:

Unique numeric sample identifiers

Recording of sample interval, drill hole, and depth in field logs and tag books

Secure on-site storage with controlled access

Sequential organization and verification of all samples, including QA/QC materials

Sealed containers (rice bags or bins) with numbered security seals

8-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Detailed sample submittal forms documenting shipment and analytical requirements

Direct transport to laboratories by authorized personnel (ALS or contractors)

Documentation of sample movement using handling forms and photographs

These procedures maintained sample security, traceability, and representativity through collection, handling, and shipment. The QP considers these protocols

consistent with industry best practice and sufficient to support the integrity of the analytical dataset for the Mineral Resource Estimate.

8.2.2.2

Sample Preparation

Sample preparation for Paramount drilling was completed at ALS Chemex (Elko), using standardized, ISO-accredited

procedures. Samples were logged, assigned laboratory IDs, and prepared under ALS protocols.

Preparation included the following steps:

Drying (if required)

Primary crushing to approximately 75% passing 6 mm

Mechanical splitting to approximately 250 g subsample

Pulverization to approximately 85% passing 75 µm (200 mesh)

These steps reduce particle-size variability and improve sample representativity.

Contamination control included cleaner sand through the crushing circuit every five samples or with lithology changes, and between all pulverization stages.

For sonic drilling, samples were initially processed at McClelland Laboratories, where coarse crushing was completed before transfer to ALS. Samples were

transported in sealed bins and delivered the same day.

Prepared pulps were shipped to ALS Vancouver for analysis.

8.2.2.3

Analytical Methods

Analytical methods for the Paramount Gold drilling programs (2010–2013) were selected to provide an accurate determination of gold and associated

elements across a wide grade range and to address coarse gold effects. The program included multiple analytical methods, re-assay protocols, and verification procedures.

Gold was determined primarily by fire assay fusion. Both 30 g and 50 g aliquots were used, with 50 g charges improving the representativeness of nuggety

mineralization. Routine samples used fire assay with atomic absorption (AA) finish (e.g., ALS Au-AA23).

For

elevated gold values or AA over limits:

Fire assay with gravimetric finish (ALS Au-GRA21) for >10 g/t Au

50 g fire assay charges to improve precision

Metallic screen fire assay for coarse gold, separating coarse and fine fractions to mitigate nugget effects

8-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Silver and multi-element analyses used four-acid digestion with inductively coupled plasma atomic emission

spectroscopy (ICP-AES) (e.g., ALS ME-ICP61) on approximately 5 g aliquots, providing near-total digestion and analysis of approximately 32 elements.

For elevated silver values:

>100 g/t Ag: four-acid digestion with atomic absorption finish (ALS

AG-OG62)

>1,500 g/t Ag: fire assay with gravimetric finish (ALS Ag-GRA21)

During parts of 2011–2012, silver was also analyzed by three-acid digestion with ICP and, in some cases, by 50 g fire assay with

gravimetric finish. Gold was similarly analyzed using 30 g and 50 g charges with AA or gravimetric finish.

Independent check assays were completed by

Inspectorate (Sparks, Nevada) using 30 g and 50 g fire assay for gold (AA or gravimetric finish) and atomic absorption or ICP methods for silver. This provided external verification of analytical results.

Laboratories applied QA/QC protocols, including blanks, CRMs, and duplicates. Samples were processed in numerical sequence to distribute QA/QC materials

across batches. Results were monitored, and out-of-tolerance values triggered review and re-assay.

The combined use of fire assay, gravimetric and metallic screen methods, multi-element ICP analysis, and independent verification is consistent with industry

best practice and supports the use of the data for Mineral Resource estimation

8.2.2.4

Laboratory Accreditation and Quality Systems

Analytical work was completed by ALS Chemex (ALS Global), accredited to ISO/IEC 17025:2005 for analytical testing, including gold assays, and ISO 9001:2008 for

quality management. ISO/IEC 17025 requires validated methods, calibrated instrumentation, QA/QC protocols, external proficiency testing, and independent audits to support analytical accuracy, precision, reproducibility, and traceability.

Laboratory QA/QC included internal standards, blanks, duplicates, and defined re-assay protocols for out-of-limit results. These controls complemented Paramount’s field QA/QC program and provided an integrated framework from sampling through analysis.

Inspectorate was used as an independent laboratory for check assays, providing external verification; however, certification details for the reporting period

were unavailable.

8.2.2.5

Sample Retention

Following analysis, pulps and coarse rejects were retained by the laboratory or returned to the site for storage, allowing future verification and re-analysis.

The QP considers sample preparation, analytical methods, and laboratory quality systems, including use of ISO-accredited laboratories, consistent with industry best practice and sufficient to support the analytical dataset for the Mineral Resource Estimate.

8.3

Quality Assurance and Quality Control

Quality assurance (QA) demonstrates that assay data meet accepted precision and accuracy limits for the methods used, supporting confidence in the Mineral

Resource estimate. Quality control (QC) comprises procedures to maintain data quality during sampling, preparation, and analysis. QA/QC programs detect contamination and quantify accuracy, precision, repeatability, and overall sampling variability.

8-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

QA/QC procedures at the Project evolved over time, with limited documentation for early programs and more

robust protocols in later programs (X-Cal, New Sleeper Gold, Paramount 2010–2013). The Paramount QA/QC program included certified reference materials (CRMs), blanks, duplicates, and secondary laboratory

check assays to monitor accuracy, precision, contamination, and reproducibility.

QA/QC data for historical programs is incomplete and was not fully

available for independent verification. The Paramount dataset includes a comprehensive QA/QC program with documented performance and validation.

8.3.1

Procedures

8.3.1.1

Historical

QA/QC procedures for early historical programs (AMAX, NGM, Placer Dome) are poorly documented, and records of standards, blanks, and duplicates were not

available to SLR. Direct evaluation of analytical accuracy and precision is, therefore, limited.

Later programs

(X-Cal and New Sleeper Gold) implemented formal QA/QC procedures, including:

Insertion of certified reference materials

Use of blanks for contamination control

Collection of field and laboratory duplicates

Submission of check assays to independent laboratories

Duplicate sampling was conducted at regular intervals (e.g., approximately 150 ft for RC drilling), with standards inserted at defined frequencies. Sample

shipments were tracked, and results were monitored against expected values.

These procedures are consistent with industry practice; however, incomplete

QA/QC datasets limit quantitative assessment of overall performance.

8.3.1.2

Paramount

The QA/QC program for the Paramount (2010–2013) drilling programs incorporated CRMs, blanks, and duplicates, together with internal laboratory QA/QC

procedures and independent check assays to monitor accuracy, precision, and contamination.

QA/QC samples were inserted approximately once every 20

routine samples for each control type (CRMs, blanks, duplicates). Samples were submitted and processed in numerical sequence to ensure distribution across analytical batches. Protocols included CRM acceptance criteria, duplicate precision

monitoring, and blank contamination review. Failures or out-of-tolerance results triggered batch review and re-assay where

required.

The QA/QC dataset is summarized in Table 8-1, which presents counts of QA/QC samples by type relative

to the total number of samples. QA/QC insertion rates are consistent and provide coverage for accuracy (CRMs), contamination (blanks), and precision (duplicates).

Based on SLR’s review and noted limitations, the QA/QC program is consistent with industry best practice and supports confidence in the analytical

dataset.

8-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 8-1: Summary Counts of Sleeper QA/QC Analysis (X-Cal and Paramount)

Category

2003–2007 (X-Cal)

2011–2013 (Paramount)

QA/QC Type

Au

Ag

Au

Ag

Standard (CRM):

Number in Use

N/A

N/A

12

6

Number of Analyses

N/A

N/A

387

16

Number of Failures

N/A

N/A

13

0

Duplicate

Field Duplicate

822

875

200

199

Preparation Duplicate

642

309

0

0

Pulp Duplicate

1,610

2,451

0

42

Lab Preparation Duplicate

0

64

0

6

Lab Pulp Duplicate

162

11

0

Blank

Pulp Blank

0

0

56

0

Coarse Blank

42

35

231

230

Lab Prep Blanks

0

0

8

10

Drill Hole Samples

51,325

44,980

10,134

10,137

Total Insertion Percent (%)

5.00

4.93

8.11

4.42

8.3.2

Certified Reference Material

8.3.2.1

Historical

CRMs) were used in later historical programs, including X-Cal (1996–2007) and New Sleeper Gold (2004–2005),

to monitor analytical accuracy and laboratory performance.

RESPEC confirmed the use of CRMs in the 2003–2007

X-Cal program; however, supporting documentation was not available for review. CRMs were sourced from commercial providers and selected to represent relevant gold grade ranges, but records of insertion

frequency, standard types, certified values, and performance metrics (bias, variance, pass/fail) were not provided to SLR.

Findings and Limitations:

CRM use confirms the implementation of accuracy monitoring

Insufficient documentation to assess performance against tolerance limits

No statistical evaluation (control charts or bias analysis) available

No systematic failures or analytical bias reported

CRM use is confirmed; however, the effectiveness of accuracy control cannot be quantitatively verified and remains a limitation in the QA/QC assessment.

8-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

8.3.2.2

Paramount Gold

Certified Reference Materials (CRMs) were used during the Paramount Gold (2010–2013) programs to monitor analytical accuracy and laboratory performance.

CRMs from Mineral Exploration Geochemistry (MEG), RockLabs Ltd. (RockLabs), and CDN Resource Laboratories (CDN) were inserted at approximately one per 20 samples and selected to represent low-, medium-, and

high-grade gold ranges. Some included listed silver values for multi-element verification. CRMs were distributed throughout the sample stream and processed in sequence with routine samples.

Performance was evaluated against certified values using ±3 standard deviation (SD) acceptance limits. Most results met these criteria, indicating

acceptable accuracy and no systematic bias. Performance was consistent across grade ranges, with variability within expected analytical limits.

Isolated

CRM failures occurred but were not systematic or batch related. These triggered a review of associated batches and re-assay where warranted. Results indicate analytical accuracy was controlled and laboratory

performance was stable for Mineral Resource estimation.

Paramount used four MEG CRMs (Reno, Nevada) and eight RockLabs CRMs (Perth, Western Australia).

All 12 were certified for gold, some listed uncertified silver values. RESPEC data indicate CRM insertion rates of approximately 4% for gold and <1% for silver, reflecting limited silver-certified standards and selective silver analysis. Table 8-2 summarizes the CRMs used.

Table 8-2: Paramount Gold Certified Reference

Material

Standard ID

Drill Years

Insertion Count

Certified Au

(ppm)

Au SD

(ppm)

Listed Ag

(ppm)

MEG S107005X

2011-13

32

1.347

0.085

9.00

MEG S107006X

2011-13

34

2.850

0.364

8.00

MEG S107010X

2011-13

17

6.405

0.302

18.00

MEG-Au.09.02

2011-13

35

0.185

0.019

0.10

OxA89

2011-13

29

0.084

0.008

OxC30

2011-13

18

0.200

0.005

OxD87

2011-13

59

0.417

0.013

Si25

2011-13

44

1.801

0.044

33.25

Si42

2011-13

40

1.761

0.054

SJ63

2011-13

31

2.632

0.055

SL61

2011-13

30

5.931

0.177

SN16

2011-13

18

8.367

0.217

17.64

RESPEC identified three high and ten low failures in ALS gold analyses requiring review. Three of four MEG CRMs and five of

eight RockLabs CRMs show slight negative bias. Three CRM pulps were also analyzed by Inspectorate (Reno, Nevada). Due to the limited Inspectorate dataset and equivalent detection limits, results from both laboratories were evaluated together.

Results are summarized in Table 8-3, with failures detailed in Table 8-4.

8-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 8-3: Summary of Sleeper Gold Results for CRMs

2010–2013

Standard ID

Grades in Au in ppm

Count

Date Used

Failure Counts

Bias

Pct

Target

Ave

Max

Min

First

Last

High

Low

MEGS107005X

1.347

1.336

1.490

1.130

32

7/9/2011

8/26/2012

0

0

-0.8

MEG S107006X

2.850

3.001

3.350

2.150

34

7/13/2011

8/31/2012

0

0

5.3

MEG S107010X

6.405

5.899

6.450

5.080

17

7/9/2011

8/26/2012

0

2

-7.9

MEG-Au.09.02

0.185

0.172

0.198

0.124

35

7/9/2011

8/26/2012

0

1

-6.9

OxA89

0.084

0.080

0.089

0.073

29

9/20/2012

6/8/2013

0

0

-4.8

OxC30

0.200

0.366

3.250

0.181

18

7/9/2011

9/20/2012

1

2

83.2

OxD87

0.417

0.410

0.431

0.392

59

7/26/2012

6/8/2013

0

0

-1.8

Si25

1.801

1.796

1.915

1.395

44

7/9/2011

4/26/2013

0

1

-0.3

Si42

1.761

1.802

1.875

1.750

40

10/5/2012

6/8/2013

0

0

2.3

SJ63

2.632

2.653

2.790

2.540

31

9/20/2012

6/8/2013

0

0

0.8

SL61

5.931

5.808

6.270

4.800

30

7/26/2012

6/3/2013

0

1

-2.1

SN16

8.367

8.087

9.603

4.610

18

7/9/2011

1/30/2012

2

3

-3.4

Table 8-4: Gold Failure Details 2010–2013

Standard ID

Hole ID

Values in Au ppm

Sample Number

Certificate

Target for Std

Fail Type

Fail Limit

Failed Value

MEGS107010X

PGC-11-007

6.405

Low

5.499

5.330

613065

RE11131983

MEGS107010X

PGC-11-014

6.405

Low

5.499

5.080

613897

WN11189542

MEG-Au.09.02

PGC-11-007

0.185

Low

0.128

0.124

613075

RE11131983

OxC30

PGC-12-021

0.200

High

0.215

3.250

616935

WN12209477

OxC30

NDRC-11-041

0.200

Low

0.185

0.181

612271

11-338-10754-01

OxC30

SDRC-11-051

0.200

Low

0.185

0.183

612548

11-338-10755-01

Si25

PGR-11-015

1.801

Low

1.700

1.395

609960

WN11114096

SL61

PGC-12-016

5.931

Low

5.400

4.800

614254

WN12152755

SN16

NDRC-11-041

8.367

High

9.018

9.603

612436

11-338-10754-01

SN16

NDRC-12-061

8.367

High

9.018

9.117

612745

12-338-00257-01

SN16

PGR-11-013

8.367

Low

7.716

5.330

609511A

WN11114451

SN16

PGR-11-014

8.367

Low

7.716

4.610

609762A

WN11112727

SN16

PGC-11-011

8.367

Low

7.716

7.620

613501

WN11164001

8-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Two failures are from certificate RE11131983. Sample 616935 is likely mislabeled, as MEG S107006X was in use

and falls within that range. Four failures lie near the failure limit and, given the observed negative bias, are likely to be due to bias rather than analytical error. CRMs were analyzed by ALS using atomic absorption fire-assay, not the gravimetric

method used for certification.

Figure 8-1 shows the control chart for CRM

MEG-Au.09.02, indicating one low-side failure. A consistent low bias is present; adjusted for this bias, the result would not be considered a failure.

Figure 8-1: Gold Control Chart for MEG-Au.09.02

Notes:

USL Upper Specification Limit Target + 3 Std Dev (CRM)

Target Expected Value (CRM)

LSL Lower Specification Limit Target - 3 Std Dev (CRM)

Items Calculated using Paramount Data

UCL Upper Control Limit Avg + 3 Std Dev (Population)

Avg Mean Value (Population)

LCL Lower Control Limit Avg - 3 Std Dev (Population)

Only six CRMs had listed but uncertified silver values. ALS analyzed all silver samples using three-acid digestion with ICP finish (detection limit <0.5

ppm). Sixteen CRM silver analyses at Inspectorate used aqua regia digestion with atomic absorption finish.

Because listed values lacked standard

deviations, LCL/UCL control limits for the sample population were used to evaluate performance. Table 8-5 shows no silver failures for the 2011–2013 program.

Low-side bias in MEG S107006X, MEG S107010X, and SN16 is attributed to differences in analytical methods

8-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 8-5: Summary of Sleeper Silver Results for CRMs

2010–2013

Standard ID

Grades in Ag in ppm

Count

Date Used

Failure

Counts

Bias

Pct

Target

Ave

Max

Min

First

Last

High

Low

MEGS107005X

9.0

8.9

9.6

8.4

3

1/18/2012

1/23/2012

0

0

-1.5

MEGS107006X

8.0

7.2

7.2

7.1

2

1/18/2012

1/18/2012

0

0

-10.6

MEGS107010X

18.0

9.8

9.8

9.8

1

1/30/2012

1/30/2012

0

0

-45.6

OxC30

0.1

0.1

0.1

0.1

2

1/18/2012

1/30/2012

0

0

0.0

Si25

33.3

31.7

34.3

28.4

3

1/23/2012

1/30/2012

0

0

-4.8

SN16

17.6

15.7

17.6

14.0

5

1/18/2012

1/30/2012

0

0

-10.9

8.3.3

Duplicates

8.3.3.1

Historical

Duplicate sampling during the historical programs was implemented primarily during the X-Cal (1996–2007) and New

Sleeper Gold (2004–2005) periods, reflecting more structured QA/QC protocols. Duplicate types included field duplicates, mainly from RC drilling at regular intervals, and laboratory duplicates, including coarse reject and pulp duplicates.

Sampling frequency was variable but typically followed defined intervals, such as approximately one duplicate per 150 ft or similar spacing within batches.

Duplicate sampling indicates that analytical precision was monitored during these programs. However, detailed datasets required for quantitative assessment,

including duplicate-pair analysis, RPD calculations, and statistical precision measures, were not available to SLR. Formal evaluation of precision was therefore not possible.

Available documentation does not identify systematic precision issues or reproducibility concerns. Duplicate sampling practices are consistent with industry

standards, and although supporting data are incomplete, there is no indication that precision materially affects the reliability of the historical dataset.

X-Cal Duplicates 2003–2007

RESPEC evaluated duplicate pairs using scatterplots (RMA regression), quantile–quantile plots, relative percent difference (RPD) plots, and absolute RPD

plots. Two RPD methods were applied:

RPD (max) = 100 × ((Duplicate – Original) / Lesser of (Duplicate, Original))

RPD (mean) = 100 × ((Duplicate – Original) / Mean of (Duplicate, Original))

RPD (max) yields larger relative differences than RPD (mean).

Outliers were excluded from scatterplots by visual assessment, and pairs with absolute RPD >2,000% were removed from RPD plots. These outliers may remain

relevant and should be considered in the overall evaluation; only pairs with incorrect sample identification are excluded. Causes of extreme variability require further review.

8-12

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Preparation Duplicates: Giroux et al. (2009) reported core duplicates collected from coarse rejects

returned by AAL. Selected samples were re-prepared and analyzed at ALS, representing preparation duplicates of core samples. These were not processed at the primary laboratory (AAL), which is preferred

practice. Figure 8-2 presents the RPD plot for gold core preparation duplicates.

Figure 8-2: X-Cal Core Preparation Duplicates, Relative Differences 2003-2007

Source: RESPEC 2023

At

grades >0.1 g/t Au, most duplicate pairs fall within RPD limits of ±50%, with most within ±25%. A small proportion of pairs exhibit higher RPDs, indicating greater variability between the original and duplicate assays. No bias is

evident; however, high-variability pairs cause the moving-average line to deviate from 0% RPD. Data with a mean RPD near 0% indicates no bias.

Figure 8-3 presents absolute RPD values for each gold pair, illustrating the magnitude of variability. Figure 8-4 shows RPDs for X-Cal RC gold

field duplicates.

.

8-13

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 8-3: X-Cal Core

Preparation Duplicates, Relative Differences 2003-2007

Source: RESPEC 2023

Figure 8-4: X-Cal Gold RC Field Duplicates, Relative Differences 2003-2007

Source: RESPEC 2023

The

moving-average line is influenced by extreme outliers, limiting its utility. Statistical analysis indicates an apparent high bias in duplicate assays relative to original samples; however, this bias is eliminated when the 16% of pairs with absolute

value (AV) RPD >100% are removed, indicating it is entirely attributable to this subset of highly variable pairs. Silver RC field duplicates show similar behavior, consistent with gold and silver occurring in electrum.

8-14

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The average AV RPD is 24% for pairs with AV < 100%, with most pairs < 50%, which is typical for field

duplicates. The primary issue is the proportion of pairs with AV RPD >100% and the tendency for these pairs to show higher duplicate grades. Elevated variability at low grades is expected due to reduced analytical precision and amplification of

percentage differences.

Excluding sample mix-ups or data errors, the most likely cause of AV RPD >100% is

unrepresentative RC sample splitting at the drill rig. This may be limited to duplicate intervals if sampling protocols differed from routine intervals. Otherwise, routine RC splitting may have been

non-representative in approximately 15% to 20% of cases.

Figure 8-5

presents absolute RPD values for RC duplicate pairs (RPD max). Pairs exceeding the AV RPD of 500% are truncated and shown as blue lines without apices.

Figure 8-5: X-Cal Gold RC Field Duplicates, Absolute Values of the Relative

Differences 2003-2007

Source: RESPEC 2023

8-15

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Field duplicates reflect inherent mineralization variability and variability from all subsampling stages:

(i) coarse reject splitting; (ii) pulp preparation; (iii) assay aliquot selection; and (iv) analytical error. Variability introduced prior to duplicate splitting is captured in preparation duplicates.

At Sleeper, approximately half of the variability observed in RC field duplicates is present in core preparation duplicates. Although core duplicates were

analyzed at a different laboratory, the absence of bias supports comparison of the datasets for variability assessment.

Core preparation duplicates show

high variability at relevant gold grades, like RC field duplicates, but with fewer high-variability pairs and no associated bias. This supports potential RC splitting issues during the X-Cal 2003–2007

programs.

High-variability pairs should be reviewed to confirm validity and assess causes, including temporal or spatial clustering.

Elevated variability is also expected due to the nugget effect associated with gold and silver in electrum. This inherent variability introduces risk to

resource estimation and should be considered when selecting an estimation methodology.

8.3.3.2

Paramount Gold

Duplicate sampling during the Paramount Gold (2010–2013) programs was systematic and included multiple precision controls: coarse reject and pulp

duplicates at approximately 1 in 20 samples, and quarter-core duplicates, where one sample per batch was split and submitted under separate identifiers. Laboratories also performed internal duplicate analyses. Routine field core duplicates were not

collected; however, laboratory duplicates and quarter-core splits provide an adequate framework to evaluate analytical precision. Table 8-6 summarizes field duplicate data for

X-Cal and Paramount (2011–2013). No QA/QC data were available for the 2010 five-hole program (RESPEC 2023).

Duplicate results show good agreement across most grade ranges. Precision is consistent at low to moderate grades, with increased variability at higher grades

reflecting coarse gold and nugget effects typical of the deposit. Elevated relative differences at higher grades occur but are not systematic. No systematic bias or material precision issues are identified. Overall, duplicate data indicate

acceptable precision consistent with the mineralization style (Table 8-6) and support the reliability of the analytical dataset for the Mineral Resource Estimate.

8-16

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 8-6: Summary of Results

X-Cal Historical and Paramount Field Duplicates

Laboratory

Duplicate Type

Drill Type(s)

Element

Period

Counts

RMA Regression

Averages as Percent

All

Used

Outliers

y = Duplicate

x = Original

RPD

AV RPD

ALS Minerals Inspectorate ACME Labs

Field Dup

R/C

Au

2003-2007

822

757

65

Y = 1.0047x + 0.0027

3.56

31.12

ALS Minerals Inspectorate ACME Labs

Prep Dup

Core

Au

2003-2007

642

618

24

Y = 1.0229x - 0.0238

0.97

33.64

ALS Minerals Inspectorate ACME Labs

Field Dup

R/C Core

Au

2011-2013

200

192

8

Y = 0.8866x + 0.0126

8.02

31.38

ALS Minerals Inspectorate ACME Labs

Field Dup

R/C

Au

2011-2013

137

132

5

Y = 1.5165x – 0.0439

16.60

31.78

ALS Minerals Inspectorate ACME Labs

Field Dup

Core

Au

2011-2013

63

60

3

Y = 1.037x – 0.0107

-9.26

30.44

ALS Minerals Inspectorate ACME Labs

Field Dup

R/C Core

Ag

2003-2007

875

870

5

Y= 0.992x + 0.126

0.30

54.20

ALS Minerals Inspectorate ACME Labs

Field Dup

R/C Core

Ag

2011-2013

225

224

1

Y = 1.063x + 0.241

-27.20

66.50

Notes:

AV absolute value

RPD relative percent difference

8-17

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Pulp and Preparation Duplicates.

Paramount’s pulp and preparation duplicate data were in final compilation and analysis as of the 2023 Technical Report (RESPEC, 2023) and not available

for review.

Field Duplicates:

A total of 137 RC

field duplicates were compiled from the 2011–2013 program. Figure 8-6 presents an RPD plot for 121 pairs, excluding pairs where both values are below the detection limit.

Figure 8-6: Paramount RC Field Duplicates, Relative Differences 2010-2013

Source: RESPEC 2023

No bias

is evident at grades greater than 0.1 g/t Au. Five of 51 pairs with mean grades >0.1 ppm have AV RPD greater than 100%, all within the highest-grade subset (1.1–2.2 ppm).

Fewer core field-duplicate pairs exceed detection limits (Figure 8-7). These data indicate a consistent low bias, with

duplicate values lower than original assays; additional data are required to confirm. Three of 26 pairs with mean grades greater than 0.1 g/t Au have AV RPD greater than 100%.

8-18

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 8-7: Paramount Core Field Duplicates, Relative Differences

2010-2013

Source: RESPEC, 2023

8.3.4

Blanks

8.3.4.1

Historical

Blank samples were used during later historical programs, particularly X-Cal and New Sleeper Gold, to monitor

contamination during sample preparation and analysis, confirming inclusion of contamination control in the QA/QC framework.

Blank materials were likely

inert or low-grade; however, documentation of blank types, insertion frequency, and analytical results was not available to the SLR. Blank performance cannot be quantitatively assessed, and no statistical

evaluation of contamination is available.

No systematic contamination issues are identified, and no sample integrity concerns are reported. However, the

absence of detailed QA/QC records limits verification of blank effectiveness and remains a constraint on the QA/QC assessment of the historical dataset.

X-Cal Blanks 2003–2007

A total of 38 coarse blanks from the X-Cal drilling were analyzed for gold and, in 35 cases, for silver, with detection

limits of 0.005 ppm and 0.2 ppm, respectively (Table 8-7). This represents a subset of the blanks analyzed, as many were not sufficiently described or not reported in the RESPEC dataset.

Four gold failures and one silver failure were identified using thresholds of five times the detection limit for gold and two times for silver, reflecting the

higher silver detection limit (Table 8-8). Three of the four failures were preceded by higher-grade samples (Figure 8-8), indicating intermittent cross-contamination in

the AAL crushing circuit between May 2004 and April 2005. The remaining failure may reflect a mislabeled sample.

8-19

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 8-7: X-Cal Blank

Samples 2003–2007

Blank ID

Drill Program

Elem

Counts

Maximum

(ppm)

Dates of Analyses

All

Above

Warning

Start

End

Coarse Blank

2003-07

Au

38

4

0.171

23-Mar-04

20-Jun-05

Coarse Blank

2003-07

Ag

35

1

5.300

23-Mar-04

20-Jun-05

Table 8-8: X-Cal Blank Failures and

Preceding Sample 2003–2007

Blank

Certificate

Elem

Method

Preceding

Blank

5x

Det

Limit

(ppm)

Sample

Value (ppm)

Sample

Value

(ppm)

Blank

SP065348

Au

ICP

27805

1.226

27806

0.028

0.025

Blank

SP065582

Au

F50/ICP

28127

1.620

28128

0.050

0.025

Blank

SP065732

Au

F50/ICP

28248

0.672

28249

0.030

0.025

Blank

SP068824

Au

F50/ICP

WW39-05 34018

0.011

WW39-05 34019

0.171

0.025

Blank

SP068894

Ag

AA

NS-01-05 30854

0.600

NS-01-05 30855

5.300

1.000

Figure 8-8: X-Cal Gold in Blanks and

Preceding Samples 2003–2007

Source: RESPEC 2023

8.3.4.2

Paramount

Blank samples were systematically incorporated into the QA/QC program during the Paramount Gold (2010–2013) drilling programs at approximately one blank

per 20 samples, consistent with industry best practice for contamination monitoring. Both coarse and pulp blanks were used, including commercially prepared blanks and inert materials. These included MEG laboratory blanks such as AuBlank40 (<0.002

ppm Au) and MEG-Blank.11.01 (<0.005 ppm Au), together with coarse blank material consisting of commercially crushed white marble with certified values below 0.005 ppm Au (Table 8-9)

8-20

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 8-9: Blank Materials Used in Paramount QA/QC Program

Blank ID

Certified Value

Type

Origin

AuBlank40

<0.002 ppm

Coarse

MEG Labs

MEG-Blank 11.01

<0.005 ppm

Pulp

MEG Labs

Blank

<0.005 ppm

Coarse

Commercial crushed white marble

Blank samples were inserted into the sample stream and distributed throughout analytical batches to monitor contamination

during sample preparation and analysis. The use of both coarse and pulp blanks allowed assessment of contamination during crushing, pulverizing, and analytical procedures.

Analytical results show most blank values at or below detection limits, indicating minimal contamination. Performance was consistent across batches and

laboratories, indicating controlled laboratory conditions.

Coarse blanks, including two from MEG and one prepared by Paramount using commercially crushed

rock, and pulp blanks were inserted at a rate of approximately one per 30 samples (RESPEC). Values exceeding five times the detection limit were considered failures and reviewed.

A total of 231 coarse blanks were analyzed for gold and 230 for silver, with no failures. A total of 56 pulp blanks were analyzed for gold, with no failures.

ALS internal blank data (eight gold, 10 silver) also showed no issues.

Figure 8-9 shows gold values for coarse

blanks plotted with preceding sample values. Some elevated blank values, although not failures, correspond to high-grade preceding samples, indicating minor cross-contamination from the preceding sample.

Figure 8-9: Gold Values of Paramount Coarse Blanks and Preceding Samples

Source: RESPEC, 2023

Occasional elevated blank values were recorded but were isolated and not systematic. These results triggered a review of associated batches and adjacent

samples to assess potential contamination. No persistent contamination trends or material impact on the analytical dataset were identified.

8-21

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Blank results indicate that contamination during sampling, preparation, and analysis was effectively

controlled. The absence of systematic blank failures supports the integrity of the analytical dataset and confirms that field and laboratory procedures were effective in limiting cross-contamination.

8.4

Sample Security

Sample security at the Project was maintained through field handling procedures, controlled storage, documented chain-of-custody protocols, and laboratory custody practices. The level of control and documentation improved over time, with the most comprehensive procedures implemented during the Paramount Gold

(2010–2013) programs.

8.4.1

Historical (1983–2010)

Sample security procedures during the historical programs were generally consistent with industry practice, but documentation for early operators, including

AMAX, NGM, and Placer Dome, was limited. Samples were collected by trained personnel and sent to commercial laboratories for preparation and analysis; however, detailed records of the chain of custody, storage conditions, and access controls were

not available to SLR for independent verification.

During the later historical programs, particularly those completed by

X-Cal and New Sleeper Gold, more formal sample security procedures were implemented. Samples were stored in secured areas, including fenced compounds or controlled-access facilities, before shipment. Shipments

to laboratories were documented, and the laboratories maintained custody during preparation and analysis.

These procedures are consistent with accepted

industry practice. However, the lack of detailed supporting documentation limits SLR’s ability to fully evaluate the effectiveness of sample security for the historical datasets. There is no indication in the available information of sample

tampering, loss, or material compromise of sample integrity.

8.4.2

Paramount (2010–2013)

Sample security during the Paramount drilling programs included controls from drill site collection through laboratory analysis. Drill contractors transported

samples from the drill sites to the Paramount logging and sampling facility at the Sleeper site near Winnemucca, Nevada, where they were logged, processed, and stored in a secure, controlled-access facility.

Drill core was stored in core boxes within the secured facility. Reverse circulation and sonic samples were stored in designated secure areas before shipment.

Trained personnel handled samples, and access to storage areas was controlled to prevent unauthorized handling.

Before shipment, samples were organized,

inventoried, and packaged in sealed containers, including rice bags or bins secured with numbered security seals. Each shipment contained samples from a single drill hole and included sample submittal documentation listing sample numbers, requested

analyses, and QA/QC instructions. Sample batches were verified and photographed before shipment to confirm completeness and integrity.

ALS personnel or

authorized contractors transported samples to the laboratory. All transfers were documented on sample handling forms, maintaining a continuous chain of custody from the project site to the laboratory. On receipt, the laboratories logged the samples

into internal tracking systems and maintained custody through preparation and analysis.

8-22

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

After analysis, pulps and coarse rejects were retained by the laboratory or returned to the project site for

secure storage, allowing future verification and re-analysis.

These sample security procedures are consistent

with industry’s best practice and support confidence in the integrity, traceability, and security of the analytical dataset used to support the Mineral Resource Estimate.

8.5

QP Opinion

In the QP’s opinion the sample preparation, security and analytical procedures are suitable to support the disclosure of the MRE in this TRS.

Sampling (1983–2013) is appropriate for the mineralization style. RC drilling (approximately 95%) using cyclone and splitter systems, with limited

diamond drilling, supports both bulk-tonnage and structurally controlled mineralization. Later programs (X-Cal, New Sleeper Gold, Paramount) show improved controls. Early programs lack documentation but show

no material deficiencies; uncertainties are addressed through classification.

Sample preparation and analytical methods are consistent with industry

standards. Accredited laboratories (ALS, AAL), standard preparation, fire assay, and the use of metallic screen and gravimetric methods, where required, are appropriate. Multi-element ICP and check assays support data validity.

QA/QC is robust in the Paramount (2010–2013) dataset, including CRMs, blanks, duplicates, check assays, and

re-assay protocols. CRM results show acceptable accuracy with minor, non-systematic bias. Blanks show no systematic contamination. Duplicates show acceptable precision,

with higher variability at elevated grades consistent with nugget effects.

Historical QA/QC data are incomplete, limiting quantitative assessment. No

systematic bias, contamination, or precision issues are identified. Elevated variability in X-Cal RC duplicates, including RPD outliers and potential splitting issues, has been taken into account in

classification.

Sample security is adequate. Paramount programs demonstrate a controlled chain of custody, secure storage, documented tracking, and

sealed shipments. Historical documentation is limited; no evidence of tampering or loss is identified.

Key limitations are listed:

Incomplete QA/QC and custody records for early programs (1983–1997)

Limited analytical certificates for verification

Elevated variability in X-Cal RC duplicates from splitting and nugget

effects

These are addressed through validation, reliance on later datasets, and classification.

The dataset is sufficiently accurate and reliable to support the MRE and meets the requirements of S-K 1300 and CIM

(2019), with uncertainties reflected in the Mineral Resource classification.

8-23

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

9.0

Data Verification

Data verification comprises a systematic process to confirm that exploration and analytical data were collected using appropriate procedures, accurately

transcribed into the Project database, and are suitable for use in the preparation of this Technical Report.

All available data relevant to the Project

were compiled, digitized, and incorporated into a database by personnel from Paramount Gold. The QP audited the database for completeness, accuracy, and reliability.

The QP is of the opinion that database verification procedures for the Sleeper project comply with industry standards and are adequate for the purposes of

Mineral Resource estimation.

Project data was provided to the QP in the form of Microsoft Excel spreadsheets and subsequently imported into Leapfrog Geo

and Maptek Vulcan software for independent modeling and resource interpolation.

Verification procedures included checks for:

Unique, missing, or overlapping intervals

Total depth consistency

Duplicate hole identification

Boundary compliance

Database certification was conducted by the QP through a combination of visual inspections and statistical checks, including cross-referencing lithology,

assay values, and spatial data against original hard copy records. Identified inconsistencies were either corrected using primary source documents or excluded from the Mineral Resource estimation

9.1

RESPEC Data Validation

A SLR review shows that RESPEC undertook a comprehensive data verification program to confirm that the Sleeper project database is reliable and suitable for

Mineral Resource estimation.

This work included multiple site visits between 2021 and 2023, during which RESPEC personnel inspected drill core and RC

cuttings, reviewed logging, sampling, and data management procedures, assessed sample storage conditions, and collected GPS collar locations for comparison with the database. RESPEC also examined original drill logs, assay certificates, and

supporting records, and reviewed geological interpretations used in modeling.

The drill hole database was subjected to detailed validation testing to

identify data integrity issues such as missing or duplicated collar information, inconsistent survey data, invalid assay intervals, and gaps or overlaps in geological and analytical records. Where discrepancies were identified, they were evaluated,

corrected where appropriate, and documented using the original data sources provided by Paramount. Collar locations were verified against historical drill logs and electronic records, including validation of coordinate system conversions from local

mine grid to UTM. Downhole survey data were reviewed against available records and found to be generally consistent, although many historical holes lack survey data, limiting full verification. Assay data verification included comparison of the

database against original laboratory certificates, with a complete digital audit of available electronic records and partial manual verification of scanned certificates.

9-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Additional confidence in the dataset was obtained through review of QA/QC programs and results, including

resampling programs completed by Paramount to validate historical assays.

9.2

SLR Data Verification

The QP conducted a site visit on April 2, 2026. During the visit, the QP reviewed the historical mine site, waste rock dump areas, exploration facilities,

and infrastructure relevant to the evaluation of the Project. Historical drill sites were examined, selected drill collar locations were confirmed with GPS, and detailed discussions were held with Paramount technical staff regarding exploration

plans, drilling methods, analytical procedures, and geological controls on mineralization. The Paramount technical team demonstrated a strong understanding of deposit geology and assay interpretation.

9.2.1

Limitations

No material restrictions were encountered during the QP’s independent verification of the Sleeper drill hole database; however, the following limitations

were identified:

Bulk Density: A comprehensive bulk density sampling program has not been completed for all geological units used

in the Mineral Resource model. Additional bulk density data are required to improve confidence in tonnage estimates.

QA/QC Records: Documentation supporting the use of certified reference materials, blanks, and duplicates for

historical channel sampling is unavailable. A formal QA/QC program is recommended for future drilling and sampling campaigns.

Alteration Logging: A review of the oxidation model indicates that oxide and sulfide classifications were

interchanged across a portion of the historical drill hole database. Comparisons with historical mining records from AMAX are inconsistent with the logged oxidation data, further evidence of this issue. Resolution of these discrepancies and

validation of oxidation state logging are recommended to improve confidence in the geological and metallurgical interpretations.

Downhole Surveying: Most historical drill holes lack deviation surveys and are assumed to be vertical. This

assumption introduces uncertainty in the interpretation of true mineralization geometry and thickness.

9.3

QP Opinion

Although some historical information (including portions of QA/QC documentation, downhole surveys, and legacy records) could not be independently verified, the

drill hole database compiled by Paramount and validated by RESPEC aligns with S-K 1300 industry practices. The SLR QP is of the opinion that the database is reliable, internally consistent, and suitable for

use in the Mineral Resource Estimate.

The Project’s extensive production history and prior operational use of these data support their adequacy.

Historical grade control and metallurgical studies corroborate reported gold grades, although recent independent assay verification is lacking for certain legacy datasets.

Data with incomplete collars or insufficient documentation were excluded where necessary and are not considered material to the estimate. Sampling methods

from historical and recent programs are consistent with industry standards. While additional QA/QC documentation and targeted resampling are recommended to further improve confidence, the database is considered appropriate for Mineral Resource

estimation.

9-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

10.0

Mineral Processing and Metallurgical Testing

10.1

Introduction

The metallurgical information reviewed for the Project includes historical operating performance, bottle roll and column leach testing, flotation

investigations, and later oxidation studies.

For this Initial Assessment, the proposed processing method is heap leach treatment of selected oxide,

mixed, and waste rock dump material with Merrill-Crowe recovery. Processing of sulfide, historical heap leach pad (HLP), and historical tailings materials is considered separately through on-site flotation,

with rougher concentrate assumed to be sold or toll treated off site. Sulfide processing test work remains preliminary and requires additional variability test work, concentrate quality, and commercial review.

10.2

Nature and Extent of Metallurgical Testing and Analytical Procedures

SLR reviewed historical oxide milling and heap leaching records; bottle roll and column leach testing on oxide, mixed and waste rock dump composites; flotation

investigations on selected historic HLP, tailings, waste, and sulfide-related materials; and later bio-oxidation and pressure-oxidation studies. For the current study, the McClelland bottle roll and column

leach programs provide the principal support for the coarse-crush agglomerated heap leach flowsheet, while flotation test work supports preliminary consideration of a separate flotation route for sulfide, historic HLP, and tailings materials.

Table 10-1 lists the principal metallurgical reports reviewed for the project. Later technical reports were used as

summary references, while the McClelland, Hazen, SGS, MRDI, KCA, and other historical studies provided the primary metallurgical support for interpretation of processing options and recovery assumptions.

Table 10-1: Metallurgical Reports Reviewed

Report / Document

Date

Laboratory / Organization

Comment

Sampling and Metallurgical Evaluation of Existing Leach Heaps and Mill Tailings

1997

Mineral Resources Development Inc. (MRDI)

Existing heap and tailings metallurgical study.

Sleeper Project Sampling and Metallurgical Test Program

1999

Kappes, Cassiday & Associates (KCA)

Internal report for X-Cal Resources Ltd.

Sleeper Mine Tailings and Heap Evaluation as Potential Gold Resources

2007

Edouard K. Zoutomou / X-Cal Resources Ltd.

Existing tailings and heap evaluation study.

Phase 2 Metallurgical Evaluation – Waste Rock Dump, Westwood and Facilities Composites

2012

McClelland Laboratories Inc. (including ALS and Inspectorate results)

Existing waste rock dump, West Wood, and Facilities cyanidation test work.

10-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Report / Document

Date

Laboratory / Organization

Comment

Pressure Oxidation Pretreatment and Cyanide Leaching of Sleeper Mine Samples

2013

Hazen Research, Inc.

POX subcontract work reported within the 2015 McClelland study.

Metallurgical Tests and Analyses on 12 Sleeper Project Core Composites

2014

McClelland Laboratories Inc.

Bottle roll, column leach, and related cyanidation test work on core composites.

Biooxidation and Pressure Oxidation Testing – Sleeper Drill Core Composites

2015

McClelland Laboratories Inc.

Sulfide-focused metallurgical test work including biooxidation and cyanidation.

Mineralogical study appendix to 2015 McClelland report

2015

SGS Canada Inc.

Supporting mineralogical/deportment study.

Technical Report and Preliminary Economic Assessment – Sleeper Project (Amended)

2017

Metal Mining Consultants Inc.

Technical Report summarizing prior metallurgical work; not a laboratory report.

2022 Sleeper S-K 1300 Technical Report Summary

2022

RESPEC / Woods Process Services LLC

TRS compiling historical metallurgical work; not a laboratory report.

The analytical procedures described in the reviewed reports are conventional for scoping-level evaluation of gold-silver heap

leach and flotation performance and include head assays, bottle roll tests, column leach tests, flotation tests, and reagent-consumption measurements. These procedures are standard industry practice for preliminary assessment of cyanide amenability,

leach kinetics, reagent demand, and flotation response. No non-conventional analytical procedure has been identified as the basis for either the heap leach case or the preliminary flotation case. Certain

recovery values remain provisional where direct representative test work is limited.

10.3

Sample Representativeness

The metallurgical dataset includes several distinct oxide and mixed material groups evaluated as potential heap leach feed, including Facilities Oxide, West

Wood Oxide, and Sleeper Oxide, together with Facilities Mixed, Sleeper Mixed, and West Wood Mixed material. These groups represent separate source areas within the Project and are treated individually because the available test work support, cyanide

amenability, recovery response, and reagent demand differ by material type. The available metallurgical testing and analysis are adequate for preliminary evaluation of selected oxide, mixed, and waste rock dump material as early heap leach feed.

Facilities Oxide is the best-supported heap leach feed type in the database, and selected West Wood Oxide and waste rock dump composites also support a phased heap leach processing scenario. Available flotation work is sufficient to justify

preliminary consideration of a separate flotation-concentrate route for sulfide, HLP, and tailings materials, but not yet for definitive design or pre-feasibility-level recovery prediction.

Sample representativeness is weaker for the sulfide, HLP, and tailings materials now grouped in the separate flotation case. The current data does not support

inclusion of these materials in the same heap leach recovery framework used for oxide, mixed, and waste materials. Historic HLP, tailings, and sulfides require additional metallurgical testing, analysis, and economic evaluation before they can be

assigned definitive recoveries, concentrate terms, and operating cost.

10-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

10.4

Testing Laboratories

The test work reports identify McClelland Laboratories in Sparks, Nevada as the principal metallurgical laboratory for the bottle roll, column leach,

flotation, and related process test work programs used in the oxide, mixed, waste rock dump, and sulfide evaluations. Supporting specialized work was also completed by Hazen Research and SGS Canada, and project QA/QC documentation (Metal Mining

Consultants Inc. 2017) references ALS and Inspectorate for analytical and check-assay work. Based on the files reviewed, the SLR QP understands these laboratories to have been independent of the project owner.

Table 10-2 summarizes the accreditation details, which are shown only where identified during review. “No public

certification record identified” indicates that no specific accreditation record was located during the present review. All listed organizations are considered independent of the mine owner based on the available information.

Table 10-2: Laboratory Accreditation Summary

Laboratory /

Organization

Location

Certification/

accreditation

Affiliation with

mine/

owner

McClelland Laboratories, Inc. (MLI)

Sparks, Nevada

2012–2015 accreditation: IAS-accredited to ANSI/ISO/IEC 17025:2005; accreditation in place since November 12, 2012.

Independent Laboratory

Hazen Research, Inc.

Golden, Colorado

No public certification record identified

Independent Laboratory

SGS Canada Inc. / SGS Minerals Services

Ontario, Canada

Accredited to ISO/IEC 17025

Independent Laboratory

Kappes, Cassiday & Associates (KCA)

Reno, Nevada

No public certification record identified

Independent Technical Consultant

10.5

Relevant Metallurgical Results

Historical operating records show that Sleeper successfully processed oxide material by both milling and heap leaching, supporting oxide material as the

clearest near-term development path. The prior assessments and mine history, therefore, provide a precedent for a large-scale oxide heap leach concept supplied by open-pit mining and, where justified,

rehandling of selected existing waste rock dump material.

10.5.1

Oxides

Facilities oxide is the strongest candidate for initial processing utilizing heap leach and Merrill-Crowe processing. The column and bottle roll results show

favorable gold recovery and cyanide amenability, a coarse crush size of P80 19 mm, with column gold recoveries averaging 83.9% and bottle roll recovery of about 81% Au. West Wood oxide also showed a positive heap leach response with an average

column gold recovery of 76.5%, although with greater variability and higher reagent demand. Sleeper oxide bottle roll gold performance was favorable at 93.9%, but the database does not provide the same level of direct column confirmation as

Facilities oxide.

10-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

10.5.2

Waste Rock Dumps

Selected waste rock dump material also shows potential for a heap leach case. Historical testing concluded that the dump composites evaluated were amenable to

agglomerated heap leach cyanidation at coarse crush size, with column gold recoveries ranging from the mid-60% range to the low-80% range, depending on dump area and

composite. Reagent consumption was variable and, in some cases, high. Waste material is therefore technically amenable to heap leaching, but economic performance is sensitive to recovery, crush-size, and

reagent assumptions.

10.5.3

HLP, Tailings, and Sulfide Flotation

Historical metallurgical data indicate that HLP, tailings, and sulfide materials are more amenable to flotation recovery than through direct heap leaching. The

available database is limited and variable in scope, but it provides a reasonable preliminary basis for evaluation of a flotation process at the IA level. Historical tailings work reported cleaner flotation-related recoveries of 63% Au and 33% Ag at

P75 200 mesh (75 µm) in the 1997 program and approximately 50.8% Au and 64.8% Ag, at P85 400 mesh (37 µm), in the 1999

program, demonstrating that precious metals can be recovered from these materials, although performance was variable and the work did not establish a final commercial flowsheet.

Sulfide rougher and cleaner flotation test work was completed at P80 200 mesh (75 µm) by

McClelland in 2012. The rougher flotation results showed generally favorable recovery performance and are therefore included for the flotation results. For Facilities sulfide material, rougher flotation testing returned gold recoveries of 70.7% and

91.2%, with reported silver recoveries of 43.6% and less than 48.8%. For West Wood argillic-silicic sulfide material, rougher flotation gold recoveries ranged from 57.7% to 79.7%, averaging 70.8%, with an average silver recovery of about 57.0%. For

West Wood strong silicic sulfide material, rougher flotation gold recoveries ranged from 65.0% to 84.9%, averaging 75.1%, with an average silver recovery of 67.1%. McClelland noted that these flotation results were scoping-level in nature and that

additional optimization and locked-cycle testing would be required.

Existing heap leach pad material has not been supported by a sufficiently robust and

dedicated flotation testing program and was historically evaluated primarily for in-place or re-leach potential rather than as flotation feed. At this time, HLP material

is considered with the existing tailings for a flotation-processing case based on the closest available historical flotation analogs. The QP considers this approach acceptable for initial assessment only. Additional variability testing, concentrate

characterization, and economic viability are required before HLP, tailings, and sulfide materials can be assigned recoveries and operating costs for a flotation flowsheet.

The principal processing factors identified in the test work are sulfide content, refractory gold locking, variable leach kinetics, and elevated reagent

demand in certain materials. Sulfide-rich, HLP, and tailings materials are not included in the heap leach case and are instead considered through flotation, followed by sale or toll treatment of rougher concentrate. For IA purposes, a 12% discount

to flotation recoveries is applied to reflect toll milling fees and related downstream charges.

10.5.4

Deleterious Elements

Review of the available multi-element dataset for the oxide, mixed, and waste rock dump materials indicates that mercury, arsenic, antimony and sulfur are the

primary deleterious constituents requiring additional evaluation for the Sleeper Project. The West Wood Oxide samples show elevated mean mercury and antimony concentrations, while the Facilities Mixed and North Dump materials show elevated arsenic

and antimony. The North Dump also reports elevated total sulfur concentrations.

10-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The identified deleterious elements are not currently considered to be prohibitive to heap leach development,

however, the elevated mercury, arsenic, antimony, and total sulfur in selected material groups warrant additional metallurgical and precipitate-quality test work prior to pre-feasibility level design.

Initial refinery capital cost allowances include a mercury retort to address the elevated mercury concentrations identified in selected material groups. This

allowance is intended to provide an IA level provision for mercury management during doré production and refinery handling. Additional test work, precipitate characterization, and doré/refinery assessments are recommended in future

study phases to confirm the required mercury-control measures and refine the associated capital and operating cost assumptions.

10.6

Recovery Assumptions and Basis for Estimation

Recovery assumptions used for the preliminary economic evaluation were derived from available test work and adjusted to reflect confidence levels across the

resource. For heap leach materials, column leach results were given greater weight than bottle roll results because they are more representative of coarse-crush heap leach conditions and kinetics. When only bottle-roll data were available,

conservative adjustments were applied. Sulfide, HLP, and tailings materials are considered separately on the basis of flotation performance, with payable recoveries reduced by 12% to reflect toll milling fees and related concentrate handling

charges.

10.6.1

Sleeper Oxide

The recovery value assigned to Sleeper oxide was based on reported bottle roll test results; however, because no directly comparable representative column

leach result is presently available for that material, the reported bottle roll recoveries of 93.9% Au and 11% Ag were discounted by 10% for use in the recovery model. This adjustment is intended to provide a conservative approximation of expected

heap leach performance and to recognize the generally more optimistic nature of bottle roll extraction results relative to column leach performance under field-relevant conditions.

10.6.2

Sleeper Mixed and West Wood Mixed

Recovery values assigned to Sleeper mixed and West Wood mixed material are estimated assumptions rather than direct outputs from a complete set of

representative column leach tests. These values were developed from metallurgical interpretation of the available data, including oxidation state, relative cyanide amenability, bottle roll, and limited column response, and comparison with analogous

oxide and mixed composites. These recoveries are suitable only for initial assessment and should be confirmed by additional representative column leach testing.

10.6.3

HLP, Tailings, and Sulfides

For the IA, flotation recoveries assigned to HLP, tailings, and sulfide materials were derived from the available historical test work and reduced by 12% to

reflect the assumed toll-milling and downstream concentrate treatment charges associated with off-site processing of rougher concentrate. These values are preliminary planning assumptions only and should not

be interpreted as demonstrated commercial recoveries.

10-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

10.6.3.1

HLP and Tailings – Gold

The recovery assumptions for HLP and tailings were based on the average of the historical tailings flotation results from the 1997 and 1999 test programs.

Using reported recoveries of 63% Au from the 1997 program and approximately 50.8% Au from the 1999 program results in average unadjusted recoveries of 56.9.0% Au. After application of the 12% discount, the assumed recoveries for both HLP and

tailings are 50.0% Au. This assumption is necessarily approximate because direct flotation test work on HLP material is limited, and the historical HLP studies were not designed to support a modern flotation circuit.

10.6.3.2

Facilities Sulfide

The Facilities sulfide recovery assumption was based on the average of the two available McClelland rougher flotation tests. The average unadjusted gold

recovery was 80.95%, which results in an applied recovery of 71.2% Au after the 12% discount.

10.6.4

West Wood Strong Silicic and West Wood Argillic

The West Wood strong silicic recovery assumption was based on the average West Wood strong silicic rougher flotation results reported by McClelland. Average

unadjusted recoveries were 75.1% Au, resulting in applied recoveries of 66.1% Au after the 12% discount. The West Wood argillic-silicic recovery assumption was based on the average West Wood argillic-silicic rougher flotation results. Average

unadjusted recoveries were 70.8% Au, resulting in applied recoveries of 62.3% Au after discount.

These recovery assumptions provide a consistent

preliminary basis for evaluating flotation treatment of HLP, tailings, and sulfide materials in the IA. However, the underlying test work remains limited, variably representative, and unsupported by pilot-scale confirmation, finalized concentrate

specifications, or project-specific commercial toll-treatment terms. Additional metallurgical test work is required before these materials can be assigned a proven processing route with demonstrated recoveries and acceptable operating costs.

10.6.5

HLP Tailings and Sulfides Ag

No silver recovery has been applied to the HLP, tailings, or sulfide flotation cases at this time. Although historical testing reported some silver recovery,

the available dataset is limited and variable, and it is not yet supported by sufficient concentrate characterization or downstream payable assumptions. Silver is therefore excluded from the current flotation recovery model and treated as upside

potential only, pending additional metallurgical and commercial evaluation.

10.6.6

Summary of Assumptions

Metallurgical recovery assumptions applied in the IA are summarized in Table 10-3. The table distinguishes between

recoveries supported by representative column leach test work, adjusted values derived from bottle roll testing, and provisional estimates assigned where direct representative test work is limited. Oxide, mixed, and waste rock dump materials are

evaluated within the heap leach framework, whereas historic HLP, tailings, and sulfide materials are considered separately through a preliminary flotation-concentrate route.

10-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 10-3: Recovery Assumptions and Process Basis by Material

Type

Material Type

Test Basis

Au Rec

(%)

Ag Rec

(%)

Recovery Basis

Note

Facilities Oxide

Column

83.9

8.1

Column Average

Historical column basis

Sleeper Oxide

Bottle Roll

84.5

9.9

Adjusted Bottle Roll

10% discount applied

West Wood Oxide

Column

76.5

9.0

Column Average

Historical column basis

Facilities Mixed

Column

71.3

22.3

Column Value

Historical column basis

Sleeper Mixed

Limited data

70.0

15.0

Estimated

IA-level assumption

West Wood Mixed

Limited data

65.0

10.0

Estimated

IA-level assumption

North Dump

Column

79.0

40.5

Column Value

Historical column basis

South Dump

Column

69.8

43.9

Column Average

Historical column basis

West Dump

Column

81.4

54.6

Column Value

Historical column basis

HLP and Tailings Material

Flotation/ Limited data

50.0

Separate process route

Preliminary flotation/toll milling case

Facilities Sulfide

Flotation

71.2

Separate process

Preliminary flotation/toll milling case

West Wood Strong Silicic Sulfide

Flotation

66.1

Separate process

Preliminary flotation/toll milling case

West Wood Argillic Sulfide

Flotation

62.3

Separate process

Preliminary flotation/toll milling case

For heap leach materials, column leach results were given greater weight than bottle roll results because they better reflect

coarse-crush heap leach conditions and leach kinetics. In several cases, column recoveries equaled or exceeded corresponding bottle roll results because some bottle roll tests were run at coarse size and did not reach asymptotic recovery, whereas

most column tests were run longer and more closely approached asymptotic extraction under heap-representative conditions. Figure 10-1 presents the comparison of bottle roll and column test results by material

type.

No uniform discount has been applied to the reported column-based recoveries at this stage. Although column results are often reduced to

approximate field performance, the available data shows substantial variability by material type, particularly within the waste rock dump domains, and does not support a single discount factor across all heap leach materials. Additional variability

and confirmatory testing are recommended before applying any blanket reduction.

An exception was made for Sleeper Oxide, for which no representative

column leach result is currently available. In this case, the reported bottle roll recovery was reduced by 10% for use in the recovery model to provide a conservative estimate of expected coarse-crush heap leach performance pending confirmatory

column testing.

Recoveries for Sleeper Mixed and West Wood Mixed were assigned as IA-level estimates because the

available test work is insufficient to support fully representative column-based recovery assumptions. These values were derived from metallurgical interpretation of the available data and comparison with analogous oxide and mixed composites.

10-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

For heap leach consumables, the NaCN consumption value used for capital and operating cost development was

derived as 33% of the average laboratory column test consumption. Lime/cement consumption was conservatively based on the average laboratory-scale consumptions, excluding the 40 kg/t North Dump value, with no deduction applied. The historical data

shows extreme variability and does not support a representative reduction factor without further test work. Figure 10-2 presents the reagent consumption comparison.

Existing HLP, tailings, and sulfide materials are shown separately because they are not included in the heap leach recovery framework. For IA purposes, these

materials are considered through a preliminary flotation process, with rougher concentrate assumed to be sold or toll treated off site. Applied gold recoveries for these materials include a 12% deduction to reflect toll milling and related

downstream treatment charges. No silver recovery has been applied to the flotation cases at this stage, and silver is treated as upside potential pending additional metallurgical, concentrate-quality, and commercial evaluation.

10-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 10-1: Comparison of Reported Metallurgical Recovery Results

10-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 10-2: Material Specific Reagent Consumption and IA Heap

Leach Recovery Assumptions by Material Type

10-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

10.7

QP Opinion - Adequacy of Data

In the opinion of the QP, the available metallurgical data are adequate for an IA focused on heap leach processing for oxide, mixed, and existing waste rock

dump material.

There is also sufficient metallurgical test work to support the estimation of Mineral Resources from sulfide materials, including existing

HLP and tailings material. The proposed processing method for these Mineral Resources is flotation.

The data are not yet adequate to support definitive

recoveries, concentrate terms, and operating costs for the flotation case at pre-feasibility level. Additional variability testing, concentrate characterization, marketing review, and process-specific cost

definition are required before those materials can be incorporated into a more advanced development scenario.

10-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.0

Mineral Resource Estimates

The information presented herein has been reviewed, edited, and, where appropriate, directly derived from RESPEC (2023). The Mineral Resource estimate,

prepared by RESPEC Company LLC (RESPEC), has been independently reviewed and validated by SLR QPs for completeness, internal consistency, and technical accuracy.

The SLR QPs confirm that the Mineral Resource estimate complies with disclosure requirements of SEC Regulation S-K

1300. The estimate is supported by appropriate geological interpretation, drilling and sampling data, analytical and QA/QC procedures, and industry-standard geostatistical methods. It incorporates inputs and assumptions sufficient to demonstrate

reasonable prospects for economic extraction (RPEE). In situ Mineral Resources are classified as Measured, Indicated, or Inferred. Material contained in waste rock dumps, heap leach pads, and tailings storage facilities (TSF) is classified as

Inferred. Mineral Resources do not constitute Mineral Reserves.

SLR’s review included assessment of the database, geological and domain

interpretations, compositing, grade capping, variography, interpolation parameters, classification criteria, and block model validation. The SLR QP assumes responsibility for the estimate and considers it reasonable, suitable for disclosure, and

compliant in all material respects with applicable reporting requirements.

This TRS presents an updated Mineral Resource estimate for the Project, with

an effective date of April 29, 2026. The estimate incorporates a review of historical drilling for surface material and supersedes prior disclosures, reflecting updated geological interpretation, revised economic parameters, and application of

RPEE through open-pit optimization and metallurgical recovery assumptions.

11.1

Summary

The Mineral Resource estimate for the Project was completed using a conventional three-dimensional block modeling approach developed by RESPEC. The workflow

included database validation, geological and oxidation domain modeling, density assignment, compositing and grade capping, followed by gold and silver grade interpolation and open-pit constraint using industry-standard software and methodologies.

Gold and silver mineralization domains were defined based on lithology, structure, alteration style, oxidation state, and grade continuity. Separate

estimation domains were constructed for gold and silver to reflect differences in grade distribution and continuity. Mineralized domains encompass stockwork, breccia, and vein-related mineralization hosted primarily within altered volcanic units in

the hanging wall of the range-bounding fault system. Oxidation was independently modeled and classified into oxide, mixed, and sulfide material, based on its metallurgical significance.

Grade estimation was validated using standard industry practices, including statistical comparison of raw assays, capped values, and composites, as well as

comparative estimates generated using inverse distance squared (ID²). Additional validation included swath plots, visual assessment of grade distributions in plan and cross-section, and direct comparison of block estimates against drill hole

assays to confirm geological and analytical consistency.

The updated Mineral Resource estimate, prepared by SLR, supersedes prior disclosures for the

Project and includes gold and silver only; no other commodities are reported.

11-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

In situ Mineral Resources are constrained within an optimized conceptual

open-pit shell demonstrating RPEE. Pit optimization assumes open-pit mining and heap leaching, with metallurgical recoveries supported by test work and economic

parameters appropriate for the deposit.

The Mineral Resource Estimates (MRE) for the Project are reported by estimation domain consistent with the

geological, processing, and material type distinctions illustrated in Figure 11-1. Domain classifications include open-pit oxide material,

open-pit sulfide material, and surface material domains comprising west, north, and south dumps, multiple heap leach domains, and tailings storage facility (TSF) material. These domains were defined to reflect

differences in lithology, oxidation state, material origin, and anticipated processing response

Mineral Resources are classified in accordance with S-K 1300 definitions (Table 11-1).

The SLR QP is of the opinion that, with

consideration of the recommendations summarized in Sections 1 and 23 of this TRS, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.

11-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-1: Sleeper Mineral Resource Domains

11-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-1: Summary of Mineral Resources Estimate –

April 29, 2026

Category

Tonnage

(000 t)

Grade

(g/t Au)

Grade

(g/t Ag)

Contained

Metal

(000 oz Au)

Contained

Metal

(000 oz Ag)

Metallurgical

Au Recovery

(%)

Metallurgical

Ag Recovery

(%)

Measured Oxide/Mixed Pit (non-sulfide)

2,004

0.293

3.019

19

195

75.2%

17.1%

Measured Oxide/Mixed Pit (sulfide)

178

0.316

4.307

2

25

70.6%

0.0%

Measured Sulfide Pit

3,347

0.621

3.724

67

401

66.5%

0.0%

Total Measured In Situ

5,528

0.492

3.487

88

620

69.8%

6.2%

Indicated Oxide/Mixed Pit (non-sulfide)

77,899

0.261

3.613

653

9,049

74.2%

17.3%

Indicated Oxide/Mixed Pit (sulfide)

15,941

0.328

4.934

168

2,529

68.7%

0.0%

Indicated Sulfide Pit

85,336

0.393

3.848

1,078

10,558

66.5%

0.0%

Total Indicated In Situ

179,176

0.330

3.842

1,900

22,135

70.1%

7.5%

Total Measured + Indicated In Situ

184,704

0.335

3.832

1,987

22,755

70.0%

7.5%

Inferred Dumps

46,893

0.279

1.941

420

2,927

77.1%

44.6%

Inferred Heap Leach

31,600

0.301

8.363

306

8,497

40.0%

0.0%

Inferred TSF

11,165

0.599

6.221

215

2,233

50.1%

0.0%

Total Inferred Surface

89,658

0.327

4.738

942

13,657

60.6%

23.3%

Inferred Oxide/Mixed Pit (non-sulfide)

48,656

0.235

2.384

367

3,729

76.6%

14.4%

Inferred Oxide/Mixed Pit (sulfide)

4,960

0.286

3.543

46

565

68.9%

0.0%

Inferred Sulfide Pit

94,761

0.311

2.657

948

8,095

66.5%

0.0%

Total Inferred In Situ

148,377

0.285

2.597

1,361

12,390

69.9%

4.7%

Total Inferred Surface + In Situ

238,035

0.301

3.403

2,303

26,047

97.9%

8.8%

11-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Notes:

1.

The definitions for Mineral Resources in S-K 1300 were followed for

Mineral Resources

2.

The Mineral Resource estimate is reported on a 100% ownership basis.

3.

The point of reference for the Mineral Resource is before the crusher (in situ).

4.

Open Pit Mineral Resources are reported at a cut-off grade ranging from

0.074 g/t to 0.217 g/t Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.

5.

The optimized pit shell and cut-off grades were generated by assuming

metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of US$2.40/t moved for open pit, processing costs of $5.51/t oxide/mixed and $10.44

sulfide processed, and general and administrative costs of $0.46/t processed

6.

Minimal mining width was 60 m for oxide/mixed material and 20 m for sulfide material

7.

Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce

8.

Bulk density ranges from 1.5 t/m3 in the tailings storage

area to 2.7 t/m3 for in situ material

9.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

10.

Numbers may not add due to rounding.

11-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.2

Resource Database

As of the effective date of this report, Paramount and its predecessor operators have completed more than 4,455 drill holes at the Project. These include a mix

of reverse-circulation (RC), diamond core (DD), sonic, and limited-auger drilling conducted between 1983 and 2013.

The Mineral Resource database used for

the in situ estimate contains 4,258 drill holes, of which 3,994 are located within or near the Mineral Resource model area and were considered in the resource estimation. Drill holes located outside the modeled mineralized zones, including those

intersecting unmineralized alluvium or barren volcanic and metasedimentary units, were excluded from the Mineral Resource estimate.

Drill holes

associated with the heap leach and waste rock dumps were treated as separate estimation domains; however, the estimated mineralized material from these domains is included in the Mineral Resource Estimate.

The Project Mineral Resource database includes surveyed drill hole collar locations, down-hole survey data (dip and azimuth), gold and silver assay data,

geological and alteration logs, oxidation state information, and supporting QA/QC records collected from multiple drill programs. Drill holes or assay intervals deemed unreliable due to data integrity issues or potential contamination were marked

and excluded from grade estimation in accordance with SLR’s modeling protocols.

The compilation, validation, and appropriateness of the drilling

database for Mineral Resource estimation were reviewed by SLR QP, who agrees that the dataset is suitable for supporting the Mineral Resource estimate under SEC Regulation S-K1300, subject to the classification limitations discussed elsewhere in

this report.

Table 11-2: Summary of Drill Hole Data used in Mineral Resource Estimation

Area

No. Holes

Total Depth

(m)

Average Depth

(m)

Number of Records

Survey

Lithology

Assay

In Situ

4,258

640,572.96

150.43

10,709

287,878

320,560

North Dump

34

1316.4

38.71

34

0

868

South Dump

22

789.36

35.88

22

0

425

West Dump

18

552.01

30.66

18

0

381

Heap Leach 1-3

31

772.83

24.45

31

0

827

Heap Leach 4

9

205.17

22.79

9

0

270

TSF

83

824.61

9.93

80

0

553

Grand Total

4,455

645,033.34

312.85

10,903

287,878

323,884

11.3

Geological Interpretation

The Project is located within the northern Nevada rift, where gold–silver mineralization is hosted in a structurally controlled epithermal system within

Middle Miocene volcanic rocks. The geological model reflects this fault-controlled geometry and incorporates the established regional volcanic stratigraphic framework. The model integrates lithological, structural, alteration, oxidation, and assay

data from multiple drilling campaigns to define the

11-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

three-dimensional distribution of mineralized rock. Geological interpretation focuses on the volcanic host

sequence and the principal fault systems that control the geometry and continuity of mineralization and constrain the Mineral Resource model, as illustrated in Figure 11-2. The geological model was

reinterpreted and refined by SLR based on the original geological modeling framework described in RESPEC (2023).

At the local scale, the geological model

defines fault-bounded mineralized zones characterized by vein-, breccia-, and stockwork-style mineralization. These zones are spatially associated with structural features, lithological contrasts, and areas of enhanced permeability and extend along

strike and down-dip from the historical mining area into adjacent zones. In addition, distinct estimation domains were created within the heap leach and waste rock dumps to account for differences in material type, grade distribution, and

metallurgical behavior relative to in-situ mineralization.

11-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-2: Sleeper Geologic Model Cross Section

11-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.3.1

Mineralization

In situ mineralization at the Project was subdivided into three grade-based mineral domains to support Mineral Resource estimation and to reflect differences

in grade distribution, continuity, and variability of gold and silver mineralization. The domains were defined primarily on gold-grade populations, with silver domains guided by the spatial distribution of gold, given their strong genetic and

spatial association, and consisted of a low-grade, mid-grade, and high-grade domain.

The low-grade (LG) domain represents disseminated and stockwork

mineralization that forms a laterally and vertically extensive envelope surrounding higher-grade mineralization, as illustrated in Figure 11-3. This domain comprises most of the mineralized volume and is

characterized by relatively continuous grades and lower variance. This domain is modeled at a cut-off grade of 0.1 g/t Au to 1.0 g/t Au and 1.80 g/t Ag to 10 g/t Ag.

The mid-grade (MG) domain comprises narrow veins and hydrothermal breccias that extend down-dip and laterally from areas of historically mined high-grade

mineralization. Mineralization within this domain exhibits moderate continuity and increased grade variability relative to the low-grade domain. Boundaries between the low- and mid-grade domains are generally sharp and grade-controlled. This domain

is modeled at a cut-off grade of 1.0 g/t Au to 8.0 g/t Au and 10 g/t Ag to 20 g/t Ag.

The high-grade (HG)

domain represents discrete, discontinuous zones of bonanza-grade mineralization associated with banded quartz–chalcedony veins and localized hydrothermal breccias. These zones are typically narrow, steeply dipping, structurally controlled, and

exhibit high-grade variability. Contacts between the mid- and high-grade domains are commonly gradational. This domain is modeled at a cut-off grade of > 8.0 g/t Au and >20 g/t Ag.

11-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-3: Sleeper Mineralization Model Cross Section

11-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.3.2

Oxidation Model

An oxidation model was developed to support in-situ Mineral Resource estimation and associated metallurgical recovery assumptions by defining the spatial

distribution of oxide, mixed, and sulfide material. The oxidation model was re-interpreted and refined based on the original oxidation framework described in RESPEC (2023). The review of the historical database identified instances in which oxide

and sulfide intervals were locally exchanged or inconsistently coded. These inconsistencies were addressed through SLR’s reinterpretation, which incorporated geological context and supporting information to correct oxidation assignments for

the current Mineral Resource estimate.

Oxidation-state interpretation was based on geological logging, alteration characteristics, and historical mining

information, with oxide material representing fully oxidized mineralization, mixed material representing partially oxidized mineralization, and sulfide material representing relatively unoxidized mineralization dominated by primary sulfide

assemblages. Oxidation domains were modeled independently of lithology and mineralization domains and constrained using drill hole data and sectional interpretations, reflecting a general transition from oxide material near the surface to sulfide

material at depth, with locally variable boundaries influenced by structure and permeability.

While the identified oxidation coding issues were corrected

within the current SLR reinterpretation, the SLR QP recommends additional verification and review for future Mineral Resource estimation updates, particularly where oxidation state affects metallurgical routing, recovery assumptions, and economic

parameters.

In the opinion of the SLR QP, the refined oxidation model is appropriate for the current in situ Mineral Resource estimation in accordance

with SEC Regulation S-K 1300 and CIM (2019) Best Practice Guidelines, subject to the limitations noted above.

11-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-4: Sleeper Alteration Model Cross Section

11-12

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.4

Resource Assays

Gold and silver assay intervals were coded to mineralization domains prior to any statistical treatment or grade estimation. Domain coding was based on the

interpreted geological and mineralization models and confirmed that assays were assigned solely to geologically consistent populations. This method prevented the mixing of mineralized and non-mineralized

material and ensured that subsequent statistical analysis, capping, compositing, and interpolation were performed within appropriate geological controls.

Only assays from accepted drill holes and intervals were coded for resource estimation. Intervals impacted by identified down-hole contamination or other data

quality issues were excluded from further analysis.

11.5

Treatment of High-Grade Assays

11.5.1

Capping Levels

Gold and silver assay data for the Sleeper deposit were coded by mineral domain, including modeled mineralized domains, Outside domains, and alluvium (Qal),

prior to grade interpolation as part of the in-situ mineral resource estimation. Domain coding ensured that assay data were assigned to geologically appropriate populations and that subsequent statistical analysis, capping, and interpolation honored

geological controls. Assay data were then evaluated for high-grade outliers to ensure that estimated block grades are representative of the underlying mineralization and not unduly influenced by extreme values. The Sleeper deposit exhibits

significant grade variability and localized nugget effects, characteristic of low-sulfidation epithermal gold-silver mineralization; accordingly, assay capping and high-grade restrictions were applied as complementary risk-management measures

consistent with accepted industry practice.

Assay capping was conducted on a domain-by-domain basis, recognizing that grade distributions, continuity,

and variability differ between mineralized domains, Outside domains, and alluvium (Table 11-3). Domain-specific gold and silver capping thresholds were established using statistical analysis, including

histogram, log-probability plot, and descriptive statistics reviews. The selected caps were designed to limit the influence of rare, extreme assay values while preserving the overall grade tenor and geological character of each domain. Assay values

exceeding the selected domain caps were reduced to the cap value prior to compositing and grade estimation.

Table

11-3: Sleeper In Situ Gold and Silver Capping Levels by Domain

Domain

Au Samples

Capped

Au Cap (g/t)

Ag Samples

Capped

Ag Cap (g/t)

Outside

19

6

76

20

Low - Grade

107

3

154

35

Mid - Grade

0

N/A

8

65

High - Grade

0

N/A

0

N/A

Alluvium (Qal)

23

5

0

N/A

11-13

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.6

Compositing

Capped gold and silver grade assay intervals from drill holes were combined into 3.05 m composite lengths for in situ grade estimation to ensure consistent

sample support. This composite length was chosen to honor historical assay data originally sampled at 5 ft intervals and then converted to metric units, aligning closely with the original sampling support used in most drilling at the Sleeper

deposit. The selected composite length is appropriate, given the drill spacing and the style of mineralization (Table 11-4 and Table 11-5). Figure 11-5 illustrates a histogram of the distribution of composite lengths.

Material sampled from waste rock dumps and heap

leach pads was combined into 5 m intervals to reflect the broader sampling support and the generally lower spatial variability typical of these areas. Compositing strictly respected mineral domain boundaries, ensuring no composite included assay

data from more than one domain. Residual intervals at the ends of drill holes, at domain boundaries, or at dump and heap leach pad boundaries were composited using length-weighted averaging.

The resulting gold and silver composites were reviewed statistically to confirm that the compositing methodology produced stable and representative grade

distributions suitable for block-model interpolation. In the opinion of the QP, the compositing procedures applied are appropriate for the nature of the available data and support the estimation of Mineral Resources.

Figure 11-5: Histogram of Sample Lengths in the Estimation Domains

11-14

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-4: Sleeper In Situ Gold Composite by Domain

Domain

Pre - Capping Au (g/t)

Post - Capping Au (g/t)

Low - Grade Gold

Median

0.24

0.24

Mean

0.30

0.30

SD

0.33

0.23

Maximum

34.00

3.00

Mid - Grade Gold

Median

1.46

1.46

Mean

1.84

1.84

SD

1.16

1.16

Maximum

27.63

27.63

High - Grade Gold

Median

11.02

11.02

Mean

19.52

19.52

SD

31.33

31.33

Maximum

297.73

297.73

Alluvium (Qal)

Median

0.71

0.71

Mean

1.43

1.10

SD

2.25

1.11

Maximum

15.23

5.00

Outside Gold

Median

0.03

0.03

Mean

0.09

0.06

SD

6.48

0.13

Maximum

1497.58

6.00

11-15

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-5: Sleeper In Situ Silver Composite by Domain

Domain

Pre - Capping Ag (g/t)

Post - Capping Ag (g/t)

Low - Grade Silver

Median

3.33

3.33

Mean

4.24

4.02

Std Dev

7.34

3.07

Maximum

478.01

35.00

Mid - Grade Silver

Median

13.31

13.31

Mean

14.06

13.81

Std Dev

10.75

4.17

Maximum

402.73

65.00

High - Grade Silver

Median

33.43

33.43

Mean

55.17

55.17

Std Dev

90.94

90.94

Maximum

1683.41

1683.41

Alluvium (Qal)

Median

5.94

5.94

Mean

6.32

6.32

Std Dev

2.81

2.81

Maximum

13.03

13.03

Outside Silver

Median

0.31

0.31

Mean

0.63

0.60

Std Dev

2.44

0.98

Maximum

274.70

20.00

11.7

Spatial Analysis

11.7.1

Variography

Spatial continuity was evaluated to assess the suitability of the data for geostatistical interpolation and to determine whether variogram models could be

reliably developed. This review considered grade distributions, spatial continuity, and potential directional trends within the mineralized domains. The available dataset did not demonstrate sufficient variability or well-defined spatial structure

to support the development of robust and defensible variogram models.

Given the limited variability and the absence of a clearly defined anisotropy,

formal variography was not undertaken, and grade estimation was completed using inverse distance squared (ID²) and inverse distance cubed (ID³) interpolation methods, which do not require variogram inputs. A planar ellipsoid search

strategy was applied to reflect the general geometry of the mineralized zones and to provide appropriate spatial weighting of sample data during estimation.

11-16

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.8

Bulk Density

Bulk density values used for the Mineral Resource estimate were assigned by material type, lithology, and, where applicable, redox domain. Bulk density values

were applied to convert block model volumes to tonnage. A total of 2,546 in situ bulk density measurements were available from historical drilling programs completed by X-Cal and Paramount. Density

determinations were derived from water-immersion measurements on drill core samples. The density data were reviewed for reasonableness and statistically summarized prior to application in the resource model.

For the in situ Mineral Resource estimate, the dataset has a sample-weighted average applied density of approximately 2.33 g/cm³. The strongest sample

support is in Tertiary Sleeper Rhyolite Mixed (970 samples) and Tertiary Sleeper Basalt Mixed (800 samples), both assigned 2.33 g/cm³. Tertiary Intrusive Felsic is also well supported, with 398 samples and an applied density of 2.36 g/cm³.

In situ density assignments show expected lithological variation. Quaternary Alluvium was assigned 1.90 g/cm³; West Wood Breccia, Breccia, and

Tertiary Sleeper Volcanic Sediment range from 2.35 g/cm³ to 2.46 g/cm³; Tertiary Sleeper Rhyolite ranges from 2.18 g/cm³ to 2.33 g/cm³; Tertiary Sleeper Basalt ranges from 2.24 g/cm³ to 2.33 g/cm³; and Mesozoic

Basement was assigned the highest density at 2.64 g/cm³. These values are consistent with the expected density contrast between unconsolidated cover, volcanic host rocks, intrusive units, and basement.

Density values were assigned deterministically to block model cells based on lithology and oxidation state and were not interpolated. This approach provides

consistent and stable tonnage estimates given the distribution, spatial coverage, and quality of the available density measurements. Representative values were selected for each lithologic and redox domain based on measured data and supplemented by

geological judgment where direct measurements were limited.

Lower densities assigned by SLR to the waste rock dumps, heap leach, and TSF reflect

deposited, crushed, stacked, or rehandled material with greater void space than competent in situ bedrock. The applied density of 1.80 g/cm³ for waste rock dumps is reasonable for broken, rehandled waste rock in a Nevada open-pit gold setting. The applied density of 1.65 g/cm³ for heap leach material reflects crushed and stacked leach material. The applied density of 1.50 g/cm³ for tailings is consistent with

lower-density deposited tailings material.

In the opinion of the SLR QP, the density assignment methodology and applied values are appropriate for the

style of mineralization and the available data and are adequate for use in estimating Mineral Resources.

The applied densities used in the Mineral

Resource estimation are summarized in Table 11-6.

11-17

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-6: Sleeper Density Values by Lithology

Material / Lithology

Redox

Domain

No.

Samples

Density Range

(g/cm³)

Applied Density

(g/cm³)

Waste Rock Dumps

All

521

Not reported

1.80

Heap Leach

All

187

Not reported

1.65

TSF

All

Not reported

Not reported

1.50

Quaternary Alluvium

All

7

1.76–2.42

1.90

West Wood Breccia

All

20

2.04–2.56

2.35

Breccia

All

1

2.42–2.42

2.42

Tertiary Intrusive Felsic

All

398

0.06–2.90

2.36

Tertiary Intrusive Mafic

All

0

Not reported

2.30

Tertiary Sleeper Rhyolite

All

115

1.86–3.11

2.18

Tertiary Sleeper Rhyolite

Oxide

84

1.68–2.42

2.18

Tertiary Sleeper Rhyolite

Mixed

970

1.39–3.83

2.33

Tertiary Sleeper Basalt

Sulfide

28

1.88–2.48

2.24

Tertiary Sleeper Basalt

Oxide

51

1.91–2.65

2.33

Tertiary Sleeper Basalt

Mixed

800

1.58–3.74

2.33

Tertiary Sleeper Volcanic Sediment

Sulfide

26

2.06–2.80

2.46

Mesozoic Basement

All

46

2.32–3.24

2.64

11.9

Block Models

The in situ mineralization geology model was developed by RESPEC using Seequent Leapfrog Geo software, while grade estimation for the in situ Mineral Resource

Estimate was completed in MineSight. SLR imported the completed in situ block model estimate into Leapfrog Geo for review, validation, and integration with the waste rock dump, heap leach, and tailings models. The waste rock dump, heap leach, and

tailings Mineral Resource Estimates were prepared by SLR using Seequent Leapfrog Geo, version 2025.3. Collectively, these models provide the basis for domain-controlled estimation, validation, integration, and final Mineral Resource reporting.

11.9.1

RESPEC In situ

The in situ block model was constructed using an unrotated approach. Each block was assigned to the geological domain containing its centroid, ensuring

appropriate domain representation and that grade estimation and reporting were constrained to the relevant geological controls. The model was oriented with an azimuth, dip, and plunge of 0.0° and employed a parent block size of 10 m (X) ×

10 m (Y) × 10.0 m (Z) to reflect the geometry of the mineralized zones and the anticipated selective mining unit dimensions, while honoring the interpreted geological surfaces and wireframes. The block model was prepared by RESPEC and

includes representations of the in situ mineralized zones (Table 11-7).

11-18

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-7: Summary of In Situ Block Model Extents

Description

Easting (X)

(m)

Northing (Y)

(m)

Elevation (Z)

(masl)

Block Model Origin (lower left corner)

410,520

4,573,830

1600

Parent Block Dimension (m)

10

10

10

Number of Blocks

333

412

120

Rotation

0

0

0

11.9.2

SLR Waste Rock Dumps and Heap Leach

The heap leach and dump block model was constructed in Leapfrog Edge (version 2025.2.1) using an unrotated, sub-blocked

approach. Each block was assigned to the geological domain containing its centroid, ensuring appropriate domain representation. The model was oriented with an azimuth, dip, and plunge of 0.0° and employed a parent block size of 10 m (X) by

10 m (Y) by 5 m (Z) to reflect the deposit geometry and anticipated selective mining unit dimensions, while honoring modeled geological surfaces. A summary of the block model extents is provided in Table

11-8.

Table 11-8: Summary of Waste Rock Dumps and Heap Leach Block

Model Extents

Description

Easting (X)

(m)

Northing (Y)

(m)

Elevation (Z)

(masl)

Block Model Origin (lower left corner)

410,020

453,830

1600

Parent Block Dimension (m)

10

10

5

Number of Blocks

383

462

240

Rotation

0

0

0

11.9.3

SLR Tailing Storage Facility

The TSF block model was constructed in Leapfrog Edge (version 2025.2.1) using an unrotated, sub-blocked approach. Each

block was assigned to the geological domain containing its centroid, ensuring appropriate domain representation. The model was oriented with an azimuth, dip, and plunge of 0.0° and employed a parent block size of 10 m (X) by 10 m

(Y) by 5. m (Z) to reflect the deposit geometry and anticipated selective mining unit dimensions, while honoring modeled geological surfaces. A summary of the block model extents is provided in Table

11-9.

Table 11-9: Summary of TSF Block Model Extents

Description

Easting (X)

(m)

Northing (Y)

(m)

Elevation (Z)

(masl)

Block Model Origin (lower left corner)

410,020

453,830

1600

Parent Block Dimension (m)

10

10

5

Number of Blocks

383

462

240

Rotation

0

0

0

11-19

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.9.4

SLR Vulcan Block Model

For final Mineral Resource Estimate reporting, the in situ, waste rock dump, heap leach, and tailings block models were combined into one regularized 10 m

× 10 m × 10 m block model using Maptek Vulcan software. The consolidated Vulcan model provided a consistent reporting framework across all material types and was used for final MRE tabulation and disclosure.

11.10

Search Strategy and Grade Interpolation Parameters

Gold and silver grades for the Sleeper deposit were estimated for the in situ Mineral Resource estimate using domain-controlled inverse-distance interpolation

methods applied to the three-dimensional block model. Grade interpolation was completed separately by mineralized domain to ensure that estimates honored the geological controls, grade populations, and spatial continuity characteristics established

during domain modeling.

The primary estimation method was inverse-distance weighting, with inverse distance cubed (ID³) applied to the mid-grade and high-grade domains and inverse distance squared (ID²) applied to the low-grade domains. These domain-specific distance powers were selected to reflect

differences in grade variability, continuity, and nugget effect, while balancing local grade influence against excessive smoothing. Ordinary kriging (OK) and nearest-neighbor (NN) estimates were also generated for validation and comparison against

the inverse-distance estimates.

Interpolation used domain-specific search ellipsoids, orientations, and maximum search distances consistent with the

geometry of the mineralized zones. Sample selection was controlled by minimum, maximum, and maximum-per-hole constraints to reduce spatial bias and limit

over-representation of closely spaced drill data. Although the RESPEC (2023) report does not expressly use the term “hard boundaries,” the estimation workflow is consistent with hard-boundary estimation, as composite samples were

restricted to their respective grade domains and were not used across domain contacts. Partial-volume block coding was used to represent domain proportions within blocks; however, the report does not document the use of soft-boundary interpolation

or cross-domain sample sharing.

In the opinion of the SLR QP, the grade interpolation approach is appropriate for the in situ Mineral Resource estimate.

The use of domain-controlled estimation, domain-specific search parameters, and validation checks is consistent with SEC Regulation S-K 1300 reporting expectations and CIM (2019) Best Practice Guidelines.

11.10.1 High Grade Restriction

In addition to assay

capping, high-grade restrictions (HGRs) were applied during grade interpolation to limit the spatial influence of elevated composite grades. The restrictions were implemented using grade–distance limits, whereby composites above defined

threshold grades were restricted to a shorter search distance, generally less than the primary search ellipse and commonly approximating one-half of the main search distance.

High-grade restriction thresholds were selected by estimation domain based on statistical review, grade distribution analysis, and visual assessment of the

apparent continuity of high-grade values. This approach was used to reduce the potential for grade smearing and localized overestimation, particularly in domains characterized by high-grade variability or nugget effect. Thresholds and restriction

distances were defined on a domain-specific basis to reflect geological continuity, grade population characteristics, and confidence in spatial continuity (Table 11-10).

11-20

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The effects of assay coding, capping, and high-grade restrictions were evaluated by comparing pre- and post-capping statistics and reviewing grade distributions. Based on this review, the selected controls appropriately limited the influence of extreme values without materially altering mean grades or

distorting the underlying domain grade populations.

Table 11-10: Sleeper Estimation Parameters by Domain

Domain

Min

Samples

Max

Samples

Max per

Hole

Search

Major

Search

Semimajor

Search

Minor

(Vertical)

ID

Power

Au

Grade

Cap

Au

Distance

(m)

Ag Grade

Cap

Ag

Distance

(m)

Low-Grade

1

12

3

1

1

0.5

2

1.6

75

10.5

75

Mid-Grade

1

12

3

1

1

0.33

3

8

75

30

75

High-Grade

1

12

4

1

1

0.33

3

100

75

290

75

Outside Domains

2

12

3

1

1

0.5

2

1.1

20

11

20

Qal

1

9

3

1

1

0.5

3

1.5

20

11

20

In the opinion of the SLR QP, the combined application of domain-specific assay coding, assay capping, and high-grade

restrictions is appropriate for the style of mineralization and the quality and variability of the available data and supports the estimation of Mineral Resources.

11.11

Reasonable Prospects for Economic Extraction for Mineral Resources

Mineral Resources must demonstrate reasonable prospects for economic extraction (RPEE), which generally implies that the quantity and grade estimates meet

certain economic thresholds and that the Mineral Resources are reported at an appropriate cut-off grade, taking into account extraction scenarios.

Metal prices used to determine Mineral Reserves are based on consensus long-term forecasts from banks, financial institutions, and other sources. For Mineral

Resources, metal prices are typically higher than those used for Mineral Reserves.

A reporting cut-off grade was

established for the Project based on assumed costs for an open pit mining and heap leaching operation and commodity prices that provide a reasonable basis for establishing RPEE for Mineral Resources.

These cost references were modified to align with the Project’s assumed production rate. These cost and price assumptions have been used to inform an

optimization process using the Whittle optimized pit shell software. Metallurgical recoveries and process costs were applied by metallurgical domains (Table 10-3)

11.11.1

Cut-off Grade Estimation

To demonstrate RPEE in accordance with SEC Regulation S-K 1300, Mineral Resources were constrained within pit shells

developed using Whittle pit optimization software. The optimization incorporated gold and silver prices of US$3,100/oz and US$34/oz, with payable metal factors of 99% and royalties of 3%. Selling costs of US$6.00/oz Au and US$0.50/oz Ag were

applied.

The Whittle pit-optimization metallurgical recoveries were applied on a material-type basis, reflecting

variability across oxide, mixed, and sulfide domains.

11-21

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The pit optimization utilized material-specific processing costs ranging from US$5.51/t (heap leach) to

US$10.44/t (sulfide processing), with general and administrative costs of US$0.46/t processed. Mining costs of US$2.40/t moved were applied in the pit optimization but excluded from the cut-off grade (COG)

calculation.

Open-pit Mineral Resources are reported within the selected Whittle pit shells (an Oxide/Mixed Pit

and a Sulfide Pit) at material-specific cut-off grades derived from the above economic parameters and metallurgical assumptions. The applied cut-off grades (g/t Au) by

material type are summarized in Table 11-11. Figure 11-6 illustrates the spatial distribution of material types across the project area.

These cut-off grades reflect differences in metallurgical recovery (Au recovery ranging from 40.0% to 84.5% for

leachable materials and from 50.1% to 71.2% for sulfides; Ag recovery ranging from 0% to 54.6%) and processing routes. Sulfide material is assigned a higher cut-off grade due to increased processing costs and

lack of defined recoveries within the current flowsheet assumptions.

The Whittle pit shell serves solely as a reporting constraint and does not represent

a Mineral Reserve, mine plan, or final pit design. Mineralized material below the applicable cut-off grade or outside the optimized pit shell is excluded from the reported Mineral Resources.

For reporting, the block model was reblocked to a 10 m bench height consistent with the open-pit mining assumption. No

additional mining dilution or mining recovery factors were applied. The applied cut-off grades and pit constraint are considered appropriate to support RPEE and Mineral Resource disclosure.

11-22

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-6: Sleeper Material Type/Area Distribution Map

11-23

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-11: Sleeper

Cut-off Grade Parameters by Domain

Area

Unit

West

Wood

Sulfide

Facilities /

Office

Sulfide

TSF

Heap

North

Dump

South

Dump

West

Dump

Alluvium

Block Model Codes

Type

Sulfides

Sulfides

Mixed

Mixed

Oxide

Oxide

Oxide

Oxide

Recovery Code

RecCode

1

15

14

13

12

11

10

9

8

Price Au

US$

/oz

3,100

3,100

3,100

3,100

3,100

3,100

3,100

3,100

Price Ag

US$

/oz

34

34

34

34

34

34

34

34

Payable

%

99

%

99

%

99

%

99

%

99

%

99

%

99

%

99

%

Selling Cost Au

US$

/oz

6.00

6.00

6.00

6.00

6.00

6.00

6.00

6.00

Selling Cost Ag

US$

/oz

0.50

0.50

0.50

0.50

0.50

0.50

0.50

Royalties

%

3

%

3

%

3

%

3

%

3

%

3

%

3

%

3

%

Net Price Au

US$

/g

95.53

95.53

95.53

95.53

95.53

95.53

95.53

95.53

Recovery Au

%

64.2

%

71.2

%

50.1

%

40.0

%

79.0

%

69.8

%

81.4

%

60.0

%

Recovery Ag

%

0.0

%

0.0

%

0.0

%

0.0

%

40.5

%

43.9

%

54.6

%

8.0

%

Mining (excluded from COG)

$

/t mined

2.40

2.40

2.40

2.40

2.40

2.40

2.40

2.40

Processing

$

/t processed

10.53

10.26

10.15

4.00

5.51

5.51

5.51

5.51

G&A

0.46

0.46

0.46

0.46

0.46

0.46

0.46

COG

gr/tonne

0.179

0.157

0.222

0.105

0.079

0.089

0.077

0.104

11-24

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Area

Unit

Facilities /

Office Oxide

Facilities /

Office Mixed

Sleeper

Oxide

West Wood

Oxide

Sleeper

Mixed

West Wood

Mixed

Sulfides

Block Model Codes

Type

Oxide

Mixed

Oxide

Oxide

Mixed

Mixed

Sulfides

Recovery Code

RecCode

1

7

6

5

4

3

2

1

Price Au

US$

/oz

3,100

3,100

3,100

3,100

3,100

3,100

3,100

Price Ag

US$

/oz

34

34

34

34

34

34

34

Payable

%

99

%

99

%

99

%

99

%

99

%

99

%

99

%

Selling Cost Au

US$

/oz

6.00

6.00

6.00

6.00

6.00

6.00

6.00

Selling Cost Ag

US$

/oz

0.50

0.50

0.50

0.50

0.50

0.50

0.50

Royalties

%

3

%

3

%

3

%

3

%

3

%

3

%

3

%

Net Price Au

US$

/g

95.53

95.53

95.53

95.53

95.53

95.53

95.53

Recovery Au

%

83.9

%

71.3

%

84.5

%

76.5

%

70.0

%

65.0

%

66.5

%

Recovery Ag

%

8.1

%

22.3

%

9.9

%

9.0

%

15.0

%

10.0

%

0.0

%

Mining (excluded from COG)

$

/t mined

2.40

2.40

2.40

2.40

2.40

2.40

2.40

Processing

$

/t processed

5.51

5.51

5.51

5.51

5.51

5.51

10.44

G&A

0.46

0.46

0.46

0.46

0.46

0.46

0.46

COG

g/t Au

0.074

0.088

0.074

0.082

0.089

0.096

0.171

Note:

1

Recovery Code: RECCODE is a variable added to the block model to designate material type based on the

metallurgical recovery factor for reporting Mineral Resources

11-25

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.11.2 Factors Affecting the Mineral Resource

Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The Mineral Resource Estimate is reported within a Whittle

optimized open-pit shell and at material-specific cut-off grades derived from the economic, metallurgical, and cost parameters summarized in Section 11.11.1. At the

time of reporting, the SLR QP is not aware of any title, taxation, socio-political, marketing, or other relevant issues that materially impact the Mineral Resource estimate beyond those outlined below.

Key factors that may materially affect the Mineral Resource estimate are listed:

Changes to metal price assumptions (US$3,100/oz Au and US$34/oz Ag) and associated payable factors (99%) and

royalties (3%), which directly influence net realized metal values and cut-off grades.

Changes to cut-off grade assumptions, including processing costs, which

underpin the material-specific cut-off grades applied for reporting.

Changes to metallurgical recovery assumptions by material type, which directly impact economic value and cut-off grade determination.

Changes to the assumptions and parameters used in the Whittle pit optimization, including slope angles, cost

inputs, and economic criteria used to define the reporting pit shell for RPEE as described in Sections 13.1 and 13.2 of this report.

Changes to geological interpretations, including mineralized domain geometry, continuity, and grade distribution,

which may affect block model estimation and classification.

Changes resulting from additional drilling, sampling, or data acquisition that modify the understanding of

geological controls, grade continuity, or domain boundaries.

Changes to estimation methodology, including treatment of high-grade values (e.g., capping and high-grade

restrictions), which may influence grade distribution and local estimates.

Changes to assigned bulk density values, which directly impact tonnage estimates.

11.11.3

QP Comments on the Prospect of Economic Extraction

The Mineral Resources are reported within Whittle optimized open-pit shells using a gold price of US$3,100/oz and

material-specific cut-off grades derived from appropriate cost, recovery, and economic assumptions. These parameters are consistent with current market conditions and industry benchmarks for comparable Nevada

gold operations.

In the QP’s opinion, the combination of metal price assumptions, metallurgical recoveries, processing costs, and pit optimization

parameters provides a reasonable basis for demonstrating RPEE. The use of material-specific cut-off grades and a Whittle pit shell constraint appropriately reflects the variability in processing performance

and economic value across material types and supports the technical and economic plausibility of the reported Mineral Resources.

11-26

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.12 Classification

Mineral Resources for the Project were classified as Measured, Indicated, and Inferred in accordance with SEC Regulation S-K 1300, using a conservative,

block-level classification methodology that integrates drill-hole confidence, data density, proximity to supporting data, geological continuity, and verification status, consistent with CIM (2019) Best Practice Guidelines. Classification was

applied only to blocks located within modeled mineral domains and constrained to material demonstrating reasonable prospects for economic extraction.

Resource classification was controlled using quantitative criteria summarized in Table 11-12 incorporating drill hole

confidence codes, sample counts, and distance to the nearest informing samples:

Measured Mineral Resources were defined within modeled domains where drill hole confidence codes are ≥ 0.9,

supported by at least seven samples with a closest sample distance of ≤ 10 m.

Indicated Mineral Resources were defined within modeled domains where drill hole confidence codes are ≥

0.55, supported either by at least seven samples within ≤ 22 m, or by at least two samples within ≤ 10 m.

Inferred Mineral Resources comprise remaining modeled domain material not meeting Measured or Indicated criteria,

or material supported by drill hole confidence codes ≥ 0.5 with at least one sample within ≤ 10 m.

Drill hole confidence

codes were assigned by the drilling program based on the availability and quality of supporting documentation used for data verification, including assay certificates and down-hole surveys, and range from 1.0 (full documentation available) to 0.0

(no supporting documentation). These confidence attributes were propagated to the block model and used as a primary control on classification. Drill intervals with insufficient documentation or identified data quality concerns were excluded from

resource estimation.

In the opinion of the SLR QP, the resulting Measured, Indicated, and Inferred Mineral Resource classifications appropriately reflect

the current level of geological confidence and data reliability for the Sleeper deposit. Additional data verification and targeted infill drilling is required to support future upgrades of Inferred material to higher-confidence resource categories.

Table 11-12: Summarized Methodology for Resource Classification

Class

Confidence Code

Sampling & Distance Criteria

Data Quality / Documentation

Measured

≥ 0.9

≥ 7 samples with the closest sample ≤ 10 m

Fully verified data; complete assay certificates and down - hole survey documentation

Indicated

≥ 0.55

≥ 7 samples ≤ 22 m or ≥ 2 samples ≤ 10 m

Assay data available with partial supporting documentation; some limitations in historical records

Inferred

≥ 0.5

≥ 1 sample with the closest sample ≤ 10 m

Limited supporting documentation; data verification is incomplete or reliant on historical drilling

11-27

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.13

Block Model Validation

Block model validation was conducted to ensure the Mineral Resource estimate for the Project is consistent with the input data, geological interpretation, and

estimation methodology.

The process included:

Global Statistical comparison of block grades against composite grades to evaluate estimation bias and smoothing.

Visual inspection of grade distribution, domain boundaries, and composite alignment using cross-sections and 3D

views.

Swath plots to assess grade trends along principal directions and confirm the model reflects spatial patterns in

the data.

The QP found grade continuity to be reasonable and confirmed that the block grades were reasonably consistent with local

drill hole composite grades.

11.13.1

Global Statistics

Statistical comparisons were conducted between composite grades and estimated block grades to evaluate the consistency of the interpolation. This analysis

helps identify potential smoothing or bias and ensures that the block model reasonably reflects the input data, as shown in Table 11-13 through Table 11-16.

Table 11-13: Summary of Composite vs Block Model Mean Au (ppm) Oxide/Mixed Pit – In Situ

Area

Oxide

Mixed

Sulfide

Descriptive Statistic

Comp

Block Model

Comp

Block Model

Comp

Block Model

Count

23,429

108,433

13,763

57,481

8,633

13,613

Mean

0.11

0.08

0.26

0.19

0.32

0.24

SD

0.37

0.13

0.40

0.17

1.11

0.21

CV

3.47

1.71

1.58

0.88

3.49

0.85

Variance

0.14

0.02

0.16

0.03

1.24

0.04

Min

0.00

0.00

0.00

0.00

0.00

0.00

Lower Quartile

0.00

0.00

0.06

0.07

0.08

0.13

Median

0.01

0.01

0.16

0.16

0.18

0.21

Upper Quartile

0.10

0.11

0.31

0.26

0.35

0.30

Max

13.96

4.27

21.53

4.63

79.26

6.72

11-28

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-14: Summary of Composite vs Block Model Mean Au (ppm)

Sulfide Pit – In Situ

Area

Oxide

Mixed

Sulfide

Descriptive Statistic

Comp

Block Model

Comp

Block Model

Comp

Block Model

Count

9,781

40,769

3,001

19,406

33,856

114,569

Mean

0.05

0.05

0.13

0.08

0.43

0.26

SD

0.22

0.09

0.36

0.13

2.15

0.38

CV

4.62

1.87

2.70

1.52

5.04

1.47

Variance

0.05

0.01

0.13

0.02

4.63

0.14

Min

0.00

0.00

0.00

0.00

0.00

0.00

Lower Quartile

0.00

0.00

0.01

0.01

0.04

0.10

Median

0.00

0.01

0.03

0.04

0.16

0.22

Upper Quartile

0.03

0.07

0.10

0.10

0.38

0.32

Max

14.11

2.51

6.23

2.36

244.75

35.02

Table 11-15: Summary of Composite vs Block Model Mean Au (ppm) Dumps

Area

North Dump

West Dump

South Dump

Descriptive Statistic

Comp

Block Model

Comp

Block Model

Comp

Block Model

Count

231

17,725

102

9,886

111

11,780

Mean

0.32

0.30

0.14

0.15

0.13

0.14

SD

0.31

0.20

0.23

0.14

0.19

0.09

CV

0.96

0.68

1.58

0.90

1.41

0.69

Variance

0.09

0.04

0.05

0.02

0.04

0.01

Min

0.00

0.01

0.00

0.00

0.00

0.00

Lower Quartile

0.06

0.15

0.02

0.06

0.00

0.07

Median

0.25

0.27

0.05

0.11

0.03

0.12

Upper Quartile

0.47

0.44

0.16

0.19

0.26

0.19

Max

1.37

0.99

1.48

1.24

1.36

1.10

11-29

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-16: Summary of Composite vs Block Model Mean Au (ppm)

Heaps and TSF

Area

Heap Leach 1-3

Heap Leach 4

TSF

Descriptive Statistic

Comp

Block Model

Comp

Block Model

Comp

Block Model

Count

142

15,896

45

5,498

207

10,061

Mean

0.28

0.28

0.37

0.35

0.65

0.61

SD

0.13

0.09

0.11

0.06

0.15

0.13

CV

0.45

0.30

0.31

0.17

0.23

0.21

Variance

0.02

0.01

0.01

0.00

0.02

0.02

Min

0.06

0.00

0.20

0.20

0.00

0.04

Lower Quartile

0.20

0.23

0.29

0.31

0.55

0.51

Median

0.25

0.28

0.35

0.34

0.66

0.61

Upper Quartile

0.34

0.32

0.43

0.37

0.77

0.72

Max

0.79

0.68

0.62

0.58

1.09

1.04

The SLR QP reviewed the statistical results and observed that the estimated block grades are consistent with the composite

grades, with no material bias or over-smoothing. The QP considers the statistical comparison results to be reasonable and supportive of the reported Mineral Resource Estimate.

11.13.2

Visual Comparison

Cross-sections, long sections, and 3D views were reviewed to verify that block grades align with composite data and are properly constrained within mineralized

domains. Cross sections through the oxide/mixed pit and the sulfide pit are shown in Figure 11-7 and Figure 11-8, respectively.

The QP confirms that the visual inspection shows good agreement between block estimates and input composites. No inconsistencies or estimation artifacts were

observed.

11-30

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-7: East-West Cross Section Oxide Pit

11-31

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-8: East-West Cross Section Sulfide Pit

11-32

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.13.3 Swath Plots

Swath plots were generated to compare composite and block grades along the easting, northing, and elevation directions. These plots are used to assess local

grade trends and continuity, and to verify that the block model appropriately reflects the spatial grade distribution observed in the underlying data. Representative examples for the Waste rock dumps, Heap Leach Pads, and Tailings Storage Facilities

(TSF) are presented in Figure 11-9 through Figure 11-11.

The QP reviewed

the swath plots and confirmed that the block models satisfactorily reproduce the grade trends observed in the composite data. No significant smoothing or anomalous behavior is evident, and there is good spatial correlation between composite grades

and block model grades.

11-33

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-9: Swath Plots in the X, Y, and Z Directions –

Waste Rock Dumps

11-34

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-10: Swath Plots in the X, Y, and Z Directions –

Heap Pads

11-35

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-11: Swath Plots in the X, Y, and Z Directions –

TSF

11-36

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.14

Sensitivity to Reporting Cut-off

The reported Mineral Resource estimates for the Project are sensitive to the metal price assumptions used to establish the reporting cut-off parameters. To evaluate this sensitivity, Mineral Resource tonnage and average grade estimates derived from the block model were assessed for oxide and mixed open pit scenarios across a range of gold price

assumptions from US$1,500/oz to US$4,500/oz. The analysis applies to Measured + Indicated Mineral Resources and incorporates corresponding revenue factors, metallurgical recovery assumptions, and waste-to-ore strip ratios (Table 11-17 and Figure 11-12).

At lower gold price assumptions, reported Mineral Resource tonnage is limited to higher-grade material, resulting in

lower total tonnes, higher average gold grades, and relatively low strip ratios. As the gold price assumption increases, additional lower-grade material becomes reportable, resulting in a material increase in

reported Mineral Resource tonnage, a corresponding decrease in average gold grade, and progressively higher strip ratios. Metallurgical recovery assumptions remain relatively consistent across the evaluated price range.

A gold price of US$3,100/oz was selected for the cash flow estimate presented in this report. For purposes of

by-product valuation, this assumption corresponds to a silver price of US$34/oz, equivalent to a silver-to-gold price ratio of

approximately 0.011:1, or silver pricing representing approximately 1.1% of the assumed gold price.

This sensitivity analysis demonstrates that the

reported Mineral Resource estimates are materially dependent on the selected metal price assumptions and associated reporting cut-off parameters and supports the conclusion that the reported Mineral Resources

have RPEE within the range of metal price assumptions evaluated, consistent with the requirements of Regulation S-K 1300.

Table 11-17: Open Pit Grade vs Tonnage for Measured + Indicated Resources (Oxide/Mixed Pit Constrained)

Gold Price

($/oz)

RF

Total Rock

(t)

Resource M+I

(t)

Strip Rato

(W:O)

Au Grade

(g/t)

Ag Grade

(g/t)

Au Rec

(%)

Ag Rec

(%)

1,694

0.48

35,732,409

20,468,964

0.75

0.37

4.49

74.99

16.72

2,033

0.58

68,197,241

37,612,499

0.81

0.32

4.16

74.61

17.56

2,257

0.65

81,659,853

45,065,866

0.81

0.31

4.07

74.55

17.67

2,597

0.74

99,200,686

53,323,671

0.86

0.30

4.02

74.50

17.73

2,936

0.84

110,812,588

58,689,771

0.89

0.29

3.93

74.54

17.62

3,272

0.94

124,512,625

63,344,842

0.97

0.28

3.84

74.57

17.58

3,100

1.00

132,050,829

66,288,945

0.99

0.27

3.79

74.56

17.53

3,951

1.13

144,294,460

70,633,066

1.04

0.27

3.71

74.50

17.54

4,291

1.23

165,570,401

74,237,792

1.23

0.27

3.63

74.42

17.43

4,630

1.32

171,018,579

75,830,152

1.26

0.26

3.60

74.40

17.41

5,082

1.45

177,363,755

77,429,268

1.29

0.26

3.56

74.38

17.39

Notes:

RF revenue factor

11-37

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 11-12: Open Pit Grade Tonnage Curve for Measured +

Indicated Mineral Resources

11.15

Comparison with Previous Estimate

The Mineral Resource estimate prepared by SLR (2026) was compared with the RESPEC (2023) Mineral Resource estimate to assess changes in tonnage,

grade, contained metal, classification, and the assumptions supporting the determination of RPEE.

The 2026 SLR estimate reports increases in Mineral

Resources across all classification categories relative to the 2023 RESPEC estimate. Measured Mineral Resources increased from 4.9 Mt at 0.537 g/t Au and 3.615 g/t Ag to 5.5 Mt at 0.492 g/t Au and 3.487 g/t Ag, representing a modest increase in

tonnage with slightly lower grades. Indicated Mineral Resources increased from 158.3 Mt at 0.356 g/t Au and 4.059 g/t Ag to 179.2 Mt at 0.330 g/t Au and 3.842 g/t Ag, an increase of approximately 13% in tonnage with broadly comparable grades.

Inferred Mineral Resources increased from 119.9 Mt at 0.315 g/t Au and 2.454 g/t Ag to 238.0 Mt at 0.301 g/t Au and 3.403 g/t Ag, nearly doubling the reported tonnage.

The increase in Inferred Mineral Resources is primarily attributable to the inclusion of additional surface Mineral Resources, including waste rock dumps,

heap leach materials, and TSF materials totaling 89.7 Mt, together with expanded pit-constrained oxide/mixed and sulfide Mineral Resources. More broadly, the changes reflect updated geological and block

models, enhanced database validation, revised estimation parameters, and updated economic assumptions, including a long-term gold price of US$3,100/oz and optimized pit shells and cut-off grades based on

current mining, processing, and metallurgical recovery assumptions.

Mineral Resources are not Mineral Reserves and do not have demonstrated economic

viability.

11-38

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.15.1

In Situ Mineral Resources (Pit-Constrained)

For in situ mineralization, excluding surface materials, the 2026 estimate reports Measured Mineral Resources of 5.5 Mt at 0.492 g/t

Au, Indicated Mineral Resources of 179.2 Mt at 0.330 g/t Au, and combined Measured and Indicated Mineral Resources of 184.7 Mt at 0.335 g/t Au, compared with 163.2 Mt at 0.361 g/t Au reported by RESPEC (2023). Inferred in situ Mineral Resources

total 148.4 Mt at 0.285 g/t Au, compared with 119.9 Mt at 0.315 g/t Au in the previous estimate.

These results represent a moderate increase in tonnage

of approximately 13% for Measured and Indicated Mineral Resources and approximately 24% for Inferred Mineral Resources, with a corresponding decrease in average gold grade. The changes are attributable to updated geological interpretations, revised

domain wireframes, incorporation of additional drilling and improved database validation, and expansion of optimized pit shells under higher metal price assumptions, which support the inclusion of additional marginal material. Contained gold remains

broadly consistent with the previous estimate, indicating no evidence of material global estimation bias

11.15.2

Surface Materials (Dumps, Heap Leach, TSF)

A significant difference between the estimates is the treatment of surface materials, which are reported entirely as Inferred Mineral Resources in the 2026

estimate. SLR (2026) reports 89.7 Mt at 0.327 g/t Au and 4.738 g/t Ag, containing approximately 942 koz Au and 13.7 Moz Ag, comprising waste rock dumps, heap leach pads, and TSF materials.

In contrast, in 2023 15.8 Mt of Inferred dump material was reported and heap leach pad and TSF inventories were not separately estimated. The expanded surface

Mineral Resource inventory in the 2026 estimate reflects the incorporation of additional datasets and operational inventories, improved delineation and classification of anthropogenic deposits, and the separation of material types to support

appropriate processing and metallurgical recovery assumptions. The higher long-term gold price assumption of US$3,100/oz also supports lower cut-off grades and demonstrates reasonable prospects for eventual

economic extraction for additional lower-grade material.

11.15.3 Metallurgical Recovery Assumptions

Metallurgical recovery assumptions differ materially:

RESPEC (2023): Generalized recoveries by material type, including high silver recoveries for sulfide material (up

to 70%)

SLR (2026): Process- and material-specific recoveries applied at a detailed domain level, including:

Variable gold recoveries (generally approximately 63.7% to 85.0% basis for pit optimization inputs)

Zero silver recovery assigned to sulfide material

Distinct recovery assumptions for dumps, heap leach, and TSF materials reflecting leachable characteristics

These revisions represent a more conservative and operationally realistic basis for RPEE. While recovery assumptions do not affect

reported grades or contained metal, they materially influence the derivation of the cut-off grade and the economic evaluation.

11-39

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

11.15.4

Classification

The distribution of Mineral Resources by classification remains broadly consistent. The 2026 estimate reports modest increases in Measured and Indicated

tonnage, reflecting:

Improved database validation and reconciliation;

Refinement of geological domains and estimation controls; and

Incorporation of additional drilling and updated interpretations.

No material changes to classification methodology or confidence criteria are identified.

11.15.5

Cut-off Grades

Cut-off grades in the 2026 estimate range from 0.074 g/t to 0.217 g/t Au, depending on material type and location, and

are constrained by optimized pit shells developed using updated economic assumptions.

The primary differentiator relative to the 2023 estimate is the

increase in assumed gold price of US$1,800/oz to US$3,100/oz, which has the following impacts:

Lowers economic cut-off grades

Expands pit limits

Increases total tonnage reported

Incorporates additional lower-grade material

The overall reporting framework remains consistent, but the economic basis for RPEE is materially more favorable in the 2026 estimate.

11.15.6 QP Opinion

In the opinion of the QP, the 2026

Mineral Resource estimate represents a reasonable, transparent, and defensible update to the 2023 estimate. The increase in tonnage and contained metal is primarily attributable to the following:

Inclusion and improved delineation of surface materials

Expansion of in situ mineralization under revised economic assumptions

Higher gold price assumptions supporting lower cut-off grades and

expanded pit shells

The reduction in average grade is consistent with the inclusion of marginal material and does not indicate

estimation bias. Metallurgical recovery assumptions have been revised to a more conservative and operationally supportable basis consistent with S-K 1300 requirements.

11.16

Mineral Resource Reporting

Table 11-18 presents a detailed breakdown of the Mineral Resource estimate by classification category and area, in

accordance with the reporting requirements of S-K 1300. The QP has reviewed and accepted the application of relevant modifying factors, including the results of open pit optimization, as described in

Section 11.11. These constraints define the spatial volumes within which the Mineral Resources are considered to have RPEE and may therefore be reported in accordance with S-K 1300.

11-40

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 11-18: Detailed Summary of Mineral Resources by Area –

April 29, 2026

Category

Area

Tonnage

(000 t)

Grade

(g/t Au)

Grade

(g/t Ag)

Contained

Metal

(000 oz Au)

Contained

Metal

(000 oz Ag)

Metallurgical

Au Recovery

(%)

Metallurgical

Ag Recovery

(%)

Measured

Oxide/Mixed Pit

Facilities/Office Mixed

1,148

0.327

3.194

12.1

117.9

71.3%

22.3%

Facilities/Office Oxide

560

0.264

2.543

4.8

45.8

83.9%

8.1%

Sleeper Mixed

220

0.234

4.031

1.7

28.5

70.0%

15.0%

Sleeper Oxide

76

0.177

0.957

0.4

2.3

84.5%

9.9%

West Wood Mixed

65.0%

10.0%

West Wood Oxide

76.5%

9.0%

Oxide/Mixed Pit (non-sulfides)

2,004

0.293

3.019

18.9

194.5

75.2%

17.1%

Sulfide

24

0.261

3.843

0.2

2.9

66.5%

0.0%

Facilities/Office Sulfide

154

0.325

4.378

1.6

21.7

71.2%

0.0%

Oxide/Mixed Pit (sulfides)

178

0.316

4.307

1.8

24.6

70.6%

0.0%

Subtotal Measured Oxide/Mixed Pit

2,182

0.295

3.124

20.7

219.2

74.8%

15.7%

Sulfide Pit

Sulfide

340

0.409

2.405

4.5

26.3

66.5%

0.0%

West Wood Sulfide

928

1.206

4.826

36.0

144.0

64.2%

0.0%

Facilities/Office Sulfide

1,899

0.372

3.291

22.7

201.0

71.2%

0.0%

Facilities/Office Mixed

21

0.354

2.500

0.2

1.7

71.3%

22.3%

Facilities/Office Oxide

83.9%

8.1%

Sleeper Mixed

7

0.285

0.870

0.1

0.2

70.0%

15.0%

Sleeper Oxide

22.0

84.5%

9.9%

West Wood Mixed

77

0.764

8.881

1.9

5.5

65.0%

10.0%

West Wood Oxide

74

0.612

2.325

1.5

76.5%

9.0%

Subtotal Measured Sulfide Pit

3,347

0.621

3.724

66.8

400.7

68.8%

0.6%

Total Measured

5,528

0.492

3.487

87.5

619.9

71.2%

6.5%

11-41

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Category

Area

Tonnage

(000 t)

Grade

(g/t Au)

Grade

(g/t Ag)

Contained

Metal

(000 oz Au)

Contained

Metal

(000 oz Ag)

Metallurgical

Au Recovery

(%)

Metallurgical

Ag Recovery

(%)

Indicated

Oxide/Mixed Pit

Facilities/Office Mixed

41,658

0.275

4.373

368.5

5,856.6

71.3%

22.3%

Facilities/Office Oxide

15,030

0.226

2.644

109.3

1,277.7

83.9%

8.1%

Sleeper Mixed

16,910

0.260

2.981

141.5

1,620.7

70.0%

15.0%

Sleeper Oxide

4,300

0.245

2.123

33.9

293.5

84.5%

9.9%

West Wood Mixed

65.0%

10.0%

West Wood Oxide

76.5%

9.0%

Oxide/Mixed Pit (non-sulfides)

77,899

0.261

3.613

653

9,049

74.2%

17.3%

Sulfide

8,618

0.360

4.996

99.8

1,384.2

66.5%

0.0%

Facilities/Office Sulfide

7,323

0.290

4.861

68.2

1,144.5

71.2%

0.0%

Oxide/Mixed Pit (sulfides)

15,941

0.328

4.934

168.0

2,528.7

68.7%

0.0%

Subtotal Indicated Oxide/Mixed Pit

93,840

0.272

3.837

821.2

11,577.3

73.2%

14.4%

Sulfide Pit

Sulfide

56,544

0.382

4.245

694.2

7,717.5

66.5%

0.0%

West Wood Sulfide

8,286

0.709

2.342

188.9

624.0

64.2%

0.0%

Facilities/Office Sulfide

16,184

0.302

3.691

157.0

1,920.5

71.2%

0.0%

Facilities/Office Mixed

1,556

0.218

2.669

10.9

133.5

71.3%

22.3%

Facilities/Office Oxide

83

0.186

2.224

0.5

6.0

83.9%

8.1%

Sleeper Mixed

1,344

0.248

1.948

10.7

84.1

70.0%

15.0%

Sleeper Oxide

83

0.187

0.500

0.5

1.3

84.5%

9.9%

West Wood Mixed

757

0.374

2.108

9.1

51.3

65.0%

10.0%

West Wood Oxide

499

0.413

1.219

6.6

19.6

76.5%

9.0%

Subtotal Indicated Sulfide Pit

85,336

0.393

3.848

1,078.5

10,557.9

67.4%

0.8%

Total Indicated

179,176

0.330

3.842

1,899.7

22,135.2

70.5%

7.9%

11-42

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Category

Area

Tonnage

(000 t)

Grade

(g/t Au)

Grade

(g/t Ag)

Contained

Metal

(000 oz Au)

Contained

Metal

(000 oz Ag)

Metallurgical

Au Recovery

(%)

Metallurgical

Ag Recovery

(%)

Measured + Indicated

Oxide/Mixed Pit

Facilities/Office Mixed

42,806

0.277

4.341

380.5

5,974.5

71.3

%

22.3

%

Facilities/Office Oxide

15,590

0.228

2.640

114.1

1,323.5

83.9

%

8.1

%

Sleeper Mixed

17,130

0.260

2.995

143.2

1,649.3

70.0

%

15.0

%

Sleeper Oxide

4,376

0.244

2.103

34.4

295.9

84.5

%

9.9

%

West Wood Mixed

0

0.000

0.000

0.0

0.0

65.0

%

10.0

%

West Wood Oxide

0

0.000

0.000

0.0

0.0

76.5

%

9.0

%

Oxide/Mixed Pit (non-sulfides)

79,903

0.262

3.598

672

9,243

74.2

%

17.3

%

Sulfide

8,642

0.360

4.993

100.0

1,387.2

66.5

%

0.0

%

Facilities/Office Sulfide

7,477

0.290

4.851

69.8

1,166.2

71.2

%

0.0

%

Oxide/Mixed Pit (sulfides)

16,119

0.328

4.927

169.8

2,553.4

68.7

%

0.0

%

Subtotal Measured + Indicated Oxide/Mixed Pit

96,022

0.273

3.821

841.9

11,796.5

73.3

%

14.4

%

Sulfide Pit

Sulfide

56,884

0.382

4.234

698.7

7,743.8

66.5

%

0.0

%

West Wood Sulfide

9,214

0.759

2.592

224.9

768.0

64.20

%

0.00

%

Facilities/Office Sulfide

18,084

0.309

3.649

179.8

2,121.5

71.2

%

0.0

%

Facilities/Office Mixed

1,577

0.220

2.667

11.2

135.2

71.3

%

22.3

%

Facilities/Office Oxide

83

0.186

2.224

0.5

6.0

83.9

%

8.1

%

Sleeper Mixed

1,350

0.248

1.942

10.8

84.3

70.0

%

15.0

%

Sleeper Oxide

83

0.187

8.727

0.5

23.4

84.5

%

9.9

%

West Wood Mixed

834

0.410

2.119

11.0

56.8

65.0

%

10.0

%

West Wood Oxide

573

0.439

1.062

8.1

19.6

76.5

%

9.0

%

Subtotal Measured + Indicated Sulfide Pit

88,683

0.402

3.843

1,145.3

10,958.6

67.5

%

0.8

%

Total Measured + Indicated

184,704

0.335

3.832

1,987.2

22,755.0

70.5

%

7.9

%

11-43

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Category

Area

Tonnage

(000 t)

Grade

(g/t Au)

Grade

(g/t Ag)

Contained

Metal

(000 oz Au)

Contained

Metal

(000 oz Ag)

Metallurgical

Au Recovery

(%)

Metallurgical

Ag Recovery

(%)

Inferred

Surface

North Dump

23,747

0.364

2.584

277.7

1,972.8

79.0

%

40.5

%

South Dump

12,667

0.182

1.612

74.2

656.7

69.8

%

43.9

%

West Dump

10,478

0.203

0.883

68.5

297.4

81.4

%

54.6

%

Subtotal Inferred Dumps

46,893

0.279

1.941

420.3

2,926.9

77.1

%

44.6

%

Heap Leach Pads

31,600

0.301

8.363

306.3

8,496.9

40.0

%

0.0

%

TSF

11,165

0.599

6.221

215.2

2,233.2

50.1

%

0.0

%

Subtotal Inferred Surface

89,658

0.327

4.738

941.8

13,656.9

60.6

%

23.3

%

Oxide/Mixed Pit

Facilities/Office Mixed

12,668

0.251

3.233

102.1

1,316.9

71.3

%

22.3

%

Facilities/Office Oxide

6,461

0.198

1.800

41.1

373.9

83.9

%

8.1

%

Sleeper Mixed

14,851

0.232

2.884

110.6

1,377.2

70.0

%

15.0

%

Sleeper Oxide

14,661

0.240

1.403

113.0

661.2

84.5

%

9.9

%

West Wood Mixed

65.0

%

10.0

%

West Wood Oxide

15

0.136

0.272

0.1

0.1

76.5

%

9.0

%

Oxide/Mixed Pit (non-sulfides)

48,656

0.235

2.384

367

3,729

76.6

%

14.4

%

Sulfide

2,485

0.302

3.288

24.1

262.6

66.5

%

0.0

%

Facilities/Office Sulfide

2,475

0.271

3.800

21.6

302.4

71.2

%

0.0

%

Oxide/Mixed Pit (sulfides)

4,960

0.286

3.543

45.7

565.0

68.9

%

0.0

%

Subtotal Inferred Oxide/Mix Pit

53,616

0.239

2.491

412.6

4,294.4

75.8

%

13.1

%

Sulfide Pit

Sulfide

69,108

0.324

2.661

718.8

5,913.4

66.5

%

0.0

%

West Wood Sulfide

1,242

0.369

0.987

14.7

39.4

64.2

%

0.0

%

Facilities/Office Sulfide

14,602

0.316

3.848

148.3

1,806.5

71.2

%

0.0

%

Facilities/Office Mixed

1,728

0.217

2.208

12.1

122.7

71.3

%

22.3

%

Facilities/Office Oxide

225

0.190

1.443

1.4

10.5

83.9

%

8.1

%

11-44

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Category

Area

Tonnage

(000 t)

Grade

(g/t Au)

Grade

(g/t Ag)

Contained

Metal

(000 oz Au)

Contained

Metal

(000 oz Ag)

Metallurgical

Au Recovery

(%)

Metallurgical

Ag Recovery

(%)

Sleeper Mixed

3,348

0.237

1.036

25.5

111.5

70.0

%

15.0

%

Sleeper Oxide

2,152

0.183

0.700

12.6

48.4

84.5

%

9.9

%

West Wood Mixed

932

0.204

0.616

6.1

18.4

65.0

%

10.0

%

West Wood Oxide

1,424

0.193

0.534

8.8

24.4

76.5

%

9.0

%

Subtotal Inferred Sulfide Pit

94,761

0.311

2.657

948.3

8,095.3

68.0

%

1.4

%

Total Inferred

238,035

0.301

3.403

2,302.7

26,046.7

67.0

%

12.3

%

Notes:

1.

The definitions for Mineral Resources in S-K 1300 were followed for

Mineral Resources

2.

The Mineral Resource estimate is reported on a 100% ownership basis.

3.

The point of reference for the Mineral Resource is before the crusher (in situ).

4.

Open Pit Mineral Resources are reported at a cut-off grade ranging from

0.074 g/t to 0.217 g/t Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.

5.

The optimized pit shell and cut-off grades were generated by assuming

metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of US$2.40/t moved for open pit, processing costs of $5.51/t oxide/mixed and $10.44

sulfide processed, and general and administrative costs of $0.46/t processed

6.

Minimal mining width was 60 m for oxide/mixed material and 20 m for sulfide material

7.

Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce

8.

Bulk density ranges from 1.5 t/m3 in the tailings storage

area to 2.7 t/m3 for in situ material

9.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

10.

Numbers may not add due to rounding.

11-45

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

12.0 Mineral Reserve Estimates

There are no Mineral Reserves defined at the Sleeper Gold Mine at this time.

12-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

13.0 Mining Methods

The proposed Base Case mining operations include a conventional open pit truck-shovel operation and rehandling of mineralized material from three existing

waste rock dumps. The in situ mining inventory is approximately 128.5 Mt and the rehandled existing waste dump rock material totals approximately 46.9 Mt. The operation is designed to deliver approximately 30,000 tpd of mineralized material to

the processing facilities, with a LOM open pit average strip ratio of 1.9:1 (waste tonne: process feed tonne).

In the Alternative Case, only in situ

material is mined and processed; no material from the existing waste rock dumps is reclaimed for processing.

13.1 Geotechnical Studies

The current pit slope design is based on preliminary geotechnical assumptions appropriate for an Initial Assessment level of study. In competent bedrock, an

overall slope angle of approximately 45° has been applied, as observed in the existing pit walls, reflecting assumed favorable rock mass conditions and stable bench-scale performance. In contrast, alluvial materials are assigned a significantly

flatter overall slope angle of approximately 22°, which is also observed in the current pit slopes and is consistent with reduced material strength, potential for raveling, and sensitivity to groundwater and weathering.

Bench-scale geometry is based on 10 m bench heights, which are compatible with production drilling, loading equipment reach, and operational efficiency. In

competent rock, bench face angles of 80° and berm widths of approximately 8.24 m have been assumed, while alluvial zones utilize flatter bench face angles of approximately 34° with wider berms of approximately 9.93 m, as shown in Figure 13-3. These parameters are considered reasonable for conceptual planning but will require confirmation through detailed geotechnical investigation, including drilling, laboratory testing, structural analysis, and

slope stability modeling in future study phases.

Groundwater conditions have not been explicitly incorporated into slope design at this stage; however,

given the pit’s depth (approximately 230 m), dewatering and depressurization will be required and will influence the final slope configurations. The current design criteria are considered appropriate for the Initial Assessment but are subject

to refinement.

Table 13-1: Geotechnical Design Criteria

Parameter

Competent Rock

Alluvium

Bench height (m)

10

10

Bench face angle (degrees)

80

34

Overall slope angle (degrees)

45

22

Bench berm width (m)

8.24

9.93

13-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

13.2 Mine Design

The current pit lake water elevation is 1,255 masl as presented in Figure 13-1. The conceptual open pit design has

approximate plan dimensions of 2,650 m (north-south) by 1,860 m (east-west) and a maximum depth of approximately 230 m, with a pit bottom elevation of approximately 1,080 masl, as shown in Figure 13-2. Primary

pit access is provided via a south-side waste haul exit at approximately 1,270 masl and a west-side crusher exit at approximately 1,265 masl, allowing for separation of mineralized material and waste haulage where practical.

The pit design was developed based on pit optimization results at a revenue factor of 1.0 derived using 20 m × 20 m × 20 m blocks. Slope

assumptions applied during the optimization were assumed at an overall slope angle of 45° for fresh rock and 22° for alluvial material. Pit Optimization economic parameters and recoveries are provided in Table

11-11, and the mining cost of $2.40 per tonne mined.

13-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 13-1: Initial Mine Topography

13-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 13-2: Oxide Pit Cross Section 4,576,271 N

13-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Mining will be conducted on 10 m benches with a minimum mining width of 60 m, providing adequate working

space for drilling, loading, haulage, and safe operation of large production equipment. Haul road design is based on 150 t class haul trucks, with main ramps constructed at approximately 35 m width and 10% gradient. In the bottom two benches of the

pit, where space is constrained, single-lane haulage (supported by traffic management controls and localized passing areas) is proposed.

Ex-pit haul distances to the crusher and waste rock storage facilities are estimated to range from approximately 0.8 km to 2.4 km (0.5 miles to 1.5 miles). Haul cycle times are based on typical industry operating

speeds for 150 t haul trucks, accounting for loaded and unloaded travel, ramp grades, and road conditions consistent with a well-maintained Nevada open pit operation.

Material movement assumptions include a swell factor of 35% and a loose density of 1.7 t/m3, resulting in

an approximate loose volume of 88 m3 per truck load, equivalent to approximately 65 bank cubic meters (bcm) per load. The SLR QP considers these values to be appropriate for preliminary equipment

productivity and haulage calculations.

Operational assumptions include 24-hour continuous operation, utilizing

two 12-hour shifts per day across four rotating crews. Effective operating time is assumed to be 53 minutes per hour, reflecting delays for operational inefficiencies, shift changes, and minor interruptions.

Equipment performance is further adjusted to 90% mechanical availability utilization, consistent with contractor-operated mining fleets.

Table 13-2: Mine Design Parameters

Parameter

Value

Pit dimensions (N-S)

2,650 m

Pit dimensions (E-W)

1,860 m

Pit depth

230 m

Pit bottom elevation

1,080 masl

Waste exit elevation (south)

1,270 masl

Crusher exit elevation (west)

1,265 masl

Bench height

10 m

Minimum mining width

60 m

Ramp width

35 m

Ramp grade

10%

Bottom benches

Single-lane haulage

Ex-pit haul distance

0.8 km to 2.4 km

(0.5–1.5 miles)

Swell Percent

35%

Swell Factor

0.7407

Loose density

1.7 t/m3

13-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Parameter

Value

Operating schedule

24 hr/day, 2 shifts, 4 crews

Effective time

53 min/hr

Utilization

90% of availability

13.3

Waste Rock Storage Facilities Design

Waste rock generated from open pit mining is planned to be placed in conventional end-dumped waste rock storage

facilities (WRSF) located adjacent to the pit. The WRSFs are conceptualized to a maximum height of approximately 150 m and developed in 30 m lifts, consistent with typical large-scale open pit operations in Nevada. Waste material is assumed to have

an in situ density of approximately 2.3 t/m3, a swell factor of 35%, and a corresponding loose density of approximately 1.70 t/m3, which forms

the basis for volumetric and capacity estimates.

During active operations, waste will be placed by end-dumping

over the advancing dump crest in 30 m lift, with the working face developing at an approximate angle of repose of 35°, equivalent to about 1.5H:1V. This geometry reflects the typical behavior of coarse, fragmented rock under gravity placement

conditions. For long-term stability and closure, the external slopes of the waste rock dumps are assumed to be regraded to a final 3H:1V slope.

The

assumed geometry is appropriate for an IA; however, detailed WRSF design, including slope stability, drainage control, compaction behavior, and closure landform development, will require further geotechnical and hydrological evaluation in future

study phases.

Table 13-3 summarizes the WRSF design parameters. Figure

13-3 presents the Final Pit Design and Waste Rock Storage Facility Design based on the parameters summarized in this section.

Table 13-3: WRSF Design Parameters

Parameter

Value

Maximum dump height

104 m

Lift height

30 m

Number of lifts

3.5

In situ density

2.3 t/m3

Swell Percent

35%

Loose density

1.70 t/m3

Active dump slope

35° (~1.5H:1V)

Final reclaimed slope

3H:1V

13-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 13-3: Final Pit Design and Waste Storage Facility Design

13-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

13.4

Mining Method

At the stated production rate, the operation will mine approximately 66,300 tpd of waste, resulting in a total material movement of approximately 95,890 tpd.

This equates to approximately 10.8 Mtpa of mineralized material, 24.2 Mtpa of waste, and 35.0 Mtpa of total pit movement, assuming continuous operations.

Primary loading is performed using CAT 6060-class hydraulic shovels equipped with 18 m3 to 22 m3 buckets, supplemented by large wheel loaders for operational flexibility, rehandle, and backup loading. The loading configuration is designed around a 4-pass

match with 150 t haul trucks, which provides an efficient balance between productivity and truck utilization.

Production drilling is carried out using

single-pass diesel rotary drills, such as Pit Viper-class drills, capable of drilling the full 10 m bench height in a single pass. This approach improves drilling efficiency, reduces hole deviation, and supports consistent blast performance. Drill

and blast parameters will be refined in future phases based on rock mass characteristics and fragmentation requirements.

Production blasting is assumed

to be conducted using conventional rotary blasthole drilling on 10 m bench heights. Blastholes are designed at a nominal diameter of 229 mm and drilled on a 6.5 m burden by 7.5 m spacing pattern, which is considered appropriate for the volcanic and

locally silicified rock units present at the Sleeper deposit.

Each blasthole is drilled to include approximately 1.0 m of subdrill to ensure full

breakage at the bench floor. Stemming length is assumed to be 4.0 m, resulting in an effective charged length of approximately 7.0 m per hole.

The

average in situ rock density is assumed to be 2.3 t/m³, yielding approximately 1,120 t of rock broken per blasthole under the selected pattern geometry.

Given the anticipated groundwater conditions and the requirement for ongoing pit dewatering, wet blasthole conditions are expected to be common. Accordingly,

blasting is assumed to utilize bulk emulsion or heavy ANFO–emulsion blends rather than dry ANFO. An average explosive density of approximately 1.15 t/m³ is assumed, resulting in a charge concentration of approximately 47 kg of explosive

per metre of loaded hole. This corresponds to approximately 330 kg of explosive per blasthole. Blasting practices are expected to be optimized during operations through field trials to achieve the desired fragmentation for efficient loading,

hauling, and downstream crushing or heap leach performance.

Based on these parameters, a powder factor of approximately 0.28 kg of explosive per tonne of

rock blasted has been adopted for the mine plan. This value is considered appropriate for preliminary design and cost estimation and is consistent with similar open-pit gold operations in northern Nevada

operating under comparable ground and groundwater conditions. Drilling and blasting parameters are summarized in Table 13-4.

Table 13-4: Drilling and Blasting Parameters

Parameter

Unit

Value

Bench height

m

10

Hole diameter

mm

229

Burden

m

6.5

Spacing

m

7.5

13-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Parameter

Unit

Value

Pattern

m × m

6.5 × 7.5

Subdrill

m

1.0

Total hole depth

m

11.0

Stemming length

m

4.0

Charged length

m

7.0

Explosive type

Bulk emulsion / heavy

ANFO–emulsion

Explosive density

t/m³

1.15

Explosive per metre

kg/m

47

Explosive per hole

kg

330

Rock density

t/m³

2.3

Rock broken per hole

t

1,120

Powder factor

kg/t

0.28

Notes:

1.

Parameters reflect production blasting on 10 m benches with 229

mm-diameter blastholes.

2.

The 6.5 m × 7.5 m pattern is considered appropriate for the volcanic and locally silicified rock units at

Sleeper.

3.

Wet blasthole conditions are expected to be common due to groundwater inflows; therefore, bulk emulsion or

heavy ANFO–emulsion blends are assumed rather than dry ANFO.

4.

The powder factor is derived from the geometry, explosive density, and charge length and is appropriate for

preliminary mine planning and cost estimation.

Haulage is performed using a fleet of 150 t class rigid frame haul trucks, which

transport mineralized material to the crusher and waste to designated storage areas. Based on nominal payload assumptions, the approximate required truckloads per day are listed:

200 mineralized material truckloads

442 waste truckloads

642 total loaded truckloads

Additional haulage demand will be generated by the reclaim of the existing waste rock dump material, depending on the production schedule adopted.

Reclaim of waste rock dumps will be conducted using loaders and/or hydraulic shovels, with material excavated in controlled lifts and hauled directly to the

processing facilities. This activity is expected to require limited or no drilling and blasting, depending on material consolidation, and represents a conventional rehandle operation.

Mine support activities include road maintenance using CAT 16H motor graders, along with track dozers, water trucks, and service equipment. Proper road

maintenance is critical to maintaining haul truck productivity, extending tire life, minimizing rolling resistance, and ensuring safe operating conditions.

Overall, the selected mining method, comprised of a 10 m bench open pit mining using 150 t haul trucks, CAT 6060-class hydraulic shovels, Pit Viper-class

drills, and CAT 16H graders, combined with rehandle of existing waste rock dumps, is considered appropriate for the scale and nature of the Project and consistent with industry practice for Nevada heap leach operations. A summary of the mining

method and proposed equipment fleet is provided in Table 13-5.

13-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 13-5: Mining Method and Equipment Summary

Category

Description

Mining method

Conventional open pit truck-shovel plus waste dump reclaim

Process rate

30,000 tpd mineralized material

Strip ratio (W:O)

1.9:1

Waste mined

66,300 tpd

Total movement

95,890 tpd

Haul trucks

150 t class

Hydraulic shovel

CAT 6060 class

Bucket size

18–22 m3

Loading

4-pass

Drills

Single-pass diesel rotary (Pit Viper class)

Graders

CAT 16H

Waste dump reclaim

46.9 Mt

Truckloads (process feed)

approximately 200/day

Truckloads (waste)

approximately 442/day

13.5

Life of Mine Plan

Base Case production schedule starts by mining the existing waste rock dumps, followed by the in situ oxide and mixed Mineral Resources located around the

previous open pit operation.

The total mineralized inventory processed in the Base Case LOM plan is 175.4 Mt at average grades of 0.26 g/t Au and 2.8 g/t

Ag. Inferred Resources account for 54.5% of the Base Case production schedule.

Compared to the previous LOM plan (RESPEC 2023), the pit optimization

resulted in additional material at lower average gold and silver grades being included in the LOM plan, due to the higher gold price and lower cut-off grades. Cut-off

grades by material type, recoveries, and economic parameters used are presented in Table 11-11. Silver is considered a by-product, accounting for less than 4% of the

Base Case cash flow on gross revenue average.

There are sufficient Existing Dump Mineral Resources to allow processing for five years, as presented in

Table 13-6, totaling Oxide and Mixed Resources of 46.9 Mt at an average gold grade of 0.28 g/t.

13-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 13-6: Process Feed from Existing Dumps to the Crusher

Units

Dumps

Grade

Contained

Recovery

Recovered

Oxide+

Mixed

(Mt)

Gold

(g/t)

Silver

(g/t)

Gold

(koz)

Silver

(koz)

Gold

(%)

Silver

(%)

Gold

(koz)

Silver

(koz)

Year 1

7.3

0.27

2.2

63.8

510

79.0

%

40.5

%

50.4

207

Year 2

10.8

0.39

2.7

135.0

930

79.0

%

40.5

%

106.7

377

Year 3

10.8

0.36

2.1

123.6

724

80.1

%

47.2

%

99.1

342

Year 4

10.8

0.17

1.4

60.6

496

75.6

%

49.2

%

45.8

244

Year 5

7.2

0.16

1.2

37.6

268

69.8

%

43.9

%

26.3

118

Totals

46.9

0.28

1.9

420.6

2,929

78.0

%

43.9

%

328.2

1,287

Table 13-7 shows the In Situ Mineral Resources feeding the crusher starting in year

five and continuing for approximately 12.5 years. The In Situ Oxide and Mixed material feed totals 128.5 Mt at an average gold grade of 0.25 g/t.

Table 13-7: Process Feed from Open Pit to the Crusher

Units

Pit

Grade

Contained

Recovery

Recovered

In Situ

Oxide+Mixed

(Mt)

Gold

(g/t)

Silver

(g/t)

Gold

(koz)

Silver

(koz)

Gold

(%)

Silver

(%)

Gold

(koz)

Silver

(koz)

Year 1

Year 2

Year 3

Year 4

Year 5

3.6

0.23

3.1

26.2

357

74.1

%

32.1

%

19.4

115

Year 6

10.8

0.22

4.2

76.8

1,473

76.7

%

15.9

%

59.0

235

Year 7

10.8

0.25

5.1

85.6

1,765

72.7

%

20.5

%

62.2

362

Year 8

10.8

0.24

4.8

84.1

1,670

74.7

%

19.0

%

62.8

317

Year 9

10.8

0.21

2.9

74.1

1,017

79.1

%

11.4

%

58.6

116

Year 10

10.8

0.20

3.4

68.2

1,180

72.7

%

14.2

%

49.5

167

Year 11

10.8

0.24

3.6

84.8

1,249

74.2

%

15.1

%

62.9

188

Year 12

10.8

0.27

2.4

95.3

818

75.0

%

18.1

%

71.5

148

Year 13

10.8

0.27

2.3

94.8

815

72.6

%

20.6

%

68.8

168

Year 14

10.8

0.27

3.1

95.5

1,065

71.9

%

20.7

%

68.6

220

Year 15

10.8

0.26

1.3

91.0

443

78.0

%

14.3

%

70.9

63

Year 16

10.8

0.29

1.2

99.9

421

77.4

%

12.4

%

77.4

52

Year 17

6.1

0.31

2.6

62.0

518

71.9

%

14.3

%

44.6

74

Totals

128.5

0.25

3.1

1,038.2

12,793

74.8

%

17.4

%

776.2

2,225

Table 13-8 includes all Oxide and Mixed Resources processed during the life of mine,

totaling of 175.4 Mt at an average gold grade of 0.26 g/t, as summarized in Table 13-8.

13-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 13-8: Mining Inventory Processed by Year

Units

Pit

Grade

Contained

Recovery

Recovered

Total Oxide+

Mixed

(Mt)

Gold

(g/t)

Silver

(g/t)

Gold

(koz)

Silver

(koz)

Gold

(%)

Silver

(%)

Gold

(koz)

Silver

(koz)

Year 1

7.3

0.27

2.2

63.8

510.2

79.0

%

40.5

%

50.4

207

Year 2

10.8

0.39

2.7

135.0

930.4

79.0

%

40.5

%

106.7

377

Year 3

10.8

0.36

2.1

123.6

724.2

80.1

%

47.2

%

99.1

342

Year 4

10.8

0.17

1.4

60.6

495.8

75.6

%

49.2

%

45.8

244

Year 5

10.8

0.18

1.8

63.8

625.3

74.5

%

32.2

%

47.5

201

Year 6

10.8

0.22

4.2

76.8

1,472.5

76.7

%

15.9

%

59.0

235

Year 7

10.8

0.25

5.1

85.6

1,764.6

72.7

%

20.5

%

62.2

362

Year 8

10.8

0.24

4.8

84.1

1,670.4

74.7

%

19.0

%

62.8

317

Year 9

10.8

0.21

2.9

74.1

1,016.9

79.1

%

11.4

%

58.6

116

Year 10

10.8

0.20

3.4.

68.2

1,180.4

72.7

%

14.2

%

49.5

167

Year 11

10.8

0.24

3.6

84.8

1,249.5

74.2

%

15.1

%

62.9

188

Year 12

10.8

0.27

2.4

95.3

818.3

75.0

%

18.1

%

71.5

148

Year 13

10.8

0.27

2.4

94.8

815.2

72.6

%

20.6

%

68.8

168

Year 14

10.8

0.27

3.1

95.5

1,065.1

71.9

%

20.7

%

68.6

220

Year 15

10.8

0.26

1.3

91.0

443.1

78.0

%

14.3

%

70.9

63

Year 16

10.8

0.29

1.2

99.9

421.2

77.4

%

12.4

%

77.4

52

Year 17

6.1

0.31

2.6

62.0

518.2

71.9

%

14.3

%

44.6

74

Totals

175.4

0.26

2.8

1,458.9

15,721.1

75.8

%

22.1

%

1,106.2

3,481

The LOM plan requires extracting waste along with the mineralized material from the open pit and existing dumps. Table 13-9 summarizes all open pit materials relevant to the Base Case operation cost estimates, excluding existing dump extraction.

Table 13-9: Base Case Open Pit Production Schedule

Units

Total

Oxide +

Mixed

(Mt)

Gold

Grade

(g/t)

Silver

Grade

(g/t)

Total

Waste

Tonnage

(Mt)

Total

Material

Tonnage

(Mt)

Strip

Ratio

(W:O)

Resource

Mining

Rate

(tpd)

Waste

Mining

Rate

(tpd)

Total

Mining

Rate

(tpd)

Year 1

Year 2

Year 3

Year 4

Year 5

3.6

0.23

3.1

13.2

16.8

3.7

9,927

36,155

45,946

Year 6

10.8

0.22

4.2

13.0

23.8

1.2

30,000

35,497

65,086

13-12

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Units

Total

Oxide +

Mixed

(Mt)

Gold

Grade

(g/t)

Silver

Grade

(g/t)

Total

Waste

Tonnage

(Mt)

Total

Material

Tonnage

(Mt)

Strip

Ratio

(W:O)

Resource

Mining

Rate

(tpd)

Waste

Mining

Rate

(tpd)

Total

Mining

Rate

(tpd)

Year 7

10.8

0.25

5.1

10.3

21.1

1.0

30,000

28,303

57,892

Year 8

10.8

0.24

4.8

24.2

35.0

2.2

30,000

66,301

95,890

Year 9

10.8

0.21

2.9

24.2

35.0

2.2

30,000

66,31

95,890

Year 10

10.8

0.20

3.4

23.8

34.6

2.2

30,000

65,075

94,664

Year 11

10.8

0.24

3.6

19.3

30.1

1.8

30,000

52,931

82,520

Year 12

10.8

0.27

2.4

24.2

35.0

2.2

30,000

66,301

95,890

Year 13

10.8

0.27

2.3

24.2

35.0

2.2

30,000

66,301

95,890

Year 14

10.8

0.27

3.1

16.2

27.0

1.5

30,000

44,436

74,025

Year 15

10.8

0.26

1.3

24.2

35.0

2.2

30,000

66,301

95,890

Year 16

10.8

0.29

1.2

15.9

26.7

1.5

30,000

43,571

73,160

Year 17

6.1

0.31

2.6

9.4

15.6

1.5

17,069

25,778

42,612

Totals

128.5

0.25

3.1

242.1

370.6

1.9

Note:

Resource mining rates are based on 360 days per year.

Waste and Total mining rates are based on 365 days per year

13.6

Contract Mining Discussion

Mining at the Project is planned to be executed by an experienced third-party mining contractor under a unit-rate contract. This approach has been selected

based on the relatively small size of the Company and the desire to minimize initial capital expenditures associated with the purchase, commissioning, and maintenance of a mining fleet. By utilizing a contractor, the Project avoids significant

upfront capital outlays and transfers a portion of the operational and maintenance risk to the contractor, while maintaining flexibility to scale operations as required.

13.6.1

Mining Rate and Production Basis

As previously noted, for the Base Case, operations will begin by mining the existing waste rock dumps at 30,000 tpd, followed by mining the in situ material,

which will require additional equipment and personnel.

The mine plan contemplates a nominal processing rate of approximately 30,000 tpd of process feed,

supported by a LOM strip ratio of approximately 1.9:1 (waste:process feed) when mining in situ material, resulting in a total material movement rate of approximately 95,890 tpd.Mining activities will include drilling, blasting, loading, and

hauling of both process feed and waste materials. Process feed will be transported to the primary crusher and/or ROM stockpiles for downstream processing, while waste material will be hauled to designated waste rock storage facilities.

13-13

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

13.6.2

Contract Structure and Unit Rates

The estimated cost of contract mining is US$1.04 per banked cubic meter (bcm), equivalent to approximately US$2.40 per tonne (based on assumed bulk densities).

The unit rate is expected to include all standard open pit mining activities, including drilling and blasting, loading, hauling, equipment operation,

maintenance, supervision, and typical consumables required for production. The use of a unit-rate contract provides cost transparency and aligns contractor compensation directly with production volumes.

13.6.3

Out-of-Scope (“Forced

Work”) Allowance

In addition to the base unit mining rate, an allowance has been included for

out-of-scope or “forced work”, which encompasses activities not explicitly covered under the base mining contract. These may include, but are not limited to,

the following:

Road construction beyond normal maintenance requirements

Sump excavation and water management support

Rehandling of material outside planned sequences

Additional dozer support or cleanup activities

Standby time or operational inefficiencies outside contractor control

Owner-directed miscellaneous work

Based on benchmarking and preliminary discussions, a monthly allowance of approximately US$112,000 has been included for such activities. This represents

approximately 10% of the estimated base mining cost and is considered appropriate for an IA level estimate.

13.6.4

Grade Control and Sampling

The contractor will be responsible for the collection of blasthole drill cuttings during production drilling operations. These samples will be used for grade

control purposes and will be collected in accordance with procedures established by the Company to ensure representativity and data quality.

Blasthole

sampling will support short-term ore control, including mineralized material/waste delineation and routing of material to the appropriate destinations (crusher, stockpile, or waste dump).

A separate contract will be established for dedicated grade control drilling, which will provide a higher-resolution definition of mineralization boundaries

and support the conversion of Mineral Resources and reconciliation of production. This work is not included in the mining contractor’s scope or unit rate.

13.6.5

Operational Considerations

The contractor will be expected to supply and operate a fleet of appropriately sized equipment, likely including hydraulic excavators, front-end loaders, and haul trucks in the 150 t class, along with ancillary support equipment such as dozers, graders, water trucks, and service vehicles.

The contractor will be responsible for the following:

Equipment supply, operation, and maintenance

Provision of qualified labor and supervision

13-14

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Compliance with site safety, environmental, and operational standards

Execution of the mine plan in accordance with Company specifications

Paramount will retain responsibility for mine planning, scheduling, grade control, and overall operational oversight to ensure that mining activities are

conducted in accordance with the Project’s technical and economic objectives.

13.6.6

Contract Mining Summary

The use of a contract mining strategy provides a capital-efficient and flexible approach to Project development. The selected unit rate and allowances are

considered reasonable for an IA level study and are consistent with similar operations in the region. The inclusion of a defined allowance for out-of-scope work and

separation of grade control drilling provides appropriate transparency and conservatism in the cost estimate.

13.7

Mine Infrastructure

The proposed mining operation is a conventional open pit mining operation designed to support a nominal process feed production rate of approximately 30,000

tpd, with an associated waste-to-process feed strip ratio of approximately 1.92:1, resulting in total material movement of approximately 95,890 tpd. The mine

infrastructure has been conceptually designed to support continuous, year-round operations in a manner consistent with industry practice for open pit heap leach operations in northern Nevada.

13.7.1

Mine Access and Haul Roads

The open pit will be developed with a series of engineered haul roads and ramps designed to accommodate 150 t-class

rear-dump haul trucks. Ramp widths are expected to be approximately 35 m for two-way traffic, including safety berms and drainage features, with maximum sustained grades of approximately 10%, consistent with

standard open pit design criteria. Haul roads will be constructed using locally sourced waste rock and maintained by motor graders to ensure appropriate rolling resistance and safety. Internal pit access will be designed to provide flexibility for

multiple working faces and phased pushbacks over the mine life.

13.7.2

Material Handling

Material handling will consist of conventional truck-and-shovel/loader

operations, with process feed hauled from the pit to a primary crushing facility located adjacent to the heap leach pad. Process feed haul distances are expected to range from approximately 1.5 km to 4.5 km

one-way, while waste material will be hauled to designated waste rock storage facilities located approximately 2.5 km from the pit exit. The primary crusher will reduce ROM material to a size suitable for heap

leaching, after which the material may be conveyed or trucked to the leach pad for stacking. Agglomeration may be employed depending on final metallurgical test results.

13.7.3

Backfill

No backfilling of the open pit is currently planned during operations. Waste rock will be placed in external waste rock storage facilities designed to ensure

geotechnical stability, drainage control, and long-term reclamation. Placement will be managed using track dozers and haul trucks, with lift heights and dump configurations consistent with industry practice. Partial backfilling of the pit may be

considered at closure, depending on the final reclamation plan.

13-15

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

13.7.4

Dewatering

Mine dewatering is expected to be a significant component of the operation, with inflows estimated at approximately 53 m3/min (14,000 gpm). Dewatering will be achieved using a staged pumping system installed within the pit, consisting of submersible or vertical turbine pumps located in sumps and on intermediate benches.

Water will be pumped to surface pipelines and conveyed to designated storage or discharge areas. Consistent with operational constraints, no electrical infrastructure will be installed within active mining areas beyond the dewatering pump

installations. Excess water not required for processing will be discharged, subject to permitting, to rapid infiltration basin(s) or equivalent area located several kilometers from the pit. The dewatering system will be designed to maintain safe and

dry working conditions. and it will include redundancy to ensure reliability.

13.7.5

Maintenance Facilities

The Project currently includes an existing four-bay truck shop located within the footprint of the planned ultimate pit

and will therefore require relocation. A new maintenance facility will be constructed outside of the pit limits in a location suitable for long-term operations. The replacement facility is expected to include multiple service bays sized for 150-tonne haul trucks, overhead cranes, lubrication systems, tire handling equipment, and supporting infrastructure. The shop will be supported by adjacent maintenance yards, parts storage, and fueling facilities.

Additional light-vehicle and support-equipment maintenance will be accommodated within the same complex or in dedicated auxiliary buildings.

13.7.6

Fuel Storage and Distribution

Diesel fuel storage and distribution facilities will be constructed on-site to support the mining fleet and auxiliary

equipment. Fuel will be delivered by tanker truck and stored in above-ground tanks with appropriate containment. Mobile fueling units will be used for in-pit refueling of haul trucks and support equipment to

minimize downtime. Refer to Table 13-13 for details on fuel storage arrangements.

13.7.7

Power Supply and Distribution

Electrical power distribution at the mine would utilize multiple voltage levels consistent with industry practice. Major mine loads will be the mine

dewatering, support facilities, and maintenance infrastructure.

13.7.8

Communications and Control Systems

The mine will be equipped with a comprehensive communications system, including two-way radio networks, cellular or

satellite backup systems, and data communication infrastructure to support operational coordination and safety. A dispatch system may be implemented to optimize fleet productivity and monitor equipment performance. Supervisory control and data

acquisition (SCADA) systems will be used to monitor and control key process and infrastructure components, including power distribution and dewatering systems.

13.7.9

Water Supply and Management Infrastructure

Water management infrastructure will include pipelines, storage ponds, and pumping systems to manage both process water and dewatering flows. Given the

significant dewatering inflows, the site is expected to be a net water producer, with water reused in processing where practical and excess water discharged in accordance with regulatory requirements. Potable water will be supplied by truck, as no

permanent accommodation camp is planned.

13-16

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

13.7.10

Mine Infrastructure Summary

The proposed mine infrastructure for the Sleeper operation is conventional and appropriate for a 30,000 tpd open pit heap leach project. Key infrastructure

elements, including haul roads, material handling systems, dewatering, maintenance facilities, power supply, and communications, have been conceptually designed in accordance with industry standards and comparable operations in Nevada. The

relocation of the existing truck shop and the development of new surface infrastructure will support efficient and safe mining operations over the LOM.

13.8

Mine Equipment

The proposed open pit operation will be carry out by contractors, extracting approximately 30,000 tpd of process feed and 66,000 tpd waste, for a maximum total

daily material movement of approximately 95,890 tpd based on a waste-to-process feed strip ratio of 1.9:1. Given the projected haul distances, with process feed

transported 1.5 km to 4.5 km one-way to the crusher and waste hauled approximately 2.5 km one-way to the waste dump, a conventional diesel-powered truck and shovel fleet

using 150 t class rear-dump haul trucks is appropriate.

Based on the planned production rate and a weighted-average haul profile, the haulage fleet would

consist of approximately 15 trucks of 150 t trucks. This fleet size is expected to provide adequate capacity to meet the required material movement under average conditions, while allowing for normal mechanical downtime, delays, and short-term

cycle-time variability.

Primary loading would be carried out by two hydraulic excavators in the 18 m3

to 22 m3 bucket class, which are suitably matched to the 150 t trucks and would typically load each truck in approximately 4 to 6 passes. A large wheel loader in the 16 m3 to 20 m3 class would supplement the excavator fleet and provide flexibility for ore control. Table 13-10

summarizes the anticipated primary mining equipment fleet requirements.

The support fleet would include a conventional complement of ancillary equipment,

including production drills, track dozers, graders, water trucks, fuel and lube trucks, service trucks, and a tire handler. A likely configuration would include two production drills, with one active and one shared standby or campaign support unit,

two large track dozers for dump maintenance, pit cleanup, and push assistance, one medium dozer for bench and auxiliary work, two motor graders for haul road maintenance, and two water trucks for dust suppression. Mobile maintenance support would be

provided by field service units, lubrication trucks, and a tire handler suitable for the selected truck class.

Table

13-10: Primary Fleet Estimate

Equipment

Typical Size /

Class

Qty

Operating

Qty Standby /

Relief

Total

Qty

Primary Duty

Hydraulic excavator

18 to 22 m3 bucket

2

0

2

Primary process feed and waste loading

Front-end wheel loader

16 to 20 m3 bucket

1

0

1

Backup loading, blending, crusher support, and cleanup

Rear-dump haul trucks

150 t payload

15

2

17

Process feed and waste haulage

13-17

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Equipment

Typical Size /

Class

Qty

Operating

Qty Standby /

Relief

Total

Qty

Primary Duty

Production drill

171 to 229 mm class

1

1 shared/relief

2

Production drilling

Track dozer

Cat D10/D11 class

2

0

2

Dump maintenance, push assist, pit cleanup

Track dozer

Cat D8 class

1

0

1

Bench cleanup, support work

Motor grader

16M/24M class

1

1

2

Haul road maintenance

Water truck

50,000 to

60,000 L

2

0

2

Dust suppression

Fuel/lube truck

service unit

1

0

1

In-pit fueling and lubrication

Service truck

field mechanic unit

1

0

1

Mobile maintenance support

Tire handler

150 t truck class

1

0

1

Tire changes

Crane / utility truck

site support

1

0

1

Field lifting and support

13.8.1

Fuel Consumption

Using the fleet basis from the mining assumptions, the SLR QP estimates that the operation will consume on the order of 72,000 L to 75,000 L per day of diesel,

with a practical base case of about 72,500 L/d (about 19,000 to 19,700 US gal/d). That estimate includes the production fleet and the principal support equipment, not just haulage. The haul fleet consists of 150 t class trucks and uses the Cat 785

as a reasonable proxy, since its nominal payload is 147 t and gross power is 1,193 kW (1,600 hp). The shovel selected was a Cat 6060 hydraulic shovel, which has a gross power of about 2,248 to 2,256 kW, Pit Viper

271-class diesel drills at 652 to 708 kW, and Cat 16 graders at 216 kW.

For the mining rate of approximately

87,600 tpd (total material movement), using an operating basis of 24 h/d, 2 shifts, 4 crews, 53 min/h effective time, and 90% utilization of availability, the mine effectively needs enough active equipment to sustain the target rate of about 19.1

effective operating hours per day. On the haul side, using normal loaded and empty truck speeds for an 8% ramp, plus a 0.8 km to 2.4 km (0.5 to 1.5 miles) ex-pit haul distances, the estimated average cycle

time is about 23 minutes for process feed and 26.5 minutes for waste. That supports an operating fleet of approximately 13 haul trucks in service at any one time, which would translate into a purchased or contracted fleet of 14 to 15 trucks total to

cover float, maintenance, and shift change. This is an engineering estimate, not a vendor guarantee.

13.8.1.1

Estimated Diesel Consumption by Equipment

Table 13-11 shows the estimated daily diesel consumption for the Base Case. The hourly fuel burn rates are engineering

assumptions based on machine class, installed power, and a typical mining duty cycle.

13-18

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 13-11: Equipment Diesel Consumption Estimate

Equipment

Assumed Count

Operating

Assumed Fuel Burn

(L/h each)

Assumed Operating

Hours/Day

Estimated

L/d

150-t haul trucks

15

190

21.2

60,420

Cat 6060 hydraulic shovel

1

320

21.2

6,784

Large wheel loaders

2

105

21.2

4,452

Pit Viper-class drills

2

100

18.0

3,600

Cat 16H graders

2

38

18.0

1,368

Track dozers

2

50

18.0

1,800

Water truck

1

80

18.0

1,440

Lube truck

1

15

12.0

180

Service truck

1

15

12.0

180

Light vehicles / pickups

6

5

10.0

300

Total

80,524

That base case is about 80.5 m3/d, approximately 29.4 million L/y.

13.8.1.2

Diesel Storage Comparisons

For storage, the SLR QP recommends that there should be enough fuel on-site to account for weather, supplier delays,

delivery timing, and maintenance outages. Using the Base Case burn of about 80.5 m3/d, the recommended storage requirements are shown in Table 13-13.

Table 13-12: Diesel Storage Comparisons

Basis

Days of

Storage

Required Diesel (m3)

Base consumption only

7

564

Base consumption + 15% reserve

7

647

Base consumption only

10

805

Base consumption + 15% reserve

10

926

Base consumption only

14

1,127

Base consumption + 15% reserve

14

1,296

For this Project, a practical recommendation would be to install a total of 850

m3 to 1,000 m3 of diesel storage. The arrangements are provided in Table 13-13.

13-19

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 13-13: Recommended Diesel Storage Arrangements

Tank Arrangement

Total Capacity

Comment

2 × 100,000 gal ASTs + 1 × 25,000 gal day tank

850 m3

(225,000 gal)

Preferred base case

(10.6 days)

3 × 75,000 gal ASTs + 1 × 10,000 to 15,000 gal day tank

890- 900 m3

(235,000 to 240,000 gal)

Good redundancy, smaller units

(11-11.3 days)

2 × 120,000 gal ASTs + 1 × 25,000 gal day tank

1,000 m3

(265,000 gal)

Better if deliveries are less frequent

(12.5

days)

AST – Aboveground Storage Tank

The preferred base case is approximately 850 m3 of total storage,

consisting of two 378.5 m3 bulk tanks and one 94.6 m3 day tank, providing approximately 11 to 12 days of base-case storage and just over 10

days including reserve margin. For the current study level, the QP recommends the following parameters for the budget and layout of the fuel system as follows:

Diesel consumption: 80,524L/d base case

Annual diesel: about 80.5 million L/y

13.9

Mine Personnel

The operation is planned to run continuously on a

24-hour-per-day, year-round basis using a conventional four-crew rotation on 12-hour

shifts. Mining activities will be carried out by a mining contractor, who will provide the majority of the operational workforce, including equipment operators, maintenance personnel, and mine-related site support.

The total workforce is estimated at approximately 220 personnel. Of these, about 170 personnel will be employed by the contractor and will support mining

operations, equipment maintenance, dewatering, and site services. The remaining approximately 50 personnel will be employed by Paramount owner and will provide technical, supervisory, and administrative functions, including geology, mine

engineering, technical services, management, and contract administration.

13-20

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

14.0

Processing and Recovery Methods

14.1

Selected Processing Strategy

Based on the metallurgical test work summarized in Section 10.0, the oxide and mixed Mineral Resources and the existing waste rock dumps are amenable to

processing via heap leach with Merrill-Crowe processing. The economic analysis presented in this IA considers the processing of these Mineral Resources only.

Sulfide, HLP, and tailings materials are amenable to processing via flotation, with rougher concentrate assumed to be sold or toll treated at an off-site facility. Sulfide processing is not considered in the economic analysis of this IA. The proposed processing for sulfide, HLP, and tailings materials is presented as an opportunity meriting further

evaluation.

14.2

Proposed Process Description

The proposed plant for the initial development case is a conventional crush-agglomerate-heap-leach operation with Merrill-Crowe solution processing.

Merrill-Crowe processing has been selected because recovered Ag:Au ratios are expected to exceed 4:1. ROM material from oxide pits and selected waste sources would be crushed to a coarse target size consistent with the historical McClelland test

programs, approximately P80 19 mm, and agglomerated with cement at approximately 6.2 kg/t and/or lime as required for pH control. Planned crushing throughput is 30,000 tpd and would consist of

primary gyratory crushing followed by secondary cone crushing. Agglomerated material would be conveyor stacked on a lined heap leach pad using a series of conveyors and a radial stacker, with heap lifts constructed at approximately 10 m heights.

Dilute sodium cyanide solution would be applied to the stacked mineralized material using drip emitters at an application rate of approximately 7

L/m²/hr to 8 L/m²/hr. The minimum planned leach cycle is 45 days. Barren solution would be applied to the heap leach pad at a nominal flow rate of approximately 500 m³/hr to 510 m³/hr, with a cyanide concentration of

approximately 300 ppm to 400 ppm NaCN. As the solution percolates through the heap, cyanide-soluble gold and silver would dissolve into solution. Pregnant leach solution would be collected through the pad drainage system and pumped to the

Merrill-Crowe plant for metal recovery.

In the Merrill-Crowe circuit, pregnant solution would be clarified to remove suspended solids, de-aerated to reduce dissolved oxygen, and contacted with zinc dust to precipitate dissolved gold and silver. The precious-metal precipitate would be recovered by filtration, dried, and smelted to produce

doré bars. The barren solution would then be recycled back to the heap leach circuit, with cyanide, lime or pH-control reagents, and make-up water added as

required. Make-up water demand is currently estimated at approximately 40 m³/hr to 50 m³/hr. Figure 14-1 shows the crushing and agglomeration flowsheet, and

Figure 14-2 provides the overall process plant flowsheet.

14.2.1

Defining Sulfides for the Mineral Resources

Although sulfides are not included as part of the Sleeper process recovery in this IA, sulfide material was included in the Mineral Resource estimate, and a

process method was selected. Sulfide, HLP, and tailings materials will be considered separately through a conventional flotation circuit, producing a rougher concentrate. For the definition of Mineral Resources in this IA, the flotation concentrate

is assumed to be sold or toll treated off-site rather than processed through an on-site oxidation or concentrate leach plant. Operating costs and payable recoveries for

this route, therefore, include a 12% discount to flotation recoveries to reflect toll milling and related downstream charges. Additional test work is required to further refine opportunities for processing the sulfide, HLP, and TSF material.

14-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

14.3

Plant Throughput and Design Basis

The available resource base supports evaluation of a nominal 30,000 tpd heap leach operation, equivalent to approximately 11 Mtpa, as a reasonable benchmark

for the conceptual heap leach plant and infrastructure basis. Final throughput should be confirmed against mine scheduling, the proportion of metallurgically supported feed, and the reagent and cycle-time implications of the selected domains.

Major equipment for the heap leach case would include crushing facilities, agglomeration equipment, conveying and stacking systems, lined heap leach cells,

solution collection ponds, Merrill-Crowe clarification and precipitation equipment, refining and doré handling facilities, reagent storage and addition systems, and associated utilities.

14.4

Energy, Water, Process Materials, and Personnel

Projected requirements for energy, water, and process consumables for the heap leach case are typical of a Nevada gold-silver heap leach operation. Estimated

electrical demand for crushing and conveying, heap leach solution pumping, Merrill Crowe processing and refinery circuits is approximately 4.35 MW operating load. Primary water requirements include make-up

water for crushing/agglomeration moisture control, heap leach solution inventory, evaporative losses, and process water make-up. Make-up water is assumed to be provided

by pit-dewatering. Principal process consumables include 0.34 kg/mt sodium cyanide, 6.26 kg/mt cement and/or lime for agglomeration and pH control, zinc dust, lead nitrate, diatomaceous earth or filter aid,

anti-scalant/flocculant as required, and other Merrill Crowe, refinery and laboratory consumables. Personnel requirements would include 42 operators, 10 maintenance/electrical, and 13 supervision and technical support staff.

14.5

Suitability of the Selected Method

Given the oxide and mixed material is consistent with Sleeper’s historical oxide processing history and with the most reliable portions of the

metallurgical database (namely Facilities oxide and selected oxide, mixed, and waste composites), it is the QP’s opinion that the proposed heap leach and Merrill-Crowe route is a suitable processing method. It is a commercially proven

extraction method and does not require special justification as a novel process.

The identified deleterious elements are not currently considered

prohibitive; however, elevated Hg, As, Sb, and total sulfur in selected material groups warrant additional metallurgical, precipitate-quality, and refinery test work in future study phases.

Initial refinery capital allowances include a mercury retort as an IA-level provision for mercury management during

precipitate handling, doré production, and refinery handling. Future test work should confirm mercury behavior, precipitate, and doré quality, and any required mercury-control measures to refine capital and operating cost assumptions.

Sulfide, HLP, and tailings materials may be considered at IA level through conventional flotation, followed by sale or toll treatment of rougher concentrate at an off-site facility. This is also a commercially

used approach, but the current application remains preliminary because concentrate quality, payable terms, impurity penalties, and toll milling costs have not yet been demonstrated by project-specific commercial arrangements.

14-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 14-1: Crushing & Agglomeration Process Flow Sheet

14-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 14-2: Process Plant Flow Sheet

14-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

15.0

Infrastructure

The Project infrastructure has been designed to support a large-scale open pit mining and heap leach operation utilizing conventional, well-established

technologies commonly employed in northern Nevada. Major infrastructure components include site access and internal mine roads, waste rock storage facilities, ROM and crushed mineralized material stockpiles, a single heap leach pad with associated

solution management and storm event ponds, Merrill Crowe Plant for precious metals recovery, electrical power supply and distribution systems, and process and raw water pipelines. The Project benefits from its location within an established mining

district with access to existing regional infrastructure, experienced contractors, grid power, and services. Infrastructure development is planned to be staged in alignment with the mine production schedule and designed to meet regulatory,

environmental, and operational requirements.

15-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 15-1: Infrastructure Layout

15-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

15.1

Access Roads

Existing access to the Project truck shop from Winnemucca, Nevada, is via a combination of paved highway and maintained gravel access roads, with a total one-way distance of approximately 56 km (35 mi). From Winnemucca, proceed north on U.S. Highway 95 for approximately 40 km (25 mi). This segment is fully paved and generally in good condition, providing reliable

year-round access. At approximately Milepost 66 to 68 (measured from Winnemucca), turn west onto a graded dirt access road that serves local ranching and mining activities. After leaving U.S. 95, follow the gravel access road for approximately 10 km

(6 mi) toward the Sleeper Mine site. This road is typically maintained to accommodate mine-related traffic, although conditions can vary with weather and usage, including sections of wash boarding or minor erosion. The route trends generally

west-northwest across gently rolling basin and range terrain. Upon reaching the mine property boundary, continue along internal haul and service roads for an additional 1 to 3 km (1 to 2 miles) to access the main operational area. The current truck

shop is located within the central yard complex, adjacent to maintenance bays, fueling stations, and equipment staging areas.

In total, the route

comprises approximately 40 km (25 mi) of paved highway driving and approximately 16 km (10 mi) of gravel and site roads, with an estimated travel time of 45 to 60 minutes under normal conditions. Seasonal weather, particularly winter precipitation

or spring runoff, may temporarily affect road conditions on the unpaved segments.

15.2

Leach Pad

A synthetically lined Heap Leach Pad (HLP) of approximately 2 Mm2 in size will be constructed near the

open pit crest to accommodate approximately 175 Mt of mineralized material. The heap will have a total height of 60 m (200 ft), lifts will be placed by radial stacker at a thickness of 10 m (33 ft). The pad footprint of 2 Mm2, as shown in Figure 15-1, contains the 175 Mt of heap material at 60 m high and 3H:1V final outslopes at closure.

Mineralized material will be placed on the HLP and irrigated with a cyanide solution. The solution will be recovered from the HLP and stored in the pregnant

solution pond (Preg Pond) before being processed and recirculated to the HLP as barren solution. The HLP and External Ponds, collectively referred to as the Heap Leach Facility (HLF), will be synthetically lined so that the solution is in a closed

system, with the only net solution loss being to evaporation.

SLR identified a conceptual HLF site within the general area that could be sized to contain

the ultimate (175 Mt) HLP capacity, and generally met the following siting constraints:

Proximity to mining activities

Gently sloping terrain to maintain positive drainage for solution along the pad liner while remaining

geotechnically stable

The leach pad will be synthetically lined with a geomembrane primary liner that is underlain with either a

prepared low permeability subgrade or geosynthetic clay liner (GCL). Both applications are acceptable to the State of Nevada. A network of collection system pipelines will be placed over the liner and embedded in a

1-meter-thick lift of granular drain fill (Overliner Drain Fill (ODF)) The pipes will be sized and placed such that the solution application rate over the leached mineralized material will not allow for head

to build up on the liner. The particle size distribution of the ODF will allow for free draining of the PLS and will be specified to be two orders of magnitude greater permeability than the barren application rate.

15-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The conceptual HLP layout and capital cost estimate assumed the geotechnical and hydrogeological conditions

were suitable. Typical design values were assumed, or values were estimated from previous experience on similar projects, and key criteria were comprised of the following:

Storage of approximately 175 Mt

An average annual mineralized material loading rate of 30,000 tpd / 11 million tonnes per annum (Mtpa),

resulting in a project life of approximately 16 years (Base Case).

Mineralized material will be prepared as described in Section 14.0 (crushed and agglomerated) and placed on

the HLP using conveyors in 10 m lifts in a retreating manner to limit material compaction. A stability analysis was not performed, and SLR assumed that agglomerated mineralized material will be placed at an overall 3H:1V slope to facilitate closure,

a maximum height of approximately 60 m (200 ft), and an average density of 100 pounds per cubic foot (pcf).

The HLP was designed as a “zero discharge” facility. Containment for the HLP will be provided with a

composite lining system, comprised of a Geosynthetic Clay Liner (GCL) overlain by a High-Density Polyethylene (HDPE) geomembrane, over a total area of approximately 200 acres. This liner system is acceptable to the state of Nevada;

A network of collection system pipelines will be placed over the HDPE geomembrane and embedded in a 2 ft thick

lift of granular drain fill (Overliner Drain Fill [ODF]). The pipes will be sized and placed to minimize the risk of head (i.e., pressure) build-up on the liner

Construction of the HLP was assumed to be over five stages (i.e., approximately three-year increments) to reduce

initial capital.

Three external ponds were included in the capital cost estimate, including a pregnant solution pond (Preg Pond),

barren solution pond (Barren Pond), and storm event pond (collectively, the Ponds). The HLP will be connected to the pond system via a solution corridor. Typical design values for the external ponds were assumed, or values were estimated from

previous experience on similar projects, and key criteria were comprised of the following:

A water balance was not performed to size the ponds, as pond sizing is based on site specific and operational

based criteria, such as dead storage, emergency draindown, operational volume, freeboard, and a design storm event, which is typically the 100-year, 24-hour storm event.

For the purpose of the IA, storage of approximately 2.5 million gallons, 2.1 million gallons, and 30.9 million gallons were assumed for the Preg, Barren, and Event Ponds, respectively, based on the QP’s previous experience with

similar projects.

The Ponds were designed as a “zero discharge” facility. Containment for the Ponds will be provided

with a double liner system with Leak Collection and Recovery System (LCRS), comprised of a Geosynthetic Clay Liner (GCL) overlain by a HDPE Secondary geomembrane, Geonet drainage layer, and a HDPE Primary geomembrane. This liner has been previously

approved by the State of Nevada at similar projects.

Construction of the Ponds, in their entirety, is assumed to be performed during initial construction.

The ponds will be double lined with integrated leak collection and recovery systems (LCRS) and will be sized to

accommodate:

Freeboard (0.6 m)

15-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Operational Volume

Emergency Draindown Volume (24-hours of Barren Application Rate)

Design Storm Volume

Dead Storage for Sedimentation and Pump Priming

The HLP and solution ponds are synthetically lined so that the solution is contained within a closed system, with the only net solution loss due to

evaporation, which will be empirically confirmed during pond design using the sitewide water balance.

15.3

Buildings and Facilities

The buildings and facilities described below are in the main plant and offices area, as shown in Figure 15-1:

Truck shop and mobile maintenance warehouse: The Sleeper truck shop complex will be located near the mine

entrance. It is a four-bay shop sized up to 200 t class haul trucks. The shop will contain a tool crib, oil and lubricant bulk storage, multiple offices, locker rooms, a training room, and a warehouse. A

covered warehouse storage yard is located adjacent to the admin building complex.

Process building: The mill building, which is currently not operating, consists of facilities supporting the

mineral processing operations, including grinding, gravity separation, flotation, sulfide concentrate filtration and load-out, leach CIP circuit (bypassed), tailings filtration and agglomeration, recovery, and

doré casting, and metallurgical laboratory. Adjacent to the mill building is the thickener water storage tank and the remaining CIL tanks from the 1989 flowsheet.

Crushing plant: The crushing plant will produce P80 19 mm

(0.79-in) material for leaching. Stemming for blastholes, road material, and initial material overliner material for the leach pad which will require additional crushing and screening and will be completed

using mobile equipment, not a part of the primary crushing circuit, phased according to construction and development activities.

Process Recovery: Merrill-Crowe Circuit, zinc precipitation, doré casting, and solution pumping and

management. The recovery plant will contain analytical and metallurgical laboratories.

Wash bay: The wash bay will be located next to the truck shop and consists of one covered bay.

Administration buildings: The main administration building encompasses most site-support departments.

Assay laboratory: The assay laboratory will support ongoing mine operations, including grade control and gold

solution analysis.

Motor control center (MCC): The MCC will house controls for the pumps and boosters for the barren and pregnant

solution ponds.

15-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

15.4

Power Supply and Distribution

Electrical power for the proposed Project is expected to be supplied from the regional electrical grid operated by NV Energy. The project area is situated

within a well-established mining district with existing transmission infrastructure, and grid power is considered available within a reasonable distance of the site. Power would be delivered via a new overhead transmission line, anticipated to be

either 69 kilovolt (kV) or 120 kV, depending on final engineering, load growth considerations, and utility interconnection requirements. For the projected peak demand, a 120 kV supply is preferred to provide additional capacity, improved

voltage stability, and flexibility for future expansion.

The total connected electrical load for the operation is estimated to be approximately 9

megawatts (MW) to 15 MW, with an average operating demand of 10 MW, based on first principles estimates and benchmarking against comparable heap-leach operations in Nevada. The primary contributors to electrical demand include crushing and

conveying, heap leach solution pumping, the Merrill-Crowe recovery plant, pit dewatering, and general site infrastructure, including maintenance facilities, buildings, and lighting. Among these, pit dewatering represents a significant continuous

load, reflecting the need to pump approximately 4,542 m3/hr (20,000 gpm) from the open pit.

Electrical power received at the site would be stepped down through a central substation equipped with a primary transformer rated at approximately 25

megavolt-amperes (MVA). The substation would convert transmission voltage (69 kV or 120 kV) to a primary site distribution voltage of 13.8 kV, which would serve as the backbone of the site-wide electrical system. Distribution from the substation

would be configured in a radial arrangement with looped circuits for critical infrastructure, including the process plant and dewatering systems, to enhance operational reliability.

Power distribution across the site would utilize multiple voltage levels consistent with industry practice. Major process loads, including crushing,

conveying, and high-capacity pumping systems, would operate at 13.8 kV or 4.16 kV, with local step-down transformers where required. The Merrill-Crowe plant, maintenance facilities, warehouse, and ancillary infrastructure would primarily utilize 480-volt (V) systems, while lighting, offices, and control systems would be supplied at 240/120 V. Motor control centers and variable frequency drives would be employed extensively to optimize energy efficiency

and process control.

The crushing and conveying circuit are estimated to require approximately 3 MW to 5 MW, supplied at medium voltage, with large

motors driving the primary crusher and overland conveyors. Heap leach solution handling systems, including pregnant and barren solution pumps, are estimated to require approximately 0.35 MW to 1 MW. The Merrill-Crowe recovery plant, including

clarification, deaeration, zinc precipitation, and refining circuits, is expected to require approximately 1 MW to 2 MW.

Pit dewatering is estimated to

require approximately 2 MW to 3.5 MW, depending on final pump configuration, total dynamic head, and system efficiency. The system would consist of staged pumping installations located on pit benches or in sump areas, supplied via medium-voltage

distribution. Consistent with operational requirements, no electrical infrastructure would be installed within active mining faces beyond the dewatering pump installations.

Site infrastructure, including the truck shop, maintenance facilities, warehouse, assay laboratory, administrative buildings, and site lighting, is estimated

to require approximately 0.5 MW to 1 MW. Additional miscellaneous loads, including reagent handling systems, control systems, and contingency allowances, are estimated at 2 MW to 3 MW.

Emergency and backup power systems would be installed to support critical operations, including process control systems, Merrill-Crowe circuits, and minimum

dewatering capacity. These systems would consist of diesel-powered generators with sufficient capacity to maintain safe shutdown and restart conditions. The electrical system would be monitored and controlled through a supervisory control and data

acquisition (SCADA) system integrated with plant operations.

15-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Overall, the proposed electrical power system is conventional for a Nevada-based heap leach operation of this

scale and is considered technically feasible. The use of grid power supplied by NV Energy, combined with standard substation and distribution infrastructure, provides a reliable and scalable solution to support the planned mining and processing

activities.

Table 15-1: Estimated Power Load by Area

Area

Estimated Load (kW)

Estimated Load (MW)

Crushing and Conveying

3,100

3.10

Heap Leach Solution Pumping

350

0.35

Merrill-Crowe Plant/Recovery/Refining

1250

1.25

Pit Dewatering (20,000 gpm-nominal)

2,400

2.40

Infrastructure, Maintenance & Lab Facilities

1,000

1.00

Miscellaneous and Contingency

2,000

2.00

Total Connected Load

10,100

10.00 – 12.00

15.5

Water

The Project water balance for the proposed 30,000 tpd operation would be dominated by pit dewatering inflows, process solution inventory, heap leach

application losses, and evaporation. Mine dewatering, estimated to average approximately 4,542 m3/hr (20,000 gpm), is expected to provide substantially more water than required for crushing,

possible agglomeration, heap leaching, and Merrill-Crowe recovery, such that excess water would likely be discharged, subject to permitting and water quality requirements, to engineered rapid infiltration basins (RIBs) located several kilometers and

down gradient from the pit.

Process water demand would include dust suppression, ore agglomeration if required, heap leach solution make-up, and plant service water, with solution losses principally associated with heap and pond inventory, evaporation, and residual moisture retained in spent material. No accommodation camp is planned, which

materially reduces domestic water demand, and potable water for personnel would be trucked to the site.

Overall, the operation is expected to be a net

water producer, with site water management focused primarily on collection, storage, reuse where practical, controlled discharge of surplus dewatering water, and maintenance of adequate operational and environmental water controls.

15.5.1

Current Well Network

As of 2022, four interceptor wells remained operational. All bedrock dewatering wells and the remaining interceptor wells have been decommissioned. In 2005,

three of the operational dewatering wells were reported to be completed with line-shaft turbine pumps (WMC 2005a); however, pump reports from 2022 show groundwater discharged from only one of the interceptor wells (New Sleeper Gold 2022). The power

lines servicing any on-site line-shaft turbine pumps are expected to remain in place.

15-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

As of 2005, four monitoring wells installed adjacent to the tails dam were reported to remain operational.

All of the remaining monitoring wells are reported to have been decommissioned (WMC 2005a).

15.5.2

Pit Dewatering Plan

To dewater the Slumber pit lake, infrastructure and service requirements are expected to be as follows:

One barge-mounted pump operating in the pit lake having a capacity of 631 L/s (10,000 gpm) and an additional

barge-mounted pump available on-standby if one of the barge-mounted pumps required maintenance

Conveyance pipe from the barge pump to the conveyance channel on the west crest of the pit

Power to the barge-mounted pump

Submersible camera inspection and rehabilitation of the four interceptor wells remaining from previous dewatering

A monitoring well network to monitor both groundwater pressures and groundwater quality.

Approximately fourteen 50 mm diameter PVC standpipe monitoring wells installed in 200 mm nominal diameter

boreholes.

Approximately six monitoring wells can be installed to 90 m below grade in the basal gravel aquifer

Three monitoring wells installed in the bedrock DFS at 244 m below grade

Five monitoring wells in the compartmentalized bedrock PSF assumed to be at 200 m below grade.

Total monitoring well drilling would be 2,280 m.

Twenty 350 mm nominal diameter interceptor wells complete with louvered well screens installed in 450 mm nominal

diameter boreholes. As pit lake water level decreases, it is conceivable that as many as 8 additional interceptor wells will be required to lower the head in areas with greater storage capacity.

Twelve 350 mm nominal diameter bedrock dewatering wells complete with 450 mm nominal diameter surface casings.

Since the continuity and interconnectedness of the fracture network is unknown, it is conceivable that as many as four additional bedrock wells will be required. Initially, seven bedrock wells will target the DFS 244 m below grade from the crest of

the west wall. Following substantial dewatering of the pit, the remaining bedrock wells will be installed adjacent to compartmentalized zones where groundwater pressures have not been substantially lowered.

Ten 350 mm nominal diameter wells installed in 450 mm diameter boreholes from the 1,220 m (4,000 ft) elevation in

the waste rock piles at the based of the pit. These wells could not be installed until the pit has been dewatered to expose the waste rock and access can be developed for the drill rig.

Each of the interceptor, bedrock, and waste rock wells completed with a line shaft turbine pump.

15-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Conveyance pipe from each wellhead to the conveyance channel to the artificial wetland.

Power to each of the line shaft turbine pumps.

Excavation of a conveyance channel from the west crest of the pit to the artificial wetland in the middle of the

Desert Valley.

Construction of the impoundment dykes required to develop the artificial wetland.

Generally, installation of functional groundwater dewatering infrastructure is considered to be the critical path that limits the rate at which the pit is

dewatered. To maintain pit wall stability groundwater piezometric pressures must be maintained at a level only slightly higher than the level in the pit lake (WMC 2005d).

15.6

Accommodation Camp

An accommodation camp is not required for the Project due to its proximity to the established community of Winnemucca, located approximately 70 km to 80 km (45

to 50 miles) by road from the site. Winnemucca provides sufficient existing infrastructure to support the workforce, including housing, hotels, dining, medical services, and commercial amenities. The Project is accessible via U.S. Highway 95 and

maintained access roads, enabling reliable daily commuting for employees.

The operation is expected to utilize a local and regional workforce on a drive-in/drive-out basis, consistent with standard practice for mining operations in north central Nevada. This approach reduces capital and operating costs associated with

constructing and maintaining a camp, while also minimizing environmental disturbance and permitting requirements.

15-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

16.0

Market Studies and Contracts

16.1

Markets

Gold is the principal commodity at the Sleeper Gold Mine and is freely traded at prices that are widely known, so that prospects for sale of any production are

virtually assured. Metal prices for the economic analysis were estimated based on recent consensus industry metal price forecasts and compared with those used in other published studies. The metal prices used for the economic analysis, shown in

Table 16-1. These represent the average analyst consensus prices of March 2026.

Table 16-1: Economic Analysis Metal Price Assumptions

Metal Price

Units

Y-1

Y1

Y2

Y3

Y4

Long-

Term

Gold

$

/oz

4,370

4,000

3,600

3,600

3,600

3,600

Silver1

$

/oz

66.00

59.00

48.00

48.00

48.00

48.00

Note 1: Silver was modeled and evaluated in the cash flow; silver is recovered in the Sleeper recovery facilities.

The doré is securely transported by road freight to a refinery where it is refined into gold bullion. The bullion will be sold by reputable gold trader

to banks that specialize in the purchase and sale of gold bullion.

16.2

Contracts

Some of the major contracts that will be negotiated and implemented are discussed below.

Mining. Mining operations are expected to be executed by a contract mining firm under a unit-rate

agreement, with costs structured primarily on a volumetric basis (US$/bcm mined) covering drilling, blasting, loading, and haulage activities. The contract would include a schedule of rates for additional “out-of-scope” work, such as road construction, dewatering, and other ancillary services, with provisions for escalation, productivity adjustments, and fuel price variability. Contractor

performance would be managed through standard key performance indicators (KPIs), including productivity, dilution control, and safety compliance.

Diesel Fuel Supply Contract. Diesel fuel for mining and mobile equipment would be supplied under a term

supply agreement with a regional fuel distributor, with pricing typically referenced to published rack or index prices (e.g., OPIS), plus a negotiated differential for delivery, handling, and the supplier’s margin. The contract would include

provisions for volume commitments, delivery scheduling, on-site storage and inventory management, and adjustments tied to market fuel price fluctuations. Additional terms may address fuel quality

specifications, winterization requirements, and contingency supply arrangements to ensure continuity of operations.

Cyanide Supply Contract. Sodium cyanide would be procured under a supply agreement with a qualified

manufacturer or distributor, with pricing generally based on US$/tonne delivered and indexed to market conditions and potentially adjusted for freight and energy-related cost drivers. The contract would include provisions for delivery in solid

briquette or liquid form, storage and handling requirements, and compliance with applicable safety and environmental regulations (including the International Cyanide Management Code, where applicable). Supplier support services may include technical

assistance, inventory management, and emergency response provisions.

16-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Grinding Media Supply Contract. Grinding media (e.g., steel balls) for the comminution circuit would be

supplied under a contract with an established manufacturer, with pricing based on US$/t delivered and dependent on media specifications, alloy composition, and wear performance guarantees. The agreement would typically include provisions for quality

control, delivery schedules, minimum order quantities, and potential price adjustments linked to steel input costs or indices. Supplier performance may be monitored through consumption rates and wear characteristics to optimize operating costs and

milling efficiency.

Smelting and Refining. Gold and silver doré produced on site would be sold under standard refining

agreements with established precious metal refineries, in which the refineries purchase the doré and pay for the contained metal based on agreed payable percentages. The contract would include typical industry terms for refining charges,

treatment fees, assay procedures, and settlement timelines, with deductions for impurities and processing losses as applicable. Final payments are generally based on independently verified assays and prevailing market prices at the time of

settlement.

Transportation and Handling. Transportation of doré bullion from site to the refinery would be

conducted by a specialized, insured security logistics provider under a contract covering handling, transport, and custody of the material. The agreement would include provisions for secure packaging, chain-of-custody documentation, insurance coverage based on metal value, and defined responsibilities for loss or damage during transit. Logistics arrangements would be coordinated to align with production

schedules and refinery delivery requirements.

Sales, Hedging, Forward Sales. The Project may consider implementing a hedging or forward sales strategy

for a portion of future gold and silver production to support financing requirements or mitigate commodity price volatility. Any such program would be structured in accordance with standard industry practices and may include instruments such as

forward sales, collars, or other price protection mechanisms, subject to market conditions and lender requirements. At this stage, no specific hedging arrangements have been defined.

All contracts described above are expected to be negotiated on commercially reasonable terms consistent with industry norms for comparable Nevada heap leach

operations, and no unusual or non-standard contractual provisions are anticipated.

16-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

17.0

Environmental Studies, Permitting and Plans, and Social or Community Impact

The Project was developed (mined, milled, and heap leached) by AMAX in the 1980s and 1990s. Operation ceased in 1996. Reclamation has occurred on most of the

mine facilities (waste rock dumps, tailing impounds, heap leach pads and ancillary facilities (access and haul roads) and the open pit has been allowed to refill with water. Current activities at the site involve exploration, permit and reclamation

maintenance (including e-cells associated with the former heap leach units), and post-closure environmental monitoring.

17.1

Site Environmental Conditions and Monitoring Programs

The summaries of environmental conditions and studies in this section are based on information documented in environmental impact statement (EIS) and

environmental assessment (EA) baseline reports as well as the water pollution control permit (WPCP) and regulatory submissions required under the various permits and EIS/EA conditions. A Final Permanent Closure Plan (FPCP) for the Sleeper site was

submitted to the Nevada Department of Environmental Protection (NDEP) in 2003 for site-wide closure of the former project. The FPCP included details supporting characterization and stabilization information relative to the various facilities at the

site and the stabilization and closure of remaining process facilities.

17.1.1

Physiography

Sleeper is located in northern Nevada in the Great Basin region of the Basin and Range physiographic province. The Project area is situated in a valley on a

gently west-sloping alluvial plain at an approximate elevation of 1,300 masl (4,265 fasl).

17.1.2

Geology

The Basin and Range is characterized by a series of generally north-trending, fault-bounded mountain ranges separated by broad alluvium or lake sediment-filled

valleys. The Project is at the northwestern flank of the Slumbering Hills within the Desert Valley, which is a typical Basin and Range, fault-bounded valley. The underlying geology is comprised of Mesozoic basement rocks overlain by a sequence of

Tertiary volcanic and volcaniclastic units.

17.1.3

Acid Rock Drainage/Metal Leaching Potential

Acid base accounting (ABA) and meteoric water mobility procedures (MWMP) were performed by Hydrotechnica in 1989 to determine acid rock drainage and metal

leaching potential in support of the initial WPCP. The results have been used to update the pit lake model, with the latest update in 2021 by Piteau. The MWMP analysis for alluvium indicated that arsenic, iron, mercury, and manganese have the

potential for mobility in the alluvial system. In the oxidized volcanic bedrock, analysis conducted to date indicates most metals are immobile; however, the unoxidized volcanic bedrock indicates significant potential exists for mobilizing major

cations and anions, as well as trace metals such as manganese and arsenic. The current updated 2016 pit lake model shows that modelled results of these parameters will remain within Profile III reference ranges for the

104-year model simulation, with the possible exception of fluoride (Piteau 2021).

17-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

To reduce the impact of acid generation and metal leaching, the open pits on site were partially backfilled

with oxidized and unoxidized material and rapid filled through pumping to form a pit lake. Lime slurry was added to the pit lake between July 1996 and November 2001 to increase the pH of the pit lake water. Consistent monitoring of the pit lake and

modeled lake chemistry has shown that most parameters are stable, with a slow increase of alkalinity from alluvial groundwater. The data from monitoring indicates there are no increasing constituent trends and seasonal differences appear to be low.

The main control of future water quality is evapoconcentration; however, the rate of evapoconcentration on the site remains low (NDEP 2017).

Oxide and

sulfide ore was placed on the existing heap leach pads during operations. The heap leach pads were reclaimed in 2000 in accordance with approved closure plans. Solution from heap leach draindown is monitored semi-annually and quarterly, and

indicates the solution is acidic. Draindown solution from the heap leach facilities is managed through passive e-cells. Draindown solution for all pads contain elevated metals and sulfate, with the NROM pad

showing consistently higher concentrations of aluminum, arsenic, iron, sulfate, zinc and total dissolved solids.

The existing waste rock dumps consist of

alluvial material and both oxidized and unoxidized argillized volcanic tuffs. Acid neutralizing potential (ANP) / acid generating potential (AGP) ratios indicate a net acid generating potential. It is unknown where potentially acid-generating

material was placed within the existing waste rock dumps, and no seeps have been observed during quarterly inspections conducted since the completion of reclamation.

17.1.4

Atmospheric Environment

The climate at Sleeper is arid, characterized by warm, dry summers and cold, dry winters. Site-specific data is collected from a meteorological station on the

northern side of the site. Site data collected from 2003 to 2025 indicates an average annual temperature of 10°C with a range of -30°C to 36°C, and 153 mm of average annual precipitation with a

range of 47 mm to 447 mm.

The air quality in the region of the Project is generally good, due to the limited population and industrial activity. Several

mines in the vicinity have the potential to contribute to particulate emissions and industrial pollutants within the Project area. The nearest currently active mine is the Turquoise Ridge-Twin Creeks mine, located approximately 72 km (45 miles) as

the crow flies to the east.

17.1.5

Acoustic Environment

Sleeper is in a remote area with limited human activity, and no substantive anthropogenic noise sources within 42 km (29 mi). The nearest town is Winnemucca,

Nevada, located approximately 42 km (29 mi) south of the Project area. Ranching activities occur in proximity to the site, which contribute limited noise to the surrounding area. Highway 95 is located approximately 19 km (12 mi) east of the project

site, which contributes traffic noise in proximity to the Project area as one of the main travel ways to Idaho and Oregon.

17.1.6

Groundwater and Surface Water

The Project area is located within the Desert Valley (031) groundwater basin. The depth to water in the shallow aquifer before mining activity was

approximately 9 m (30 ft) to 12 m (40 ft) below ground surface (bgs). Several hydrologic and hydrochemical models for the site that have been prepared by Water Management Consultants Inc. (WMC) are listed (WMC 1995):

Sleeper Mine Summary of Groundwater Conditions Beneath the Tailings Dam (1994)

Preliminary Assessment of Hydrologic and Hydrochemical Conditions in the Final Pit (1994)

17-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Results of Supplemental Pit Lake Modeling and Closure Plan for the Final Pit (1995)

Additionally, the most recent update to the Sleeper project was completed by Piteau in 2021.

There are three hydrogeologic units identified within the Project area:

Shallow groundwater zone – lacustrine unit comprised of silty-clay sediments, varying in thickness from

near zero to 30 m (100 ft) in the vicinity of the pit area.

Basal Gravel Aquifer – this aquifer largely dominates the regional groundwater flow system in the Project

area and ranges in thickness from near zero to over 152 m (500 ft) west of the pit.

Volcanic bedrock aquifer – groundwater movement in this aquifer is a result of fracture flow, with variable

hydraulic conductivity. The thickness ranges from near zero to 52 m (170 ft).

Because of the abundant fractures within the rocks, the bedrock complex in the Project area, along with the

overlying Basal Gravel Aquifer, is the principal source of groundwater. Water chemistry in the shallow groundwater zone is believed to represent background conditions. No baseline data exists on the volcanic bedrock aquifer.

There are no surface waters at or near the mine site, with the exception of the pit lake. Groundwater modeling and pit lake monitoring indicate the pit lake

water level has stabilized at an elevation of about 6 m (20 ft) below the pre-mining groundwater level. The latest pit lake model by Piteau in 2021 indicates the pit lake effectively collects groundwater

beneath the mine site facilities and will remain a permanent hydrogeologic sink. Contact stormwater is contained on site and non-contact stormwater (stormwater runoff generated from the closed waste rock

dumps) discharges off site. The site is considered a zero-discharge facility.

17.1.7

Wildlife

There is limited data available for the Project regarding wildlife and biological resources within the area. Big game species, such as mule deer and pronghorn

antelope, small mammals, reptiles, aquatic, and avian species exist within the project area. Several raptor species inhabit the project area, including owls and hawks. It is unknown if golden eagles are present in the project area. No known special

status species or threatened or endangered species occur within the project area. There is evidence of aquatic species within the pit lake.

17.1.8

Cultural Resources

A cultural resources survey was conducted for the 1985 EA resulting in the identification of one obsidian flake within the project area. There is no evidence

of significant cultural or archaeological sites.

17.2

Waste and Tailings Disposal, Site Monitoring, and Water Management

17.2.1

Tailings Storage Facility

The tailings impoundment was designed as a zero-discharge facility. It was constructed as a native clay-lined facility

in accordance with existing standards and was approved by the Nevada Department of Environmental Protection (NDEP). The tailings impoundment was designed to allow for 6.6 million tons of tailings to be deposited over 63 hectares (156 acres).

The facility

17-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

was constructed in four phases from 1985 through 1994. The final thickness of tailings is about 13.7 m (45

ft) in the southeast corner of the impoundment and about 13.1 m (43 ft) in the northwest corner. The present surface area of the tailings is approximately 45 hectares (113 acres). The tailings facility is closed and released, in accordance with the

Closure and Reclamation Plan for the Tailings Impoundment (June 1998) and Final Plan for Permanent Closure (2003), with revegetation remaining as the only remaining activity that has yet to be released. No drain down has been measured since 2009,

and the Tailings Seepage Pond was closed in 2017.

17.2.2

Waste Rock Storage Facilities

There are three existing waste rock storage facilities on the site (North, West, and South dumps) that total approximately 171 hectares (423 acres). The waste

rock storage facilities on site are reclaimed and revegetated, except for a small laydown area on the South Waste Rock Dump, a non-hazardous solid waste landfill within the West Waste Rock Dump, and a portion

of the site access road is located on the North Waste Rock Dump to allow for access to associated collection ponds for processing. Approximately 44.2 metric tons (48.8 million short tons) of oxide and sulfide material was placed onto the heap

leach pads during operations. Leaching or recirculation of solution has not occurred since 1997.

17.2.3

Heap Leach Facilities

The heap leach pads were capped and covered in 2000 in accordance with the closure and reclamation plans approved by the NDEP. Pads were graded and revegetated

to allow for surface water runoff, which is routed to a long-term stormwater diversion channel that runs along the facility, designed for the 100-year, 24-hour storm

event. Process ponds have been closed and in 2023, process ponds for pads 2 (Process Pond #2), 4 (Overflow Pond #4) and NROM (Overflow Pond NROM) were converted to double-lined E-cells with leak detection to

passively manage draindown through evaporative disposal. E-cell conversion was completed in 2024 in accordance with approved plans and designs.

The following ponds were closed between 2017 and 2020:

Overflow Pond #2

Overflow Pond #3

Process Pond #4

South Barren Pond

Process Pond NROM

The following ponds were closed in 2023:

Closure of Process Pond #3

Conversion of Process Pond #2 to E-cell #1

Conversion of Overflow Pond #4 to E-cell #2

Conversion of Overflow Pond NROM to E-cell #3

Flows from heap leach pads 1 and 2 are routed via gravity piping to E-Cell 1, flow from heap leach pad 4 is routed via

gravity piping to E-Cell 2, and flows from heap leach pads 3 and NROM are routed via gravity piping to E-Cell 3.

17-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

17.2.4

Water Management

The project site is considered a zero-discharge facility. All contact stormwater is captured on-site, and facilities have been designed to manage stormwater in diversion channels and features to prevent off-site discharge of contact water. Draindown solution from the

heap leach pads is routed to and managed within the E-cells. The pit lake is passively contained.

17.2.5

Monitoring

Routine monitoring is conducted on a quarterly, semi-annual and annual basis as required in the WPCP. Monitoring includes groundwater, pit lake, heap leach pad

draindown, erosional stability of closed landforms, and identification of seeps. The site is in compliance with all current permits. There are no known Notices of Violation active at the site; however, some erosion has occurred on the North Waste

Rock Dump that is being monitored.

Tailings Storage Facility

The tailings storage facility is reclaimed and released, and monitoring is no longer required.

Waste Rock Dump Facilities

The waste rock dumps are

monitored semi-annually for physical stability and presence of seeps.

Heap Leach Facilities

The heap leach pads are monitored for erosion and stability. Process solution is monitored for weekly fluid in the leak detection systems. The draindown

solution is monitored on a quarterly basis from each pad, as well as combined E-Cell fluid.

Water Management

Seven groundwater wells are located around the perimeter of the facility to monitor any potential impacts to groundwater on a quarterly basis. The pit

lake is monitored continuously for water elevation, quarterly for surface water quality and semi-annually at different depths within the pit. Additionally, meteorological conditions at the site are monitored as required in the WPCP.

17.3

Project Permitting

Current permits for the site exist at the county, state and federal levels, and the Project will be subject to additional permits and amendments to ensure

compliance with regulatory requirements and to mitigate potential environmental impacts. Current permits at the site are referenced in Table 17-1 and include the Record of Decision for exploration and closure

from the Bureau of Land Management, a WPCP, Reclamation Permit, Surface Area Disturbance Permit, and Class III Solid Landfill Waiver from the NDEP, which may require modification for operations as described within this IA.

The Project is within public lands and is authorized under BLM 43 CFR 3809 mining regulations. Mining activities in accordance with the IA would require an

amendment to the current Plan of Operations, which would be submitted to the BLM for National Environmental Policy Act of 1969 (NEPA) determination. Following their review, the BLM will determine whether an EA or an EIS

is required for compliance with NEPA. The EA or EIS would be prepared, and would require additional baseline surveys to be conducted, in accordance with NEPA and BLM guidelines for mining on public lands. Baseline studies and

preparation of a new EA or EIS could take 12 to 36 months to complete for an operating site. Baseline studies would be required to assess current conditions for multiple resources including but not limited to groundwater and surface water,

17-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

flora and fauna, cultural and social environment, air and wildlife. During the NEPA process, baseline studies

will be utilized to facilitate the NEPA process and potential impacts to resources in the EA or EIS. Cultural resources determined to be significant by the Nevada State Historic Preservation Office (SHPO) office will need to be managed through

avoidance or approved mitigation during development.

State permits will need to be obtained from NDEP and other state agencies. The primary permit is the

WPCP in accordance with NAC 445A.350-445A.447, for any mining operation that has a “mine, waste rock piles, ore piles, beneficiation process components, processed ore disposal sites, and all associated

buildings and structures that have the potential to degrade waters of the state”. The Project currently has a WPCP for a closure facility, and a new permit would need to be obtained for mining and processing operations as described in this IA.

The Project would also require a new or modified Reclamation Permit in accordance with NAC519A.010-519A.415, “for any exploration, mining, milling, or other beneficiation process activity that proposes

to create disturbance of greater than five acres, or remove an excess of 36,500 tons of material from the earth in any calendar year.”

Required or

potential permits are included in Table 17-1.

Table 17-1: Required or

Potentially Required Permits

Regulatory Agency

Permit Name

Activity

Status

BLM

Record of Decision resulting from NEPA process

Mine Operation, Exploration

Will require modification through NEPA process

EPA

EPA/RCRA ID

Hazardous waste generation and storage

To be initiated

Federal Bureau of Alcohol. Tobacco, and Firearms

Explosives License

Transport, shipment, receiving, or possessing explosive materials

To be initiated

NDEP-BMRR

Water Pollution Control Permit

Protection for Waters of the State

Amended or new permit to be initiated

NDEP-BMRR

Water Pollution Control Permit (RIBS)

Discharge of water produced from the dewatering of the open pits

New permit to be initiated

NDEP-BMRR

Reclamation Permit

Reclamation Plan and Bond

Amended or New permit to be initiated

NDEP- BAPC

Air Quality Permit

Facilities that emit air pollutants

To be initiated

NDEP- BAPC

Surface Area Disturbance Permit

Surface disturbances of more than 5 acres for dust generation

Amended or New permit to be initiated

NDEP- BWPC

Mining Stormwater Permit

Control of stormwater discharges from mining facilities

To be initiated

NDEP- BWPC

Onsite Sewage Disposal Permit

Disposal of sewage

To be initiated

17-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

NDEP- BSDW

Potable Water Permit

Providing potable and drinking water

To be initiated

NDEP- BWM

Waste management Permit

Generation of waste and determination

To be initiated, Landfill application amended

NDWR

Permit to Appropriate Public Waters

Water rights for use or production

Amended

NDOW

Industrial Artificial Pond Permit

Protection of wildlife from process solutions

Amended

NDOT

Encroachment Permit

Transportation and use of roads to site

To be initiated

NDOM

Mine Registry Form

Registration of mining projects in Nevada

To be initiated

NDIR

Opening of Mine Notification

Business notification of opening a mine

To be initiated

Nevada State Fire Marshall

Emergency Response Plan

Inventory and response plan for hazardous materials

To be initiated

Humboldt County

Building Permits

Mine operations and facilities

To be initiated

Notes:

BAPC Bureau of Air Pollution Control

BLM Bureau of Land Management

BMRR Bureau of Mining Regulation

and Reclamation

BSDW Bureau of Safe Drinking Water

BWPC

Bureau of Water Pollution Control

BWM Bureau of Waste Management

EPA Environmental Protection Agency

NDEP Nevada Division of

Environmental Protection

NDIR Nevada Division of Industrial Relations

NDOM Nevada Division of Minerals

NDOT Nevada Department of

Transportation

NDOW Nevada Department of Wildlife

17.4

Social or Community Requirements

There are no known social or community issues that would have a material impact to the Project. Identified socioeconomic issues (employment, payroll, services

and supply purchases, and State and local tax payments) are anticipated to be positive through the creation of direct and indirect jobs. Hiring practices will include local staff to the extent practicable.

As many new development projects have been identified in the area, community and tribal engagement is a key element to the successful development of a mining

project. As the Project progresses beyond IA, Paramount will engage with the local community and tribal entities to allow an understanding of concerns, opportunities, and goals for the Project leading up to, during, and post operation.

Engagement at this level has not occurred to date but will occur as part of the mine planning and permitting process.

17-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

17.5

Mine Closure Requirements and Summary

The BLM and NDEP-BMRR require a closure plan to be submitted with the submittal of a Plan of Operations, which includes closure and reclamation cost estimate

for bonding as well as reclamation and closure plans for facilities and disturbance. A closure cost estimate is required to provide the BLM and/or NDEP surety bonds in the event the operator is unable to fulfill closure requirements to prevent

unnecessary or undue degradation of the environment. Closure planning is conceptual at this point, as the mine plan has not been fully developed. All facilities will be closed in accordance with applicable closure regulations. Growth media will be

salvaged from existing waste rock dumps and stockpiled for use in reclamation.

The open pit will become a pit lake, and earthen berms will be placed

around the perimeter at closure. Depending on water quality analysis and modeling during the Project, inert backfill or lime may be placed within the pit upon closure. This closure approach mirrors the current successful closed condition of the pit

lake.

The existing TSF is closed, and no additional closure is expected to occur.

The Heap Leach Pad will be recontoured to a final stable slope, and inert cover material or growth media will be placed on the top and slopes. The area will

be revegetated with an approved BLM seed mix. The top will be graded to allow for stormwater runoff. Solution management ponds will be drained and converted to evaporative cells to manage long-term solution. This closure approach mirrors the current

successful closed condition of the existing heap leach pads.

Waste rock dumps will be recontoured to a final stable slope and graded to allow for

stormwater runoff. Inert cover material or growth media will be placed on top and slopes, and the top and slopes will be revegetated with an approved BLM seed mix.

Buildings and facilities will be demolished and disposed of in accordance with applicable waste regulations, at an

on-site non-hazardous landfill. Roads, yards, and other ancillary disturbances will be graded to mirror pre-existing topography

and prevent erosion or ponding and revegetated with an approved BLM seed mix.

Reclamation bonding will be prepared using the State Reclamation Cost

Estimator (SRCE) model and submitted to the BLM and State agencies to provide financial assurance for the Project. The SRCE model was originally developed as a cooperative effort between the NDEP-BMRR, the U.S. Department of the Interior, BLM, and

the Nevada Mining Association (NVMA), to facilitate accuracy, completeness, and consistency in the calculation of costs for mine site closure and reclamation. It is not possible to prepare a SRCE at this stage due to the preliminary nature of the

project development. However, based on the size and processing rate described in this IA, a preliminary closure cost estimate ranges between US$35 million to US$60 million.

17.6

QP Opinion

The SLR QP is of the opinion that the current plans are adequate to address any issues related to environmental compliance, permitting and local individuals or

groups. Plans will be modified as needed to address new issues as they arise.

17-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

18.0

Capital and Operating Costs

The capital and operating costs presented in this section include those required to mine and process Mineral Resources from Sleeper Gold Mine. All capital and

operating costs in this section are expressed in Q2 2026 US dollars, and unit costs are based on metric tonnes.

SLR’s forecast capital and

operating cost estimates for the development of Mineral Resources have been prepared using a combination of first principles estimating, benchmarking against comparable projects, and available contractor quotations.

In accordance with the American Association of Cost Engineers (AACE) classification system, the estimates are predominantly Class 5 (scoping-level),

indicating a preliminary level of project definition. At this stage, the expected accuracy range is approximately -50% to +50%.

A 25% contingency allowance has been applied to the base capital estimate. This contingency is considered appropriate for a Class 5 estimate and is

intended to account for uncertainties associated with limited scope definition, quantities, unit pricing, and execution factors. The contingency does not eliminate the inherent variability in a scoping-level estimate but provides a reasonable

allowance for the identified and anticipated risks consistent with the current level of engineering and project development.

18.1

Capital Costs

Life of mine (LOM) capital costs for the Project are estimated at $596.1 million, and reclamation/closure costs are estimated at $52.4 million, as

summarized in Table 18-1. Initial capital is $201.1 million and is considered reasonable because (i) the mining fleet will not be purchased as the Base Case assumes contract mining, and (ii) the

leach pad will be built in phases.

Costs related to the leach pad are needed to provide additional space for mined process feed. Finishing the Phase 2

construction for the leach pad is estimated to cost approximately $19 million (year 6), Phase 3 is estimated at $19 million (year 9), and Phase 4 will cost $19 million (year 12). These costs have been distributed over time.

As dewatering capital costs will start in year 3, these are considered sustaining capital; the LOM total for dewatering costs is $139 million (excluding

indirect costs).

The Project’s economic analysis includes $52.4 million for Mine Reclamation and Closure, per the updated asset retirement

obligation (ARO) estimate and LOM reclamation spend schedule as of 2026. SLR’s initial estimate for re-permitting the Project is $5.5 million.

Table 18-1: LOM Capital Cost Estimate

Capital Area

LOM Total

($ 000)

Initial Growth and Development Capital

201,085

Sustaining Capital

342,544

Reclamation/Closure Capital

52,432

Total

596,062

18-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 18-2: LOM Capital Cost Estimate by Major Area

Capital Area

Initial Growth and

Development

Capital ($ 000)

Sustaining Capital

($ 000)

LOM Total

($ 000)

(Year -2 to Year -1)

(Year 1 to Year 17)

(Year -2 to Year 17)

Mining – Mine Equipment

(Contract Mining)

Mining – Dewatering

138,866

138,866

Processing – Leach Pad / Ponds

40,635

58,132

98,767

Process – Recovery Plant

56,964

2,316

59,280

Infrastructure

23,497

41,007

64,504

Indirects

39,772

33,714

73,486

Contingency

40,217

68,509

108,726

Total Before Closure

201,085

342,544

543,629

Reclamation / Closure Capital

52,432

52,432

Total

201,085

394,977

596,062

18.2

Operating Costs

Table 18-3 presents the average LOM unit operating costs.

Table 18-3: LOM Average Unit Operating Costs

Mining Area

Unit Mining Cost

OP Mining-Base ($/t mined) – typical year of full production

$

2.40/t

OP Mining-Out of Scope Work ($ 000/yr) – LOM annual

average

$

4,867/yr

Total Mining ($/t processed)

$

6.37

Total Dewatering ($/t processed)

$

0.59

Processing ($/t processed)

$

5.55

G&A ($/t processed)

$

0.52

Total ($/t processed)

13.03

18.2.1

Primary Consumable Costs

Power costs are estimated based on NV Energy Northern Nevada tariffs and benchmarked against comparable industrial operations, with an assumed high load factor

typical of continuous mining operations. SLR used US$0.085/kWh for the Base Case.

Diesel fuel costs are based on

off-highway (dyed) diesel pricing in northern Nevada, benchmarked against recent retail prices, less applicable federal and state fuel taxes, and adjusted for bulk supply conditions typical of large mining

operations. SLR used US$3.50 per US gallon ($0.92/L).

Propane costs are based on bulk delivered pricing in northern Nevada, benchmarked against wholesale

propane indices and commercial delivery rates. A base case of approximately $2.25 per US gallon has been assumed.

18-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Sodium cyanide costs are estimated at approximately US$2,650/t (equivalent to approximately US$2,400/st)

delivered to site.

It has been assumed that high-calcium pebble quicklime (CaO) will be used and slaked on site as needed. Costs for the type of lime are

assumed to be US$375/t.

18.2.2

Workforce

Sleeper will be one of the largest employers in Humboldt County, Nevada, and it will contribute significant tax revenue to the State of Nevada. The average

full-time employee count in year 3 of the operation is estimated at 220. PGN anticipates that approximately 75% of the workforce will live in Humboldt County and approximately 12.5% in Elko and Eureka Counties, with the remaining workforce from

other areas. A tabulation of the Project’s workforce is presented in Table 18-4. On average, 75% of the workforce is paid hourly.

The proposed operation would employ a conventional four-crew rotation on 12-hour shifts to support continuous 24-hour-per-day, year-round mining and processing activities. The total workforce is estimated at approximately 220 personnel,

including both hourly and salaried staff. The hourly workforce, comprising approximately 170 personnel, supports mining, maintenance, processing, and site services, while the remaining 55 personnel consist of supervisory, technical, engineering,

geological, and administrative staff.

Mine operations represent the largest component of the workforce, followed by maintenance and processing functions.

Staffing levels reflect the use of a 150 t class truck and shovel fleet, which reduces operator requirements relative to smaller truck configurations, as well as the relatively simple processing flowsheet consisting of crushing, heap leaching, and

Merrill-Crowe recovery. Additional personnel are allocated to support pit dewatering operations, which represent a significant operational component at the site. The absence of an accommodation camp further reduces total staffing requirements, as

all personnel are expected to operate on a drive-in/drive-out basis from nearby communities.

Table 18-4: Sleeper Workforce (Year 3)

Category

Personnel

Mine Operations

80-90

Mine Maintenance

40-50

Processing / Water / Merrill-Crowe

25-35

Geology / Ore Control

8-12

Engineering

8-12

Supervision

12-16

HSE / Environmental

6-10

Warehouse / Admin / Support

20-25

Total

210–220

18-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

19.0

Economic Analysis

The economic analysis presented in this IA considers the processing of the in situ oxide and mixed Mineral Resources and the Mineral Resources in the existing

waste rock dumps only.

The economic analyses contained in this TRS are preliminary in nature and are based, in part, on Inferred Mineral Resources that

are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as Mineral Reserves. It is important to note that, unlike Mineral Reserves, Mineral Resources do not have demonstrated

economic viability, and there is no certainty that the economic projections presented in this IA will be realized.

Taxes and revenues are assumed.

Discounted cash flow analyses are based on assumed production rates and revenues from available Mineral Resources.

SLR notes that the economic analysis

presented in this section is based on revenue from gold and silver only. After-tax cash flow projections have been generated from the Base Case and the Alternative Case LOM production schedules and capital and

operating cost estimates, as summarized in the sub-sections that follow.

19.1

Base Case

The Project’s Base Case is based on a production plan with a mine life of 17 years and includes a mineralized material inventory of approximately:

Approximately 47 million tonnes (Mt) of waste rock dump material, classified as Inferred Mineral Resources,

grading approximately 0.28 g/t gold (Au)

In situ oxide and mixed Mineral Resources, including approximately 2 Mt Measured Resources grading 0.29 g/t Au,

78 Mt Indicated Resources grading 0.26 g/t Au, and 49 Mt Inferred Resources grading 0.24 g/t Au.

The Base Case mineralized

material inventory includes approximately 95.6 Mt of Inferred Mineral Resources containing 788 koz of gold and 6,484 koz of silver, representing approximately:

55% of the total Base Case tonnage.

54% of the total Base Case gold ounces.

41% of the total Base Case silver ounces.

The remaining material in the mined inventory is from Measured and Indicated Mineral Resources. A summary of the Base Case criteria is provided below.

19.1.1

Economic Criteria

19.1.1.1

Revenue

Mine life: 17 years.

LOM production and processing plans as summarized in Table 13-9 and Table

13-8, respectively.

30,000 tpd mineralized material stacked (approximately 10.8 Mt per year), average stacked grade of 0.26 g/t Au

and silver grade of 2.79 g/t Ag (ROM, crushed, and stockpile mine plan).

19-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Mine life averages 65,000 ounces per year of gold recovered and 205,000 ounces per year of silver recovered from

the mine plan, with LOM stacked process gold recovery averaging 75.8% and silver recovery averaging 22.1%.

Total 1.11 Moz of gold recovered, and 3.5 Moz of silver recovered over the LOM operation.

The summary of the physicals in the financial model is listed in Table

19-1. It has been estimated that 420 koz of gold and 2,952 koz of silver are in waste rock dumps and are accounted for in the financial model over the first five years of Leach Pad operations.

Gold and silver payable at the refinery are assumed at 99.95% Au payable and 97.0% Ag payable

Gold and silver prices are based on analyst consensus price forecasts from the end of March 2026. For the

economic analysis it was assumed:

Y1: US$4,000/oz Au and US$59.00/oz Ag

Y2 to Y17: US$3,600/oz Au and US$48.00/oz Ag

Resulting in LOM net realized prices of:US$3,618/oz Au and US$48.70/oz Ag

Net Smelter Return (NSR) includes doré refining, transport, and insurance costs.

NSR royalty assumed at 3%. The property is subject to different royalties between 0.5% and 3%, and for modeling

purposes was assumed at an overall 3%

Revenue is recognized at the time of gold and silver production.

Non-cash inventory adjustments are not included in the SLR cash flow

model.

LOM net revenue is US$4,014 million (after royalty, transportation, and refining charges)

Table 19-1: Sleeper Base Case Production Physicals Summary

Physicals

Value

Total Mineralized Material Stacked (kt)

175,445

Max Process Rate (tpd)

30,000

Au Head Grade (g/t)

0.26

Ag Head Grade (g/t)

2.79

Contained Au (koz)

1,459

Contained Ag (koz)

15,721

Average Recovery, Au

75.8

%

Average Recovery, Ag

22.1

%

Recovered Au (koz)

1,106

Recovered Ag (koz

3,481

Payable Au (koz)

1,101

Payable Ag (koz)

3,376

Avg Annual Au—LOM (koz / yr)

65

Avg Annual Ag Sales—LOM (koz / yr)

199

19-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

19.1.1.2

Costs

Pre-production period assumes 24 months (Year -1 to Year -2).

Initial (Growth) and development capital costs total US$201 million

Mine life sustaining capital totals US$343 million

Final reclamation costs from after year 17 total US$52.4 million.

Mine life capital totals US$596 million.

Average LOM operating cost is US$13.03 per tonne stacked.

Open pit operating costs of US$2.53 per tonne mined (US$6.37 per tonne stacked). Includes out-of-scope mining operations.

Dewatering operating costs of US$0.59 per tonne stacked.

Processing operating costs of US$5.55 per tonne stacked.

Site services & general and administrative (G&A) costs of US$5.6 million per year for years of

full production (LOM average of US$0.52 per tonne stacked).

Life of Mine production plan as summarized in Table 13-9.

19.1.1.3

Taxation and Royalties

The federal and state income taxes are summarized in Table 19-2.

Table 19-2: Federal and State Tax Summary

Tax Type

Rate

Federal Corporate Income Tax

21.0%

Nevada Corporate Income Tax

5.0% of federal taxable income

Royalties and Severance Fees

Based on ore extracted (state-regulated).

A total of five NSR royalties apply to future mineral production from portions of the Project. These royalties are summarized

in Table 19-3.

Table 19-3: Royalties Summary

Royalty Holder

Royalty Terms

Snyder Syndicate

1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, AL SS, AND ALL BLUE.)

Franco-Nevada U.S. Corporation

2% NSR on minerals produced from all 2,474 claims

Evolving Gold / Quinton Hennigh

2% NSR royalty on all SS and all SP claims.

Dry Lake Placer Association

3% NSR on Dry Lake Placer claims

ICN Resources Ltd.

0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims

For the economic analysis and financial modeling purposes, an overall 3% NSR royalty rate was assumed over the LOM.

19-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

19.1.2

Cash Flow Analysis

SLR has prepared its own unlevered after-tax LOM cash flow model based on the information contained in this TRS to

confirm the physical and economic parameters of the Project.

The Project’s Base Case economics have been evaluated using the discounted cash flow

method, considering annual processed tonnages and the associated gold and silver grades. The process gold and silver recoveries, gold and silver price forecasts, operating costs, refining and transportation charges, royalties, and initial and

sustaining capital expenditures were also considered.

The Project, as currently designed, has variations in the mining and processing amounts over its

planned 17-year life. These variations are shown in Figure 19-1, Figure 19-2, and Figure

19-3.

Figure 19-1: Mine Production Profile by Material Movement

– Base Case

19-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 19-2: Process Production Profile and Head Grade –

Base Case

Figure 19-3: Annual Processing Gold Production and Head Grade Profile –

Base Case

The economic analysis demonstrates that the Project’s Mineral Resources have reasonable prospects for economic

extraction at the LOM net average realized prices of US$3,618/oz Au and US$48.70/oz Ag, and with long-term prices of US$3,600/oz Au and US$48.00/oz Ag, and that further advancement of Project studies is warranted.

A base discount rate of 8% has been applied in this TRS for the Project. This rate is considered reasonable for evaluating a precious metals project at a

preliminary level of project definition, such as Sleeper. Discounted present values of annual cash flows are summed to arrive at the Mine’s Base Case NPV.

19-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Considering the Project’s Base Case on a stand-alone basis, the Project’s pre-tax NPV at an 8% discount rate is approximately US$505 million, and the pre-tax internal rate of return (IRR) is approximately 51.3%. The Project’s after-tax NPV at an 8% discount is approximately US$402 million, the after-tax IRR is approximately 44.5%, and the payback period is approximately 1.4 years from the

start of production.

The LOM undiscounted pre-tax cash flow totals approximately US$1,132 million, and the

LOM undiscounted after-tax cash flow totals approximately US$918 million.

SLR has also run a stand-alone

economic analysis for the Project using flat resource metal prices of US$3,100/oz Au and US$34/oz Ag, and the analysis demonstrates that the Project’s Mineral Resources also have reasonable prospects for economic extraction at these prices.

The Project’s after-tax free cash flow profile and gold payable metal per year are presented in Figure 19-4.

Figure 19-4: Base Case Project

After-Tax Metrics Summary

Table 19-4 shows the LOM total metrics for the Sleeper mine as currently designed.

Due to the length of the mine life, the full annual cash flow model is presented in Appendix 2 Cash Flow Summaries.

Table 19-4: Total Life of Mine Metrics – Base Case

Item

Units

Base Case Values

Realized Market Prices

Au Price

US$

/oz

$

3,618

Ag Price

US$

/oz

$

48.70

Payable Gold

koz

1,101

Payable Silver

koz

3,376

19-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Item

Units

Base Case Values

Total Gross Revenue

US$

million

4,147

Mining Cost

US$

million

(1,117

)

Dewatering Costs

US$

million

(104

)

Process Cost

US$

million

(974

)

G & A Cost

US$

million

(92

)

Refining/Freight

US$

million

(8

)

Royalties

US$

million

(124

)

Total Operating Costs

US$

million

(2,418

)

Operating Margin (EBITDA)

US$

million

1,728

Federal Income Tax

US$

million

(134

)

State Tax—Nevada Mining Tax

US$

million

(80

)

Working Capital

US$

million

0

Operating Cash Flow

US$

million

1,514

Development (Initial) Capital

US$

million

(201

)

Sustaining Capital

US$

million

(343

)

Closure/Reclamation Capital

US$

million

(52

)

Total Capital

US$

million

(596

)

Pre-tax Free Cash Flow

US$

million

1,132

Pre-tax NPV @ 5%

US$

million

670

Pre-tax NPV @ 8%

US$

million

505

Pre-Tax IRR

%

51.3

%

Pre-Tax Payback

years

1.3

After-tax Free Cash Flow

US$

million

918

After-tax NPV @ 5%

US$

million

539

After-tax NPV @ 8%

US$

million

402

After-Tax IRR

%

44.5

%

After-Tax Payback

years

1.4

Note:

Numbers may not add due to rounding.

The Project’s World Gold Council Adjusted Operating Cost (AOC) net of Ag by-product credits is US$2,048/oz Au

payable. The mine life sustaining capital costs are US$359/oz Au payable, for an All-in Sustaining Cost (AISC) net of Ag by-products credits of US$2,407/oz Au payable.

The average annual gold sales during operations are approximately 64,746 payable ounces. Table 19-5 shows the

AISC build-up.

19-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 19-5: Base Case

All-in Sustaining Costs Composition

Item

Total LOM

($ million)

Unit Cost

($/oz Au)

Mining

1,117

1,015

Dewatering

104

94

Process

974

885

Site G&A

92

83

Subtotal Site Costs

2,286

2,077

Refining/Freight

8

8

Mining Royalties

124

113

Total Cash Costs before by-product

credits

2,418

2,197

Ag By-Product Credit

(164

)

(149

)

Total Cash Costs net of by-product

credits

2,254

2,048

Sustaining Capital Cost

343

311

Closure/Reclamation Costs

52

48

Total Sustaining Costs

395

359

Total All-in Sustaining Costs

2,649

2,407

Note:

Numbers may not add due to rounding.

The AISC calculated in the cash flow analysis reflects the benefit of low-cost ounces already stacked on the heap leach

pads, compared to AISC estimated in a steady-state model that assumes current input costs. Much of Sleeper’s near-term production comes from material mined and placed in prior years, when gold prices, fuel, and consumable costs were lower.

These ounces require minimal additional spending to recover, resulting in lower realized cash costs. As these legacy ounces are depleted and replaced with newly mined material, unit costs are expected to gradually normalize toward long-term levels.

19.1.3

Sensitivity Analysis

The Project’s Base Case risks can be identified in both economic and non-economic terms. Key economic risks were

examined by running cash flow sensitivities:

Metal prices

Head grade

Metallurgical Recovery

Operating costs

Pre-production and sustaining capital costs

19-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Where possible, the after-tax NPV 8% sensitivities relative to the

Base Case have been calculated for -20% to +20% variations in head grade and recovery, and -20% to +30% in metal prices. Operating and capital cost sensitivities have

been calculated at -15% to +35% variations. The sensitivities are shown in Table 19-6 and Figure 19-5

Table 19-6: Base Case After-Tax Sensitivity Analyses

Variance

Head Grade

(g/t Au)

NPV at 8%

(US$ 000)

80%

0.21

91,329

90%

0.23

249,814

100%

0.26

402,353

110%

0.28

554,310

120%

0.31

706,171

Variance

Recovery

(% Au)

NPV at 8%

(US$ 000)

80%

60.7

%

91,329

90%

68.2

%

249,814

100%

75.8

%

402,353

110%

83.4

%

554,310

120%

91.0

%

706,171

Variance

Metal Prices

(US$/oz Au)

NPV at 8%

(US$ 000)

80%

$

2,880

90,637

90%

$

3,240

249,505

100%

$

3,600

402,353

110%

$

3,960

554,614

131%

$

4,700

866,553

Variance

Operating Costs

(US$/t)

NPV at 8%

(US$ 000)

85%

$

11.07

523,205

93%

$

12.05

462,780

100%

$

13.03

402,353

118%

$

15.31

259,020

135%

$

17.59

102,091

Variance

Capital Costs

(US$ 000)

NPV at 8%

(US$ 000)

85%

$

506,652

460,155

93%

$

551,357

431,254

100%

$

596,062

402,353

118%

$

700,372

334,916

135%

$

804,683

267,480

19-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 19-5: Base Case

After-Tax Sensitivity Analysis

19.2

Alternative Case—Measured and Indicated Only

19.2.1

Economic Criteria

The Alternative Case assumes a production schedule based exclusively on Measured and Indicated Mineral Resources, resulting in a mineralized material inventory

of 62.4 Mt and a projected mine life of seven years. A summary of the Measured and Indicated Only Case criteria is provided below.

19.2.1.1

Revenue

Mine life: 7 years.

30,000 tpd mineralized material stacked (approximately 10.8 Mt per year), average stacked grade of 0.27 g/t Au

and silver grade of 3.83 g/t Ag (ROM, crushed, and stockpile mine plan).

Mine life averages 58,500 ounces per year of gold recovered and 200,000 ounces per year of silver recovered from

the mine plan, with LOM stacked process gold recovery averaging 74.3% and silver recovery averaging 18.1%.

Total 410 koz of gold recovered, and 1,396 koz of silver recovered over the LOM operation.

Gold and silver payable at the refinery are assumed at 99.95% Au payable and 97% Ag payable

Gold and silver prices are based on analyst consensus price forecasts from the end of March 2026. For the

economic analysis was assumed:

19-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Y1: US$4,000/oz Au and US$59.00/oz Ag

Y2 to Y7: US$3,600/oz Au and US$48.00/oz Ag

Resulting in LOM net realized prices of:US$3,622/oz Au and US$48.00/oz Ag

Net Smelter Return (NSR) includes doré refining, transport, and insurance costs.

NSR royalty assumed at 3%. The property is subject to different royalties between 0.5% and 3%, and for modeling

purposes was assumed at an overall 3%

Revenue is recognized at the time of gold and silver production.

Non-cash inventory adjustments are not included in the SLR cash flow

model.

LOM net revenue is US$1,493 million (after royalty, and transportation, and refining charges).

Table 19-7: Sleeper Alternative Case Production Physicals Summary

Physicals

Value

Total Mineralized Material Stacked (kt)

62,447

Max Process Rate (tpd)

30,000

Au Head Grade (g/t)

0.27

Ag Head Grade (g/t)

3.83

Contained Au (koz)

552

Contained Ag (koz)

7,697

Average Recovery, Au

74.3

%

Average Recovery, Ag

18.1

%

Recovered Au (koz)

410

Recovered Ag (koz

1,396

Payable Au (koz)

408

Payable Ag (koz)

1,354

Avg Annual Au Sales-LOM (koz / yr) – full production

64

Avg Annual Ag Sales-LOM (koz / yr) – Full production

218

19.2.1.2

Costs

Pre-production period assumes at 24 months (Year -1 to Year -2).

Initial (Growth) and development capital costs total US$335 million.2

Mine life sustaining capital totals US$120 million

Final reclamation costs from after year 7 total US$18.7 million.

Mine life capital totals US$473 million.

2

Note that, in the Alternative Case, only in situ Measured and Indicated Mineral Resources are included in the

mining inventory. The existing waste dumps are not included in the LOM plan for the Alternative Case because they are currently classified as Inferred Mineral Resources. As dewatering of the in situ Mineral Resources must start before mining, the

rapid infiltration basins cost and the dewatering costs are Initial Capital Costs for the Alternative Case rather than Sustaining Capital as in the Base Case.

19-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Average LOM operating cost is US$11.87 per tonne stacked.

Open pit operating costs of US$2.59 per tonne mined (US$5.03 per tonne stacked). Includes out-of-scope mining operations.

Dewatering operating costs of US$0.73 per tonne stacked.

Processing operating costs of US$5.55 per tonne stacked.

Site services & general and administrative (G&A) costs of US$5.6 million per year for years of

full production (LOM average of US$0.56 per tonne stacked).

19.2.1.3

Taxation and Royalties

The federal and state income taxes are summarized in Table 19-8

Table 19-8: Federal and State Tax Summary

Tax Type

Rate

Federal Corporate Income Tax

21.0%

Nevada Corporate Income Tax

5.0% of federal taxable income

Royalties and Severance Fees

Based on ore extracted (state-regulated).

A total of five NSR royalties apply to future mineral production from portions of the Project. These royalties are summarized

in Table 19-9.

Table 19-9: Royalties Summary

Royalty Holder

Royalty Terms

Snyder Syndicate

1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, AL SS, AND ALL BLUE.)

Franco-Nevada U.S. Corporation

2% NSR on minerals produced from all 2,474 claims

Evolving Gold / Quinton Hennigh

2% NSR royalty on all SS and all SP claims.

Dry Lake Placer Association

3% NSR on Dry Lake Placer claims

ICN Resources Ltd.

0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims

For the economic analysis and financial modeling purposes, an overall 3% NSR royalty rate was assumed over the LOM.

19.2.2

Cash Flow Analysis

SLR has prepared its own unlevered after-tax LOM cash flow model based on the information contained in this TRS to

confirm the physical and economic parameters of the Project.

The Project’s Alternative Case economics have been evaluated using the discounted cash

flow method, considering annual processed tonnages and the associated gold and silver grades. The process gold and silver recoveries, gold and silver price forecasts, operating costs, refining and transportation charges, royalties, and initial and

sustaining capital expenditures were also considered.

19-12

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

The Project, as currently designed, has variations in the mining and processing amounts over its planned 7-year life. These variations are shown in Figure 19-6, Figure 19-7, and Figure 19-8.

Figure 19-6: Mine Production Profile by Material Movement – Alternative Case

Figure 19-7: Process Production Profile and Head Grade – Alternative Case

19-13

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 19-8: Annual Processing Gold Production and Head Grade

Profile

The economic analysis demonstrates that the Project’s Mineral Resources have reasonable prospects for economic

extraction, at the LOM net average realized prices of US$3,622/oz Au and US$48.40/oz Ag, with long-term prices of US$3,600/oz Au and US$48.00/oz Ag, and that further advancement of Project studies is warranted.

A base discount rate of 8% has been applied in this TRS for the Project. This rate is considered reasonable for evaluating a precious metals project at a

preliminary level of project definition, such as Sleeper. Discounted present values of annual cash flows are summed to arrive at the Mine’s Base Case NPV.

Considering the Project’s Alternative Case on a stand-alone basis, the Project’s pre-tax NPV at an 8%

discount rate is approximately US$59 million, and the pre-tax internal rate of return (IRR) is approximately 11.5%. The Project’s after-tax NPV at an 8%

discount is approximately US$31 million, the after-tax IRR is approximately 9.9%, and the payback period is approximately 4.9 years from the start of production.

The LOM undiscounted pre-tax cash flow totals approximately US$279 million, and the LOM undiscounted after-tax cash flow totals approximately US$232 million.

The Project’s

after-tax free cash flow profile and gold payable metal per year are presented in Figure 19-9.

19-14

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 19-9: Alternative Case Project After-Tax Metrics Summary

Table 19-10 shows the LOM total metrics for the Project’s Alternative Case.

The full annual cash flow model is presented in Appendix 2 Cash Flow Summaries.

Table 19-10: Total Life of

Mine Metrics – Alternative Case (Measured and Indicated Only)

Item

Units

Base Case Values

Realized Market Prices

Au Price

US$/oz

$

3,622

Ag Price

US$/oz

$

48.40

Payable Gold

koz

408

Payable Silver

koz

1,354

Total Gross Revenue

US$ million

1,542

Mining Cost

US$ million

(314

)

Dewatering Costs

US$ million

(45

)

Process Cost

US$ million

(347

)

G & A Cost

US$ million

(35

)

Refining/Freight

US$ million

(3

)

Royalties

US$ million

(46

)

Total Operating Costs

US$ million

(790

)

Operating Margin (EBITDA)

US$ million

752

Federal Income Tax

US$ million

(12

)

19-15

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Item

Units

Base Case Values

State Tax - Nevada Mining Tax

US$ million

(34

)

Working Capital

US$ million

0

Operating Cash Flow

US$ million

705

Development (Initial) Capital

US$ million

(335

)

Sustaining Capital

US$ million

(120

)

Closure/Reclamation Capital

US$ million

(19

)

Total Capital

US$ million

(473

)

Pre-tax Free Cash Flow

US$ million

279

Pre-tax NPV @ 5%

US$ million

124

Pre-tax NPV @ 8%

US$ million

59

Pre-Tax IRR

%

11.5

%

Pre-Tax Payback

years

4.7

After-tax Free Cash Flow

US$ million

232

After-tax NPV @ 5%

US$ million

91

After-tax NPV @ 8%

US$ million

31

After-Tax IRR

%

9.9

%

After-Tax Payback

years

4.9

Note: Numbers may not add due to rounding.

The Project’s World Gold Council Adjusted Operating Cost (AOC) net of Ag by-product credits is US$1,778/oz Au

payable. The mine life sustaining capital costs are US$339/oz Au payable, for an All-in Sustaining Cost (AISC) net of Ag by-products credits of US$2,117/oz Au payable.

The average annual gold sales during operations are approximately 64,267 payable ounces.

Table 19-11 shows the AISC build-up.

Table 19-11: Alternative Case All-in Sustaining Costs Composition

Item

Total LOM

($ million)

Unit Cost

($/oz Au)

Mining

314

770

Dewatering

45

111

Process

347

850

Site G&A

35

86

Subtotal Site Costs

741

1,817

19-16

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Item

Total LOM

($ million)

Unit Cost

($/oz Au)

Refining/Freight

3

8

Mining Royalties

46

113

Total Cash Costs before by-product

credits

790

1,938

Ag By-Product Credit

(65

)

(161

)

Total Cash Costs net of by-product

credits

725

1,778

Sustaining Capital Cost

120

293

Closure/Reclamation Costs

19

46

Total Sustaining Costs

138

339

Total All-in Sustaining Costs

863

2,117

Note: Numbers may not add due to rounding.

19.2.3

Sensitivity Analysis

The project’s Alternative Case risks can be identified in both economic and non-economic terms. Key economic

risks were examined by running cash flow sensitivities:

Metal prices

Head grade

Metallurgical Recovery

Operating costs

Pre-production and sustaining capital costs

Where possible, the after-tax NPV 8% sensitivities relative to the Alternative Case have been calculated for -20% to +20% variations in head grade and recovery, and -20% to +30% in metal prices. Operating and capital cost sensitivities have been calculated at -15% to +35% variations. The sensitivities are shown in Table 19-12 and Figure 19-10.

19-17

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Table 19-12: Alternative Case

After-Tax Sensitivity Analyses

Variance

Head Grade

(g/t Au)

NPV at 8%

(US$000)

80%

0.22

(140,512)

90%

0.25

(54,187)

100%

0.27

31,106

110%

0.30

106,275

120%

0.33

180,559

Variance

Recovery (%

Au)

NPV at 8%

(US$000)

80%

59.4%

(140,512)

90%

66.9%

(54,187)

100%

74.3%

31,106

110%

81.7%

106,275

120%

89.2%

180,559

Variance

Metal Prices

(US$/oz Au)

NPV at 8%

(US$000)

80%

$2,880

(140,868)

90%

$3,240

(54,363)

100%

$3,600

31,106

110%

$3,960

106,424

131%

$4,700

258,552

Variance

Operating Costs

(US$/t)

NPV at 8%

(US$000)

85%

$10.09

87,662

93%

$10.98

59,481

100%

$11.87

31,106

118%

$13.94

(44,879)

135%

$16.02

(122,212)

Variance

Capital Costs

(US$000)

NPV at 8%

(US$000)

85%

$401,924

90,847

93%

$437,387

60,977

100%

$472,851

31,106

118%

$555,600

(38,591)

135%

$638,349

(108,288)

19-18

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Figure 19-10: Alternative Case

After-Tax Sensitivity Analysis

19-19

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

20.0

Adjacent Properties

The Project is located within the Sleeper Mining District of Humboldt County, Nevada, an area that hosts several past-producing precious-metal deposits and

active exploration properties.

Several exploration properties occur within a 10 km radius of the Project, targeting similar epithermal mineralization

hosted in Miocene volcanic rocks. Historical exploration programs in the district have included geologic mapping, geochemical sampling, geophysical surveys, and drilling.

Publicly available information indicates that these adjacent properties host epithermal gold-silver mineralization genetically related to regional volcanic

and structural systems.

The SLR QP has not independently verified this information, and this information is not necessarily indicative of the

mineralization at the Sleeper Gold Project.

20-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

21.0

Other Relevant Data and Information

21.1

Sleeper PFS - Project Overview and Execution Philosophy

The Project Execution Plan (PEP) defines the strategy for advancing the Project from the current S-K 1300 IA stage

through Pre-Feasibility Study (PFS), permitting, construction, and into operations. The development scenario evaluated in the IA consists of a 30,000 tpd open pit mining operation feeding a probable processing

scenario comprising a crush–agglomerate–heap-leach process with Merrill-Crowe recovery.

The scope of the IA, and therefore this PEP, is

limited to the reprocessing of waste dump material and the mining of in situ oxide and mixed mineralization. Processing will occur on a single-use heap leach pad designed in accordance with Nevada regulatory

requirements.

The execution philosophy is based on a practical and capital-efficient restart strategy, incorporating the following principles:

Low initial capital intensity with contractor mining and modular process infrastructure. This approach minimizes

upfront fleet purchases and reduces financing requirements during early project development.

Immediate advancement to a PFS, with overlapping technical, environmental, and permitting workstreams to

accelerate the overall project schedule.

Maximizing the use of existing disturbed areas, including waste rock dumps and previously impacted process areas,

to streamline permitting and reduce environmental footprint.

Parallel advancement of engineering, metallurgical test work, and environmental baseline programs to avoid

sequential delays.

Maintaining optionality for future expansion, including potential treatment of sulfide material under a separate

development scenario.

21.2

Project Development Strategy

21.2.1

Development Pathway

The Project will advance through a structured, but overlapping, series of development phases designed to minimize schedule duration while maintaining technical

rigor:

PFS Phase (Immediate Initiation): Comprehensive technical evaluation, including updated mine planning,

metallurgical test work, cost estimation, and trade-off studies.

Permitting and Baseline Study Advancement: Collection of environmental baseline data and preparation of

regulatory submissions. This phase represents the Project’s critical path.

Definitive Engineering: Advancement of engineering design to a level sufficient to support construction,

procurement, and cost certainty.

Early Works and Site Preparation: Initial site activities, including relocation of existing infrastructure,

earthworks, and utility installation.

Construction and Commissioning: Development of process facilities, heap leach pad, ponds, and supporting

infrastructure, followed by commissioning.

21-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Ramp-up to Steady-State Operations: Progressive increase to the design

throughput of approximately 30,000 tpd.

The Company intends to initiate the PFS immediately and pursue an execution strategy targeting

first production approximately 24 months from initiation, subject to permitting timelines and technical outcomes.

21.3

Workstreams and Scope of Activities

21.3.1

Geological, Resource, and Drilling Programs

A comprehensive drilling and sampling program will be implemented to support resource confidence, metallurgical characterization, and engineering design. The

program is designed to address both waste dump material and in situ oxide and mixed mineralization.

Key programs are listed:

Sonic and reverse circulation (RC) drilling of waste dumps, TSF, and heap leach pads to characterize grade

distribution, material variability, and bulk density.

RC drilling of in situ oxide and mixed material to support resource classification upgrades and mine planning.

Twin drilling and QA/QC validation to confirm historical data reliability and ensure compliance with reporting

standards.

Bulk sampling to provide representative material for metallurgical test work and variability analysis of waste

dumps, heap leach pads and TSF.

The outputs of these programs will support updates to the Mineral Resource Estimate, development of a

geometallurgical model, and refinement of mine planning inputs for the PFS.

21.3.2

Metallurgical Test Work

Metallurgical test work is a critical component of technical risk reduction, particularly given the presence of mixed oxides and transition materials, as well

as reprocessed waste rock dumps.

The metallurgical program will include the following:

Bottle roll testing across all defined material domains to establish baseline recoveries and reagent consumption.

Column leach testing at multiple crush sizes to evaluate heap leach performance and optimize particle size

distribution.

Agglomeration optimization to improve permeability and leach kinetics for fine-grained or clay-rich materials.

Permeability testing to assess heap stability and solution flow characteristics.

Cyanide consumption and reagent optimization to define operating cost inputs.

Gold and silver recovery variability testing to establish recovery models by domain.

Evaluation of gravity recovery potential, where applicable.

Deliverables will include recovery models by domain, heap leach design criteria, reagent consumption forecasts, and inputs for operating cost estimation.

21-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

21.3.3

Mining and Production Planning

Mining operations will be executed by a contractor to minimize initial capital requirements and provide operational flexibility during the early years of

production.

Key components of the mining plan include:

Open pit optimization and shell selection based on updated economic and metallurgical inputs.

Mine sequencing to prioritize oxide and mixed material and optimize cash flow.

Waste dump reclaim sequencing integrated with in situ mining operations.

Haulage design, including process feed haul distances of approximately 1.5 km to 4.5 km and waste haul distances

of approximately 2.5 km.

Development of a production schedule supporting approximately 30,000 tpd of material processing.

The mining contractor is expected to supply and operate a fleet comprising 150 t to 200 t class haul trucks, hydraulic excavators,

loaders, and support equipment. The Owner’s team will provide oversight, grade control, and reconciliation.

21.3.4

Process Design and Infrastructure

The process flowsheet is based on conventional and well-established technologies suitable for oxide and mixed gold mineralization.

Process plant components include:

Primary crushing to achieve the target particle size for heap leaching.

Agglomeration, if required, to improve heap permeability and recovery.

Heap leach stacking using conveyor or truck stacking systems.

Solution management systems, including pregnant and barren solution circuits.

Merrill-Crowe recovery plant for gold and silver extraction.

Refining facilities for doré production.

Infrastructure components include:

Single-use heap leach pad designed with double-liner systems consistent

with Nevada regulatory requirements.

Solution ponds, including pregnant, barren, and stormwater ponds.

Recovery/Merrill-Crowe processing facilities.

Power supply infrastructure, which may include grid connection or hybrid systems.

Water supply and distribution systems.

Maintenance facilities, including relocation of the existing truck shop affected by pit expansion.

Site access roads, haul roads, and support infrastructure.

21-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

21.3.5

Water Management and Dewatering

SLR considers water management to be a key operational and permitting consideration for the Project. A comprehensive program will be implemented to define

water availability, manage process water, and ensure compliance with regulatory requirements.

Key components include:

Groundwater baseline data collection and pump testing to define aquifer characteristics.

Development of a groundwater model to support dewatering design and water balance calculations.

Evaluation of pit dewatering and discharge requirements.

Preparation of a detailed process water balance.

Design of heap leach solution management systems, including containment and recycling.

Stormwater management systems to control runoff and protect water quality.

Water supply is expected to be sourced from a combination of groundwater and recycled process water, subject to permitting and availability.

21.3.6

Environmental Baseline and Permitting

Permitting represents the critical path for Project development and will be advanced in parallel with technical studies.

The anticipated environmental baseline studies that will be required are listed:

Surface water quality and hydrology.

Groundwater quality and levels.

Air quality and emissions.

Flora and fauna surveys.

Cultural and archaeological resource assessments.

Geochemical characterization, including acid rock drainage and metal leaching potential.

Meteorological data collection.

The permitting strategy includes the following steps.

Submission of a Notice of Intent (NOI) to the BLM.

Advancement through the EA process, or EIS process if required.

Modification of existing Plans of Operations and permits.

Coordination with relevant agencies, including the BLM, NDEP, and Nevada Division of Water Resources.

A key advantage of the Project is that existing disturbance areas, including waste rock dumps, heap leach pads, and tailings storage

facilities, remain bonded and permitted. This condition is expected to facilitate a brownfields redevelopment pathway and reduce permitting complexity.

21-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

21.3.7

Project Organization and Execution Model

21.3.7.1

Execution Model

The Project will be executed using a combination of Owner’s team oversight, contractor execution, and specialist consulting support.

Owner’s Team: Responsible for overall project management, technical oversight, permitting coordination, and

stakeholder engagement.

EPCM/EPC Contractor: Responsible for engineering, procurement, and construction management or execution.

Mining Contractor: Responsible for all mining operations, including drilling, blasting, loading, and hauling.

Specialist Consultants: Provide expertise in metallurgy, geotechnical engineering, environmental studies, and

hydrogeology.

21.3.7.2

Staffing Philosophy

The staffing approach will be scaled to the project phase:

Lean Owner’s team during PFS and early development.

Increased staffing during construction and commissioning.

Transition to steady-state operational staffing levels during production.

No on-site camp is required, as the Project will utilize a local or regional workforce.

21.4

Schedule and Critical Path

21.4.1

Overall Timeline

The Project schedule is structured to allow overlapping activities and accelerated development:

PFS initiation: Immediate.

Permitting and baseline data collection: Approximately 12 to 36 months.

Engineering and procurement: Approximately 12 to 18 months, overlapping with permitting.

Construction: Approximately 9 to 12 months.

Commissioning and ramp-up: Several months following construction

completion.

The target for first gold production is approximately 24 months from project initiation, subject to permitting approvals

and technical validation.

21-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

21.4.2

Critical Path Elements

The primary critical path elements include:

Completion of environmental baseline data collection.

Progression through the BLM permitting process, including NOI submission, EA/EIS preparation, and Record of

Decision.

Water rights acquisition and discharge permitting.

Resolution of metallurgical variability and confirmation of recovery assumptions.

21.5

Procurement and Contracting Strategy

21.5.1

Mining

Mining will be conducted by a contractor under a unit-rate contract, typically expressed in US dollars per cubic meter of mined material. Contracts will

include provisions for standard mining activities and rate schedules for out-of-scope work.

21.5.2

Process and Infrastructure

Major process equipment and infrastructure components will be procured through competitive bidding processes. Key items include crushers, Merrill-Crowe plant

components, pumps, and piping systems.

Anticipated bulk consumables and services contracts and agreements are listed:

Diesel fuel supply contracts

Cyanide supply agreements

Lime and other reagents

Grinding media, if required

21.5.3

Refining and Sales

Gold and silver doré will be transported to third-party refineries under standard industry contracts. Transportation, security, and refining

arrangements will be structured to align with industry norms. The potential use of hedging or forward sales will be evaluated during the PFS.

21.6

Sulfide Mineralization – Future Work Programs

Although sulfide mineralization is included within the Mineral Resource inventory, it is explicitly excluded from the economic analysis presented in this

Initial Assessment. The sulfide material represents a potential future development opportunity; however, additional technical studies, test work, and engineering are required to determine an appropriate processing pathway and economic viability.

Sulfides have been identified in the heap leach pads, the TSF, and are found in the in situ material.

The following work programs are recommended to

advance understanding of sulfide mineralization and support future evaluation:

21-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

21.6.1

Geological and Resource Definition

Additional drilling and geological modeling will be required to improve confidence in the sulfide Mineral Resources and support potential conversion to higher

confidence categories. Key activities include:

Infill drilling to improve spatial continuity and grade confidence within sulfide domains.

Extension drilling to evaluate down-dip and along-strike mineralization

potential.

Detailed geological modeling to refine lithological, structural, and alteration controls on sulfide

mineralization.

Density measurements and validation to support tonnage estimates.

These efforts will support a future Mineral Resource update and will be instrumental in the conversion to Mineral Reserves and provide a foundation for mine

planning studies specific to sulfide material.

21.6.2

Metallurgical Test Work

Sulfide mineralization at Sleeper is not amenable to conventional heap leaching and will require alternative processing methods. A staged metallurgical program

is required to evaluate viable treatment options.

Recommended test work includes:

Mineralogical and deportment studies to define gold association (e.g., refractory vs. free milling

components).

Gravity concentration studies.

Flotation testing to evaluate concentrate grade, recovery, and mass pull.

Diagnostic leach testing to assess gold liberation characteristics.

Evaluation of oxidation processes, including pressure oxidation (POX),

bio-oxidation, or roasting, where applicable.

Cyanidation testing of flotation concentrates and/or oxidized products.

The objective of this program is to identify a technically viable and economically competitive flowsheet for sulfide processing.

21.6.3

Process and Infrastructure Trade-Off Studies

Development of sulfide mineralization will require significant additional infrastructure compared to the oxide heap-leach scenario. Trade-off studies should evaluate:

Standalone sulfide processing facility versus integration with existing oxide infrastructure.

Processing options, gravity concentration circuit, including flotation with concentrate sale, flotation with on-site oxidation, or whole ore processing.

Consideration of POX Toll Mill for flotation concentrate

Capital and operating cost implications of each processing route.

Power requirements and supply options for high-energy processing circuits.

Water demand and additional permitting requirements.

These studies will define the preferred development pathway and associated capital intensity.

21-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

21.7

Risk Management

21.7.1

Key Risks

Key project risks are listed:

Metallurgical variability, particularly within transition material

Permitting delays or regulatory challenges

Water availability and water management (dewatering) constraints

Contractor performance and productivity

Cost escalation for fuel, reagents, and construction materials

21.7.2

Mitigation Measures

Risk mitigation strategies include the following:

Early and comprehensive metallurgical testing across all material types

Parallel advancement of permitting and engineering activities

Use of conservative design assumptions and contingency allowances

Engagement of experienced contractors with Nevada operating experience

Inclusion of appropriate contingency in capital and operating cost estimates

21.7.3

Capital Efficiency Strategy

The Project has been designed to minimize initial capital requirements while maintaining operational flexibility. Key elements of this strategy are listed:

Use of contractor mining to eliminate the need for owner-purchased mining fleet.

Development within existing disturbed areas to reduce earthworks and permitting requirements.

Modular process plant design to allow phased expansion.

Deferral of major capital expenditures associated with sulfide processing.

21.7.4

Transition to Pre-Feasibility Study (PFS)

The PFS will build upon the IA and refine all technical and economic assumptions. The study will upgrade cost estimates to an AACE Class 4 level, with an

expected accuracy range of approximately minus 25 percent to plus 25 percent.

Key PFS deliverables will include the following:

Development and geotechnical drilling, assaying, and metallurgical test work.

Updated mine plan and production schedule.

Refined metallurgical recovery models.

Detailed capital and operating cost estimates.

Permitting plan and status updates.

Comprehensive set of trade off studies, yet to be defined.

Economic analysis, including net present value and internal rate of return.

21-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

21.7.5

Mining and Scheduling Considerations

Future development of sulfide material will require integration into the overall mine plan. Key considerations include:

Sequencing oxide and sulfide material to optimize project economics.

Potential stockpiling strategies for sulfide material during oxide operations.

Evaluation of cut-off grades specific to sulfide processing costs and

recoveries.

Impact on strip ratio and overall mine life.

These factors will be incorporated into future mine planning studies.

21.7.6

Environmental and Permitting Requirements

Processing of sulfide mineralization will likely introduce additional environmental considerations and permitting requirements, including:

Expanded process facilities and tailings storage requirements.

Increased water usage and potential discharge considerations.

Additional air quality permitting, particularly for oxidation processes.

Enhanced geochemical characterization to assess acid rock drainage and metal leaching potential.

Early engagement with regulatory agencies is recommended to define permitting pathways and timelines for sulfide development.

21.7.7

Future Sulfide Study Pathway

Advancement of sulfide mineralization is expected to follow a staged study approach, including:

Scoping-level evaluation of processing options and economics.

Pre-Feasibility Study (PFS) specific to sulfide development, if

warranted.

Feasibility Study (FS) and detailed engineering following confirmation of economic viability.

The sulfide resource represents a longer-term opportunity that could materially extend mine life and increase total metal production;

however, it is associated with higher capital intensity and greater technical complexity than the oxide heap leach operation.

21.8

Conclusion

The Project PEP outlines a practical and efficient pathway to develop the Project through the reprocessing of waste rock dumps and the mining of oxide and

mixed material using heap-leach technology. The strategy leverages existing site conditions, proven processing methods, and contractor-based mining to reduce capital intensity and accelerate development.

Permitting remains the critical path, supported by environmental baseline programs and regulatory engagement. With immediate initiation of the PFS and

execution of parallel workstreams, the Project has the potential to achieve first production within approximately two years, subject to permitting timelines and successful completion of technical programs.

21-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

22.0

Interpretation and Conclusions

22.1

Geology and Mineral Resources

The geological interpretation and deposit model are appropriate, internally consistent, and aligned with a low-sulfidation epithermal system, with mineralization strongly controlled by fault architecture and lithological contrasts.

Mineralization exhibits high spatial variability, with discontinuous high-grade veins embedded within a laterally

and vertically continuous low-grade stockwork domain, which comprises most of the tonnage.

The Mineral Resource estimate has been prepared in accordance with S-K

1300 and CIM (2019) Best Practice Guidelines, supported by appropriate domain modeling, compositing, grade capping, interpolation, and validation workflows.

The estimate is constrained within optimized open-pit shells

demonstrating Reasonable Prospects for Economic Extraction (RPEE,) based on reasonable mining, processing, and economic assumptions, including a long-term gold price of US$3,100/oz.

The drilling database is large and generally adequate (approximately 4,300+ drill holes); however, gaps in

historical metadata, incomplete records, and exclusion of unverifiable data introduce uncertainty, which is appropriately reflected in classification.

Historical drilling is predominantly vertical RC, which adequately defines bulk-tonnage mineralization but limits

confidence in true geometry and continuity of steeply dipping high-grade structures.

The QA/QC and sampling protocols, while variable in early historical programs, are considered sufficient overall

due to:

Exclusion of unreliable or unsupported data from the Mineral Resource Estimate (MRE)

Validation of assay datasets through statistical analysis, capping, compositing, and multi-method estimation

checks

Use of industry-standard QA/QC review and data screening prior to estimation. Accordingly, the QP considers the

analytical dataset valid and appropriate to support the MRE, with remaining uncertainties reflected in classification.

The oxidation model has been reviewed and corrected for inconsistencies and is considered appropriate for current

estimation; however, localized coding issues indicate moderate residual uncertainty where metallurgical assumptions are sensitive.

Exploration datasets (geophysical, geochemical, geological) are well integrated and effective for targeting,

defining structural corridors, and mineralized trends extending beyond historically mined areas.

Mineralization remains open along strike, at depth, and beneath cover, with identified targets considered

conceptual but supported by integrated datasets.

Compared to the 2023 estimate, the 2026 MRE shows a material increase in tonnage and contained metal, driven by:

22-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Inclusion and delineation of surface materials (existing waste rock dumps, heap leach pads, and tailings storage

facility);

Expanded pit shells under higher gold price assumptions (US$3,100/oz versus approximately US$1,800/oz); and

Updated geological interpretation and database validation.

This increase in tonnage is accompanied by a moderate reduction in average grade, consistent with inclusion of

marginal material and not indicative of estimation bias.

22.2

Mining and Mineral Reserves

There is no current geotechnical information for the pit slopes. Current pit slope assumptions may be optimized

once geotechnical information has been collected and incorporated into the pit design.

The current Base Case life of mine (LOM) plan includes a significant proportion of Inferred Mineral Resources

(approximately 55%). The next stage of the Project will require converting Inferred Resources to Indicated Resources to reduce the project risk.

Pit slope design assumes dry (i.e., dewatered) walls. Pit dewatering needs to start early enough for the open-pit mining operation to begin.

There is potential to extend the mine life with the addition of a sulfide pit. To include the sulfide pit in the

LOM plan, additional metallurgical test work and block modeling will be required.

22.3

Mineral Processing

Metallurgical test work supports heap leaching with Merrill-Crowe recovery for oxide, mixed, and selected

waste-rock materials, and flotation with off-site toll treatment or concentrate sale for sulfide, existing heap leach pad (HLP), and existing tailings material.

The Base Case economic analysis is restricted to the heap-leach scenario, which is supported by the most

complete, representative, and internally consistent metallurgical dataset.

The proposed Base Case processing facility is a 30,000 tpd conventional crush–agglomerate–heap-leach

operation employing Merrill-Crowe recovery. Design parameters include crushing to approximately P80 19 mm and agglomeration using cement and/or lime.

Facilities oxide material demonstrates the strongest metallurgical response to heap leaching, with additional

oxide, mixed, and selected waste-dump composites also supporting inclusion in the heap-leach feed blend.

Gold and silver recovery assumptions for the heap-leach case are derived primarily from column leach testing,

with conservative assumptions applied where only bottle-roll or limited test data exist.

Sulfide, HLP, and tailings materials represent future processing opportunities via flotation. Recoveries have

been reduced by 12% to account for toll-milling deductions and downstream treatment charges.

22-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

No silver recovery is currently attributed to the flotation scenario; silver is treated as upside potential

pending further metallurgical test work and commercial assessment.

The heap leach flowsheet is a commercially proven, low-risk processing route appropriate for IA-level planning.

Preliminary test work of the flotation option as a processing method for the sulfide material and existing HLP

and TSF material is sufficient for the declaration of Mineral Resources; however, additional variability testing, concentrate characterization, and commercial evaluation are required to advance this option.

22.4

Infrastructure

Access to the mine site is reliable via frequently traveled and maintained public infrastructure from Winnemucca,

Nevada.

Access and haul roads constructed on site will be designed and constructed in a manner sufficient to facilitate

required on-site vehicular movement

The proposed heap leach pad has been sited based on terrain, environmental, and operational bases and has been

adequately sized to accommodate 175 Mt of agglomerated mineralized material.

The pregnant solution and barren solution ponds have been located in proximity to the leach pad to take advantage

to native slopes and have been sized to accommodate operational solution flow rates.

The storm event pond has been located adjacent to the process ponds and has been sized to accommodate the 100-year 24-hour storm volume.

Rapid infiltration basins have been designed to accommodate infiltration from pit dewatering efforts at an

average rate of 4,542 m3/hr (20,000 US gallons per minute [gpm]).

No accommodation camp has been included in the proposed infrastructure as the town of Winnemucca is within

commuting distance and hosts a knowledgeable mining industry labor force.

22.5

Environment

There are no known significant environmental issues at the site, and the former mine is in an advanced state of

closure with post-closure monitoring and minor operational and maintenance activities being conducted.

The regulatory environment is well developed, and the environmental permitting path forward for the mine plan

presented in this TRS is generally well understood.

22.6

Capital and Operating Costs

Preliminary capital and operating cost estimates have been prepared for the proposed mining operation based on a

conceptual processing rate of approximately 30,000 tpd.

For the Base Case, initial capital costs required to restart mining operations are estimated to be approximately

US$201 million, with sustaining capital estimated at approximately US$342 million over the life of mine.

Life-of-mine operating costs for

the Base Case are estimated to average approximately US$13.03 per tonne processed, resulting in an estimated all-in sustaining cost of approximately US$2,407 per ounce of gold produced.

22-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

22.7

Risks

The economic analysis presented in the Base Case as part of this TRS includes a material proportion of Inferred

Mineral Resources within the mine plan and associated cash flow. The Inferred Mineral Resources are included at the beginning of the life-of-mine plan by mining existing

dumps in the economic analysis, which introduces significant uncertainty.

22-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

23.0

Recommendations

The SLR QPs offer the following recommendations by discipline:

23.1

Geology and Mineral Resources

1

Conduct the following drilling and exploration programs:

a)

Infill drilling to support conversion of Inferred to Indicated Mineral Resources (in situ and surface

materials) by conducting systematic infill drilling within pit-constrained in situ domains and within surface material domains (dumps, heap leach pads, and TSF) to increase data density and improve confidence

in grade continuity, tonnage, and material variability, consistent with S-K 1300 classification criteria.

b)

Targeted infill drilling within established mineralization domains to increase drill density within defined

grade domains to better constrain grade variability and continuity, particularly in areas where current spacing limits classification.

c)

Additional drilling and geological logging to improve confidence in oxide, mixed, and sulfide boundaries, which

directly influence metallurgical assumptions applied in the MRE.

2

Geology and Mineral Resource Estimate

a)

Maintain domain-controlled drilling and sampling protocols to ensure all new data collection aligns with the

current geological, mineralization, and estimation domain framework to support direct integration into future MRE updates.

b)

Incorporate new data into updated geological interpretations and block models to support iterative improvement

of the Mineral Resource estimate in accordance with S-K 1300 reporting requirements.

c)

Acquire additional bulk density measurements across in situ and surface material domains where current density

assignments are based on limited data, to improve tonnage estimates.

d)

Focus drilling within the existing Mineral Resource footprint by prioritizing data acquisition in areas where

incremental drilling is most likely to materially improve classification, rather than expanding the resource footprint at this stage.

3

Quality Assurance and Quality Control

a)

Implement consistent QA/QC protocols for future work. Apply standardized QA/QC procedures (sampling, insertion

rates, documentation) to ensure all new data meets S-K 1300 and CIM (2019) requirements and supports classification upgrades.

b)

Recommend investigation of incomplete database information and update the database through investigation of

historic files

To advance the Project, the QP recommends that Paramount Gold undertake a

two-phase exploration and data validation program totaling $8.52 million, as summarized in Table 23-1.

The goal is to support upgrading Inferred Mineral Resources to the Indicated category, validate key project assumptions regarding density and metallurgy, and

continue delineation in underexplored areas.

23-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

This budget reflects a disciplined yet robust investment to de-risk

the MRE, validate key technical assumptions (density, metallurgical recovery), and support a potential future Preliminary Feasibility Study (PFS). The recommended work is expected to materially enhance the geological understanding and economic

viability of the Sleeper Project.

The two phases of the work program are independent of each other.

Table 23-1: Proposed Sleeper 2026-2027 Exploration Budget

Activity

Details

Estimated Cost

(US$ 000)

Phase 1 – Surface and In Situ Resource Definition, QA/QC Implementation, and Metallurgical Studies

ESG Permitting

Exploration and Environmental Permits for Phase 1 drilling

25

Sonic Drilling

Up to 30 holes (4000 ft) of sonic drilling at $90/ft focused on obtaining metallurgical samples from Waste dumps, TSF and HL pads

360

RC Drilling

Up to 500 holes (50,000 ft) of RC drilling in Waste dumps, HL pads at $50/ft

2,500

Core drilling

Confirmation core drilling of up to 10,000 ft at $120/ft (HQ/NQ core)

1,200

Bulk Density Sampling

Collection and testing of up to 200 core and/or pit samples across all domains

12

Geochemical Assays

Assaying of approximately 15,000 samples incl. duplicates, standards, blanks

750

QA/QC Program Implementation

Establish certified sample control and auditing protocols

100

Metallurgical Testing

Leach testing of mineralized core for recovery studies

750

Technical Staff & Supervision

Field geologist, QA/QC lead, database tech

300

Total Phase 1

5,997

Phase 2 – Project Development Scoping

ESG Permitting

Exploration and Environmental Permits for Phase 2 Geotech

25

Ground Support Geotechnical Testing

Geotech and analysis studies for Ground Support

250

Heap Leach Pad Geotechnical Testing and Design

Geotech and design engineering studies for Heap Leach Pad

600

Mining and Process Design & Engineering Analysis

Process design and engineering cost analysis and modeling

400

Environmental Baseline Studies

Hydrogeology, cultural, flora/fauna baseline for mine permitting

600

Stakeholder Engagement & Permitting Prep

Initial outreach, permitting roadmap

100

23-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Activity

Details

Estimated Cost

(US$ 000)

Technical Oversight & Contingency (10%)

Includes legal, overhead, permitting scope prep

198

Reporting and Independent Review

S-K 1300 PFS update and QP sign-off

350

Total Phase 2

2,523

Grand Total

8,520

23.2

Mining and Mineral Reserves

1

Collect geotechnical information and develop geotechnical studies to support the pit design slopes for the next

stage of the project.

2

Ensure the open-pit mining sequence is closely coordinated with the open-pit dewatering plan.

3

Continue the analysis of the sulfide pit as an opportunity after the oxide pit mining.

23.3

Mineral Processing

1.

Complete additional variability column leach testing on oxide, mixed, and waste rock dump domains to confirm

recovery, leach kinetics, and reagent consumption across the planned heap leach feed range.

2.

Confirm provisional recovery assumptions for Sleeper oxide, Sleeper mixed, and West Wood mixed material with

representative column leach test work.

3.

Refine crush-size and agglomeration test work to confirm the selected

coarse-crush heap leach design basis and optimize cement and lime addition by material type.

4.

Expand reagent-consumption testing to better define sodium cyanide, lime, and cement demand for oxide, mixed,

and waste rock dump materials, particularly where existing results indicate variable or elevated consumable requirements.

5.

Complete additional column leach testing on selected waste rock dump materials to refine recovery assumptions

by dump area and improve confidence in domain-based economic modeling.

6.

Complete additional deleterious-element and precipitate-quality testing for Hg, As, Sb, and sulfur to confirm

mercury management requirements and refine refinery and operating cost assumptions.

7.

Complete flotation variability, optimization, and locked-cycle test work on representative sulfide, HLP and

tailings composites to confirm recovery, consumable requirements, concentrate quality, and the suitability of an off-site toll-treatment or concentrate-sale route.

23.4

Infrastructure

1

Evaluate site-wide water balance and discharge requirements.

23-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

2

Perform a hydrogeological evaluation to support PFS level engineering of the rapid infiltration basin.

3

Confirm power requirements and supply availability.

4

Develop site-specific design criteria for the HLP and perform field investigations and laboratory testing to

support advancing the HLP design.

5

Develop a PFS level HLP design that incorporates site specific data into the engineering calculations and

analysis for such items as grading plan, slope stability analysis, water balance, settlement, and closure.

23.5

Environment

1.

Complete updated baseline studies in accordance with National Environmental Policy Act of 1969 (NEPA) and

applicable guidelines.

2.

Engage early with local stakeholders and tribes and develop a stakeholder outreach plan.

3.

Develop a permitting strategy and timeline.

23.6

Capital and Operating Costs

1

Move the dewatering from an “Allowance” to a full ‘Engineered System’, e.g., calibrated

groundwater model; staged dewatering sequencing; pumping lift curves by pit phase; transient inflow modeling; wellfield spacing and drawdown analysis; contingency pumping scenarios; and power demand modeling for peak pumping periods.

2

Re-evaluate the crushing/agglomeration

trade-off, e.g., variability column testing; permeability testing; compaction testing; fines migration testing; cement consumption optimization; lift-height testing; and irrigation optimization.

3

Tighten the heap leach pad phasing strategy, e.g., minimizing initial lined acreage; maximizing early vertical

expansion; deferring later phases; reducing early pond construction; and sequencing underdrain installation.

4

Lock down power infrastructure requirements early, e.g., actual condition of transmission line; substation

rebuild requirements; transformer replacement needs; utility interconnect requirements; and backup generation philosophy.

5

Validate the contractor mining strategy, i.e., obtain budgetary contractor bids; benchmark Nevada owner-mining

versus contractor-mining; validate bank cubic meter (bcm) assumptions; stress-test diesel escalation; and stress-test productivity losses from wet conditions.

6

Refine the estimate by:

a)

Improving mine haulage and re-handle modeling.

b)

Tightening reagent consumption assumptions.

c)

Adding more detailed closure escalation and water management costs.

23-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

24.0

References

Alexander, G. 2005. Pit Dewatering, Internal Memo, New Sleeper Gold, from Glenn Alexander to Jim Smithson, June 1, 2005.

AMAX Gold Inc. 1985. Sleeper Gold Mine Project Development Documentation. Corporate technical release.

AMAX Gold Inc. 1986–1996. Sleeper Mine Production Records and Operating Reports.

Bevan, Peter A. 2002. Sleeper Tailings Project, Winnemucca, Nevada, USA. Confidential report for X-Cal Resources Ltd. Dated October 11, 2002.

Borg, I. and Handin, J. 1966.

Experimental deformation of crystalline rocks: Tectonophysics, v. 3(4), p. 249-368.

Bradley, Mark A. 2005. Progress Report – Sleeper Facilities Area. Confidential report for New Sleeper Gold LLC dated

May 4, 2005.

Bureau of Land Management, Nevada State Office. Mining Claim Regulations and Surface Management

Requirements.

Burke, D.B. and Silberling, N.J. 1973. The Auld Lang Syne Group, of Late Triassic and Jurassic (?) age,

north-central Nevada: U.S. Geol. Sur(?) age. 1394-E, p. E1E14.

Chevillon, Vic.

2006. Internal memo to X-Cal Resources of August 14, 2006.

Code of Federal

Regulations (CFR), Title 43. Public Lands: Interior.

Cooper, J.J., and Vikre, P.G., eds., Bulk Mineable Precious Metal

Deposits of the Western United States: Reno, Nevada, Geological Society of Nevada, Symposium Proceedings, p. 11–34., p. 293-302.

Conrad, J.E., McKee, E.H., Rytuba, J.J., Nash, J.T., and Utterback, W.C., 1993, Geochronology of the Sleeper deposit,

Humboldt County, Nevada: Epithermal gold silver mineralization following emplacement of a silicic flow-dome complex: Econ. Geol., v. 88, p. 317-327.

Cooke, D.R. and Simmons, S.F. 2000, Characteristics and genesis of epithermal gold deposits, in Hagemann, S.G., and Brown,

P.E., eds., Gold in 2000: Reviews in Economic Geology, v. 13, p. 221-244.

Corbett, G. J. 2005. Sleeper, PowerPoint presentation. Presented to New Sleeper Gold LLC staff in April 2005.

Corbett, G.J. 2005. Comments on Continued Exploration at the Sleeper Gold Mine and Environs, Nevada. Confidential report for

New Sleeper Gold LLC dated May 2005.

Crawford, A. E. J. 2007. Geologic Map of Nevada; USGS Data Series, DS-249

Cyprus Amax Minerals Company, 1994–1996. Sleeper Mine Operational

Summaries.

Doerner, Bill, 2005, New Sleeper Gold Corporation Titan – 24 Magnetic Telluric Survey, Data Processing,

Inversion, and Interpretation. Confidential report for New Sleeper Gold LLC by Quantech Consulting Inc, Reno NV dated Sep 2005.

Doucette, John. 2005. Summary of XRF data for Silicic Rocks from Sleeper Mine Area. Confidential memo for New Sleeper Gold

LLC dated Nov 2, 2005.

24-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Even, G., Nur, J., and Gochnour, L. 2012. Mineral Resource Estimation

Sleeper Gold Project, Nevada, USA, SRK Consulting (Chile) S.A. October 2012.

Ferdock, Gregory C., Bradley, M., Ross, K.,

Martin, L., Fleming, A., Wellman, J., and Blair, K. 2005. Mineralogy and mineralization at the New Sleeper Gold project, Awakening Mining District, Slumbering Hills, Humboldt County, Nevada, in Rhoden, H.N., Steininger, R.C., and Vikre, P.G., eds.,

Geological Society of Nevada Symposium 2005: Window to the World, Reno, Nevada, May 2005, pp. 497-510.

Ferdock, Gregory C. 2005. BC-03-03 Target

Generation. Confidential memo for New Sleeper Gold LLC dated May 2005.

Ferdock, Gregory C. 2005. Mineralogical Sample

Evaluation, placer gold collected from OP-01-05and BC-03-03. Confidential memo for New

Sleeper Gold LLC dated Nov 2005.

Fleming, Adrian. 2005. Sleeper Project Nevada 2004 Report. Contributions from: Blair,

K., Bradley, M., Doucette, J., Ferdock, G., Martin, L., O’Donnell, M., Ross, K., Wellman, J. Annual report for year ending 2004, for New Sleeper Gold Corp. and X-Cal Resources Ltd., dated April 2005.

Giroux, G., Kornze, L., and Martin, L.G., and Healy, T.H.A. 2009. Sleeper Gold Property Preliminary Economic Assessment,

effective date November 16, 2009.

Gustin, M.S. and Fleming, J. 2004. Environmental and Geochemical Studies of the

Sleeper Mine Area. University of Nevada, Reno.

Gustin, M.M. and Fleming, A. 2004. Technical Report on the Sleeper Gold

Project, Nevada, USA. Report prepared for New Sleeper Gold Corporation and Upland Resource Corporation by Mine Development Associates and RockWorks Ltd.

Hedenquist, J.W., Arribas, A.R., and Gonzalez-Urien, E. 2000. Exploration for epithermal gold deposits, in Hagemann, S.G.,

and Brown, P.E., eds., Gold in 2000: Reviews in Economic Geology, vol. 13, pp. 245-277.

Hedenquist, J.W. 2005. Observations on the Sleeper Gold Project, Nevada. Confidential memorandum to X-Cal Resources Ltd. dated December 2005.

Histed, Rich. 2005. Trench ICP Analysis.

Confidential report for New Sleeper Gold LLC dated August 2005. Histed, Rich, 2005, Sleeper Range Front Review. Confidential report for New Sleeper Gold LLC dated August 27, 2005.

Histed, Rich. 2005. Range Front South Target Area. Confidential report for New Sleeper Gold LLC dated November 2005.

Hudson, D.M. 2013a. Simplified Sleeper geology and stratigraphy. Internal technical report prepared for Paramount Gold and

Silver dated August 2013, 5 p.

Hudson, D.M. 2013b. “Series of east-west cross sections across the Sleeper deposit

on 25-meter spaced intervals,” internal data with text and stratigraphic column prepared for Paramount Gold and Silver Corporation dated August 2013.

Hudson, D.M. 2014a. Petrography of select samples for diamond drill holes MC-21A, MC-24, MC-26, MC-42-04,

WW-27-04, XW-07-60, and MC-11 from the Sleeper

Project, Humboldt County, Nevada,” 92 p.

24-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Hudson, D.M. 2014b. Geologic observations from core relogging of the Sleeper

Project, Humboldt County, Nevada,” report prepared for Paramount Gold and Silver Corporation, 30 p.

Giroux,

Kornze, and Martin. 2008. Technical Report 2008 on the Sleeper Gold Property, dated September 22, 2008.

Goldstrand,

P.M. and Schmidt, K.W. 2000. Geology, mineralization, and ore controls at the Ken Snyder mine, Elko County, Nevada: Geol. Soc. Nevada, in Geology and Ore Deposits 2000: The Great Basin and Beyond Symposium, May

15-8, 2000, Reno-Sparks, Nevada, Proceedings, p. 265-287.

Jaacks, Jeffrey A. 2005. Review of Sleeper Soil Gas Program. Confidential report for New Sleeper Gold LLC dated Sep 26, 2005.

Jackson, R.G. 2006. Alteration mineralogy 3D model of the Sleeper

low-sulfidation gold system, Nevada. Report prepared for New Sleeper Gold Corporation, 12 p.

Jackson, R.G., and Chevillon, C.V. 2007. 3D geochemical and mineralogical model of the Sleeper low-sulphidation gold system,

Nevada: Exploration 2007: Toronto, Ontario, Canada, International Conference on Mineral Exploration, poster presentation.

John, D.A. 2001. Miocene and Early Pliocene epithermal gold-silver deposits in the Northern Great Basin, Western United

States: characteristics, distribution, and relationship to magmatism: Economic Geology, v. 96, no. 8, p. 1827-1853.

KCA.

1999. Sleeper project sampling and metallurgical test program: Internal report by Kappes, Cassiday & Associates for X-Cal Resources, Ltd., dated 28 February 1999, 25 p.

Kinakin, D. 2012a. Sleeper Gold Project Preliminary Economic Assessment-Open Pit Slope Design Recommendations, Preliminary, a

letter report to Glen van Treek, VP Exploration, Paramount Gold & Silver Corp., from BGC Engineering Inc. , Report No. 1059-001, Vancouver, BC, February 10, 2012.

Kornze, L.D. and Phinisey, J.D. 2002. Geologic due diligence report and Sleeper gold district exploration proposal for X-Cal Resources Ltd., Humboldt County, Nevada: Private report for Dundee Capital, 31 p.

Martin, Larry G. 2005. Trench 03. Confidential report for New Sleeper Gold LLC dated April 2005.

Martin, Larry G. 2005. Targets to the North/Northwest. Confidential memo for New Sleeper Gold LLC dated May 26, 2005.

Martin, Larry G. 2005. Trench Update. Confidential memo for New Sleeper Gold LLC dated July 15, 2005. Martin, Larry

G., 2005, Photo Lineament Study. Confidential report for New Sleeper Gold LLC dated August 05, 2005.

Martin, Larry G.

2005. Trench Study. Confidential report for New Sleeper Gold LLC dated November 05, 2005.

McClelland, G. 2012. Report on

Phase 2 Metallurgical Evaluation – Waste Dump, Westwood and Facilities Composites (“bench” scale tests), a report to Glen van Treek, VP Exploration, Paramount Gold & Silver Corp. , from McClelland Laboratories, Inc.,

Sparks, NV, January 27, 2012.

24-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

McPhie, J., Doyle, M., and Allen, R. 1993. Volcanic Textures, A guide to the

interpretation of textures in volcanic rocks. Centre for ore deposit OD and Exploration Studies, University of Tasmania, 198p.

MRDI. 1997. Modeling and resource estimation of the Facility, Saddle, West Wood, and Silica Cap area, Sleeper Gold property.

Report prepared for Placer Dome U.S. Inc. and X-Cal Resources Ltd. by Mineral Resources Development Inc. Dated August 1997. 155 p.

24-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Nash, J.T., Utterback, W.C., and Saunders, J.A. 1991. Geology and

Geochemistry of the Sleeper Gold Deposits, Humboldt County, Nevada: An Interim Report, in Raines, G.L., Lisle, R.E., Schafer, R.W., and Wilkinson, W.H., eds., Geology and Ore Deposits of the Great Basin, Symposium Proceedings: Reno, Geological

Society of Nevada and U.S. Geological Survey, p. 1063-1084.

Nash, J.T., Utterback, W.C., and Trudel, W.C. 1995. Geology

and geochemistry of Tertiary volcanic host rocks, Sleeper gold-silver deposit, Humboldt County, Nevada: U.S. Geological Survey Bulletin 2090, 63 p.

Nash, J.T. and Trudel, W.S. 1996. Bulk mineable gold ore at the Sleeper mine, Nevada: Importance of extensional faults,

breccia, framboids, and oxidation, in Coyner, A.R., and Fahey, P.L., eds., Geology and Ore Deposits of the American Cordillera: Geological Society of Nevada Symposium Proceedings, Reno, Nevada, April 1995, p.

235-256.

New Sleeper Gold LLC. 2022. Monthly Water Reports to Nevada Department

of Conservation & Natural Resources. Division of Water Resources, January to December.

Nevada Bureau of Mines

and Geology. Regional geologic mapping and mineral resource reports for Humboldt County, Nevada.

Nevada Division of

Environmental Protection. 2017. New Sleeper Gold LLC NEV00500006 Fact Sheet.

Nevada Revised Statutes (NRS). Chapters

512–520. Mining Laws of the State of Nevada.

Nevada Administrative Code (NAC). Chapter 517. Nevada Mining

Regulations.

Nyman, Mark. 2005. Notes Regarding Northwest Sleeper Drill Target. Confidential memo for New Sleeper Gold

LLC dated November 3, 2005.

Oldow, J.S. 1984. Evolution of a Late Mesozoic

back-arc fold and thrust belt, northwestern Great Basin, USA: Tectonophysics, v. 102, p. 245–274.

O’Donnell, Megan. 2005. Red Mercury Concept Test Proposal – Phase I. Confidential memo for New Sleeper Gold LLC

dated November 2005.

Paramount. 2022a. “Amendment Paramount PEA 2017_Section 4_11_REV_mfm_08032022.docx,”

project document received from M. McGinnis of New Sleeper Gold LLC via email on August 29, 2022.

Paramount. 2022b.

“Sleeper Claims Aug 2022.xlsx,” project document received M. McGinnis of New Sleeper Gold LLC via email on August 29, 2022.

Paramount. 2022c. “Sleeper Royalties_mfm_20220829.docx,” project document received from M. McGinnis of New

Sleeper Gold LLC via email on August 29, 2022.

Piteau (Piteau Associates USA). 2021. Sleeper Pit Lake Model, Update

– May 2021.Prepared for Paramount Gold. Project 3938. May 2021.

Proteus. 2002. Information Memorandum: X-Cal Resources Ltd., dated August 6, 2002, by Proteus Capital Corporation, 30 p.

Redfern, R.R. and Rowe, W.A. 2003, “Technical report on the Sleeper Gold property,” report prepared for X-Cal Resources Ltd. dated December 2003, 118 p.

RESPEC. 2023. Technical Report

Summary for the Sleeper Gold Project, Humboldt County, Nevada, USA, SK 1300 Report (RSI(RNO) – MO 144.21001 Rev 7, prepared for Paramount Gold Nevada, August 31, 2023, p. 215

24-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Ressel, M., Christensen, O.D., and Gustin, M.M., 2020, “Evaluation of

the exploration potential at the Sleeper Project, Humboldt County, Nevada,” report prepared for Paramount Gold and Silver Corporation, dated November 17, 2020, 215 p.

Ross, Ken. 2005. Preliminary Report on Mineralization of the West Wood Breccias. Confidential report for New Sleeper Gold LLC

dated December 2005.

Rowe, Winthrop A. 1998. Sleeper Gold Project, internal memo for

X-Cal Resources Ltd, report dated June 1998. 69 p.

Rowe, Winthrop A. 2004.

General Observations on the Deep Core Holes Under the Sleeper Pit. Confidential memo for New Sleeper Gold LLC dated August 2004.

Sierra Mining and Engineering LLC. 1999. Mineral inventory report: Sleeper mine, Humboldt County, Nevada. Report prepared for

X-Cal Resources Ltd. dated November 1999.

Sillitoe, R.H. and Hedenquist, J.W.

2003. Linkages between volcanotectonic setting, ore-fluid compositions and epithermal precious metal deposits. Society of Economic Geologists Special Publication 10. p.

315-343.

Simmons, S.F., White, N.C., and John, D.A. 2005. Geological

characteristics of epithermal precious and base metal deposits. Economic Geology 100th Anniversary Volume, pp. 485-522.

SLR International Corporation. 2023. Water Pollution Control Permit Renewal Application.

Smithson, Jim. 2005. Environmental reports, monitor sampling and observations, compliance documents, regulatory agency

reports, confidential memos to Sleeper Joint Venture.

Snyder, Ken. 2005. Sleeper Exploration Review. Memo dated

May 9, 2005.

Snyder, Ken. 2005. Status of Sleeper Project, Exploration. Memo dated June 27, 2005.

Snyder, Ken. 2005. Sleeper Technical Summit. Memo dated Sep 30, 2005.

Tarnocai, C. 2000. Structural setting of the Sleeper Project, Confidential Memo with maps and plates for Placer Dome, made

available to X-Cal, dated October, 2000, 3p.

Taylor, John D. 2007. Sleeper

Project – Blasthole Modeling Update, Confidential memo to X-Cal Resources Ltd.

Thomason, R.E., Kornze, L., and Rowe, W.A. 2006. Technical Report on the Sleeper Gold Property for X-Cal Resources Ltd., report dated March 12, 2006, 149 p.

Thompson, R. 2012b.

Sleeper Gold Project Preliminary Economic Assessment-Open Pit Depressurization Recommendations, Preliminary, a letter report to Glen van Treek, VP Exploration, Paramount Gold & Silver Corp., from BGC Engineering Inc., Report No. 1059-001, Vancouver, BC, February 10, 2010. Utterback, William C., 2005, Critical Review and Commentary of: “Comments on Continued Exploration at the Sleeper Gold Mine and Environs,

Nevada”, Corbett, G.J., May 2005. Confidential report for New Sleeper Gold LLC dated Sep 18, 2005.

United States

Code (USC). Title 30. Mineral Lands and Mining.

United States Code (USC). Title 43. Public Lands and the Federal Land

Policy and Management Act.

U.S. Geological Survey. Various publications. Geologic studies of the Sleeper gold-silver

deposit and Awakening District.

24-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Utterback, William C. 2005. Conclusions and Recommendations Resulting from

Drill Core Features. Confidential report for New Sleeper Gold LLC dated Aug 18, 2005. Water Management Consultants, Inc. (WMCI). 1996. Sleeper Mine, Results of Supplemental Pit Lake Modeling and Closure Plan for the Final Pit.

White, T.L. 2003. Airborne magnetic survey and IP survey lines for the Sleeper Project. Internal report prepared for X-Cal Resources Ltd., 2 p.

White, N.C. and Hedenquist, J.W. 1995. Epithermal gold

deposits: styles, characteristics and exploration. Society of Economic Geologists Newsletter, No. 23, pp. 1, 9-13.

Willden, R. 1964. Geology and Mineral Deposits of Humboldt County, Nevada: Nevada Bureau of Mines and Geology Bulletin 59,

154 p.

Wilson, S.E. and SRK. 2012. Technical Report and Preliminary Economic Assessment, Sleeper Gold Project, Nevada,

USA, Paramount Gold Nevada Corp., July 30, 2012, 261 p.

Wilson, B. and Pennstrom, R.K. 2012. “Preliminary

economic assessment for the Sleeper Gold Project, Nevada, USA,” report prepared by Scott E. Wilson Consulting, Inc., dated July 2012, 261 p.

Wilson, S.E., Brechtel, C., and Pennstrom, W.J., Jr. 2015. Preliminary economic assessment, Paramount Gold Nevada Corp.

Sleeper Project, Humboldt County, Nevada: report by Metal Mining Consultants Inc., 218 p.

Wilson, S.E. and Brechtel, C.

2017. Technical report and preliminary economic assessment, Paramount Gold Nevada Corp. Sleeper Project, Humboldt County, Nevada, December 10, 2015, amended September 25, 2017: report by Metal Mining Consultants Inc., 215 p.

Wilson, S.E., Pennstrom, W.J., Jr, Brechtel, C.E., and Even, G. 2012, Technical Report and Preliminary Economic Assessment,

Sleeper Gold Project, Nevada, USA, prepared for Paramount Gold and Silver Corp., July 30, 2012, p. 261

Wood, J.D.

1988. Geology of the Sleeper gold deposit, Humboldt County, Nevada, in Schafer, R.W., et al., eds., Bulk mineable precious metal deposits of the Western United States: Reno, Geological Society of Nevada, p.

293-302.

WMC (Water Management Consultants Inc.). 1995. Sleeper Mine,

Preliminary Assessment of Hydrologic and Hydrochemical Conditions in the Final Pit. Prepared for Nevada Gold Mining Inc. – Sleeper Mine. Project 1006/R11. April 1995.

WMC. 2005a. Memorandum to Adrian Fleming – New Sleeper Gold, Pit Dewatering – Reestablishing Historic Cone of

Depression, 1006 Technical Memo. June 20, 2005, 11p.

WMC. 2005b. Memorandum to Adrian Fleming – New Sleeper

Gold, Pit Dewatering – Partial Dewatering, 1006 Technical Memo. June 21, 2005, 2p.

WMC. 2005c. Memorandum to

Adrian Fleming – New Sleeper Gold, Pit Dewatering – Expanded Pit, 1006 Technical Memo. June 22, 2005, 2p.

WMC. 2005d. Technical Memorandum to Adrian Fleming – New Sleeper Gold, Future Sleeper Dewatering, 1006 Technical Memo.

July 8, 2005, 3p.

Wood, J.D. and Hamilton, S.K. 1991. The Sleeper gold-silver deposit: Discovery through

feasibility: Econ. Geol. Monograph 8, p. 289-299.

Wright, James L., 2005.

Sleeper Property Induced Polarization Inverted Sections. Confidential report for New Sleeper Gold LLC dated Jan 15, 2005.

24-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

Wright, James L. 2005. Sleeper Property Gravity and Induced Polarization

Surveys GIS Database. Confidential report for New Sleeper Gold LLC dated Jan 15, 2005.

Wright, James L. 2005. Sleeper

Property Induced Polarization Survey. Confidential report for New Sleeper Gold LLC dated April 25, 2005.

Wright,

James L. 2005. Sleeper Property Magnetic – Telluric Survey GIS Database.

Wright, J.L. 2012. Sleeper project

Evolving Gold data compilation. Report prepared for Paramount Gold. 6 pages.

Wright, J., 2012a. Sleeper project –

induced polarization survey, 2012: internal company report prepared for Paramount Gold, 21 p.

Wright, J. 2012b. Sleeper

project – gravity survey, 2012: internal company report prepared for Paramount Gold, 17 p.

Wright, J. 2015.

Sleeper property airborne magnetic survey, GIS database: internal company report prepared for Paramount Gold Nevada: 15 p.

Wyld, S.J. 2002, Structural evolution of a Mesozoic backarc

fold-and-thrust belt in the U.S. Cordillera: New evidence from northern Nevada: Geological Society of America Bulletin, v. 114; no. 11; p. 1452–1468.

Zamudio, Joe. 2005. ASD mineralogical determinations of selected holes from Sleeper Gold Project. Internal confidential memos

to Sleeper Joint Venture.

Zoutomou, Edouard K. 2007. Sleeper Mine Tailings and Heap Evaluation as Potential Gold

Resources. Confidential report to X-Cal Resources Ltd

24-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

25.0

Reliance on Information Provided by the Registrant

This TRS has been prepared by SLR for PGN. The information, conclusions, opinions, and estimates contained herein are based on:

Information available to SLR at the time of preparation of this TRS.

Assumptions, conditions, and qualifications as set forth in this TRS.

Data, reports, and other information supplied by PGN and other third-party sources.

For the purpose of this TRS, SLR has relied on current ownership information provided by PGN in a Title Report from PGN’s Owner Representative dated

December 1, 2023, entitled “2023 Update of Title Report on Sleeper Project, Humboldt County, Nevada.” SLR has not researched property title or mineral rights for the Property as we consider it reasonable to rely on PGN’s legal

counsel, who is responsible for maintaining this information.

SLR has relied on PGN for guidance on applicable taxes, royalties, and other government

levies or interests, applicable to revenue or income from the Property in the Executive Summary and Sections 4 and 19.

The SLR QP have taken all

appropriate steps, in their professional opinion, to ensure that the above information from PGN is sound.

Except as specifically provided by applicable

laws, any use of this TRS by any third party is at that party’s sole risk.

25-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

26.0

Date and Signature Page

This report titled “S-K 1300 Technical Report Summary, Sleeper Gold Mine, Humboldt County, Nevada” with an

effective date of April 29, 2026, was prepared and signed by:

(Signed) SLR International Corporation

Dated at Lakewood, CO

June 17, 2026

SLR International Corporation

26-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

27.0

Appendix 1 List of Claims

Table 27-1: Sleeper List of Claims

Claim Group

Claim Name

BLM Serial No.

Claim Group

Claim Name

BLM Serial No.

SLEEPER

SLEEPER# 1

NMC250715

MIMI

MIMI 371

NMC1072951

SLEEPER

SLEEPER# 2

NMC250716

MIMI

MIMI 372

NMC1 072952

SLEEPER

SLEEPER# 3

NMC250717

MIMI

MIMI 373

NMC1072953

SLEEPER

SLEEPER# 4

NMC250718

MIMI

MIMI 374

NMC1072954

SLEEPER

SLEEPER# 5

NMC250719

MIMI

MIMI 375

NMC1072955

SLEEPER

SLEEPER# 6

NMC250720

MIMI

MIMI 376

NMC1072956

SLEEPER

SLEEPER# 7

NMC250721

MIMI

MIMI 377

NMC1072957

SLEEPER

SLEEPER# 8

NMC250722

MIMI

MIMI 378

NMC1072958

SLEEPER

SLEEPER# 9

NMC250723

MIMI

MIMI 379

NMC1072959

SLEEPER

SLEEPER# 10

NMC250724

MIMI

MIMI 380

NMC1 072960

SLEEPER

SLEEPER # 11

NMC250725

MIMI

MIMI 381

NMC1072961

SLEEPER

SLEEPER# 12

NMC250726

MIMI

MIMI 382

NMC1072962

SLEEPER

SLEEPER# 13

NMC250727

MIMI

MIMI 383

NMC1072963

SLEEPER

SLEEPER# 14

NMC250728

MIMI

MIMI 384

NMC1072964

SLEEPER

SLEEPER# 15

NMC250729

MIMI

MIMI 385

NMC1072965

SLEEPER

SLEEPER# 16

NMC250730

MIMI

MIMI 386

NMC1072966

SLEEPER

SLEEPER # 17

NMC250731

MIMI

MIMI 387

NMC1072967

SLEEPER

SLEEPER # 18

NMC250732

MIMI

MIMI 388

NMC1072968

SLEEPER

SLEEPER# 19

NMC250733

MIMI

MIMI 389

NMC1072969

SLEEPER

SLEEPER # 20

NMC250734

MIMI

MIMI 390

NMC1072970

SLEEPER

SLEEPER#21

NMC250735

MIMI

MIMI 391

NMC1072971

SLEEPER

SLEEPER # 22

NMC250736

MIMI

MIMI 392

NMC1072972

SLEEPER

SLEEPER # 23

NMC250737

MIMI

MIMI 393

NMC1072973

SLEEPER

SLEEPER # 24

NMC250738

MIMI

MIMI 394

NMC1072974

SLEEPER

SLEEPER # 25

NMC250739

MIMI

MIMI 395

NMC1072975

SLEEPER

SLEEPER # 26

NMC250740

MIMI

MIMI 396

NMC1072976

SLEEPER

SLEEPER # 27

NMC250741

MIMI

MIMI 397

NMC1072977

SLEEPER

SLEEPER # 28

NMC250742

MIMI

MIMI 398

NMC1072978

SLEEPER

SLEEPER # 29

NMC250743

MIMI

MIMI 399

NMC1072979

SLEEPER

SLEEPER#30

NMC250744

MIMI

MIMI 400

NMC1072980

SLEEPER

SLEEPER# 31

NMC250745

MIMI

MIMI 401

NMC1072981

SLEEPER

SLEEPER # 32

NMC250746

MIMI

MIMI 402

NMC1072982

SLEEPER

SLEEPER# 33

NMC250747

MIMI

MIMI 403

NMC1 072983

SLEEPER

SLEEPER # 34

NMC250748

MIMI

MIMI 404

NMC1072984

SLEEPER

SLEEPER#35

NMC250749

MIMI

MIMI 405

NMC1072985

SLEEPER

SLEEPER# 36

NMC250750

MIMI

MIMI 406

NMC1072986

27-1

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

SLEEPER

SLEEPER# 37

NMC250751

MIMI

MIMI 407

NMC1072987

SLEEPER

SLEEPER# 38

NMC250752

MIMI

MIMI 408

NMC1072988

SLEEPER

SLEEPER # 39

NMC250753

MIMI

MIMI 409

NMC1072989

SLEEPER

SLEEPER # 40

NMC250754

MIMI

MIMI 410

NMC1072990

SLEEPER

SLEEPER# 41

NMC250755

MIMI

MIMI 411

NMC1072991

SLEEPER

SLEEPER # 42

NMC250756

MIMI

MIMI 412

NMC1072992

SLEEPER

SLEEPER # 43

NMC250757

MIMI

MIMI 413

NMC1072993

SLEEPER

SLEEPER # 44

NMC250758

MIMI

MIMI 414

NMC1072994

SLEEPER

SLEEPER # 45

NMC250759

MIMI

MIMI 415

NMC1072995

SLEEPER

SLEEPER # 46

NMC250760

MIMI

MIMI 416

NMC1072996

SLEEPER

SLEEPER # 47

NMC250761

MIMI

MIMI 417

NMC1072997

SLEEPER

SLEEPER # 48

NMC250762

MIMI

MIMI 418

NMC1072998

SLEEPER

SLEEPER # 49

NMC250763

MIMI

MIMI 419

NMC1072999

SLEEPER

SLEEPER # 50

NMC250764

MIMI

MIMI 420

NMC1073000

SLEEPER

SLEEPER# 51

NMC250765

MIMI

MIMI 421

NMC1073001

SLEEPER

SLEEPER # 52

NMC250766

MIMI

MIMI 422

NMC1073002

SLEEPER

SLEEPER # 53

NMC250767

MIMI

MIMI 423

NMC1073003

SLEEPER

SLEEPER # 54

NMC250768

MIMI

MIMI 424

NMC1073004

SLEEPER

SLEEPER# 55

NMC250769

MIMI

MIMI 425

NMC1073005

SLEEPER

SLEEPER # 56

NMC250770

MIMI

MIMI 426

NMC1073006

SLEEPER

SLEEPER# 57

NMC250771

MIMI

MIMI 427

NMC1073007

SLEEPER

SLEEPER# 58

NMC250772

MIMI

MIMI 428

NMC1073008

SLEEPER

SLEEPER # 59

NMC250773

MIMI

MIMI 429

NMC1073009

SLEEPER

SLEEPER # 60

NMC250774

MIMI

MIMI 430

NMC1073010

SLEEPER

SLEEPER# 61

NMC250775

MIMI

MIMI 431

NMC1073011

SLEEPER

SLEEPER # 62

NMC250776

MIMI

MIMI 432

NMC1073012

SLEEPER

SLEEPER # 63

NMC250777

MIMI

MIMI 433

NMC1073013

SLEEPER

SLEEPER # 64

NMC250778

MIMI

MIMI 434

NMC1073014

SLEEPER

SLEEPER # 65

NMC250779

MIMI

MIMI 435

NMC1073015

SLEEPER

SLEEPER # 66

NMC250780

MIMI

MIMI 436

NMC1073016

SLEEPER

SLEEPER # 67

NMC250781

MIMI

MIMI 437

NMC1073017

SLEEPER

SLEEPER # 68

NMC250782

MIMI

MIMI 438

NMC1073018

SLEEPER

SLEEPER # 69

NMC250783

MIMI

MIMI 439

NMC1073019

SLEEPER

SLEEPER # 70

NMC250784

MIMI

MIMI 440

NMC1073020

SLEEPER

SLEEPER#71

NMC250785

MIMI

MIMI 441

NMC1073021

SLEEPER

SLEEPER # 72

NMC250786

MIMI

MIMI 442

NMC1073022

SLEEPER

SLEEPER # 73

NMC250787

MIMI

MIMI 443

NMC1073023

SLEEPER

SLEEPER # 74

NMC250788

MIMI

MIMI 444

NMC1073024

SLEEPER

SLEEPER # 75

NMC250789

MIMI

MIMI 445

NMC1073025

SLEEPER

SLEEPER # 76

NMC250790

MIMI

MIMI 446

NMC1073026

27-2

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

SLEEPER

SLEEPER # 77

NMC250791

MIMI

MIMI 447

NMC1073027

SLEEPER

SLEEPER#78

NMC250792

MIMI

MIMI 448

NMC1073028

SLEEPER

SLEEPER # 79

NMC250793

MIMI

MIMI 449

NMC1073029

SLEEPER

SLEEPER # 80

NMC250794

MIMI

MIMI 450

NMC1073030

SLEEPER

SLEEPER# 81

NMC250795

MIMI

MIMI 451

NMC1073031

SLEEPER

SLEEPER # 82

NMC250796

MIMI

MIMI 452

NMC1073032

SLEEPER

SLEEPER # 83

NMC250797

MIMI

MIMI 453

NMC1073033

SLEEPER

SLEEPER # 84

NMC250798

MIMI

MIMI 454

NMC1073034

SLEEPER

SLEEPER # 85

NMC250799

MIMI

MIMI 455

NMC1073035

SLEEPER

SLEEPER # 86

NMC250800

MIMI

MIMI 456

NMC1073036

SLEEPER

SLEEPER # 87

NMC250801

MIMI

MIMI 457

NMC1073037

NA

NA# 1

NMC250802

MIMI

MIMI 458

NMC1073038

NA

NA# 2

NMC250803

MIMI

MIMI 459

NMC1073039

NA

NA# 3

NMC250804

MIMI

MIMI 460

NMC1073040

NA

NA# 4

NMC250805

MIMI

MIMI 461

NMC1073041

NA

NA# 5

NMC250806

MIMI

MIMI 462

NMC1073042

NA

NA# 6

NMC250807

MIMI

MIMI 463

NMC1073043

NA

NA# 7

NMC250808

MIMI

MIMI 464

NMC1 073044

NA

NA# 8

NMC250809

MIMI

MIMI 465

NMC1073045

NA

NA# 9

NMC250810

MIMI

MIMI 466

NMC1073046

NA

NA# 10

NMC250811

MIMI

MIMI 467

NMC1073047

NA

NA# 11

NMC250812

MIMI

MIMI 468

NMC1073048

NA

NA# 12

NMC250813

MIMI

MIMI 469

NMC1073049

NA

NA# 13

NMC250814

MIMI

MIMI 470

NMC1073050

NA

NA# 14

NMC250815

MIMI

MIMI 471

NMC1073051

NA

NA# 15

NMC250816

MIMI

MIMI 472

NMC1073052

NA

NA# 16

NMC250817

MIMI

MIMI 473

NMC1073053

NA

NA# 17

NMC250818

MIMI

MIMI 474

NMC1073054

NA

NA# 18

NMC250819

MIMI

MIMI 475

NMC1073055

NA

NA# 19

NMC250820

MIMI

MIMI 476

NMC1073056

NA

NA#20

NMC250821

MIMI

MIMI 477

NMC1073057

NA

NA#21

NMC250822

MIMI

MIMI 478

NMC1073058

NA

NA#22

NMC250823

MIMI

MIMI 479

NMC1073059

NA

NA#23

NMC250824

MIMI

MIMI 480

NMC1073060

NA

NA#24

NMC250825

MIMI

MIMI 481

NMC1073061

NA

NA#25

NMC250826

MIMI

MIMI 482

NMC1073062

NA

NA#26

NMC250827

MIMI

MIMI 483

NMC1 073063

NA

NA#27

NMC250828

MIMI

MIMI 484

NMC1073064

NA

NA#28

NMC250829

MIMI

MIMI 485

NMC1073065

NA

NA#37

NMC250838

MIMI

MIMI 486

NMC1073066

27-3

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

NA

NA#38

NMC250839

MIMI

MIMI 487

NMC1073067

NA

NA#39

NMC250840

MIMI

MIMI 488

NMC1073068

NA

NA#40

NMC250841

MIMI

MIMI 489

NMC1073069

NA

NA#41

NMC250842

MIMI

MIMI 490

NMC1073070

NA

NA#42

NMC250843

MIMI

MIMI 491

NMC1073071

NA

NA#43

NMC250844

MIMI

MIMI 492

NMC1073072

NA

NA#44

NMC250845

MIMI

MIMI 493

NMC1073073

NA

NA#45

NMC250846

MIMI

MIMI 494

NMC1 073074

NA

NA#46

NMC250847

MIMI

MIMI 495

NMC1073075

NA

NA#47

NMC250848

MIMI

MIMI 496

NMC1073076

NA

NA#48

NMC250849

MIMI

MIMI 497

NMC1073077

NA

NA#49

NMC250850

MIMI

MIMI 498

NMC1073078

NA

NA#50

NMC250851

MIMI

MIMI 499

NMC1073079

NA

NA# 51

NMC250852

MIMI

MIMI 500

NMC1073080

NA

NA#52

NMC250853

MIMI

MIMI 501

NMC1073081

NA

NA#53

NMC250854

MIMI

MIMI 502

NMC 1073082

NA

NA# 54

NMC250855

MIMI

MIMI 503

NMC1073083

NA

NA#55

NMC250856

MIMI

MIMI 504

NMC1073084

NA

NA# 56

NMC250857

MIMI

MIMI 505

NMC1073085

NA

NA#57

NMC250858

MIMI

MIMI 506

NMC1073086

NA

NA# 58

NMC250859

MIMI

MIMI 507

NMC1073087

NA

NA# 59

NMC250860

MIMI

MIMI 508

NMC1073088

NA

NA# 60

NMC250861

MIMI

MIMI 509

NMC1 073089

NA

NA# 61

NMC250862

MIMI

MIMI 510

NMC1073090

NA

NA#62

NMC250863

MIMI

MIMI 511

NMC1073091

DRYLAKE

DRYLAKE# 4

NMC251345

MIMI

MIMI 512

NMC1073092

DRYLAKE

DRYLAKE# 15

NMC251346

MIMI

MIMI 513

NMC1 073093

DRYLAKE

DRYLAKE# 17

NMC251347

MIMI

MIMI 514

NMC1 073094

DRYLAKE

DRYLAKE# 18

NMC251348

MIMI

MIMI 515

NMC1073095

DRYLAKE

DRYLAKE # 20

NMC251350

MIMI

MIMI 516

NMC1073096

DRYLAKE

DRYLAKE# 21

NMC251351

MIMI

MIMI 517

NMC1 073097

DRYLAKE

DRYLAKE # 25

NMC251352

MIMI

MIMI 518

NMC1073098

DRYLAKE

DRYLAKE # 28

NMC251353

MIMI

MIMI 519

NMC1073099

DRYLAKE

DRYLAKE # 40

NMC251354

MIMI

MIMI 520

NMC1073100

NA

NA#63

NMC262286

MIMI

MIMI 521

NMC1073101

NA

NA#64

NMC262287

MIMI

MIMI 522

NMC1073102

NA

NA#65

NMC262288

MIMI

MIMI 523

NMC1073103

NA

NA#66

NMC262289

MIMI

MIMI 524

NMC1073104

NA

NA#67

NMC262290

MIMI

MIMI 525

NMC1073105

NA

NA#68

NMC262291

MIMI

MIMI 526

NMC1073106

27-4

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

NA

NA#69

NMC262292

MIMI

MIMI 527

NMC1073107

NA

NA#70

NMC262293

MIMI

MIMI 528

NMC1073108

NA

NA#71

NMC262294

MIMI

MIMI 529

NMC1073109

NA

NA#72

NMC262295

MIMI

MIMI 530

NMC1073110

NA

NA# 73

NMC262296

MIMI

MIMI 531

NMC1073111

NA

NA#74

NMC262297

MIMI

MIMI 532

NMC1073112

NA

NA# 75

NMC262298

MIMI

MIMI 533

NMC1073113

NA

NA#76

NMC262299

MIMI

MIMI 534

NMC1073114

NA

NA#77

NMC262300

MIMI

MIMI 535

NMC1073115

NA

NA# 78

NMC262301

MIMI

MIMI 536

NMC1073116

NA

NA#79

NMC262302

MIMI

MIMI 537

NMC1073117

NA

NA#80

NMC262303

MIMI

MIMI 538

NMC1073118

NA

NA#81

NMC262304

MIMI

MIMI 539

NMC1073119

NA

NA# 82

NMC262305

MIMI

MIMI 540

NMC1073120

NA

NA# 83

NMC262306

MIMI

MIMI 541

NMC1073121

NA

NA# 84

NMC262307

MIMI

MIMI 542

NMC1073122

NA

NA#85

NMC262308

MIMI

MIMI 543

NMC1073 123

NA

NA# 86

NMC262309

MIMI

MIMI 544

NMC1073124

NA

NA# 87

NMC262310

MIMI

MIMI 545

NMC1073125

NA

NA#88

NMC262311

MIMI

MIMI 546

NMC1073 126

NA

NA# 89

NMC262312

MIMI

MIMI 547

NMC1073127

NA

NA#90

NMC262313

MIMI

MIMI 548

NMC1073128

NA

NA#91

NMC262314

MIMI

MIMI 549

NMC1073129

NA

NA#92

NMC262315

MIMI

MIMI 550

NMC1073130

NA

NA#93

NMC262316

MIMI

MIMI 551

NMC1073131

NA

NA#94

NMC262317

MIMI

MIMI 552

NMC1073132

NA

NA#95

NMC321784

MIMI

MIMI 553

NMC1073133

NA

NA#96

NMC321785

MIMI

MIMI 554

NMC1073134

NA

NA#97

NMC321786

MIMI

MIMI 555

NMC1073135

NA

NA#98

NMC321787

MIMI

MIMI 556

NMC1073136

NA

NA#99

NMC321788

MIMI

MIMI 557

NMC1073137

NA

NA#100

NMC321789

MIMI

MIMI 558

NMC1073138

NA

NA#101

NMC321790

MIMI

MIMI 559

NMC1073139

NA

NA#102

NMC321791

MIMI

MIMI 560

NMC1073 140

NA

NA#103

NMC321792

MIMI

MIMI 561

NMC1073141

NA

NA#104

NMC321793

MIMI

MIMI 562

NMC1073142

NA

NA#105

NMC321794

MIMI

MIMI 563

NMC1073143

NA

NA#106

NMC321795

MIMI

MIMI 564

NMC1073144

NA

NA#107

NMC321796

MIMI

MIMI 565

NMC1073145

NA

NA#108

NMC321797

MIMI

MIMI 566

NMC1073146

27-5

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

NA

NA#109

NMC321798

MIMI

MIMI 567

NMC1073147

NA

NA#110

NMC321799

MIMI

MIMI 568

NMC1073148

NA

NA#111

NMC321800

MIMI

MIMI 569

NMC1073149

NA

NA#112

NMC321801

MIMI

MIMI 570

NMC1073150

NA

NA#113

NMC321802

MIMI

MIMI 571

NMC1073151

NA

NA#115

NMC321803

MIMI

MIMI 572

NMC1073152

NA

NA#116

NMC321804

MIMI

MIMI 573

NMC1073153

NA

NA#117

NMC321805

MIMI

MIMI 574

NMC1073154

NA

NA#118

NMC321806

MIMI

MIMI 575

NMC1073155

NA

NA#119

NMC321807

MIMI

MIMI 576

NMC1073156

NA

NA#120

NMC321808

MIMI

MIMI 577

NMC1073157

NA

NA#121

NMC321809

MIMI

MIMI 578

NMC1073158

NA

NA#122

NMC321810

MIMI

MIMI 579

NMC1073159

NA

NA#123

NMC321811

MIMI

MIMI 580

NMC1073160

NA

NA#124

NMC321812

MIMI

MIMI 581

NMC1073161

NA

NA#125

NMC321813

MIMI

MIMI 582

NMC1073162

NA

NA#126

NMC321814

MIMI

MIMI 583

NMC1073163

NA

NA#127

NMC321815

MIMI

MIMI 584

NMC1073164

NA

NA#128

NMC321816

MIMI

MIMI 585

NMC1073 165

NA

NA#129

NMC321817

MIMI

MIMI 586

NMC1073166

NA

NA#130

NMC321818

MIMI

MIMI 587

NMC1073167

NA

NA#131

NMC321819

MIMI

MIMI 588

NMC1073168

NA

NA#132

NMC321820

MIMI

MIMI 589

NMC1073169

NA

NA#133

NMC321821

MIMI

MIMI 590

NMC1073170

NA

NA#134

NMC321822

MIMI

MIMI 591

NMC1073171

NA

NA#135

NMC321823

MIMI

MIMI 592

NMC1073172

NA

NA#136

NMC321824

MIMI

MIMI 593

NMC1073173

NA

NA#137

NMC321825

MIMI

MIMI 594

NMC1073 174

NA

NA#138

NMC321826

MIMI

MIMI 595

NMC1073175

NA

NA#139

NMC321827

MIMI

MIMI 596

NMC1073176

NA

NA#140

NMC321828

MIMI

MIMI 597

NMC1073177

NA

NA#141

NMC321829

MIMI

MIMI 598

NMC1073 178

NA

NA#142

NMC321830

MIMI

MIMI 599

NMC1073179

NA

NA#143

NMC321831

MIMI

MIMI 600

NMC1073180

NA

NA#144

NMC321832

MIMI

MIMI 601

NMC1073181

NA

NA#145

NMC321833

MIMI

MIMI 602

NMC1073 182

NA

NA#146

NMC321834

MIMI

MIMI 603

NMC1073183

NA

NA#147

NMC321835

MIMI

MIMI 604

NMC1073184

NA

NA#148

NMC321836

MIMI

MIMI 605

NMC1073185

NA

NA#149

NMC321837

MIMI

MIMI 606

NMC1073 186

27-6

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

NA

NA#150

NMC321838

MIMI

MIMI 607

NMC1073187

NA

NA#151

NMC321839

MIMI

MIMI 608

NMC1073188

NA

NA#152

NMC321840

MIMI

MIMI 609

NMC1073189

NA

NA#153

NMC321841

MIMI

MIMI 610

NMC1073190

NA

NA#154

NMC321842

MIMI

MIMI 611

NMC1073191

NA

NA#155

NMC321843

MIMI

MIMI 612

NMC1073192

NA

NA#156

NMC321844

MIMI

MIMI 613

NMC1073193

NA

NA#157

NMC321845

MIMI

MIMI 614

NMC1073194

NA

NA#158

NMC321846

MIMI

MIMI 615

NMC1073195

NA

NA#159

NMC321847

MIMI

MIMI 616

NMC1073196

NA

NA#159A

NMC321848

MIMI

MIMI 617

NMC1073197

NA

NA#165

NMC321854

MIMI

MIMI 618

NMC1073198

NA

NA#166

NMC321855

MIMI

MIMI 619

NMC1073199

NA

NA#167

NMC321856

MIMI

MIMI 620

NMC1073200

NA

NA#168

NMC321857

MIMI

MIMI 621

NMC1073201

NA

NA#169

NMC321858

MIMI

MIMI 622

NMC1073202

NA

NA#170

NMC321859

MIMI

MIMI 623

NMC1073203

NA

NA#171

NMC321860

MIMI

MIMI 624

NMC1073204

NA

NA#172

NMC321861

MIMI

MIMI 625

NMC1 073205

NA

NA#173

NMC321862

MIMI

MIMI 626

NMC1 073206

NA

NA#174

NMC321863

MIMI

MIMI 627

NMC1073207

NA

NA#175

NMC321864

MIMI

MIMI 628

NMC1 073208

NA

NA#182

NMC321871

MIMI

MIMI 629

NMC1073209

NA

NA#183

NMC321872

MIMI

MIMI 630

NMC1073210

NA

NA#184

NMC321873

MIMI

MIMI 631

NMC1073211

NA

NA#185

NMC321874

MIMI

MIMI 632

NMC1073212

NA

NA#186

NMC321875

MIMI

MIMI 633

NMC1073213

NA

NA#187

NMC321876

MIMI

MIMI 634

NMC1073214

NA

NA#188

NMC321877

MIMI

MIMI 635

NMC1073215

NA

NA#189

NMC321878

MIMI

MIMI 636

NMC1073216

NA

NA#190

NMC321879

MIMI

MIMI 637

NMC1073217

NA

NA#191

NMC321880

MIMI

MIMI 638

NMC1073218

NA

NA#192

NMC321881

MIMI

MIMI 639

NMC1073219

NA

NA#193

NMC321882

MIMI

MIMI 640

NMC1073220

NA

NA#194

NMC321883

MIMI

MIMI 641

NMC1073221

NA

NA#195

NMC321884

MIMI

MIMI 642

NMC1 073222

NA

NA#196

NMC321885

MIMI

MIMI 643

NMC1073223

NA

NA#197

NMC321886

MIMI

MIMI 644

NMC1073224

NA

NA#198

NMC321887

MIMI

MIMI 645

NMC1073225

NA

NA#199

NMC321888

MIMI

MIMI 646

NMC1073226

27-7

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

NA

NA#206

NMC321895

MIMI

MIMI 647

NMC1 073227

NA

NA#207

NMC321896

MIMI

MIMI 648

NMC1073228

NA

NA#208

NMC321897

MIMI

MIMI 649

NMC1073229

NA

NA#209

NMC321898

MIMI

MIMI 650

NMC1073230

NA

NA#210

NMC321899

MIMI

MIMI 651

NMC1073231

NA

NA#211

NMC321900

MIMI

MIMI 652

NMC1073232

NA

NA#212

NMC321901

MIMI

MIMI 653

NMC1073233

NA

NA#213

NMC321902

MIMI

MIMI 654

NMC1073234

NA

NA#214

NMC321903

MIMI

MIMI 655

NMC1073235

NA

NA#215

NMC321904

MIMI

MIMI 656

NMC1073236

NA

NA#216

NMC321905

MIMI

MIMI 657

NMC1073237

NA

NA#217

NMC321906

MIMI

MIMI 658

NMC1073238

NA

NA#218

NMC321907

MIMI

MIMI 659

NMC1073239

NA

NA#219

NMC321908

MIMI

MIMI 660

NMC1073240

NA

NA#220

NMC321909

MIMI

MIMI 661

NMC1073241

NA

NA#221

NMC321910

MIMI

MIMI 662

NMC1073242

NA

NA#222

NMC321911

MIMI

MIMI 663

NMC1073243

NA

NA#223

NMC321912

MIMI

MIMI 664

NMC1073244

NA

NA#226

NMC321915

MIMI

MIMI 665

NMC1073245

NA

NA#227

NMC321916

MIMI

MIMI 666

NMC1 073246

SLEEPER

SLEEPER# 88

NMC322017

MIMI

MIMI 667

NMC1073247

SLEEPER

SLEEPER # 89

NMC322018

MIMI

MIMI 668

NMC1073248

SLEEPER

SLEEPER # 90

NMC322019

MIMI

MIMI 669

NMC1 073249

SLEEPER

SLEEPER#91

NMC322020

MIMI

MIMI 670

NMC1073250

SLEEPER

SLEEPER # 92

NMC322021

MIMI

MIMI 671

NMC1073251

SLEEPER

SLEEPER # 93

NMC322022

MIMI

MIMI 672

NMC1073252

SLEEPER

SLEEPER # 94

NMC322023

MIMI

MIMI 673

NMC1073253

SLEEPER

SLEEPER # 95

NMC322024

MIMI

MIMI 674

NMC1073254

SLEEPER

SLEEPER # 96

NMC322025

MIMI

MIMI 675

NMC1073255

SLEEPER

SLEEPER # 97

NMC322026

MIMI

MIMI 676

NMC1073256

SLEEPER

SLEEPER # 98

NMC322027

MIMI

MIMI 677

NMC1073257

SLEEPER

SLEEPER # 99

NMC322028

MIMI

MIMI 678

NMC1073258

SLEEPER

SLEEPER#100

NMC322029

MIMI

MIMI 679

NMC1073259

SLEEPER

SLEEPER#101

NMC322030

MIMI

MIMI 680

NMC1 073260

SLEEPER

SLEEPER#102

NMC322031

MIMI

MIMI 681

NMC1073261

SLEEPER

SLEEPER#103

NMC322032

MIMI

MIMI 682

NMC1073262

SLEEPER

SLEEPER#104

NMC322033

MIMI

MIMI 683

NMC1073263

SLEEPER

SLEEPER#105

NMC322034

MIMI

MIMI 684

NMC1073264

SLEEPER

SLEEPER#106

NMC322035

MIMI

MIMI 685

NMC1073265

SLEEPER

SLEEPER#107

NMC322036

MIMI

MIMI 686

NMC1073266

27-8

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

SLEEPER

SLEEPER#108

NMC322037

MIMI

MIMI 687

NMC1 073267

SLEEPER

SLEEPER#109

NMC322038

MIMI

MIMI 688

NMC1073268

SLEEPER

SLEEPER#110

NMC322039

MIMI

MIMI 689

NMC1073269

SLEEPER

SLEEPER#111

NMC322040

MIMI

MIMI 690

NMC1073270

SLEEPER

SLEEPER#112

NMC322041

MIMI

MIMI 691

NMC1073271

SLEEPER

SLEEPER#113

NMC322042

MIMI

MIMI 692

NMC1 073272

SLEEPER

SLEEPER#114

NMC322043

MIMI

MIMI 693

NMC1073273

SLEEPER

SLEEPER#! 15

NMC322044

MIMI

MIMI 694

NMC1073274

SLEEPER

SLEEPER#116

NMC322045

MIMI

MIMI 695

NMC1 073275

SLEEPER

SLEEPER#117

NMC322046

MIMI

MIMI 696

NMC1 073276

SLEEPER

SLEEPER #118

NMC322047

MIMI

MIMI 697

NMC1 073277

SLEEPER

SLEEPER#119

NMC322048

MIMI

MIMI 698

NMC1073278

SLEEPER

SLEEPER#120

NMC322049

MIMI

MIMI 699

NMC1 073279

SLEEPER

SLEEPER#121

NMC322050

MIMI

MIMI 700

NMC1073280

SLEEPER

SLEEPER#122

NMC322051

MIMI

MIMI 701

NMC1073281

SLEEPER

SLEEPER#123

NMC322052

MIMI

MIMI 702

NMC1073282

SLEEPER

SLEEPER#124

NMC322053

MIMI

MIMI 703

NMC1073283

SLEEPER

SLEEPER#125

NMC322054

MIMI

MIMI 704

NMC1 073284

SLEEPER

SLEEPER#126

NMC322055

MIMI

MIMI 705

NMC1 073285

SLEEPER

SLEEPER#127

NMC322056

MIMI

MIMI 706

NMC1073286

SLEEPER

SLEEPER#128

NMC322057

MIMI

MIMI 707

NMC1073287

SLEEPER

SLEEPER#129

NMC322058

MIMI

MIMI 708

NMC1073288

SLEEPER

SLEEPER#130

NMC322059

MIMI

MIMI 709

NMC1073289

SLEEPER

SLEEPER#131

NMC322060

MIMI

MIMI 710

NMC1 073290

SLEEPER

SLEEPER#132

NMC322061

MIMI

MIMI 711

NMC1073291

SLEEPER

SLEEPER#133

NMC322062

MIMI

MIMI 712

NMC1073292

SLEEPER

SLEEPER#134

NMC322063

MIMI

MIMI 713

NMC1073293

SLEEPER

SLEEPER#135

NMC322064

MIMI

MIMI 714

NMC1073294

SLEEPER

SLEEPER#136

NMC322065

MIMI

MIMI 715

NMC1073295

SLEEPER

SLEEPER#137

NMC322066

MIMI

MIMI 716

NMC1073296

SLEEPER

SLEEPER#138

NMC322067

MIMI

MIMI 717

NMC1073297

SLEEPER

SLEEPER#139

NMC322068

MIMI

MIMI 718

NMC1073298

SLEEPER

SLEEPER#140

NMC322069

MIMI

MIMI 719

NMC1073299

SLEEPER

SLEEPER#141

NMC322070

MIMI

MIMI 720

NMC1073300

SLEEPER

SLEEPER#142

NMC322071

MIMI

MIMI 721

NMC1073301

SLEEPER

SLEEPER#143

NMC322072

MIMI

MIMI 722

NMC1073302

SLEEPER

SLEEPER#144

NMC322073

MIMI

MIMI 723

NMC1073303

SLEEPER

SLEEPER#145

NMC322074

MIMI

MIMI 724

NMC1073304

SLEEPER

SLEEPER#146

NMC322075

MIMI

MIMI 725

NMC1073305

SLEEPER

SLEEPER#147

NMC322076

MIMI

MIMI 726

NMC1073306

27-9

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

SLEEPER

SLEEPER#148

NMC322077

MIMI

MIMI 727

NMC1073307

SLEEPER

SLEEPER#149

NMC322078

MIMI

MIMI 728

NMC1073308

SLEEPER

SLEEPER#150

NMC322079

MIMI

MIMI 729

NMC1073309

SLEEPER

SLEEPER#151

NMC322080

MIMI

MIMI 730

NMC1073310

SLEEPER

SLEEPER#152

NMC322081

MIMI

MIMI 731

NMC1073311

SLEEPER

SLEEPER#153

NMC322082

MIMI

MIMI 732

NMC1073312

SLEEPER

SLEEPER#154

NMC322083

MIMI

MIMI 733

NMC1073313

SLEEPER

SLEEPER#155

NMC322084

MIMI

MIMI 734

NMC1073314

SLEEPER

SLEEPER#156

NMC322085

MIMI

MIMI 735

NMC1073315

SLEEPER

SLEEPER#157

NMC322086

MIMI

MIMI 736

NMC1073316

SLEEPER

SLEEPER#158

NMC322087

MIMI

MIMI 737

NMC1073317

SLEEPER

SLEEPER#159

NMC322088

MIMI

MIMI 738

NMC1073318

SLEEPER

SLEEPER#160

NMC322089

MIMI

MIMI 739

NMC1073319

SLEEPER

SLEEPER#161

NMC322090

MIMI

MIMI 740

NMC1073320

SLEEPER

SLEEPER#162

NMC322091

MIMI

MIMI 741

NMC1073321

SLEEPER

SLEEPER#163

NMC322092

MIMI

MIMI 742

NMC1073322

SLEEPER

SLEEPER#164

NMC322093

MIMI

MIMI 743

NMC1073323

SLEEPER

SLEEPER#165

NMC322094

MIMI

MIMI 744

NMC1073324

SLEEPER

SLEEPER#166

NMC322095

MIMI

MIMI 745

NMC1073325

SLEEPER

SLEEPER#167

NMC322096

MIMI

MIMI 746

NMC1073326

SLEEPER

SLEEPER#168

NMC322097

MIMI

MIMI 747

NMC1073327

SLEEPER

SLEEPER#169

NMC322098

MIMI

MIMI 748

NMC1073328

SLEEPER

SLEEPER#170

NMC322099

MIMI

MIMI 749

NMC1073329

SLEEPER

SLEEPER#171

NMC322100

MIMI

MIMI 750

NMC1073330

SLEEPER

SLEEPER#172

NMC322101

MIMI

MIMI 751

NMC1073331

SLEEPER

SLEEPER#173

NMC322102

MIMI

MIMI 752

NMC1073332

SLEEPER

SLEEPER#174

NMC322103

MIMI

MIMI 753

NMC1073333

SLEEPER

SLEEPER#175

NMC322104

MIMI

MIMI 754

NMC1073334

SLEEPER

SLEEPER#176

NMC322105

MIMI

MIMI 755

NMC1073335

SLEEPER

SLEEPER#177

NMC322106

MIMI

MIMI 756

NMC1073336

SLEEPER

SLEEPER#178

NMC322107

MIMI

MIMI 757

NMC1073337

SLEEPER

SLEEPER#179

NMC322108

MIMI

MIMI 758

NMC1073338

SLEEPER

SLEEPER#180

NMC322109

MIMI

MIMI 759

NMC1073339

SLEEPER

SLEEPER#181

NMC322110

MIMI

MIMI 760

NMC1073340

SLEEPER

SLEEPER#182

NMC322111

MIMI

MIMI 761

NMC1073341

SLEEPER

SLEEPER#183

NMC322112

MIMI

MIMI 762

NMC1 073342

SLEEPER

SLEEPER#184

NMC322113

MIMI

MIMI 763

NMC1073343

SLEEPER

SLEEPER#185

NMC322114

MIMI

MIMI 764

NMC1073344

SLEEPER

SLEEPER#186

NMC322115

MIMI

MIMI 765

NMC1073345

SLEEPER

SLEEPER#187

NMC322116

MIMI

MIMI 766

NMC1073346

27-10

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

SLEEPER

SLEEPER#188

NMC322117

MIMI

MIMI 767

NMC1 073347

SLEEPER

SLEEPER#189

NMC322118

MIMI

MIMI 768

NMC1073348

SLEEPER

SLEEPER#190

NMC322119

MIMI

MIMI 769

NMC1073349

SLEEPER

SLEEPER#191

NMC322120

MIMI

MIMI 770

NMC1073350

SLEEPER

SLEEPER#192

NMC322121

MIMI

MIMI 771

NMC1073351

SLEEPER

SLEEPER#193

NMC322122

MIMI

MIMI 772

NMC1073352

SLEEPER

SLEEPER#194

NMC322123

MIMI

MIMI 773

NMC1073353

SLEEPER

SLEEPER#195

NMC322124

MIMI

MIMI 774

NMC1073354

SLEEPER

SLEEPER#196

NMC322125

MIMI

MIMI 775

NMC1073355

SLEEPER

SLEEPER#197

NMC322126

MIMI

MIMI 776

NMC1073356

SLEEPER

SLEEPER#198

NMC322127

MIMI

MIMI 777

NMC1073357

SLEEPER

SLEEPER#199

NMC322128

MIMI

MIMI 778

NMC1073358

SLEEPER

SLEEPER#200

NMC322129

MIMI

MIMI 779

NMC1073359

SLEEPER

SLEEPER#201

NMC322130

MIMI

MIMI 780

NMC1073360

SLEEPER

SLEEPER#202

NMC322131

MIMI

MIMI 786

NMC1073361

SLEEPER

SLEEPER#203

NMC322132

MIMI

MIMI 787

NMC1073362

SLEEPER

SLEEPER#204

NMC322133

MIMI

MIMI 788

NMC1073363

SLEEPER

SLEEPER#205

NMC322134

MIMI

MIMI 789

NMC1073364

SLEEPER

SLEEPER#206

NMC322135

MIMI

MIMI 790

NMC1073365

SLEEPER

SLEEPER#207

NMC322136

MIMI

MIMI 791

NMC1073366

SLEEPER

SLEEPER#208

NMC322137

MIMI

MIMI 792

NMC1073367

SLEEPER

SLEEPER#209

NMC322138

MIMI

MIMI 793

NMC1073368

SLEEPER

SLEEPER#210

NMC322139

MIMI

MIMI 794

NMC1073369

SLEEPER

SLEEPER#312

NMC405562

MIMI

MIMI 795

NMC1073370

SLEEPER

SLEEPER#317

NMC405567

MIMI

MIMI 796

NMC1073371

SLEEPER

SLEEPER#318

NMC405568

MIMI

MIMI 797

NMC1 073372

SLEEPER

SLEEPER#319

NMC405569

MIMI

MIMI 798

NMC1073373

SLEEPER

SLEEPER#320

NMC405570

MIMI

MIMI 799

NMC1073374

SLEEPER

SLEEPER#321

NMC405571

MIMI

MIMI 800

NMC1073375

SLEEPER

SLEEPER#326

NMC405576

MIMI

MIMI 801

NMC1073376

SLEEPER

SLEEPER#327

NMC405577

MIMI

MIMI 802

NMC1073377

SLEEPER

SLEEPER#328

NMC405578

MIMI

MIMI 803

NMC1073378

SLEEPER

SLEEPER#329

NMC405579

MIMI

MIMI 804

NMC1073379

SLEEPER

SLEEPER#330

NMC405580

MIMI

MIMI 805

NMC1073380

SLEEPER

SLEEPER#335

NMC405585

MIMI

MIMI 806

NMC1073381

SLEEPER

SLEEPER#336

NMC405586

MIMI

MIMI 807

NMC1073382

SLEEPER

SLEEPER#337

NMC405587

MIMI

MIMI 808

NMC1073383

SLEEPER

SLEEPER#338

NMC405588

MIMI

MIMI 809

NMC1073384

SLEEPER

SLEEPER#339

NMC405589

MIMI

MIMI 810

NMC1073385

SLEEPER

SLEEPER#343

NMC405593

MIMI

MIMI 811

NMC1073386

27-11

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

SLEEPER

SLEEPER#344

NMC405594

MIMI

MIMI 812

NMC1073387

SLEEPER

SLEEPER#345

NMC405595

MIMI

MIMI 813

NMC1073388

SLEEPER

SLEEPER#346

NMC405596

MIMI

MIMI 814

NMC1073389

SLEEPER

SLEEPER#347

NMC405597

MIMI

MIMI 815

NMC1 073390

SLEEPER

SLEEPER#348

NMC405598

MIMI

MIMI 816

NMC1073391

SLEEPER

SLEEPER#349

NMC405599

MIMI

MIMI 817

NMC1073392

SLEEPER

SLEEPER#350

NMC405600

MIMI

MIMI 818

NMC1073393

SLEEPER

SLEEPER#351

NMC405601

MIMI

MIMI 819

NMC1073394

SLEEPER

SLEEPER#352

NMC405602

MIMI

MIMI 820

NMC1073395

SLEEPER

SLEEPER#353

NMC405603

MIMI

MIMI 821

NMC1073396

SLEEPER

SLEEPER#354

NMC405604

MIMI

MIMI 822

NMC1073397

SLEEPER

SLEEPER#355

NMC405605

MIMI

MIMI 823

NMC1073398

SLEEPER

SLEEPER#356

NMC405606

MIMI

MIMI 824

NMC1073399

SLEEPER

SLEEPER#357

NMC405607

MIMI

MIMI 825

NMC1073400

SLEEPER

SLEEPER#358

NMC405608

MIMI

MIMI 826

NMC1073401

SLEEPER

SLEEPER#359

NMC405609

MIMI

MIMI 827

NMC1073402

SLEEPER

SLEEPER#360

NMC405610

MIMI

MIMI 828

NMC1073403

SLEEPER

SLEEPER#361

NMC405611

MIMI

MIMI 829

NMC1073404

SLEEPER

SLEEPER#362

NMC405612

MIMI

MIMI 830

NMC1073405

SLEEPER

SLEEPER#363

NMC405613

MIMI

MIMI 831

NMC1073406

SLEEPER

SLEEPER#364

NMC405614

MIMI

MIMI 832

NMC1073407

SLEEPER

SLEEPER#365

NMC405615

MIMI

MIMI 833

NMC1073408

SLEEPER

SLEEPER#366

NMC405616

MIMI

MIMI 834

NMC1 073409

SLEEPER

SLEEPER#367

NMC405617

MIMI

MIMI 835

NMC1073410

SLEEPER

SLEEPER#368

NMC405618

MIMI

MIMI 836

NMC1073411

SLEEPER

SLEEPER#369

NMC405619

MIMI

MIMI 837

NMC1073412

SLEEPER

SLEEPER#370

NMC405620

MIMI

MIMI 838

NMC 1073413

SLEEPER

SLEEPER#371

NMC405621

MIMI

MIMI 839

NMC1073414

SLEEPER

SLEEPER#372

NMC405622

MIMI

MIMI 840

NMC1073415

SLEEPER

SLEEPER#373

NMC405623

MIMI

MIMI 841

NMC1073416

SLEEPER

SLEEPER#374

NMC405624

MIMI

MIMI 842

NMC1073417

SLEEPER

SLEEPER#375

NMC405625

MIMI

MIMI 843

NMC1073418

SLEEPER

SLEEPER#376

NMC405626

MIMI

MIMI 844

NMC1073419

LAM

LAM 90

NMC764009

MIMI

MIMI 845

NMC1073420

LAM

LAM 91

NMC764010

MIMI

MIMI 846

NMC1073421

LAM

LAM 92

NMC764011

MIMI

MIMI 847

NMC1073422

LAM

LAM 93

NMC764012

MIMI

MIMI 848

NMC1073423

LAM

LAM 94

NMC764013

MIMI

MIMI 849

NMC1073424

LAM

LAM 95

NMC764014

MIMI

MIMI 850

NMC1073425

LAM

LAM 96

NMC764015

MIMI

MIMI 851

NMC1073426

27-12

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

LAM

LAM 97

NMC764016

MIMI

MIMI 852

NMC1073427

LAM

LAM 98

NMC764017

MIMI

MIMI 853

NMC1073428

LAM

LAM 99

NMC764018

MIMI

MIMI 854

NMC1073429

LAM

LAM 100

NMC764019

MIMI

MIMI 855

NMC1073430

LAM

LAM 102

NMC764021

MIMI

MIMI 856

NMC1073431

LAM

LAM 104

NMC764023

MIMI

MIMI 857

NMC1073432

LAM

LAM 106

NMC764025

MIMI

MIMI 858

NMC1073433

LAM

LAM 108

NMC764027

MIMI

MIMI 859

NMC1073434

LAM

LAM 110

NMC764029

MIMI

MIMI 860

NMC1073435

LAM

LAM 112

NMC764031

MIMI

MIMI 861

NMC1073436

LAM

LAM 114

NMC764033

MIMI

MIMI 862

NMC1073437

LAM

LAM 116

NMC764035

MIMI

MIMI 863

NMC1073438

LAM

LAM 118

NMC764037

MIMI

MIMI 864

NMC1 073439

LAM

LAM 120

NMC764039

MIMI

MIMI 865

NMC1073440

LAM

LAM 122

NMC764041

MIMI

MIMI 866

NMC1073441

LAM

LAM 124

NMC764043

MIMI

MIMI 867

NMC1073442

LAM

LAM 126

NMC764045

MIMI

MIMI 868

NMC1073443

LAM

LAM 128

NMC764047

MIMI

MIMI 869

NMC1073444

LAM

LAM 130

NMC764049

MIMI

MIMI 870

NMC1 073445

LAM

LAM 132

NMC764051

MIMI

MIMI 871

NMC1073446

LAM

LAM 134

NMC764053

MIMI

MIMI 872

NMC1073447

LAM

LAM 136

NMC764055

MIMI

MIMI 873

NMC1073448

LAM

LAM 138

NMC764057

MIMI

MIMI 874

NMC1073449

LAM

LAM 140

NMC764059

MIMI

MIMI 875

NMC1073450

LAM

LAM 142

NMC764061

MIMI

MIMI 876

NMC1073451

LAM

LAM 144

NMC764063

MIMI

MIMI 877

NMC1 073452

LAM

LAM 146

NMC764065

MIMI

MIMI 878

NMC1073453

LAM

LAM 148

NMC764067

MIMI

MIMI 879

NMC1073454

LAM

LAM 150

NMC764069

MIMI

MIMI 880

NMC1 073455

LAM

LAM 152

NMC764071

MIMI

MIMI 881

NMC1073456

LAM

LAM 153

NMC764072

MIMI

MIMI 882

NMC1073457

LAM

LAM 154

NMC764073

MIMI

MIMI 883

NMC1073458

LAM

LAM 155

NMC764074

MIMI

MIMI 884

NMC1073459

LAM

LAM 156

NMC764075

MIMI

MIMI 885

NMC1073460

LAM

LAM 157

NMC764076

MIMI

MIMI 886

NMC1073461

LAM

LAM 158

NMC764077

MIMI

MIMI 887

NMC1073462

LAM

LAM 159

NMC764078

MIMI

MIMI 888

NMC1073463

LAM

LAM 160

NMC764079

MIMI

MIMI 889

NMC1073464

LAM

LAM 161

NMC764080

MIMI

MIMI 890

NMC1073465

LAM

LAM 162

NMC764081

MIMI

MIMI 891

NMC1073466

27-13

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

LAM

LAM 163

NMC764082

MIMI

MIMI 892

NMC1073467

LAM

LAM 164

NMC764083

MIMI

MIMI 893

NMC1073468

LAM

LAM 165

NMC764084

MIMI

MIMI 894

NMC1073469

LAM

LAM 166

NMC764085

MIMI

MIMI 895

NMC1073470

LAM

LAM 167

NMC764086

MIMI

MIMI 896

NMC1073471

LAM

LAM 168

NMC764087

MIMI

MIMI 897

NMC1073472

LAM

LAM 169

NMC764088

MIMI

MIMI 898

NMC1073473

LAM

LAM 170

NMC764089

MIMI

MIMI 899

NMC1073474

LAM

LAM 171

NMC764090

MIMI

MIMI 900

NMC1073475

LAM

LAM 172

NMC764091

MIMI

MIMI 901

NMC1073476

LAM

LAM 173

NMC764092

MIMI

MIMI 902

NMC 1073477

LAM

LAM 174

NMC764093

MIMI

MIMI 903

NMC1 073478

LAM

LAM 175

NMC764094

MIMI

MIMI 904

NMC1073479

LAM

LAM 176

NMC764095

MIMI

MIMI 905

NMC1073480

LAM

LAM 177

NMC764096

MIMI

MIMI 906

NMC1073481

LAM

LAM 178

NMC771946

MIMI

MIMI 907

NMC1073482

LAM

LAM 180

NMC771947

MIMI

MIMI 908

NMC1073483

LAM

LAM 181

NMC771948

MIMI

MIMI 909

NMC1073484

LAM

LAM 182

NMC771949

MIMI

MIMI 910

NMC1073485

LAM

LAM 183

NMC771950

MIMI

MIMI 911

NMC1073486

LAM

LAM 184

NMC771951

MIMI

MIMI 912

NMC1073487

LAM

LAM 185

NMC771952

MIMI

MIMI 913

NMC1073488

LAM

LAM 186

NMC771953

MIMI

MIMI 914

NMC1073489

LAM

LAM 187

NMC771954

MIMI

MIMI 915

NMC1073490

LAM

LAM 188

NMC771955

MIMI

MIMI 916

NMC1073491

LAM

LAM 189

NMC771956

MIMI

MIMI 917

NMC1073492

LAM

LAM 191

NMC771958

MIMI

MIMI 918

NMC1073493

LAM

LAM 192

NMC771959

MIMI

MIMI 919

NMC1073494

LAM

LAM 193

NMC771960

MIMI

MIMI 920

NMC1073495

LAM

LAM 194

NMC771961

MIMI

MIMI 921

NMC1073496

LAM

LAM 195

NMC771962

MIMI

MIMI 922

NMC1073497

LAM

LAM 196

NMC771963

MIMI

MIMI 923

NMC1073498

LAM

LAM 197

NMC771964

MIMI

MIMI 924

NMC1073499

LAM

LAM 198

NMC771965

MIMI

MIMI 925

NMC1073500

LAM

LAM 199

NMC771966

MIMI

MIMI 926

NMC1073501

LAM

LAM 200

NMC771967

MIMI

MIMI 927

NMC1073502

LAM

LAM 201

NMC771968

MIMI

MIMI 928

NMC1073503

LAM

LAM 202

NMC771969

MIMI

MIMI 929

NMC1073504

LAM

LAM 203

NMC771970

MIMI

MIMI 930

NMC1073505

PDSLP

PDSLP 104

NMC778341

MIMI

MIMI 931

NMC1073506

27-14

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

PDSLP

PDSLP 106

NMC778342

MIMI

MIMI 932

NMC1073507

PDSLP

PDSLP 108

NMC778343

MIMI

MIMI 933

NMC1073508

PDSLP

PDSLP 110

NMC778344

MIMI

MIMI 934

NMC1073509

PDSLP

PDSLP 112

NMC778346

MIMI

MIMI 935

NMC1073510

PDSLP

PDSLP 114

NMC778348

MIMI

MIMI 936

NMC1073511

PDSLP

PDSLP 116

NMC778350

MIMI

MIMI 937

NMC1073512

PDSLP

PDSLP 118

NMC778352

MIMI

MIMI 938

NMC1073513

PDSLP

PDSLP 120

NMC778354

MIMI

MIMI 939

NMC1073514

PDSLP

PDSLP 122

NMC778356

MIMI

MIMI 955

NMC1077567

PDSLP

PDSLP 124

NMC778358

MIMI

MIMI 956

NMC1 077568

PDSLP

PDSLP 126

NMC778360

MIMI

MIMI 957

NMC1077569

PDSLP

PDSLP 128

NMC778362

MIMI

MIMI 958

NMC1077570

PDSLP

PDSLP 130

NMC778364

MIMI

MIMI 959

NMC1077571

PDSLP

PDSLP 132

NMC778366

MIMI

MIMI 960

NMC1077572

PDSLP

PDSLP 134

NMC778368

MIMI

MIMI 961

NMC1077573

PDSLP

PDSLP 136

NMC778370

MIMI

MIMI 962

NMC1077574

PDSLP

PDSLP 138

NMC778372

MIMI

MIMI 963

NMC1077575

PDSLP

PDSLP 140

NMC778374

MIMI

MIMI 964

NMC1077576

PDSLP

PDSLP 142

NMC778376

MIMI

MIMI 965

NMC1077577

PDSLP

PDSLP 144

NMC778378

MIMI

MIMI 966

NMC1077578

PDSLP

PDSLP 146

NMC778380

MIMI

MIMI 940

NMC1080362

PDSLP

PDSLP 148

NMC778382

MIMI

MIMI 941

NMC1080363

PDSLP

PDSLP 177

NMC778383

MIMI

MIMI 942

NMC1 080364

PDSLP

PDSLP 178

NMC778384

MIMI

MIMI 943

NMC1 080365

PDSLP

PDSLP 179

NMC778385

MIMI

MIMI 944

NMC1080366

PDSLP

PDSLP 180

NMC778386

MIMI

MIMI 945

NMC1080367

PDSLP

PDSLP 181

NMC778387

MIMI

MIMI 946

NMC1080368

PDSLP

PDSLP 182

NMC778388

MIMI

MIMI 947

NMC1080369

PDSLP

PDSLP 183

NMC778389

MIMI

MIMI 948

NMC1080370

PDSLP

PDSLP 184

NMC778390

MIMI

MIMI 949

NMC1080371

PDSLP

PDSLP 185

NMC778391

MIMI

MIMI 950

NMC1080372

PDSLP

PDSLP 186

NMC778392

MIMI

MIMI 951

NMC1080373

PDSLP

PDSLP 187

NMC778393

MIMI

MIMI 952

NMC1080374

PDSLP

PDSLP 188

NMC778394

MIMI

MIMI 953

NMC1080375

PDSLP

PDSLP 189

NMC778395

MIMI

MIMI 954

NMC1080376

PDSLP

PDSLP 190

NMC778396

ELECTRUM

ELECTRUM # 11

NMC235675

PDSLP

PDSLP 191

NMC778397

ELECTRUM

ELECTRUM# 12

NMC235676

PDSLP

PDSLP 192

NMC778398

ELECTRUM

ELECTRUM# 13

NMC235677

PDSLP

PDSLP 193

NMC778399

ELECTRUM

ELECTRUM#21

NMC239887

PDSLP

PDSLP 194

NMC778400

ELECTRUM

ELECTRUM # 23

NMC239889

27-15

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

PDSLP

PDSLP 195

NMC778401

FREE GOLD

FREE GOLD# 1

NMC252825

PDSLP

PDSLP 196

NMC778402

FREE GOLD

FREE GOLD# 2

NMC252826

PDSLP

PDSLP 197

NMC778403

FREE GOLD

FREE GOLD# 3

NMC252827

PDSLP

PDSLP 198

NMC778404

FREE GOLD

FREE GOLD # 4

NMC252828

PDSLP

PDSLP 199

NMC778405

FREE GOLD

FREE GOLD# 5

NMC252829

PDSLP

PDSLP 200

NMC778406

FREE GOLD

FREE GOLD# 6

NMC252830

PDSLP

PDSLP 201

NMC778407

FREE GOLD

FREE GOLD# 7

NMC252831

PDSLP

PDSLP 202

NMC778408

FREE GOLD

FREE GOLD# 8

NMC252832

PDSLP

PDSLP 203

NMC778409

FREE GOLD

FREE GOLD# 9

NMC252833

PDSLP

PDSLP 204

NMC778410

FREE GOLD

FREE GOLD# 10

NMC252834

PDSLP

PDSLP 230

NMC778415

DAY

DAYLIGHT FRACTION

NMC269681

PDSLP

PDSLP 231

NMC778416

RR

RR#2

NMC340619

PDSLP

PDSLP 232

NMC778417

RR

RR#13

NMC340630

PDSLP

PDSLP 233

NMC778418

RR

RR#24

NMC340641

PDSLP

PDSLP 234

NMC778419

RR

RR#26

NMC340643

PDSLP

PDSLP 235

NMC778420

RR

RR#28

NMC340645

PDSLP

PDSLP 236

NMC778421

RR

RR#35

NMC340652

PDSLP

PDSLP 237

NMC778422

RR

RR#37

NMC340654

PDSLP

PDSLP 238

NMC778423

RR

RR#38

NMC340655

PDSLP

PDSLP 239

NMC778424

RR

RR#39

NMC340656

PDSLP

PDSLP 240

NMC778425

RR

RR#40

NMC340657

PDSLP

PDSLP 241

NMC778426

ELECTRUM

ELECTRUM# 1

NMC371654

PDSLP

PDSLP 242

NMC778427

ELECTRUM

ELECTRUM# 2

NMC371655

PDSLP

PDSLP 243

NMC778428

ELECTRUM

ELECTRUM# 3

NMC371656

PDSLP

PDSLP 244

NMC778429

LLY

LLY 1

NMC683286

PDSLP

PDSLP 245

NMC778430

LLY

LLY2

NMC683287

PDSLP

PDSLP 246

NMC778431

LLY

LLY 3

NMC683288

PDSLP

PDSLP 247

NMC778432

LLY

LLY 4

NMC683289

PDSLP

PDSLP 248

NMC778433

LLY

LLY 5

NMC683290

PDSLP

PDSLP 249

NMC778434

LLY

LLY 6

NMC683291

PDSLP

PDSLP 250

NMC778435

LLY

LLY 7

NMC683292

PDSLP

PDSLP 251

NMC778436

LLY

LLY 8

NMC683293

PDSLP

PDSLP 252

NMC778437

LLY

LLY 9

NMC683294

PDSLP

PDSLP 253

NMC778438

LLY

LLY 10

NMC683295

PDSLP

PDSLP 254

NMC778439

LLY

LLY 11

NMC683296

PDSLP

PDSLP 279

NMC778448

LLY

LLY 12

NMC683297

PDSLP

PDSLP 280

NMC778449

LLY

LLY 13

NMC683298

PDSLP

PDSLP 281

NMC778450

LLY

LLY 14

NMC683299

PDSLP

PDSLP 282

NMC778451

LLY

LLY 15

NMC683300

PDSLP

PDSLP 283

NMC778452

LLY

LLY 16

NMC683301

27-16

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

PDSLP

PDSLP 284

NMC778453

LLY

LLY 17

NMC683302

PDSLP

PDSLP 285

NMC778454

LLY

LLY 18

NMC683303

PDSLP

PDSLP 286

NMC778455

LLY

LLY 19

NMC683304

PDSLP

PDSLP 287

NMC778456

LLY

LLY 20

NMC683305

PDSLP

PDSLP 288

NMC778457

LLY

LLY 21

NMC683306

PDSLP

PDSLP 289

NMC778458

LLY

LLY 22

NMC683307

PDSLP

PDSLP 290

NMC778459

LLY

LLY 23

NMC683308

PDSLP

PDSLP 291

NMC778460

LLY

LLY 24

NMC683309

PDSLP

PDSLP 292

NMC778461

LLY

LLY 25

NMC683310

PDSLP

PDSLP 293

NMC778462

LLY

LLY 26

NMC683311

PDSLP

PDSLP 294

NMC778463

LLY

LLY 27

NMC683312

PDSLP

PDSLP 295

NMC778464

LLY

LLY 28

NMC683313

PDSLP

PDSLP 296

NMC778465

LLY

LLY 29

NMC683314

PDSLP

PDSLP 297

NMC778466

LLY

LLY 30

NMC683315

PDSLP

PDSLP 298

NMC778467

LLY

LLY 31

NMC683316

PDSLP

PDSLP 299

NMC778468

LLY

LLY 32

NMC683317

PDSLP

PDSLP 300

NMC778469

LLY

LLY 33

NMC683318

PDSLP

PDSLP 325

NMC778478

LLY

LLY 34

NMC683319

PDSLP

PDSLP 326

NMC778479

LLY

LLY 35

NMC683320

PDSLP

PDSLP 327

NMC778480

LLY

LLY36

NMC683321

PDSLP

PDSLP 328

NMC778481

LLY

LLY 37

NMC683322

PDSLP

PDSLP 329

NMC778482

LLY

LLY 38

NMC683323

PDSLP

PDSLP 330

NMC778483

LLY

LLY 39

NMC683324

PDSLP

PDSLP 331

NMC778484

DAY

DAY 1

NMC700996

PDSLP

PDSLP 332

NMC778485

DAY

DAY 2

NMC700997

PDSLP

PDSLP 333

NMC778486

DAY

DAY 3

NMC700998

PDSLP

PDSLP 334

NMC778487

DAY

DAY 4

NMC700999

PDSLP

PDSLP 335

NMC778488

DAY

DAY 5

NMC701000

PDSLP

PDSLP 336

NMC778489

DAY

DAY 6

NMC701001

PDSLP

PDSLP 337

NMC778490

DAY

DAY 7

NMC701002

PDSLP

PDSLP338

NMC778491

DAY

DAY 8

NMC701003

PDSLP

PDSLP 339

NMC778492

DAY

DAY 9

NMC701004

PDSLP

PDSLP 340

NMC778493

DAY

DAY 10

NMC701005

PDSLP

PDSLP 341

NMC778494

DAY

DAY 11

NMC701006

PDSLP

PDSLP 342

NMC778495

DAY

DAY 12

NMC701007

PDSLP

PDSLP 343

NMC778496

DAY

DAY 13

NMC701008

PDSLP

PDSLP 344

NMC778497

DAY

DAY 14

NMC701009

PDSLP

PDSLP 369

NMC778506

DAY

DAY 15

NMC701010

PDSLP

PDSLP 370

NMC778507

DAY

DAY 16

NMC701011

PDSLP

PDSLP 371

NMC778508

DAY

DAY 17

NMC701012

27-17

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

PDSLP

PDSLP 372

NMC778509

DAY

DAY 18

NMC701013

PDSLP

PDSLP 373

NMC778510

DAY

DAY 19

NMC701014

PDSLP

PDSLP 374

NMC77851 1

DAY

DAY 20

NMC701015

PDSLP

PDSLP 375

NMC778512

DAY

DAY 21

NMC701016

PDSLP

PDSLP 376

NMC778513

DAY

DAY 22

NMC701017

PDSLP

PDSLP 377

NMC778514

DAY

DAY 23

NMC701018

PDSLP

PDSLP 378

NMC778515

DAY

DAY 24

NMC701019

PDSLP

PDSLP 379

NMC778516

DAY

DAY 25

NMC701020

PDSLP

PDSLP 380

NMC778517

DAY

DAY 26

NMC701021

PDSLP

PDSLP 381

NMC778518

DAY

DAY 27

NMC701022

PDSLP

PDSLP 382

NMC778519

DAY

DAY 28

NMC701023

PDSLP

PDSLP 383

NMC778520

DAY

DAY 29

NMC701024

PDSLP

PDSLP 384

NMC778521

DAY

DAY 30

NMC701025

PDSLP

PDSLP 409

NMC778530

DAY

DAY 31

NMC701026

PDSLP

PDSLP 410

NMC778531

DAY

DAY 32

NMC701027

PDSLP

PDSLP 411

NMC778532

DAY

DAY 33

NMC701028

PDSLP

PDSLP 412

NMC778533

DAY

DAY 34

NMC701029

PDSLP

PDSLP 413

NMC778534

DAY

DAY 35

NMC701030

PDSLP

PDSLP 414

NMC778535

DAY

DAY 36

NMC701031

PDSLP

PDSLP 415

NMC778536

DAY

DAY 37

NMC701032

PDSLP

PDSLP 416

NMC778537

DAY

DAY 38

NMC701033

PDSLP

PDSLP 417

NMC778538

DAY

DAY 39

NMC701034

PDSLP

PDSLP 418

NMC778539

DAY

DAY 40

NMC701035

PDSLP

PDSLP419

NMC778540

DAY

DAY 41

NMC701036

PDSLP

PDSLP 420

NMC778541

DAY

DAY 42

NMC701037

PDSLP

PDSLP 421

NMC778542

DAY

DAY 43

NMC701038

PDSLP

PDSLP 422

NMC778543

DAY

DAY 44

NMC701039

PDSLP

PDSLP 439

NMC778552

DAY

DAY 45

NMC701040

PDSLP

PDSLP 440

NMC778553

DAY

DAY 46

NMC701041

PDSLP

PDSLP 441

NMC778554

DAY

DAY 47

NMC701042

PDSLP

PDSLP 442

NMC778555

DAY

DAY 48

NMC701043

PDSLP

PDSLP 443

NMC778556

DAY

DAY 49

NMC701044

PDSLP

PDSLP 444

NMC778557

DAY

DAY 50

NMC713671

PDSLP

PDSLP 445

NMC778558

DAY

DAY 51

NMC713672

PDSLP

PDSLP 446

NMC778559

DAY

DAY 52

NMC713673

PDSLP

PDSLP 447

NMC778560

DAY

DAY 53

NMC713674

PDSLP

PDSLP 448

NMC778561

DAY

DAY 54

NMC713675

PDSLP

PDSLP 449

NMC778562

DAY

DAY 55

NMC713676

PDSLP

PDSLP 450

NMC778563

DAY

DAY 56

NMC713677

PDSLP

PDSLP 451

NMC778564

DAY

DAY 57

NMC713678

27-18

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

PDSLP

PDSLP 452

NMC778565

DAY

DAY 58

NMC713679

LAM

LAM#206

NMC785737

DAY

DAY 59

NMC713680

LAM

LAM#207

NMC785738

LAM

LAM 1

NMC730912

LAM

LAM#208

NMC785739

LAM

LAM 2

NMC730913

LAM

LAM#209

NMC785740

LAM

LAM 3

NMC730914

LAM

LAM#210

NMC785741

LAM

LAM 4

NMC730915

SK

SK 1

NMC789774

LAM

LAM 5

NMC730916

SK

SK2

NMC789775

LAM

LAM 6

NMC730917

SK

SK 3

NMC789776

LAM

LAM 7

NMC730918

SK

SK4

NMC789777

LAM

LAM 8

NMC730919

SK

SK5

NMC789778

LAM

LAM 9

NMC730920

SK

SK6

NMC789779

LAM

LAM 10

NMC730921

SK

SK7

NMC789780

LAM

LAM 11

NMC730922

SK

SK8

NMC789781

LAM

LAM 12

NMC730923

SK

SK9

NMC789782

LAM

LAM 13

NMC730924

SK

SK 14

NMC789783

LAM

LAM 14

NMC730925

SK

SK 15

NMC789784

LAM

LAM 15

NMC730926

SK

SK 16

NMC789785

LAM

LAM 16

NMC730927

SK

SK 17

NMC789786

LAM

LAM 17

NMC730928

SK

SK 18

NMC789787

LAM

LAM 18

NMC730929

SK

SK 19

NMC789788

LAM

LAM 19

NMC730930

SK

SK21

NMC789790

LAM

LAM 20

NMC730931

SK

SK 23

NMC789792

LAM

LAM 21

NMC730932

SK

SK25

NMC789794

LAM

LAM 22

NMC730933

SK

SK 27

NMC789796

LAM

LAM 23

NMC730934

AW

AW 1

NMC850604

LAM

LAM 24

NMC730935

AW

AW 2

NMC850605

LAM

LAM 25

NMC730936

AW

AW 3

NMC850606

LAM

LAM 26

NMC730937

AW

AW 4

NMC850607

LAM

LAM 27

NMC730938

AW

AW 5

NMC850608

LAM

LAM 28

NMC730939

AW

AW 6

NMC850609

LAM

LAM 29

NMC730940

AW

AW 7

NMC850610

LAM

LAM 30

NMC730941

AW

AW 8

NMC850611

LAM

LAM 31

NMC730942

AW

AW 9

NMC850612

LAM

LAM 32

NMC730943

AW

AW 10

NMC850613

LAM

LAM 33

NMC730944

AW

AW 11

NMC850614

LAM

LAM 34

NMC730945

AW

AW 12

NMC850615

LAM

LAM 35

NMC730946

AW

AW 13

NMC850616

LAM

LAM 36

NMC730947

AW

AW 14

NMC850617

LAM

LAM 37

NMC730948

AW

AW 15

NMC850618

LAM

LAM 38

NMC730949

27-19

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

AW

AW 16

NMC850619

LAM

LAM 39

NMC730950

AW

AW 17

NMC850620

LAM

LAM 40

NMC730951

AW

AW 18

NMC850621

LAM

LAM 41

NMC730952

AW

AW 19

NMC850622

LAM

LAM 42

NMC730953

AW

AW 20

NMC850623

LAM

LAM 43

NMC730954

AW

AW 21

NMC850624

LAM

LAM 44

NMC730955

AW

AW 22

NMC850625

LAM

LAM 45

NMC730956

AW

AW 23

NMC850626

LAM

LAM 46

NMC730957

AW

AW 24

NMC850627

LAM

LAM 47

NMC730958

AW

AW 25

NMC850628

LAM

LAM 48

NMC730959

AW

AW 26

NMC850629

LAM

LAM 49

NMC730960

AW

AW 27

NMC850630

LAM

LAM 50

NMC730961

AW

AW 28

NMC850631

LAM

LAM 51

NMC730962

AW

AW 29

NMC850632

LAM

LAM 52

NMC730963

SS

SSG 1

NMC909185

LAM

LAM 53

NMC730964

SS

SSG2

NMC909186

LAM

LAM 54

NMC730965

SS

SSG 3

NMC909187

LAM

LAM 55

NMC730966

SS

SSG 4

NMC909188

LAM

LAM 56

NMC730967

SS

SSG 5

NMC909189

LAM

LAM 57

NMC730968

SS

SSG 6

NMC909190

LAM

LAM 58

NMC730969

SS

SSG 7

NMC909191

LAM

LAM 59

NMC730970

SS

SSG 8

NMC909192

LAM

LAM 60

NMC730971

SS

SSG 9

NMC909193

LAM

LAM 61

NMC730972

SS

SSG 10

NMC909194

LAM

LAM 62

NMC730973

SS

SSG 11

NMC909195

LAM

LAM 63

NMC730974

SS

SSG 12

NMC909196

LAM

LAM 64

NMC730975

SS

SSG 13

NMC909197

LAM

LAM 65

NMC730976

SS

SSG 14

NMC909198

LAM

LAM 66

NMC730977

SS

SSG 15

NMC909199

LAM

LAM 67

NMC730978

SS

SSG 16

NMC909200

LAM

LAM 68

NMC730979

SS

SSG 17

NMC909201

LAM

LAM 69

NMC730980

SS

SSG 18

NMC909202

LAM

LAM 70

NMC730981

SS

SSG 19

NMC909203

LAM

LAM 71

NMC730982

SS

SSG 20

NMC909204

LAM

LAM 72

NMC730983

SS

SSG 21

NMC909205

LAM

LAM 73

NMC730984

SS

SSG 22

NMC909206

LAM

LAM 74

NMC730985

SS

SSG 23

NMC909207

LAM

LAM 75

NMC730986

SS

SSG 24

NMC909208

LAM

LAM 80

NMC730991

RO

RO 1

859961

LAM

LAM 82

NMC730993

RO

RO 2

859962

LAM

LAM 84

NMC730995

27-20

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

RO

RO 3

859963

LAM

LAM 85

NMC730996

RO

RO 4

859964

LAM

LAM 86

NMC730997

RO

RO 5

859965

LAM

LAM 87

NMC730998

RO

RO 6

859966

LAM

LAM 88

NMC730999

RO

RO 7

859967

LAM

LAM 89

NMC731000

RO

RO 8

859968

NEW ALMA

NEW ALMA

NMC75273

RO

RO 9

859969

VIRGINIA

VIRGINIA

NMC75274

RO

RO 10

859970

MORNING

MORNING

NMC75275

RO

RO 11

859971

MORNING STAR

MORNING STAR

NMC75276

RO

RO 12

859972

NEW EVENING

NEW EVENING

NMC75277

RO

RO 13

859973

NEW SNOWSTORM

NEW SNOWSTORM

NMC75278

RO

RO 14

859974

LAM

LAM 76

NMC771939

RO

RO 15

859975

LAM

LAM 77

NMC771940

RO

RO 16

859976

LAM

LAM 78

NMC771941

RO

RO 17

859977

LAM

LAM 79

NMC771942

RO

RO 18

859978

LAM

LAM 81

NMC771943

RO

RO 19

859979

LAM

LAM 83

NMC771944

RO

RO 20

859980

YORK

YORK#1

NMC787346

RO

RO 21

859981

YORK

YORK#2

NMC787347

RO

RO 22

859982

YORK

YORK#3

NMC787348

RO

RO 23

859983

YORK

YORK#4

NMC787349

RO

RO 24

859984

YORK

YORK#5

NMC787350

RO

RO 25

859985

BLUE NO.

BLUE NO. 982

NMC1024274

RO

RO 26

859986

BLUE NO.

BLUE NO. 983

NMC1024275

RO

RO 27

859987

BLUE NO.

BLUE NO. 984

NMC1024276

RO

RO 28

859988

BLUE NO.

BLUE NO. 985

NMC1024277

RO

RO 29

859989

BLUE NO.

BLUE NO. 986

NMC1024278

RO

RO 30

859990

BLUE NO.

BLUE NO. 987

NMC1024279

RO

RO 31

859991

BLUE NO.

BLUE NO. 988

NMC1024280

RO

RO 32

859992

BLUE NO.

BLUE NO. 989

NMC1024281

RO

RO 33

859993

BLUE NO.

BLUE NO. 990

NMC1024282

RO

RO 34

859994

BLUE NO.

BLUE NO. 991

NMC1024283

RO

RO 35

859995

BLUE NO.

BLUE NO. 992

NMC1024284

RO

RO 36

859996

BLUE NO.

BLUE NO. 993

NMC1 024285

RO

RO 37

859997

BLUE NO.

BLUE NO. 994

NMC1024286

RO

RO 38

859998

BLUE NO.

BLUE NO. 995

NMC1024287

RO

RO 39

859999

BLUE NO.

BLUE NO. 996

NMC1024288

RO

RO 40

860000

BLUE NO.

BLUE NO. 997

NMC1024289

RO

RO 41

860001

BLUE NO.

BLUE NO. 928

NMC1029648

RO

RO 42

860002

BLUE NO.

BLUE NO. 929

NMC1029649

27-21

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

RO

RO 43

860003

BLUE NO.

BLUE NO. 930

NMC1029650

RO

RO 44

860004

BLUE NO.

BLUE NO. 931

NMC1029651

RO

RO 45

860005

BLUE NO.

BLUE NO. 932

NMC1029652

RO

RO 46

860006

BLUE NO.

BLUE NO. 933

NMC1029653

RO

RO 47

860007

BLUE NO.

BLUE NO. 934

NMC1029654

RO

RO 48

860008

BLUE NO.

BLUE NO. 935

NMC1029655

RO

RO 49

860009

BLUE NO.

BLUE NO. 936

NMC1 029656

RO

RO 50

860010

BLUE NO.

BLUE NO. 937

NMC1029657

RO

RO 51

860011

BLUE NO.

BLUE NO. 938

NMC102965 8

RO

RO 52

860012

BLUE NO.

BLUE NO. 939

NMC1029659

RO

RO 53

860013

BLUE NO.

BLUE NO. 940

NMC1029660

RO

RO 54

860014

BLUE NO.

BLUE NO. 941

NMC1029661

RO

RO 55

860015

BLUE NO.

BLUE NO. 942

NMC1029662

RO

RO 56

860016

BLUE NO.

BLUE NO. 943

NMC1029663

RO

RO 57

860017

BLUE NO.

BLUE NO. 944

NMC1029664

RO

RO 58

860018

BLUE NO.

BLUE NO. 945

NMC1029665

RO

RO 59

860019

BLUE NO.

BLUE NO. 946

NMC1029666

RO

RO 60

860020

BLUE NO.

BLUE NO. 947

NMC1029667

SH

SH 1

1067899

BLUE NO.

BLUE NO. 948

NMC1029668

SH

SH2

1067900

BLUE NO.

BLUE NO. 949

NMC1029669

SH

SH 3

1067901

BLUE NO.

BLUE NO. 950

NMC 1029670

SH

SH4

1067902

BLUE NO.

BLUE NO. 951

NMC1029671

SH

SH5

1067903

BLUE NO.

BLUE NO. 952

NMC1029672

SH

SH6

1067904

BLUE NO.

BLUE NO. 953

NMC1029673

SH

SH7

1067905

BLUE NO.

BLUE NO. 954

NMC1029674

SH

SH 8

1067906

BLUE NO.

BLUE NO. 955

NMC1029675

SH

SH9

1067907

BLUE NO.

BLUE NO. 956

NMC1029676

SH

SH 10

1067908

BLUE NO.

BLUE NO. 957

NMC1029677

SH

SH 11

1067909

BLUE NO.

BLUE NO. 958

NMC1029678

SH

SH 12

1067910

BLUE NO.

BLUE NO. 959

NMC1029679

SH

SH 13

1067911

BLUE NO.

BLUE NO. 960

NMC1029680

SH

SH 14

1067912

BLUE NO.

BLUE NO. 961

NMC 1029681

SH

SH 15

1067913

BLUE NO.

BLUE NO. 962

NMC1029682

SH

SH 16

1067914

BLUE NO.

BLUE NO. 963

NMC1029683

SH

SH 17

1067915

BLUE NO.

BLUE NO. 2000

NMC1029684

SH

SH 18

1067916

BLUE NO.

BLUE NO. 2001

NMC1029685

SH

SH 19

1067917

BLUE NO.

BLUE NO. 2002

NMC1029686

SH

SH 20

1067918

BLUE NO.

BLUE NO. 2003

NMC1029687

SH

SH21

1067919

BLUE NO.

BLUE NO. 2004

NMC1029688

SH

SH22

1067920

BLUE NO.

BLUE NO. 2005

NMC1029689

27-22

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

SH

SH 23

1067921

BLUE NO.

BLUE NO. 2006

NMC1029690

SH

SH 24

1067922

BLUE NO.

BLUE NO. 2007

NMC1029691

SH

SH25

1067923

BLUE NO.

BLUE NO. 2008

NMC1029692

SH

SH26

1067924

BLUE NO.

BLUE NO. 2009

NMC1029693

SH

SH 27

1067925

BLUE NO.

BLUE NO. 2010

NMC1029694

SH

SH43

1067926

BLUE NO.

BLUE NO. 2011

NMC1029695

SH

SH 44

1067927

BLUE NO.

BLUE NO. 2012

NMC1029696

SH

SH51

1067928

BLUE NO.

BLUE NO. 2013

NMC1029697

SH

SH 52

1067929

BLUE NO.

BLUE NO. 2014

NMC1029698

SH

SH 53

1067930

BLUE NO.

BLUE NO. 2015

NMC1029699

SH

SH 54

1067931

BLUE NO.

BLUE NO. 2016

NMC1029700

SH

SH55

1067932

BLUE NO.

BLUE NO. 2017

NMC1029701

SH

SH56

1067933

BLUE NO.

BLUE NO. 2018

NMC1029702

SH

SH57

1067934

BLUE NO.

BLUE NO. 2019

NMC1029703

SH

SH58

1067935

BLUE NO.

BLUE NO. 2020

NMC1029704

SH

SH59

1067936

BLUE NO.

BLUE NO. 2021

NMC1029705

SH

SH 60

1067937

BLUE NO.

BLUE NO. 2022

NMC1029706

SH

SH61

1067938

BLUE NO.

BLUE NO. 2023

NMC1029707

SH

SH 62

1067939

BLUE NO.

BLUE NO. 2024

NMC1029708

SH

SH 63

1067940

BLUE NO.

BLUE NO. 2025

NMC1029709

SH

SH 64

1067941

BLUE NO.

BLUE NO. 2026

NMC1029710

SH

SH 65

1067942

BLUE NO.

BLUE NO. 2027

NMC1029711

SH

SH 66

1067943

BLUE NO.

.BLUE NO. 2028

NMC1029712

SH

SH 67

1067944

BLUE NO.

BLUE NO. 2029

NMC1029713

SH

SH 68

1067945

BLUE NO.

BLUE NO. 2030

NMC1029714

SH

SH 69

1067946

BLUE NO.

BLUE NO. 2031

NMC1029715

SH

SH 70

1067947

BLUE NO.

BLUE NO. 2032

NMC1029716

SH

SH71

1067948

BLUE NO.

BLUE NO. 2033

NMC1029717

SH

SH 72

1067949

BLUE NO.

BLUE NO. 2034

NMC1029718

SH

SH 73

1067950

BLUE NO.

BLUE NO. 2035

NMC1029719

SH

SH 74

1067951

BLUE NO.

BLUE NO. 2036

NMC1029720

SH

SH 75

1067952

BLUE NO.

BLUE NO. 2037

NMC1029721

SH

SH 76

1067953

BLUE NO.

BLUE NO. 2038

NMC1029722

SH

SH77

1067954

BLUE NO.

BLUE NO. 2039

NMC1029723

SH

SH78

1067955

SP

SP 1

NMC955469

SH

SH 79

1067956

SP

SP 2

NMC955470

SH

SH 80

1067957

SP

SP 3

NMC955471

SH

SH 81

1067958

SP

SP 4

NMC955472

SH

SH 82

1067959

SP

SP 5

NMC955473

SH

SH 83

1067960

SP

SP 52

NMC955520

27-23

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

SH

SH 84

1067961

SP

SP 53

NMC955521

SH

SH85

1067962

SP

SP 54

NMC955522

SH

SH 86

1067963

SP

SP 55

NMC955523

SH

SH 87

1067964

SP

SP 56

NMC955524

SH

SH88

1067965

SP

SP 103

NMC955571

SH

SH 89

1067966

SP

SP 104

NMC955572

SH

SH 90

1067967

SP

SP 105

NMC955573

SH

SH91

1067968

SP

SP 106

NMC955574

SH

SH 92

1067969

SP

SP 107

NMC955575

SH

SH 93

1067970

SP

SP 154

NMC955622

SH

SH 94

1067971

SP

SP 155

NMC955623

SH

SH95

1067972

SP

SP 156

NMC955624

SH

SH 96

1067973

SP

SP 157

NMC955625

SH

SH97

1067974

SP

SP 158

NMC955626

SH

SH98

1067975

SP

SP 205

NMC955673

SH

SH 99

1067976

SP

SP 206

NMC955674

SH

SH 100

1067977

SP

SP 207

NMC955675

SH

SH 101

1067978

SP

SP 208

NMC955676

SH

SH 102

1067979

SP

SP 209

NMC955677

SH

SH 103

1067980

SP

SP 256

NMC955724

SH

SH 104

1067981

SP

SP 257

NMC955725

SH

SH 105

1067982

SP

SP 258

NMC955726

SH

SH 106

1067983

SP

SP 259

NMC955727

SH

SH 107

1067984

SP

SP 260

NMC955728

SH

SH 108

1067985

SP

SP 347

NMC955815

SH

SH 109

1067986

SP

SP 348

NMC955816

SH

SH 110

1067987

SP

SP 349

NMC955817

SH

SH 111

1067988

SP

SP 350

NMC955818

SH

SH 112

1067989

SP

SP 351

NMC955819

SH

SH 113

1067990

SP

SP 352

NMC955820

MIMI

MIMI 1

NMC1065272

SP

SP 353

NMC955821

MIMI

MIMI 2

NMC1065273

SP

SP 354

NMC955822

MIMI

MIMI 3

NMC1065274

SP

SP 355

NMC955823

MIMI

MIMI 4

NMC1065275

SP

SP 356

NMC955824

MIMI

MIMI 5

NMC1065276

SP

SP 357

NMC955825

MIMI

MIMI 6

NMC1065277

SP

SP 358

NMC955826

MIMI

MIMI 7

NMC1065278

SP

SP 359

NMC955827

MIMI

MIMI 8

NMC1065279

SP

SP 360

NMC955828

MIMI

MIMI 9

NMC1 065280

SP

SP 361

NMC955829

MIMI

MIMI 10

NMC1065281

SP

SP 362

NMC955830

27-24

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

MIMI

MIMI 11

NMC1065282

SP

SP 363

NMC955831

MIMI

MIMI 12

NMC1065283

SP

SP 364

NMC955832

MIMI

MIMI 13

NMC1065284

SP

SP 365

NMC955833

MIMI

MIMI 14

NMC1065285

SP

SP 366

NMC955834

MIMI

MIMI 15

NMC1065286

SP

SP 367

NMC955835

MIMI

MIMI 16

NMC1065287

SP

SP 368

NMC955836

MIMI

MIMI 17

NMC1065288

SP

SP 369

NMC955837

MIMI

MIMI 18

NMC1065289

SP

SP 370

NMC955838

MIMI

MIMI 19

NMC1065290

SP

SP 371

NMC955839

MIMI

MIMI 20

NMC1065291

SP

SP 372

NMC955840

MIMI

MIMI 21

NMC1065292

SP

SP 373

NMC955841

MIMI

MIMI 22

NMC1065293

SP

SP 374

NMC955842

MIMI

MIMI 23

NMC1065294

SP

SP 375

NMC955843

MIMI

MIMI 24

NMC1065295

SP

SP 376

NMC955844

MIMI

MIMI 25

NMC1065296

SP

SP 377

NMC955845

MIMI

MIMI 26

NMC1065297

SP

SP 378

NMC955846

MIMI

MIMI 27

NMC1065298

SP

SP 379

NMC955847

MIMI

MIMI 28

NMC1065299

SP

SP 380

NMC955848

MIMI

MIMI 29

NMC1 065300

SP

SP 381

NMC955849

MIMI

MIMI 30

NMC1065301

SP

SP 382

NMC955850

MIMI

MIMI 31

NMC1065302

SP

SP 383

NMC955851

MIMI

MIMI 32

NMC1065303

SP

SP 384

NMC955852

MIMI

MIMI 33

NMC1065304

SP

SP 385

NMC955853

MIMI

MIMI 34

NMC1065305

SP

SP 386

NMC955854

MIMI

MIMI 35

NMC1065306

SP

SP 387

NMC955855

MIMI

MIMI 36

NMC1065307

SP

SP 388

NMC955856

MIMI

MIMI 37

NMC1065308

SP

SP 389

NMC955857

MIMI

MIMI 38

NMC1065309

SP

SP 390

NMC955858

MIMI

MIMI 39

NMC1065310

SP

SP 391

NMC955859

MIMI

MIMI 40

NMC10653 11

SP

SP 392

NMC955860

MIMI

MIMI 41

NMC1065312

SP

SP 393

NMC955861

MIMI

MIMI 42

NMC1065313

SP

SP 394

NMC9555862

MIMI

MIMI 43

NMC1065314

SP

SP 395

NMC9555863

MIMI

MIMI 44

NMC1065315

SP

SP 396

NMC9555864

MIMI

MIMI 45

NMC1065316

SP

SP 397

NMC9555865

MIMI

MIMI 46

NMC1065317

SP

SP 398

NMC9555866

MIMI

MIMI 47

NMC1065318

SP

SP 399

NMC9555867

MIMI

MIMI 48

NMC1065319

SP

SP 400

NMC9555868

MIMI

MIMI 49

NMC1065320

SP

SP 401

NMC9555869

MIMI

MIMI 50

NMC1065321

SP

SP 402

NMC9555870

27-25

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

MIMI

MIMI 51

NMC1065322

SP

SP 423

NMC9555891

MIMI

MIMI 52

NMC1065323

SP

SP 424

NMC9555892

MIMI

MIMI 53

NMC1065324

SP

SP 425

NMC9555893

MIMI

MIMI 54

NMC1065325

SP

SP 426

NMC9555894

MIMI

MIMI 55

NMC1065326

SP

SP 427

NMC9555895

MIMI

MIMI 56

NMC1065327

SP

SP 428

NMC9555896

MIMI

MIMI 57

NMC1065328

SP

SP 429

NMC9555897

MIMI

MIMI 58

NMC1065329

SP

SP 430

NMC9555898

MIMI

MIMI 59

NMC1065330

SP

SP 431

NMC9555899

MIMI

MIMI 60

NMC1065331

SP

SP 432

NMC9555900

MIMI

MIMI 61

NMC1065332

SP

SP 433

NMC9555901

MIMI

MIMI 62

NMC1065333

SP

SP 434

NMC9555902

MIMI

MIMI 63

NMC1065334

SP

SP 435

NMC9555903

MIMI

MIMI 64

NMC1065335

SP

SP 436

NMC9555904

MIMI

MIMI 65

NMC1065336

SP

SP 437

NMC9555905

MIMI

MIMI 66

NMC1065337

SP

SP 438

NMC9555906

MIMI

MIMI 67

NMC1065338

SP

SP 439

NMC9555907

MIMI

MIMI 68

NMC1065339

SP

SP 440

NMC9555908

MIMI

MIMI 69

NMC1065340

SP

SP 441

NMC9555909

MIMI

MIMI 70

NMC1065341

SP

SP 442

NMC9555910

MIMI

MIMI 71

NMC1065342

SP

SP 443

NMC9555911

MIMI

MIMI 72

NMC1065343

SP

SP 444

NMC9555912

MIMI

MIMI 73

NMC1065344

SP

SP 445

NMC9555913

MIMI

MIMI 74

NMC1 065345

SP

SP 446

NMC9555914

MIMI

MIMI 75

NMC1065346

SP

SP 447

NMC9555915

MIMI

MIMI 76

NMC1065347

SP

SP 448

NMC9555916

MIMI

MIMI 77

NMC1065348

SP

SP 449

NMC955917

MIMI

MIMI 78

NMC1 065349

SP

SP 450

NMC955918

MIMI

MIMI 79

NMC1065350

SP

SP 451

NMC955919

MIMI

MIMI 80

NMC1065351

SP

SP 452

NMC955920

MIMI

MIMI 81

NMC1065352

SP

SP 453

NMC955921

MIMI

MIMI 82

NMC1065353

SP

SP 454

NMC955922

MIMI

MIMI 83

NMC1065354

SP

SP 455

NMC955923

MIMI

MIMI 84

NMC1065355

SP

SP 456

NMC955924

MIMI

MIMI 103

NMC1065374

SP

SP 457

NMC955925

MIMI

MIMI 104

NMC1065375

SP

SP 458

NMC955926

MIMI

MIMI 110

NMC1065381

SP

SP 486

NMC955954

MIMI

MIMI 111

NMC1065382

SP

SP 487

NMC955955

MIMI

MIMI 112

NMC1065383

SP

SP 488

NMC955956

MIMI

MIMI 113

NMC1065384

SP

SP 489

NMC955957

27-26

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

MIMI

MIMI 114

NMC1065385

SP

SP 490

NMC955958

MIMI

MIMI 115

NMC1065386

SP

SP 491

NMC955959

MIMI

MIMI 118

NMC1065389

SP

SP 492

NMC955960

MIMI

MIMI 119

NMC1065390

SP

SP 493

NMC955961

MIMI

MIMI 120

NMC1065391

SP

SP 494

NMC955962

MIMI

MIMI 121

NMC1065392

SP

SP 495

NMC955963

MIMI

MIMI 122

NMC1065393

SP

SP 496

NMC955964

MIMI

MIMI 123

NMC1065394

SP

SP 497

NMC955965

MIMI

MIMI 124

NMC1065395

SP

SP 498

NMC955966

MIMI

MIMI 125

NMC1065396

SP

SP 499

NMC955967

MIMI

MIMI 126

NMC1065397

SP

SP 500

NMC955968

MIMI

MIMI 127

NMC1065398

SP

SP 501

NMC955969

MIMI

MIMI 128

NMC1065399

SP

SP 502

NMC955970

MIMI

MIMI 129

NMC1065400

SP

SP 503

NMC955971

MIMI

MIMI 130

NMC1065401

SP

SP 504

NMC955972

MIMI

MIMI 131

NMC1065402

SP

SP 505

NMC955973

MIMI

MIMI 132

NMC1065403

SP

SP 506

NMC955974

MIMI

MIMI 133

NMC1065404

SP

SP 507

NMC955975

MIMI

MIMI 134

NMC1065405

SP

SP 508

NMC955976

MIMI

MIMI 137

NMC1065406

SP

SP 509

NMC955977

MIMI

MIMI 138

NMC1065407

SP

SP 510

NMC955978

MIMI

MIMI 139

NMC1065408

SP

SP 511

NMC955979

MIMI

MIMI 140

NMC 1068172

SP

SP 512

NMC955980

MIMI

MIMI 141

NMC1068173

SP

SP 513

NMC955981

MIMI

MIMI 142

NMC1068174

SP

SP 514

NMC955982

MIMI

MIMI 143

NMC1068175

SP

SP 515

NMC955983

MIMI

MIMI 144

NMC1068176

SP

SP 516

NMC955984

MIMI

MIMI 145

NMC1068177

SP

SP 517

NMC955985

MIMI

MIMI 146

NMC1068178

SP

SP 518

NMC955986

MIMI

MIMI 147

NMC1068179

SP

SP 519

NMC955987

MIMI

MIMI 148

NMC1068180

SP

SP 520

NMC955988

MIMI

MIMI 149

NMC1068181

SP

SP 521

NMC955989

MIMI

MIMI 150

NMC1068182

SP

SP 522

NMC955990

MIMI

MIMI 151

NMC1068183

SP

SP 523

NMC955991

MIMI

MIMI 152

NMC1068184

SP

SP 524

NMC955992

MIMI

MIMI 153

NMC1068185

SP

SP 525

NMC955993

MIMI

MIMI 154

NMC1068186

SP

SP 526

NMC955994

MIMI

MIMI 155

NMC1068187

SP

SP 527

NMC955995

MIMI

MIMI 156

NMC1068188

SP

SP 528

NMC955996

MIMI

MIMI 157

NMC1068189

SP

SP 529

NMC955997

27-27

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

MIMI

MIMI 158

NMC1068190

SP

SP 530

NMC955998

MIMI

MIMI 159

NMC1068191

SP

SP 531

NMC955999

MIMI

MIMI 160

NMC1068192

SP

SP 532

NMC956000

MIMI

MIMI 161

NMC1068193

SP

SP 533

NMC956001

MIMI

MIMI 162

NMC1068194

SP

SP 534

NMC956002

MIMI

MIMI 163

NMC1068195

SP

SP 535

NMC956003

MIMI

MIMI 164

NMC1068196

SP

SP 536

NMC956004

MIMI

MIMI 165

NMC1068197

SP

SP 537

NMC956005

MIMI

MIMI 166

NMC1068198

SP

SP 538

NMC956006

MIMI

MIMI 167

NMC1068199

SP

SP 539

NMC956007

MIMI

MIMI 168

NMC1068200

SP

SP 540

NMC956008

MIMI

MIMI 169

NMC1068201

SP

SP 541

NMC956009

MIMI

MIMI 170

NMC1068202

SP

SP 542

NMC956010

MIMI

MIMI 171

NMC1068203

SP

SP 543

NMC956011

MIMI

MIMI 172

NMC1068204

SP

SP 544

NMC956012

MIMI

MIMI 173

NMC1068205

SP

SP 545

NMC956013

MIMI

MIMI 174

NMC1068206

SP

SP 546

NMC956014

MIMI

MIMI 175

NMC1 068207

SP

SP 547

NMC956015

MIMI

MIMI 176

NMC1068208

SP

SP 548

NMC956016

MIMI

MIMI 177

NMC1068209

SP

SP 549

NMC956017

MIMI

MIMI 194

NMC1068226

SP

SP 550

NMC956018

MIMI

MIMI 195

NMC1068227

SP

SP 551

NMC956019

MIMI

MIMI 196

NMC1 068228

SP

SP 552

NMC956020

MIMI

MIMI 197

NMC1068229

SP

SP 553

NMC956021

MIMI

MIMI 198

NMC1068230

SP

SP 554

NMC956022

MIMI

MIMI 199

NMC1 068231

SP

SP 555

NMC956023

MIMI

MIMI 200

NMC1 068232

SP

SP 556

NMC956024

MIMI

MIMI 201

NMC1068233

SP

SP 557

NMC956025

MIMI

MIMI 202

NMC1068234

SP

SP 558

NMC956026

MIMI

MIMI 203

NMC1 068235

SP

SP 559

NMC956027

MIMI

MIMI 204

NMC1068236

SP

SP 560

NMC956028

MIMI

MIMI 205

NMC1068237

SP

SP 561

NMC956029

MIMI

MIMI 206

NMC1068238

SP

SP 562

NMC956030

MIMI

MIMI 207

NMC1068239

SP

SP 563

NMC956031

MIMI

MIMI 208

NMC1068240

SP

SP 564

NMC956032

MIMI

MIMI 209

NMC1068241

SP

SP 565

NMC956033

MIMI

MIMI 210

NMC1068242

SP

SP 566

NMC956034

MIMI

MIMI 211

NMC1068243

SP

SP 567

NMC956035

MIMI

MIMI 212

NMC1068244

SP

SP 568

NMC956036

MIMI

MIMI 213

NMC1068245

SP

SP 569

NMC956037

27-28

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

MIMI

MIMI 214

NMC1068246

SP

SP 570

NMC956038

MIMI

MIMI 215

NMC1068247

SP

SP 571

NMC956039

MIMI

MIMI 216

NMC1068248

SP

SP 572

NMC956040

MIMI

MIMI 217

NMC1068249

SP

SP 573

NMC956041

MIMI

MIMI 218

NMC1068250

SP

SP 574

NMC956042

MIMI

MIMI 219

NMC1068251

SP

SP 575

NMC956043

MIMI

MIMI 225

NMC1068257

SP

SP 576

NMC956044

MIMI

MIMI 226

NMC1068258

SP

SP 577

NMC956045

MIMI

MIMI 227

NMC1 068259

SP

SP 578

NMC956046

MIMI

MIMI 228

NMC1068260

SP

SP 579

NMC956047

MIMI

MIMI 229

NMC1068261

SP

SP 580

NMC956048

MIMI

MIMI 230

NMC1068262

SP

SP 581

NMC956049

MIMI

MIMI 231

NMC1068263

SP

SP 582

NMC956050

MIMI

MIMI 232

NMC1068264

SP

SP 583

NMC956051

MIMI

MIMI 239

NMC1068271

SP

SP 584

NMC956052

MIMI

MIMI 240

NMC1 068272

SP

SP 585

NMC956053

MIMI

MIMI 241

NMC1068273

SP

SP 586

NMC956054

MIMI

MIMI 242

NMC1068274

SP

SP 587

NMC956055

MIMI

MIMI 246

NMC 1068278

SP

SP 588

NMC956056

MIMI

MIMI 247

NMC1068279

SP

SP 589

NMC956057

MIMI

MIMI 248

NMC1068280

SP

SP 590

NMC956058

MIMI

MIMI 257

NMC1072849

SP

SP 591

NMC956059

MIMI

MIMI 258

NMC1072850

SP

SP 592

NMC956060

MIMI

MIMI 259

NMC1072851

SP

SP 593

NMC956061

MIMI

MIMI 260

NMC1072852

SP

SP 594

NMC956062

MIMI

MIMI 261

NMC1072853

SP

SP 595

NMC956063

MIMI

MIMI 262

NMC1072854

SP

SP 596

NMC956064

MIMI

MIMI 263

NMC1072855

SP

SP 597

NMC956065

MIMI

MIMI 264

NMC1072856

SP

SP 598

NMC956066

MIMI

MIMI 265

NMC1072857

SP

SP 599

NMC956067

MIMI

MIMI 266

NMC1072858

SP

SP 600

NMC956068

MIMI

MIMI 267

NMC1072859

SP

SP 601

NMC956069

MIMI

MIMI 268

NMC1072860

SP

SP 602

NMC956070

MIMI

MIMI 269

NMC1072861

SP

SP 612

NMC956080

MIMI

MIMI 270

NMC1072862

SP

SP 613

NMC956081

MIMI

MIMI 271

NMC1 072863

SP

SP 614

NMC956082

MIMI

MIMI 272

NMC1072864

SP

SP 615

NMC956083

MIMI

MIMI 273

NMC1072865

SP

SP 616

NMC956084

MIMI

MIMI 274

NMC1072866

SP

SP 617

NMC956085

MIMI

MIMI 275

NMC1072867

SP

SP 618

NMC956086

27-29

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

MIMI

MIMI 276

NMC1072868

SP

SP 619

NMC956087

MIMI

MIMI 277

NMC1072869

SP

SP 620

NMC956088

MIMI

MIMI 278

NMC1072870

SP

SP 621

NMC956089

MIMI

MIMI 279

NMC1072871

SP

SP 622

NMC956090

MIMI

MIMI 280

NMC1072872

SP

SP 623

NMC956091

MIMI

MIMI 281

NMC1072873

SP

SP 624

NMC956092

MIMI

MIMI 282

NMC1072874

SP

SP 625

NMC956093

MIMI

MIMI 283

NMC1072875

SP

SP 626

NMC956094

MIMI

MIMI 284

NMC1072876

SP

SP 627

NMC956095

MIMI

MIMI 285

NMC1072877

SP

SP 628

NMC956096

MIMI

MIMI 286

NMC1072878

SP

SP 629

NMC956097

MIMI

MIMI 287

NMC1072879

SP

SP 630

NMC956098

MIMI

MIMI 288

NMC1072880

SP

SP 631

NMC956099

MIMI

MIMI 289

NMC1072881

SP

SP 632

NMC956100

MIMI

MIMI 290

NMC1072882

SP

SP 633

NMC956101

MIMI

MIMI 291

NMC1072883

SP

SP 634

NMC956102

MIMI

MIMI 292

NMC1072884

SP

SP 635

NMC956103

MIMI

MIMI 293

NMC1 072885

SP

SP 636

NMC956104

MIMI

MIMI 294

NMC1072886

SP

SP 637

NMC956105

MIMI

MIMI 295

NMC1072887

SP

SP 638

NMC956106

MIMI

MIMI 296

NMC1072888

SS

SS 65

NMC985080

MIMI

MIMI 297

NMC1072889

SS

SS66

NMC985081

MIMI

MIMI 301

NMC1 072890

SS

SS67

NMC985082

MIMI

MIMI 302

NMC1072891

SS

SS68

NMC985083

MIMI

MIMI 303

NMC1072892

SS

SS 69

NMC985084

MIMI

MIMI 304

NMC1072893

SS

SS 70

NMC985085

MIMI

MIMI 305

NMC1 072894

SS

SS71

NMC985086

MIMI

MIMI 315

NMC1072895

SS

SS 72

NMC985087

MIMI

MIMI 316

NMC1072896

SS

SS 73

NMC985088

MIMI

MIMI 317

NMC1072897

SS

SS 74

NMC985089

MIMI

MIMI 318

NMC1072898

SS

SS 75

NMC985090

MIMI

MIMI 319

NMC1072899

SS

SS76

NMC985091

MIMI

MIMI 320

NMC1072900

SS

SS 77

NMC985092

MIMI

MIMI 321

NMC1072901

SS

SS 78

NMC985093

MIMI

MIMI 322

NMC1072902

SS

SS 79

NMC985094

MIMI

MIMI 323

NMC1072903

SS

SS 80

NMC985095

MIMI

MIMI 324

NMC1072904

SS

SS 81

NMC985096

MIMI

MIMI 325

NMC1072905

SS

SS 82

NMC985097

MIMI

MIMI 326

NMC1072906

SS

SS 83

NMC985098

MIMI

MIMI 327

NMC1072907

SS

SS 84

NMC985099

27-30

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

MIMI

MIMI 328

NMC1072908

SS

SS 85

NMC985100

MIMI

MIMI 329

NMC1072909

SS

SS 86

NMC985101

MIMI

MIMI 330

NMC1072910

SS

SS 87

NMC985102

MIMI

MIMI 331

NMC1072911

SS

SS 88

NMC985103

MIMI

MIMI 332

NMC1072912

SS

SS 89

NMC985104

MIMI

MIMI 333

NMC1072913

SS

SS 90

NMC985105

MIMI

MIMI 334

NMC1072914

SS

SS 91

NMC985106

MIMI

MIMI 335

NMC1072915

SS

SS 92

NMC985107

MIMI

MIMI 336

NMC1072916

SS

SS 93

NMC985108

MIMI

MIMI 337

NMC1072917

SS

SS 94

NMC985109

MIMI

MIMI 338

NMC1072918

SS

SS 95

NMC985110

MIMI

MIMI 339

NMC1072919

SS

SS 96

NMC9851 11

MIMI

MIMI 340

NMC1072920

SS

SS 97

NMC985112

MIMI

MIMI 341

NMC1072921

SS

SS 98

NMC985113

MIMI

MIMI 342

NMC1072922

SS

SS 99

NMC9851 14

MIMI

MIMI 343

NMC1072923

SS

SS 100

NMC985115

MIMI

MIMI 344

NMC1072924

LAM

LAM 190

NMC771957

MIMI

MIMI 345

NMC1 072925

LAM

LAM 204

NMC771971

MIMI

MIMI 346

NMC1072926

LAM

LAM 205

NMC771972

MIMI

MIMI 347

NMC1072927

LAM

LAM 0201

NMC833020

MIMI

MIMI 348

NMC1072928

LAM

LAM 0202

NMC833021

MIMI

MIMI 349

NMC1072929

LAM

LAM 0203

NMC833022

MIMI

MIMI 350

NMC1072930

LAM

LAM 0204

NMC833023

MIMI

MIMI 351

NMC1072931

LAM

LAM 0205

NMC833024

MIMI

MIMI 352

NMC1072932

LAM

LAM 0206

NMC833025

MIMI

MIMI 353

NMC1072933

LAM

LAM 0207

NMC833026

MIMI

MIMI 354

NMC1 072934

LAM

LAM 0208

NMC833027

MIMI

MIMI 355

NMC1072935

LAM

LAM 0209

NMC833028

MIMI

MIMI 356

NMC1 072936

LAM

LAM 0210

NMC833029

MIMI

MIMI 357

NMC1072937

CR

CR 1

NMC945647

MIMI

MIMI 358

NMC1072938

CR

CR2

NMC945648

MIMI

MIMI 359

NMC1072939

CR

CR3

NMC945649

MIMI

MIMI 360

NMC1 072940

CR

CR4

NMC945650

MIMI

MIMI 361

NMC1072941

CR

CR5

NMC945651

MIMI

MIMI 362

NMC1072942

CR

CR6

NMC945652

MIMI

MIMI 363

NMC1072943

CR

CR7

NMC945653

MIMI

MIMI 364

NMC1072944

CR

CR8

NMC945654

MIMI

MIMI 365

NMC1072945

CR

CR9

NMC945655

MIMI

MIMI 366

NMC1072946

CR

CR 10

NMC945656

MIMI

MIMI 367

NMC1072947

MIMI

MIMI 368

NMC1072948

MIMI

MIMI 369

NMC1072949

MIMI

MIMI 370

NMC1 072950

27-30

Paramount Gold Nevada Corp. | Sleeper Gold Mine

S-K 1300 Technical Report Summary

June 17, 2026

SLR Project No.: 123.020721.00001

28.0

Appendix 2 Cash Flow Summaries

28-1

GRAPHIC

GRAPHIC

Filename: g161084dsp11.jpg · Sequence: 8

Binary file (76150 bytes)

Download g161084dsp11.jpg

GRAPHIC

GRAPHIC

Filename: g161084dsp115_.jpg · Sequence: 9

Binary file (38414 bytes)

Download g161084dsp115_.jpg

GRAPHIC

GRAPHIC

Filename: g161084g03g18.jpg · Sequence: 10

Binary file (39174 bytes)

Download g161084g03g18.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618052738802.jpg · Sequence: 11

Binary file (5566 bytes)

Download g161084g0618052738802.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074827912.jpg · Sequence: 12

Binary file (45033 bytes)

Download g161084g0618074827912.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074828763.jpg · Sequence: 13

Binary file (47452 bytes)

Download g161084g0618074828763.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074829188.jpg · Sequence: 14

Binary file (47122 bytes)

Download g161084g0618074829188.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074829490.jpg · Sequence: 15

Binary file (41655 bytes)

Download g161084g0618074829490.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074830086.jpg · Sequence: 16

Binary file (41602 bytes)

Download g161084g0618074830086.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074830432.jpg · Sequence: 17

Binary file (33395 bytes)

Download g161084g0618074830432.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074831053.jpg · Sequence: 18

Binary file (34286 bytes)

Download g161084g0618074831053.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074831319.jpg · Sequence: 19

Binary file (38851 bytes)

Download g161084g0618074831319.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074832009.jpg · Sequence: 20

Binary file (39544 bytes)

Download g161084g0618074832009.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618074832495.jpg · Sequence: 21

Binary file (43170 bytes)

Download g161084g0618074832495.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618080058301.jpg · Sequence: 22

Binary file (38851 bytes)

Download g161084g0618080058301.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618080059141.jpg · Sequence: 23

Binary file (39544 bytes)

Download g161084g0618080059141.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618080100184.jpg · Sequence: 24

Binary file (43170 bytes)

Download g161084g0618080100184.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618080102100.jpg · Sequence: 25

Binary file (87385 bytes)

Download g161084g0618080102100.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618110709066.jpg · Sequence: 26

Binary file (50477 bytes)

Download g161084g0618110709066.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618110709620.jpg · Sequence: 27

Binary file (67303 bytes)

Download g161084g0618110709620.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618110709949.jpg · Sequence: 28

Binary file (56984 bytes)

Download g161084g0618110709949.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618110710295.jpg · Sequence: 29

Binary file (90141 bytes)

Download g161084g0618110710295.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618110710642.jpg · Sequence: 30

Binary file (58788 bytes)

Download g161084g0618110710642.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618110710979.jpg · Sequence: 31

Binary file (76060 bytes)

Download g161084g0618110710979.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618131905468.jpg · Sequence: 32

Binary file (35330 bytes)

Download g161084g0618131905468.jpg

GRAPHIC

GRAPHIC

Filename: g161084g0618131905785.jpg · Sequence: 33

Binary file (37800 bytes)

Download g161084g0618131905785.jpg

GRAPHIC

GRAPHIC

Filename: g161084g12g12.jpg · Sequence: 34

Binary file (284108 bytes)

Download g161084g12g12.jpg

GRAPHIC

GRAPHIC

Filename: g161084g13g13.jpg · Sequence: 35

Binary file (280212 bytes)

Download g161084g13g13.jpg

GRAPHIC

GRAPHIC

Filename: g161084g14g14.jpg · Sequence: 36

Binary file (183597 bytes)

Download g161084g14g14.jpg

GRAPHIC

GRAPHIC

Filename: g161084g15g15.jpg · Sequence: 37

Binary file (239129 bytes)

Download g161084g15g15.jpg

GRAPHIC

GRAPHIC

Filename: g161084g16g16.jpg · Sequence: 38

Binary file (196875 bytes)

Download g161084g16g16.jpg

GRAPHIC

GRAPHIC

Filename: g161084g17g17.jpg · Sequence: 39

Binary file (144583 bytes)

Download g161084g17g17.jpg

GRAPHIC

GRAPHIC

Filename: g161084g41r48.jpg · Sequence: 40

Binary file (155236 bytes)

Download g161084g41r48.jpg

GRAPHIC

GRAPHIC

Filename: g161084g76r56.jpg · Sequence: 41

Binary file (158321 bytes)

Download g161084g76r56.jpg

GRAPHIC

GRAPHIC

Filename: g161084g93b33.jpg · Sequence: 42

Binary file (116987 bytes)

Download g161084g93b33.jpg

GRAPHIC

GRAPHIC

Filename: g161084g93p68.jpg · Sequence: 43

Binary file (4006 bytes)

Download g161084g93p68.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap117.jpg · Sequence: 44

Binary file (62836 bytes)

Download g161084snap117.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap118.jpg · Sequence: 45

Binary file (61452 bytes)

Download g161084snap118.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap118a.jpg · Sequence: 46

Binary file (63505 bytes)

Download g161084snap118a.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap119.jpg · Sequence: 47

Binary file (61671 bytes)

Download g161084snap119.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap122.jpg · Sequence: 48

Binary file (74865 bytes)

Download g161084snap122.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap123.jpg · Sequence: 49

Binary file (68404 bytes)

Download g161084snap123.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap124.jpg · Sequence: 50

Binary file (47563 bytes)

Download g161084snap124.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap125.jpg · Sequence: 51

Binary file (50806 bytes)

Download g161084snap125.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap138.jpg · Sequence: 52

Binary file (83659 bytes)

Download g161084snap138.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap139.jpg · Sequence: 53

Binary file (61145 bytes)

Download g161084snap139.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap143.jpg · Sequence: 54

Binary file (99657 bytes)

Download g161084snap143.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap148.jpg · Sequence: 55

Binary file (64658 bytes)

Download g161084snap148.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap150.jpg · Sequence: 56

Binary file (68206 bytes)

Download g161084snap150.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap152.jpg · Sequence: 57

Binary file (47259 bytes)

Download g161084snap152.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap154.jpg · Sequence: 58

Binary file (28402 bytes)

Download g161084snap154.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap163.jpg · Sequence: 59

Binary file (78848 bytes)

Download g161084snap163.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap171.jpg · Sequence: 60

Binary file (70224 bytes)

Download g161084snap171.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap172.jpg · Sequence: 61

Binary file (72315 bytes)

Download g161084snap172.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap174.jpg · Sequence: 62

Binary file (19706 bytes)

Download g161084snap174.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap174a.jpg · Sequence: 63

Binary file (24091 bytes)

Download g161084snap174a.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap174b.jpg · Sequence: 64

Binary file (15034 bytes)

Download g161084snap174b.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap175.jpg · Sequence: 65

Binary file (24221 bytes)

Download g161084snap175.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap175a.jpg · Sequence: 66

Binary file (25271 bytes)

Download g161084snap175a.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap175b.jpg · Sequence: 67

Binary file (15526 bytes)

Download g161084snap175b.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap176.jpg · Sequence: 68

Binary file (54637 bytes)

Download g161084snap176.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap178.jpg · Sequence: 69

Binary file (50334 bytes)

Download g161084snap178.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap189.jpg · Sequence: 70

Binary file (109430 bytes)

Download g161084snap189.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap190.jpg · Sequence: 71

Binary file (103681 bytes)

Download g161084snap190.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap212.jpg · Sequence: 72

Binary file (123223 bytes)

Download g161084snap212.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap236.jpg · Sequence: 73

Binary file (57797 bytes)

Download g161084snap236.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap237.jpg · Sequence: 74

Binary file (60809 bytes)

Download g161084snap237.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap237a.jpg · Sequence: 75

Binary file (60571 bytes)

Download g161084snap237a.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap238.jpg · Sequence: 76

Binary file (49669 bytes)

Download g161084snap238.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap242.jpg · Sequence: 77

Binary file (48410 bytes)

Download g161084snap242.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap245.jpg · Sequence: 78

Binary file (39840 bytes)

Download g161084snap245.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap245a.jpg · Sequence: 79

Binary file (40959 bytes)

Download g161084snap245a.jpg

GRAPHIC

GRAPHIC

Filename: g161084snap9.jpg · Sequence: 80

Binary file (1632 bytes)

Download g161084snap9.jpg

XML — IDEA: XBRL DOCUMENT

XML

Filename: R1.htm · Sequence: 82

v3.26.1

Document and Entity Information

Jun. 17, 2026

Cover [Abstract]

Amendment Flag

false

Entity Central Index Key

0001629210

Document Type

8-K

Document Period End Date

Jun. 17, 2026

Entity Registrant Name

Paramount Gold Nevada Corp.

Entity Incorporation State Country Code

NV

Entity File Number

001-36908

Entity Tax Identification Number

98-0138393

Entity Address, Address Line One

665 Anderson Street

Entity Address, City or Town

Winnemucca

Entity Address, State or Province

NV

Entity Address, Postal Zip Code

89445

City Area Code

775

Local Phone Number

625-3600

Written Communications

false

Soliciting Material

false

Pre Commencement Tender Offer

false

Pre Commencement Issuer Tender Offer

false

Security 12b Title

Common Stock, $0.01 Par Value Per Share

Trading Symbol

PZG

Security Exchange Name

NYSEAMER

Entity Emerging Growth Company

false

X

- Definition

Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.

+ References

No definition available.

+ Details

Name:

dei_AmendmentFlag

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Area code of city

+ References

No definition available.

+ Details

Name:

dei_CityAreaCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Cover page.

+ References

No definition available.

+ Details

Name:

dei_CoverAbstract

Namespace Prefix:

dei_

Data Type:

xbrli:stringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.

+ References

No definition available.

+ Details

Name:

dei_DocumentPeriodEndDate

Namespace Prefix:

dei_

Data Type:

xbrli:dateItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.

+ References

No definition available.

+ Details

Name:

dei_DocumentType

Namespace Prefix:

dei_

Data Type:

dei:submissionTypeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 1 such as Attn, Building Name, Street Name

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine1

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the City or Town

+ References

No definition available.

+ Details

Name:

dei_EntityAddressCityOrTown

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Code for the postal or zip code

+ References

No definition available.

+ Details

Name:

dei_EntityAddressPostalZipCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the state or province.

+ References

No definition available.

+ Details

Name:

dei_EntityAddressStateOrProvince

Namespace Prefix:

dei_

Data Type:

dei:stateOrProvinceItemType

Balance Type:

na

Period Type:

duration

X

- Definition

A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityCentralIndexKey

Namespace Prefix:

dei_

Data Type:

dei:centralIndexKeyItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Indicate if registrant meets the emerging growth company criteria.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityEmergingGrowthCompany

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.

+ References

No definition available.

+ Details

Name:

dei_EntityFileNumber

Namespace Prefix:

dei_

Data Type:

dei:fileNumberItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Two-character EDGAR code representing the state or country of incorporation.

+ References

No definition available.

+ Details

Name:

dei_EntityIncorporationStateCountryCode

Namespace Prefix:

dei_

Data Type:

dei:edgarStateCountryItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityRegistrantName

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityTaxIdentificationNumber

Namespace Prefix:

dei_

Data Type:

dei:employerIdItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Local phone number for entity.

+ References

No definition available.

+ Details

Name:

dei_LocalPhoneNumber

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 13e

-Subsection 4c

+ Details

Name:

dei_PreCommencementIssuerTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14d

-Subsection 2b

+ Details

Name:

dei_PreCommencementTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Title of a 12(b) registered security.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b

+ Details

Name:

dei_Security12bTitle

Namespace Prefix:

dei_

Data Type:

dei:securityTitleItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the Exchange on which a security is registered.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection d1-1

+ Details

Name:

dei_SecurityExchangeName

Namespace Prefix:

dei_

Data Type:

dei:edgarExchangeCodeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14a

-Subsection 12

+ Details

Name:

dei_SolicitingMaterial

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Trading symbol of an instrument as listed on an exchange.

+ References

No definition available.

+ Details

Name:

dei_TradingSymbol

Namespace Prefix:

dei_

Data Type:

dei:tradingSymbolItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Securities Act

-Number 230

-Section 425

+ Details

Name:

dei_WrittenCommunications

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration