Form 8-K
8-K — Paramount Gold Nevada Corp.
Accession: 0001193125-26-278471
Filed: 2026-06-23
Period: 2026-06-17
CIK: 0001629210
SIC: 1000 (METAL MINING)
Item: Regulation FD Disclosure
Item: Other Events
Item: Financial Statements and Exhibits
Documents
8-K — d161084d8k.htm (Primary)
EX-23.1 (d161084dex231.htm)
EX-99.1 (d161084dex991.htm)
EX-99.2 (d161084dex992.htm)
GRAPHIC (g161084dsp11.jpg)
GRAPHIC (g161084dsp115_.jpg)
GRAPHIC (g161084g03g18.jpg)
GRAPHIC (g161084g0618052738802.jpg)
GRAPHIC (g161084g0618074827912.jpg)
GRAPHIC (g161084g0618074828763.jpg)
GRAPHIC (g161084g0618074829188.jpg)
GRAPHIC (g161084g0618074829490.jpg)
GRAPHIC (g161084g0618074830086.jpg)
GRAPHIC (g161084g0618074830432.jpg)
GRAPHIC (g161084g0618074831053.jpg)
GRAPHIC (g161084g0618074831319.jpg)
GRAPHIC (g161084g0618074832009.jpg)
GRAPHIC (g161084g0618074832495.jpg)
GRAPHIC (g161084g0618080058301.jpg)
GRAPHIC (g161084g0618080059141.jpg)
GRAPHIC (g161084g0618080100184.jpg)
GRAPHIC (g161084g0618080102100.jpg)
GRAPHIC (g161084g0618110709066.jpg)
GRAPHIC (g161084g0618110709620.jpg)
GRAPHIC (g161084g0618110709949.jpg)
GRAPHIC (g161084g0618110710295.jpg)
GRAPHIC (g161084g0618110710642.jpg)
GRAPHIC (g161084g0618110710979.jpg)
GRAPHIC (g161084g0618131905468.jpg)
GRAPHIC (g161084g0618131905785.jpg)
GRAPHIC (g161084g12g12.jpg)
GRAPHIC (g161084g13g13.jpg)
GRAPHIC (g161084g14g14.jpg)
GRAPHIC (g161084g15g15.jpg)
GRAPHIC (g161084g16g16.jpg)
GRAPHIC (g161084g17g17.jpg)
GRAPHIC (g161084g41r48.jpg)
GRAPHIC (g161084g76r56.jpg)
GRAPHIC (g161084g93b33.jpg)
GRAPHIC (g161084g93p68.jpg)
GRAPHIC (g161084snap117.jpg)
GRAPHIC (g161084snap118.jpg)
GRAPHIC (g161084snap118a.jpg)
GRAPHIC (g161084snap119.jpg)
GRAPHIC (g161084snap122.jpg)
GRAPHIC (g161084snap123.jpg)
GRAPHIC (g161084snap124.jpg)
GRAPHIC (g161084snap125.jpg)
GRAPHIC (g161084snap138.jpg)
GRAPHIC (g161084snap139.jpg)
GRAPHIC (g161084snap143.jpg)
GRAPHIC (g161084snap148.jpg)
GRAPHIC (g161084snap150.jpg)
GRAPHIC (g161084snap152.jpg)
GRAPHIC (g161084snap154.jpg)
GRAPHIC (g161084snap163.jpg)
GRAPHIC (g161084snap171.jpg)
GRAPHIC (g161084snap172.jpg)
GRAPHIC (g161084snap174.jpg)
GRAPHIC (g161084snap174a.jpg)
GRAPHIC (g161084snap174b.jpg)
GRAPHIC (g161084snap175.jpg)
GRAPHIC (g161084snap175a.jpg)
GRAPHIC (g161084snap175b.jpg)
GRAPHIC (g161084snap176.jpg)
GRAPHIC (g161084snap178.jpg)
GRAPHIC (g161084snap189.jpg)
GRAPHIC (g161084snap190.jpg)
GRAPHIC (g161084snap212.jpg)
GRAPHIC (g161084snap236.jpg)
GRAPHIC (g161084snap237.jpg)
GRAPHIC (g161084snap237a.jpg)
GRAPHIC (g161084snap238.jpg)
GRAPHIC (g161084snap242.jpg)
GRAPHIC (g161084snap245.jpg)
GRAPHIC (g161084snap245a.jpg)
GRAPHIC (g161084snap9.jpg)
XML — IDEA: XBRL DOCUMENT (R1.htm)
8-K
8-K (Primary)
Filename: d161084d8k.htm · Sequence: 1
8-K
false 0001629210 0001629210 2026-06-17 2026-06-17
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d)
of the Securities Exchange Act of 1934
Date of Report (Date of earliest event reported): June 17, 2026
Paramount Gold Nevada Corp.
(Exact name of Registrant as Specified in Its Charter)
Nevada
001-36908
98-0138393
(State or Other Jurisdiction
of Incorporation)
(Commission
File Number)
(IRS Employer
Identification No.)
665 Anderson Street
Winnemucca, Nevada
89445
(Address of Principal Executive Offices)
(Zip Code)
Registrant’s Telephone Number, Including Area Code: 775 625-3600
(Former Name or Former Address, if Changed Since Last Report)
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:
☐
Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
☐
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
☐
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
☐
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Trading
Symbol(s)
Name of each exchange
on which registered
Common Stock, $0.01 Par Value Per Share
PZG
NYSE American LLC
Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§ 230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§ 240.12b-2 of this chapter).
Emerging growth company ☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Item 7.01 Regulation FD Disclosure.
On June 17, 2026, Paramount Gold Nevada Corp. (the “Company”) issued a press release announcing the results of a Technical Report Summary Initial Assessment, prepared in accordance with subpart 1300 of Regulation S-K, for its 100%-owned Sleeper Gold Project located in Humboldt County, Nevada. A copy of the press release is furnished as Exhibit 99.1 to this Current Report on Form 8-K and is incorporated herein by reference.
This report, including Exhibit 99.1, contains forward-looking statements that are subject to risks and uncertainties that could cause actual results to differ materially. Additional information regarding these risks is set forth in Exhibit 99.1 and in the Company’s filings with the Securities and Exchange Commission. The Company undertakes no obligation to update any forward-looking statement except as required by law.
The information furnished under this Item 7.01, including the referenced exhibit, shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933, except as shall be expressly set forth by reference to such filing.
Item 8.01 Other Events
On June 17, 2022, Paramount Gold Nevada Corp. (the “Company”) announced that it had completed a technical report summary, effective as of April 29, 2026, which had been prepared in accordance with the requirements of subpart 1300 of Regulation S-K, for its Sleeper Gold Project (the “Report”). The Report and the corresponding consent of the “Qualified Person” are filed as Exhibits 99.2 and 23.1, respectively, to this Current Report on Form 8-K and are incorporated herein by reference.
Item 9.01 Financial Statements and Exhibits.
(d) Exhibits.
Exhibit
Number
Description
23.1
Consent of Qualified Person - SLR International Corporation
99.1
Press release of Paramount Gold Nevada Corp. dated June 17, 2026.
99.2
Technical Report Summary for the Sleeper Gold Project effective April 29, 2026.
104
Cover Page Interactive Data File (embedded within the Inline XBRL document)
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
Paramount Gold Nevada Corp.
Date: June 23, 2026
By:
/s/ Rachel Goldman
Rachel Goldman, Chief Executive Officer
EX-23.1
EX-23.1
Filename: d161084dex231.htm · Sequence: 2
EX-23.1
SLR International Corporation
165 S.
Union Blvd., Suite 888, Lakewood, CO 80228
Exhibit 23.1
June 23, 2026
Consent of Qualified Person
SLR International Corporation (“SLR”), in connection with the Paramount Gold Nevada Corp. Current Report on Form 8-K (the “Form 8-K”), consents to:
i.
the filing of the technical report summary titled “S-K 1300
Technical Report Summary, Sleeper Gold Mine, Humboldt County, Nevada” (the “TRS”), dated June 17, 2026, as an exhibit to and referenced in the Form 8-K;
ii.
the incorporation by reference of the TRS in the Registration Statements on Form
S-3 (333-275376) and Form S-8 (No. 333-205024,
No. 333-262857 and No. 333-291058) (the “Registration Statements”);
iii.
the use of and references to our name in connection with the TRS, Form
8-K, and the Registration Statements; and
iv.
the information derived, summarized, quoted or referenced from the TRS, or portions thereof, that was prepared
by us, that we supervised the preparation of, and/or that was reviewed and approved by us, that is included or incorporated by reference in the Form 8-K and the Registration Statements.
SLR International Corporation is responsible for authoring, and this consent pertains to all sections of the TRS.
SLR International Corporation
Per:
/s/ Grant A. Malensek
Grant A. Malensek, P.Eng.
Technical Director – Mining Advisory
Financial Sector
Services (Americas)
1
EX-99.1
EX-99.1
Filename: d161084dex991.htm · Sequence: 3
EX-99.1
Exhibit 99.1
Paramount Gold Announces Positive Initial Assessment of the Sleeper Gold Project
After-Tax NPV of $402M and IRR of 45% ($3,600/oz gold)
After-Tax NPV of $867M and IRR of 66% ($4,700/oz gold)
Winnemucca, Nevada – June 17, 2026 – Paramount Gold Nevada Corp. (NYSE American: PZG) (“Paramount” or the
“Company”) announced today the results of an Initial Assessment prepared in accordance with S-K 1300 (the “Assessment” or “Study”) for its 100%-owned Sleeper Gold Project
(“Sleeper” or the “Project”), a past-producing gold mine located in Humboldt County, Nevada. All figures are in U.S. Dollars.
The
Assessment evaluates the potential restart of the historic Sleeper Mine through the processing of existing waste rock dumps and mining of in situ oxide and mixed Mineral Resources utilizing conventional
open-pit mining and a 30,000 tonne per day crush-agglomerate-heap-leach processing facility with Merrill-Crowe recovery.
The Project demonstrates strong economics, based on assumed metal prices of $3,600 per ounce gold and $48 per ounce silver, including an after-tax net present value (NPV) at an 8% discount rate of $402 million, an after-tax internal rate of return (IRR) of 44%, and a payback period of approximately 1.4
years.
The Assessment includes sensitivity analysis to higher commodity prices amongst other inputs. Assuming metal prices of $4,700 per ounce gold and
$80 per ounce silver, the Project’s after-tax NPV (8%) increases to $867 million, with an IRR of 66% and a payback period of 1.2 years.
Over a 17-year mine life, the Assessment projects average annual gold production of approximately 65,000 ounces and
total payable gold production of approximately 1.1 million ounces.
The use of existing mineralized surface material and existing infrastructure
contributes to the Project’s strong economics by reducing upfront capital requirements and leads to the expected, short payback period. Approximately 47 million tonnes of mineralized waste dump material containing approximately 420,000
recoverable ounces of gold are included in the mine plan, representing a significant, lower-cost source of early production and cash flow prior to initiation of open pit mining. The economic analysis considers only oxide and mixed mineralized
material amenable to heap leaching, and does not include sulfide mineralization, which will be evaluated in subsequent studies.
PARAMOUNT GOLD NEVADA
CORP.
665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233
1
Rachel Goldman, Chief Executive Officer of Paramount, stated:
“The Sleeper Initial Assessment outlines an exciting restart opportunity, with strong projected returns, a short payback period and a 17-year mine life. In the first five years alone, the Project has a very low strip ratio of 0.74:1 and is expected to produce approximately 348,000 ounces of gold and 1.33 million ounces of silver, generating after-tax cash flow of approximately $514 million in the Base Case and $826 million in the Upside Case.
Building on these results, Sleeper offers further excellent optionality. The Project can advance toward a production restart, while additional surface
materials not yet included in this Assessment will be evaluated for inclusion in future study updates. There exists meaningful potential to convert additional resource ounces and expand the surface sources of heap-leachable inventory. The longer we
can extend that phase of operations, the stronger the overall project economics become.
Additionally, with no significant exploration conducted at
Sleeper in over two decades, we see substantial upside through a focused exploration program across our large land position.
The Study reinforces our
view that Sleeper is well positioned for redevelopment and has the potential to become an important producing asset for Paramount. We look forward to updating these results as we continue to advance the Project.”
The following table summarizes key metrics from the Assessment, including an upside case at higher metal prices.
SUMMARY OF INITIAL ASSESSMENT METRICS
METRIC
BASE CASE
($3,600/oz GOLD)
UPSIDE CASE†
($4,700/oz GOLD)
Project Economics
After-tax NPV (8%)
$
402M
$
867M
After-tax IRR
45%
66%
Payback
1.4 years
1.2 years
Production Profile
Average Annual Gold Production
65 koz
Average Annual Silver Production
205 koz
Total Payable Gold
1.101 Moz
Total Payable Silver
3.376 Moz
Mine Life
17 years
Capital and Cost Structure (Base Case)
Initial Capital
$201M
PARAMOUNT GOLD NEVADA
CORP.
665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233
2
Sustaining Capital
$343M
Closure Capital
$52M
Cash Costs*
$
2,048/oz
$
1,987/oz
All-in sustaining costs**
$
2,407/oz
$
2,346/oz
NOTES:
†
Production and capital cost metrics are unchanged across both price cases.
*
Cash costs consist of mining costs, dewatering costs, processing costs, mine-level G&A, refining charges
and royalties, net of by-product credits.
**
AISC includes cash costs plus sustaining capital and closure costs, net of silver by-product credits, at the project level. Corporate G&A is not included. The reported AISC reflects the benefit of low-cost ounces already stacked on the existing heap
leach pads, which require minimal additional spending to recover. As these legacy ounces are depleted and replaced with newly mined material, unit costs are expected to gradually normalize toward long-term levels.
The following table compares the Project’s economics over the first five years of operations to the full 17-year
mine life. Over the life of the mine, the Project is expected to produce approximately 1.10 million ounces of gold and 3.38 million ounces of silver, generating cumulative after-tax cash flow of
approximately $918 million in the Base Case and $1.93 billion in the Upside Case.
BASE CASE AND UPSIDE CASE: FIRST FIVE YEARS COMPARED TO
LIFE OF MINE
First Five Years
Life of Mine (LOM)
Units
Base Case,
$3,600
Upside
Case,
$4,700
Base
Case,
$3,600
Upside
Case,
$4,700
Mineralized Tonnes Mined
kt
51
51
175
175
Waste Tonnes Mined
kt
37
37
266
266
Total Tonnes Mined
kt
88
88
442
442
Strip Ratio
Waste: Ore
0.74
0.74
1.52
1.52
Gold Production
koz
348
348
1,101
1,101
Silver Production
koz
1,329
1,329
3,376
3,376
Mining Costs
US$
/t
$
2.24
$
2.24
$
2.53
$
2.53
Pit Dewatering
US$
/t
$
0.33
$
0.33
$
0.59
$
0.59
Processing Costs
US$
/t
$
5.55
$
5.55
$
5.55
$
5.55
G&A Costs
US$
/t
$
0.52
$
0.52
$
0.52
$
0.52
After-tax Cash Flow
US$
M
$
514
$
826
$
918
$
1,928
Cumulative Cash Flow
US$
M
$
307
$
619
$
918
$
1,928
All-in sustaining costs**
US$
/oz
$
1,854
$
1,934
$
2,407
$
2,346
After-tax IRR
%
41
%
63
%
45
%
66
%
After-tax NPV at 8%
US$
M
$
190
$
403
$
402
$
872
PARAMOUNT GOLD NEVADA
CORP.
665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233
3
MINERAL RESOURCE ESTIMATE (METRIC)
The Mineral Resource estimate presented below reflects updated geological interpretations, revised economic parameters, and updated metallurgical recovery
assumptions. The estimate includes in situ oxide, mixed and sulfide mineralization, as well as surface material contained in waste rock dumps, heap leach pads, and the tailings storage facility, which is classified as Inferred. The Project hosts
1.99 million ounces of gold in Measured and Indicated Mineral Resources and an additional 2.30 million ounces of gold in Inferred Mineral Resources, compared to 1.90 million ounces and 1.21 million ounces, respectively, in the
2023 Mineral Resource estimate. This represents an increase of approximately 5% in Measured and Indicated Resources and 90% in Inferred Resources, significantly expanding the Project’s resource base and future growth potential.
Category
Tonnes
(Mt)
Au
g/t
Au
Moz
Ag
g/t
Ag
Moz
Measured
5.5
0.492
0.09
3.487
0.62
Indicated
179.2
0.330
1.90
3.842
22.1
Measured & Indicated
184.7
0.335
1.99
3.832
22.8
Inferred
238.0
0.301
2.30
3.403
26.0
NOTES:
1.
The definitions for Mineral Resources in S-K 1300 were followed for
Mineral Resources
2.
The Mineral Resource estimate is reported on a 100% ownership basis.
3.
The point of reference for the Mineral Resource is before the crusher (in situ).
4.
Open Pit Mineral Resources are reported at a cut-off grade ranging from
0.074 g/t to 0.217 g/t Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.
5.
The optimized pit shell and cut-off grades were generated by assuming
metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of $2.40/t moved for open pit, processing costs of $5.51/t oxide/mixed and $10.44 sulfide
processed, and general and administrative costs of $0.46/t processed
6.
Minimal mining width was 60 m for oxide/mixed material and 20m for sulfide material
7.
Mineral Resources are estimated using a long-term gold price of $3,100 per ounce
8.
Bulk density ranges from 1.5 t/m3 in the tailings storage area to 2.7 t/m3 for in situ material
9.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
10.
Numbers may not add due to rounding.
The Sleeper Mine produced approximately 1.66 million ounces of gold and 2.3 million ounces of silver between 1986 and 1996 and benefits from
existing infrastructure, established site access, extensive historical operating data, and a large land position in one of the world’s premier mining jurisdictions.
RECOMMENDED ADVANCEMENT PROGRAM
The Assessment
recommends an $8.7 million advancement program designed to improve resource confidence classifications, enhance metallurgical and geotechnical confidence, complete environmental baseline studies, advance permitting activities, optimize
heap-leach design through engineering studies, and support the completion of a pre-feasibility study.
PARAMOUNT GOLD NEVADA
CORP.
665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233
4
In parallel, the Company plans to initiate permitting for infill drilling targeting surface material, which
includes the historic heap leach pads and tailings storage facility at Sleeper. This work will support future resource updates and contribute to subsequent pre-feasibility or feasibility studies. Permitting is
expected to be straightforward and timely, as the proposed activities fall within the scope of the existing Plan of Operations.
The updated S-K 1300 Technical Report Summary for the Sleeper Gold Project will be available on the Company’s website and filed with the U.S. Securities and Exchange Commission on Form
8-K. The report will also be included in the Company’s next Annual Report on Form 10-K.
Qualified Persons
The
S-K 1300 Technical Report Summary Initial Assessment was prepared by SLR International Corporation (“SLR”). The scientific and technical information from the technical report summary and contained
in this news release has been reviewed and verified by the QP of SLR, who is independent of Paramount Gold Nevada Corp. within the meaning of S-K 1300.
About Paramount Gold Nevada Corp.
Paramount Gold Nevada
Corp. is a U.S.-focused exploration and development company advancing a portfolio of high-quality gold assets. The Company holds a 100% interest in approximately 50,000 acres across its portfolio, including the Grassy Mountain and Sleeper projects.
Grassy Mountain is an advanced-stage development project in Malheur County, Oregon. Sleeper is a past-producing development project in Humboldt County,
Nevada, one of the world’s premier mining jurisdictions, with a large land position.
About SLR Consulting
SLR Consulting is a global consulting firm providing integrated technical, advisory, environmental, and sustainability services to mining and investment
clients. SLR supports projects across the entire lifecycle, from exploration and development through operations and closure. (www.slrconsulting.com)
For further information, please contact:
Rachel Goldman
CEO and Director
rachel@paramountnevada.com
844.488.2233
Investor Relations
IR@paramountnevada.com
844.488.2233
PARAMOUNT GOLD NEVADA
CORP.
665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233
5
Safe Harbor for Forward-Looking Statements
This release and related documents may include “forward-looking statements” and “forward-looking information” (collectively,
“forward-looking statements”) pursuant to applicable United States and Canadian securities laws. Paramount’s future expectations, beliefs, goals, plans or prospects constitute forward-looking statements within the meaning of the
United States Private Securities Litigation Reform Act of 1995 and other applicable securities laws. Words such as “believes,” “plans,” “anticipates,” “expects,” “may,”
“continue,” “intend,” “estimates,” “potential,” “budget,” “scheduled,” “project,” and similar expressions, or the negatives of, such words and phrases, or statements
that certain actions, events or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved, are intended to identify forward-looking statements,
although these words may not be present in all forward-looking statements. Forward-looking statements included in this news release include, without limitation, statements with respect to the timing and success of the permitting of the Grassy
Mountain Gold Project and the Sleeper Gold Project, and the results of the Sleeper Initial Assessment. Forward-looking statements are based on the reasonable assumptions, estimates, analyses and opinions of management made in light of its experience
and its perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be
incorrect. Management believes that the assumptions and expectations reflected in such forward-looking statements are reasonable. Assumptions have been made regarding, among other things: the conclusions made in the Sleeper Initial Assessment; the
conclusions made in the feasibility study for the Grassy Mountain Gold Project (the “FS”); the quantity and grade of resources included in resource estimates; the accuracy and achievability of projections included in the FS;
Paramount’s ability to carry on exploration and development activities, including construction; the timely receipt of required approvals and permits; the price of silver, gold and other metals; prices for key mining supplies, including labor
costs and consumables, remaining consistent with current expectations; work meeting expectations and being consistent with estimates and plant, equipment and processes operating as anticipated. There are a number of important factors that could
cause actual results or events to differ materially from those indicated by such forward-looking statements, including, but not limited to: uncertainties involving interpretation of drilling results; environmental matters; the ability to obtain
required permitting; equipment breakdown or disruptions; additional financing requirements; the completion of a definitive feasibility study for the Sleeper Gold Project; discrepancies between actual and estimated mineral reserves and mineral
resources, between actual and estimated development and operating costs, between actual and estimated timing of production and development, between estimated and actual production; and the other factors described in Paramount’s disclosures as
filed with the U.S. Securities and Exchange Commission, and the Ontario, British Columbia and Alberta Securities Commissions.
Please see “Risks
Factors” in the Form 10-K filed by Paramount for the fiscal year ended June 30, 2025, for more information regarding risks pertaining to the Company, which is available on EDGAR at
www.sec.gov/edgar. Readers are encouraged to carefully review these risk factors as well as the Company’s other filings with the U.S. Securities and Exchange Commission. All forward-looking statements contained in this press release speak only
as of the date of this press release or as of the dates specified in such statements. Except as required by applicable law, Paramount disclaims any intention or obligation to update any forward-looking statements as a result of developments
occurring after the date of this document.
PARAMOUNT GOLD NEVADA
CORP.
665 Anderson Street, Winnemucca, NV, USA, 89445 T: (844) 488-2233
6
EX-99.2
EX-99.2
Filename: d161084dex992.htm · Sequence: 4
EX-99.2
Exhibit 99.2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table of Contents
1.0
Executive Summary
1-1
1.1
Summary
1-1
1.2
Economic Analysis
1-9
1.3
Technical Summary
1-28
2.0
Introduction
2-1
2.1
Site Visits
2-3
2.2
Sources of Information
2-3
2.3
List of Abbreviations
2-4
3.0
Property Description
3-1
3.1
Location
3-1
3.2
Land Tenure
3-3
3.3
Encumbrances
3-7
3.4
Royalties
3-7
3.5
Required Permits and Status
3-7
3.6
Other Significant Factors and Risks
3-9
4.0
Accessibility, Climate, Local Resources, Infrastructure, and Physiography
4-1
4.1
Accessibility
4-1
4.2
Climate
4-1
4.3
Local Resources and Infrastructure
4-1
4.4
Physiography
4-4
5.0
History
5-1
5.1
Early Mining – Awakening District (Pre-1982)
5-1
5.2
Ownership
5-1
5.3
Exploration and Development History
5-3
5.4
Past Production
5-6
6.0
Geological Setting, Mineralization, and Deposit
6-1
6.1
Regional Geology
6-1
6.2
Local Geology
6-5
6.3
Mineralization
6-10
6.4
Deposit Types
6-13
7.0
Exploration
7-1
7.1
Exploration
7-1
i
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
7.2
Drilling
7-2
7.3
Hydrogeology Data
7-8
7.4
Geotechnical Data
7-13
8.0
Sample Preparation, Analyses, and Security
8-1
8.1
Sample Method and Approach
8-1
8.2
Sample Preparation and Analysis
8-2
8.3
Quality Assurance and Quality Control
8-6
8.4
Sample Security
8-22
8.5
QP Opinion
8-23
9.0
Data Verification
9-1
9.1
RESPEC Data Validation
9-1
9.2
SLR Data Verification
9-2
9.3
QP Opinion
9-2
10.0
Mineral Processing and Metallurgical Testing
10-1
10.1
Introduction
10-1
10.2
Nature and Extent of Metallurgical Testing and Analytical Procedures
10-1
10.3
Sample Representativeness
10-2
10.4
Testing Laboratories
10-3
10.5
Relevant Metallurgical Results
10-3
10.6
Recovery Assumptions and Basis for Estimation
10-5
10.7
QP Opinion - Adequacy of Data
10-11
11.0
Mineral Resource Estimates
11-1
11.1
Summary
11-1
11.2
Resource Database
11-6
11.3
Geological Interpretation
11-6
11.4
Resource Assays
11-13
11.5
Treatment of High-Grade Assays
11-13
11.6
Compositing
11-14
11.7
Spatial Analysis
11-16
11.8
Bulk Density
11-17
11.9
Block Models
11-18
11.10
Search Strategy and Grade Interpolation Parameters
11-20
11.11
Reasonable Prospects for Economic Extraction for Mineral Resources
11-21
11.12
Classification
11-27
ii
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.13
Block Model Validation
11-28
11.14
Sensitivity to Reporting Cut-off
11-37
11.15
Comparison with Previous Estimate
11-38
11.16
Mineral Resource Reporting
11-40
12.0
Mineral Reserve Estimates
12-1
13.0
Mining Methods
13-1
13.1
Geotechnical Studies
13-1
13.2
Mine Design
13-1
13.3
Waste Rock Storage Facilities Design
13-6
13.4
Mining Method
13-8
13.5
Life of Mine Plan
13-10
13.6
Contract Mining Discussion
13-13
13.7
Mine Infrastructure
13-15
13.8
Mine Equipment
13-17
13.9
Mine Personnel
13-20
14.0
Processing and Recovery Methods
14-1
14.1
Selected Processing Strategy
14-1
14.2
Proposed Process Description
14-1
14.3
Plant Throughput and Design Basis
14-2
14.4
Energy, Water, Process Materials, and Personnel
14-2
14.5
Suitability of the Selected Method
14-2
15.0
Infrastructure
15-1
15.1
Access Roads
15-3
15.2
Leach Pad
15-3
15.3
Buildings and Facilities
15-5
15.4
Power Supply and Distribution
15-6
15.5
Water
15-7
15.6
Accommodation Camp
15-9
16.0
Market Studies and Contracts
16-1
16.1
Markets
16-1
16.2
Contracts
16-1
17.0
Environmental Studies, Permitting and Plans, and Social or Community Impact
17-1
17.1
Site Environmental Conditions and Monitoring Programs
17-1
17.2
Waste and Tailings Disposal, Site Monitoring, and Water Management
17-3
iii
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
17.3
Project Permitting
17-5
17.4
Social or Community Requirements
17-7
17.5
Mine Closure Requirements and Summary
17-8
17.6
QP Opinion
17-8
18.0
Capital and Operating Costs
18-1
18.1
Capital Costs
18-1
18.2
Operating Costs
18-2
19.0
Economic Analysis
19-1
19.1
Base Case
19-1
19.2
Alternative Case - Measured and Indicated Only
19-10
20.0
Adjacent Properties
20-1
21.0
Other Relevant Data and Information
21-1
21.1
Sleeper PFS - Project Overview and Execution Philosophy
21-1
21.2
Project Development Strategy
21-1
21.3
Workstreams and Scope of Activities
21-2
21.4
Schedule and Critical Path
21-5
21.5
Procurement and Contracting Strategy
21-6
21.6
Sulfide Mineralization – Future Work Programs
21-6
21.7
Risk Management
21-8
21.8
Conclusion
21-9
22.0
Interpretation and Conclusions
22-1
22.1
Geology and Mineral Resources
22-1
22.2
Mining and Mineral Reserves
22-2
22.3
Mineral Processing
22-2
22.4
Infrastructure
22-3
22.5
Environment
22-3
22.6
Capital and Operating Costs
22-3
22.7
Risks
22-4
23.0
Recommendations
23-1
23.1
Geology and Mineral Resources
23-1
23.2
Mining and Mineral Reserves
23-3
23.3
Mineral Processing
23-3
23.4
Infrastructure
23-3
23.5
Environment
23-4
iv
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
23.6
Capital and Operating Costs
23-4
24.0
References
24-1
25.0
Reliance on Information Provided by the Registrant
25-1
26.0
Date and Signature Page
26-1
27.0
Appendix 1 List of Claims
27-1
28.0
Appendix 2 Cash Flow Summaries
28-1
Tables
Table 1-1:
Proposed Sleeper 2026-2027 Exploration Budget
1-6
Table 1-2:
Sleeper Base Case Production Physicals Summary
1-11
Table 1-3:
Federal and State Tax Summary
1-12
Table 1-4:
Royalties Summary
1-12
Table 1-5:
Total Life of Mine Metrics – Base Case
1-15
Table 1-6:
Base Case All-in Sustaining Costs Composition
1-16
Table 1-7:
Base Case After-Tax Sensitivity Analyses
1-17
Table 1-8:
Sleeper Alternative Case Production Physicals Summary
1-20
Table 1-9:
Federal and State Tax Summary
1-21
Table 1-10:
Royalties Summary
1-21
Table 1-11:
Total Life of Mine Metrics – Alternative Case (Measured and Indicated Only)
1-24
Table 1-12:
Alternative Case All-in Sustaining Costs
Composition
1-25
Table 1-13:
Alternative Case After-Tax Sensitivity Analyses
1-27
Table 1-14:
Summary of Mineral Resources Estimate – April 29, 2026
1-31
Table 3-1:
Sleeper – Summary of Claim Holdings
3-3
Table 3-2:
Property Holding Costs
3-7
Table 3-3:
Royalty Agreement Summary
3-7
Table 3-4:
Sleeper - Key BLM and State Permits in Place
3-8
Table 3-5:
Sleeper Reclamation Bonds
3-9
Table 5-1:
Sleeper Gold Mine – Total Annual Production (1986–1996)
5-6
Table 7-1:
Drill Hole Database
7-3
Table 7-2:
Hydrostratigraphic Unit Hydraulic Properties
7-10
Table 7-3:
Monthly Water Balance for the Calibrated Pit Lake Numerical Model
7-10
Table 7-4:
Evolution of Pit Lake Water Quality
7-11
Table 7-5:
Groundwater Sample Distribution
7-12
Table 7-6:
Exceedances of USEPA Water Quality Standards in Dewatering Discharge
7-12
v
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 8-1:
Summary Counts of Sleeper QA/QC Analysis (X-Cal and
Paramount)
8-8
Table 8-2:
Paramount Gold Certified Reference Material
8-9
Table 8-3:
Summary of Sleeper Gold Results for CRMs 2010–2013
8-10
Table 8-4:
Gold Failure Details 2010–2013
8-10
Table 8-5:
Summary of Sleeper Silver Results for CRMs 2010–2013
8-12
Table 8-6:
Summary of Results X-Cal Historical and Paramount Field
Duplicates
8-17
Table 8-7:
X-Cal Blank Samples 2003–2007
8-20
Table 8-8:
X-Cal Blank Failures and Preceding Sample
2003–2007
8-20
Table 8-9:
Blank Materials Used in Paramount QA/QC Program
8-21
Table 10-1:
Metallurgical Reports Reviewed
10-1
Table 10-2:
Laboratory Accreditation Summary
10-3
Table 10-3:
Recovery Assumptions and Process Basis by Material Type
10-7
Table 11-1:
Summary of Mineral Resources Estimate – April 29, 2026
11-5
Table 11-2:
Summary of Drill Hole Data used in Mineral Resource Estimation
11-7
Table 11-3:
Sleeper In Situ Gold and Silver Capping Levels by Domain
11-14
Table 11-4:
Sleeper In Situ Gold Composite by Domain
11-16
Table 11-5:
Sleeper In Situ Silver Composite by Domain
11-17
Table 11-6:
Sleeper Density Values by Lithology
11-19
Table 11-7:
Summary of In Situ Block Model Extents
11-20
Table 11-8:
Summary of Waste Rock Dumps and Heap Leach Block Model Extents
11-20
Table 11-9:
Summary of TSF Block Model Extents
11-20
Table 11-10:
Sleeper Estimation Parameters by Domain
11-22
Table 11-11:
Sleeper Cut-off Grade Parameters by Domain
11-25
Table 11-12:
Summarized Methodology for Resource Classification
11-28
Table 11-13:
Summary of Composite vs Block Model Mean Au (ppm) Oxide/Mixed Pit – In Situ
11-29
Table 11-14:
Summary of Composite vs Block Model Mean Au (ppm) Sulfide Pit – In Situ
11-30
Table 11-15:
Summary of Composite vs Block Model Mean Au (ppm) Dumps
11-30
Table 11-16:
Summary of Composite vs Block Model Mean Au (ppm) Heaps and TSF
11-31
Table 11-17:
Open Pit Grade vs Tonnage for Measured + Indicated Resources (Oxide/Mixed Pit
Constrained)
11-38
Table 11-18:
Detailed Summary of Mineral Resources by Area – April 29, 2026
11-42
Table 13-1:
Geotechnical Design Criteria
13-1
Table 13-2:
Mine Design Parameters
13-5
Table 13-3:
WRSF Design Parameters
13-6
vi
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 13-4:
Drilling and Blasting Parameters
13-8
Table 13-5:
Mining Method and Equipment Summary
13-10
Table 13-6:
Process Feed from Existing Dumps to the Crusher
13-11
Table 13-7:
Process Feed from Open Pit to the Crusher
13-11
Table 13-8:
Mining Inventory Processed by Year
13-12
Table 13-9:
Base Case Open Pit Production Schedule
13-12
Table 13-10:
Primary Fleet Estimate
13-17
Table 13-11:
Equipment Diesel Consumption Estimate
13-19
Table 13-12:
Diesel Storage Comparisons
13-19
Table 13-13:
Recommended Diesel Storage Arrangements
13-20
Table 15-1:
Estimated Power Load by Area
15-7
Table 16-1:
Economic Analysis Metal Price Assumptions
16-1
Table 17-1:
Required or Potentially Required Permits
17-6
Table 18-1:
LOM Capital Cost Estimate
18-1
Table 18-2:
LOM Capital Cost Estimate by Major Area
18-2
Table 18-3:
LOM Average Unit Operating Costs
18-2
Table 18-4:
Sleeper Workforce (Year 3)
18-3
Table 19-1:
Sleeper Base Case Production Physicals Summary
19-2
Table 19-2:
Federal and State Tax Summary
19-3
Table 19-3:
Royalties Summary
19-3
Table 19-4:
Total Life of Mine Metrics – Base Case
19-6
Table 19-5:
Base Case All-in Sustaining Costs Composition
19-8
Table 19-6:
Base Case After-Tax Sensitivity Analyses
19-9
Table 19-7:
Sleeper Alternative Case Production Physicals Summary
19-11
Table 19-9:
Royalties Summary
19-12
Table 19-10:
Total Life of Mine Metrics – Alternative Case (Measured and Indicated Only)
19-15
Table 19-11:
Alternative Case All-in Sustaining Costs
Composition
19-16
Table 19-12:
Alternative Case After-Tax Sensitivity Analyses
19-18
Table 23-1:
Proposed Sleeper 2026-2027 Exploration Budget
23-2
Figures
Figure 1-1:
Mine Production Profile by Material Movement – Base Case
1-13
Figure 1-2:
Process Production Profile and Head Grade – Base Case
1-13
vii
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 1-3:
Annual Processing Gold Production and Head Grade Profile – Base Case
1-14
Figure 1-4:
Base Case Project After-Tax Metrics Summary
1-15
Figure 1-5:
Base Case After-Tax Sensitivity Analysis
1-19
Figure 1-6:
Mine Production Profile by Material Movement – Alternative Case
1-22
Figure 1-7:
Process Production Profile and Head Grade – Alternative Case
1-22
Figure 1-8:
Annual Processing Gold Production and Head Grade Profile
1-23
Figure 1-9:
Alternative Case Project After-Tax Metrics
Summary
1-24
Figure 1-10:
Alternative Case After-Tax Sensitivity Analysis
1-28
Figure 3-1:
Location Map
3-2
Figure 3-2:
Sleeper Tenement Map
3-5
Figure 6-1:
Regional Geology
6-3
Figure 6-2:
Cross Section of Regional Geology
6-4
Figure 6-3:
Stratigraphic Column
6-7
Figure 6-4:
Local Geology
6-8
Figure 6-5:
Cross Section of Local Geology
6-9
Figure 6-6:
Schematic Model of Low-Sulfidation Epithermal
System
6-11
Figure 7-1:
Drill Hole Location Map
7-5
Figure 8-1:
Gold Control Chart for MEG-Au.09.02
8-11
Figure 8-2:
X-Cal Core Preparation Duplicates, Relative Differences
2003-2007
8-13
Figure 8-3:
X-Cal Core Preparation Duplicates, Relative Differences
2003-2007
8-14
Figure 8-4:
X-Cal Gold RC Field Duplicates, Relative Differences
2003-2007
8-14
Figure 8-5:
X-Cal Gold RC Field Duplicates, Absolute Values of the
Relative Differences 2003-2007
8-15
Figure 8-6:
Paramount RC Field Duplicates, Relative Differences 2010-2013
8-18
Figure 8-7:
Paramount Core Field Duplicates, Relative Differences 2010-2013
8-19
Figure 8-8:
X-Cal Gold in Blanks and Preceding Samples
2003–2007
8-20
Figure 8-9:
Gold Values of Paramount Coarse Blanks and Preceding Samples
8-21
Figure 10-1:
Comparison of Reported Metallurgical Recovery Results
10-9
Figure 10-2:
Material Specific Reagent Consumption and IA Heap Leach Recovery Assumptions by Material
Type
10-10
Mineral Resources are classified in accordance with S-K 1300 definitions (Figure 11-1: Sleeper Mineral Resource Domains
11-2
Figure 11-1:
Sleeper Mineral Resource Domains
11-3
Figure 11-2:
Sleeper Geologic Model Cross Section
11-8
Figure 11-3:
Sleeper Mineralization Model Cross Section
11-10
viii
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-4:
Sleeper Alteration Model Cross Section
11-12
Figure 11-5:
Histogram of Sample Lengths in the Estimation Domains
11-14
Figure 11-6:
Sleeper Material Type/Area Distribution Map
11-23
Figure 11-7:
East-West Cross Section Oxide Pit
11-31
Figure 11-8:
East-West Cross Section Sulfide Pit
11-32
Figure 11-9:
Swath Plots in the X, Y, and Z Directions – Waste Rock Dumps
11-34
Figure 11-10:
Swath Plots in the X, Y, and Z Directions – Heap Pads
11-35
Figure 11-11:
Swath Plots in the X, Y, and Z Directions – TSF
11-36
Figure 11-12:
Open Pit Grade Tonnage Curve for Measured + Indicated Mineral Resources
11-38
Figure 13-1:
Initial Mine Topography
13-3
Figure 13-2:
Oxide Pit Cross Section 4,576,271 N
13-4
Figure 13-3:
Final Pit Design and Waste Storage Facility Design
13-7
Figure 14-1:
Crushing & Agglomeration Process Flow Sheet
14-3
Figure 14-2:
Process Plant Flow Sheet
14-4
Figure 15-1:
Infrastructure Layout
15-2
Figure 19-1:
Mine Production Profile by Material Movement – Base Case
19-4
Figure 19-2:
Process Production Profile and Head Grade – Base Case
19-5
Figure 19-3:
Annual Processing Gold Production and Head Grade Profile – Base Case
19-5
Figure 19-4:
Base Case Project After-Tax Metrics Summary
19-6
Figure 19-5:
Base Case After-Tax Sensitivity Analysis
19-10
Figure 19-6:
Mine Production Profile by Material Movement – Alternative Case
19-13
Figure 19-7:
Process Production Profile and Head Grade – Alternative Case
19-13
Figure 19-8:
Annual Processing Gold Production and Head Grade Profile
19-14
Figure 19-9:
Alternative Case Project After-Tax Metrics
Summary
19-15
Figure 19-10:
Alternative Case After-Tax Sensitivity Analysis
19-19
Appendix Tables
Table 31-1:
Base Case Cash Flow Summary
28-2
Table 31-2:
Alternative Case Cash Flow Summary
28-6
ix
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
1.0
Executive Summary
1.1
Summary
SLR International Corporation (SLR) was retained by Paramount Gold Nevada Corp. (PGN, Paramount Gold, or the Company) to prepare an independent Technical
Report Summary (TRS) on the Sleeper Gold Mine (Sleeper or the Project), located in Humboldt County, Nevada, USA. The purpose of this TRS is to provide an Initial Assessment to support Mineral Resource disclosure. This TRS conforms to the United
States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants
Engaged in Mining Operations (S-K 1300) and Item 601(b)(96) Technical Report Summary.
Paramount Gold is a
U.S.-domiciled precious metals exploration and development company engaged in the acquisition, exploration, and development of gold and silver projects in the United States. The company’s principal assets include the Sleeper Gold Mine in
Nevada and the Grassy Mountain Gold Project in Oregon, as well as additional exploration properties in the western United States. Paramount Gold is publicly listed on the NYSE exchange under the ticker symbol PZG and maintains its corporate offices
in Winnemucca, Nevada.
Paramount Gold holds a 100% interest in the Sleeper Gold Mine, which includes the historical Sleeper open-pit gold mine and a large surrounding claim block totaling 2,474 unpatented mining claims covering approximately 44,917 acres (approximately 18,178 hectares) in Humboldt County, Nevada. The Sleeper mine was
operated by AMAX Gold Inc. (AMAX) from 1986 through 1996, producing approximately 1.66 million ounces (Moz) of gold and 2.3 Moz of silver from open-pit mining and heap leaching and milling operations.
The Project is currently at the Initial Assessment (IA) stage, and as such, the level of engineering, geological definition, and metallurgical
characterization remains preliminary. The Mineral Resources for the Project comprise in situ oxide and mixed material, in situ sulfide material, and material from existing waste rock dumps, heap leach pads (HLPs), and tailing storage facilities
(TSFs). The development concept considered in the cash flow analysis presented in this TRS contemplates the restart of mining and processing operations with a focus on those Mineral Resources amenable to heap leaching, i.e., existing waste rock
dumps and in situ oxide and mixed mineralized material. Additional work is required to develop the cash flow analysis for the sulfide Mineral Resources, including the heap leach and tailings material.
The existing waste rock dumps were generated during prior mining operations conducted under substantially lower gold prices, which led to the application of
higher cut-off grades (COGs) at the time of mining. Consequently, material that was classified as waste under historical economic conditions contains grades that are potentially economic under current or
reasonably foreseeable gold price assumptions and processing technologies. This reclassification to Mineral Resources forms a key component of the Project’s economic rationale.
To support this evaluation, the waste rock dumps have been subject to initial drilling, sampling, and assaying programs, supplemented by preliminary
metallurgical test work. These programs have been designed to characterize the grade distribution, material variability, and metallurgical response of the dump material, including leachability and recovery potential. While these datasets provide an
important foundation for the current assessment, they remain limited in scope and density relative to that required for higher-confidence classifications, and additional work will be required to support future Mineral Resource estimation,
metallurgical modeling, and process design.
1-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
In parallel, the Project concept includes recovery of in situ oxide and mixed mineralized material remaining
in the vicinity of the historical pit. These materials are considered amenable to conventional surface mining methods and heap leach processing, consistent with prior operations at Sleeper, although additional drilling, metallurgical testing, and
engineering studies will be required to confirm recoveries, processing parameters, and economic viability.
Overall, the Project represents a brownfields
redevelopment opportunity, leveraging existing site disturbance, historical data, and previously mined material inventories; however, given the early stage of evaluation, all assumptions related to mineralization, processing performance, and
economic outcomes should be considered preliminary and subject to refinement through subsequent phases of study. The development concept assumes a nominal processing rate of approximately 30,000 tonnes per day (tpd), utilizing conventional open pit
mining, crushing and agglomeration, cyanide heap leaching, and Merrill-Crowe zinc precipitation to recover gold and silver.
The Base Case economic
analysis presented in this TRS evaluates the potential economic viability of processing Measured, Indicated, and Inferred Mineral Resources. The Base Case mining inventory comprises the following:
•
Approximately 47 million tonnes (Mt) of waste rock dump material, classified as Inferred Mineral Resources,
grading approximately 0.28 g/t gold (Au)
•
In situ oxide and mixed mineralized material including approximately 2 Mt Measured Resources grading 0.29 g/t Au,
78 Mt Indicated Resources grading 0.26 g/t Au, and 49 Mt Inferred Resources grading 0.24 g/t Au.
Overall, the Base Case
production schedule includes approximately 55% of Inferred Resources as part of the economic analysis. An Alternative Case was considered that included only in situ Measured and Indicated Resources in the economic analysis.
1.1.1
Conclusions
1.1.1.1
Geology and Mineral Resources
•
The geological interpretation and deposit model are appropriate, internally consistent, and aligned with a low-sulfidation epithermal system, with mineralization strongly controlled by fault architecture and lithological contrasts.
•
Mineralization exhibits high spatial variability, with discontinuous high-grade veins embedded within a laterally
and vertically continuous low-grade stockwork domain, which comprises most of the tonnage.
•
The Mineral Resource estimate has been prepared in accordance with S-K
1300 and CIM (2019) Best Practice Guidelines, supported by appropriate domain modeling, compositing, grade capping, interpolation, and validation workflows.
•
The estimate is constrained within optimized open-pit shells
demonstrating Reasonable Prospects for Economic Extraction (RPEE,) based on reasonable mining, processing, and economic assumptions, including a long-term gold price of US$3,100/oz.
•
The drilling database is large and generally adequate (approximately 4,300+ drill holes); however, gaps in
historical metadata, incomplete records, and exclusion of unverifiable data introduce uncertainty, which is appropriately reflected in classification.
1-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Historical drilling is predominantly vertical RC, which adequately defines bulk-tonnage mineralization but limits
confidence in true geometry and continuity of steeply dipping high-grade structures.
•
The QA/QC and sampling protocols, while variable in early historical programs, are considered sufficient overall
due to:
•
Exclusion of unreliable or unsupported data from the Mineral Resource Estimate (MRE)
•
Validation of assay datasets through statistical analysis, capping, compositing, and multi-method estimation
checks
•
Use of industry-standard QA/QC review and data screening prior to estimation. Accordingly, the QP considers the
analytical dataset valid and appropriate to support the MRE, with remaining uncertainties reflected in classification.
•
The oxidation model has been reviewed and corrected for inconsistencies and is considered appropriate for current
estimation; however, localized coding issues indicate moderate residual uncertainty where metallurgical assumptions are sensitive.
•
Exploration datasets (geophysical, geochemical, geological) are well integrated and effective for targeting,
defining structural corridors, and mineralized trends extending beyond historically mined areas.
•
Mineralization remains open along strike, at depth, and beneath cover, with identified targets considered
conceptual but supported by integrated datasets.
•
Compared to the 2023 estimate, the 2026 MRE shows a material increase in tonnage and contained metal, driven by:
•
Inclusion and delineation of surface materials (existing waste rock dumps, heap leach pads, and tailings storage
facility);
•
Expanded pit shells under higher gold price assumptions (US$3,100/oz versus approximately US$1,800/oz); and
•
Updated geological interpretation and database validation.
•
This increase in tonnage is accompanied by a moderate reduction in average grade, consistent with inclusion of
marginal material and not indicative of estimation bias.
1.1.1.2
Mining and Mineral Reserves
•
There is no current geotechnical information for the pit slopes. Current pit slope assumptions may be optimized
once geotechnical information has been collected and incorporated into the pit design.
•
The current Base Case life of mine (LOM) plan includes a significant proportion of Inferred Mineral Resources
(approximately 55%). The next stage of the Project will require converting Inferred Resources to Indicated Resources to reduce the project risk.
•
Pit slope design assumes dry (i.e., dewatered) walls. Pit dewatering needs to start early enough for the open-pit mining operation to begin.
•
There is potential to extend the mine life with the addition of a sulfide pit. To include the sulfide pit in the
LOM plan, additional metallurgical test work and block modeling will be required.
1-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
1.1.1.3
Mineral Processing
•
Metallurgical test work supports heap leaching with Merrill-Crowe recovery for oxide, mixed, and selected
waste-rock materials, and flotation with off-site toll treatment or concentrate sale for sulfide, existing heap leach pad (HLP), and existing tailings material.
•
The Base Case economic analysis is restricted to the heap-leach scenario, which is supported by the most
complete, representative, and internally consistent metallurgical dataset.
•
The proposed Base Case processing facility is a 30,000 tpd conventional crush–agglomerate–heap-leach
operation employing Merrill-Crowe recovery. Design parameters include crushing to approximately P80 19 mm and agglomeration using cement and/or lime.
•
Facilities oxide material demonstrates the strongest metallurgical response to heap leaching, with additional
oxide, mixed, and selected waste-dump composites also supporting inclusion in the heap-leach feed blend.
•
Gold and silver recovery assumptions for the heap-leach case are derived primarily from column leach testing,
with conservative assumptions applied where only bottle-roll or limited test data exist.
•
Sulfide, HLP, and tailings materials represent future processing opportunities via flotation. Recoveries have
been reduced by 12% to account for toll-milling deductions and downstream treatment charges.
•
No silver recovery is currently attributed to the flotation scenario; silver is treated as upside potential
pending further metallurgical test work and commercial assessment.
•
The heap leach flowsheet is a commercially proven, low-risk processing route appropriate for IA-level planning.
•
Preliminary test work of the flotation option as a processing method for the sulfide material and existing HLP
and TSF material is sufficient for the declaration of Mineral Resources; however, additional variability testing, concentrate characterization, and commercial evaluation are required to advance this option.
1.1.1.4
Infrastructure
•
Access to the mine site is reliable via frequently traveled and maintained public infrastructure from Winnemucca,
Nevada.
•
Access and haul roads constructed on site will be designed and constructed in a manner sufficient to facilitate
required on-site vehicular movement
•
The proposed heap leach pad has been sited based on terrain, environmental, and operational bases and has been
adequately sized to accommodate 175 Mt of agglomerated mineralized material.
•
The pregnant solution and barren solution ponds have been located in proximity to the leach pad to take advantage
to native slopes and have been sized to accommodate operational solution flow rates.
•
The storm event pond has been located adjacent to the process ponds and has been sized to accommodate the 100-year 24-hour storm volume.
1-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Rapid infiltration basins have been designed to accommodate infiltration from pit dewatering efforts at an
average rate of 4,542 m3/hr (20,000 US gallons per minute [gpm]).
•
No accommodation camp has been included in the proposed infrastructure as the town of Winnemucca is within
commuting distance and hosts a knowledgeable mining industry labor force.
1.1.1.5
Environment
•
There are no known significant environmental issues at the site, and the former mine is in an advanced state of
closure with post-closure monitoring and minor operational and maintenance activities being conducted.
•
The regulatory environment is well developed, and the environmental permitting path forward for the mine plan
presented in this TRS is generally well understood.
1.1.1.6
Capital and Operating Costs
•
Preliminary capital and operating cost estimates have been prepared for the proposed mining operation based on a
conceptual processing rate of approximately 30,000 tpd.
•
For the Base Case, initial capital costs required to restart mining operations are estimated to be approximately
US$201 million, with sustaining capital estimated at approximately US$342 million over the life of mine.
•
Life-of-mine operating costs for
the Base Case are estimated to average approximately US$13.03 per tonne processed, resulting in an estimated all-in sustaining cost of approximately US$2,407 per ounce of gold produced.
1.1.1.7
Risks
•
The economic analysis presented in the Base Case as part of this TRS includes a material proportion of Inferred
Mineral Resources within the mine plan and associated cash flow. The Inferred Mineral Resources are included at the beginning of the life-of-mine plan by mining existing
dumps in the economic analysis, which introduces significant uncertainty.
1.1.2
Recommendations
The SLR QPs offer the following recommendations by discipline:
1.1.2.1
Geology and Mineral Resources
1
Conduct the following drilling and exploration programs:
a)
Infill drilling to support conversion of Inferred to Indicated Mineral Resources (in situ and surface
materials) by conducting systematic infill drilling within pit-constrained in situ domains and within surface material domains (dumps, heap leach pads, and TSF) to increase data density and improve confidence
in grade continuity, tonnage, and material variability, consistent with S-K 1300 classification criteria.
b)
Targeted infill drilling within established mineralization domains to increase drill density within defined
grade domains to better constrain grade variability and continuity, particularly in areas where current spacing limits classification.
1-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
c)
Additional drilling and geological logging to improve confidence in oxide, mixed, and sulfide boundaries, which
directly influence metallurgical assumptions applied in the MRE.
2
Geology and Mineral Resource Estimate
a)
Maintain domain-controlled drilling and sampling protocols to ensure all new data collection aligns with the
current geological, mineralization, and estimation domain framework to support direct integration into future MRE updates.
b)
Incorporate new data into updated geological interpretations and block models to support iterative improvement
of the Mineral Resource estimate in accordance with S-K 1300 reporting requirements.
c)
Acquire additional bulk density measurements across in situ and surface material domains where current density
assignments are based on limited data, to improve tonnage estimates.
d)
Focus drilling within the existing Mineral Resource footprint by prioritizing data acquisition in areas where
incremental drilling is most likely to materially improve classification, rather than expanding the resource footprint at this stage.
3
Quality Assurance and Quality Control
a)
Implement consistent QA/QC protocols for future work. Apply standardized QA/QC procedures (sampling, insertion
rates, documentation) to ensure all new data meets S-K 1300 and CIM (2019) requirements and supports classification upgrades.
b)
Recommend investigation of incomplete database information and update the database through investigation of
historic files
To advance the Project, the QP recommends that Paramount Gold undertake a
two-phase exploration and data validation program totaling $8.52 million, as summarized in Table 1-1.
The goal is to support upgrading Inferred Mineral Resources to the Indicated category, validate key project assumptions regarding density and metallurgy, and
continue delineation in underexplored areas.
This budget reflects a disciplined yet robust investment to de-risk
the MRE, validate key technical assumptions (density, metallurgical recovery), and support a potential future Preliminary Feasibility Study (PFS). The recommended work is expected to materially enhance the geological understanding and economic
viability of the Sleeper Project.
The two phases of the work program are independent of each other.
Table 1-1: Proposed Sleeper 2026-2027 Exploration Budget
Activity
Details
Estimated Cost
(US$ 000)
Phase 1 – Surface and In Situ Resource Definition, QA/QC Implementation, and
Metallurgical Studies
ESG Permitting
Exploration and Environmental Permits for Phase 1 drilling
25
Sonic Drilling
Up to 30 holes (4000 ft) of sonic drilling at $90/ft focused on obtaining metallurgical samples from Waste dumps, TSF and HL pads
360
RC Drilling
Up to 500 holes (50,000 ft) of RC drilling in Waste dumps, HL pads at $50/ft
2,500
1-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Activity
Details
Estimated Cost
(US$ 000)
Core drilling
Confirmation core drilling of up to 10,000 ft at $120/ft (HQ/NQ core)
1,200
Bulk Density Sampling
Collection and testing of up to 200 core and/or pit samples across all domains
12
Geochemical Assays
Assaying of approximately 15,000 samples incl. duplicates, standards, and blanks
750
QA/QC Program Implementation
Establish certified sample control and auditing protocols
100
Metallurgical Testing
Leach testing of mineralized core for recovery studies
750
Technical Staff & Supervision
Field geologist, QA/QC lead, database tech
300
Total Phase 1
5,997
Phase 2 – Project Development Scoping
ESG Permitting
Exploration and Environmental Permits for Phase 2 Geotech
25
Ground Support Geotechnical Testing
Geotech and analysis studies for Ground Support
250
Heap Leach Pad Geotechnical Testing and Design
Geotech and design engineering studies for Heap Leach Pad
600
Mining and Process Design & Engineering Analysis
Process design and engineering cost analysis and modeling
400
Environmental Baseline Studies
Hydrogeology, cultural, flora/fauna baseline for mine permitting
800
Stakeholder Engagement & Permitting Prep
Initial outreach, permitting roadmap
100
Technical Oversight & Contingency (10%)
Includes legal, overhead, permitting scope prep
218
Reporting and Independent Review
S-K 1300 PFS update and QP
sign-off
350
Total Phase 2
2,723
Grand Total
8,740
1.1.2.2
Mining and Mineral Reserves
1
Collect geotechnical information and develop geotechnical studies to support the pit design slopes for the next
stage of the project.
2
Ensure the open-pit mining sequence is closely coordinated with the open-pit dewatering plan.
3
Continue the analysis of the sulfide pit as an opportunity after the oxide pit mining.
1-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
1.1.2.3
Mineral Processing
1.
Complete additional variability column leach testing on oxide, mixed, and waste rock dump domains to confirm
recovery, leach kinetics, and reagent consumption across the planned heap leach feed range.
2.
Confirm provisional recovery assumptions for Sleeper oxide, Sleeper mixed, and West Wood mixed material with
representative column leach test work.
3.
Refine crush-size and agglomeration test work to confirm the selected
coarse-crush heap leach design basis and optimize cement and lime addition by material type.
4.
Expand reagent-consumption testing to better define sodium cyanide, lime, and cement demand for oxide, mixed,
and waste rock dump materials, particularly where existing results indicate variable or elevated consumable requirements.
5.
Complete additional column leach testing on selected waste rock dump materials to refine recovery assumptions
by dump area and improve confidence in domain-based economic modeling.
6.
Complete additional deleterious-element and precipitate-quality testing for Hg, As, Sb, and sulfur to confirm
mercury management requirements and refine refinery and operating cost assumptions.
7.
Complete flotation variability, optimization, and locked-cycle test work on representative sulfide, HLP and
tailings composites to confirm recovery, consumable requirements, concentrate quality, and the suitability of an off-site toll-treatment or concentrate-sale route.
1.1.2.4
Infrastructure
1
Evaluate site-wide water balance and discharge requirements.
2
Perform a hydrogeological evaluation to support PFS level engineering of the rapid infiltration basin.
3
Confirm power requirements and supply availability.
4
Develop site-specific design criteria for the HLP and perform field investigations and laboratory testing to
support advancing the HLP design.
5
Develop a PFS level HLP design that incorporates site specific data into the engineering calculations and
analysis for such items as grading plan, slope stability analysis, water balance, settlement, and closure.
1.1.2.5
Environment
1.
Complete updated baseline studies in accordance with National Environmental Policy Act of 1969 (NEPA) and
applicable guidelines.
2.
Engage early with local stakeholders and tribes and develop a stakeholder outreach plan.
3.
Develop a permitting strategy and timeline.
1-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
1.1.2.6
Capital and Operating Costs
1
Move the dewatering from an “Allowance” to a full ‘Engineered System’, e.g., calibrated
groundwater model; staged dewatering sequencing; pumping lift curves by pit phase; transient inflow modeling; wellfield spacing and drawdown analysis; contingency pumping scenarios; and power demand modeling for peak pumping periods.
2
Re-evaluate the crushing/agglomeration
trade-off, e.g., variability column testing; permeability testing; compaction testing; fines migration testing; cement consumption optimization; lift-height testing; and irrigation optimization.
3
Tighten the heap leach pad phasing strategy, e.g., minimizing initial lined acreage; maximizing early vertical
expansion; deferring later phases; reducing early pond construction; and sequencing underdrain installation.
4
Lock down power infrastructure requirements early, e.g., actual condition of transmission line; substation
rebuild requirements; transformer replacement needs; utility interconnect requirements; and backup generation philosophy.
5
Validate the contractor mining strategy, i.e., obtain budgetary contractor bids; benchmark Nevada owner-mining
versus contractor-mining; validate bank cubic meter (bcm) assumptions; stress-test diesel escalation; and stress-test productivity losses from wet conditions.
6
Refine the estimate by:
a)
Improving mine haulage and re-handle modeling.
b)
Tightening reagent consumption assumptions.
c)
Adding more detailed closure escalation and water management costs.
1.2
Economic Analysis
The economic analysis presented in this IA considers the processing of the in situ oxide and mixed Mineral Resources and the Mineral Resources in the existing
waste rock dumps only.
The economic analyses contained in this TRS are preliminary in nature and are based, in part, on Inferred Mineral Resources that
are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as Mineral Reserves. It is important to note that, unlike Mineral Reserves, Mineral Resources do not have demonstrated
economic viability, and there is no certainty that the economic projections presented in this IA will be realized.
Taxes and revenues are assumed.
Discounted cash flow analyses are based on assumed production rates and revenues from available Mineral Resources.
SLR notes that the economic analysis
presented in this section is based on revenue from gold and silver only. After-tax cash flow projections have been generated from the Base Case and the Alternative Case LOM production schedules and capital and
operating cost estimates, as summarized in the sub-sections that follow.
1-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
1.2.1
Base Case
The Project’s Base Case is based on a production plan with a mine life of 17 years and includes a mineralized material inventory of approximately:
•
Approximately 47 million tonnes (Mt) of waste rock dump material, classified as Inferred Mineral Resources,
grading approximately 0.28 g/t gold (Au)
•
In situ oxide and mixed Mineral Resources including approximately 2 Mt Measured Resources grading 0.29 g/t Au, 78
Mt Indicated Resources grading 0.26 g/t Au, and 49 Mt Inferred Resources grading 0.24 g/t Au.
The Base Case mineralized material
inventory includes approximately 95.6 Mt of Inferred Mineral Resources containing 788 koz of gold and 6,484 koz of silver, representing approximately:
•
55% of the total Base Case tonnage.
•
54% of the total Base Case gold ounces.
•
41% of the total Base Case silver ounces.
The remaining material in the mined inventory is from Measured and Indicated Mineral Resources. A summary of the Base Case criteria is provided below.
1.2.1.1
Economic Criteria
1.2.1.1.1
Revenue
•
Mine life: 17 years.
•
LOM production and processing plans as summarized in Table 13-9 and Table
13-8, respectively.
•
30,000 tpd mineralized material stacked (approximately 10.8 Mt per year), average stacked grade of 0.26 g/t Au
and silver grade of 2.79 g/t Ag (ROM, crushed, and stockpile mine plan).
•
Mine life averages 65,000 ounces per year of gold recovered and 205,000 ounces per year of silver recovered from
the mine plan, with LOM stacked process gold recovery averaging 75.8% and silver recovery averaging 22.1%.
•
Total 1.11 Moz of gold recovered, and 3.5 Moz of silver recovered over the LOM operation.
•
The summary of the physicals in the financial model is listed in Table
1-2. It has been estimated that 420 koz of gold and 2,952 koz of silver are in waste rock dumps and are accounted for in the financial model over the first five years of Leach Pad operations.
•
Gold and silver payable at the refinery are assumed at 99.95% Au payable and 97.0% Ag payable
•
Gold and silver prices are based on analyst consensus price forecasts from the end of March 2026. For the
economic analysis it was assumed:
•
Y1: US$4,000/oz Au and US$59.00/oz Ag
•
Y2 to Y17: US$3,600/oz Au and US$48.00/oz Ag
•
Resulting in LOM net realized prices of:US$3,618/oz Au and US$48.70/oz Ag
•
Net Smelter Return (NSR) includes doré refining, transport, and insurance costs.
•
NSR royalty assumed at 3%. The property is subject to different royalties between 0.5% and 3%, and for modeling
purposes was assumed at an overall 3%
1-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Revenue is recognized at the time of gold and silver production.
•
Non-cash inventory adjustments are not included in the SLR cash flow
model.
•
LOM net revenue is US$4,014 million (after royalty, transportation, and refining charges)
Table 1-2: Sleeper Base Case Production Physicals Summary
Physicals
Value
Total Mineralized Material Stacked (kt)
175,445
Max Process Rate (tpd)
30,000
Au Head Grade (g/t)
0.26
Ag Head Grade (g/t)
2.79
Contained Au (koz)
1,459
Contained Ag (koz)
15,721
Average Recovery, Au
75.8
%
Average Recovery, Ag
22.1
%
Recovered Au (koz)
1,106
Recovered Ag (koz
3,481
Payable Au (koz)
1,101
Payable Ag (koz)
3,376
Avg Annual Au - LOM (koz / yr)
65
Avg Annual Ag Sales - LOM (koz / yr)
199
1.2.1.1.2
Costs
•
Pre-production period assumes 24 months (Year -1 to Year -2).
•
Initial (Growth) and development capital costs total US$201 million
•
Mine life sustaining capital totals US$343 million
•
Final reclamation costs from after year 17 total US$52.4 million.
•
Mine life capital totals US$596 million.
•
Average LOM operating cost is US$13.03 per tonne stacked.
•
Open pit operating costs of US$2.53 per tonne mined (US$6.37 per tonne stacked). Includes out-of-scope mining operations.
•
Dewatering operating costs of US$0.59 per tonne stacked.
•
Processing operating costs of US$5.55 per tonne stacked.
•
Site services & general and administrative (G&A) costs of US$5.6 million per year for years of
full production (LOM average of US$0.52 per tonne stacked).
•
Life of Mine production plan as summarized in Table 13-9.
1.2.1.1.3
Taxation and Royalties
The federal and state income taxes are summarized in Table 1-3.
1-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 1-3: Federal and State Tax Summary
Tax Type
Rate
Federal Corporate Income Tax
21.0%
Nevada Corporate Income Tax
5.0% of federal taxable income
Royalties and Severance Fees
Based on ore extracted (state-regulated).
A total of five NSR royalties apply to future mineral production from portions of the Project. These royalties are summarized
in Table 1-4.
Table 1-4: Royalties Summary
Royalty Holder
Royalty Terms
Snyder Syndicate
1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, AL SS, AND ALL BLUE.)
Franco-Nevada U.S. Corporation
2% NSR on minerals produced from all 2,474 claims
Evolving Gold / Quinton Hennigh
2% NSR royalty on all SS and all SP claims.
Dry Lake Placer Association
3% NSR on Dry Lake Placer claims
ICN Resources Ltd.
0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims
For the economic analysis and financial modeling purposes, an overall 3% NSR royalty rate was assumed over the LOM.
1.2.1.2
Cash Flow Analysis
SLR has prepared its own unlevered after-tax LOM cash flow model based on the information contained in this TRS to
confirm the physical and economic parameters of the Project.
The Project’s Base Case economics have been evaluated using the discounted cash flow
method, considering annual processed tonnages and the associated gold and silver grades. The process gold and silver recoveries, gold and silver price forecasts, operating costs, refining and transportation charges, royalties, and initial and
sustaining capital expenditures were also considered.
The Project, as currently designed, has variations in the mining and processing amounts over its
planned 17-year life. These variations are shown in Figure 1-1, Figure 1-2, and Figure
1-3.
1-12
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 1-1: Mine Production Profile by Material Movement –
Base Case
Figure 1-2: Process Production Profile and Head Grade – Base Case
1-13
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 1-3: Annual Processing Gold Production and Head Grade
Profile – Base Case
The economic analysis demonstrates that the Project’s Mineral Resources have reasonable prospects for economic
extraction at the LOM net average realized prices of US$3,618/oz Au and US$48.70/oz Ag, and with long-term prices of US$3,600/oz Au and US$48.00/oz Ag, and that further advancement of Project studies is warranted.
A base discount rate of 8% has been applied in this TRS for the Project. This rate is considered reasonable for evaluating a precious metals project at a
preliminary level of project definition, such as Sleeper. Discounted present values of annual cash flows are summed to arrive at the Mine’s Base Case NPV.
Considering the Project’s Base Case on a stand-alone basis, the Project’s pre-tax NPV at an 8% discount
rate is approximately US$505 million, and the pre-tax internal rate of return (IRR) is approximately 51.3%. The Project’s after-tax NPV at an 8% discount is
approximately US$402 million, the after-tax IRR is approximately 44.5%, and the payback period is approximately 1.4 years from the start of production.
The LOM undiscounted pre-tax cash flow totals approximately US$1,132 million, and the LOM undiscounted after-tax cash flow totals approximately US$918 million.
SLR has also run a stand-alone economic analysis for the
Project using flat resource metal prices of US$3,100/oz Au and US$34/oz Ag, and the analysis demonstrates that the Project’s Mineral Resources also have reasonable prospects for economic extraction at these prices.
The Project’s after-tax free cash flow profile and gold payable metal per year are presented in Figure 1-4.
1-14
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 1-4: Base Case Project
After-Tax Metrics Summary
Table 1-5 shows the LOM total metrics for the Sleeper mine as currently designed.
Due to the length of the mine life, the full annual cash flow model is presented in Appendix 2.
Table 1-5:
Total Life of Mine Metrics – Base Case
Item
Units
Base Case Values
Realized Market Prices
Au Price
US$/oz
$
3,618
Ag Price
US$/oz
$
48.70
Payable Gold
koz
1,101
Payable Silver
koz
3,376
Total Gross Revenue
US$ million
4,147
Mining Cost
US$ million
(1,117
)
Dewatering Costs
US$ million
(104
)
Process Cost
US$ million
(974
)
G & A Cost
US$ million
(92
)
Refining/Freight
US$ million
(8
)
Royalties
US$ million
(124
)
Total Operating Costs
US$ million
(2,418
)
Operating Margin (EBITDA)
US$ million
1,728
Federal Income Tax
US$ million
(134
)
1-15
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Item
Units
Base Case Values
State Tax - Nevada Mining Tax
US$
million
(80
)
Working Capital
US$
million
0
Operating Cash Flow
US$
million
1,514
Development (Initial) Capital
US$
million
(201
)
Sustaining Capital
US$
million
(343
)
Closure/Reclamation Capital
US$
million
(52
)
Total Capital
US$
million
(596
)
Pre-tax Free Cash Flow
US$
million
1,132
Pre-tax NPV @ 5%
US$
million
670
Pre-tax NPV @ 8%
US$
million
505
Pre-Tax IRR
%
51.3
%
Pre-Tax Payback
years
1.3
After-tax Free Cash Flow
US$
million
918
After-tax NPV @ 5%
US$
million
539
After-tax NPV @ 8%
US$
million
402
After-Tax IRR
%
44.5
%
After-Tax Payback
years
1.4
Note: Numbers may not add due to rounding.
The Project’s World Gold Council Adjusted Operating Cost (AOC) net of Ag by-product credits is US$2,048/oz Au
payable. The mine life sustaining capital costs are US$359/oz Au payable, for an All-in Sustaining Cost (AISC) net of Ag by-products credits of US$2,407/oz Au payable.
The average annual gold sales during operations are approximately 64,746 payable ounces. Table 1-6 shows the AISC
build-up.
Table 1-6: Base Case
All-in Sustaining Costs Composition
Item
Total LOM
($ million)
Unit Cost
($/oz Au)
Mining
1,117
1,015
Dewatering
104
94
Process
974
885
Site G&A
92
83
Subtotal Site Costs
2,286
2,077
Refining/Freight
8
8
Mining Royalties
124
113
1-16
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Item
Total LOM
($ million)
Unit Cost
($/oz Au)
Total Cash Costs before by-product
credits
2,418
2,197
Ag By-Product Credit
(164
)
(149
)
Total Cash Costs net of by-product
credits
2,254
2,048
Sustaining Capital Cost
343
311
Closure/Reclamation Costs
52
48
Total Sustaining Costs
395
359
Total All-in Sustaining Costs
2,649
2,407
Note: Numbers may not add due to rounding.
The AISC calculated in the cash flow analysis reflects the benefit of low-cost ounces already stacked on the heap leach
pads, compared to AISC estimated in a steady-state model that assumes current input costs. Much of Sleeper’s near-term production comes from material mined and placed in prior years, when gold prices, fuel, and consumable costs were lower.
These ounces require minimal additional spending to recover, resulting in lower realized cash costs. As these legacy ounces are depleted and replaced with newly mined material, unit costs are expected to gradually normalize toward long-term levels.
1.2.1.3
Sensitivity Analysis
The Project’s Base Case risks can be identified in both economic and non-economic terms. Key economic risks were
examined by running cash flow sensitivities:
•
Metal prices
•
Head grade
•
Metallurgical Recovery
•
Operating costs
•
Pre-production and sustaining capital costs
Where possible, the after-tax NPV 8% sensitivities relative to the Base Case have been calculated for -20% to +20% variations in head grade and recovery, and -20% to +30% in metal prices. Operating and capital cost sensitivities have been calculated at -15% to +35% variations. The sensitivities are shown in Table 1-7 and Figure 1-5.
Table 1-7: Base Case After-Tax Sensitivity Analyses
Variance
Head Grade
(g/t Au)
NPV at 8%
(US$ 000)
80%
0.21
91,329
90%
0.23
249,814
100%
0.26
402,353
110%
0.28
554,310
120%
0.31
706,171
1-17
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Variance
Recovery
(% Au)
NPV at 8%
(US$ 000)
80%
60.7
%
91,329
90%
68.2
%
249,814
100%
75.8
%
402,353
110%
83.4
%
554,310
120%
91.0
%
706,171
Variance
Metal Prices
(US$/oz Au)
NPV at 8%
(US$ 000)
80%
$
2,880
90,637
90%
$
3,240
249,505
100%
$
3,600
402,353
110%
$
3,960
554,614
131%
$
4,700
866,553
Variance
Operating Costs
(US$/t)
NPV at 8%
(US$ 000)
85%
$
11.07
523,205
93%
$
12.05
462,780
100%
$
13.03
402,353
118%
$
15.31
259,020
135%
$
17.59
102,091
Variance
Capital Costs
(US$ 000)
NPV at 8%
(US$ 000)
85%
$
506,652
460,155
93%
$
551,357
431,254
100%
$
596,062
402,353
118%
$
700,372
334,916
135%
$
804,683
267,480
1-18
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 1-5: Base Case
After-Tax Sensitivity Analysis
1.2.2
Alternative Case - Measured and Indicated Only
1.2.2.1
Economic Criteria
The Alternative Case assumes a production schedule based exclusively on Measured and Indicated Mineral Resources, resulting in a mineralized material inventory
of 62.4 Mt and a projected mine life of seven years. A summary of the Measured and Indicated Only Case criteria is provided below.
1.2.2.1.1
Revenue
•
Mine life: 7 years.
•
30,000 tpd mineralized material stacked (approximately 10.8 Mt per year), average stacked grade of 0.27 g/t Au
and silver grade of 3.83 g/t Ag (ROM, crushed, and stockpile mine plan).
•
Mine life averages 58,500 ounces per year of gold recovered and 200,000 ounces per year of silver recovered from
the mine plan, with LOM stacked process gold recovery averaging 74.3% and silver recovery averaging 18.1%.
•
Total 410 koz of gold recovered, and 1,396 koz of silver recovered over the LOM operation.
•
Gold and silver payable at the refinery are assumed at 99.95% Au payable and 97% Ag payable
1-19
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Gold and silver prices are based on analyst consensus price forecasts from the end of March 2026. For the
economic analysis was assumed:
•
Y1: US$4,000/oz Au and US$59.00/oz Ag
•
Y2 to Y7: US$3,600/oz Au and US$48.00/oz Ag
•
Resulting in LOM net realized prices of:US$3,622/oz Au and US$48.00/oz Ag
•
Net Smelter Return (NSR) includes doré refining, transport, and insurance costs.
•
NSR royalty assumed at 3%. The property is subject to different royalties between 0.5% and 3%, and for modeling
purposes was assumed at an overall 3%
•
Revenue is recognized at the time of gold and silver production.
•
Non-cash inventory adjustments are not included in the SLR cash flow
model.
•
LOM net revenue is US$1,493 million (after royalty, and transportation, and refining charges).
Table 1-8: Sleeper Alternative Case Production Physicals Summary
Physicals
Value
Total Mineralized Material Stacked (kt)
62,447
Max Process Rate (tpd)
30,000
Au Head Grade (g/t)
0.27
Ag Head Grade (g/t)
3.83
Contained Au (koz)
552
Contained Ag (koz)
7,697
Average Recovery, Au
74.3
%
Average Recovery, Ag
18.1
%
Recovered Au (koz)
410
Recovered Ag (koz
1,396
Payable Au (koz)
408
Payable Ag (koz)
1,354
Avg Annual Au Sales - LOM (koz / yr) – full production
64
Avg Annual Ag Sales - LOM (koz / yr) – Full production
218
1.2.2.1.2
Costs
•
Pre-production period: assumes at 24 months (Year -1 to Year -2).
•
Initial (Growth) and development capital costs total US$335 million.1
•
Mine life sustaining capital totals US$120 million
1
Note that, in the Alternative Case, only in situ Measured and Indicated Mineral Resources are included in the
mining inventory. The existing waste dumps are not included in the LOM plan for the Alternative Case because they are currently classified as Inferred Mineral Resources. As dewatering of the in situ Mineral Resources must start before mining, the
rapid infiltration basins cost and the dewatering costs are Initial Capital Costs for the Alternative Case rather than Sustaining Capital as in the Base Case.
1-20
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Final reclamation costs from after year 7 total US$18.7 million.
•
Mine life capital totals US$473 million.
•
Average LOM operating cost is US$11.87 per tonne stacked.
•
Open pit operating costs of US$2.59 per tonne mined (US$5.03 per tonne stacked). Includes out-of-scope mining operations.
•
Dewatering operating costs of US$0.73 per tonne stacked.
•
Processing operating costs of US$5.55 per tonne stacked.
•
Site services & general and administrative (G&A) costs of US$5.6 million per year for years of
full production (LOM average of US$0.56 per tonne stacked).
1.2.2.1.3
Taxation and Royalties
The federal and state income taxes are summarized in Table 1-9.
Table 1-9: Federal and State Tax Summary
Tax Type
Rate
Federal Corporate Income Tax
21.0%
Nevada Corporate Income Tax
5.0% of federal taxable income
Royalties and Severance Fees
Based on ore extracted (state-regulated).
A total of five NSR royalties apply to future mineral production from portions of the Project. These royalties are summarized
in Table 1-10.
Table 1-10: Royalties Summary
Royalty Holder
Royalty Terms
Snyder Syndicate
1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, AL SS, AND ALL BLUE.)
Franco-Nevada U.S. Corporation
2% NSR on minerals produced from all 2,474 claims
Evolving Gold / Quinton Hennigh
2% NSR royalty on all SS and all SP claims.
Dry Lake Placer Association
3% NSR on Dry Lake Placer claims
ICN Resources Ltd.
0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims
For the economic analysis and financial modeling purposes, an overall 3% NSR royalty rate was assumed over the LOM.
1.2.2.2
Cash Flow Analysis
SLR has prepared its own unlevered after-tax LOM cash flow model based on the information contained in this TRS to
confirm the physical and economic parameters of the Project.
The Project’s Alternative Case economics have been evaluated using the discounted cash
flow method, considering annual processed tonnages and the associated gold and silver grades. The process gold and silver recoveries, gold and silver price forecasts, operating costs, refining and transportation charges, royalties, and initial and
sustaining capital expenditures were also considered.
1-21
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The Project, as currently designed, has variations in the mining and processing amounts over its planned 7-year life. These variations are shown in Figure 1-6, Figure 1-7, and Figure 1-8.
Figure 1-6: Mine Production Profile by Material Movement – Alternative Case
Figure 1-7: Process Production Profile and Head Grade – Alternative Case
1-22
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 1-8: Annual Processing Gold Production and Head Grade
Profile
The economic analysis demonstrates that the Project’s Mineral Resources have reasonable prospects for economic
extraction, at the LOM net average realized prices of US$3,622/oz Au and US$48.40/oz Ag, with long-term prices of US$3,600/oz Au and US$48.00/oz Ag, and that further advancement of Project studies is warranted.
A base discount rate of 8% has been applied in this TRS for the Project. This rate is considered reasonable for evaluating a precious metals project at a
preliminary level of project definition, such as Sleeper. Discounted present values of annual cash flows are summed to arrive at the Mine’s Base Case NPV.
Considering the Project’s Alternative Case on a stand-alone basis, the Project’s pre-tax NPV at an 8%
discount rate is approximately US$59 million, and the pre-tax internal rate of return (IRR) is approximately 11.5%. The Project’s after-tax NPV at an 8%
discount is approximately US$31 million, the after-tax IRR is approximately 9.9%, and the payback period is approximately 4.9 years from the start of production.
The LOM undiscounted pre-tax cash flow totals approximately US$279 million, and the LOM undiscounted after-tax cash flow totals approximately US$232 million.
The Project’s
after-tax free cash flow profile and gold payable metal per year are presented in Figure 1-9.
1-23
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 1-9: Alternative Case Project After-Tax Metrics Summary
Table 1-11 shows the LOM total metrics for the Project’s Alternative Case.
The full annual cash flow model is presented in Appendix 2.
Table 1-11: Total Life of Mine Metrics –
Alternative Case (Measured and Indicated Only)
Item
Units
Base Case Values
Realized Market Prices
Au Price
US$/oz
$
3,622
Ag Price
US$/oz
$
48.40
Payable Gold
koz
408
Payable Silver
koz
1,354
Total Gross Revenue
US$ million
1,542
Mining Cost
US$ million
(314
)
Dewatering Costs
US$ million
(45
)
Process Cost
US$ million
(347
)
G & A Cost
US$ million
(35
)
Refining/Freight
US$ million
(3
)
Royalties
US$ million
(46
)
Total Operating Costs
US$ million
(790
)
Operating Margin (EBITDA)
US$ million
752
Federal Income Tax
US$ million
(12
)
1-24
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Item
Units
Base Case Values
State Tax - Nevada Mining Tax
US$ million
(34
)
Working Capital
US$ million
0
Operating Cash Flow
US$ million
705
Development (Initial) Capital
US$ million
(335
)
Sustaining Capital
US$ million
(120
)
Closure/Reclamation Capital
US$ million
(19
)
Total Capital
US$ million
(473
)
Pre-tax Free Cash Flow
US$ million
279
Pre-tax NPV @ 5%
US$ million
124
Pre-tax NPV @ 8%
US$ million
59
Pre-Tax IRR
%
11.5
%
Pre-Tax Payback
years
4.7
After-tax Free Cash Flow
US$ million
232
After-tax NPV @ 5%
US$ million
91
After-tax NPV @ 8%
US$ million
31
After-Tax IRR
%
9.9
%
After-Tax Payback
years
4.9
Note:Numbers may not add due to rounding.
The Project’s World Gold Council Adjusted Operating Cost (AOC) net of Ag by-product credits is US$1,778/oz Au
payable. The mine life sustaining capital costs are US$339/oz Au payable, for an All-in Sustaining Cost (AISC) net of Ag by-products credits of US$2,117/oz Au payable.
The average annual gold sales during operations are approximately 64,267 payable ounces. Table 1-12 shows the
AISC build-up.
Table 1-12: Alternative Case All-in Sustaining Costs Composition
Item
Total LOM
($
million)
Unit Cost
($/oz Au)
Mining
314
770
Dewatering
45
111
Process
347
850
Site G&A
35
86
Subtotal Site Costs
741
1,817
Refining/Freight
3
8
1-25
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Item
Total LOM
($
million)
Unit Cost
($/oz Au)
Mining Royalties
46
113
Total Cash Costs before by-product
credits
790
1,938
Ag By-Product Credit
(65
)
(161
)
Total Cash Costs net of by-product
credits
725
1,778
Sustaining Capital Cost
120
293
Closure/Reclamation Costs
19
46
Total Sustaining Costs
138
339
Total All-in Sustaining Costs
863
2,117
Note: Numbers may not add due to rounding.
1.2.2.3
Sensitivity Analysis
The project’s Alternative Case risks can be identified in both economic and non-economic terms. Key economic
risks were examined by running cash flow sensitivities:
•
Metal prices
•
Head grade
•
Metallurgical Recovery
•
Operating costs
•
Pre-production and sustaining capital costs
Where possible, the after-tax NPV 8% sensitivities relative to the Alternative Case have been calculated for -20% to +20% variations in head grade and recovery, and -20% to +30% in metal prices. Operating and capital cost sensitivities have been calculated at -15% to +35% variations. The sensitivities are shown in Table 1-13 and Figure 19-10.
1-26
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 1-13: Alternative Case
After-Tax Sensitivity Analyses
Variance
Head Grade
(g/t Au)
NPV at 8%
(US$000)
80%
0.22
(140,512
)
90%
0.25
(54,187
)
100%
0.27
31,106
110%
0.30
106,275
120%
0.33
180,559
Variance
Recovery
(% Au)
NPV at 8%
(US$000)
80%
59.4
%
(140,512
)
90%
66.9
%
(54,187
)
100%
74.3
%
31,106
110%
81.7
%
106,275
120%
89.2
%
180,559
Variance
Metal Prices
(US$/oz Au)
NPV at 8%
(US$000)
80%
$
2,880
(140,868
)
90%
$
3,240
(54,363
)
100%
$
3,600
31,106
110%
$
3,960
106,424
131%
$
4,700
258,552
Variance
Operating Costs
(US$/t)
NPV at 8%
(US$000)
85%
$
10.09
87,662
93%
$
10.98
59,481
100%
$
11.87
31,106
118%
$
13.94
(44,879
)
135%
$
16.02
(122,212
)
Variance
Capital Costs
(US$000)
NPV at 8%
(US$000)
85%
$
401,924
90,847
93%
$
437,387
60,977
100%
$
472,851
31,106
118%
$
555,600
(38,591
)
135%
$
638,349
(108,288
)
1-27
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 1-10: Alternative Case
After-Tax Sensitivity Analysis
1.3
Technical Summary
1.3.1
Property Description
The Sleeper Gold Mine is in Humboldt County in north-central Nevada, approximately 42 km (26 mi) northwest of the city of Winnemucca, Nevada. The Project
is situated within Desert Valley along the western flank of the Slumbering Hills within the Basin and Range physiographic province. The property includes the historical Sleeper open pit, associated waste rock storage facilities, former process plant
areas, and surrounding exploration targets.
The Project is being evaluated as a restart operation focused on processing of existing waste rock dumps and
mining of in situ oxide and mixed mineralized material within and adjacent to the historical pit. These materials are considered suitable for heap leach processing with Merrill-Crowe recovery.
1.3.2
Land Tenure
The Sleeper property consists of a block of unpatented lode mining claims, together with associated surface rights covering portions of Townships 36 through 40
North and Ranges 34 and 35 East, Mount Diablo Base and Meridian, Humboldt County, Nevada.
The property comprises approximately 2,474 unpatented mining
claims, approximately 18,178 hectares (44,917 acres). The claims are held by Paramount Gold Nevada Corp (Paramount Gold). through its wholly owned subsidiaries of Sleeper Mining Company LLC and South
1-28
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Sleeper Mining Company LLC. All claims are in good standing with the U.S. Bureau of Land Management and Humboldt County as of the date of this report.
1.3.3
History
The Sleeper deposit was discovered in the early 1980s and subsequently developed by AMAX Gold Inc. Mining operations commenced in 1986 and continued through
1996.
During this period, the Sleeper mine produced approximately 1.66 million ounces of gold and approximately 2.3 million ounces of silver
from the open pit mining operations. Ore was processed through both conventional milling and heap leach processing circuits. Following the closure of mining operations in 1996, the site underwent reclamation activities; however, substantial volumes
of mineralized material remain within existing waste rock dumps and oxide mineralized zones adjacent to the pit.
Subsequent exploration and technical
studies conducted by Paramount Gold and previous operators have identified the potential to reprocess historical surface materials and recover additional gold from remaining oxide and mixed mineralization.
1.3.4
Geological Setting, Mineralization, and Deposit
The Sleeper deposit is a low-sulfidation epithermal gold-silver system hosted within Miocene volcanic rocks typical of
the northern Nevada volcanic field. Mineralization occurs within a sequence of rhyolitic flows, volcanic breccias, and ash-flow tuffs that have been affected by hydrothermal alteration and silicification.
Gold mineralization occurs as disseminated and fracture-controlled mineralization associated with hydrothermal brecciation, silicification, and
quartz-adularia veining. Near-surface oxidation of sulfide minerals has produced oxide and mixed mineralization amenable to cyanide heap-leach processing.
1.3.5
Exploration
Exploration activities at the Sleeper property have included geological mapping, geochemical sampling, geophysical surveys, and diamond and reverse circulation
drilling. Since mine closure, exploration has focused on delineating oxide and mixed mineralization and on evaluating the gold content of existing waste rock dump, heap leach pads, and tailings. Drilling has identified gold mineralization in oxide
and mixed zones, and sampling of existing waste rock dumps indicates that portions of this material contain measurable gold.
1.3.6
Mineral Resource Estimates
The Mineral Resource estimate for the Sleeper Gold Mine (Table 1-14) was developed using a three-dimensional block
modeling approach incorporating validated drilling data, geological and oxidation domain modeling, compositing, grade capping, and domain-controlled interpolation. The estimate has been independently reviewed by the SLR QP and is compliant with SEC
Regulation S-K 1300 and prepared in accordance with CIM (2019) Best Practice Guidelines. Mineral Resources include both in situ mineralization constrained within an optimized open-pit shell demonstrating RRPEE and surface materials, including waste rock dumps, heap leach pads, and tailings storage facilities. The estimate is based on appropriate mining, processing, metallurgical, and
economic assumptions and supersedes prior disclosures for the Project.
1-29
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Measured Mineral Resources total 5.5 Mt at 0.492 g/t Au and 3.487 g/t Ag, containing 0.09 Moz Au
and 0.62 Moz Ag. Indicated Mineral Resources total 179.2 Mt at 0.330 g/t Au and 3.842 g/t Ag, containing 1.90 Moz Au and 22.1 Moz Ag. Measured and Indicated Mineral Resources combined total 184.7 Mt at 0.335 g/t Au and 3.832 g/t Ag, containing 1.99
Moz Au and 22.8 Moz Ag, with average metallurgical recoveries of approximately 70.0% for Au and 7.5% for Ag.
Inferred Mineral Resources total 238.0 Mt at
0.301 g/t Au and 3.403 g/t Ag, containing 2.30 Moz Au and 26.0 Moz Ag, including 89.7 Mt of surface materials (waste rock dumps, heap leach pads, and tailings storage facilities) at 0.327 g/t Au and 4.738 g/t Ag.
1-30
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 1-14: Summary of Mineral Resources Estimate –
April 29, 2026
Category
Tonnage
(000 t)
Grade
(g/t Au)
Grade
(g/t Ag)
Contained
Metal
(000 oz Au)
Contained
Metal
(000 oz Ag)
Metallurgical
Au Recovery
(%)
Metallurgical
Ag Recovery
(%)
Measured Oxide/Mixed Pit (non-sulfide)
2,004
0.293
3.019
19
195
75.2
%
17.1
%
Measured Oxide/Mixed Pit (sulfide)
178
0.316
4.307
2
25
70.6
%
0.0
%
Measured Sulfide Pit
3,347
0.621
3.724
67
401
66.5
%
0.0
%
Total Measured In Situ
5,528
0.492
3.487
88
620
69.8
%
6.2
%
Indicated Oxide/Mixed Pit (non-sulfide)
77,899
0.261
3.613
653
9,049
74.2
%
17.3
%
Indicated Oxide/Mixed Pit (sulfide)
15,941
0.328
4.934
168
2,529
68.7
%
0.0
%
Indicated Sulfide Pit
85,336
0.393
3.848
1,078
10,558
66.5
%
0.0
%
Total Indicated In Situ
179,176
0.330
3.842
1,900
22,135
70.1
%
7.5
%
Total Measured + Indicated In Situ
184,704
0.335
3.832
1,987
22,755
70.0
%
7.5
%
Inferred Dumps
46,893
0.279
1.941
420
2,927
77.1
%
44.6
%
Inferred Heap Leach
31,600
0.301
8.363
306
8,497
40.0
%
0.0
%
Inferred TSF
11,165
0.599
6.221
215
2,233
50.1
%
0.0
%
Total Inferred Surface
89,658
0.327
4.738
942
13,657
60.6
%
23.3
%
Inferred Oxide/Mixed Pit (non-sulfide)
48,656
0.235
2.384
367
3,729
76.6
%
14.4
%
Inferred Oxide/Mixed Pit (sulfide)
4,960
0.286
3.543
46
565
68.9
%
0.0
%
Inferred Sulfide Pit
94,761
0.311
2.657
948
8,095
66.5
%
0.0
%
Total Inferred In Situ
148,377
0.285
2.597
1,361
12,390
69.9
%
4.7
%
Total Inferred Surface + In Situ
238,035
0.301
3.403
2,303
26,047
97.9
%
8.8
%
1-31
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Notes:
1.
The definitions for Mineral Resources in S-K 1300 were followed for
Mineral Resources
2.
The Mineral Resource estimate is reported on a 100% ownership basis.
3.
The point of reference for the Mineral Resource is before the crusher (in situ).
4.
Open Pit Mineral Resources are reported at a cut-off grade ranging from
0.074 g/t to 0.217 g/t Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.
5.
The optimized pit shell and cut-off grades were generated by assuming
metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of US$2.40/t moved for open pit, processing costs of $5.51/t oxide/mixed and $10.44
sulfide processed, and general and administrative costs of $0.46/t processed
6.
Minimal mining width was 60 m for oxide/mixed material and 20 m for sulfide material
7.
Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce
8.
Bulk density ranges from 1.5 t/m3 in the tailings storage
area to 2.7 t/m3 for in situ material
9.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
10.
Numbers may not add due to rounding.
1-32
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
1.3.7
Mineral Reserve Estimates
There are no defined Mineral Reserves for the Sleeper Gold Mine as of the date of this TRS.
1.3.8
Mining Methods
Mining operations are planned as a conventional open pit operation using drill, blast, load, and haul methods on benches. Mining will be performed by a
third-party mining contractor. The mining fleet is expected to consist of diesel-powered hydraulic excavators and/or front-end loaders, supported by haul trucks typical of modern open pit mining operations in
Nevada. Mining activities will include both the rehandling of existing waste rock dump material and the extraction of in situ oxide and mixed mineralized material considered amenable to heap leaching and Merrill-Crowe recovery.
The Initial Assessment (IA) economic analysis considers only leachable mineralized material, including oxide and mixed material within the pit limits and
existing waste rock dump material. Existing waste rock dump material is currently estimated at approximately 47 Mt grading approximately 0.28 g/t gold, while in situ oxide and mixed mineralized material totals approximately 129 Mt grading
approximately 0.25 g/t gold. Sulfide mineralization, as well as material contained within the tailings storage facility (TSF) and heap leach pad (HLP), demonstrates RPEE; however, additional metallurgical testing, engineering studies, environmental
review, and economic evaluation are required before these materials can be considered for inclusion in the IA economic analysis.
The Base Case mine plan
considers Measured, Indicated, and Inferred Mineral Resources. Inferred Mineral Resources account for approximately 55% of the total mining inventory and are considered too speculative geologically to have the economic considerations applied to them
that would enable them to be categorized as Mineral Reserves. There is no certainty that the results of the Base Case economic analysis will be realized.
An Alternative Case was also evaluated comprising Measured and Indicated Mineral Resources only, excluding all Inferred Mineral Resources from the mine plan
and economic analysis.
1.3.9
Processing and Recovery Methods
Processing of mined material is planned using conventional crushing, agglomeration, and cyanide heap leach processing, followed by Merrill-Crowe zinc
precipitation for recovery of gold and silver.
The conceptual processing rate for the operation is approximately 30,000 tpd. Heap leach processing will
involve stacking crushed material on lined leach pads and applying cyanide solution to dissolve precious metals.
To date, metallurgical test work at
Sleeper has included historical bottle roll and column leach testing on oxide, mixed, waste rock dump, and selected sulfide materials; flotation testing on sulfide and existing tailings composites; and later
bio-oxidation, pressure oxidation, mineralogical, and comminution testing on selected refractory or sulfide-bearing materials. Overall, the work supports heap leach evaluation for oxide, mixed, and waste
materials, and flotation-based evaluation for tailings, HLP, and sulfide materials.
For the oxide, mixed, and waste rock dump material groups included in
the heap leach case, applied recoveries range from 65.0% Au to 83.9% Au and 8.1% Ag to 54.6% Ag. For the existing HLP and tailings, and sulfide material groups evaluated under the flotation and toll-milling case, applied gold recoveries range from
50.0% Au to 71.2% Au. No silver recovery is applied to the flotation case at this stage, and silver remains upside potential pending additional metallurgical and commercial evaluation.
1-33
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
For oxide, mixed, and waste rock dump material within the Measured and Indicated Resource categories,
estimated recoveries of approximately 70% Au and 7.5% Ag were applied.
1.3.10
Infrastructure
Existing infrastructure at the Sleeper property includes exploration offices, equipment maintenance shops, water management ponds, monitoring wells, and a
network of access roads constructed during historical mining operations.
Electrical power is available via an existing
120-kV transmission line serving the region. Water supply for operations will be sourced from groundwater within the Desert Valley hydrographic basin under existing water rights.
1.3.11
Market Studies
Gold and silver produced from the proposed operation would be recovered as doré bars through the Merrill-Crowe process and transported to third-party
refineries for final metal recovery.
Gold and silver are internationally traded commodities with established global markets. Market studies are therefore
not considered necessary for the Project’s evaluation.
1.3.12
Environmental Studies, Permitting and Plans, Negotiations, or Agreements with Local Individuals or Groups
Historical mining operations at Sleeper were conducted under permits issued by federal and state regulatory agencies, including the
U.S. Bureau of Land Management and the Nevada Division of Environmental Protection.
Future development of the Project will require updated environmental
studies, permitting, and regulatory approvals associated with the restart of mining operations. These will include updates to existing permits and approvals for mine operations, water management, and heap leach processing facilities.
The project area is in a sparsely populated region with limited nearby residential development. Consultation with regulatory agencies and local stakeholders
will continue throughout the permitting process.
1.3.13
Capital and Operating Cost Estimates
The capital and operating cost estimates for the IA were developed by SLR using a combination of first-principles estimating, benchmarking against comparable
operations, and available contractor quotations, with all costs expressed in Q2 2026 US dollars and based on metric tonnes. Consistent with AACE International Class 5 scoping-level estimates, the cost estimates reflect a preliminary level of
engineering definition with an expected accuracy range of approximately ±50%. The capital costs include a 25% contingency.
For the Base Case,
total LOM capital costs are estimated at approximately $596 million, including $201 million in initial growth and development capital, $343 million in sustaining capital, and approximately $52 million allocated for reclamation
and closure activities. Initial capital requirements are reduced through the use of contract mining and phased heap leach pad development. Sustaining capital is dominated by pit dewatering expenditures totaling approximately $139 million over
the LOM. Additional sustaining expenditures are associated with staged heap leach pad expansions occurring in years 6, 9, and 12, as well as ongoing infrastructure and indirect costs.
1-34
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Average LOM operating costs are estimated at approximately $13.03/t processed, including mining, dewatering,
processing, and general and administrative costs. Open pit mining costs are estimated at $2.40/t mined, with total mining costs averaging $6.37/t processed after accounting for waste movement, rehandling requirements, and out-of-scope contractor allowances. Processing costs are estimated at $5.55/t processed and reflect a relatively simple crushing, heap leach, and Merrill-Crowe flowsheet.
Primary consumable costs include power at approximately $0.085/kWh based on NV Energy Northern Nevada industrial tariffs,
off-highway diesel at approximately $3.50 per US gallon, propane at approximately $2.25 per US gallon, sodium cyanide at approximately $2,650 per tonne delivered, and quicklime at approximately $375 per tonne.
The proposed operation is expected to employ approximately 210 to 220 personnel during steady-state operations using a conventional four-crew, 12-hour shift rotation to support continuous 24-hour-per-day mining and processing activities.
Staffing requirements are moderated by the use of large 150 t class haul trucks, contractor mining, and a relatively simple processing flowsheet; however, additional personnel are required to support significant pit dewatering activities.
Approximately 75% of the workforce is expected to reside in Humboldt County, Nevada, with the balance drawn from surrounding regions on a drive-in/drive-out basis
without the use of an on-site accommodation camp.
1-35
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
2.0
Introduction
SLR International Corporation (SLR) was retained by Paramount Gold Nevada Corp. (PGN, Paramount Gold, or the Company) to prepare an independent Technical
Report Summary (TRS) on the Sleeper Gold Mine (Sleeper or the Project). The purpose of this TRS is to provide an Initial Assessment to support Mineral Resource disclosure. This TRS conforms to the United States Securities and Exchange
Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601(b)(96) Technical Report Summary.
Paramount Gold is a U.S.-domiciled precious metals exploration
and development company engaged in the acquisition, exploration, and development of gold and silver projects in the United States. The company’s principal assets include the Sleeper Gold Mine in Nevada and the Grassy Mountain Gold Project in
Oregon, as well as additional exploration properties in the western United States. Paramount Gold is publicly listed on the NYSE exchange under the ticker symbol PZG and maintains its corporate offices in Winnemucca, Nevada.
Paramount Gold holds a 100% interest in the Sleeper Gold Mine, which includes the historical Sleeper open-pit gold
mine and a large surrounding claim block totaling 2,474 unpatented mining claims covering approximately 44,917 acres (approximately 18,178 hectares) in Humboldt County, Nevada. The Sleeper mine was operated by AMAX Gold Inc. (AMAX) from 1986 through
1996, producing approximately 1.66 million ounces (Moz) of gold and 2.3 Moz of silver from open-pit mining and heap leaching and milling operations.
The Project is currently at the Initial Assessment (IA) stage, and as such, the level of engineering, geological definition, and metallurgical
characterization remains preliminary. The Mineral Resources for the Project comprise in situ oxide and mixed material, in situ sulfide material, and material from existing waste rock dumps, heap leach pads (HLPs), and tailing storage facilities
(TSFs). The development concept considered in the cash flow analysis presented in this TRS contemplates the restart of mining and processing operations with a focus on those Mineral Resources amenable to heap leaching, i.e., existing waste rock
dumps and in situ oxide and mixed mineralized material. Additional work is required to develop the cash flow analysis for the sulfide Mineral Resources, including the heap leach and tailings material.
The existing waste rock dumps were generated during prior mining operations conducted under substantially lower gold prices, which led to the application of
higher cut-off grades (COGs) at the time of mining. Consequently, material that was classified as waste under historical economic conditions contains grades that are potentially economic under current or
reasonably foreseeable gold price assumptions and processing technologies. This reclassification to Mineral Resources forms a key component of the Project’s economic rationale.
To support this evaluation, the waste rock dumps have been subject to initial drilling, sampling, and assaying programs, supplemented by preliminary
metallurgical test work. These programs have been designed to characterize the grade distribution, material variability, and metallurgical response of the dump material, including leachability and recovery potential. While these datasets provide an
important foundation for the current assessment, they remain limited in scope and density relative to that required for higher-confidence classifications, and additional work will be required to support future Mineral Resource estimation,
metallurgical modeling, and process design.
2-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
In parallel, the Project concept includes recovery of in situ oxide and mixed mineralized material remaining
in the vicinity of the historical pit. These materials are considered amenable to conventional surface mining methods and heap leach processing, consistent with prior operations at Sleeper, although additional drilling, metallurgical testing, and
engineering studies will be required to confirm recoveries, processing parameters, and economic viability.
Overall, the Project represents a brownfields
redevelopment opportunity, leveraging existing site disturbance, historical data, and previously mined material inventories; however, given the early stage of evaluation, all assumptions related to mineralization, processing performance, and
economic outcomes should be considered preliminary and subject to refinement through subsequent phases of study. The development concept assumes a nominal processing rate of approximately 30,000 tonnes per day (tpd), utilizing conventional open pit
mining, crushing and agglomeration, cyanide heap leaching, and Merrill-Crowe zinc precipitation to recover gold and silver.
The Base Case economic
analysis presented in this TRS evaluates the potential economic viability of processing Measured, Indicated, and Inferred Mineral Resources. The Base Case mining inventory comprises the following:
•
Approximately 47 million tonnes (Mt) of waste rock dump material, classified as Inferred Mineral Resources,
grading approximately 0.28 g/t gold (Au)
•
In situ oxide and mixed mineralized material including approximately 2 Mt Measured Resources grading 0.29 g/t Au,
78 Mt Indicated Resources grading 0.26 g/t Au, and 49 Mt Inferred Resources grading 0.24 g/t Au.
The Base Case production schedule
includes approximately 55% of Inferred Resources as part of the economic analysis. An Alternative Case was considered that included only in situ Measured and Indicated Resources in the economic analysis.
Unlike Mineral Reserves, Mineral Resources do not have demonstrated economic viability. The economic analysis contained in this TRS is preliminary in nature
and is based, in part, on Inferred Mineral Resources that are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that economic
forecasts on which this Initial Assessment is based will be realized.
Terms of Reference and Purpose
This Technical Report Summary has been prepared for Paramount Gold Nevada Corp. in accordance with the requirements of Regulation S-K 1300 for disclosure of Mineral Resources, exploration results, and initial assessments for mining properties.
The
purposes of this TRS are listed:
•
Summarize the geology, mineralization, exploration history, and technical studies conducted on the Project.
•
Present the results of an IA evaluating the potential economic viability of processing existing waste rock dump
material and in situ oxide and mixed mineralization.
•
Provide disclosure of Mineral Resources, mining methods, processing methods, infrastructure, and economic
assumptions consistent with S-K 1300 disclosure standards.
This TRS supersedes all previously
filed TRS for the Sleeper Gold Mine and is an update to the most recent TRS titled, “Technical Report Summary for the Sleeper Gold-Silver Project, Humboldt County, Nevada, USA” with an effective date of June 30, 2023, prepared for
Paramount Gold Nevada Corp. by RESPEC Company LLC., dated August 31, 2023 (RESPEC 2023).
2-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
2.1
Site Visits
The Qualified Persons (QPs) responsible for the preparation of this TRS include professionals from SLR with relevant expertise in geology, mining engineering,
metallurgy, and economic evaluation.
Personal inspections of Sleeper were completed by SLR QPs on April 2, 2026, and May 17, 2024. During the
April 2, 2026, site visit, the SLR mining and geology QPs reviewed the historical mine site, surface geology, waste rock dump areas, exploration facilities, and infrastructure relevant to the Project evaluation. During the May 17, 2024,
site visit, the SLR heap leach QP reviewed the historical mine site, waste rock dump areas, exploration facilities, and infrastructure relevant to the Project evaluation. The Environmental QP has visited the site several times over the past five
years, including the most recent visit on January 27, 2026, at which time all permitted facilities were reviewed.
2.2
Sources of Information
During the preparation of this TRS, discussions were held with personnel from PGN:
•
Rachel Goldman, CEO, Paramount Gold Nevada Corp.
•
Michael McGinnis, CPG, Owner’s Representative, Paramount Gold Nevada Corp.
•
Carlo Buffone, CFO, Paramount Gold Nevada Corp.
This TRS has been prepared using information and data obtained from multiple sources, including:
•
Historical technical reports and feasibility studies for the Sleeper Gold Mine
•
Company reports, internal studies, and databases provided by Paramount Gold Nevada Corp.
•
Geological, metallurgical, and engineering studies prepared by previous operators and consultants
•
Publicly available technical publications and regulatory filings
•
Site visits and technical discussions with Paramount Gold personnel
Where appropriate, data sources are referenced within the relevant sections of this report.
The documentation reviewed and other sources of information are listed at the end of this TRS in Section 24.0 References.
2-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
2.3
List of Abbreviations
Units of measurement used in this TRS conform to the metric system, unless otherwise noted. All currency in this TRS is US dollars (US$) unless otherwise
noted.
µ
micron
kVA
kilovolt-amperes
µg
microgram
kW
kilowatt
a
annum
kWh
kilowatt-hour
A
ampere
L
litre
bbl
barrels
lb
pound
Btu
British thermal units
L/s
litres per second
°C
degree Celsius
m
metre
C$
Canadian dollars
M
mega (million); molar
cal
calorie
m2
square metre
cfm
cubic feet per minute
m3
cubic metre
cm
centimetre
MASL
metres above sea level
cm2
square centimetre
m3/h
cubic metres per hour
d
day
mi
mile
dia
diameter
min
minute
dmt
dry metric tonne
µm
micrometre
dwt
dead-weight ton
mm
millimetre
°F
degree Fahrenheit
mph
miles per hour
ft
foot
MVA
megavolt-amperes
ft2
square foot
MW
megawatt
ft3
cubic foot
MWh
megawatt-hour
ft/s
foot per second
oz
Troy ounce (31.1035g)
g
gram
oz/st, opt
ounce per short ton
G
giga (billion)
ppb
part per billion
gal
US gallon
ppm
part per million
g/L
gram per litre
psia
pound per square inch absolute
gpm
US gallons per minute
psig
pound per square inch gauge
g/t
gram per tonne
RL
relative elevation
gr/ft3
grain per cubic foot
s
second
gr/m3
grain per cubic metre
st
short ton
ha
hectare
stpa
short ton per year
hp
horsepower
stpd
short ton per day
hr
hour
t
metric tonne
Hz
hertz
tpa
metric tonne per year
in.
inch
tpd
metric tonne per day
in2
square inch
US$
United States dollar
kcal
kilocalorie
V
volt
kg
kilogram
W
watt
km
kilometre
wmt
wet metric tonne
km2
square kilometre
wt%
weight percent
km/h
kilometre per hour
yd3
cubic yard
kPa
kilopascal
yr
year
2-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
3.0
Property Description
3.1
Location
The Sleeper Gold Mine, a material exploration property of Paramount Gold, is located in Desert Valley at the western base of the Slumbering Hills within the
Awakening Mining District, Humboldt County, Nevada, United States. The Company holds the rights to explore, develop, and mine the property through its 100% ownership of unpatented lode mining claims (the Property). The Property lies approximately 42
kilometers (km) (26 miles [mi]) northwest of Winnemucca, Nevada, and is centered at approximately latitude 41°20’03” North and longitude 118°03’10” West. The location of the Property is illustrated in Figure 3-1 and is shown on the Jackson Well 7.5-minute quadrangle published by the United States Geological Survey. The main historical Sleeper mine workings are located near these
coordinates.
3-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 3-1: Location Map
3-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
3.2
Land Tenure
The Property comprises 2,474 unpatented federal lode mining claims covering approximately 18,178 hectares (approximately 44,917 acres) in Humboldt County,
Nevada. The claims are administered by the U.S. Bureau of Land Management (BLM) under the provisions of the Mining Law of 1872. Paramount Gold Nevada Corp., through its wholly owned subsidiaries Sleeper Mining LLC and New Sleeper LLC, holds 100%
ownership of the claims that make up the Project.
Ownership of unpatented mining claims conveys the right to explore, develop, and mine locatable
minerals subject to compliance with federal and state regulations. The surface estate remains under the title of the United States Government and is managed by the BLM. Surface use associated with exploration and mining activities is subject to
applicable environmental and land management regulations.
Paramount Gold’s latest Title Report was completed in December 2023, and the land
position has not been altered since. The properties subject to this 2023 Title Report Update include all the Claims.
The Property consists of contiguous
unpatented lode and placer mining claims covering portions of Sections 35 through 36 in Township 40 North, Range 34 East; Sections 3 through 10, 11, 14 through 23, and 25 through 36 in Township 40 North, Range 35 East; Sections 1 through 2, 11
through 14, 23 through 26, and 35 through 36 in Township 39 North, Range 34 East; Sections 1 through 12, 16 through 22, and 28 through 33 in Township 39 North, Range 35 East; Sections 1, 2, 11, and 12 in Township 38 North, Range 34 East; Sections 9,
16, 19 through 21, 28, and 32 through 34 in Township 38 North, Range 35 East; Sections 24, and 35 through 36 in Township 37 North, Range 34 East; Sections 1 through 5, 8, 9, 15 through 17, and 27 through 28 in Township 37 North, Range 35 East;
Sections 2 through 3, in Township 36 North, Range 34 East, Mount Diablo Base and Meridian, Humboldt County, Nevada. Surface rights for the unpatented claims are owned by the United States Government.
3.2.1
Mining Claims
The Project consists of four primary claim groups totaling 2,474 unpatented lode mining claims. These claim groups were assembled through a series of
acquisitions and claim-staking programs from 2010 to 2021.
Table 3-1: Sleeper – Summary of Claim
Holdings
Claim Group (SUB CLAIM NAMES)
Number of
Claims
Approximate Surface
Area
(Hectares)
(Acres)
Sleeper Gold Mine (AW, CR, DAY, DRYLAKE, ELECTRUM, FREE GOLD, LAM, LLY, MORNING, MORNING STAR, NA,
NEW ALMA, NEW EVENING, NEW SNOWSTORM, PDSLP, SK, SLEEPER, SS, VIRGINIA, YORK)
1,044
6,544
16,171
Dunes (Blue No., SP, SS)
394
2,997
7,405
Mimi (MIMI)
884
7,383
18,243
South Sleeper (RO, SH)
152
1,254
3,098
Total
2,474
18,178
44,917
3-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Section 27.0 provides a complete list of individual mining claims that comprise the Property.
Federal and State Mining Law Framework
Federal laws
governing mining activities on public lands in the United States are primarily contained in Title 30 of the United States Code (USC), “Mineral Lands and Mining,” and Title 43 of the United States Code, Chapter 35, “Federal Land
Policy and Management Act” (FLPMA). Implementing regulations for these statutes are contained in Title 43 of the Code of Federal Regulations (CFR), “Public Lands.”
Nevada state laws applicable to mining operations are primarily contained in the Nevada Revised Statutes (NRS), particularly Chapters 512 through 520, and in
the Nevada Administrative Code (NAC), primarily Chapter 517.
Federal mining claim law applicable to claims located on federal lands is based on the
General Mining Law of 1872, formally titled “An Act to Promote the Development of Mineral Resources of the United States”. Federal regulations governing mining claims and surface disturbance are implemented through provisions in
30 USC, 43 USC, and 43 CFR, as well as corresponding Nevada statutes, including NRS 517.
Approximately 85 percent of the land area within the State
of Nevada is federally owned. Most of these lands are administered by federal agencies, including the BLM, the United States Forest Service (USFS), the United States Department of Energy (DoE), and the United States Department of Defense. Large
areas of land administered by the Bureau of Land Management and the Forest Service remain open to mineral exploration and to the location of mining claims under the General Mining Law.
3-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 3-2: Sleeper Tenement Map
3-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Federal Requirements for Exploration and Mining Activities
Regulations administered by the BLM governing surface disturbance and reclamation are contained in 43 CFR 3809. These regulations require that exploration
activities involving disturbance of five acres or less be conducted under a Notice of Intent submitted to the appropriate BLM Field Office (43 CFR 3809.1-1 through
3809.1-4).
A Plan of Operations (POO) must be submitted and approved for mining or processing activities, as well
as for exploration activities that will disturb more than five acres. A Plan of Operations is also required for bulk sampling programs where 1,000 short tons or more of presumed ore are proposed to be removed (43 CFR 3802.1 through 3802.6; 43 CFR 3809.1-4 and 3809.1-5).
BLM regulations further require that operators post
reclamation bonds sufficient to ensure reclamation of disturbances caused by activities exceeding casual use (43 CFR 3809.500 through 3809.560).
Federal Mining Claim Location and Maintenance Requirements
Federal regulations (43 USC 1744; 43 CFR 3833.1-2) require that the locator of a mining claim, mill site, or tunnel
site file a copy of the notice or certificate of location with the appropriate State Office of the Bureau of Land Management. This filing must include a map showing the claim location and must be completed within 90 days after the claim is located.
Failure to complete this filing within the required period renders the claim void.
The certificate of location must include:
•
The name and current mailing address of the claim owner or owners
•
The type of claim
•
The legal location of the claim, including township, range, section, and quarter section
•
The accompanying map must correspond to the claim location requirements established under Nevada state law.
Federal law (30 USC 28f; 43 CFR 3833.1-5) also requires payment of an annual claim maintenance
fee to the Bureau of Land Management. This fee must be paid to the appropriate BLM State Office on or before September 1 of each year. During the initial assessment year (the year in which the claim is located), the maintenance fee must be paid
at the time the notice of location is filed with the BLM. Failure to pay the claim maintenance fee results in the claim being declared void.
Nevada
State Requirements
Nevada law also requires claim holders to file documentation demonstrating continued intent to hold mining claims. Under NRS
517.230, on or before November 1 of each year, the claimant, or an authorized representative, must record with the County Recorder a Notice of Intent to Hold if annual assessment work is not being performed.
This affidavit must include the following:
•
Name and mailing address of the claimant
•
Name of the mining claim
•
Bureau of Land Management serial number (if assigned)
3-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Statement affirming the claimant’s intention to maintain the claim
The Notice of Intent to Hold establishes the claimant’s intent to maintain the claim from 12:00 pm on September 1 of the previous year through
11:59 am on September 1 of the current year.
3.3
Encumbrances
Unpatented mining claims require annual maintenance fees paid to the BLM as well as county recording fees. As of the Effective Date of this report, claim
maintenance fees have been paid in full through August 31, 2026.
Table 3-2: Property Holding Costs
Cost Category
Annual Cost
(US$)
Notes
Annual Claim Fees
494,800
BLM maintenance fees ($200/claim)
County Recording Fees
37,110
Humboldt County recording costs (approximately $15/claim)
Total Annual Holding Cost
531,910
Estimated annual property holding cost
3.4
Royalties
A total of five net smelter return (NSR) royalties apply to future mineral production from portions of the Project. These royalties are summarized in Table 3-3.
Table 3-3: Royalty Agreement Summary
Royalty Holder
Royalty Terms
Montezuma
1% NSR on ALL RO and SH claims (South Sleeper)
Geologix
1% NSR on ALL RO and SH claims (South Sleeper)
Snyder Syndicate
1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, ALL SS, AND ALL BLUE.)
Franco-Nevada U.S. Corporation
2% NSR on minerals produced from all 2,474 claims
Evolving Gold / Quinton Hennigh
2% NSR royalty on all SS and all SP claims.
Dry Lake Placer Association
3% NSR on Dry Lake Placer claims
ICN Resources Ltd.
0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims
3.5
Required Permits and Status
The permits are summarized in Table 3-4 represent the principal BLM and State of Nevada authorizations for exploration,
reclamation, historical operations, and ongoing site maintenance at the Property as of the report’s Effective Date. The summary preserves the permit numbers, bond references, and compliance details from the source material and is intended to
support a concise yet complete permit section in the technical report.
3-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
3.5.1
Key BLM and State Permits in Place
Table 1 summarizes the key BLM and State permits identified as being in place as of the Effective Date of the report. These permits are associated with
exploration, mine operations, air quality, reclamation, water management, solid waste, and related site activities.
Table 3-4: Sleeper—Key BLM and State Permits in Place
Permit / Authorization
Permit Number
Regulatory
Agency
Notes/Scope
Exploration Reclamation Permit
#0219
Nevada Division of Environmental Protection / Nevada Division of Minerals
Exploration reclamation authorization maintained for exploration disturbance and associated reclamation obligations.
Exploration Plan of Operations
#NVN077104
BLM
Federal exploration plan covering exploration activities and related surface disturbance.
Sleeper Mine
#NVN064100
BLM
Mine-level federal authorization associated with the Sleeper Mine operations area.
Class II Air Quality Operating Permit – Surface Area Disturbance
#AP1041-2831
State of Nevada
Air quality operating permit associated with surface disturbance activities.
Mine Reclamation Permit
#0037
State of Nevada
Legacy permit maintained from prior mining activities for future reactivation flexibility.
Water Pollution Control Permit
#NEV50006
State of Nevada
Water pollution control authorization maintained from prior operations.
Ground Water Appropriation Permits
#53228, #53231, and #53236
State of Nevada
Groundwater rights and appropriation permits applicable to the project area.
Hazardous Materials Permit
#30473; FDID #08250; Facility #1168-2326
State / Local
Hazardous materials registration and related compliance records for the site.
Class III Solid Waste Landfill Waiver
#SWMI-08-10
State of Nevada
Waiver associated with the site landfill / solid waste management function.
Industrial Artificial Pond Permit
#S34480
State of Nevada
Industrial pond authorization maintained from prior operating conditions.
Mine Plan of Operations
#N64100
BLM
Mine plan maintained for historical operations and future updating if production is reinitiated.
3-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
In addition to the principal permits listed above, the property maintains numerous other permits associated
with previous mining activities. These legacy permits are retained to facilitate future updates should a decision be made to reinitiate production at the site. Ongoing maintenance of these permits includes monthly, quarterly, and annual monitoring
and reporting, as applicable.
3.5.2
Reclamation Bonds
Table 3-5 summarizes the reclamation bonds associated with the principal
BLM-authorized activities. The BLM Nevada State Office currently holds both bonds, and the current bond obligation was approved on October 9, 2020. The bond amounts are reviewed every three years.
Table 3-5: Sleeper Reclamation Bonds
Bond Number
Principal
Covered
Authorization
Current
Obligation
(US$)
Purpose
NVB000444
New Sleeper Gold LLC
NVN077104
345,044
Surface reclamation coverage for the Sleeper Gold Exploration Plan.
NVB000330
Sleeper Mining Company LLC
NVN064100
3,966,373
Surface reclamation coverage for operations conducted under the Sleeper Mine authorization.
3.5.3
Compliance and Permit Status
According to the source material, Paramount Gold is currently in compliance with all issued permits and is in the process of renewing those permits that
require renewal. The bonds held by the BLM provide surface reclamation coverage for operations conducted by the relevant principals under NVN064100 and NVN077104, respectively.
The current bond obligation was approved on October 9, 2020, and is reviewed every three years. Permit maintenance activities include monthly, quarterly,
and annual monitoring and reporting. Retaining legacy permits from previous mining activities is intended to simplify future permit updates if production is restarted.
3.6
Other Significant Factors and Risks
The SLR QP is not aware of any environmental liabilities on the property. Paramount Gold has, or can obtain, all the required permits to conduct the proposed
work on the property. The SLR QP is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the proposed work program on the property.
3-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
4.0
Accessibility, Climate, Local Resources, Infrastructure, and Physiography
4.1
Accessibility
The Sleeper Gold Mine is in Humboldt County in north-central Nevada, approximately 42 km (26 mi) northwest of Winnemucca, Nevada, which lies along
Interstate 80, the principal east–west transportation corridor across northern Nevada connecting Reno, Nevada, and Salt Lake City, Utah. Access to the project area is provided by Nevada State Highway 95, approximately 51 km (32 mi) north of
Winnemucca, and Nevada State Highway 140, approximately 23 km (14 mi) west toward the project area. The property is connected to the paved highway network by Sod House Road, a maintained gravel road that provides direct access to the mine site and
surrounding exploration areas. Interstate 80 parallels the Union Pacific transcontinental railroad, providing efficient transportation of bulk materials and mining consumables to Winnemucca and the surrounding mining district. The project area can
be reached year-round by vehicle under typical weather conditions, given the region’s generally dry climate and moderate winter snowfall.
4.2
Climate
The Sleeper Gold Mine is in Desert Valley at the western base of the Slumbering Hills in Humboldt County, Nevada. The project area lies within the Basin and
Range physiographic province at an elevation of approximately 1,300 m (about 4,265 ft) above sea level. The regional climate is characteristic of the semi-arid high desert of northern Nevada, with relatively low annual precipitation, large daily
temperature variations, and generally clear skies throughout much of the year. Winters are typically cool to cold, with average daytime temperatures in January of approximately 6°C to 8°C and nighttime temperatures commonly declining to
approximately -7°C to -9°C, although colder temperatures may occur during periodic Arctic air incursions. Snowfall occurs intermittently during winter storm
events; however, snow accumulations at the valley floor are generally modest and short-lived, typically melting within several days.
Average annual
precipitation in the Desert Valley area is approximately 130 mm to 150 mm per year (about 5 to 6 inches), with most precipitation occurring during winter and early spring frontal systems. Summers are generally warm to hot during the day, with
temperatures often exceeding 30°C, while nighttime temperatures typically cool significantly due to the dry desert air and elevation. Summer precipitation is relatively limited and typically occurs as isolated convective thunderstorms associated
with late-season Great Basin monsoonal activity. Overall, the area is characterized by low humidity, high evaporation rates, and sparse high-desert vegetation. Because of the relatively dry climate, moderate winter snowfall, and the absence of
prolonged severe weather conditions, the Sleeper property area is considered favorable for year-round exploration, development, and mining operations, with only minor seasonal impacts on access or operational efficiency.
4.3
Local Resources and Infrastructure
The Project lies within a region with a long history of mining activity. The historical Sleeper mine was operated by AMAX from 1986 to 1996 as a large open-pit
gold and silver operation. The previous operation required the development of significant mining infrastructure, including haul roads, processing facilities, water supply systems, electrical distribution systems, and support
4-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
facilities, demonstrating that the area can support large-scale mining operations. Several facilities remain on-site and are currently utilized to support
exploration activities, including office space, equipment maintenance facilities, and storage areas used for drilling and exploration programs.
The
nearest regional service center is Winnemucca, Nevada, located approximately 42 km southeast of the property. The city of Winnemucca is the county seat of Humboldt County and has a population of approximately 8,400 people. The city functions as a
primary commercial and logistical hub for mining operations throughout north-central Nevada and provides access to equipment suppliers, fuel distribution, heavy equipment maintenance facilities, drilling and blasting contractors, warehousing,
lodging, medical services, and other industrial support services commonly required by mining projects.
Transportation and Access
Regional access to the Sleeper property is provided by Interstate 80, which passes through Winnemucca and serves as the principal east–west
transportation corridor across northern Nevada. Interstate 80 provides direct connections to major mining centers, including Elko, Nevada and Salt Lake City, Utah, to the east and Reno, Nevada, to the west.
An extensive network of historical mine haul roads, exploration access roads, and drill roads exists throughout the property, resulting from mining activities
conducted between 1986 and 1996 and subsequent exploration programs. These roads provide access to the historical open pit, heap-leach pads, waste-rock facilities, and exploration targets throughout the Sleeper district. Depending on the development
scenario, portions of this road network may require upgrading or rehabilitation to support future operations.
Electrical Power
Electrical power in northern Nevada is supplied by regional utilities through a network of high-voltage transmission lines serving numerous mining operations.
Transmission infrastructure in the broader region commonly includes 69-kV, 120-kV, and 230-kV lines that connect mines and industrial facilities to the regional grid operated by NV Energy. Typical overhead transmission lines in the region consist of
aluminum-conductor steel-reinforced (ACSR) cables mounted on steel or wooden monopole structures spaced approximately 90 m to 135 m apart, with structure heights typically ranging from about 17 m to 25 m, depending on terrain and span requirements.
Transmission corridors commonly occupy rights-of-way approximately 27 m wide.
Historical mining operations at Sleeper required electrical power for
mining equipment, ore processing facilities, pumping systems, and general site infrastructure. Historically, electrical power to the project area was supplied by an existing 120-kV transmission line
approaching the property from the north, operated by Harney Electric Cooperative. Future operations could utilize regional transmission connections, combined with on-site substations and electrical distribution systems similar to those used at other
open-pit mining operations in northern Nevada.
Airports and Air Transportation
The closest airport to the project area is Winnemucca Municipal Airport, approximately 10 km southwest of Winnemucca. The airport has a primary asphalt runway
approximately 2,134 m (7,000 ft) in length and supports general aviation and charter aircraft used by mining companies operating in the region. The nearest airports offering scheduled commercial airline service are Reno–Tahoe International
Airport, approximately 260 km southwest of the project area, and Elko Regional Airport, approximately 200 km east of the project area.
4-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Workforce and Mining Services
Northern Nevada is one of the most active gold-mining regions in the world and hosts numerous large mining operations. As a result, the region supports a
well-established mining workforce, including equipment operators, geologists, engineers, mechanics, electricians, and other skilled trades. Many workers employed at regional mines reside in Winnemucca or nearby communities. The presence of multiple
operating mines has also resulted in the establishment of numerous mining contractors and equipment suppliers capable of supporting exploration programs, construction activities, and large-scale mining operations.
Services available in Winnemucca and the surrounding region include heavy equipment repair facilities, fuel distribution, drilling and blasting contractors,
industrial construction contractors, mining equipment suppliers, and transportation and logistics companies. These services support both existing mining operations and exploration activities throughout Humboldt County and the broader northern Nevada
mining district.
Sources of Water
Water for the
previous operations was obtained from groundwater sources within the Desert Valley basin, supplemented by pit dewatering systems during mining operations. Paramount Gold currently holds water rights associated with the Project.
General Infrastructure
Much of the previous mining
infrastructure has been reclaimed following the mine’s closure in 1996; however, several facilities remain available to support exploration and future development. The property’s subdued topography provides suitable areas for the
construction of mine infrastructure, including processing facilities, heap leach pads, waste rock storage areas, and associated operational infrastructure.
Existing infrastructure at the Sleeper site is listed below:
•
Exploration and administrative office building
•
Heavy equipment maintenance shop (four-bay truck shop)
•
Dewatering well service shop
•
Truck maintenance facilities
•
Diesel storage and fuel tanks
•
Electrical transmission and distribution lines
•
Groundwater monitoring wells
•
Water management ponds
•
Administrative and storage buildings
•
On-site landfill area
•
Existing mine haul roads and exploration access roads
4-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
4.4
Physiography
The Project is in north-central Nevada within the Basin and Range physiographic province, a region characterized by alternating north–south trending
mountain ranges and broad alluvial valleys formed by extensional tectonics. The Sleeper property lies primarily within Desert Valley and along the western flank of the Slumbering Hills, a low mountain range that forms the eastern boundary of the
valley. Elevations in the immediate project area average approximately 1,300 m above sea level (masl) (about 4,265 feet above mean sea level [fasl]) on the valley floor, increasing eastward into the Slumbering Hills where elevations exceed
approximately 1,700 masl. The terrain surrounding the historical Sleeper open pit consists of gently sloping alluvial fans, pediments, and low bedrock ridges, which transition into steeper volcanic uplands within the Slumbering Hills. Relief within
the immediate mine area is generally moderate, with local elevation differences of several hundred meters between the valley floor and adjacent uplands.
Desert Valley is a broad internally drained basin typical of northern Nevada, formed by fault-bounded mountain ranges and filled with unconsolidated alluvial
and lacustrine sediments derived from surrounding highlands. Surface drainage in the project area is limited and largely ephemeral, consisting of intermittent washes and small drainage channels that flow only during seasonal precipitation or
localized storm events. These ephemeral drainages typically flow westward across the valley floor and dissipate into alluvial sediments, forming no perennial streams. Vegetation in the area is characteristic of Great Basin high-desert shrubland,
dominated by sagebrush, rabbitbrush, and scattered grasses adapted to semi-arid conditions. The relatively subdued topography of the valley floor, combined with sparse vegetation and arid conditions, provides favorable terrain for the development of
large open-pit mining operations, heap leach facilities, and associated infrastructure. Overall, the physiography of the Sleeper property is typical of the northern Nevada Basin and Range region and presents
few significant natural constraints to exploration, development, or mining activities.
4-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
5.0
History
5.1
Early Mining – Awakening District (Pre-1982)
The Sleeper Gold Mine is in the Awakening Mining District. Gold mineralization in the district was recognized well before the discovery of the Sleeper deposit.
Early mining activity in the district dates to the early 1900s, with production associated primarily with gold-bearing quartz veins hosted in metasedimentary rocks.
Significant production began in the 1930s from the Jumbo and Alma mines in the Slumbering Hills, approximately 6 km southeast of the eventual Sleeper pit.
Narrow quartz–adularia veins were mined by underground and small open pit methods. Historical compilations report that the Awakening District produced approximately 26,262 ounces of gold between 1932 and 1958. Numerous historical shafts,
adits, and prospect pits occur within a few kilometers of the Sleeper deposit, indicating widespread early exploration activity.
5.2
Ownership
5.2.1
AMAX Gold Inc. Discovery and Mining (1982–1996)
The modern history of the Sleeper deposit began in 1982 when John Wood, an exploration geologist with AMAX, recognized iron-oxide staining in an outcrop during
aerial reconnaissance. AMAX conducted geological mapping, geochemical sampling, and drilling programs between 1982 and 1984.
A breakthrough occurred in
late 1984 when a step-out drill hole intersected approximately 102 m of silicified breccia averaging approximately 27.87 g/t gold and 61.7 g/t silver. The discovery hole confirmed the presence of a
high-grade epithermal gold system and led to rapid project advancement. AMAX formally announced the Sleeper gold discovery in February 1985. Regulatory approvals for the mine’s construction were granted later in 1985. Mining began in January
1986, and mill commissioning commenced the following month. The first gold bar was poured on March 26, 1986, only slightly more than a year after the discovery announcement.
The operation processed oxide mineralization using both milling and heap-leaching circuits. Initial mine plans projected modest production, but actual
production greatly exceeded expectations due to exceptionally high grades encountered early in the Sleeper vein system. Gold production during 1986 reached approximately 126,000 ounces, with operating costs reported at less than US$60 per ounce.
Production increased to approximately 159,000 oz in 1987 and approximately 230,000 oz in 1988. The mine was widely recognized as one of the lowest-cost
gold producers in the world during the late 1980s. AMAX later added heap-leach facilities to process lower-grade oxide material.
In 1994, AMAX merged
with Cyprus Minerals to form Cyprus Amax Minerals Company. Mining at Sleeper continued until 1996, when operations were suspended. Total historical production from the Sleeper mine is approximately 1.66 Moz Au and 2.3 Moz Ag. Approximately
1,219,880 Moz Au were recovered from milling operations and approximately 438,609 Moz Au from heap-leach processing.
5-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Following closure, groundwater began filling the open pit, forming a pit lake. AMAX accelerated the filling
of the open pit to prevent the formation of acidic water. Processing facilities and crushing equipment have since been removed, and the former mill area has been reclaimed.
5.2.2
X-Cal Resources Ltd. and Joint Venture Exploration (1993–2010)
X-Cal Resources Ltd (X-Cal) began assembling a land package in the district in 1993 when it acquired property around
the Alma Mine through an agreement with Leland York. Surface mapping and sampling identified several areas of anomalous gold mineralization. Additional claims were acquired in 1994 and 1995, extending X-Cal’s holdings to the boundary of the
AMAX Sleeper property.
In April 1996, X-Cal and AMAX entered into a joint venture agreement to explore the Sleeper property and the surrounding land
package. In 1997, X-Cal entered into an option agreement with Placer Dome Inc. (Placer Dome). During a 40-day review period, Placer Dome conducted data compilation, completed an aeromagnetic survey, and drilled 47 holes totaling approximately 13,323
m (43,710 ft) of reverse circulation (RC) drilling and of diamond core drilling. The option ultimately expired after revised terms could not be negotiated.
Kinross Gold Corp. (Kinross) acquired AMAX’s interest in the Sleeper project. Between 1998 and 2003, X-Cal negotiated several agreements with Kinross
regarding ownership of the property.
On January 9, 2004, X-Cal and New Sleeper Gold Corp. (New Sleeper Gold) formed a 50/50 joint venture and
acquired Kinross’s 50% interest in the Sleeper property. New Sleeper Gold assumed management of the Project and funded extensive exploration programs between 2004 and 2005. These programs included approximately 29,780 m (97,704 ft) of
drilling, consisting of sonic, reverse-circulation, and diamond-core drilling, as well as trenching, induced polarization and magnetotelluric geophysical surveys, gravity surveys, soil-gas surveys, geological mapping, and geochemical sampling.
In May 2006, X-Cal acquired New Sleeper Gold’s 50% interest in the joint venture, consolidating 100% ownership of the Sleeper project.
5.2.3
Paramount Gold Nevada Corp. (2010–Present)
In August 2010, Paramount Gold and Silver Corp. acquired all outstanding shares of X-Cal Resources Ltd. through a plan of arrangement. Following the
acquisition, Paramount Gold Corp. began renewed exploration drilling at Sleeper in October 2010.
In 2011, Paramount Gold Corp. acquired the Dunes Project
claims located south of the Sleeper deposit from ICN Resources Ltd. (ICN). In 2012, additional claims known as the Mimi Project were staked adjacent to the historical Sleeper mine.
In connection with the acquisition of Paramount Gold and Silver Corp. by Coeur Mining, Inc., the Nevada assets were spun out into a separate publicly traded
company, Paramount Gold Nevada Corp., in 2015. Paramount Gold Nevada Corp. now controls the Project through its subsidiaries, Sleeper Mining LLC and New Sleeper LLC.
Additional claims known as the South Sleeper (RO and SH groups) were acquired in 2021, expanding the overall property. The Sleeper Gold Mine currently
comprises a large district-scale land position comprising 2,474 unpatented federal mining claims administered by the BLM. The Project is an advanced exploration and redevelopment project centered on the historical open pit mine and numerous
surrounding exploration targets within the Awakening Mining District.
5-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
5.3
Exploration and Development History
5.3.1
Historical Drilling (1983–2010)
Drilling at the Project has been conducted intermittently since the early 1980s by multiple operators and forms the primary basis for the current geological,
structural, and grade interpretation of the deposit. Initial drilling programs undertaken by AMAX between 1983 and 1995 established the core of the drilling database. Subsequent exploration and evaluation programs were completed by Placer Dome, X-Cal, New Sleeper Gold, and others through approximately 2010.
The historical drilling database is extensive and
represents the majority of drilling completed at the Project. Reverse circulation (RC) drilling predominates, accounting for approximately 95% of all drill holes and meters drilled, with most holes oriented vertically, reflecting the exploration and
production objectives of early-stage development. Later programs incorporated angled diamond core drilling to better define structural controls, vein orientations, and the geometry of higher-grade
mineralization. These core programs significantly improved geological control, particularly in areas characterized by steeply dipping vein systems and structurally controlled mineralization. Integration of RC and core datasets has enabled the
development of a refined geological and structural model, including the recognition of multiple vein sets, hydrothermal breccias, and stratigraphically controlled mineralized domains. However, portions of the historical database are incomplete, with
missing hole metadata, survey information, and total depths for certain programs. These limitations have been considered by the QP in evaluating data reliability and Mineral Resource classification.
Modern exploration commenced with AMAX in April 1982, following reconnaissance identification of iron staining. Surface mapping, geochemical sampling, and
drilling culminated in a late-1984 step-out hole intercepting 102 m averaging 27.87 g/t Au (0.81 oz/st Au) and 61.7 g/t silver, including a high-grade quartz-electrum vein with visible gold. Discovery was announced in February 1985, construction was approved in August 1985, and mining began in January 1986. The
mill was commissioned in February 1986, and first gold was poured on March 26, 1986. Between 1986 and 1996, production totaled approximately 1.66 Moz of gold and 2.3 Moz of silver. During the 1983–1995 period, AMAX completed 3,668 drill
holes totaling 509,043 m and conducted an IP/resistivity survey in 1987. Mining concluded in 1996.
In 1989, NGM reportedly drilled nine holes totaling
438 m; however, SLR is unaware of NGM’s full name or of any relationship, if any, between NGM and AMAX. No information is available regarding NGM’s drilling contractors, drill rig types, sample collection procedures, or collar and down-hole survey methods.
From 1996 to 1997, under the X-Cal/AMAX joint
venture, work focused on data compilation, mapping, surface geochemistry, and geophysics. Between 1993 and 1997, X-Cal collected 7,599 soil samples and 2,480 rock samples and completed 140 RC holes totaling
27,700 m. QA/QC procedures established during this period formed the basis for protocols adopted in later programs.
In 1997, Placer Dome optioned the
property, conducted a comprehensive database review, and completed a high-resolution airborne magnetic survey (50 m line spacing with 2 m readings). Placer Dome drilled 47 holes totaling 13,323 m, including RC and RC/core combination holes. During
this period, Mineral Resources Development Inc. (MRDI) evaluated tailings and heap-leach pads using six auger holes in tailings (7.6 m to 10.7 m depth), two RC holes, and three auger holes in leach pads.
5-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Between 1998 and 2003, X-Cal focused on consolidating and evaluating
tailings and heap-leach materials. This work included ten auger holes drilled into tailings in 1999, 83 sonic holes completed in 2002 (9.1 m to 10.7 m depth with 1.52 m sampling intervals), and a gravity survey conducted in 2003 on 500 m line
spacing with 200 m stations. Sampling and analytical procedures were generally consistent with industry standards, although documentation from early programs is incomplete.
In January 2004, New Sleeper Gold acquired Kinross’ 50% interest and entered into a joint venture with X-Cal.
Between 2004 and 2005, exploration and development activities included 29,780 m of drilling (comprising 17,028.9 m core, 11,373.6 m RC, and 688.8 m sonic drilling), trenching, IP, magnetotelluric (MT), gravity surveys,
soil-gas surveys (Hg and O₂/CO₂), surface mapping, geochemical sampling, and aerial photography. During this period, mill and crusher facilities were removed and reclaimed. Joint funding commenced
in August 2005, and X-Cal acquired full ownership in May 2006.
From 2004 to 2007, integrated interpretation of
magnetic, gravity, IP, and MT datasets refined the understanding of structural controls on mineralization. Magnetic inversion modeling in 2005 identified mineralization within a magnetic low bounded by magnetic highs, while gravity surveys completed
between 2003 and 2005 delineated density contrasts and major structural trends. Soil-gas and geochemical anomalies further highlighted concealed structures. QA/QC procedures applied during this period were
consistent with industry practice.
Between 2003 and 2007, X-Cal drilled an additional 47,347 m, including 30 core
holes (9,027 m), 133 RC holes (35,546 m), eight RC/core combination holes (2,776 m), and one hole of unknown type. Drilling, sampling, and QA/QC procedures implemented in 2006 and refined in 2007 became standard for subsequent programs. Work during
this period also included structural interpretation, target generation, blasthole modeling, and continued evaluation of tailings and heap-leach materials. Subsequent exploration drilling included 69 drill
holes totaling 18,041 m by New Sleeper Gold between 2004 and 2005, followed by an additional 34 holes (6,636 m) completed by Evolving Gold in 2008, and by Montezuma Mines, 11 holes (1,940 m) between 2011 and 2012. Evolving Gold also conducted
gravity, IP/resistivity, and ground magnetic surveys between 2007 and 2008, while Montezuma completed ground magnetics (2009–2010) and gravity/IP surveys (2011–2012). Some drill hole locations from these programs were not incorporated
into the historical drilling database due to unresolved drill hole location surveys. In 2021, Paramount Gold conducted an exploration RC drilling program focused on the Range Front target area southeast of the pit in the hills east of the South
Dump. Drilling of 6 RC holes totaling 2,644 m was completed.
5.3.2
Historical Geophysical and Surface Exploration Programs
5.3.2.1
Airborne Geophysical Surveys (1980s–1997)
Airborne geophysical surveys were conducted during several phases of exploration from the 1980s through the late 1990s, culminating in a detailed aeromagnetic
survey completed in 1997. This survey utilized closely spaced east–west and north–south flight lines, approximately 50 m apart, with high-frequency data acquisition along the lines. The airborne magnetic data were used to identify
lithologic variations and structural features, including volcanic units, intrusive bodies, and fault zones. Magnetic highs were interpreted to be associated with volcanic, hypabyssal, and metasedimentary rock units, providing important context for
geological interpretation and exploration targeting. These airborne datasets provided regional-scale coverage of the property and were instrumental in defining large-scale structural trends and lithologic domains that guided subsequent ground-based
exploration and drilling programs.
5-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
5.3.2.2
Ground Geophysical Surveys (1980s–2012)
Ground-based geophysical surveys were conducted from the early 1980s through 2012 and included magnetic, gravity, IP, resistivity, and MT methods. Ground
magnetic surveys were used to refine interpretations derived from airborne data and to provide higher-resolution mapping of local structures and lithologic contacts. Gravity surveys conducted throughout this period, including early programs and
later expansions, were used to define basin geometry, bedrock topography, and density contrasts associated with lithologic and alteration variations. These data were particularly important in identifying structural features beneath post-mineral
cover and in constraining the geometry of the basin hosting the Sleeper deposit. Electrical geophysical methods, including induced polarization and resistivity surveys conducted during multiple phases of exploration, including the 2004–2005
joint venture period, were used to detect chargeability anomalies and resistivity contrasts associated with sulfide mineralization, silicification, and hydrothermal alteration. MT surveys conducted during this period provided insight into deeper
conductivity structures and regional controls on hydrothermal fluid pathways.
5.3.2.3
Surface Geochemical Programs (1980s–2012)
Surface geochemical sampling programs were conducted from the early 1980s through 2012 and included extensive soil and rock-chip sampling campaigns across the
property. Soil geochemical programs, comprising more than 11,000 samples collected over multiple phases, were designed to identify anomalous concentrations of gold and pathfinder elements, particularly in areas of shallow alluvial cover.
Rock-chip sampling programs were used to verify mineralization exposed at surface and to characterize lithologic units and alteration zones. The integration
of geochemical data with geological mapping and geophysical interpretations enabled the delineation of coherent mineralized trends and target areas for follow-up drilling.
5.3.2.4
Soil Gas and Specialized Geochemical Surveys (2004–2005)
During the 2004–2005 joint venture exploration programs, specialized soil gas surveys were conducted, including mercury vapor and O₂/CO₂
measurements. These techniques were applied to detect subtle geochemical signatures associated with concealed mineralization and hydrothermal activity, particularly in areas where conventional soil geochemistry was less effective due to cover
conditions. These data were integrated with other exploration datasets to refine target generation.
5.3.3
Geological Mapping and Trenching (1980s–2005)
Geological mapping programs were conducted throughout the property’s exploration history, beginning in the early 1980s and continuing through later
campaigns, including the 2004–2005 joint venture period. These programs focused on defining lithologic units, alteration assemblages, and structural features across the property.
Trenching programs, particularly those conducted during the 2004–2005 period, were used to expose bedrock beneath shallow cover and to allow direct
observation and sampling of mineralized zones. These activities supported refinement of the geological model and validation of geochemical and geophysical anomalies.
The integration of these historical geophysical and surface exploration programs resulted in the identification of multiple mineralized trends and
structurally controlled zones across the property. Several of these trends, including those associated with volcanic contacts and major structural corridors, have not been extensively drill tested and remain prospective for additional mineralization
5-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
5.4
Past Production
Table 5-1 combines gold production from both the mill and heap-leach circuits operated by AMAX Gold Inc. at the Sleeper
Mine. Silver production was primarily recovered from mill operations. Totals correspond with reported cumulative production of approximately 1.66 Moz of gold and approximately 2.3 Moz of silver.
Table 5-1: Sleeper Gold Mine – Total Annual Production (1986–1996)
Year
Mill Gold
(000 oz)
Heap Gold
(000 oz)
Total Gold
(000 oz)
Mill Silver
(000 oz)
Heap Silver
(000 oz)
Total Silver
(000 oz)
1986
132.6
4.9
137.6
93.1
11.4
104.5
1987
152.8
16.8
169.6
131.3
38.8
170.1
1988
170.6
56.7
227.3
173.4
74.3
247.7
1989
196.3
57.9
254.3
245.0
97.2
342.2
1990
191.1
53.6
244.7
269.7
120.8
390.5
1991
121.1
62.6
183.7
183.2
108.0
291.2
1992
78.3
61.7
140.0
130.0
122.0
252.0
1993
51.3
48.9
100.2
157.7
98.5
256.2
1994
70.9
36.2
107.1
59.6
83.8
143.3
1995
54.7
27.3
82.1
47.7
51.0
98.7
1996
—
12.0
12.0
—
9.9
9.9
Totals
1,219.9
438.6
1,658.5
1,490.8
815.6
2,306.4
Avg. Metallurgical Recovery (%)
89.6
42.9
—
43.4
39.5
—
5-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
6.0
Geological Setting, Mineralization, and Deposit
The information presented herein has been reviewed, edited, and, where appropriate, directly derived from RESPEC (2023) and Wilson and SRK (2012). The
geological framework, mineralization models, and deposit interpretations have been evaluated by SLR for completeness, internal consistency, and technical reasonableness.
6.1
Regional Geology
The Project is located within the northern Basin and Range Province of Nevada, a region characterized by extensional tectonics, high-angle normal faulting, and
widespread Cenozoic magmatism. The regional geologic framework comprises the following (Figure 6-1 and Figure 6-2):
•
Mesozoic metasedimentary basement rocks of the Auld Lang Syne Group
•
Cretaceous granitic intrusive rocks
•
Overlying Tertiary volcanic sequences, including bimodal basaltic and rhyolitic units
•
Basin-fill sediments associated with post-mineral extensional deformation
The Project is situated along the western flank of the Slumbering Hills within the western portion of the Northern Nevada Rift (NNR), a northwest-trending mid-Miocene geologic province extending from southeastern Oregon to southeastern Nevada. As described in RESPEC (2023) and Wilson and SRK (2012), the NNR is characterized by bimodal basalt–rhyolite
volcanism, extensional tectonics, and a documented spatial association with low-sulfidation epithermal gold-silver mineralization (John 2001).
Available geological information indicates that the NNR developed during a period of regional extension beginning in the
mid-Miocene (approximately 17 Ma), expressed by high-angle normal faulting and associated volcanic activity. These structural and magmatic features are widely recognized as key controls on epithermal mineral
systems in northern Nevada. The association between mineralization and this tectono-magmatic framework at the Project is based on regional analogs and published studies and should be considered interpretive.
Pre-Tertiary rocks in the Slumbering Hills consist of metasedimentary rocks of the Auld Lang Syne Group and Cretaceous
granitic intrusions, consistent with descriptions in both source reports. The metasedimentary sequence has been interpreted as part of an early Mesozoic back-arc basin assemblage that was subsequently deformed
and metamorphosed to greenschist facies during late Jurassic contraction associated with the Luning–Fencemaker thrust system.
Tertiary volcanic and
volcaniclastic rocks unconformably overlie the pre-Tertiary basement and locally intrude it. As described in the Wilson and SRK report (2012), many of these volcanic units are interpreted to represent outflow
facies of the McDermitt volcanic field and related caldera complexes to the north. Volcanic rocks hosting mineralization at Sleeper are interpreted to have been derived from a local volcanic center; however, the extent, timing, and configuration of
this source remain open to interpretation.
Quaternary pediment gravels and aeolian deposits occur west of the Slumbering Hills and locally cover portions
of the Project area, limiting bedrock exposure and influencing surface geological mapping and exploration methods.
6-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The regional structural framework is dominated by northwest- to north-northeast–trending high-angle
normal faults, which control basin development and are interpreted to have provided conduits for hydrothermal fluid flow. Basin and Range extension is also expressed by tilting of structural blocks. District-scale interpretations in the Wilson and
SRK report (2012) suggest a northeast-trending arch or anticline within the northern Slumbering Hills, characterized by opposing limb dips; however, this feature is inferred from regional mapping and remains conceptual.
The association between extensional faulting, bimodal volcanism, and epithermal mineralization is supported by regional studies and both technical reports;
however, the specific structural and lithologic controls on mineralization at the Property remain interpretive and subject to refinement with additional geological and drilling data.
6-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 6-1: Regional Geology
6-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 6-2: Cross Section of Regional Geology
6-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
6.2
Local Geology
At the local scale, the Sleeper Gold-Silver Project is situated along the western flank of the Slumbering Hills within Desert Valley, where the geological
framework has been significantly modified by Basin and Range extensional tectonics. The present-day configuration reflects substantial displacement along north- to northeast-trending normal faults, which have
down-dropped the volcanic and basin-fill sequences by approximately 900 m to 1,000 m (3,000 ft to 3,300 ft) relative to the exposed basement rocks in the adjacent uplifts. In addition to these dominant structures, northwest-striking faults are
present and are interpreted as reactivated regional structural trends, contributing to a complex structural architecture that exerts primary control over lithological distribution and mineralization.
The stratigraphic framework at the property comprises Mesozoic basement rocks overlain by a sequence of Tertiary volcanic and volcaniclastic units. The
basement consists of the Auld Lang Syne Group, composed of slate, phyllite, quartzite, and calcareous metasedimentary rocks that have undergone deformation and low-grade metamorphism to greenschist facies, and
which are locally intruded by Cretaceous granodioritic to monzonitic bodies. These rocks form the structural footwall to the principal mineralized system. Overlying the basement is a succession of Miocene volcanic rocks, which serve as the primary
host sequence for mineralization.
The volcanic stratigraphy begins with a basal sequence of intermediate-composition volcaniclastic rocks and minor flow
units, which are overlain by dacitic to basaltic lava flows and associated flow breccias. This sequence is succeeded by felsic pyroclastic units, including pumiceous lapilli tuffs, and culminates in the emplacement of the Sleeper rhyolite. The
Sleeper rhyolite, consisting of flows, domes, dikes, and sills characterized by quartz-eye textures and sanidine phenocrysts, represents the principal host to gold-silver mineralization and is interpreted to
have played a critical role in the development of the hydrothermal system. Post-mineral volcanic units, including peralkaline ash-flow tuffs, overlie the mineralized sequence and are interpreted to post-date
mineralization.
Structurally, the deposit is dominated by a west-dipping, range-bounding normal fault that juxtaposes the Mesozoic basement rocks in the
footwall against the Miocene volcanic sequence in the hanging wall. This structure is interpreted to have served as the principal conduit for hydrothermal fluids and represents the first-order control on mineralization. Secondary structures within
the hanging wall, including splays, vein arrays, and fault intersections, create localized zones of enhanced permeability and are closely associated with the distribution of mineralized veins, breccias, and stockwork zones. The resulting structural
framework is hierarchical, with primary faults controlling the overall geometry of the system and secondary structures governing local mineralization patterns and grade distribution.
At the property scale, the Sleeper deposit is defined by a well-developed mineralized system comprising a central zone of historically mined high-grade
quartz–adularia veins surrounded by halos of stockwork and breccia-hosted mineralization, which transition outward into peripheral zones of lower-grade mineralization (Figure 6-3, Figure 6-4, and Figure 6-5).
The deposit extends approximately 1,500 m to 1,700 m
along strike, is on the order of 600 m in width, and has a vertical extent exceeding 600 m from near-surface to depth. This geometry reflects the combined influence of structural controls and lithological competency contrasts, which together
governed the development of permeability and fluid flow within the hydrothermal system.
6-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Following historical mining, the geological setting is characterized by extensive envelopes of low-grade stockwork mineralization that surround and underlie the previously mined high-grade vein systems. Remnant mid- to high-grade zones persist beneath and adjacent to
mined areas, representing down-dip and along-strike extensions of the primary vein systems as well as mineralization associated with secondary structural zones. Additional mineralization is recognized at
targets such as West Wood, where hydrothermal breccia-hosted mineralization is associated with structural complexity and possible intrusive influences, indicating that the mineralizing system remains open and locally underexplored.
The Qualified Person notes that geological continuity is generally well defined within the broader low-grade stockwork
domains, which form laterally and vertically continuous mineralized envelopes suitable for bulk-tonnage evaluation. In contrast, high-grade vein-hosted mineralization is discontinuous and strongly controlled by structural features, resulting in
significant spatial variability. This variability is an inherent characteristic of the deposit and represents an important consideration in geological modeling and Mineral Resource estimation. The overall geological interpretation is considered
robust and appropriate for the current level of study and is consistent with CIM (2014) Definition Standards, CIM (2019) Best Practice Guidelines, and SEC Regulation S-K 1300 reporting requirements.
6-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 6-3: Stratigraphic Column
6-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 6-4: Local Geology
6-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 6-5: Cross Section of Local Geology
6-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
6.3
Mineralization
Mineralization at the Sleeper Gold-Silver Project is characteristic of a low-sulfidation epithermal system (Figure 6-6) developed within a Miocene volcanic center and spatially associated with a major west-dipping, range-bounding normal fault. Gold and silver mineralization occurs predominantly within the hanging-wall volcanic
sequence, particularly within the Sleeper rhyolite and underlying basaltic units, and reflects a structurally controlled hydrothermal system with multiple phases of fluid flow and mineral deposition.
6-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 6-6: Schematic Model of
Low-Sulfidation Epithermal System
6-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Mineralization at Sleeper comprises four principal styles that collectively define the deposit architecture:
(i) quartz–adularia vein systems, which host the highest grades and represent the primary fluid conduits; (ii) hydrothermal breccias, which occur in structurally prepared zones and locally host moderate- to high-grade mineralization;
(iii) stockwork veinlets and disseminated mineralization, which form a broad, lower-grade halo surrounding higher-grade structures; and (iv) alluvial or placer mineralization, derived from erosion of primary mineralized zones and preserved
in post-mineral sedimentary units. These styles reflect a continuum of hydrothermal processes ranging from focused fluid flow in discrete structures to more diffuse fluid dispersion into the surrounding host rocks.
Gold and silver mineralization is spatially and genetically linked to the structural framework of the deposit. The principal control is the regional-scale
normal fault system, which provided the primary conduit for hydrothermal fluids and established the hanging-wall domain in which mineralization is concentrated. Secondary controls include hanging-wall splays, vein arrays, and structural
intersections, which created localized zones of enhanced permeability. These structural features governed the distribution of mineralization and are directly associated with the development of high-grade veins, breccia bodies, and vein swarms. The
interaction between structure and lithology, particularly within competent rhyolitic units, played a critical role in focusing fluid flow and controlling mineral deposition.
The mineralization exhibits a clear relationship between style and grade distribution. High-grade mineralization is localized within quartz–adularia
vein systems that may extend along strike over significant distances but are typically limited in width and continuity. Bonanza veins were as much as 4 to 5 m wide. Although disrupted by post-ore faulting, the
reconstructed strike length of bonanza veins were quite consistent along strike for distances of more than 200 m. These veins can locally exceed 100 g/t Au, particularly within bonanza-grade shoots, although
such grades are spatially restricted. Mid-grade mineralization is typically associated with hydrothermal breccias and structurally controlled vein swarms, where grades generally range from approximately 3 g/t
Au to 34 g/t Au. These zones represent transitional domains between high-grade vein systems and the broader mineralized envelope. Low-grade mineralization occurs as pervasive stockwork veinlets and
disseminations, generally grading less than 3 g/t Au, but forming the bulk of the tonnage within the current Mineral Resource.
Mineralogically, the
system is dominated by quartz–adularia gangue assemblages with associated electrum, pyrite, and marcasite, consistent with deposition from near-neutral pH hydrothermal fluids under low-sulfidation
epithermal conditions. Alteration is characterized by strong silicification associated with veins and breccias, adularia alteration indicative of boiling conditions, and weaker argillic to sericitic halos in surrounding wall rocks. Distal propylitic
alteration is locally developed and reflects background fluid–rock interaction outside the main mineralized zones.
The geometry and continuity of
mineralization reflect the underlying structural controls. Mineralized zones extend over a strike length of approximately 1.5 km to 2.0 km, widths of several hundred meters to over 1 km, and vertical extents exceeding 600 m. However, continuity
varies significantly by mineralization style, with high-grade veins exhibiting limited lateral and vertical continuity relative to the more continuous, lower grade stockwork domains. This results in a deposit characterized by a highly heterogeneous
grade distribution, with localized high-grade zones embedded within a large, lower-grade mineralized envelope.
Following historical mining, the remaining
mineralization is dominated by lower-grade stockwork material, down-dip extensions of previously mined high-grade veins, and secondary structural zones hosting moderate-grade mineralization. Discrete zones
such as the West Wood area demonstrate the continued presence of structurally controlled, higher-grade mineralization associated with hydrothermal breccias and intrusive-related features.
6-12
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
6.4
Deposit Types
The Project is classified as a low-sulfidation epithermal gold-silver deposit developed within a middle Miocene
volcanic center in an extensional tectonic environment. This classification is supported by the observed geological, mineralogical, structural, and alteration characteristics, including quartz–adularia vein systems, hydrothermal breccias,
stockwork mineralization, and associated alteration assemblages typical of epithermal systems formed at shallow crustal levels.
Low-sulfidation epithermal deposits are formed from near-neutral pH hydrothermal fluids, typically derived from magmatic sources and circulating through structurally prepared volcanic sequences. At Sleeper,
mineralization is spatially associated with a major west-dipping, range-bounding normal fault and related structural splays, which provided the principal conduits for hydrothermal fluid flow. The deposit is hosted predominantly within Miocene
basaltic and rhyolitic volcanic rocks, with the Sleeper rhyolite representing the primary host lithology. The structural and lithological framework is consistent with the development of an epithermal system in an extensional volcanic setting, where
repeated fault movement and magmatism facilitated fluid migration and metal deposition.
The mineralization at Sleeper exhibits the key features of low-sulfidation epithermal systems, including banded quartz–adularia veins, chalcedonic silica, and hydrothermal breccias, with associated gold occurring primarily as electrum. Sulfide mineralization is
generally limited to pyrite and marcasite, reflecting relatively low sulfur fugacity conditions compared to high-sulfidation systems. The alteration assemblage is dominated by silicification and adularia, with subordinate argillic to sericitic halos
and distal propylitic alteration, consistent with deposition from low-temperature hydrothermal fluids under boiling and fluid-mixing conditions.
The deposit displays a well-developed vertical and lateral zonation typical of epithermal systems. High-grade mineralization occurs in structurally controlled
quartz–adularia veins and associated breccias within the central portion of the system, representing zones of focused fluid flow and boiling. These zones transition outward and downward into intermediate grade breccias and vein swarms, and
ultimately into broad envelopes of low-grade stockwork and disseminated mineralization. This zonation reflects decreasing fluid flux and permeability away from the principal structural conduits and is
consistent with established genetic models for low-sulfidation epithermal deposits.
The overall geometry and
scale of the Sleeper system are also consistent with this deposit type, with mineralization extending over approximately 1.5 km to 2.0 km along strike, several hundred meters in width, and more than 600 m vertically. The system comprises a
combination of discrete high-grade vein structures and a large, lower-grade mineralized envelope, reflecting both focused and diffuse hydrothermal processes. The presence of alluvial or placer mineralization derived from erosion of primary
mineralized zones further supports the interpretation of a shallow-level epithermal system that has undergone post-mineral erosion and sediment redistribution.
6-13
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
7.0
Exploration
Exploration at the Project comprises an extensive, multi-decade dataset integrating drilling, geochemical sampling, geological mapping, and a wide range of
geophysical surveys completed by multiple operators from the early 1980s through 2013. The deposit was discovered beneath shallow alluvial cover through drilling, and subsequent programs have included more than 4,400 drill holes, extensive soil and
rock geochemical datasets, and numerous geophysical surveys, including gravity, airborne and ground magnetics, induced polarization (IP), resistivity, magnetotelluric (MT), and seismic methods
7.1
Exploration
7.1.1
Paramount Gold Geophysical Surveys (2010–2013)
7.1.1.1
Overview (2010–2013)
Following the acquisition of the Project in 2010, Paramount Gold undertook a series of targeted geophysical surveys between 2010 and 2013 to enhance the
understanding of the structural and lithologic framework controlling mineralization. These surveys were designed to complement and refine the extensive historical geophysical database and were interpreted by a qualified geophysical consultant in the
context of both newly acquired and legacy datasets. The primary objective of this work was to delineate structural corridors, identify lithologic contrasts, and define alteration patterns associated with the hydrothermal system.
7.1.1.2
Gravity Survey (2012)
In 2012, Paramount Gold completed a detailed ground gravity survey over the southern portion of the property. The survey was conducted between late March and mid-April 2012 and comprised approximately 1,019 gravity stations collected on variable grid spacing, including 100 m and 200 m grids, supplemented by wider-spaced reconnaissance stations.
Gravity measurements were acquired using LaCoste & Romberg Model-G gravity meters, with station locations
surveyed using Trimble Real-Time Kinematic (RTK) and Fast-Static GPS methods to ensure accurate positioning and elevation control. The dataset was processed to Complete Bouguer Anomaly using a range of assumed densities, with a representative
density of approximately 2.35 g/cm³ applied based on prior work in the area. Terrain corrections were applied over multiple radii extending to regional scales, and the processed data were gridded and filtered to generate regional, residual, and
horizontal gradient products suitable for structural interpretation.
Interpretation of the gravity data identified three north–south–trending
structural corridors extending more than 30 km southward from the Sleeper deposit. These features define a series of basin and horst geometries and are interpreted to represent fundamental controls on the distribution of mineralization and the
architecture of the hydrothermal system.
7.1.1.3
Induced Polarization and Electrical Surveys (2012–2013)
Induced polarization (IP) and associated resistivity surveys were conducted during the 2012–2013 period to further investigate subsurface chargeability
and resistivity contrasts. These surveys were designed to identify zones of sulfide mineralization, silicification, and hydrothermal alteration that may not be evident from surface observations or magnetic data.
7-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The IP data were integrated with gravity and magnetic datasets to refine interpretations of subsurface
structures and alteration zones. Chargeability anomalies identified through these surveys were interpreted as zones of disseminated sulfides and hydrothermal activity, providing additional drilling targets and contributing to the overall
understanding of mineralization controls.
7.1.1.4
Data Integration and Interpretation (2010–2013)
All geophysical datasets acquired by Paramount Gold between 2010 and 2013 were integrated with historical geophysical, geological, and drilling data to produce
a coherent interpretation of the property-scale structural framework. The combined dataset allowed for improved delineation of major structural trends, basin geometry, and potential mineralized corridors extending beyond the limits of historical
mining.
This integrated interpretation confirmed that the Sleeper deposit is situated within a structurally complex setting characterized by major
north–south structural corridors and associated secondary structures that control the localization of high-grade vein systems and broader zones of disseminated mineralization. The results of the Paramount Gold geophysical programs have
therefore provided a critical foundation for ongoing exploration targeting, particularly in areas beneath post-mineral cover and along underexplored structural trends.
7.1.2
Exploration Targeting – QP Comment
Exploration targeting at Sleeper is based on integrating geological, geochemical, and geophysical datasets, with particular emphasis on structural controls and
the distribution of hydrothermal alteration. High-grade mineralization is interpreted to be localized along steeply dipping structural zones and associated vein systems, while broader zones of lower-grade mineralization occur within
stratigraphically controlled envelopes surrounding these structures.
Geophysical data, particularly gravity and IP surveys, have played a critical role
in identifying structural corridors, basin architecture, and potential alteration zones beneath the cover. These features provide key vectors for exploration, particularly in areas beyond the limits of historical mining and drilling. Targets include
down-dip and along-strike extensions of known vein systems, structurally controlled high-grade zones, and underexplored areas beneath post-mineral cover, including West Wood within the broader mineralized
halo.
The QP emphasizes that these exploration targets are conceptual and based on geological interpretation supported by available data. There has been
insufficient exploration to define Mineral Resources in these areas, and it is uncertain whether further exploration will result in the delineation of additional Mineral Resources.
7.2
Drilling
Drilling at the Project has been conducted by numerous operators over several decades and has served as the primary source of geological and grade information
supporting the current understanding of the deposit. As of the effective date of this Technical Report, Paramount Gold and the Project’s predecessor owners have completed approximately 4,400 drill holes totaling about 638,000 m of drilling
completed between 1983 and 2021 by multiple operators (Table 7-1 and Figure 7-1). Drilling methods are dominated by Reverse Circulation (RC), with limited core and sonic
drilling incorporated in later programs. Some historical drilling records lack complete information, including hole type and total depth for certain programs, and these data gaps introduce uncertainty that has been considered in the evaluation of
the dataset and Mineral Resource classification.
7-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 7-1: Drill Hole Database
Year
Operator /Property
Program /Area
Drill
Type
Number of
Drill Holes
Total Depth
Drilled (m)
1983–2010
Unknown
Exploration
RC
20
780
1983–1995
AMAX
Exploration / Production
RC
3,668
509,043
1989
NGM
Exploration
RC
9
438
1997
Placer Dome
Exploration
RC
47
13,323
1996–1997
X-Cal
Exploration
RC
140
27,700
1998–2003
X-Cal*
Exploration
RC
83
N/A
2003–2007
X-Cal
Exploration
RC
169
47,169
2004–2005
New Sleeper Gold
Exploration
RC
69
18,363
2007–2008
Evolving Gold*
Exploration
RC
34
6,636
2009–2012
Montezuma Mines*
Exploration
RC
11
1,940
2010–2021
Paramount Gold
Exploration
RC
155
29,752
Waste Rock Dump
RC
65
2,397
SONIC
9
261
Heap Leach Pad
CORE
40
978
TSF
SONIC
83
825
Total
4,596
659,605
Note: * reported historical drilling not contained in Mineral Resource Database
Reconciliation of historically reported drilling totals with the drill hole database provided to SLR indicates that, while the
datasets are broadly consistent in overall scale and principal contributors, differences exist due to incomplete, missing, or unverified data within the database available for review and use in the Mineral Resource Estimate (MRE).
AMAX drilling (3,668 holes; approximately 509,000 m), which comprises most of the dataset, is fully reconciled between sources and serves as the primary basis
for the database. NGM (9 holes; 438 m) and Placer Dome (47 holes; 13,323 m) drilling was also consistent across datasets and was considered complete.
Discrepancies were identified between historical drilling records and the drill hole database provided to SLR for the
X-Cal, Paramount Gold, and related programs. Historical records indicate that X-Cal completed 394 drill holes, including 83 holes drilled between 1998 and 2003 for which
total depths are not reported. The database provided to SLR includes 309 X-Cal holes totaling 74,869 m. Consequently, a portion of the X-Cal drilling—primarily
from the 1998–2003 program—was excluded from the Mineral Resource Estimate (MRE) due to insufficient or unverifiable supporting information.
Historical documentation also indicates that Evolving Gold drilled 34 holes totaling 6,636 m between 2007 and 2008, and Montezuma Mines drilled 11 holes
totaling 1,940 m between 2009 and 2012. These drill holes were not included in the database provided to SLR and were therefore excluded from the MRE.
7-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
A similar variance is noted for Paramount Gold drilling. Records report 155 drill holes totaling 29,752 m,
whereas the database provided to SLR contains 136 holes totaling 23,756 m. The exclusion of 13 holes (approximately 3,300 m) reflects the absence of complete or verifiable supporting data at the time of review. As this drilling is relatively recent,
the omission is noted as a limitation on overall data completeness.
In contrast, New Sleeper Gold drilling shows consistency between datasets, with 69
drill holes reported and only a minor variance of approximately 300 m in total drilled length, which is not considered material. The 20 drill holes classified as “Unknown” (780 m) are present in both datasets; however, due to the lack of
ownership attribution and supporting metadata, their use remains limited and subject to further verification.
Overall, the historically reported dataset
comprises 4,596 drill holes totaling 656,960 m, compared to 4,455 drill holes (exploration, waste rock dumps, heap leach pads and TSF) totaling 645,033 m in the database provided to SLR, resulting in a net shortfall of 215 drill holes totaling
14,584 m. These differences are primarily attributable to incomplete X-Cal and Paramount Gold datasets. Consistent with S-K 1300 and CIM (2019) guidance, the QP has
excluded data that could not be verified or adequately supported and considers the remaining dataset sufficient to support the current Mineral Resource classification, while recognizing that the excluded data represent a limitation on overall data
completeness.
7-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 7-1: Drill Hole Location Map
7-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
7.2.1
Paramount Gold (2010–2021)
Drilling conducted by Paramount Gold Nevada Corp. and Silver Corp. between 2010 and 2021 represents the most recent phase of systematic exploration at the
Project and was undertaken to validate historical data, refine the geological model, and test extensions of known mineralization. A total of 136 drill holes comprising approximately 23,756 m were included in the drill hole database provided to SLR
and used in the Mineral Resource Estimate (MRE). Drilling was primarily focused on the Sleeper deposit core area and surrounding zones, including structurally controlled targets and underexplored areas such as West Wood and areas beneath
post-mineral cover.
7.2.1.1
2010 Drilling
The 2010 program comprised 14 drill holes totaling approximately 4,123 m and represents the initial phase of Paramount Gold’s drilling following
acquisition of the project. This program focused on the central Sleeper deposit, including areas within and adjacent to the historical open pit, with the objective of validating historical drilling results and confirming the continuity of known
mineralization. Limited step-out drilling also tested extensions of mineralization along the primary structural trends associated with the Sleeper vein system.
7.2.1.2
2011 Drilling
The 2011 program was the largest of the Paramount Gold campaigns, comprising 93 drill holes totaling approximately 9,028 m. During this phase, drilling focused
on expanding mineralization within the broader low-grade halo surrounding the historical high-grade vein systems, as well as testing along-strike and down-dip extensions
of the principal structures. Additional drilling targeted peripheral zones, including the West Wood area and other structurally controlled targets interpreted to host hydrothermal breccias and vein-related mineralization.
7.2.1.3
2012 Drilling
The 2012 program included 19 drill holes totaling approximately 6,158 m and was designed to follow up on targets generated from the 2011 drilling and
concurrent geophysical surveys. Drilling focused on structurally controlled zones identified through gravity and IP data, including areas south of the historical pit and beneath post-mineral cover. The program emphasized refining the geometry of
mineralized zones and testing newly identified structural corridors interpreted to control mineralization.
7.2.1.4
2013 Drilling
The 2013 program comprised 10 drill holes totaling approximately 4,448 m and represents the final phase of Paramount Gold’s drilling during this period.
Drilling was more selective and focused on priority targets identified from previous programs, including infill and step-out drilling in the core deposit area and targeted testing of structurally controlled
zones and peripheral exploration areas.
7.2.1.5
2021 Drilling
The 2021 program consisted of 6 RC exploration holes drilled to the southeast of the open pit. A total of 2,645 m were drilled. One of the holes was an RC pre-collar in the West Wood zone. However, the planned core tail portion of the hole was never initiated due to budgeting issues at the time.
7-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
7.2.2
Drill Hole Orientation
Historical drilling at the Project was predominantly completed using vertical reverse circulation (RC) drill holes, reflecting the early focus on delineating
near-surface mineralization and supporting open-pit mine development. This approach was appropriate for defining the broad, laterally continuous low-grade mineralized
envelope; however, vertical drilling provides limited control on the true thickness and geometry of steeply dipping structures.
Subsequent drilling
programs incorporated angled holes, particularly core drilling, to better define the orientation and continuity of steeply dipping vein systems, hydrothermal breccias, and structurally controlled zones. Drill hole orientations and intercept
relationships indicate that high-grade mineralization is commonly associated with steeply dipping structures, and angled drilling was therefore required to adequately characterize these features and support geological modeling.
Paramount Gold drilling (2010–2021) continued to utilize primarily RC methods with a combination of vertical and locally angled holes, targeting both
confirmation of historical mineralization and improved definition of structural controls. Drill orientations were selected to test down-dip and along-strike extensions of known mineralized zones and to
evaluate targets identified through integrated geological and geophysical interpretation.
The QP considers that, while the predominance of vertical
drilling in the historical dataset introduces some uncertainty in defining true thickness and structural geometry, the incorporation of angled drilling and the overall drilling density provides an adequate basis for interpreting mineralization
continuity and supporting the current Mineral Resource Estimate.
7.2.3
Drill Hole Collar Surveys
Drill hole collar locations for historical and more recent drilling programs were established using survey methods consistent with industry practices at the
time of drilling. Early drilling campaigns (1980s–1990s) generally relied on conventional ground survey techniques, including optical and manual methods, which may be subject to greater positional uncertainty relative to modern standards.
More recent programs, including those conducted during the 2000s and by Paramount Gold Nevada Corp. between 2010 and 2013, utilized improved survey
techniques, including differential Global Positioning System (GPS) methods, providing greater spatial accuracy for collar positioning. Collar coordinates were compiled into a centralized database and, where possible, validated against historical
records and mapping.
For certain historical drill holes, survey control data are incomplete or lack documentation regarding survey methodology and
accuracy. In accordance with S-K 1300 requirements and CIM (2019) Best Practice Guidelines, the QP has assessed these limitations and considers that the overall collar dataset is sufficiently reliable to
support Mineral Resource estimation, with associated uncertainties addressed during the Mineral Resource estimation process.
7.2.4
Drill Hole Coordinate System
Drill hole collar locations at the Project have been recorded using multiple coordinate systems over time, reflecting changes in surveying practices and data
management by successive operators.
7-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
During initial exploration in the early 1980s, AMAX established a local mine grid coordinate system based on
a truncated State Plane system referenced to NAD27, Western Nevada Zone, in feet. This local grid was defined such that local coordinates of X = 0 and Y = 0 correspond to State Plane coordinates of X = 640,000 ft and Y = 2,390,000 ft, respectively.
This coordinate system remained in use for all drilling and data management activities through August 2004.
In August 2004, X-Cal converted all relevant project data, including drill hole collar locations, to the Universal Transverse Mercator (UTM) coordinate system, NAD27, Zone 11, in meters. The transformation included the
establishment of a local mine grid reference tied to UTM coordinates (local Mine Grid X = 0 corresponding to UTM Easting 410,125.39 m and local Mine Grid Y = 0 corresponding to UTM Northing 4,573,808.38 m).
All drilling completed after this conversion, including the Paramount Gold drilling programs (2010–2021), was surveyed directly in UTM NAD27 Zone 11
coordinates (meters). Paramount Gold did not resurvey historical drill hole collars, as many locations had been disturbed by mining or reclamation activities. Instead, collar data were compiled from historical records, including drill logs and
electronic databases.
A review of the collar dataset indicates that most historical collar coordinates were transcribed into electronic format during the
X-Cal conversion and show good agreement between original mine grid records and UTM-transformed coordinates.
In accordance with S-K 1300 and CIM (2019) Best Practice Guidelines, the QP considers the coordinate system
transformation and compilation process to be appropriate for Mineral Resource estimation, with any residual uncertainty associated with historical collar locations addressed through data validation procedures and the Mineral Resource estimation
process.
7.2.5
QP Comment – Drilling Data Considerations and Limitations
While the overall drilling database is extensive, certain portions of the historical drilling record are incomplete or lack detailed documentation regarding
drilling methods, sampling procedures, and survey control. Some historical programs, although conducted by reputable operators, do not include sufficient supporting information on data-acquisition protocols, which introduces uncertainty and
implications for the confidence and classification of Mineral Resources.
Despite these limitations, the QP considers that the available drilling data,
when integrated with geological interpretation and supported by more recent drilling and validation work, provides an adequate basis for the current Mineral Resource estimates. Continued drilling, particularly using modern standards and oriented
core techniques, is expected to further refine the geological model, improve confidence in structural interpretations, and support potential future upgrades in resource classification.
7.3
Hydrogeology Data
The Project is located along the eastern margin of Desert Valley in Humboldt County, Nevada, where basin-fill alluvium overlies a sequence of Mesozoic and
Cenozoic bedrock units. The hydrogeologic system is well characterized based on pre-mining investigations, extensive dewatering records from mine operations (1985–1996), and post-closure monitoring data collected since 1996. SLR has reviewed
numerous technical reports prepared over the past three decades, including documents submitted to state and federal regulatory agencies such as the Nevada Division of Environmental Protection (NDEP), Bureau of Mining Regulation and Reclamation
(BMRR), and the BLM.
7-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Since the Sleeper pit has previously been dewatered by a network of dewatering wells (61 drilled over the
mine life), there is an extensive physical and chemical hydrogeological database collected from these dewatering wells and a supporting network of monitoring wells (68 installed over the mine life). At full capacity, the dewatering system discharged
87,200 m3/day (16,000 US gallons per minute [gpm]) from 12 pumping wells installed into the bedrock and 28 interceptor wells installed in the basal gravel aquifer.
7.3.1
Physical Hydrogeology
Hydrostratigraphic units generally consist of layered lacustrine clays, silts, and sands overlying alluvial gravel, followed by faulted rhyolite bedrock. The
lacustrine sands (known locally as the intermediate sands) are interpreted to have been beach deposits on the shores of periglacial Lake Lahontan. The intermediate sands were de-watered under an induced
hydraulic gradient from the intermediate sands into the basal alluvial gravel. As such, no dewatering wells were installed in the intermediate sands (WMC 1995).
The basal gravel is the primary aquifer and the main source of recharge to the pit lake. The basal gravel is thin to
non-existent on the east wall of the pit. Approximately 70% of the discharged groundwater was extracted from the basal gravel aquifer (WMC 2005). Groundwater discharged from the interceptor wells (installed in
the basal gravel on the west side of the pit) is intercepted prior to discharging to the pit.
Faults transecting the rhyolite bedrock have been found to
be generally non-transmissive and effectively compartmentalize groundwater flow in the bedrock. There is a fracture zone underlying the base of the pit (below 1,087 masl), known as the Deep Fracture System
(DFS), that was targeted to complete bedrock wells. Approximately 22 % of the discharged groundwater was extracted from DFS bedrock wells (WMC 2005). Generally, de-pressurizing the deep fracture system
induced downward flow from fractures above and allowed for efficient dewatering of the bedrock pit walls and floor.
However, in zones where pressurized
shallow fracture (PSF) systems were found not to be connected to the DFS and were at risk of de-stabilizing the pit walls, additional bedrock wells were installed. Approximately 9% of the discharged
groundwater was discharged from PSF bedrock wells (WMC 2005).
A total of approximately 30 dewatering wells were operational at any one time. Some
redundancy was built into the dewatering well network to allow for well and pump maintenance; as such, 61 dewatering wells were drilled over the mine life (WMC 2005). Approximately
5,450 m3/day (1,000 gpm) of the discharged water was used for mine operation (heap process water, mill operations, and dust control), while the remainder was discharged into a temporary
wetland comprised of engineered and permitted dyke structures that impounded 47 Mm3 (3,800 acre-feet) of water located in the middle of the Desert Valley (WMC 2005). Of the discharged water,
approximately 40% infiltrated into the subsurface, while the remainder evaporated (WMC 2005). The discharge system consisted of 4.8 km of conveyance channel and 17.7 km of containment dyke and required excavation, placement, and compaction of
264,000 m3 (350,000 yd3) of material.
Basal gravel and bedrock aquifer properties have been reasonably assessed and presented in Table 7-2.
7-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 7-2: Hydrostratigraphic Unit Hydraulic Properties
Hydrostratigraphic Unit
Hydraulic
Conductivity (m/s)
Specific Storage
ft-1
Specific
Yield
Lacustrine Deposits
4E-8 to 2E-5
2E-5 to 3E-3
0.1 to 0.15
Basal Gravel Aquifer
1E-5 to 1E-4
5E-5 to 5E-4
0.1 to 0.2
Volcanic Bedrock
4E-7
3E-7
0.0001
Source: WMC 1995.
Using the hydraulic properties presented above, a three-dimensional numerical model using
MODFLOW-USG was calibrated with a 90% to 95% correlation coefficient to measured piezometric heads in the aquifers (Piteau 2021). The monthly water balance of the calibrated model is presented in Table 7-3.
Table 7-3: Monthly Water Balance for the Calibrated Pit Lake Numerical
Model
Month
Water Level
Elevation
(masl)
Surface Area
of Open
Water
(m2)
Precipitation
(m3/day)
Evaporation
(m3/day)
Lake Water
Balance
(m3/day)
October
1,248
655,290
255
1,739
-1484
November
1,248
655,290
245
940
-696
December
1,248
655,290
250
576
-326
January
1,248
655,290
190
603
-413
February
1,248
655,290
120
875
-755
March
1,248
655,290
228
1,755
-1,527
April
1,248
655,290
315
2,076
-1,761
May
1,248
655,290
456
2,913
-2,457
June
1,248
655,290
163
3,755
-3,592
July
1,248
655,290
65
4,076
-4,011
August
1,248
655,290
38
2,870
-2,832
September
1,248
655,290
92
2,755
-2,663
Source: Piteau 2021.
The water balance is consistent with a net evaporative loss whereby there is no significant recharge to the subsurface.
The model was run under two climactic scenarios: 1) current climactic conditions and 2) assuming a 15% increase in evapotranspiration. The model showed that,
under each scenario, the pit lake was a regional groundwater receptor, that the pit lake was not recharging aquifers in any direction, and that it would continue to do so for at least 100 years into the future. The physical hydrogeology data
collected to date and the calibrated model show that physical hydrogeology at Sleeper is reasonably well understood.
7-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
7.3.2
Hydrogeochemistry
A database comprising 24 years of quarterly monitoring of pit lake water quality has been developed. The data set includes depth profiling within the pit lake.
Since the pumps were turned off in 1996, the pit lake water quality has consistently improved (Table 7-4). Except for isolated exceedances of fluoride, the 2020 pit lake water quality generally met the Nevada
Profile III Reference values.
While the mine was operational, a groundwater quality database was developed consisting of groundwater samples collected
from exploration drill holes, groundwater monitoring wells and dewatering wells distributed as outlined in Table 7-5.
No formal quality assurance/quality control (QA/QC) system was implemented in the characterization of groundwater and pit lake quality.
Groundwater quality reported from each hydrostratigraphic unit was generally diagnostic of that hydrostratigraphic unit. Generally, groundwater at the margins
of the basin was younger calcium -bicarbonate type water, whereas groundwater at the center of the basin was older and trended toward a sodium-chloride type water. Since the groundwater quality from each hydrostratigraphic unit is diagnostic, the
influence of leakage across hydrostratigraphic unit boundaries can be qualitatively determined. Based on hydrogeochemical data, as dewatering progressed, an increasing percentage of the groundwater discharge originates from the basal gravel aquifer
but also an increasing percentage is older water originating from the center of the basin (WMC 1995).
Exceedances of U.S. Environmental Protection Agency
(USEPA) water quality standards in the discharged groundwater to the temporary wetland are presented in Table 7-6.
Table 7-4: Evolution of Pit Lake Water Quality
Analyte
1996 Lake
2008 Lake
1Q2011
1Q2014
1Q2020
Alkalinity (total)
nr
62.9
53
66
75
pH (pH units)
1.9
7.6
7.78
7.77
7.27
Antimony
0.12
<0.003
0.002
<0.002
<0.0025
Arsenic
31.8
0.002
0.005
0.006
0.01
Cadmium
0.12
<0.002
<0.002
<0.002
<0.0020
Chloride
178
280
280
280
310
Copper
9.01
0.007
0.002
<0.002
<0.0020
Iron
1,348
<0.05
<0.1
<0.1
<0.20
Lithium
nr
nr
nr
nr
<0.20
Magnesium
253
52
57
59
60
Manganese
27.7
0.098
0.074
0.063
0.05
Molybdenum
nr
nr
nr
nr
<0.040
Nickel
16.1
0.06
0.045
0.034
<0.050
Nitrate
0.53
0.3
<0.5
<0.5
<0.1
Phosphorus
nr
nr
nr
nr
<1.0
Potassium
32
24
29
29
31
7-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Selenium
0.02
0.006
<0.01
<0.01
<0.0050
Sodium
241
330
340
350
390
Strontium
nr
nr
nr
nr
1
Sulfate
6,366
1,330
1,300
1,400
1,400
Thallium
1.37
0.002
0.003
0.002
0.002
Tin
nr
nr
nr
nr
<0.20
Total Dissolved Solids
9,000
2,480
2,600
2,600
2,700
Uranium
nr
nr
nr
nr
<0.0050
Vanadium
nr
nr
nr
nr
<0.020
Zinc
39.5
0.015
0.06
0.05
<0.040
Source: Piteau 2021.
Notes:
nr
analyte concentration not reported
<
less than the method detection indicated
All concentrations (except pH) are reported as mg/litre unless otherwise indicated
Table 7-5: Groundwater Sample Distribution
Source
Total Number of Samples Collected
Lahontan Clays
66
Intermediate Sand
20
Basal Gravel Aquifer
57
Bedrock
14
Regional Monitoring Locations
73
Composite Dewatering Discharge
38
Source: WMC 1995.
Table 7-6: Exceedances of USEPA Water Quality Standards in Dewatering Discharge
Primary
Drinking Water
Irrigation
Livestock
Watering
Aquatic Life
Wildlife
Propagation
Dewatering Discharge
Arsenic
Selenium
TDS
Fluorine
Boron
None
Fluorine
Arsenic
Boron
Copper
Zinc
Bicarbonate
Alkalinity
Source: WMC 1995.
Notes:
TDS total dissolved solids
7-12
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
7.4
Geotechnical Data
No relevant geotechnical data have been collected by Paramount Gold recently, and the authors are not aware of any existing geotechnical data. The SLR QP
recommends that Paramount Gold compile relevant historical geotechnical data.
7-13
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
8.0
Sample Preparation, Analyses, and Security
This section has been reviewed and edited by SLR and is derived, where applicable, from RESPEC (2023) and Wilson and SRK (2012). SLR reviewed the
information for completeness, internal consistency, and compliance with SEC Regulation S-K 1300, CIM (2019) Best Practice Guidelines.
The review covered sampling methods, sample preparation and analytical procedures, QA/QC protocols, and sample security practices. Supporting documentation,
including original sampling records, full QA/QC datasets, and laboratory certificates, was not available for independent verification; therefore, the review relies on information presented in the source reports.
The SLP QP considers the sampling, preparation, analytical, and security practices to be consistent with industry standards for the deposit type and period of
work. Despite data limitations, the information is sufficient to support the Mineral Resource Estimate, with uncertainties addressed through data validation and reflected in the Mineral Resource classification.
8.1
Sample Method and Approach
Sampling at the Project was completed by multiple operators between 1983 and 2013 and forms the basis of the geological and assay database supporting the MRE.
Sampling methods evolved over time; however, the overall approach is considered appropriate for the style of mineralization and consistent with industry practice.
8.1.1
Historical (1983–2010)
Historical sampling was conducted by AMAX (1983–1995), NGM (1989), Placer Dome (1997), X-Cal (1996–2007),
and New Sleeper Gold (2004–2005). Approximately 95% of the drill hole database comprises RC drilling. RC samples were collected at the rig using cyclone and splitter systems to produce representative subsamples at regular intervals, designed
to capture lithologic and mineralization variability.
During the AMAX period, sampling focused on near-surface bulk-tonnage mineralization, predominantly
using vertical drill holes. Documentation is limited; however, methods are consistent with industry practice for the period. NGM and Placer Dome used similar RC-based approaches with limited documentation but
no identified deviations from standard practice.
X-Cal and New Sleeper Gold implemented more structured
procedures, including cyclone and splitter sampling, systematic labeling and tracking, and field duplicates at approximately 150 ft intervals. Limited diamond drilling was completed in structurally complex areas; core was logged and sampled by
lithology, alteration, and mineralization, and split with half retained.
Sampling targeted both the low-grade
mineralized envelope and higher-grade structurally controlled mineralization associated with veins and hydrothermal breccias. Where coarse gold was suspected, a metallic screen fire assay was used to address sampling bias.
8.1.2
Paramount Gold (2010–2021)
Sampling during the Paramount Gold and Silver Corp. programs (2010–2021) represents the most recent data collection phase and was completed to validate
historical data, refine the geological model, and test extensions of mineralization A total of 155 drill holes (29752 m) were sampled, primarily using RC drilling methods similar to those used in earlier programs.
8-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
RC samples were collected at the rig using cyclone and splitter systems at regular intervals. Intervals were
defined from geological logging to capture mineralization associated with vein systems, hydrothermal breccias, and disseminated zones within the broader low-grade envelope. Sampling covered the main Sleeper
deposit and peripheral targets, including structurally controlled zones and areas beneath post-mineral cover such as West Wood.
Paramount applied
standardized procedures for sample collection, labeling, and tracking, using trained personnel to maintain sample integrity. Methods were consistent with earlier programs to maintain database continuity. Where coarse gold was suspected, a metallic
screen fire assay was applied.
8.1.3
QP Comment
Sampling methods across all programs are appropriate for the mineralization style and intended data use. Documentation for early programs is limited; however,
later programs by X-Cal, New Sleeper Gold, and Paramount demonstrate adherence to industry-standard practices.
In
the opinion of the QP, the sampling approach is adequate to support the MRE, with uncertainties from historical practices addressed through data validation and Mineral Resource classification.
8.2
Sample Preparation and Analysis
8.2.1
Historical (1983–2010)
8.2.1.1
Sampling, Handling, and Chain of Custody
Sample preparation and analytical procedures for historical drilling at the Project were completed by AMAX, NGM, Placer Dome,
X-Cal, and New Sleeper Gold. Documentation has improved since the late 1990s. Early programs (1983–1997) lacked detailed records of sample handling, chain of custody, and laboratory protocols. Although
conducted by established operators and consistent with industry practice at the time, supporting documentation, including laboratory certificates and QA/QC records, was not available for independent verification.
Later programs, particularly X-Cal (1996–2007) and New Sleeper Gold (2004–2005), implemented more
structured handling and chain-of-custody procedures. Samples were collected at drill sites and transported to commercial laboratories in accordance with documented
protocols, thereby improving traceability and control.
8.2.1.2
Sample Preparation
Sample preparation during later historical programs was completed at commercial laboratories, primarily ALS Chemex (ALS Global or ALS), which is located in
Elko, Nevada. Procedures followed standard workflows, including drying (if required), whole-sample crushing, subsampling, and pulverization to produce a pulp for analysis, ensuring homogeneity and minimizing bias.
Prepared pulps were retained by the laboratory or returned to the site for storage and potential verification.
8-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
8.2.1.3
Analytical Methods
Gold was analyzed primarily by fire assay, the industry-standard method. Routine samples used fire assay with atomic absorption finish. Samples with elevated
gold or suspected coarse gold were analyzed by metallic screen fire assay to address nugget effects and improve accuracy.
Selected samples were analyzed
for multiple elements using aqua regia or four-acid digestion followed by ICP techniques to support geological interpretation and mineralization characterization.
8.2.1.4
Laboratory Accreditation and Quality Systems
Analytical work during the historical programs was completed by independent commercial laboratories, primarily ALS Chemex (ALS Global) and, during the New
Sleeper Gold programs, American Assay Laboratories (AAL), located in Sparks, Nevada.
ALS Global operates laboratories accredited to ISO/IEC 17025,
requiring validated methods, calibrated instrumentation, and quality management systems to support analytical accuracy, precision, and reproducibility. Specific certification numbers for the Elko and Vancouver facilities were not provided; however,
ALS laboratories are widely recognized as ISO-accredited.
AAL is accredited to ISO/IEC 17025:2017 by the
International Accreditation Service (IAS) (Laboratory No. TL-536). The accreditation scope includes sample preparation, fire-assay for gold, and multi-element analysis by acid digestion and fusion. AAL
maintains a formal quality management system and applicable regulatory approvals, including from the Nevada Division of Environmental Protection.
8.2.1.5
Sample Retention
Pulps generated during sample preparation were typically returned to the site for storage and potential re-analysis.
The use of established laboratories and standard methods supports dataset reliability; however, incomplete documentation for early programs remains a limitation in data evaluation and Mineral Resource classification.
8.2.2
Paramount Gold (2010–2021)
Sample preparation and analytical procedures during the Paramount Gold and Silver Corp. drilling programs (2010–2021) followed documented protocols
outlined in the 2023 Technical Report (RESPEC 2023) and reflect a controlled workflow from drill-site collection through laboratory analysis at accredited facilities.
8.2.2.1
Sampling, Handling, and Chain of Custody
Samples were transported by drill contractors from drill sites to the Paramount logging facility at the Sleeper site near Winnemucca, Nevada. Drill core was
placed in core boxes, marked in feet, and transported daily for logging, where depths were converted to meters. Core boxes were photographed and placed on logging tables prior to logging.
Paramount geologists logged lithology, alteration, mineralization, and structural features, including fault intersections, lineations, fractures, veins, and
bedding. Sample intervals were defined on geological boundaries to separate lithologies and mineralization styles, typically not exceeding 1.52 m (5 ft) and aligned with drilling runs where possible. Mineralized features were marked to ensure
representative sampling.
Samples were assigned unique numeric identifiers. Tags were placed in core boxes and sample bags, with all numbers recorded in
tag books. Sample numbering excluded drill hole, depth, and location to prevent bias.
8-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Core was sampled at a dedicated station. The competent core was cut with a diamond saw; the broken core was
split manually. One-half was bagged, and the remaining half was retained. Sampling technicians recorded sample numbers, intervals, and dates.
Sample bags were stored in a secure facility until shipment. Samples were organized sequentially, including QA/QC materials, inventoried, and placed in sealed
rice bags with numbered seals. Each shipment contained samples from a single drill hole. Submittal forms documented shipment details, sample numbers, analyses, and duplicate requirements and were provided in hard copy and electronic format.
Reverse Circulation (RC) Drilling
Reverse circulation
(RC) samples were collected at the drill rig using a cyclone system and placed in cloth bags within five-gallon buckets to capture coarse and fine fractions. Each sample was assigned a unique numeric identifier, with records linking the sample
number to drill hole, depth, and interval.
Sample bags were tied, placed in crates, and stored at the drill site or in secured areas behind locked gates
at the Sleeper site. Samples were handled to preserve integrity and prevent contamination or loss.
Before shipment, samples were arranged sequentially,
including blanks, CRMs, and duplicates. Batches were verified and photographed as part of QA/QC.
Samples were transported to the laboratory by ALS
personnel. Shipment dates and counts were recorded on handling forms, maintaining the chain of custody from drill site to laboratory receipt.
Sonic
Drilling
Sonic drilling samples were collected from the drill pipe and placed in plastic bags labeled with the ending footage and orientation. Samples
were transported to the Paramount facility and arranged sequentially on logging tables.
A geologist logged the samples and converted measurements to
meters. Each 1 m interval was transferred into one or two sealed plastic bags (approximately 45.7 cm × 61 cm) for shipment.
Samples were placed in
bins with nailed lids and transported to McClelland Laboratories, typically on the day of collection, minimizing degradation or contamination. At McClelland, samples were logged, split, and coarse crushed before transfer to ALS Chemex for final
preparation and analysis.
Chain of Custody Controls
Across all drilling methods (RC, sonic, core), chain-of-custody procedures
included:
•
Unique numeric sample identifiers
•
Recording of sample interval, drill hole, and depth in field logs and tag books
•
Secure on-site storage with controlled access
•
Sequential organization and verification of all samples, including QA/QC materials
•
Sealed containers (rice bags or bins) with numbered security seals
8-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Detailed sample submittal forms documenting shipment and analytical requirements
•
Direct transport to laboratories by authorized personnel (ALS or contractors)
•
Documentation of sample movement using handling forms and photographs
These procedures maintained sample security, traceability, and representativity through collection, handling, and shipment. The QP considers these protocols
consistent with industry best practice and sufficient to support the integrity of the analytical dataset for the Mineral Resource Estimate.
8.2.2.2
Sample Preparation
Sample preparation for Paramount drilling was completed at ALS Chemex (Elko), using standardized, ISO-accredited
procedures. Samples were logged, assigned laboratory IDs, and prepared under ALS protocols.
Preparation included the following steps:
•
Drying (if required)
•
Primary crushing to approximately 75% passing 6 mm
•
Mechanical splitting to approximately 250 g subsample
•
Pulverization to approximately 85% passing 75 µm (200 mesh)
These steps reduce particle-size variability and improve sample representativity.
Contamination control included cleaner sand through the crushing circuit every five samples or with lithology changes, and between all pulverization stages.
For sonic drilling, samples were initially processed at McClelland Laboratories, where coarse crushing was completed before transfer to ALS. Samples were
transported in sealed bins and delivered the same day.
Prepared pulps were shipped to ALS Vancouver for analysis.
8.2.2.3
Analytical Methods
Analytical methods for the Paramount Gold drilling programs (2010–2013) were selected to provide an accurate determination of gold and associated
elements across a wide grade range and to address coarse gold effects. The program included multiple analytical methods, re-assay protocols, and verification procedures.
Gold was determined primarily by fire assay fusion. Both 30 g and 50 g aliquots were used, with 50 g charges improving the representativeness of nuggety
mineralization. Routine samples used fire assay with atomic absorption (AA) finish (e.g., ALS Au-AA23).
For
elevated gold values or AA over limits:
•
Fire assay with gravimetric finish (ALS Au-GRA21) for >10 g/t Au
•
50 g fire assay charges to improve precision
•
Metallic screen fire assay for coarse gold, separating coarse and fine fractions to mitigate nugget effects
8-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Silver and multi-element analyses used four-acid digestion with inductively coupled plasma atomic emission
spectroscopy (ICP-AES) (e.g., ALS ME-ICP61) on approximately 5 g aliquots, providing near-total digestion and analysis of approximately 32 elements.
For elevated silver values:
•
>100 g/t Ag: four-acid digestion with atomic absorption finish (ALS
AG-OG62)
•
>1,500 g/t Ag: fire assay with gravimetric finish (ALS Ag-GRA21)
During parts of 2011–2012, silver was also analyzed by three-acid digestion with ICP and, in some cases, by 50 g fire assay with
gravimetric finish. Gold was similarly analyzed using 30 g and 50 g charges with AA or gravimetric finish.
Independent check assays were completed by
Inspectorate (Sparks, Nevada) using 30 g and 50 g fire assay for gold (AA or gravimetric finish) and atomic absorption or ICP methods for silver. This provided external verification of analytical results.
Laboratories applied QA/QC protocols, including blanks, CRMs, and duplicates. Samples were processed in numerical sequence to distribute QA/QC materials
across batches. Results were monitored, and out-of-tolerance values triggered review and re-assay.
The combined use of fire assay, gravimetric and metallic screen methods, multi-element ICP analysis, and independent verification is consistent with industry
best practice and supports the use of the data for Mineral Resource estimation
8.2.2.4
Laboratory Accreditation and Quality Systems
Analytical work was completed by ALS Chemex (ALS Global), accredited to ISO/IEC 17025:2005 for analytical testing, including gold assays, and ISO 9001:2008 for
quality management. ISO/IEC 17025 requires validated methods, calibrated instrumentation, QA/QC protocols, external proficiency testing, and independent audits to support analytical accuracy, precision, reproducibility, and traceability.
Laboratory QA/QC included internal standards, blanks, duplicates, and defined re-assay protocols for out-of-limit results. These controls complemented Paramount’s field QA/QC program and provided an integrated framework from sampling through analysis.
Inspectorate was used as an independent laboratory for check assays, providing external verification; however, certification details for the reporting period
were unavailable.
8.2.2.5
Sample Retention
Following analysis, pulps and coarse rejects were retained by the laboratory or returned to the site for storage, allowing future verification and re-analysis.
The QP considers sample preparation, analytical methods, and laboratory quality systems, including use of ISO-accredited laboratories, consistent with industry best practice and sufficient to support the analytical dataset for the Mineral Resource Estimate.
8.3
Quality Assurance and Quality Control
Quality assurance (QA) demonstrates that assay data meet accepted precision and accuracy limits for the methods used, supporting confidence in the Mineral
Resource estimate. Quality control (QC) comprises procedures to maintain data quality during sampling, preparation, and analysis. QA/QC programs detect contamination and quantify accuracy, precision, repeatability, and overall sampling variability.
8-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
QA/QC procedures at the Project evolved over time, with limited documentation for early programs and more
robust protocols in later programs (X-Cal, New Sleeper Gold, Paramount 2010–2013). The Paramount QA/QC program included certified reference materials (CRMs), blanks, duplicates, and secondary laboratory
check assays to monitor accuracy, precision, contamination, and reproducibility.
QA/QC data for historical programs is incomplete and was not fully
available for independent verification. The Paramount dataset includes a comprehensive QA/QC program with documented performance and validation.
8.3.1
Procedures
8.3.1.1
Historical
QA/QC procedures for early historical programs (AMAX, NGM, Placer Dome) are poorly documented, and records of standards, blanks, and duplicates were not
available to SLR. Direct evaluation of analytical accuracy and precision is, therefore, limited.
Later programs
(X-Cal and New Sleeper Gold) implemented formal QA/QC procedures, including:
•
Insertion of certified reference materials
•
Use of blanks for contamination control
•
Collection of field and laboratory duplicates
•
Submission of check assays to independent laboratories
Duplicate sampling was conducted at regular intervals (e.g., approximately 150 ft for RC drilling), with standards inserted at defined frequencies. Sample
shipments were tracked, and results were monitored against expected values.
These procedures are consistent with industry practice; however, incomplete
QA/QC datasets limit quantitative assessment of overall performance.
8.3.1.2
Paramount
The QA/QC program for the Paramount (2010–2013) drilling programs incorporated CRMs, blanks, and duplicates, together with internal laboratory QA/QC
procedures and independent check assays to monitor accuracy, precision, and contamination.
QA/QC samples were inserted approximately once every 20
routine samples for each control type (CRMs, blanks, duplicates). Samples were submitted and processed in numerical sequence to ensure distribution across analytical batches. Protocols included CRM acceptance criteria, duplicate precision
monitoring, and blank contamination review. Failures or out-of-tolerance results triggered batch review and re-assay where
required.
The QA/QC dataset is summarized in Table 8-1, which presents counts of QA/QC samples by type relative
to the total number of samples. QA/QC insertion rates are consistent and provide coverage for accuracy (CRMs), contamination (blanks), and precision (duplicates).
Based on SLR’s review and noted limitations, the QA/QC program is consistent with industry best practice and supports confidence in the analytical
dataset.
8-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 8-1: Summary Counts of Sleeper QA/QC Analysis (X-Cal and Paramount)
Category
2003–2007 (X-Cal)
2011–2013 (Paramount)
QA/QC Type
Au
Ag
Au
Ag
Standard (CRM):
Number in Use
N/A
N/A
12
6
Number of Analyses
N/A
N/A
387
16
Number of Failures
N/A
N/A
13
0
Duplicate
Field Duplicate
822
875
200
199
Preparation Duplicate
642
309
0
0
Pulp Duplicate
1,610
2,451
0
42
Lab Preparation Duplicate
0
64
0
6
Lab Pulp Duplicate
162
11
0
Blank
Pulp Blank
0
0
56
0
Coarse Blank
42
35
231
230
Lab Prep Blanks
0
0
8
10
Drill Hole Samples
51,325
44,980
10,134
10,137
Total Insertion Percent (%)
5.00
4.93
8.11
4.42
8.3.2
Certified Reference Material
8.3.2.1
Historical
CRMs) were used in later historical programs, including X-Cal (1996–2007) and New Sleeper Gold (2004–2005),
to monitor analytical accuracy and laboratory performance.
RESPEC confirmed the use of CRMs in the 2003–2007
X-Cal program; however, supporting documentation was not available for review. CRMs were sourced from commercial providers and selected to represent relevant gold grade ranges, but records of insertion
frequency, standard types, certified values, and performance metrics (bias, variance, pass/fail) were not provided to SLR.
Findings and Limitations:
•
CRM use confirms the implementation of accuracy monitoring
•
Insufficient documentation to assess performance against tolerance limits
•
No statistical evaluation (control charts or bias analysis) available
•
No systematic failures or analytical bias reported
CRM use is confirmed; however, the effectiveness of accuracy control cannot be quantitatively verified and remains a limitation in the QA/QC assessment.
8-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
8.3.2.2
Paramount Gold
Certified Reference Materials (CRMs) were used during the Paramount Gold (2010–2013) programs to monitor analytical accuracy and laboratory performance.
CRMs from Mineral Exploration Geochemistry (MEG), RockLabs Ltd. (RockLabs), and CDN Resource Laboratories (CDN) were inserted at approximately one per 20 samples and selected to represent low-, medium-, and
high-grade gold ranges. Some included listed silver values for multi-element verification. CRMs were distributed throughout the sample stream and processed in sequence with routine samples.
Performance was evaluated against certified values using ±3 standard deviation (SD) acceptance limits. Most results met these criteria, indicating
acceptable accuracy and no systematic bias. Performance was consistent across grade ranges, with variability within expected analytical limits.
Isolated
CRM failures occurred but were not systematic or batch related. These triggered a review of associated batches and re-assay where warranted. Results indicate analytical accuracy was controlled and laboratory
performance was stable for Mineral Resource estimation.
Paramount used four MEG CRMs (Reno, Nevada) and eight RockLabs CRMs (Perth, Western Australia).
All 12 were certified for gold, some listed uncertified silver values. RESPEC data indicate CRM insertion rates of approximately 4% for gold and <1% for silver, reflecting limited silver-certified standards and selective silver analysis. Table 8-2 summarizes the CRMs used.
Table 8-2: Paramount Gold Certified Reference
Material
Standard ID
Drill Years
Insertion Count
Certified Au
(ppm)
Au SD
(ppm)
Listed Ag
(ppm)
MEG S107005X
2011-13
32
1.347
0.085
9.00
MEG S107006X
2011-13
34
2.850
0.364
8.00
MEG S107010X
2011-13
17
6.405
0.302
18.00
MEG-Au.09.02
2011-13
35
0.185
0.019
0.10
OxA89
2011-13
29
0.084
0.008
OxC30
2011-13
18
0.200
0.005
OxD87
2011-13
59
0.417
0.013
Si25
2011-13
44
1.801
0.044
33.25
Si42
2011-13
40
1.761
0.054
SJ63
2011-13
31
2.632
0.055
SL61
2011-13
30
5.931
0.177
SN16
2011-13
18
8.367
0.217
17.64
RESPEC identified three high and ten low failures in ALS gold analyses requiring review. Three of four MEG CRMs and five of
eight RockLabs CRMs show slight negative bias. Three CRM pulps were also analyzed by Inspectorate (Reno, Nevada). Due to the limited Inspectorate dataset and equivalent detection limits, results from both laboratories were evaluated together.
Results are summarized in Table 8-3, with failures detailed in Table 8-4.
8-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 8-3: Summary of Sleeper Gold Results for CRMs
2010–2013
Standard ID
Grades in Au in ppm
Count
Date Used
Failure Counts
Bias
Pct
Target
Ave
Max
Min
First
Last
High
Low
MEGS107005X
1.347
1.336
1.490
1.130
32
7/9/2011
8/26/2012
0
0
-0.8
MEG S107006X
2.850
3.001
3.350
2.150
34
7/13/2011
8/31/2012
0
0
5.3
MEG S107010X
6.405
5.899
6.450
5.080
17
7/9/2011
8/26/2012
0
2
-7.9
MEG-Au.09.02
0.185
0.172
0.198
0.124
35
7/9/2011
8/26/2012
0
1
-6.9
OxA89
0.084
0.080
0.089
0.073
29
9/20/2012
6/8/2013
0
0
-4.8
OxC30
0.200
0.366
3.250
0.181
18
7/9/2011
9/20/2012
1
2
83.2
OxD87
0.417
0.410
0.431
0.392
59
7/26/2012
6/8/2013
0
0
-1.8
Si25
1.801
1.796
1.915
1.395
44
7/9/2011
4/26/2013
0
1
-0.3
Si42
1.761
1.802
1.875
1.750
40
10/5/2012
6/8/2013
0
0
2.3
SJ63
2.632
2.653
2.790
2.540
31
9/20/2012
6/8/2013
0
0
0.8
SL61
5.931
5.808
6.270
4.800
30
7/26/2012
6/3/2013
0
1
-2.1
SN16
8.367
8.087
9.603
4.610
18
7/9/2011
1/30/2012
2
3
-3.4
Table 8-4: Gold Failure Details 2010–2013
Standard ID
Hole ID
Values in Au ppm
Sample Number
Certificate
Target for Std
Fail Type
Fail Limit
Failed Value
MEGS107010X
PGC-11-007
6.405
Low
5.499
5.330
613065
RE11131983
MEGS107010X
PGC-11-014
6.405
Low
5.499
5.080
613897
WN11189542
MEG-Au.09.02
PGC-11-007
0.185
Low
0.128
0.124
613075
RE11131983
OxC30
PGC-12-021
0.200
High
0.215
3.250
616935
WN12209477
OxC30
NDRC-11-041
0.200
Low
0.185
0.181
612271
11-338-10754-01
OxC30
SDRC-11-051
0.200
Low
0.185
0.183
612548
11-338-10755-01
Si25
PGR-11-015
1.801
Low
1.700
1.395
609960
WN11114096
SL61
PGC-12-016
5.931
Low
5.400
4.800
614254
WN12152755
SN16
NDRC-11-041
8.367
High
9.018
9.603
612436
11-338-10754-01
SN16
NDRC-12-061
8.367
High
9.018
9.117
612745
12-338-00257-01
SN16
PGR-11-013
8.367
Low
7.716
5.330
609511A
WN11114451
SN16
PGR-11-014
8.367
Low
7.716
4.610
609762A
WN11112727
SN16
PGC-11-011
8.367
Low
7.716
7.620
613501
WN11164001
8-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Two failures are from certificate RE11131983. Sample 616935 is likely mislabeled, as MEG S107006X was in use
and falls within that range. Four failures lie near the failure limit and, given the observed negative bias, are likely to be due to bias rather than analytical error. CRMs were analyzed by ALS using atomic absorption fire-assay, not the gravimetric
method used for certification.
Figure 8-1 shows the control chart for CRM
MEG-Au.09.02, indicating one low-side failure. A consistent low bias is present; adjusted for this bias, the result would not be considered a failure.
Figure 8-1: Gold Control Chart for MEG-Au.09.02
Notes:
•
USL Upper Specification Limit Target + 3 Std Dev (CRM)
•
Target Expected Value (CRM)
•
LSL Lower Specification Limit Target - 3 Std Dev (CRM)
•
Items Calculated using Paramount Data
•
UCL Upper Control Limit Avg + 3 Std Dev (Population)
•
Avg Mean Value (Population)
•
LCL Lower Control Limit Avg - 3 Std Dev (Population)
Only six CRMs had listed but uncertified silver values. ALS analyzed all silver samples using three-acid digestion with ICP finish (detection limit <0.5
ppm). Sixteen CRM silver analyses at Inspectorate used aqua regia digestion with atomic absorption finish.
Because listed values lacked standard
deviations, LCL/UCL control limits for the sample population were used to evaluate performance. Table 8-5 shows no silver failures for the 2011–2013 program.
Low-side bias in MEG S107006X, MEG S107010X, and SN16 is attributed to differences in analytical methods
8-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 8-5: Summary of Sleeper Silver Results for CRMs
2010–2013
Standard ID
Grades in Ag in ppm
Count
Date Used
Failure
Counts
Bias
Pct
Target
Ave
Max
Min
First
Last
High
Low
MEGS107005X
9.0
8.9
9.6
8.4
3
1/18/2012
1/23/2012
0
0
-1.5
MEGS107006X
8.0
7.2
7.2
7.1
2
1/18/2012
1/18/2012
0
0
-10.6
MEGS107010X
18.0
9.8
9.8
9.8
1
1/30/2012
1/30/2012
0
0
-45.6
OxC30
0.1
0.1
0.1
0.1
2
1/18/2012
1/30/2012
0
0
0.0
Si25
33.3
31.7
34.3
28.4
3
1/23/2012
1/30/2012
0
0
-4.8
SN16
17.6
15.7
17.6
14.0
5
1/18/2012
1/30/2012
0
0
-10.9
8.3.3
Duplicates
8.3.3.1
Historical
Duplicate sampling during the historical programs was implemented primarily during the X-Cal (1996–2007) and New
Sleeper Gold (2004–2005) periods, reflecting more structured QA/QC protocols. Duplicate types included field duplicates, mainly from RC drilling at regular intervals, and laboratory duplicates, including coarse reject and pulp duplicates.
Sampling frequency was variable but typically followed defined intervals, such as approximately one duplicate per 150 ft or similar spacing within batches.
Duplicate sampling indicates that analytical precision was monitored during these programs. However, detailed datasets required for quantitative assessment,
including duplicate-pair analysis, RPD calculations, and statistical precision measures, were not available to SLR. Formal evaluation of precision was therefore not possible.
Available documentation does not identify systematic precision issues or reproducibility concerns. Duplicate sampling practices are consistent with industry
standards, and although supporting data are incomplete, there is no indication that precision materially affects the reliability of the historical dataset.
X-Cal Duplicates 2003–2007
RESPEC evaluated duplicate pairs using scatterplots (RMA regression), quantile–quantile plots, relative percent difference (RPD) plots, and absolute RPD
plots. Two RPD methods were applied:
•
RPD (max) = 100 × ((Duplicate – Original) / Lesser of (Duplicate, Original))
•
RPD (mean) = 100 × ((Duplicate – Original) / Mean of (Duplicate, Original))
RPD (max) yields larger relative differences than RPD (mean).
Outliers were excluded from scatterplots by visual assessment, and pairs with absolute RPD >2,000% were removed from RPD plots. These outliers may remain
relevant and should be considered in the overall evaluation; only pairs with incorrect sample identification are excluded. Causes of extreme variability require further review.
8-12
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Preparation Duplicates: Giroux et al. (2009) reported core duplicates collected from coarse rejects
returned by AAL. Selected samples were re-prepared and analyzed at ALS, representing preparation duplicates of core samples. These were not processed at the primary laboratory (AAL), which is preferred
practice. Figure 8-2 presents the RPD plot for gold core preparation duplicates.
Figure 8-2: X-Cal Core Preparation Duplicates, Relative Differences 2003-2007
Source: RESPEC 2023
At
grades >0.1 g/t Au, most duplicate pairs fall within RPD limits of ±50%, with most within ±25%. A small proportion of pairs exhibit higher RPDs, indicating greater variability between the original and duplicate assays. No bias is
evident; however, high-variability pairs cause the moving-average line to deviate from 0% RPD. Data with a mean RPD near 0% indicates no bias.
Figure 8-3 presents absolute RPD values for each gold pair, illustrating the magnitude of variability. Figure 8-4 shows RPDs for X-Cal RC gold
field duplicates.
.
8-13
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 8-3: X-Cal Core
Preparation Duplicates, Relative Differences 2003-2007
Source: RESPEC 2023
Figure 8-4: X-Cal Gold RC Field Duplicates, Relative Differences 2003-2007
Source: RESPEC 2023
The
moving-average line is influenced by extreme outliers, limiting its utility. Statistical analysis indicates an apparent high bias in duplicate assays relative to original samples; however, this bias is eliminated when the 16% of pairs with absolute
value (AV) RPD >100% are removed, indicating it is entirely attributable to this subset of highly variable pairs. Silver RC field duplicates show similar behavior, consistent with gold and silver occurring in electrum.
8-14
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The average AV RPD is 24% for pairs with AV < 100%, with most pairs < 50%, which is typical for field
duplicates. The primary issue is the proportion of pairs with AV RPD >100% and the tendency for these pairs to show higher duplicate grades. Elevated variability at low grades is expected due to reduced analytical precision and amplification of
percentage differences.
Excluding sample mix-ups or data errors, the most likely cause of AV RPD >100% is
unrepresentative RC sample splitting at the drill rig. This may be limited to duplicate intervals if sampling protocols differed from routine intervals. Otherwise, routine RC splitting may have been
non-representative in approximately 15% to 20% of cases.
Figure 8-5
presents absolute RPD values for RC duplicate pairs (RPD max). Pairs exceeding the AV RPD of 500% are truncated and shown as blue lines without apices.
Figure 8-5: X-Cal Gold RC Field Duplicates, Absolute Values of the Relative
Differences 2003-2007
Source: RESPEC 2023
8-15
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Field duplicates reflect inherent mineralization variability and variability from all subsampling stages:
(i) coarse reject splitting; (ii) pulp preparation; (iii) assay aliquot selection; and (iv) analytical error. Variability introduced prior to duplicate splitting is captured in preparation duplicates.
At Sleeper, approximately half of the variability observed in RC field duplicates is present in core preparation duplicates. Although core duplicates were
analyzed at a different laboratory, the absence of bias supports comparison of the datasets for variability assessment.
Core preparation duplicates show
high variability at relevant gold grades, like RC field duplicates, but with fewer high-variability pairs and no associated bias. This supports potential RC splitting issues during the X-Cal 2003–2007
programs.
High-variability pairs should be reviewed to confirm validity and assess causes, including temporal or spatial clustering.
Elevated variability is also expected due to the nugget effect associated with gold and silver in electrum. This inherent variability introduces risk to
resource estimation and should be considered when selecting an estimation methodology.
8.3.3.2
Paramount Gold
Duplicate sampling during the Paramount Gold (2010–2013) programs was systematic and included multiple precision controls: coarse reject and pulp
duplicates at approximately 1 in 20 samples, and quarter-core duplicates, where one sample per batch was split and submitted under separate identifiers. Laboratories also performed internal duplicate analyses. Routine field core duplicates were not
collected; however, laboratory duplicates and quarter-core splits provide an adequate framework to evaluate analytical precision. Table 8-6 summarizes field duplicate data for
X-Cal and Paramount (2011–2013). No QA/QC data were available for the 2010 five-hole program (RESPEC 2023).
Duplicate results show good agreement across most grade ranges. Precision is consistent at low to moderate grades, with increased variability at higher grades
reflecting coarse gold and nugget effects typical of the deposit. Elevated relative differences at higher grades occur but are not systematic. No systematic bias or material precision issues are identified. Overall, duplicate data indicate
acceptable precision consistent with the mineralization style (Table 8-6) and support the reliability of the analytical dataset for the Mineral Resource Estimate.
8-16
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 8-6: Summary of Results
X-Cal Historical and Paramount Field Duplicates
Laboratory
Duplicate Type
Drill Type(s)
Element
Period
Counts
RMA Regression
Averages as Percent
All
Used
Outliers
y = Duplicate
x = Original
RPD
AV RPD
ALS Minerals Inspectorate ACME Labs
Field Dup
R/C
Au
2003-2007
822
757
65
Y = 1.0047x + 0.0027
3.56
31.12
ALS Minerals Inspectorate ACME Labs
Prep Dup
Core
Au
2003-2007
642
618
24
Y = 1.0229x - 0.0238
0.97
33.64
ALS Minerals Inspectorate ACME Labs
Field Dup
R/C Core
Au
2011-2013
200
192
8
Y = 0.8866x + 0.0126
8.02
31.38
ALS Minerals Inspectorate ACME Labs
Field Dup
R/C
Au
2011-2013
137
132
5
Y = 1.5165x – 0.0439
16.60
31.78
ALS Minerals Inspectorate ACME Labs
Field Dup
Core
Au
2011-2013
63
60
3
Y = 1.037x – 0.0107
-9.26
30.44
ALS Minerals Inspectorate ACME Labs
Field Dup
R/C Core
Ag
2003-2007
875
870
5
Y= 0.992x + 0.126
0.30
54.20
ALS Minerals Inspectorate ACME Labs
Field Dup
R/C Core
Ag
2011-2013
225
224
1
Y = 1.063x + 0.241
-27.20
66.50
Notes:
AV absolute value
RPD relative percent difference
8-17
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Pulp and Preparation Duplicates.
Paramount’s pulp and preparation duplicate data were in final compilation and analysis as of the 2023 Technical Report (RESPEC, 2023) and not available
for review.
Field Duplicates:
A total of 137 RC
field duplicates were compiled from the 2011–2013 program. Figure 8-6 presents an RPD plot for 121 pairs, excluding pairs where both values are below the detection limit.
Figure 8-6: Paramount RC Field Duplicates, Relative Differences 2010-2013
Source: RESPEC 2023
No bias
is evident at grades greater than 0.1 g/t Au. Five of 51 pairs with mean grades >0.1 ppm have AV RPD greater than 100%, all within the highest-grade subset (1.1–2.2 ppm).
Fewer core field-duplicate pairs exceed detection limits (Figure 8-7). These data indicate a consistent low bias, with
duplicate values lower than original assays; additional data are required to confirm. Three of 26 pairs with mean grades greater than 0.1 g/t Au have AV RPD greater than 100%.
8-18
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 8-7: Paramount Core Field Duplicates, Relative Differences
2010-2013
Source: RESPEC, 2023
8.3.4
Blanks
8.3.4.1
Historical
Blank samples were used during later historical programs, particularly X-Cal and New Sleeper Gold, to monitor
contamination during sample preparation and analysis, confirming inclusion of contamination control in the QA/QC framework.
Blank materials were likely
inert or low-grade; however, documentation of blank types, insertion frequency, and analytical results was not available to the SLR. Blank performance cannot be quantitatively assessed, and no statistical
evaluation of contamination is available.
No systematic contamination issues are identified, and no sample integrity concerns are reported. However, the
absence of detailed QA/QC records limits verification of blank effectiveness and remains a constraint on the QA/QC assessment of the historical dataset.
X-Cal Blanks 2003–2007
A total of 38 coarse blanks from the X-Cal drilling were analyzed for gold and, in 35 cases, for silver, with detection
limits of 0.005 ppm and 0.2 ppm, respectively (Table 8-7). This represents a subset of the blanks analyzed, as many were not sufficiently described or not reported in the RESPEC dataset.
Four gold failures and one silver failure were identified using thresholds of five times the detection limit for gold and two times for silver, reflecting the
higher silver detection limit (Table 8-8). Three of the four failures were preceded by higher-grade samples (Figure 8-8), indicating intermittent cross-contamination in
the AAL crushing circuit between May 2004 and April 2005. The remaining failure may reflect a mislabeled sample.
8-19
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 8-7: X-Cal Blank
Samples 2003–2007
Blank ID
Drill Program
Elem
Counts
Maximum
(ppm)
Dates of Analyses
All
Above
Warning
Start
End
Coarse Blank
2003-07
Au
38
4
0.171
23-Mar-04
20-Jun-05
Coarse Blank
2003-07
Ag
35
1
5.300
23-Mar-04
20-Jun-05
Table 8-8: X-Cal Blank Failures and
Preceding Sample 2003–2007
Blank
Certificate
Elem
Method
Preceding
Blank
5x
Det
Limit
(ppm)
Sample
Value (ppm)
Sample
Value
(ppm)
Blank
SP065348
Au
ICP
27805
1.226
27806
0.028
0.025
Blank
SP065582
Au
F50/ICP
28127
1.620
28128
0.050
0.025
Blank
SP065732
Au
F50/ICP
28248
0.672
28249
0.030
0.025
Blank
SP068824
Au
F50/ICP
WW39-05 34018
0.011
WW39-05 34019
0.171
0.025
Blank
SP068894
Ag
AA
NS-01-05 30854
0.600
NS-01-05 30855
5.300
1.000
Figure 8-8: X-Cal Gold in Blanks and
Preceding Samples 2003–2007
Source: RESPEC 2023
8.3.4.2
Paramount
Blank samples were systematically incorporated into the QA/QC program during the Paramount Gold (2010–2013) drilling programs at approximately one blank
per 20 samples, consistent with industry best practice for contamination monitoring. Both coarse and pulp blanks were used, including commercially prepared blanks and inert materials. These included MEG laboratory blanks such as AuBlank40 (<0.002
ppm Au) and MEG-Blank.11.01 (<0.005 ppm Au), together with coarse blank material consisting of commercially crushed white marble with certified values below 0.005 ppm Au (Table 8-9)
8-20
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 8-9: Blank Materials Used in Paramount QA/QC Program
Blank ID
Certified Value
Type
Origin
AuBlank40
<0.002 ppm
Coarse
MEG Labs
MEG-Blank 11.01
<0.005 ppm
Pulp
MEG Labs
Blank
<0.005 ppm
Coarse
Commercial crushed white marble
Blank samples were inserted into the sample stream and distributed throughout analytical batches to monitor contamination
during sample preparation and analysis. The use of both coarse and pulp blanks allowed assessment of contamination during crushing, pulverizing, and analytical procedures.
Analytical results show most blank values at or below detection limits, indicating minimal contamination. Performance was consistent across batches and
laboratories, indicating controlled laboratory conditions.
Coarse blanks, including two from MEG and one prepared by Paramount using commercially crushed
rock, and pulp blanks were inserted at a rate of approximately one per 30 samples (RESPEC). Values exceeding five times the detection limit were considered failures and reviewed.
A total of 231 coarse blanks were analyzed for gold and 230 for silver, with no failures. A total of 56 pulp blanks were analyzed for gold, with no failures.
ALS internal blank data (eight gold, 10 silver) also showed no issues.
Figure 8-9 shows gold values for coarse
blanks plotted with preceding sample values. Some elevated blank values, although not failures, correspond to high-grade preceding samples, indicating minor cross-contamination from the preceding sample.
Figure 8-9: Gold Values of Paramount Coarse Blanks and Preceding Samples
Source: RESPEC, 2023
Occasional elevated blank values were recorded but were isolated and not systematic. These results triggered a review of associated batches and adjacent
samples to assess potential contamination. No persistent contamination trends or material impact on the analytical dataset were identified.
8-21
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Blank results indicate that contamination during sampling, preparation, and analysis was effectively
controlled. The absence of systematic blank failures supports the integrity of the analytical dataset and confirms that field and laboratory procedures were effective in limiting cross-contamination.
8.4
Sample Security
Sample security at the Project was maintained through field handling procedures, controlled storage, documented chain-of-custody protocols, and laboratory custody practices. The level of control and documentation improved over time, with the most comprehensive procedures implemented during the Paramount Gold
(2010–2013) programs.
8.4.1
Historical (1983–2010)
Sample security procedures during the historical programs were generally consistent with industry practice, but documentation for early operators, including
AMAX, NGM, and Placer Dome, was limited. Samples were collected by trained personnel and sent to commercial laboratories for preparation and analysis; however, detailed records of the chain of custody, storage conditions, and access controls were
not available to SLR for independent verification.
During the later historical programs, particularly those completed by
X-Cal and New Sleeper Gold, more formal sample security procedures were implemented. Samples were stored in secured areas, including fenced compounds or controlled-access facilities, before shipment. Shipments
to laboratories were documented, and the laboratories maintained custody during preparation and analysis.
These procedures are consistent with accepted
industry practice. However, the lack of detailed supporting documentation limits SLR’s ability to fully evaluate the effectiveness of sample security for the historical datasets. There is no indication in the available information of sample
tampering, loss, or material compromise of sample integrity.
8.4.2
Paramount (2010–2013)
Sample security during the Paramount drilling programs included controls from drill site collection through laboratory analysis. Drill contractors transported
samples from the drill sites to the Paramount logging and sampling facility at the Sleeper site near Winnemucca, Nevada, where they were logged, processed, and stored in a secure, controlled-access facility.
Drill core was stored in core boxes within the secured facility. Reverse circulation and sonic samples were stored in designated secure areas before shipment.
Trained personnel handled samples, and access to storage areas was controlled to prevent unauthorized handling.
Before shipment, samples were organized,
inventoried, and packaged in sealed containers, including rice bags or bins secured with numbered security seals. Each shipment contained samples from a single drill hole and included sample submittal documentation listing sample numbers, requested
analyses, and QA/QC instructions. Sample batches were verified and photographed before shipment to confirm completeness and integrity.
ALS personnel or
authorized contractors transported samples to the laboratory. All transfers were documented on sample handling forms, maintaining a continuous chain of custody from the project site to the laboratory. On receipt, the laboratories logged the samples
into internal tracking systems and maintained custody through preparation and analysis.
8-22
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
After analysis, pulps and coarse rejects were retained by the laboratory or returned to the project site for
secure storage, allowing future verification and re-analysis.
These sample security procedures are consistent
with industry’s best practice and support confidence in the integrity, traceability, and security of the analytical dataset used to support the Mineral Resource Estimate.
8.5
QP Opinion
In the QP’s opinion the sample preparation, security and analytical procedures are suitable to support the disclosure of the MRE in this TRS.
Sampling (1983–2013) is appropriate for the mineralization style. RC drilling (approximately 95%) using cyclone and splitter systems, with limited
diamond drilling, supports both bulk-tonnage and structurally controlled mineralization. Later programs (X-Cal, New Sleeper Gold, Paramount) show improved controls. Early programs lack documentation but show
no material deficiencies; uncertainties are addressed through classification.
Sample preparation and analytical methods are consistent with industry
standards. Accredited laboratories (ALS, AAL), standard preparation, fire assay, and the use of metallic screen and gravimetric methods, where required, are appropriate. Multi-element ICP and check assays support data validity.
QA/QC is robust in the Paramount (2010–2013) dataset, including CRMs, blanks, duplicates, check assays, and
re-assay protocols. CRM results show acceptable accuracy with minor, non-systematic bias. Blanks show no systematic contamination. Duplicates show acceptable precision,
with higher variability at elevated grades consistent with nugget effects.
Historical QA/QC data are incomplete, limiting quantitative assessment. No
systematic bias, contamination, or precision issues are identified. Elevated variability in X-Cal RC duplicates, including RPD outliers and potential splitting issues, has been taken into account in
classification.
Sample security is adequate. Paramount programs demonstrate a controlled chain of custody, secure storage, documented tracking, and
sealed shipments. Historical documentation is limited; no evidence of tampering or loss is identified.
Key limitations are listed:
•
Incomplete QA/QC and custody records for early programs (1983–1997)
•
Limited analytical certificates for verification
•
Elevated variability in X-Cal RC duplicates from splitting and nugget
effects
These are addressed through validation, reliance on later datasets, and classification.
The dataset is sufficiently accurate and reliable to support the MRE and meets the requirements of S-K 1300 and CIM
(2019), with uncertainties reflected in the Mineral Resource classification.
8-23
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
9.0
Data Verification
Data verification comprises a systematic process to confirm that exploration and analytical data were collected using appropriate procedures, accurately
transcribed into the Project database, and are suitable for use in the preparation of this Technical Report.
All available data relevant to the Project
were compiled, digitized, and incorporated into a database by personnel from Paramount Gold. The QP audited the database for completeness, accuracy, and reliability.
The QP is of the opinion that database verification procedures for the Sleeper project comply with industry standards and are adequate for the purposes of
Mineral Resource estimation.
Project data was provided to the QP in the form of Microsoft Excel spreadsheets and subsequently imported into Leapfrog Geo
and Maptek Vulcan software for independent modeling and resource interpolation.
Verification procedures included checks for:
•
Unique, missing, or overlapping intervals
•
Total depth consistency
•
Duplicate hole identification
•
Boundary compliance
Database certification was conducted by the QP through a combination of visual inspections and statistical checks, including cross-referencing lithology,
assay values, and spatial data against original hard copy records. Identified inconsistencies were either corrected using primary source documents or excluded from the Mineral Resource estimation
9.1
RESPEC Data Validation
A SLR review shows that RESPEC undertook a comprehensive data verification program to confirm that the Sleeper project database is reliable and suitable for
Mineral Resource estimation.
This work included multiple site visits between 2021 and 2023, during which RESPEC personnel inspected drill core and RC
cuttings, reviewed logging, sampling, and data management procedures, assessed sample storage conditions, and collected GPS collar locations for comparison with the database. RESPEC also examined original drill logs, assay certificates, and
supporting records, and reviewed geological interpretations used in modeling.
The drill hole database was subjected to detailed validation testing to
identify data integrity issues such as missing or duplicated collar information, inconsistent survey data, invalid assay intervals, and gaps or overlaps in geological and analytical records. Where discrepancies were identified, they were evaluated,
corrected where appropriate, and documented using the original data sources provided by Paramount. Collar locations were verified against historical drill logs and electronic records, including validation of coordinate system conversions from local
mine grid to UTM. Downhole survey data were reviewed against available records and found to be generally consistent, although many historical holes lack survey data, limiting full verification. Assay data verification included comparison of the
database against original laboratory certificates, with a complete digital audit of available electronic records and partial manual verification of scanned certificates.
9-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Additional confidence in the dataset was obtained through review of QA/QC programs and results, including
resampling programs completed by Paramount to validate historical assays.
9.2
SLR Data Verification
The QP conducted a site visit on April 2, 2026. During the visit, the QP reviewed the historical mine site, waste rock dump areas, exploration facilities,
and infrastructure relevant to the evaluation of the Project. Historical drill sites were examined, selected drill collar locations were confirmed with GPS, and detailed discussions were held with Paramount technical staff regarding exploration
plans, drilling methods, analytical procedures, and geological controls on mineralization. The Paramount technical team demonstrated a strong understanding of deposit geology and assay interpretation.
9.2.1
Limitations
No material restrictions were encountered during the QP’s independent verification of the Sleeper drill hole database; however, the following limitations
were identified:
•
Bulk Density: A comprehensive bulk density sampling program has not been completed for all geological units used
in the Mineral Resource model. Additional bulk density data are required to improve confidence in tonnage estimates.
•
QA/QC Records: Documentation supporting the use of certified reference materials, blanks, and duplicates for
historical channel sampling is unavailable. A formal QA/QC program is recommended for future drilling and sampling campaigns.
•
Alteration Logging: A review of the oxidation model indicates that oxide and sulfide classifications were
interchanged across a portion of the historical drill hole database. Comparisons with historical mining records from AMAX are inconsistent with the logged oxidation data, further evidence of this issue. Resolution of these discrepancies and
validation of oxidation state logging are recommended to improve confidence in the geological and metallurgical interpretations.
•
Downhole Surveying: Most historical drill holes lack deviation surveys and are assumed to be vertical. This
assumption introduces uncertainty in the interpretation of true mineralization geometry and thickness.
9.3
QP Opinion
Although some historical information (including portions of QA/QC documentation, downhole surveys, and legacy records) could not be independently verified, the
drill hole database compiled by Paramount and validated by RESPEC aligns with S-K 1300 industry practices. The SLR QP is of the opinion that the database is reliable, internally consistent, and suitable for
use in the Mineral Resource Estimate.
The Project’s extensive production history and prior operational use of these data support their adequacy.
Historical grade control and metallurgical studies corroborate reported gold grades, although recent independent assay verification is lacking for certain legacy datasets.
Data with incomplete collars or insufficient documentation were excluded where necessary and are not considered material to the estimate. Sampling methods
from historical and recent programs are consistent with industry standards. While additional QA/QC documentation and targeted resampling are recommended to further improve confidence, the database is considered appropriate for Mineral Resource
estimation.
9-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
10.0
Mineral Processing and Metallurgical Testing
10.1
Introduction
The metallurgical information reviewed for the Project includes historical operating performance, bottle roll and column leach testing, flotation
investigations, and later oxidation studies.
For this Initial Assessment, the proposed processing method is heap leach treatment of selected oxide,
mixed, and waste rock dump material with Merrill-Crowe recovery. Processing of sulfide, historical heap leach pad (HLP), and historical tailings materials is considered separately through on-site flotation,
with rougher concentrate assumed to be sold or toll treated off site. Sulfide processing test work remains preliminary and requires additional variability test work, concentrate quality, and commercial review.
10.2
Nature and Extent of Metallurgical Testing and Analytical Procedures
SLR reviewed historical oxide milling and heap leaching records; bottle roll and column leach testing on oxide, mixed and waste rock dump composites; flotation
investigations on selected historic HLP, tailings, waste, and sulfide-related materials; and later bio-oxidation and pressure-oxidation studies. For the current study, the McClelland bottle roll and column
leach programs provide the principal support for the coarse-crush agglomerated heap leach flowsheet, while flotation test work supports preliminary consideration of a separate flotation route for sulfide, historic HLP, and tailings materials.
Table 10-1 lists the principal metallurgical reports reviewed for the project. Later technical reports were used as
summary references, while the McClelland, Hazen, SGS, MRDI, KCA, and other historical studies provided the primary metallurgical support for interpretation of processing options and recovery assumptions.
Table 10-1: Metallurgical Reports Reviewed
Report / Document
Date
Laboratory / Organization
Comment
Sampling and Metallurgical Evaluation of Existing Leach Heaps and Mill Tailings
1997
Mineral Resources Development Inc. (MRDI)
Existing heap and tailings metallurgical study.
Sleeper Project Sampling and Metallurgical Test Program
1999
Kappes, Cassiday & Associates (KCA)
Internal report for X-Cal Resources Ltd.
Sleeper Mine Tailings and Heap Evaluation as Potential Gold Resources
2007
Edouard K. Zoutomou / X-Cal Resources Ltd.
Existing tailings and heap evaluation study.
Phase 2 Metallurgical Evaluation – Waste Rock Dump, Westwood and Facilities Composites
2012
McClelland Laboratories Inc. (including ALS and Inspectorate results)
Existing waste rock dump, West Wood, and Facilities cyanidation test work.
10-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Report / Document
Date
Laboratory / Organization
Comment
Pressure Oxidation Pretreatment and Cyanide Leaching of Sleeper Mine Samples
2013
Hazen Research, Inc.
POX subcontract work reported within the 2015 McClelland study.
Metallurgical Tests and Analyses on 12 Sleeper Project Core Composites
2014
McClelland Laboratories Inc.
Bottle roll, column leach, and related cyanidation test work on core composites.
Biooxidation and Pressure Oxidation Testing – Sleeper Drill Core Composites
2015
McClelland Laboratories Inc.
Sulfide-focused metallurgical test work including biooxidation and cyanidation.
Mineralogical study appendix to 2015 McClelland report
2015
SGS Canada Inc.
Supporting mineralogical/deportment study.
Technical Report and Preliminary Economic Assessment – Sleeper Project (Amended)
2017
Metal Mining Consultants Inc.
Technical Report summarizing prior metallurgical work; not a laboratory report.
2022 Sleeper S-K 1300 Technical Report Summary
2022
RESPEC / Woods Process Services LLC
TRS compiling historical metallurgical work; not a laboratory report.
The analytical procedures described in the reviewed reports are conventional for scoping-level evaluation of gold-silver heap
leach and flotation performance and include head assays, bottle roll tests, column leach tests, flotation tests, and reagent-consumption measurements. These procedures are standard industry practice for preliminary assessment of cyanide amenability,
leach kinetics, reagent demand, and flotation response. No non-conventional analytical procedure has been identified as the basis for either the heap leach case or the preliminary flotation case. Certain
recovery values remain provisional where direct representative test work is limited.
10.3
Sample Representativeness
The metallurgical dataset includes several distinct oxide and mixed material groups evaluated as potential heap leach feed, including Facilities Oxide, West
Wood Oxide, and Sleeper Oxide, together with Facilities Mixed, Sleeper Mixed, and West Wood Mixed material. These groups represent separate source areas within the Project and are treated individually because the available test work support, cyanide
amenability, recovery response, and reagent demand differ by material type. The available metallurgical testing and analysis are adequate for preliminary evaluation of selected oxide, mixed, and waste rock dump material as early heap leach feed.
Facilities Oxide is the best-supported heap leach feed type in the database, and selected West Wood Oxide and waste rock dump composites also support a phased heap leach processing scenario. Available flotation work is sufficient to justify
preliminary consideration of a separate flotation-concentrate route for sulfide, HLP, and tailings materials, but not yet for definitive design or pre-feasibility-level recovery prediction.
Sample representativeness is weaker for the sulfide, HLP, and tailings materials now grouped in the separate flotation case. The current data does not support
inclusion of these materials in the same heap leach recovery framework used for oxide, mixed, and waste materials. Historic HLP, tailings, and sulfides require additional metallurgical testing, analysis, and economic evaluation before they can be
assigned definitive recoveries, concentrate terms, and operating cost.
10-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
10.4
Testing Laboratories
The test work reports identify McClelland Laboratories in Sparks, Nevada as the principal metallurgical laboratory for the bottle roll, column leach,
flotation, and related process test work programs used in the oxide, mixed, waste rock dump, and sulfide evaluations. Supporting specialized work was also completed by Hazen Research and SGS Canada, and project QA/QC documentation (Metal Mining
Consultants Inc. 2017) references ALS and Inspectorate for analytical and check-assay work. Based on the files reviewed, the SLR QP understands these laboratories to have been independent of the project owner.
Table 10-2 summarizes the accreditation details, which are shown only where identified during review. “No public
certification record identified” indicates that no specific accreditation record was located during the present review. All listed organizations are considered independent of the mine owner based on the available information.
Table 10-2: Laboratory Accreditation Summary
Laboratory /
Organization
Location
Certification/
accreditation
Affiliation with
mine/
owner
McClelland Laboratories, Inc. (MLI)
Sparks, Nevada
2012–2015 accreditation: IAS-accredited to ANSI/ISO/IEC 17025:2005; accreditation in place since November 12, 2012.
Independent Laboratory
Hazen Research, Inc.
Golden, Colorado
No public certification record identified
Independent Laboratory
SGS Canada Inc. / SGS Minerals Services
Ontario, Canada
Accredited to ISO/IEC 17025
Independent Laboratory
Kappes, Cassiday & Associates (KCA)
Reno, Nevada
No public certification record identified
Independent Technical Consultant
10.5
Relevant Metallurgical Results
Historical operating records show that Sleeper successfully processed oxide material by both milling and heap leaching, supporting oxide material as the
clearest near-term development path. The prior assessments and mine history, therefore, provide a precedent for a large-scale oxide heap leach concept supplied by open-pit mining and, where justified,
rehandling of selected existing waste rock dump material.
10.5.1
Oxides
Facilities oxide is the strongest candidate for initial processing utilizing heap leach and Merrill-Crowe processing. The column and bottle roll results show
favorable gold recovery and cyanide amenability, a coarse crush size of P80 19 mm, with column gold recoveries averaging 83.9% and bottle roll recovery of about 81% Au. West Wood oxide also showed a positive heap leach response with an average
column gold recovery of 76.5%, although with greater variability and higher reagent demand. Sleeper oxide bottle roll gold performance was favorable at 93.9%, but the database does not provide the same level of direct column confirmation as
Facilities oxide.
10-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
10.5.2
Waste Rock Dumps
Selected waste rock dump material also shows potential for a heap leach case. Historical testing concluded that the dump composites evaluated were amenable to
agglomerated heap leach cyanidation at coarse crush size, with column gold recoveries ranging from the mid-60% range to the low-80% range, depending on dump area and
composite. Reagent consumption was variable and, in some cases, high. Waste material is therefore technically amenable to heap leaching, but economic performance is sensitive to recovery, crush-size, and
reagent assumptions.
10.5.3
HLP, Tailings, and Sulfide Flotation
Historical metallurgical data indicate that HLP, tailings, and sulfide materials are more amenable to flotation recovery than through direct heap leaching. The
available database is limited and variable in scope, but it provides a reasonable preliminary basis for evaluation of a flotation process at the IA level. Historical tailings work reported cleaner flotation-related recoveries of 63% Au and 33% Ag at
P75 200 mesh (75 µm) in the 1997 program and approximately 50.8% Au and 64.8% Ag, at P85 400 mesh (37 µm), in the 1999
program, demonstrating that precious metals can be recovered from these materials, although performance was variable and the work did not establish a final commercial flowsheet.
Sulfide rougher and cleaner flotation test work was completed at P80 200 mesh (75 µm) by
McClelland in 2012. The rougher flotation results showed generally favorable recovery performance and are therefore included for the flotation results. For Facilities sulfide material, rougher flotation testing returned gold recoveries of 70.7% and
91.2%, with reported silver recoveries of 43.6% and less than 48.8%. For West Wood argillic-silicic sulfide material, rougher flotation gold recoveries ranged from 57.7% to 79.7%, averaging 70.8%, with an average silver recovery of about 57.0%. For
West Wood strong silicic sulfide material, rougher flotation gold recoveries ranged from 65.0% to 84.9%, averaging 75.1%, with an average silver recovery of 67.1%. McClelland noted that these flotation results were scoping-level in nature and that
additional optimization and locked-cycle testing would be required.
Existing heap leach pad material has not been supported by a sufficiently robust and
dedicated flotation testing program and was historically evaluated primarily for in-place or re-leach potential rather than as flotation feed. At this time, HLP material
is considered with the existing tailings for a flotation-processing case based on the closest available historical flotation analogs. The QP considers this approach acceptable for initial assessment only. Additional variability testing, concentrate
characterization, and economic viability are required before HLP, tailings, and sulfide materials can be assigned recoveries and operating costs for a flotation flowsheet.
The principal processing factors identified in the test work are sulfide content, refractory gold locking, variable leach kinetics, and elevated reagent
demand in certain materials. Sulfide-rich, HLP, and tailings materials are not included in the heap leach case and are instead considered through flotation, followed by sale or toll treatment of rougher concentrate. For IA purposes, a 12% discount
to flotation recoveries is applied to reflect toll milling fees and related downstream charges.
10.5.4
Deleterious Elements
Review of the available multi-element dataset for the oxide, mixed, and waste rock dump materials indicates that mercury, arsenic, antimony and sulfur are the
primary deleterious constituents requiring additional evaluation for the Sleeper Project. The West Wood Oxide samples show elevated mean mercury and antimony concentrations, while the Facilities Mixed and North Dump materials show elevated arsenic
and antimony. The North Dump also reports elevated total sulfur concentrations.
10-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The identified deleterious elements are not currently considered to be prohibitive to heap leach development,
however, the elevated mercury, arsenic, antimony, and total sulfur in selected material groups warrant additional metallurgical and precipitate-quality test work prior to pre-feasibility level design.
Initial refinery capital cost allowances include a mercury retort to address the elevated mercury concentrations identified in selected material groups. This
allowance is intended to provide an IA level provision for mercury management during doré production and refinery handling. Additional test work, precipitate characterization, and doré/refinery assessments are recommended in future
study phases to confirm the required mercury-control measures and refine the associated capital and operating cost assumptions.
10.6
Recovery Assumptions and Basis for Estimation
Recovery assumptions used for the preliminary economic evaluation were derived from available test work and adjusted to reflect confidence levels across the
resource. For heap leach materials, column leach results were given greater weight than bottle roll results because they are more representative of coarse-crush heap leach conditions and kinetics. When only bottle-roll data were available,
conservative adjustments were applied. Sulfide, HLP, and tailings materials are considered separately on the basis of flotation performance, with payable recoveries reduced by 12% to reflect toll milling fees and related concentrate handling
charges.
10.6.1
Sleeper Oxide
The recovery value assigned to Sleeper oxide was based on reported bottle roll test results; however, because no directly comparable representative column
leach result is presently available for that material, the reported bottle roll recoveries of 93.9% Au and 11% Ag were discounted by 10% for use in the recovery model. This adjustment is intended to provide a conservative approximation of expected
heap leach performance and to recognize the generally more optimistic nature of bottle roll extraction results relative to column leach performance under field-relevant conditions.
10.6.2
Sleeper Mixed and West Wood Mixed
Recovery values assigned to Sleeper mixed and West Wood mixed material are estimated assumptions rather than direct outputs from a complete set of
representative column leach tests. These values were developed from metallurgical interpretation of the available data, including oxidation state, relative cyanide amenability, bottle roll, and limited column response, and comparison with analogous
oxide and mixed composites. These recoveries are suitable only for initial assessment and should be confirmed by additional representative column leach testing.
10.6.3
HLP, Tailings, and Sulfides
For the IA, flotation recoveries assigned to HLP, tailings, and sulfide materials were derived from the available historical test work and reduced by 12% to
reflect the assumed toll-milling and downstream concentrate treatment charges associated with off-site processing of rougher concentrate. These values are preliminary planning assumptions only and should not
be interpreted as demonstrated commercial recoveries.
10-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
10.6.3.1
HLP and Tailings – Gold
The recovery assumptions for HLP and tailings were based on the average of the historical tailings flotation results from the 1997 and 1999 test programs.
Using reported recoveries of 63% Au from the 1997 program and approximately 50.8% Au from the 1999 program results in average unadjusted recoveries of 56.9.0% Au. After application of the 12% discount, the assumed recoveries for both HLP and
tailings are 50.0% Au. This assumption is necessarily approximate because direct flotation test work on HLP material is limited, and the historical HLP studies were not designed to support a modern flotation circuit.
10.6.3.2
Facilities Sulfide
The Facilities sulfide recovery assumption was based on the average of the two available McClelland rougher flotation tests. The average unadjusted gold
recovery was 80.95%, which results in an applied recovery of 71.2% Au after the 12% discount.
10.6.4
West Wood Strong Silicic and West Wood Argillic
The West Wood strong silicic recovery assumption was based on the average West Wood strong silicic rougher flotation results reported by McClelland. Average
unadjusted recoveries were 75.1% Au, resulting in applied recoveries of 66.1% Au after the 12% discount. The West Wood argillic-silicic recovery assumption was based on the average West Wood argillic-silicic rougher flotation results. Average
unadjusted recoveries were 70.8% Au, resulting in applied recoveries of 62.3% Au after discount.
These recovery assumptions provide a consistent
preliminary basis for evaluating flotation treatment of HLP, tailings, and sulfide materials in the IA. However, the underlying test work remains limited, variably representative, and unsupported by pilot-scale confirmation, finalized concentrate
specifications, or project-specific commercial toll-treatment terms. Additional metallurgical test work is required before these materials can be assigned a proven processing route with demonstrated recoveries and acceptable operating costs.
10.6.5
HLP Tailings and Sulfides Ag
No silver recovery has been applied to the HLP, tailings, or sulfide flotation cases at this time. Although historical testing reported some silver recovery,
the available dataset is limited and variable, and it is not yet supported by sufficient concentrate characterization or downstream payable assumptions. Silver is therefore excluded from the current flotation recovery model and treated as upside
potential only, pending additional metallurgical and commercial evaluation.
10.6.6
Summary of Assumptions
Metallurgical recovery assumptions applied in the IA are summarized in Table 10-3. The table distinguishes between
recoveries supported by representative column leach test work, adjusted values derived from bottle roll testing, and provisional estimates assigned where direct representative test work is limited. Oxide, mixed, and waste rock dump materials are
evaluated within the heap leach framework, whereas historic HLP, tailings, and sulfide materials are considered separately through a preliminary flotation-concentrate route.
10-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 10-3: Recovery Assumptions and Process Basis by Material
Type
Material Type
Test Basis
Au Rec
(%)
Ag Rec
(%)
Recovery Basis
Note
Facilities Oxide
Column
83.9
8.1
Column Average
Historical column basis
Sleeper Oxide
Bottle Roll
84.5
9.9
Adjusted Bottle Roll
10% discount applied
West Wood Oxide
Column
76.5
9.0
Column Average
Historical column basis
Facilities Mixed
Column
71.3
22.3
Column Value
Historical column basis
Sleeper Mixed
Limited data
70.0
15.0
Estimated
IA-level assumption
West Wood Mixed
Limited data
65.0
10.0
Estimated
IA-level assumption
North Dump
Column
79.0
40.5
Column Value
Historical column basis
South Dump
Column
69.8
43.9
Column Average
Historical column basis
West Dump
Column
81.4
54.6
Column Value
Historical column basis
HLP and Tailings Material
Flotation/ Limited data
50.0
—
Separate process route
Preliminary flotation/toll milling case
Facilities Sulfide
Flotation
71.2
—
Separate process
Preliminary flotation/toll milling case
West Wood Strong Silicic Sulfide
Flotation
66.1
—
Separate process
Preliminary flotation/toll milling case
West Wood Argillic Sulfide
Flotation
62.3
—
Separate process
Preliminary flotation/toll milling case
For heap leach materials, column leach results were given greater weight than bottle roll results because they better reflect
coarse-crush heap leach conditions and leach kinetics. In several cases, column recoveries equaled or exceeded corresponding bottle roll results because some bottle roll tests were run at coarse size and did not reach asymptotic recovery, whereas
most column tests were run longer and more closely approached asymptotic extraction under heap-representative conditions. Figure 10-1 presents the comparison of bottle roll and column test results by material
type.
No uniform discount has been applied to the reported column-based recoveries at this stage. Although column results are often reduced to
approximate field performance, the available data shows substantial variability by material type, particularly within the waste rock dump domains, and does not support a single discount factor across all heap leach materials. Additional variability
and confirmatory testing are recommended before applying any blanket reduction.
An exception was made for Sleeper Oxide, for which no representative
column leach result is currently available. In this case, the reported bottle roll recovery was reduced by 10% for use in the recovery model to provide a conservative estimate of expected coarse-crush heap leach performance pending confirmatory
column testing.
Recoveries for Sleeper Mixed and West Wood Mixed were assigned as IA-level estimates because the
available test work is insufficient to support fully representative column-based recovery assumptions. These values were derived from metallurgical interpretation of the available data and comparison with analogous oxide and mixed composites.
10-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
For heap leach consumables, the NaCN consumption value used for capital and operating cost development was
derived as 33% of the average laboratory column test consumption. Lime/cement consumption was conservatively based on the average laboratory-scale consumptions, excluding the 40 kg/t North Dump value, with no deduction applied. The historical data
shows extreme variability and does not support a representative reduction factor without further test work. Figure 10-2 presents the reagent consumption comparison.
Existing HLP, tailings, and sulfide materials are shown separately because they are not included in the heap leach recovery framework. For IA purposes, these
materials are considered through a preliminary flotation process, with rougher concentrate assumed to be sold or toll treated off site. Applied gold recoveries for these materials include a 12% deduction to reflect toll milling and related
downstream treatment charges. No silver recovery has been applied to the flotation cases at this stage, and silver is treated as upside potential pending additional metallurgical, concentrate-quality, and commercial evaluation.
10-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 10-1: Comparison of Reported Metallurgical Recovery Results
10-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 10-2: Material Specific Reagent Consumption and IA Heap
Leach Recovery Assumptions by Material Type
10-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
10.7
QP Opinion - Adequacy of Data
In the opinion of the QP, the available metallurgical data are adequate for an IA focused on heap leach processing for oxide, mixed, and existing waste rock
dump material.
There is also sufficient metallurgical test work to support the estimation of Mineral Resources from sulfide materials, including existing
HLP and tailings material. The proposed processing method for these Mineral Resources is flotation.
The data are not yet adequate to support definitive
recoveries, concentrate terms, and operating costs for the flotation case at pre-feasibility level. Additional variability testing, concentrate characterization, marketing review, and process-specific cost
definition are required before those materials can be incorporated into a more advanced development scenario.
10-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.0
Mineral Resource Estimates
The information presented herein has been reviewed, edited, and, where appropriate, directly derived from RESPEC (2023). The Mineral Resource estimate,
prepared by RESPEC Company LLC (RESPEC), has been independently reviewed and validated by SLR QPs for completeness, internal consistency, and technical accuracy.
The SLR QPs confirm that the Mineral Resource estimate complies with disclosure requirements of SEC Regulation S-K
1300. The estimate is supported by appropriate geological interpretation, drilling and sampling data, analytical and QA/QC procedures, and industry-standard geostatistical methods. It incorporates inputs and assumptions sufficient to demonstrate
reasonable prospects for economic extraction (RPEE). In situ Mineral Resources are classified as Measured, Indicated, or Inferred. Material contained in waste rock dumps, heap leach pads, and tailings storage facilities (TSF) is classified as
Inferred. Mineral Resources do not constitute Mineral Reserves.
SLR’s review included assessment of the database, geological and domain
interpretations, compositing, grade capping, variography, interpolation parameters, classification criteria, and block model validation. The SLR QP assumes responsibility for the estimate and considers it reasonable, suitable for disclosure, and
compliant in all material respects with applicable reporting requirements.
This TRS presents an updated Mineral Resource estimate for the Project, with
an effective date of April 29, 2026. The estimate incorporates a review of historical drilling for surface material and supersedes prior disclosures, reflecting updated geological interpretation, revised economic parameters, and application of
RPEE through open-pit optimization and metallurgical recovery assumptions.
11.1
Summary
The Mineral Resource estimate for the Project was completed using a conventional three-dimensional block modeling approach developed by RESPEC. The workflow
included database validation, geological and oxidation domain modeling, density assignment, compositing and grade capping, followed by gold and silver grade interpolation and open-pit constraint using industry-standard software and methodologies.
Gold and silver mineralization domains were defined based on lithology, structure, alteration style, oxidation state, and grade continuity. Separate
estimation domains were constructed for gold and silver to reflect differences in grade distribution and continuity. Mineralized domains encompass stockwork, breccia, and vein-related mineralization hosted primarily within altered volcanic units in
the hanging wall of the range-bounding fault system. Oxidation was independently modeled and classified into oxide, mixed, and sulfide material, based on its metallurgical significance.
Grade estimation was validated using standard industry practices, including statistical comparison of raw assays, capped values, and composites, as well as
comparative estimates generated using inverse distance squared (ID²). Additional validation included swath plots, visual assessment of grade distributions in plan and cross-section, and direct comparison of block estimates against drill hole
assays to confirm geological and analytical consistency.
The updated Mineral Resource estimate, prepared by SLR, supersedes prior disclosures for the
Project and includes gold and silver only; no other commodities are reported.
11-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
In situ Mineral Resources are constrained within an optimized conceptual
open-pit shell demonstrating RPEE. Pit optimization assumes open-pit mining and heap leaching, with metallurgical recoveries supported by test work and economic
parameters appropriate for the deposit.
The Mineral Resource Estimates (MRE) for the Project are reported by estimation domain consistent with the
geological, processing, and material type distinctions illustrated in Figure 11-1. Domain classifications include open-pit oxide material,
open-pit sulfide material, and surface material domains comprising west, north, and south dumps, multiple heap leach domains, and tailings storage facility (TSF) material. These domains were defined to reflect
differences in lithology, oxidation state, material origin, and anticipated processing response
Mineral Resources are classified in accordance with S-K 1300 definitions (Table 11-1).
The SLR QP is of the opinion that, with
consideration of the recommendations summarized in Sections 1 and 23 of this TRS, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.
11-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-1: Sleeper Mineral Resource Domains
11-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-1: Summary of Mineral Resources Estimate –
April 29, 2026
Category
Tonnage
(000 t)
Grade
(g/t Au)
Grade
(g/t Ag)
Contained
Metal
(000 oz Au)
Contained
Metal
(000 oz Ag)
Metallurgical
Au Recovery
(%)
Metallurgical
Ag Recovery
(%)
Measured Oxide/Mixed Pit (non-sulfide)
2,004
0.293
3.019
19
195
75.2%
17.1%
Measured Oxide/Mixed Pit (sulfide)
178
0.316
4.307
2
25
70.6%
0.0%
Measured Sulfide Pit
3,347
0.621
3.724
67
401
66.5%
0.0%
Total Measured In Situ
5,528
0.492
3.487
88
620
69.8%
6.2%
Indicated Oxide/Mixed Pit (non-sulfide)
77,899
0.261
3.613
653
9,049
74.2%
17.3%
Indicated Oxide/Mixed Pit (sulfide)
15,941
0.328
4.934
168
2,529
68.7%
0.0%
Indicated Sulfide Pit
85,336
0.393
3.848
1,078
10,558
66.5%
0.0%
Total Indicated In Situ
179,176
0.330
3.842
1,900
22,135
70.1%
7.5%
Total Measured + Indicated In Situ
184,704
0.335
3.832
1,987
22,755
70.0%
7.5%
Inferred Dumps
46,893
0.279
1.941
420
2,927
77.1%
44.6%
Inferred Heap Leach
31,600
0.301
8.363
306
8,497
40.0%
0.0%
Inferred TSF
11,165
0.599
6.221
215
2,233
50.1%
0.0%
Total Inferred Surface
89,658
0.327
4.738
942
13,657
60.6%
23.3%
Inferred Oxide/Mixed Pit (non-sulfide)
48,656
0.235
2.384
367
3,729
76.6%
14.4%
Inferred Oxide/Mixed Pit (sulfide)
4,960
0.286
3.543
46
565
68.9%
0.0%
Inferred Sulfide Pit
94,761
0.311
2.657
948
8,095
66.5%
0.0%
Total Inferred In Situ
148,377
0.285
2.597
1,361
12,390
69.9%
4.7%
Total Inferred Surface + In Situ
238,035
0.301
3.403
2,303
26,047
97.9%
8.8%
11-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Notes:
1.
The definitions for Mineral Resources in S-K 1300 were followed for
Mineral Resources
2.
The Mineral Resource estimate is reported on a 100% ownership basis.
3.
The point of reference for the Mineral Resource is before the crusher (in situ).
4.
Open Pit Mineral Resources are reported at a cut-off grade ranging from
0.074 g/t to 0.217 g/t Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.
5.
The optimized pit shell and cut-off grades were generated by assuming
metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of US$2.40/t moved for open pit, processing costs of $5.51/t oxide/mixed and $10.44
sulfide processed, and general and administrative costs of $0.46/t processed
6.
Minimal mining width was 60 m for oxide/mixed material and 20 m for sulfide material
7.
Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce
8.
Bulk density ranges from 1.5 t/m3 in the tailings storage
area to 2.7 t/m3 for in situ material
9.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
10.
Numbers may not add due to rounding.
11-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.2
Resource Database
As of the effective date of this report, Paramount and its predecessor operators have completed more than 4,455 drill holes at the Project. These include a mix
of reverse-circulation (RC), diamond core (DD), sonic, and limited-auger drilling conducted between 1983 and 2013.
The Mineral Resource database used for
the in situ estimate contains 4,258 drill holes, of which 3,994 are located within or near the Mineral Resource model area and were considered in the resource estimation. Drill holes located outside the modeled mineralized zones, including those
intersecting unmineralized alluvium or barren volcanic and metasedimentary units, were excluded from the Mineral Resource estimate.
Drill holes
associated with the heap leach and waste rock dumps were treated as separate estimation domains; however, the estimated mineralized material from these domains is included in the Mineral Resource Estimate.
The Project Mineral Resource database includes surveyed drill hole collar locations, down-hole survey data (dip and azimuth), gold and silver assay data,
geological and alteration logs, oxidation state information, and supporting QA/QC records collected from multiple drill programs. Drill holes or assay intervals deemed unreliable due to data integrity issues or potential contamination were marked
and excluded from grade estimation in accordance with SLR’s modeling protocols.
The compilation, validation, and appropriateness of the drilling
database for Mineral Resource estimation were reviewed by SLR QP, who agrees that the dataset is suitable for supporting the Mineral Resource estimate under SEC Regulation S-K1300, subject to the classification limitations discussed elsewhere in
this report.
Table 11-2: Summary of Drill Hole Data used in Mineral Resource Estimation
Area
No. Holes
Total Depth
(m)
Average Depth
(m)
Number of Records
Survey
Lithology
Assay
In Situ
4,258
640,572.96
150.43
10,709
287,878
320,560
North Dump
34
1316.4
38.71
34
0
868
South Dump
22
789.36
35.88
22
0
425
West Dump
18
552.01
30.66
18
0
381
Heap Leach 1-3
31
772.83
24.45
31
0
827
Heap Leach 4
9
205.17
22.79
9
0
270
TSF
83
824.61
9.93
80
0
553
Grand Total
4,455
645,033.34
312.85
10,903
287,878
323,884
11.3
Geological Interpretation
The Project is located within the northern Nevada rift, where gold–silver mineralization is hosted in a structurally controlled epithermal system within
Middle Miocene volcanic rocks. The geological model reflects this fault-controlled geometry and incorporates the established regional volcanic stratigraphic framework. The model integrates lithological, structural, alteration, oxidation, and assay
data from multiple drilling campaigns to define the
11-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
three-dimensional distribution of mineralized rock. Geological interpretation focuses on the volcanic host
sequence and the principal fault systems that control the geometry and continuity of mineralization and constrain the Mineral Resource model, as illustrated in Figure 11-2. The geological model was
reinterpreted and refined by SLR based on the original geological modeling framework described in RESPEC (2023).
At the local scale, the geological model
defines fault-bounded mineralized zones characterized by vein-, breccia-, and stockwork-style mineralization. These zones are spatially associated with structural features, lithological contrasts, and areas of enhanced permeability and extend along
strike and down-dip from the historical mining area into adjacent zones. In addition, distinct estimation domains were created within the heap leach and waste rock dumps to account for differences in material type, grade distribution, and
metallurgical behavior relative to in-situ mineralization.
11-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-2: Sleeper Geologic Model Cross Section
11-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.3.1
Mineralization
In situ mineralization at the Project was subdivided into three grade-based mineral domains to support Mineral Resource estimation and to reflect differences
in grade distribution, continuity, and variability of gold and silver mineralization. The domains were defined primarily on gold-grade populations, with silver domains guided by the spatial distribution of gold, given their strong genetic and
spatial association, and consisted of a low-grade, mid-grade, and high-grade domain.
The low-grade (LG) domain represents disseminated and stockwork
mineralization that forms a laterally and vertically extensive envelope surrounding higher-grade mineralization, as illustrated in Figure 11-3. This domain comprises most of the mineralized volume and is
characterized by relatively continuous grades and lower variance. This domain is modeled at a cut-off grade of 0.1 g/t Au to 1.0 g/t Au and 1.80 g/t Ag to 10 g/t Ag.
The mid-grade (MG) domain comprises narrow veins and hydrothermal breccias that extend down-dip and laterally from areas of historically mined high-grade
mineralization. Mineralization within this domain exhibits moderate continuity and increased grade variability relative to the low-grade domain. Boundaries between the low- and mid-grade domains are generally sharp and grade-controlled. This domain
is modeled at a cut-off grade of 1.0 g/t Au to 8.0 g/t Au and 10 g/t Ag to 20 g/t Ag.
The high-grade (HG)
domain represents discrete, discontinuous zones of bonanza-grade mineralization associated with banded quartz–chalcedony veins and localized hydrothermal breccias. These zones are typically narrow, steeply dipping, structurally controlled, and
exhibit high-grade variability. Contacts between the mid- and high-grade domains are commonly gradational. This domain is modeled at a cut-off grade of > 8.0 g/t Au and >20 g/t Ag.
11-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-3: Sleeper Mineralization Model Cross Section
11-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.3.2
Oxidation Model
An oxidation model was developed to support in-situ Mineral Resource estimation and associated metallurgical recovery assumptions by defining the spatial
distribution of oxide, mixed, and sulfide material. The oxidation model was re-interpreted and refined based on the original oxidation framework described in RESPEC (2023). The review of the historical database identified instances in which oxide
and sulfide intervals were locally exchanged or inconsistently coded. These inconsistencies were addressed through SLR’s reinterpretation, which incorporated geological context and supporting information to correct oxidation assignments for
the current Mineral Resource estimate.
Oxidation-state interpretation was based on geological logging, alteration characteristics, and historical mining
information, with oxide material representing fully oxidized mineralization, mixed material representing partially oxidized mineralization, and sulfide material representing relatively unoxidized mineralization dominated by primary sulfide
assemblages. Oxidation domains were modeled independently of lithology and mineralization domains and constrained using drill hole data and sectional interpretations, reflecting a general transition from oxide material near the surface to sulfide
material at depth, with locally variable boundaries influenced by structure and permeability.
While the identified oxidation coding issues were corrected
within the current SLR reinterpretation, the SLR QP recommends additional verification and review for future Mineral Resource estimation updates, particularly where oxidation state affects metallurgical routing, recovery assumptions, and economic
parameters.
In the opinion of the SLR QP, the refined oxidation model is appropriate for the current in situ Mineral Resource estimation in accordance
with SEC Regulation S-K 1300 and CIM (2019) Best Practice Guidelines, subject to the limitations noted above.
11-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-4: Sleeper Alteration Model Cross Section
11-12
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.4
Resource Assays
Gold and silver assay intervals were coded to mineralization domains prior to any statistical treatment or grade estimation. Domain coding was based on the
interpreted geological and mineralization models and confirmed that assays were assigned solely to geologically consistent populations. This method prevented the mixing of mineralized and non-mineralized
material and ensured that subsequent statistical analysis, capping, compositing, and interpolation were performed within appropriate geological controls.
Only assays from accepted drill holes and intervals were coded for resource estimation. Intervals impacted by identified down-hole contamination or other data
quality issues were excluded from further analysis.
11.5
Treatment of High-Grade Assays
11.5.1
Capping Levels
Gold and silver assay data for the Sleeper deposit were coded by mineral domain, including modeled mineralized domains, Outside domains, and alluvium (Qal),
prior to grade interpolation as part of the in-situ mineral resource estimation. Domain coding ensured that assay data were assigned to geologically appropriate populations and that subsequent statistical analysis, capping, and interpolation honored
geological controls. Assay data were then evaluated for high-grade outliers to ensure that estimated block grades are representative of the underlying mineralization and not unduly influenced by extreme values. The Sleeper deposit exhibits
significant grade variability and localized nugget effects, characteristic of low-sulfidation epithermal gold-silver mineralization; accordingly, assay capping and high-grade restrictions were applied as complementary risk-management measures
consistent with accepted industry practice.
Assay capping was conducted on a domain-by-domain basis, recognizing that grade distributions, continuity,
and variability differ between mineralized domains, Outside domains, and alluvium (Table 11-3). Domain-specific gold and silver capping thresholds were established using statistical analysis, including
histogram, log-probability plot, and descriptive statistics reviews. The selected caps were designed to limit the influence of rare, extreme assay values while preserving the overall grade tenor and geological character of each domain. Assay values
exceeding the selected domain caps were reduced to the cap value prior to compositing and grade estimation.
Table
11-3: Sleeper In Situ Gold and Silver Capping Levels by Domain
Domain
Au Samples
Capped
Au Cap (g/t)
Ag Samples
Capped
Ag Cap (g/t)
Outside
19
6
76
20
Low - Grade
107
3
154
35
Mid - Grade
0
N/A
8
65
High - Grade
0
N/A
0
N/A
Alluvium (Qal)
23
5
0
N/A
11-13
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.6
Compositing
Capped gold and silver grade assay intervals from drill holes were combined into 3.05 m composite lengths for in situ grade estimation to ensure consistent
sample support. This composite length was chosen to honor historical assay data originally sampled at 5 ft intervals and then converted to metric units, aligning closely with the original sampling support used in most drilling at the Sleeper
deposit. The selected composite length is appropriate, given the drill spacing and the style of mineralization (Table 11-4 and Table 11-5). Figure 11-5 illustrates a histogram of the distribution of composite lengths.
Material sampled from waste rock dumps and heap
leach pads was combined into 5 m intervals to reflect the broader sampling support and the generally lower spatial variability typical of these areas. Compositing strictly respected mineral domain boundaries, ensuring no composite included assay
data from more than one domain. Residual intervals at the ends of drill holes, at domain boundaries, or at dump and heap leach pad boundaries were composited using length-weighted averaging.
The resulting gold and silver composites were reviewed statistically to confirm that the compositing methodology produced stable and representative grade
distributions suitable for block-model interpolation. In the opinion of the QP, the compositing procedures applied are appropriate for the nature of the available data and support the estimation of Mineral Resources.
Figure 11-5: Histogram of Sample Lengths in the Estimation Domains
11-14
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-4: Sleeper In Situ Gold Composite by Domain
Domain
Pre - Capping Au (g/t)
Post - Capping Au (g/t)
Low - Grade Gold
Median
0.24
0.24
Mean
0.30
0.30
SD
0.33
0.23
Maximum
34.00
3.00
Mid - Grade Gold
Median
1.46
1.46
Mean
1.84
1.84
SD
1.16
1.16
Maximum
27.63
27.63
High - Grade Gold
Median
11.02
11.02
Mean
19.52
19.52
SD
31.33
31.33
Maximum
297.73
297.73
Alluvium (Qal)
Median
0.71
0.71
Mean
1.43
1.10
SD
2.25
1.11
Maximum
15.23
5.00
Outside Gold
Median
0.03
0.03
Mean
0.09
0.06
SD
6.48
0.13
Maximum
1497.58
6.00
11-15
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-5: Sleeper In Situ Silver Composite by Domain
Domain
Pre - Capping Ag (g/t)
Post - Capping Ag (g/t)
Low - Grade Silver
Median
3.33
3.33
Mean
4.24
4.02
Std Dev
7.34
3.07
Maximum
478.01
35.00
Mid - Grade Silver
Median
13.31
13.31
Mean
14.06
13.81
Std Dev
10.75
4.17
Maximum
402.73
65.00
High - Grade Silver
Median
33.43
33.43
Mean
55.17
55.17
Std Dev
90.94
90.94
Maximum
1683.41
1683.41
Alluvium (Qal)
Median
5.94
5.94
Mean
6.32
6.32
Std Dev
2.81
2.81
Maximum
13.03
13.03
Outside Silver
Median
0.31
0.31
Mean
0.63
0.60
Std Dev
2.44
0.98
Maximum
274.70
20.00
11.7
Spatial Analysis
11.7.1
Variography
Spatial continuity was evaluated to assess the suitability of the data for geostatistical interpolation and to determine whether variogram models could be
reliably developed. This review considered grade distributions, spatial continuity, and potential directional trends within the mineralized domains. The available dataset did not demonstrate sufficient variability or well-defined spatial structure
to support the development of robust and defensible variogram models.
Given the limited variability and the absence of a clearly defined anisotropy,
formal variography was not undertaken, and grade estimation was completed using inverse distance squared (ID²) and inverse distance cubed (ID³) interpolation methods, which do not require variogram inputs. A planar ellipsoid search
strategy was applied to reflect the general geometry of the mineralized zones and to provide appropriate spatial weighting of sample data during estimation.
11-16
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.8
Bulk Density
Bulk density values used for the Mineral Resource estimate were assigned by material type, lithology, and, where applicable, redox domain. Bulk density values
were applied to convert block model volumes to tonnage. A total of 2,546 in situ bulk density measurements were available from historical drilling programs completed by X-Cal and Paramount. Density
determinations were derived from water-immersion measurements on drill core samples. The density data were reviewed for reasonableness and statistically summarized prior to application in the resource model.
For the in situ Mineral Resource estimate, the dataset has a sample-weighted average applied density of approximately 2.33 g/cm³. The strongest sample
support is in Tertiary Sleeper Rhyolite Mixed (970 samples) and Tertiary Sleeper Basalt Mixed (800 samples), both assigned 2.33 g/cm³. Tertiary Intrusive Felsic is also well supported, with 398 samples and an applied density of 2.36 g/cm³.
In situ density assignments show expected lithological variation. Quaternary Alluvium was assigned 1.90 g/cm³; West Wood Breccia, Breccia, and
Tertiary Sleeper Volcanic Sediment range from 2.35 g/cm³ to 2.46 g/cm³; Tertiary Sleeper Rhyolite ranges from 2.18 g/cm³ to 2.33 g/cm³; Tertiary Sleeper Basalt ranges from 2.24 g/cm³ to 2.33 g/cm³; and Mesozoic
Basement was assigned the highest density at 2.64 g/cm³. These values are consistent with the expected density contrast between unconsolidated cover, volcanic host rocks, intrusive units, and basement.
Density values were assigned deterministically to block model cells based on lithology and oxidation state and were not interpolated. This approach provides
consistent and stable tonnage estimates given the distribution, spatial coverage, and quality of the available density measurements. Representative values were selected for each lithologic and redox domain based on measured data and supplemented by
geological judgment where direct measurements were limited.
Lower densities assigned by SLR to the waste rock dumps, heap leach, and TSF reflect
deposited, crushed, stacked, or rehandled material with greater void space than competent in situ bedrock. The applied density of 1.80 g/cm³ for waste rock dumps is reasonable for broken, rehandled waste rock in a Nevada open-pit gold setting. The applied density of 1.65 g/cm³ for heap leach material reflects crushed and stacked leach material. The applied density of 1.50 g/cm³ for tailings is consistent with
lower-density deposited tailings material.
In the opinion of the SLR QP, the density assignment methodology and applied values are appropriate for the
style of mineralization and the available data and are adequate for use in estimating Mineral Resources.
The applied densities used in the Mineral
Resource estimation are summarized in Table 11-6.
11-17
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-6: Sleeper Density Values by Lithology
Material / Lithology
Redox
Domain
No.
Samples
Density Range
(g/cm³)
Applied Density
(g/cm³)
Waste Rock Dumps
All
521
Not reported
1.80
Heap Leach
All
187
Not reported
1.65
TSF
All
Not reported
Not reported
1.50
Quaternary Alluvium
All
7
1.76–2.42
1.90
West Wood Breccia
All
20
2.04–2.56
2.35
Breccia
All
1
2.42–2.42
2.42
Tertiary Intrusive Felsic
All
398
0.06–2.90
2.36
Tertiary Intrusive Mafic
All
0
Not reported
2.30
Tertiary Sleeper Rhyolite
All
115
1.86–3.11
2.18
Tertiary Sleeper Rhyolite
Oxide
84
1.68–2.42
2.18
Tertiary Sleeper Rhyolite
Mixed
970
1.39–3.83
2.33
Tertiary Sleeper Basalt
Sulfide
28
1.88–2.48
2.24
Tertiary Sleeper Basalt
Oxide
51
1.91–2.65
2.33
Tertiary Sleeper Basalt
Mixed
800
1.58–3.74
2.33
Tertiary Sleeper Volcanic Sediment
Sulfide
26
2.06–2.80
2.46
Mesozoic Basement
All
46
2.32–3.24
2.64
11.9
Block Models
The in situ mineralization geology model was developed by RESPEC using Seequent Leapfrog Geo software, while grade estimation for the in situ Mineral Resource
Estimate was completed in MineSight. SLR imported the completed in situ block model estimate into Leapfrog Geo for review, validation, and integration with the waste rock dump, heap leach, and tailings models. The waste rock dump, heap leach, and
tailings Mineral Resource Estimates were prepared by SLR using Seequent Leapfrog Geo, version 2025.3. Collectively, these models provide the basis for domain-controlled estimation, validation, integration, and final Mineral Resource reporting.
11.9.1
RESPEC In situ
The in situ block model was constructed using an unrotated approach. Each block was assigned to the geological domain containing its centroid, ensuring
appropriate domain representation and that grade estimation and reporting were constrained to the relevant geological controls. The model was oriented with an azimuth, dip, and plunge of 0.0° and employed a parent block size of 10 m (X) ×
10 m (Y) × 10.0 m (Z) to reflect the geometry of the mineralized zones and the anticipated selective mining unit dimensions, while honoring the interpreted geological surfaces and wireframes. The block model was prepared by RESPEC and
includes representations of the in situ mineralized zones (Table 11-7).
11-18
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-7: Summary of In Situ Block Model Extents
Description
Easting (X)
(m)
Northing (Y)
(m)
Elevation (Z)
(masl)
Block Model Origin (lower left corner)
410,520
4,573,830
1600
Parent Block Dimension (m)
10
10
10
Number of Blocks
333
412
120
Rotation
0
0
0
11.9.2
SLR Waste Rock Dumps and Heap Leach
The heap leach and dump block model was constructed in Leapfrog Edge (version 2025.2.1) using an unrotated, sub-blocked
approach. Each block was assigned to the geological domain containing its centroid, ensuring appropriate domain representation. The model was oriented with an azimuth, dip, and plunge of 0.0° and employed a parent block size of 10 m (X) by
10 m (Y) by 5 m (Z) to reflect the deposit geometry and anticipated selective mining unit dimensions, while honoring modeled geological surfaces. A summary of the block model extents is provided in Table
11-8.
Table 11-8: Summary of Waste Rock Dumps and Heap Leach Block
Model Extents
Description
Easting (X)
(m)
Northing (Y)
(m)
Elevation (Z)
(masl)
Block Model Origin (lower left corner)
410,020
453,830
1600
Parent Block Dimension (m)
10
10
5
Number of Blocks
383
462
240
Rotation
0
0
0
11.9.3
SLR Tailing Storage Facility
The TSF block model was constructed in Leapfrog Edge (version 2025.2.1) using an unrotated, sub-blocked approach. Each
block was assigned to the geological domain containing its centroid, ensuring appropriate domain representation. The model was oriented with an azimuth, dip, and plunge of 0.0° and employed a parent block size of 10 m (X) by 10 m
(Y) by 5. m (Z) to reflect the deposit geometry and anticipated selective mining unit dimensions, while honoring modeled geological surfaces. A summary of the block model extents is provided in Table
11-9.
Table 11-9: Summary of TSF Block Model Extents
Description
Easting (X)
(m)
Northing (Y)
(m)
Elevation (Z)
(masl)
Block Model Origin (lower left corner)
410,020
453,830
1600
Parent Block Dimension (m)
10
10
5
Number of Blocks
383
462
240
Rotation
0
0
0
11-19
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.9.4
SLR Vulcan Block Model
For final Mineral Resource Estimate reporting, the in situ, waste rock dump, heap leach, and tailings block models were combined into one regularized 10 m
× 10 m × 10 m block model using Maptek Vulcan software. The consolidated Vulcan model provided a consistent reporting framework across all material types and was used for final MRE tabulation and disclosure.
11.10
Search Strategy and Grade Interpolation Parameters
Gold and silver grades for the Sleeper deposit were estimated for the in situ Mineral Resource estimate using domain-controlled inverse-distance interpolation
methods applied to the three-dimensional block model. Grade interpolation was completed separately by mineralized domain to ensure that estimates honored the geological controls, grade populations, and spatial continuity characteristics established
during domain modeling.
The primary estimation method was inverse-distance weighting, with inverse distance cubed (ID³) applied to the mid-grade and high-grade domains and inverse distance squared (ID²) applied to the low-grade domains. These domain-specific distance powers were selected to reflect
differences in grade variability, continuity, and nugget effect, while balancing local grade influence against excessive smoothing. Ordinary kriging (OK) and nearest-neighbor (NN) estimates were also generated for validation and comparison against
the inverse-distance estimates.
Interpolation used domain-specific search ellipsoids, orientations, and maximum search distances consistent with the
geometry of the mineralized zones. Sample selection was controlled by minimum, maximum, and maximum-per-hole constraints to reduce spatial bias and limit
over-representation of closely spaced drill data. Although the RESPEC (2023) report does not expressly use the term “hard boundaries,” the estimation workflow is consistent with hard-boundary estimation, as composite samples were
restricted to their respective grade domains and were not used across domain contacts. Partial-volume block coding was used to represent domain proportions within blocks; however, the report does not document the use of soft-boundary interpolation
or cross-domain sample sharing.
In the opinion of the SLR QP, the grade interpolation approach is appropriate for the in situ Mineral Resource estimate.
The use of domain-controlled estimation, domain-specific search parameters, and validation checks is consistent with SEC Regulation S-K 1300 reporting expectations and CIM (2019) Best Practice Guidelines.
11.10.1 High Grade Restriction
In addition to assay
capping, high-grade restrictions (HGRs) were applied during grade interpolation to limit the spatial influence of elevated composite grades. The restrictions were implemented using grade–distance limits, whereby composites above defined
threshold grades were restricted to a shorter search distance, generally less than the primary search ellipse and commonly approximating one-half of the main search distance.
High-grade restriction thresholds were selected by estimation domain based on statistical review, grade distribution analysis, and visual assessment of the
apparent continuity of high-grade values. This approach was used to reduce the potential for grade smearing and localized overestimation, particularly in domains characterized by high-grade variability or nugget effect. Thresholds and restriction
distances were defined on a domain-specific basis to reflect geological continuity, grade population characteristics, and confidence in spatial continuity (Table 11-10).
11-20
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The effects of assay coding, capping, and high-grade restrictions were evaluated by comparing pre- and post-capping statistics and reviewing grade distributions. Based on this review, the selected controls appropriately limited the influence of extreme values without materially altering mean grades or
distorting the underlying domain grade populations.
Table 11-10: Sleeper Estimation Parameters by Domain
Domain
Min
Samples
Max
Samples
Max per
Hole
Search
Major
Search
Semimajor
Search
Minor
(Vertical)
ID
Power
Au
Grade
Cap
Au
Distance
(m)
Ag Grade
Cap
Ag
Distance
(m)
Low-Grade
1
12
3
1
1
0.5
2
1.6
75
10.5
75
Mid-Grade
1
12
3
1
1
0.33
3
8
75
30
75
High-Grade
1
12
4
1
1
0.33
3
100
75
290
75
Outside Domains
2
12
3
1
1
0.5
2
1.1
20
11
20
Qal
1
9
3
1
1
0.5
3
1.5
20
11
20
In the opinion of the SLR QP, the combined application of domain-specific assay coding, assay capping, and high-grade
restrictions is appropriate for the style of mineralization and the quality and variability of the available data and supports the estimation of Mineral Resources.
11.11
Reasonable Prospects for Economic Extraction for Mineral Resources
Mineral Resources must demonstrate reasonable prospects for economic extraction (RPEE), which generally implies that the quantity and grade estimates meet
certain economic thresholds and that the Mineral Resources are reported at an appropriate cut-off grade, taking into account extraction scenarios.
Metal prices used to determine Mineral Reserves are based on consensus long-term forecasts from banks, financial institutions, and other sources. For Mineral
Resources, metal prices are typically higher than those used for Mineral Reserves.
A reporting cut-off grade was
established for the Project based on assumed costs for an open pit mining and heap leaching operation and commodity prices that provide a reasonable basis for establishing RPEE for Mineral Resources.
These cost references were modified to align with the Project’s assumed production rate. These cost and price assumptions have been used to inform an
optimization process using the Whittle optimized pit shell software. Metallurgical recoveries and process costs were applied by metallurgical domains (Table 10-3)
11.11.1
Cut-off Grade Estimation
To demonstrate RPEE in accordance with SEC Regulation S-K 1300, Mineral Resources were constrained within pit shells
developed using Whittle pit optimization software. The optimization incorporated gold and silver prices of US$3,100/oz and US$34/oz, with payable metal factors of 99% and royalties of 3%. Selling costs of US$6.00/oz Au and US$0.50/oz Ag were
applied.
The Whittle pit-optimization metallurgical recoveries were applied on a material-type basis, reflecting
variability across oxide, mixed, and sulfide domains.
11-21
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The pit optimization utilized material-specific processing costs ranging from US$5.51/t (heap leach) to
US$10.44/t (sulfide processing), with general and administrative costs of US$0.46/t processed. Mining costs of US$2.40/t moved were applied in the pit optimization but excluded from the cut-off grade (COG)
calculation.
Open-pit Mineral Resources are reported within the selected Whittle pit shells (an Oxide/Mixed Pit
and a Sulfide Pit) at material-specific cut-off grades derived from the above economic parameters and metallurgical assumptions. The applied cut-off grades (g/t Au) by
material type are summarized in Table 11-11. Figure 11-6 illustrates the spatial distribution of material types across the project area.
These cut-off grades reflect differences in metallurgical recovery (Au recovery ranging from 40.0% to 84.5% for
leachable materials and from 50.1% to 71.2% for sulfides; Ag recovery ranging from 0% to 54.6%) and processing routes. Sulfide material is assigned a higher cut-off grade due to increased processing costs and
lack of defined recoveries within the current flowsheet assumptions.
The Whittle pit shell serves solely as a reporting constraint and does not represent
a Mineral Reserve, mine plan, or final pit design. Mineralized material below the applicable cut-off grade or outside the optimized pit shell is excluded from the reported Mineral Resources.
For reporting, the block model was reblocked to a 10 m bench height consistent with the open-pit mining assumption. No
additional mining dilution or mining recovery factors were applied. The applied cut-off grades and pit constraint are considered appropriate to support RPEE and Mineral Resource disclosure.
11-22
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-6: Sleeper Material Type/Area Distribution Map
11-23
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-11: Sleeper
Cut-off Grade Parameters by Domain
Area
Unit
West
Wood
Sulfide
Facilities /
Office
Sulfide
TSF
Heap
North
Dump
South
Dump
West
Dump
Alluvium
Block Model Codes
Type
Sulfides
Sulfides
Mixed
Mixed
Oxide
Oxide
Oxide
Oxide
Recovery Code
RecCode
1
15
14
13
12
11
10
9
8
Price Au
US$
/oz
3,100
3,100
3,100
3,100
3,100
3,100
3,100
3,100
Price Ag
US$
/oz
34
34
34
34
34
34
34
34
Payable
%
99
%
99
%
99
%
99
%
99
%
99
%
99
%
99
%
Selling Cost Au
US$
/oz
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
Selling Cost Ag
US$
/oz
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Royalties
%
3
%
3
%
3
%
3
%
3
%
3
%
3
%
3
%
Net Price Au
US$
/g
95.53
95.53
95.53
95.53
95.53
95.53
95.53
95.53
Recovery Au
%
64.2
%
71.2
%
50.1
%
40.0
%
79.0
%
69.8
%
81.4
%
60.0
%
Recovery Ag
%
0.0
%
0.0
%
0.0
%
0.0
%
40.5
%
43.9
%
54.6
%
8.0
%
Mining (excluded from COG)
$
/t mined
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
Processing
$
/t processed
10.53
10.26
10.15
4.00
5.51
5.51
5.51
5.51
G&A
0.46
0.46
0.46
0.46
0.46
0.46
0.46
COG
gr/tonne
0.179
0.157
0.222
0.105
0.079
0.089
0.077
0.104
11-24
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Area
Unit
Facilities /
Office Oxide
Facilities /
Office Mixed
Sleeper
Oxide
West Wood
Oxide
Sleeper
Mixed
West Wood
Mixed
Sulfides
Block Model Codes
Type
Oxide
Mixed
Oxide
Oxide
Mixed
Mixed
Sulfides
Recovery Code
RecCode
1
7
6
5
4
3
2
1
Price Au
US$
/oz
3,100
3,100
3,100
3,100
3,100
3,100
3,100
Price Ag
US$
/oz
34
34
34
34
34
34
34
Payable
%
99
%
99
%
99
%
99
%
99
%
99
%
99
%
Selling Cost Au
US$
/oz
6.00
6.00
6.00
6.00
6.00
6.00
6.00
Selling Cost Ag
US$
/oz
0.50
0.50
0.50
0.50
0.50
0.50
0.50
Royalties
%
3
%
3
%
3
%
3
%
3
%
3
%
3
%
Net Price Au
US$
/g
95.53
95.53
95.53
95.53
95.53
95.53
95.53
Recovery Au
%
83.9
%
71.3
%
84.5
%
76.5
%
70.0
%
65.0
%
66.5
%
Recovery Ag
%
8.1
%
22.3
%
9.9
%
9.0
%
15.0
%
10.0
%
0.0
%
Mining (excluded from COG)
$
/t mined
2.40
2.40
2.40
2.40
2.40
2.40
2.40
Processing
$
/t processed
5.51
5.51
5.51
5.51
5.51
5.51
10.44
G&A
0.46
0.46
0.46
0.46
0.46
0.46
0.46
COG
g/t Au
0.074
0.088
0.074
0.082
0.089
0.096
0.171
Note:
1
Recovery Code: RECCODE is a variable added to the block model to designate material type based on the
metallurgical recovery factor for reporting Mineral Resources
11-25
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.11.2 Factors Affecting the Mineral Resource
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The Mineral Resource Estimate is reported within a Whittle
optimized open-pit shell and at material-specific cut-off grades derived from the economic, metallurgical, and cost parameters summarized in Section 11.11.1. At the
time of reporting, the SLR QP is not aware of any title, taxation, socio-political, marketing, or other relevant issues that materially impact the Mineral Resource estimate beyond those outlined below.
Key factors that may materially affect the Mineral Resource estimate are listed:
•
Changes to metal price assumptions (US$3,100/oz Au and US$34/oz Ag) and associated payable factors (99%) and
royalties (3%), which directly influence net realized metal values and cut-off grades.
•
Changes to cut-off grade assumptions, including processing costs, which
underpin the material-specific cut-off grades applied for reporting.
•
Changes to metallurgical recovery assumptions by material type, which directly impact economic value and cut-off grade determination.
•
Changes to the assumptions and parameters used in the Whittle pit optimization, including slope angles, cost
inputs, and economic criteria used to define the reporting pit shell for RPEE as described in Sections 13.1 and 13.2 of this report.
•
Changes to geological interpretations, including mineralized domain geometry, continuity, and grade distribution,
which may affect block model estimation and classification.
•
Changes resulting from additional drilling, sampling, or data acquisition that modify the understanding of
geological controls, grade continuity, or domain boundaries.
•
Changes to estimation methodology, including treatment of high-grade values (e.g., capping and high-grade
restrictions), which may influence grade distribution and local estimates.
•
Changes to assigned bulk density values, which directly impact tonnage estimates.
11.11.3
QP Comments on the Prospect of Economic Extraction
The Mineral Resources are reported within Whittle optimized open-pit shells using a gold price of US$3,100/oz and
material-specific cut-off grades derived from appropriate cost, recovery, and economic assumptions. These parameters are consistent with current market conditions and industry benchmarks for comparable Nevada
gold operations.
In the QP’s opinion, the combination of metal price assumptions, metallurgical recoveries, processing costs, and pit optimization
parameters provides a reasonable basis for demonstrating RPEE. The use of material-specific cut-off grades and a Whittle pit shell constraint appropriately reflects the variability in processing performance
and economic value across material types and supports the technical and economic plausibility of the reported Mineral Resources.
11-26
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.12 Classification
Mineral Resources for the Project were classified as Measured, Indicated, and Inferred in accordance with SEC Regulation S-K 1300, using a conservative,
block-level classification methodology that integrates drill-hole confidence, data density, proximity to supporting data, geological continuity, and verification status, consistent with CIM (2019) Best Practice Guidelines. Classification was
applied only to blocks located within modeled mineral domains and constrained to material demonstrating reasonable prospects for economic extraction.
Resource classification was controlled using quantitative criteria summarized in Table 11-12 incorporating drill hole
confidence codes, sample counts, and distance to the nearest informing samples:
•
Measured Mineral Resources were defined within modeled domains where drill hole confidence codes are ≥ 0.9,
supported by at least seven samples with a closest sample distance of ≤ 10 m.
•
Indicated Mineral Resources were defined within modeled domains where drill hole confidence codes are ≥
0.55, supported either by at least seven samples within ≤ 22 m, or by at least two samples within ≤ 10 m.
•
Inferred Mineral Resources comprise remaining modeled domain material not meeting Measured or Indicated criteria,
or material supported by drill hole confidence codes ≥ 0.5 with at least one sample within ≤ 10 m.
Drill hole confidence
codes were assigned by the drilling program based on the availability and quality of supporting documentation used for data verification, including assay certificates and down-hole surveys, and range from 1.0 (full documentation available) to 0.0
(no supporting documentation). These confidence attributes were propagated to the block model and used as a primary control on classification. Drill intervals with insufficient documentation or identified data quality concerns were excluded from
resource estimation.
In the opinion of the SLR QP, the resulting Measured, Indicated, and Inferred Mineral Resource classifications appropriately reflect
the current level of geological confidence and data reliability for the Sleeper deposit. Additional data verification and targeted infill drilling is required to support future upgrades of Inferred material to higher-confidence resource categories.
Table 11-12: Summarized Methodology for Resource Classification
Class
Confidence Code
Sampling & Distance Criteria
Data Quality / Documentation
Measured
≥ 0.9
≥ 7 samples with the closest sample ≤ 10 m
Fully verified data; complete assay certificates and down - hole survey documentation
Indicated
≥ 0.55
≥ 7 samples ≤ 22 m or ≥ 2 samples ≤ 10 m
Assay data available with partial supporting documentation; some limitations in historical records
Inferred
≥ 0.5
≥ 1 sample with the closest sample ≤ 10 m
Limited supporting documentation; data verification is incomplete or reliant on historical drilling
11-27
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.13
Block Model Validation
Block model validation was conducted to ensure the Mineral Resource estimate for the Project is consistent with the input data, geological interpretation, and
estimation methodology.
The process included:
•
Global Statistical comparison of block grades against composite grades to evaluate estimation bias and smoothing.
•
Visual inspection of grade distribution, domain boundaries, and composite alignment using cross-sections and 3D
views.
•
Swath plots to assess grade trends along principal directions and confirm the model reflects spatial patterns in
the data.
The QP found grade continuity to be reasonable and confirmed that the block grades were reasonably consistent with local
drill hole composite grades.
11.13.1
Global Statistics
Statistical comparisons were conducted between composite grades and estimated block grades to evaluate the consistency of the interpolation. This analysis
helps identify potential smoothing or bias and ensures that the block model reasonably reflects the input data, as shown in Table 11-13 through Table 11-16.
Table 11-13: Summary of Composite vs Block Model Mean Au (ppm) Oxide/Mixed Pit – In Situ
Area
Oxide
Mixed
Sulfide
Descriptive Statistic
Comp
Block Model
Comp
Block Model
Comp
Block Model
Count
23,429
108,433
13,763
57,481
8,633
13,613
Mean
0.11
0.08
0.26
0.19
0.32
0.24
SD
0.37
0.13
0.40
0.17
1.11
0.21
CV
3.47
1.71
1.58
0.88
3.49
0.85
Variance
0.14
0.02
0.16
0.03
1.24
0.04
Min
0.00
0.00
0.00
0.00
0.00
0.00
Lower Quartile
0.00
0.00
0.06
0.07
0.08
0.13
Median
0.01
0.01
0.16
0.16
0.18
0.21
Upper Quartile
0.10
0.11
0.31
0.26
0.35
0.30
Max
13.96
4.27
21.53
4.63
79.26
6.72
11-28
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-14: Summary of Composite vs Block Model Mean Au (ppm)
Sulfide Pit – In Situ
Area
Oxide
Mixed
Sulfide
Descriptive Statistic
Comp
Block Model
Comp
Block Model
Comp
Block Model
Count
9,781
40,769
3,001
19,406
33,856
114,569
Mean
0.05
0.05
0.13
0.08
0.43
0.26
SD
0.22
0.09
0.36
0.13
2.15
0.38
CV
4.62
1.87
2.70
1.52
5.04
1.47
Variance
0.05
0.01
0.13
0.02
4.63
0.14
Min
0.00
0.00
0.00
0.00
0.00
0.00
Lower Quartile
0.00
0.00
0.01
0.01
0.04
0.10
Median
0.00
0.01
0.03
0.04
0.16
0.22
Upper Quartile
0.03
0.07
0.10
0.10
0.38
0.32
Max
14.11
2.51
6.23
2.36
244.75
35.02
Table 11-15: Summary of Composite vs Block Model Mean Au (ppm) Dumps
Area
North Dump
West Dump
South Dump
Descriptive Statistic
Comp
Block Model
Comp
Block Model
Comp
Block Model
Count
231
17,725
102
9,886
111
11,780
Mean
0.32
0.30
0.14
0.15
0.13
0.14
SD
0.31
0.20
0.23
0.14
0.19
0.09
CV
0.96
0.68
1.58
0.90
1.41
0.69
Variance
0.09
0.04
0.05
0.02
0.04
0.01
Min
0.00
0.01
0.00
0.00
0.00
0.00
Lower Quartile
0.06
0.15
0.02
0.06
0.00
0.07
Median
0.25
0.27
0.05
0.11
0.03
0.12
Upper Quartile
0.47
0.44
0.16
0.19
0.26
0.19
Max
1.37
0.99
1.48
1.24
1.36
1.10
11-29
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-16: Summary of Composite vs Block Model Mean Au (ppm)
Heaps and TSF
Area
Heap Leach 1-3
Heap Leach 4
TSF
Descriptive Statistic
Comp
Block Model
Comp
Block Model
Comp
Block Model
Count
142
15,896
45
5,498
207
10,061
Mean
0.28
0.28
0.37
0.35
0.65
0.61
SD
0.13
0.09
0.11
0.06
0.15
0.13
CV
0.45
0.30
0.31
0.17
0.23
0.21
Variance
0.02
0.01
0.01
0.00
0.02
0.02
Min
0.06
0.00
0.20
0.20
0.00
0.04
Lower Quartile
0.20
0.23
0.29
0.31
0.55
0.51
Median
0.25
0.28
0.35
0.34
0.66
0.61
Upper Quartile
0.34
0.32
0.43
0.37
0.77
0.72
Max
0.79
0.68
0.62
0.58
1.09
1.04
The SLR QP reviewed the statistical results and observed that the estimated block grades are consistent with the composite
grades, with no material bias or over-smoothing. The QP considers the statistical comparison results to be reasonable and supportive of the reported Mineral Resource Estimate.
11.13.2
Visual Comparison
Cross-sections, long sections, and 3D views were reviewed to verify that block grades align with composite data and are properly constrained within mineralized
domains. Cross sections through the oxide/mixed pit and the sulfide pit are shown in Figure 11-7 and Figure 11-8, respectively.
The QP confirms that the visual inspection shows good agreement between block estimates and input composites. No inconsistencies or estimation artifacts were
observed.
11-30
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-7: East-West Cross Section Oxide Pit
11-31
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-8: East-West Cross Section Sulfide Pit
11-32
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.13.3 Swath Plots
Swath plots were generated to compare composite and block grades along the easting, northing, and elevation directions. These plots are used to assess local
grade trends and continuity, and to verify that the block model appropriately reflects the spatial grade distribution observed in the underlying data. Representative examples for the Waste rock dumps, Heap Leach Pads, and Tailings Storage Facilities
(TSF) are presented in Figure 11-9 through Figure 11-11.
The QP reviewed
the swath plots and confirmed that the block models satisfactorily reproduce the grade trends observed in the composite data. No significant smoothing or anomalous behavior is evident, and there is good spatial correlation between composite grades
and block model grades.
11-33
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-9: Swath Plots in the X, Y, and Z Directions –
Waste Rock Dumps
11-34
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-10: Swath Plots in the X, Y, and Z Directions –
Heap Pads
11-35
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-11: Swath Plots in the X, Y, and Z Directions –
TSF
11-36
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.14
Sensitivity to Reporting Cut-off
The reported Mineral Resource estimates for the Project are sensitive to the metal price assumptions used to establish the reporting cut-off parameters. To evaluate this sensitivity, Mineral Resource tonnage and average grade estimates derived from the block model were assessed for oxide and mixed open pit scenarios across a range of gold price
assumptions from US$1,500/oz to US$4,500/oz. The analysis applies to Measured + Indicated Mineral Resources and incorporates corresponding revenue factors, metallurgical recovery assumptions, and waste-to-ore strip ratios (Table 11-17 and Figure 11-12).
At lower gold price assumptions, reported Mineral Resource tonnage is limited to higher-grade material, resulting in
lower total tonnes, higher average gold grades, and relatively low strip ratios. As the gold price assumption increases, additional lower-grade material becomes reportable, resulting in a material increase in
reported Mineral Resource tonnage, a corresponding decrease in average gold grade, and progressively higher strip ratios. Metallurgical recovery assumptions remain relatively consistent across the evaluated price range.
A gold price of US$3,100/oz was selected for the cash flow estimate presented in this report. For purposes of
by-product valuation, this assumption corresponds to a silver price of US$34/oz, equivalent to a silver-to-gold price ratio of
approximately 0.011:1, or silver pricing representing approximately 1.1% of the assumed gold price.
This sensitivity analysis demonstrates that the
reported Mineral Resource estimates are materially dependent on the selected metal price assumptions and associated reporting cut-off parameters and supports the conclusion that the reported Mineral Resources
have RPEE within the range of metal price assumptions evaluated, consistent with the requirements of Regulation S-K 1300.
Table 11-17: Open Pit Grade vs Tonnage for Measured + Indicated Resources (Oxide/Mixed Pit Constrained)
Gold Price
($/oz)
RF
Total Rock
(t)
Resource M+I
(t)
Strip Rato
(W:O)
Au Grade
(g/t)
Ag Grade
(g/t)
Au Rec
(%)
Ag Rec
(%)
1,694
0.48
35,732,409
20,468,964
0.75
0.37
4.49
74.99
16.72
2,033
0.58
68,197,241
37,612,499
0.81
0.32
4.16
74.61
17.56
2,257
0.65
81,659,853
45,065,866
0.81
0.31
4.07
74.55
17.67
2,597
0.74
99,200,686
53,323,671
0.86
0.30
4.02
74.50
17.73
2,936
0.84
110,812,588
58,689,771
0.89
0.29
3.93
74.54
17.62
3,272
0.94
124,512,625
63,344,842
0.97
0.28
3.84
74.57
17.58
3,100
1.00
132,050,829
66,288,945
0.99
0.27
3.79
74.56
17.53
3,951
1.13
144,294,460
70,633,066
1.04
0.27
3.71
74.50
17.54
4,291
1.23
165,570,401
74,237,792
1.23
0.27
3.63
74.42
17.43
4,630
1.32
171,018,579
75,830,152
1.26
0.26
3.60
74.40
17.41
5,082
1.45
177,363,755
77,429,268
1.29
0.26
3.56
74.38
17.39
Notes:
RF revenue factor
11-37
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 11-12: Open Pit Grade Tonnage Curve for Measured +
Indicated Mineral Resources
11.15
Comparison with Previous Estimate
The Mineral Resource estimate prepared by SLR (2026) was compared with the RESPEC (2023) Mineral Resource estimate to assess changes in tonnage,
grade, contained metal, classification, and the assumptions supporting the determination of RPEE.
The 2026 SLR estimate reports increases in Mineral
Resources across all classification categories relative to the 2023 RESPEC estimate. Measured Mineral Resources increased from 4.9 Mt at 0.537 g/t Au and 3.615 g/t Ag to 5.5 Mt at 0.492 g/t Au and 3.487 g/t Ag, representing a modest increase in
tonnage with slightly lower grades. Indicated Mineral Resources increased from 158.3 Mt at 0.356 g/t Au and 4.059 g/t Ag to 179.2 Mt at 0.330 g/t Au and 3.842 g/t Ag, an increase of approximately 13% in tonnage with broadly comparable grades.
Inferred Mineral Resources increased from 119.9 Mt at 0.315 g/t Au and 2.454 g/t Ag to 238.0 Mt at 0.301 g/t Au and 3.403 g/t Ag, nearly doubling the reported tonnage.
The increase in Inferred Mineral Resources is primarily attributable to the inclusion of additional surface Mineral Resources, including waste rock dumps,
heap leach materials, and TSF materials totaling 89.7 Mt, together with expanded pit-constrained oxide/mixed and sulfide Mineral Resources. More broadly, the changes reflect updated geological and block
models, enhanced database validation, revised estimation parameters, and updated economic assumptions, including a long-term gold price of US$3,100/oz and optimized pit shells and cut-off grades based on
current mining, processing, and metallurgical recovery assumptions.
Mineral Resources are not Mineral Reserves and do not have demonstrated economic
viability.
11-38
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.15.1
In Situ Mineral Resources (Pit-Constrained)
For in situ mineralization, excluding surface materials, the 2026 estimate reports Measured Mineral Resources of 5.5 Mt at 0.492 g/t
Au, Indicated Mineral Resources of 179.2 Mt at 0.330 g/t Au, and combined Measured and Indicated Mineral Resources of 184.7 Mt at 0.335 g/t Au, compared with 163.2 Mt at 0.361 g/t Au reported by RESPEC (2023). Inferred in situ Mineral Resources
total 148.4 Mt at 0.285 g/t Au, compared with 119.9 Mt at 0.315 g/t Au in the previous estimate.
These results represent a moderate increase in tonnage
of approximately 13% for Measured and Indicated Mineral Resources and approximately 24% for Inferred Mineral Resources, with a corresponding decrease in average gold grade. The changes are attributable to updated geological interpretations, revised
domain wireframes, incorporation of additional drilling and improved database validation, and expansion of optimized pit shells under higher metal price assumptions, which support the inclusion of additional marginal material. Contained gold remains
broadly consistent with the previous estimate, indicating no evidence of material global estimation bias
11.15.2
Surface Materials (Dumps, Heap Leach, TSF)
A significant difference between the estimates is the treatment of surface materials, which are reported entirely as Inferred Mineral Resources in the 2026
estimate. SLR (2026) reports 89.7 Mt at 0.327 g/t Au and 4.738 g/t Ag, containing approximately 942 koz Au and 13.7 Moz Ag, comprising waste rock dumps, heap leach pads, and TSF materials.
In contrast, in 2023 15.8 Mt of Inferred dump material was reported and heap leach pad and TSF inventories were not separately estimated. The expanded surface
Mineral Resource inventory in the 2026 estimate reflects the incorporation of additional datasets and operational inventories, improved delineation and classification of anthropogenic deposits, and the separation of material types to support
appropriate processing and metallurgical recovery assumptions. The higher long-term gold price assumption of US$3,100/oz also supports lower cut-off grades and demonstrates reasonable prospects for eventual
economic extraction for additional lower-grade material.
11.15.3 Metallurgical Recovery Assumptions
Metallurgical recovery assumptions differ materially:
•
RESPEC (2023): Generalized recoveries by material type, including high silver recoveries for sulfide material (up
to 70%)
•
SLR (2026): Process- and material-specific recoveries applied at a detailed domain level, including:
•
Variable gold recoveries (generally approximately 63.7% to 85.0% basis for pit optimization inputs)
•
Zero silver recovery assigned to sulfide material
•
Distinct recovery assumptions for dumps, heap leach, and TSF materials reflecting leachable characteristics
These revisions represent a more conservative and operationally realistic basis for RPEE. While recovery assumptions do not affect
reported grades or contained metal, they materially influence the derivation of the cut-off grade and the economic evaluation.
11-39
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
11.15.4
Classification
The distribution of Mineral Resources by classification remains broadly consistent. The 2026 estimate reports modest increases in Measured and Indicated
tonnage, reflecting:
•
Improved database validation and reconciliation;
•
Refinement of geological domains and estimation controls; and
•
Incorporation of additional drilling and updated interpretations.
No material changes to classification methodology or confidence criteria are identified.
11.15.5
Cut-off Grades
Cut-off grades in the 2026 estimate range from 0.074 g/t to 0.217 g/t Au, depending on material type and location, and
are constrained by optimized pit shells developed using updated economic assumptions.
The primary differentiator relative to the 2023 estimate is the
increase in assumed gold price of US$1,800/oz to US$3,100/oz, which has the following impacts:
•
Lowers economic cut-off grades
•
Expands pit limits
•
Increases total tonnage reported
•
Incorporates additional lower-grade material
The overall reporting framework remains consistent, but the economic basis for RPEE is materially more favorable in the 2026 estimate.
11.15.6 QP Opinion
In the opinion of the QP, the 2026
Mineral Resource estimate represents a reasonable, transparent, and defensible update to the 2023 estimate. The increase in tonnage and contained metal is primarily attributable to the following:
•
Inclusion and improved delineation of surface materials
•
Expansion of in situ mineralization under revised economic assumptions
•
Higher gold price assumptions supporting lower cut-off grades and
expanded pit shells
The reduction in average grade is consistent with the inclusion of marginal material and does not indicate
estimation bias. Metallurgical recovery assumptions have been revised to a more conservative and operationally supportable basis consistent with S-K 1300 requirements.
11.16
Mineral Resource Reporting
Table 11-18 presents a detailed breakdown of the Mineral Resource estimate by classification category and area, in
accordance with the reporting requirements of S-K 1300. The QP has reviewed and accepted the application of relevant modifying factors, including the results of open pit optimization, as described in
Section 11.11. These constraints define the spatial volumes within which the Mineral Resources are considered to have RPEE and may therefore be reported in accordance with S-K 1300.
11-40
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 11-18: Detailed Summary of Mineral Resources by Area –
April 29, 2026
Category
Area
Tonnage
(000 t)
Grade
(g/t Au)
Grade
(g/t Ag)
Contained
Metal
(000 oz Au)
Contained
Metal
(000 oz Ag)
Metallurgical
Au Recovery
(%)
Metallurgical
Ag Recovery
(%)
Measured
Oxide/Mixed Pit
Facilities/Office Mixed
1,148
0.327
3.194
12.1
117.9
71.3%
22.3%
Facilities/Office Oxide
560
0.264
2.543
4.8
45.8
83.9%
8.1%
Sleeper Mixed
220
0.234
4.031
1.7
28.5
70.0%
15.0%
Sleeper Oxide
76
0.177
0.957
0.4
2.3
84.5%
9.9%
West Wood Mixed
65.0%
10.0%
West Wood Oxide
76.5%
9.0%
Oxide/Mixed Pit (non-sulfides)
2,004
0.293
3.019
18.9
194.5
75.2%
17.1%
Sulfide
24
0.261
3.843
0.2
2.9
66.5%
0.0%
Facilities/Office Sulfide
154
0.325
4.378
1.6
21.7
71.2%
0.0%
Oxide/Mixed Pit (sulfides)
178
0.316
4.307
1.8
24.6
70.6%
0.0%
Subtotal Measured Oxide/Mixed Pit
2,182
0.295
3.124
20.7
219.2
74.8%
15.7%
Sulfide Pit
Sulfide
340
0.409
2.405
4.5
26.3
66.5%
0.0%
West Wood Sulfide
928
1.206
4.826
36.0
144.0
64.2%
0.0%
Facilities/Office Sulfide
1,899
0.372
3.291
22.7
201.0
71.2%
0.0%
Facilities/Office Mixed
21
0.354
2.500
0.2
1.7
71.3%
22.3%
Facilities/Office Oxide
83.9%
8.1%
Sleeper Mixed
7
0.285
0.870
0.1
0.2
70.0%
15.0%
Sleeper Oxide
22.0
84.5%
9.9%
West Wood Mixed
77
0.764
8.881
1.9
5.5
65.0%
10.0%
West Wood Oxide
74
0.612
2.325
1.5
76.5%
9.0%
Subtotal Measured Sulfide Pit
3,347
0.621
3.724
66.8
400.7
68.8%
0.6%
Total Measured
5,528
0.492
3.487
87.5
619.9
71.2%
6.5%
11-41
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Category
Area
Tonnage
(000 t)
Grade
(g/t Au)
Grade
(g/t Ag)
Contained
Metal
(000 oz Au)
Contained
Metal
(000 oz Ag)
Metallurgical
Au Recovery
(%)
Metallurgical
Ag Recovery
(%)
Indicated
Oxide/Mixed Pit
Facilities/Office Mixed
41,658
0.275
4.373
368.5
5,856.6
71.3%
22.3%
Facilities/Office Oxide
15,030
0.226
2.644
109.3
1,277.7
83.9%
8.1%
Sleeper Mixed
16,910
0.260
2.981
141.5
1,620.7
70.0%
15.0%
Sleeper Oxide
4,300
0.245
2.123
33.9
293.5
84.5%
9.9%
West Wood Mixed
65.0%
10.0%
West Wood Oxide
76.5%
9.0%
Oxide/Mixed Pit (non-sulfides)
77,899
0.261
3.613
653
9,049
74.2%
17.3%
Sulfide
8,618
0.360
4.996
99.8
1,384.2
66.5%
0.0%
Facilities/Office Sulfide
7,323
0.290
4.861
68.2
1,144.5
71.2%
0.0%
Oxide/Mixed Pit (sulfides)
15,941
0.328
4.934
168.0
2,528.7
68.7%
0.0%
Subtotal Indicated Oxide/Mixed Pit
93,840
0.272
3.837
821.2
11,577.3
73.2%
14.4%
Sulfide Pit
Sulfide
56,544
0.382
4.245
694.2
7,717.5
66.5%
0.0%
West Wood Sulfide
8,286
0.709
2.342
188.9
624.0
64.2%
0.0%
Facilities/Office Sulfide
16,184
0.302
3.691
157.0
1,920.5
71.2%
0.0%
Facilities/Office Mixed
1,556
0.218
2.669
10.9
133.5
71.3%
22.3%
Facilities/Office Oxide
83
0.186
2.224
0.5
6.0
83.9%
8.1%
Sleeper Mixed
1,344
0.248
1.948
10.7
84.1
70.0%
15.0%
Sleeper Oxide
83
0.187
0.500
0.5
1.3
84.5%
9.9%
West Wood Mixed
757
0.374
2.108
9.1
51.3
65.0%
10.0%
West Wood Oxide
499
0.413
1.219
6.6
19.6
76.5%
9.0%
Subtotal Indicated Sulfide Pit
85,336
0.393
3.848
1,078.5
10,557.9
67.4%
0.8%
Total Indicated
179,176
0.330
3.842
1,899.7
22,135.2
70.5%
7.9%
11-42
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Category
Area
Tonnage
(000 t)
Grade
(g/t Au)
Grade
(g/t Ag)
Contained
Metal
(000 oz Au)
Contained
Metal
(000 oz Ag)
Metallurgical
Au Recovery
(%)
Metallurgical
Ag Recovery
(%)
Measured + Indicated
Oxide/Mixed Pit
Facilities/Office Mixed
42,806
0.277
4.341
380.5
5,974.5
71.3
%
22.3
%
Facilities/Office Oxide
15,590
0.228
2.640
114.1
1,323.5
83.9
%
8.1
%
Sleeper Mixed
17,130
0.260
2.995
143.2
1,649.3
70.0
%
15.0
%
Sleeper Oxide
4,376
0.244
2.103
34.4
295.9
84.5
%
9.9
%
West Wood Mixed
0
0.000
0.000
0.0
0.0
65.0
%
10.0
%
West Wood Oxide
0
0.000
0.000
0.0
0.0
76.5
%
9.0
%
Oxide/Mixed Pit (non-sulfides)
79,903
0.262
3.598
672
9,243
74.2
%
17.3
%
Sulfide
8,642
0.360
4.993
100.0
1,387.2
66.5
%
0.0
%
Facilities/Office Sulfide
7,477
0.290
4.851
69.8
1,166.2
71.2
%
0.0
%
Oxide/Mixed Pit (sulfides)
16,119
0.328
4.927
169.8
2,553.4
68.7
%
0.0
%
Subtotal Measured + Indicated Oxide/Mixed Pit
96,022
0.273
3.821
841.9
11,796.5
73.3
%
14.4
%
Sulfide Pit
Sulfide
56,884
0.382
4.234
698.7
7,743.8
66.5
%
0.0
%
West Wood Sulfide
9,214
0.759
2.592
224.9
768.0
64.20
%
0.00
%
Facilities/Office Sulfide
18,084
0.309
3.649
179.8
2,121.5
71.2
%
0.0
%
Facilities/Office Mixed
1,577
0.220
2.667
11.2
135.2
71.3
%
22.3
%
Facilities/Office Oxide
83
0.186
2.224
0.5
6.0
83.9
%
8.1
%
Sleeper Mixed
1,350
0.248
1.942
10.8
84.3
70.0
%
15.0
%
Sleeper Oxide
83
0.187
8.727
0.5
23.4
84.5
%
9.9
%
West Wood Mixed
834
0.410
2.119
11.0
56.8
65.0
%
10.0
%
West Wood Oxide
573
0.439
1.062
8.1
19.6
76.5
%
9.0
%
Subtotal Measured + Indicated Sulfide Pit
88,683
0.402
3.843
1,145.3
10,958.6
67.5
%
0.8
%
Total Measured + Indicated
184,704
0.335
3.832
1,987.2
22,755.0
70.5
%
7.9
%
11-43
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Category
Area
Tonnage
(000 t)
Grade
(g/t Au)
Grade
(g/t Ag)
Contained
Metal
(000 oz Au)
Contained
Metal
(000 oz Ag)
Metallurgical
Au Recovery
(%)
Metallurgical
Ag Recovery
(%)
Inferred
Surface
North Dump
23,747
0.364
2.584
277.7
1,972.8
79.0
%
40.5
%
South Dump
12,667
0.182
1.612
74.2
656.7
69.8
%
43.9
%
West Dump
10,478
0.203
0.883
68.5
297.4
81.4
%
54.6
%
Subtotal Inferred Dumps
46,893
0.279
1.941
420.3
2,926.9
77.1
%
44.6
%
Heap Leach Pads
31,600
0.301
8.363
306.3
8,496.9
40.0
%
0.0
%
TSF
11,165
0.599
6.221
215.2
2,233.2
50.1
%
0.0
%
Subtotal Inferred Surface
89,658
0.327
4.738
941.8
13,656.9
60.6
%
23.3
%
Oxide/Mixed Pit
Facilities/Office Mixed
12,668
0.251
3.233
102.1
1,316.9
71.3
%
22.3
%
Facilities/Office Oxide
6,461
0.198
1.800
41.1
373.9
83.9
%
8.1
%
Sleeper Mixed
14,851
0.232
2.884
110.6
1,377.2
70.0
%
15.0
%
Sleeper Oxide
14,661
0.240
1.403
113.0
661.2
84.5
%
9.9
%
West Wood Mixed
65.0
%
10.0
%
West Wood Oxide
15
0.136
0.272
0.1
0.1
76.5
%
9.0
%
Oxide/Mixed Pit (non-sulfides)
48,656
0.235
2.384
367
3,729
76.6
%
14.4
%
Sulfide
2,485
0.302
3.288
24.1
262.6
66.5
%
0.0
%
Facilities/Office Sulfide
2,475
0.271
3.800
21.6
302.4
71.2
%
0.0
%
Oxide/Mixed Pit (sulfides)
4,960
0.286
3.543
45.7
565.0
68.9
%
0.0
%
Subtotal Inferred Oxide/Mix Pit
53,616
0.239
2.491
412.6
4,294.4
75.8
%
13.1
%
Sulfide Pit
Sulfide
69,108
0.324
2.661
718.8
5,913.4
66.5
%
0.0
%
West Wood Sulfide
1,242
0.369
0.987
14.7
39.4
64.2
%
0.0
%
Facilities/Office Sulfide
14,602
0.316
3.848
148.3
1,806.5
71.2
%
0.0
%
Facilities/Office Mixed
1,728
0.217
2.208
12.1
122.7
71.3
%
22.3
%
Facilities/Office Oxide
225
0.190
1.443
1.4
10.5
83.9
%
8.1
%
11-44
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Category
Area
Tonnage
(000 t)
Grade
(g/t Au)
Grade
(g/t Ag)
Contained
Metal
(000 oz Au)
Contained
Metal
(000 oz Ag)
Metallurgical
Au Recovery
(%)
Metallurgical
Ag Recovery
(%)
Sleeper Mixed
3,348
0.237
1.036
25.5
111.5
70.0
%
15.0
%
Sleeper Oxide
2,152
0.183
0.700
12.6
48.4
84.5
%
9.9
%
West Wood Mixed
932
0.204
0.616
6.1
18.4
65.0
%
10.0
%
West Wood Oxide
1,424
0.193
0.534
8.8
24.4
76.5
%
9.0
%
Subtotal Inferred Sulfide Pit
94,761
0.311
2.657
948.3
8,095.3
68.0
%
1.4
%
Total Inferred
238,035
0.301
3.403
2,302.7
26,046.7
67.0
%
12.3
%
Notes:
1.
The definitions for Mineral Resources in S-K 1300 were followed for
Mineral Resources
2.
The Mineral Resource estimate is reported on a 100% ownership basis.
3.
The point of reference for the Mineral Resource is before the crusher (in situ).
4.
Open Pit Mineral Resources are reported at a cut-off grade ranging from
0.074 g/t to 0.217 g/t Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.
5.
The optimized pit shell and cut-off grades were generated by assuming
metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of US$2.40/t moved for open pit, processing costs of $5.51/t oxide/mixed and $10.44
sulfide processed, and general and administrative costs of $0.46/t processed
6.
Minimal mining width was 60 m for oxide/mixed material and 20 m for sulfide material
7.
Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce
8.
Bulk density ranges from 1.5 t/m3 in the tailings storage
area to 2.7 t/m3 for in situ material
9.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
10.
Numbers may not add due to rounding.
11-45
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
12.0 Mineral Reserve Estimates
There are no Mineral Reserves defined at the Sleeper Gold Mine at this time.
12-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
13.0 Mining Methods
The proposed Base Case mining operations include a conventional open pit truck-shovel operation and rehandling of mineralized material from three existing
waste rock dumps. The in situ mining inventory is approximately 128.5 Mt and the rehandled existing waste dump rock material totals approximately 46.9 Mt. The operation is designed to deliver approximately 30,000 tpd of mineralized material to
the processing facilities, with a LOM open pit average strip ratio of 1.9:1 (waste tonne: process feed tonne).
In the Alternative Case, only in situ
material is mined and processed; no material from the existing waste rock dumps is reclaimed for processing.
13.1 Geotechnical Studies
The current pit slope design is based on preliminary geotechnical assumptions appropriate for an Initial Assessment level of study. In competent bedrock, an
overall slope angle of approximately 45° has been applied, as observed in the existing pit walls, reflecting assumed favorable rock mass conditions and stable bench-scale performance. In contrast, alluvial materials are assigned a significantly
flatter overall slope angle of approximately 22°, which is also observed in the current pit slopes and is consistent with reduced material strength, potential for raveling, and sensitivity to groundwater and weathering.
Bench-scale geometry is based on 10 m bench heights, which are compatible with production drilling, loading equipment reach, and operational efficiency. In
competent rock, bench face angles of 80° and berm widths of approximately 8.24 m have been assumed, while alluvial zones utilize flatter bench face angles of approximately 34° with wider berms of approximately 9.93 m, as shown in Figure 13-3. These parameters are considered reasonable for conceptual planning but will require confirmation through detailed geotechnical investigation, including drilling, laboratory testing, structural analysis, and
slope stability modeling in future study phases.
Groundwater conditions have not been explicitly incorporated into slope design at this stage; however,
given the pit’s depth (approximately 230 m), dewatering and depressurization will be required and will influence the final slope configurations. The current design criteria are considered appropriate for the Initial Assessment but are subject
to refinement.
Table 13-1: Geotechnical Design Criteria
Parameter
Competent Rock
Alluvium
Bench height (m)
10
10
Bench face angle (degrees)
80
34
Overall slope angle (degrees)
45
22
Bench berm width (m)
8.24
9.93
13-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
13.2 Mine Design
The current pit lake water elevation is 1,255 masl as presented in Figure 13-1. The conceptual open pit design has
approximate plan dimensions of 2,650 m (north-south) by 1,860 m (east-west) and a maximum depth of approximately 230 m, with a pit bottom elevation of approximately 1,080 masl, as shown in Figure 13-2. Primary
pit access is provided via a south-side waste haul exit at approximately 1,270 masl and a west-side crusher exit at approximately 1,265 masl, allowing for separation of mineralized material and waste haulage where practical.
The pit design was developed based on pit optimization results at a revenue factor of 1.0 derived using 20 m × 20 m × 20 m blocks. Slope
assumptions applied during the optimization were assumed at an overall slope angle of 45° for fresh rock and 22° for alluvial material. Pit Optimization economic parameters and recoveries are provided in Table
11-11, and the mining cost of $2.40 per tonne mined.
13-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 13-1: Initial Mine Topography
13-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 13-2: Oxide Pit Cross Section 4,576,271 N
13-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Mining will be conducted on 10 m benches with a minimum mining width of 60 m, providing adequate working
space for drilling, loading, haulage, and safe operation of large production equipment. Haul road design is based on 150 t class haul trucks, with main ramps constructed at approximately 35 m width and 10% gradient. In the bottom two benches of the
pit, where space is constrained, single-lane haulage (supported by traffic management controls and localized passing areas) is proposed.
Ex-pit haul distances to the crusher and waste rock storage facilities are estimated to range from approximately 0.8 km to 2.4 km (0.5 miles to 1.5 miles). Haul cycle times are based on typical industry operating
speeds for 150 t haul trucks, accounting for loaded and unloaded travel, ramp grades, and road conditions consistent with a well-maintained Nevada open pit operation.
Material movement assumptions include a swell factor of 35% and a loose density of 1.7 t/m3, resulting in
an approximate loose volume of 88 m3 per truck load, equivalent to approximately 65 bank cubic meters (bcm) per load. The SLR QP considers these values to be appropriate for preliminary equipment
productivity and haulage calculations.
Operational assumptions include 24-hour continuous operation, utilizing
two 12-hour shifts per day across four rotating crews. Effective operating time is assumed to be 53 minutes per hour, reflecting delays for operational inefficiencies, shift changes, and minor interruptions.
Equipment performance is further adjusted to 90% mechanical availability utilization, consistent with contractor-operated mining fleets.
Table 13-2: Mine Design Parameters
Parameter
Value
Pit dimensions (N-S)
2,650 m
Pit dimensions (E-W)
1,860 m
Pit depth
230 m
Pit bottom elevation
1,080 masl
Waste exit elevation (south)
1,270 masl
Crusher exit elevation (west)
1,265 masl
Bench height
10 m
Minimum mining width
60 m
Ramp width
35 m
Ramp grade
10%
Bottom benches
Single-lane haulage
Ex-pit haul distance
0.8 km to 2.4 km
(0.5–1.5 miles)
Swell Percent
35%
Swell Factor
0.7407
Loose density
1.7 t/m3
13-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Parameter
Value
Operating schedule
24 hr/day, 2 shifts, 4 crews
Effective time
53 min/hr
Utilization
90% of availability
13.3
Waste Rock Storage Facilities Design
Waste rock generated from open pit mining is planned to be placed in conventional end-dumped waste rock storage
facilities (WRSF) located adjacent to the pit. The WRSFs are conceptualized to a maximum height of approximately 150 m and developed in 30 m lifts, consistent with typical large-scale open pit operations in Nevada. Waste material is assumed to have
an in situ density of approximately 2.3 t/m3, a swell factor of 35%, and a corresponding loose density of approximately 1.70 t/m3, which forms
the basis for volumetric and capacity estimates.
During active operations, waste will be placed by end-dumping
over the advancing dump crest in 30 m lift, with the working face developing at an approximate angle of repose of 35°, equivalent to about 1.5H:1V. This geometry reflects the typical behavior of coarse, fragmented rock under gravity placement
conditions. For long-term stability and closure, the external slopes of the waste rock dumps are assumed to be regraded to a final 3H:1V slope.
The
assumed geometry is appropriate for an IA; however, detailed WRSF design, including slope stability, drainage control, compaction behavior, and closure landform development, will require further geotechnical and hydrological evaluation in future
study phases.
Table 13-3 summarizes the WRSF design parameters. Figure
13-3 presents the Final Pit Design and Waste Rock Storage Facility Design based on the parameters summarized in this section.
Table 13-3: WRSF Design Parameters
Parameter
Value
Maximum dump height
104 m
Lift height
30 m
Number of lifts
3.5
In situ density
2.3 t/m3
Swell Percent
35%
Loose density
1.70 t/m3
Active dump slope
35° (~1.5H:1V)
Final reclaimed slope
3H:1V
13-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 13-3: Final Pit Design and Waste Storage Facility Design
13-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
13.4
Mining Method
At the stated production rate, the operation will mine approximately 66,300 tpd of waste, resulting in a total material movement of approximately 95,890 tpd.
This equates to approximately 10.8 Mtpa of mineralized material, 24.2 Mtpa of waste, and 35.0 Mtpa of total pit movement, assuming continuous operations.
Primary loading is performed using CAT 6060-class hydraulic shovels equipped with 18 m3 to 22 m3 buckets, supplemented by large wheel loaders for operational flexibility, rehandle, and backup loading. The loading configuration is designed around a 4-pass
match with 150 t haul trucks, which provides an efficient balance between productivity and truck utilization.
Production drilling is carried out using
single-pass diesel rotary drills, such as Pit Viper-class drills, capable of drilling the full 10 m bench height in a single pass. This approach improves drilling efficiency, reduces hole deviation, and supports consistent blast performance. Drill
and blast parameters will be refined in future phases based on rock mass characteristics and fragmentation requirements.
Production blasting is assumed
to be conducted using conventional rotary blasthole drilling on 10 m bench heights. Blastholes are designed at a nominal diameter of 229 mm and drilled on a 6.5 m burden by 7.5 m spacing pattern, which is considered appropriate for the volcanic and
locally silicified rock units present at the Sleeper deposit.
Each blasthole is drilled to include approximately 1.0 m of subdrill to ensure full
breakage at the bench floor. Stemming length is assumed to be 4.0 m, resulting in an effective charged length of approximately 7.0 m per hole.
The
average in situ rock density is assumed to be 2.3 t/m³, yielding approximately 1,120 t of rock broken per blasthole under the selected pattern geometry.
Given the anticipated groundwater conditions and the requirement for ongoing pit dewatering, wet blasthole conditions are expected to be common. Accordingly,
blasting is assumed to utilize bulk emulsion or heavy ANFO–emulsion blends rather than dry ANFO. An average explosive density of approximately 1.15 t/m³ is assumed, resulting in a charge concentration of approximately 47 kg of explosive
per metre of loaded hole. This corresponds to approximately 330 kg of explosive per blasthole. Blasting practices are expected to be optimized during operations through field trials to achieve the desired fragmentation for efficient loading,
hauling, and downstream crushing or heap leach performance.
Based on these parameters, a powder factor of approximately 0.28 kg of explosive per tonne of
rock blasted has been adopted for the mine plan. This value is considered appropriate for preliminary design and cost estimation and is consistent with similar open-pit gold operations in northern Nevada
operating under comparable ground and groundwater conditions. Drilling and blasting parameters are summarized in Table 13-4.
Table 13-4: Drilling and Blasting Parameters
Parameter
Unit
Value
Bench height
m
10
Hole diameter
mm
229
Burden
m
6.5
Spacing
m
7.5
13-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Parameter
Unit
Value
Pattern
m × m
6.5 × 7.5
Subdrill
m
1.0
Total hole depth
m
11.0
Stemming length
m
4.0
Charged length
m
7.0
Explosive type
—
Bulk emulsion / heavy
ANFO–emulsion
Explosive density
t/m³
1.15
Explosive per metre
kg/m
47
Explosive per hole
kg
330
Rock density
t/m³
2.3
Rock broken per hole
t
1,120
Powder factor
kg/t
0.28
Notes:
1.
Parameters reflect production blasting on 10 m benches with 229
mm-diameter blastholes.
2.
The 6.5 m × 7.5 m pattern is considered appropriate for the volcanic and locally silicified rock units at
Sleeper.
3.
Wet blasthole conditions are expected to be common due to groundwater inflows; therefore, bulk emulsion or
heavy ANFO–emulsion blends are assumed rather than dry ANFO.
4.
The powder factor is derived from the geometry, explosive density, and charge length and is appropriate for
preliminary mine planning and cost estimation.
Haulage is performed using a fleet of 150 t class rigid frame haul trucks, which
transport mineralized material to the crusher and waste to designated storage areas. Based on nominal payload assumptions, the approximate required truckloads per day are listed:
•
200 mineralized material truckloads
•
442 waste truckloads
•
642 total loaded truckloads
Additional haulage demand will be generated by the reclaim of the existing waste rock dump material, depending on the production schedule adopted.
Reclaim of waste rock dumps will be conducted using loaders and/or hydraulic shovels, with material excavated in controlled lifts and hauled directly to the
processing facilities. This activity is expected to require limited or no drilling and blasting, depending on material consolidation, and represents a conventional rehandle operation.
Mine support activities include road maintenance using CAT 16H motor graders, along with track dozers, water trucks, and service equipment. Proper road
maintenance is critical to maintaining haul truck productivity, extending tire life, minimizing rolling resistance, and ensuring safe operating conditions.
Overall, the selected mining method, comprised of a 10 m bench open pit mining using 150 t haul trucks, CAT 6060-class hydraulic shovels, Pit Viper-class
drills, and CAT 16H graders, combined with rehandle of existing waste rock dumps, is considered appropriate for the scale and nature of the Project and consistent with industry practice for Nevada heap leach operations. A summary of the mining
method and proposed equipment fleet is provided in Table 13-5.
13-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 13-5: Mining Method and Equipment Summary
Category
Description
Mining method
Conventional open pit truck-shovel plus waste dump reclaim
Process rate
30,000 tpd mineralized material
Strip ratio (W:O)
1.9:1
Waste mined
66,300 tpd
Total movement
95,890 tpd
Haul trucks
150 t class
Hydraulic shovel
CAT 6060 class
Bucket size
18–22 m3
Loading
4-pass
Drills
Single-pass diesel rotary (Pit Viper class)
Graders
CAT 16H
Waste dump reclaim
46.9 Mt
Truckloads (process feed)
approximately 200/day
Truckloads (waste)
approximately 442/day
13.5
Life of Mine Plan
Base Case production schedule starts by mining the existing waste rock dumps, followed by the in situ oxide and mixed Mineral Resources located around the
previous open pit operation.
The total mineralized inventory processed in the Base Case LOM plan is 175.4 Mt at average grades of 0.26 g/t Au and 2.8 g/t
Ag. Inferred Resources account for 54.5% of the Base Case production schedule.
Compared to the previous LOM plan (RESPEC 2023), the pit optimization
resulted in additional material at lower average gold and silver grades being included in the LOM plan, due to the higher gold price and lower cut-off grades. Cut-off
grades by material type, recoveries, and economic parameters used are presented in Table 11-11. Silver is considered a by-product, accounting for less than 4% of the
Base Case cash flow on gross revenue average.
There are sufficient Existing Dump Mineral Resources to allow processing for five years, as presented in
Table 13-6, totaling Oxide and Mixed Resources of 46.9 Mt at an average gold grade of 0.28 g/t.
13-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 13-6: Process Feed from Existing Dumps to the Crusher
Units
Dumps
Grade
Contained
Recovery
Recovered
Oxide+
Mixed
(Mt)
Gold
(g/t)
Silver
(g/t)
Gold
(koz)
Silver
(koz)
Gold
(%)
Silver
(%)
Gold
(koz)
Silver
(koz)
Year 1
7.3
0.27
2.2
63.8
510
79.0
%
40.5
%
50.4
207
Year 2
10.8
0.39
2.7
135.0
930
79.0
%
40.5
%
106.7
377
Year 3
10.8
0.36
2.1
123.6
724
80.1
%
47.2
%
99.1
342
Year 4
10.8
0.17
1.4
60.6
496
75.6
%
49.2
%
45.8
244
Year 5
7.2
0.16
1.2
37.6
268
69.8
%
43.9
%
26.3
118
Totals
46.9
0.28
1.9
420.6
2,929
78.0
%
43.9
%
328.2
1,287
Table 13-7 shows the In Situ Mineral Resources feeding the crusher starting in year
five and continuing for approximately 12.5 years. The In Situ Oxide and Mixed material feed totals 128.5 Mt at an average gold grade of 0.25 g/t.
Table 13-7: Process Feed from Open Pit to the Crusher
Units
Pit
Grade
Contained
Recovery
Recovered
In Situ
Oxide+Mixed
(Mt)
Gold
(g/t)
Silver
(g/t)
Gold
(koz)
Silver
(koz)
Gold
(%)
Silver
(%)
Gold
(koz)
Silver
(koz)
Year 1
Year 2
Year 3
Year 4
Year 5
3.6
0.23
3.1
26.2
357
74.1
%
32.1
%
19.4
115
Year 6
10.8
0.22
4.2
76.8
1,473
76.7
%
15.9
%
59.0
235
Year 7
10.8
0.25
5.1
85.6
1,765
72.7
%
20.5
%
62.2
362
Year 8
10.8
0.24
4.8
84.1
1,670
74.7
%
19.0
%
62.8
317
Year 9
10.8
0.21
2.9
74.1
1,017
79.1
%
11.4
%
58.6
116
Year 10
10.8
0.20
3.4
68.2
1,180
72.7
%
14.2
%
49.5
167
Year 11
10.8
0.24
3.6
84.8
1,249
74.2
%
15.1
%
62.9
188
Year 12
10.8
0.27
2.4
95.3
818
75.0
%
18.1
%
71.5
148
Year 13
10.8
0.27
2.3
94.8
815
72.6
%
20.6
%
68.8
168
Year 14
10.8
0.27
3.1
95.5
1,065
71.9
%
20.7
%
68.6
220
Year 15
10.8
0.26
1.3
91.0
443
78.0
%
14.3
%
70.9
63
Year 16
10.8
0.29
1.2
99.9
421
77.4
%
12.4
%
77.4
52
Year 17
6.1
0.31
2.6
62.0
518
71.9
%
14.3
%
44.6
74
Totals
128.5
0.25
3.1
1,038.2
12,793
74.8
%
17.4
%
776.2
2,225
Table 13-8 includes all Oxide and Mixed Resources processed during the life of mine,
totaling of 175.4 Mt at an average gold grade of 0.26 g/t, as summarized in Table 13-8.
13-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 13-8: Mining Inventory Processed by Year
Units
Pit
Grade
Contained
Recovery
Recovered
Total Oxide+
Mixed
(Mt)
Gold
(g/t)
Silver
(g/t)
Gold
(koz)
Silver
(koz)
Gold
(%)
Silver
(%)
Gold
(koz)
Silver
(koz)
Year 1
7.3
0.27
2.2
63.8
510.2
79.0
%
40.5
%
50.4
207
Year 2
10.8
0.39
2.7
135.0
930.4
79.0
%
40.5
%
106.7
377
Year 3
10.8
0.36
2.1
123.6
724.2
80.1
%
47.2
%
99.1
342
Year 4
10.8
0.17
1.4
60.6
495.8
75.6
%
49.2
%
45.8
244
Year 5
10.8
0.18
1.8
63.8
625.3
74.5
%
32.2
%
47.5
201
Year 6
10.8
0.22
4.2
76.8
1,472.5
76.7
%
15.9
%
59.0
235
Year 7
10.8
0.25
5.1
85.6
1,764.6
72.7
%
20.5
%
62.2
362
Year 8
10.8
0.24
4.8
84.1
1,670.4
74.7
%
19.0
%
62.8
317
Year 9
10.8
0.21
2.9
74.1
1,016.9
79.1
%
11.4
%
58.6
116
Year 10
10.8
0.20
3.4.
68.2
1,180.4
72.7
%
14.2
%
49.5
167
Year 11
10.8
0.24
3.6
84.8
1,249.5
74.2
%
15.1
%
62.9
188
Year 12
10.8
0.27
2.4
95.3
818.3
75.0
%
18.1
%
71.5
148
Year 13
10.8
0.27
2.4
94.8
815.2
72.6
%
20.6
%
68.8
168
Year 14
10.8
0.27
3.1
95.5
1,065.1
71.9
%
20.7
%
68.6
220
Year 15
10.8
0.26
1.3
91.0
443.1
78.0
%
14.3
%
70.9
63
Year 16
10.8
0.29
1.2
99.9
421.2
77.4
%
12.4
%
77.4
52
Year 17
6.1
0.31
2.6
62.0
518.2
71.9
%
14.3
%
44.6
74
Totals
175.4
0.26
2.8
1,458.9
15,721.1
75.8
%
22.1
%
1,106.2
3,481
The LOM plan requires extracting waste along with the mineralized material from the open pit and existing dumps. Table 13-9 summarizes all open pit materials relevant to the Base Case operation cost estimates, excluding existing dump extraction.
Table 13-9: Base Case Open Pit Production Schedule
Units
Total
Oxide +
Mixed
(Mt)
Gold
Grade
(g/t)
Silver
Grade
(g/t)
Total
Waste
Tonnage
(Mt)
Total
Material
Tonnage
(Mt)
Strip
Ratio
(W:O)
Resource
Mining
Rate
(tpd)
Waste
Mining
Rate
(tpd)
Total
Mining
Rate
(tpd)
Year 1
—
—
—
—
—
—
—
—
—
Year 2
—
—
—
—
—
—
—
—
—
Year 3
—
—
—
—
—
—
—
—
—
Year 4
—
—
—
—
—
—
—
—
—
Year 5
3.6
0.23
3.1
13.2
16.8
3.7
9,927
36,155
45,946
Year 6
10.8
0.22
4.2
13.0
23.8
1.2
30,000
35,497
65,086
13-12
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Units
Total
Oxide +
Mixed
(Mt)
Gold
Grade
(g/t)
Silver
Grade
(g/t)
Total
Waste
Tonnage
(Mt)
Total
Material
Tonnage
(Mt)
Strip
Ratio
(W:O)
Resource
Mining
Rate
(tpd)
Waste
Mining
Rate
(tpd)
Total
Mining
Rate
(tpd)
Year 7
10.8
0.25
5.1
10.3
21.1
1.0
30,000
28,303
57,892
Year 8
10.8
0.24
4.8
24.2
35.0
2.2
30,000
66,301
95,890
Year 9
10.8
0.21
2.9
24.2
35.0
2.2
30,000
66,31
95,890
Year 10
10.8
0.20
3.4
23.8
34.6
2.2
30,000
65,075
94,664
Year 11
10.8
0.24
3.6
19.3
30.1
1.8
30,000
52,931
82,520
Year 12
10.8
0.27
2.4
24.2
35.0
2.2
30,000
66,301
95,890
Year 13
10.8
0.27
2.3
24.2
35.0
2.2
30,000
66,301
95,890
Year 14
10.8
0.27
3.1
16.2
27.0
1.5
30,000
44,436
74,025
Year 15
10.8
0.26
1.3
24.2
35.0
2.2
30,000
66,301
95,890
Year 16
10.8
0.29
1.2
15.9
26.7
1.5
30,000
43,571
73,160
Year 17
6.1
0.31
2.6
9.4
15.6
1.5
17,069
25,778
42,612
Totals
128.5
0.25
3.1
242.1
370.6
1.9
Note:
Resource mining rates are based on 360 days per year.
Waste and Total mining rates are based on 365 days per year
13.6
Contract Mining Discussion
Mining at the Project is planned to be executed by an experienced third-party mining contractor under a unit-rate contract. This approach has been selected
based on the relatively small size of the Company and the desire to minimize initial capital expenditures associated with the purchase, commissioning, and maintenance of a mining fleet. By utilizing a contractor, the Project avoids significant
upfront capital outlays and transfers a portion of the operational and maintenance risk to the contractor, while maintaining flexibility to scale operations as required.
13.6.1
Mining Rate and Production Basis
As previously noted, for the Base Case, operations will begin by mining the existing waste rock dumps at 30,000 tpd, followed by mining the in situ material,
which will require additional equipment and personnel.
The mine plan contemplates a nominal processing rate of approximately 30,000 tpd of process feed,
supported by a LOM strip ratio of approximately 1.9:1 (waste:process feed) when mining in situ material, resulting in a total material movement rate of approximately 95,890 tpd.Mining activities will include drilling, blasting, loading, and
hauling of both process feed and waste materials. Process feed will be transported to the primary crusher and/or ROM stockpiles for downstream processing, while waste material will be hauled to designated waste rock storage facilities.
13-13
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
13.6.2
Contract Structure and Unit Rates
The estimated cost of contract mining is US$1.04 per banked cubic meter (bcm), equivalent to approximately US$2.40 per tonne (based on assumed bulk densities).
The unit rate is expected to include all standard open pit mining activities, including drilling and blasting, loading, hauling, equipment operation,
maintenance, supervision, and typical consumables required for production. The use of a unit-rate contract provides cost transparency and aligns contractor compensation directly with production volumes.
13.6.3
Out-of-Scope (“Forced
Work”) Allowance
In addition to the base unit mining rate, an allowance has been included for
out-of-scope or “forced work”, which encompasses activities not explicitly covered under the base mining contract. These may include, but are not limited to,
the following:
•
Road construction beyond normal maintenance requirements
•
Sump excavation and water management support
•
Rehandling of material outside planned sequences
•
Additional dozer support or cleanup activities
•
Standby time or operational inefficiencies outside contractor control
•
Owner-directed miscellaneous work
Based on benchmarking and preliminary discussions, a monthly allowance of approximately US$112,000 has been included for such activities. This represents
approximately 10% of the estimated base mining cost and is considered appropriate for an IA level estimate.
13.6.4
Grade Control and Sampling
The contractor will be responsible for the collection of blasthole drill cuttings during production drilling operations. These samples will be used for grade
control purposes and will be collected in accordance with procedures established by the Company to ensure representativity and data quality.
Blasthole
sampling will support short-term ore control, including mineralized material/waste delineation and routing of material to the appropriate destinations (crusher, stockpile, or waste dump).
A separate contract will be established for dedicated grade control drilling, which will provide a higher-resolution definition of mineralization boundaries
and support the conversion of Mineral Resources and reconciliation of production. This work is not included in the mining contractor’s scope or unit rate.
13.6.5
Operational Considerations
The contractor will be expected to supply and operate a fleet of appropriately sized equipment, likely including hydraulic excavators, front-end loaders, and haul trucks in the 150 t class, along with ancillary support equipment such as dozers, graders, water trucks, and service vehicles.
The contractor will be responsible for the following:
•
Equipment supply, operation, and maintenance
•
Provision of qualified labor and supervision
13-14
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Compliance with site safety, environmental, and operational standards
•
Execution of the mine plan in accordance with Company specifications
Paramount will retain responsibility for mine planning, scheduling, grade control, and overall operational oversight to ensure that mining activities are
conducted in accordance with the Project’s technical and economic objectives.
13.6.6
Contract Mining Summary
The use of a contract mining strategy provides a capital-efficient and flexible approach to Project development. The selected unit rate and allowances are
considered reasonable for an IA level study and are consistent with similar operations in the region. The inclusion of a defined allowance for out-of-scope work and
separation of grade control drilling provides appropriate transparency and conservatism in the cost estimate.
13.7
Mine Infrastructure
The proposed mining operation is a conventional open pit mining operation designed to support a nominal process feed production rate of approximately 30,000
tpd, with an associated waste-to-process feed strip ratio of approximately 1.92:1, resulting in total material movement of approximately 95,890 tpd. The mine
infrastructure has been conceptually designed to support continuous, year-round operations in a manner consistent with industry practice for open pit heap leach operations in northern Nevada.
13.7.1
Mine Access and Haul Roads
The open pit will be developed with a series of engineered haul roads and ramps designed to accommodate 150 t-class
rear-dump haul trucks. Ramp widths are expected to be approximately 35 m for two-way traffic, including safety berms and drainage features, with maximum sustained grades of approximately 10%, consistent with
standard open pit design criteria. Haul roads will be constructed using locally sourced waste rock and maintained by motor graders to ensure appropriate rolling resistance and safety. Internal pit access will be designed to provide flexibility for
multiple working faces and phased pushbacks over the mine life.
13.7.2
Material Handling
Material handling will consist of conventional truck-and-shovel/loader
operations, with process feed hauled from the pit to a primary crushing facility located adjacent to the heap leach pad. Process feed haul distances are expected to range from approximately 1.5 km to 4.5 km
one-way, while waste material will be hauled to designated waste rock storage facilities located approximately 2.5 km from the pit exit. The primary crusher will reduce ROM material to a size suitable for heap
leaching, after which the material may be conveyed or trucked to the leach pad for stacking. Agglomeration may be employed depending on final metallurgical test results.
13.7.3
Backfill
No backfilling of the open pit is currently planned during operations. Waste rock will be placed in external waste rock storage facilities designed to ensure
geotechnical stability, drainage control, and long-term reclamation. Placement will be managed using track dozers and haul trucks, with lift heights and dump configurations consistent with industry practice. Partial backfilling of the pit may be
considered at closure, depending on the final reclamation plan.
13-15
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
13.7.4
Dewatering
Mine dewatering is expected to be a significant component of the operation, with inflows estimated at approximately 53 m3/min (14,000 gpm). Dewatering will be achieved using a staged pumping system installed within the pit, consisting of submersible or vertical turbine pumps located in sumps and on intermediate benches.
Water will be pumped to surface pipelines and conveyed to designated storage or discharge areas. Consistent with operational constraints, no electrical infrastructure will be installed within active mining areas beyond the dewatering pump
installations. Excess water not required for processing will be discharged, subject to permitting, to rapid infiltration basin(s) or equivalent area located several kilometers from the pit. The dewatering system will be designed to maintain safe and
dry working conditions. and it will include redundancy to ensure reliability.
13.7.5
Maintenance Facilities
The Project currently includes an existing four-bay truck shop located within the footprint of the planned ultimate pit
and will therefore require relocation. A new maintenance facility will be constructed outside of the pit limits in a location suitable for long-term operations. The replacement facility is expected to include multiple service bays sized for 150-tonne haul trucks, overhead cranes, lubrication systems, tire handling equipment, and supporting infrastructure. The shop will be supported by adjacent maintenance yards, parts storage, and fueling facilities.
Additional light-vehicle and support-equipment maintenance will be accommodated within the same complex or in dedicated auxiliary buildings.
13.7.6
Fuel Storage and Distribution
Diesel fuel storage and distribution facilities will be constructed on-site to support the mining fleet and auxiliary
equipment. Fuel will be delivered by tanker truck and stored in above-ground tanks with appropriate containment. Mobile fueling units will be used for in-pit refueling of haul trucks and support equipment to
minimize downtime. Refer to Table 13-13 for details on fuel storage arrangements.
13.7.7
Power Supply and Distribution
Electrical power distribution at the mine would utilize multiple voltage levels consistent with industry practice. Major mine loads will be the mine
dewatering, support facilities, and maintenance infrastructure.
13.7.8
Communications and Control Systems
The mine will be equipped with a comprehensive communications system, including two-way radio networks, cellular or
satellite backup systems, and data communication infrastructure to support operational coordination and safety. A dispatch system may be implemented to optimize fleet productivity and monitor equipment performance. Supervisory control and data
acquisition (SCADA) systems will be used to monitor and control key process and infrastructure components, including power distribution and dewatering systems.
13.7.9
Water Supply and Management Infrastructure
Water management infrastructure will include pipelines, storage ponds, and pumping systems to manage both process water and dewatering flows. Given the
significant dewatering inflows, the site is expected to be a net water producer, with water reused in processing where practical and excess water discharged in accordance with regulatory requirements. Potable water will be supplied by truck, as no
permanent accommodation camp is planned.
13-16
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
13.7.10
Mine Infrastructure Summary
The proposed mine infrastructure for the Sleeper operation is conventional and appropriate for a 30,000 tpd open pit heap leach project. Key infrastructure
elements, including haul roads, material handling systems, dewatering, maintenance facilities, power supply, and communications, have been conceptually designed in accordance with industry standards and comparable operations in Nevada. The
relocation of the existing truck shop and the development of new surface infrastructure will support efficient and safe mining operations over the LOM.
13.8
Mine Equipment
The proposed open pit operation will be carry out by contractors, extracting approximately 30,000 tpd of process feed and 66,000 tpd waste, for a maximum total
daily material movement of approximately 95,890 tpd based on a waste-to-process feed strip ratio of 1.9:1. Given the projected haul distances, with process feed
transported 1.5 km to 4.5 km one-way to the crusher and waste hauled approximately 2.5 km one-way to the waste dump, a conventional diesel-powered truck and shovel fleet
using 150 t class rear-dump haul trucks is appropriate.
Based on the planned production rate and a weighted-average haul profile, the haulage fleet would
consist of approximately 15 trucks of 150 t trucks. This fleet size is expected to provide adequate capacity to meet the required material movement under average conditions, while allowing for normal mechanical downtime, delays, and short-term
cycle-time variability.
Primary loading would be carried out by two hydraulic excavators in the 18 m3
to 22 m3 bucket class, which are suitably matched to the 150 t trucks and would typically load each truck in approximately 4 to 6 passes. A large wheel loader in the 16 m3 to 20 m3 class would supplement the excavator fleet and provide flexibility for ore control. Table 13-10
summarizes the anticipated primary mining equipment fleet requirements.
The support fleet would include a conventional complement of ancillary equipment,
including production drills, track dozers, graders, water trucks, fuel and lube trucks, service trucks, and a tire handler. A likely configuration would include two production drills, with one active and one shared standby or campaign support unit,
two large track dozers for dump maintenance, pit cleanup, and push assistance, one medium dozer for bench and auxiliary work, two motor graders for haul road maintenance, and two water trucks for dust suppression. Mobile maintenance support would be
provided by field service units, lubrication trucks, and a tire handler suitable for the selected truck class.
Table
13-10: Primary Fleet Estimate
Equipment
Typical Size /
Class
Qty
Operating
Qty Standby /
Relief
Total
Qty
Primary Duty
Hydraulic excavator
18 to 22 m3 bucket
2
0
2
Primary process feed and waste loading
Front-end wheel loader
16 to 20 m3 bucket
1
0
1
Backup loading, blending, crusher support, and cleanup
Rear-dump haul trucks
150 t payload
15
2
17
Process feed and waste haulage
13-17
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Equipment
Typical Size /
Class
Qty
Operating
Qty Standby /
Relief
Total
Qty
Primary Duty
Production drill
171 to 229 mm class
1
1 shared/relief
2
Production drilling
Track dozer
Cat D10/D11 class
2
0
2
Dump maintenance, push assist, pit cleanup
Track dozer
Cat D8 class
1
0
1
Bench cleanup, support work
Motor grader
16M/24M class
1
1
2
Haul road maintenance
Water truck
50,000 to
60,000 L
2
0
2
Dust suppression
Fuel/lube truck
service unit
1
0
1
In-pit fueling and lubrication
Service truck
field mechanic unit
1
0
1
Mobile maintenance support
Tire handler
150 t truck class
1
0
1
Tire changes
Crane / utility truck
site support
1
0
1
Field lifting and support
13.8.1
Fuel Consumption
Using the fleet basis from the mining assumptions, the SLR QP estimates that the operation will consume on the order of 72,000 L to 75,000 L per day of diesel,
with a practical base case of about 72,500 L/d (about 19,000 to 19,700 US gal/d). That estimate includes the production fleet and the principal support equipment, not just haulage. The haul fleet consists of 150 t class trucks and uses the Cat 785
as a reasonable proxy, since its nominal payload is 147 t and gross power is 1,193 kW (1,600 hp). The shovel selected was a Cat 6060 hydraulic shovel, which has a gross power of about 2,248 to 2,256 kW, Pit Viper
271-class diesel drills at 652 to 708 kW, and Cat 16 graders at 216 kW.
For the mining rate of approximately
87,600 tpd (total material movement), using an operating basis of 24 h/d, 2 shifts, 4 crews, 53 min/h effective time, and 90% utilization of availability, the mine effectively needs enough active equipment to sustain the target rate of about 19.1
effective operating hours per day. On the haul side, using normal loaded and empty truck speeds for an 8% ramp, plus a 0.8 km to 2.4 km (0.5 to 1.5 miles) ex-pit haul distances, the estimated average cycle
time is about 23 minutes for process feed and 26.5 minutes for waste. That supports an operating fleet of approximately 13 haul trucks in service at any one time, which would translate into a purchased or contracted fleet of 14 to 15 trucks total to
cover float, maintenance, and shift change. This is an engineering estimate, not a vendor guarantee.
13.8.1.1
Estimated Diesel Consumption by Equipment
Table 13-11 shows the estimated daily diesel consumption for the Base Case. The hourly fuel burn rates are engineering
assumptions based on machine class, installed power, and a typical mining duty cycle.
13-18
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 13-11: Equipment Diesel Consumption Estimate
Equipment
Assumed Count
Operating
Assumed Fuel Burn
(L/h each)
Assumed Operating
Hours/Day
Estimated
L/d
150-t haul trucks
15
190
21.2
60,420
Cat 6060 hydraulic shovel
1
320
21.2
6,784
Large wheel loaders
2
105
21.2
4,452
Pit Viper-class drills
2
100
18.0
3,600
Cat 16H graders
2
38
18.0
1,368
Track dozers
2
50
18.0
1,800
Water truck
1
80
18.0
1,440
Lube truck
1
15
12.0
180
Service truck
1
15
12.0
180
Light vehicles / pickups
6
5
10.0
300
Total
80,524
That base case is about 80.5 m3/d, approximately 29.4 million L/y.
13.8.1.2
Diesel Storage Comparisons
For storage, the SLR QP recommends that there should be enough fuel on-site to account for weather, supplier delays,
delivery timing, and maintenance outages. Using the Base Case burn of about 80.5 m3/d, the recommended storage requirements are shown in Table 13-13.
Table 13-12: Diesel Storage Comparisons
Basis
Days of
Storage
Required Diesel (m3)
Base consumption only
7
564
Base consumption + 15% reserve
7
647
Base consumption only
10
805
Base consumption + 15% reserve
10
926
Base consumption only
14
1,127
Base consumption + 15% reserve
14
1,296
For this Project, a practical recommendation would be to install a total of 850
m3 to 1,000 m3 of diesel storage. The arrangements are provided in Table 13-13.
13-19
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 13-13: Recommended Diesel Storage Arrangements
Tank Arrangement
Total Capacity
Comment
2 × 100,000 gal ASTs + 1 × 25,000 gal day tank
850 m3
(225,000 gal)
Preferred base case
(10.6 days)
3 × 75,000 gal ASTs + 1 × 10,000 to 15,000 gal day tank
890- 900 m3
(235,000 to 240,000 gal)
Good redundancy, smaller units
(11-11.3 days)
2 × 120,000 gal ASTs + 1 × 25,000 gal day tank
1,000 m3
(265,000 gal)
Better if deliveries are less frequent
(12.5
days)
AST – Aboveground Storage Tank
The preferred base case is approximately 850 m3 of total storage,
consisting of two 378.5 m3 bulk tanks and one 94.6 m3 day tank, providing approximately 11 to 12 days of base-case storage and just over 10
days including reserve margin. For the current study level, the QP recommends the following parameters for the budget and layout of the fuel system as follows:
•
Diesel consumption: 80,524L/d base case
•
Annual diesel: about 80.5 million L/y
13.9
Mine Personnel
The operation is planned to run continuously on a
24-hour-per-day, year-round basis using a conventional four-crew rotation on 12-hour
shifts. Mining activities will be carried out by a mining contractor, who will provide the majority of the operational workforce, including equipment operators, maintenance personnel, and mine-related site support.
The total workforce is estimated at approximately 220 personnel. Of these, about 170 personnel will be employed by the contractor and will support mining
operations, equipment maintenance, dewatering, and site services. The remaining approximately 50 personnel will be employed by Paramount owner and will provide technical, supervisory, and administrative functions, including geology, mine
engineering, technical services, management, and contract administration.
13-20
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
14.0
Processing and Recovery Methods
14.1
Selected Processing Strategy
Based on the metallurgical test work summarized in Section 10.0, the oxide and mixed Mineral Resources and the existing waste rock dumps are amenable to
processing via heap leach with Merrill-Crowe processing. The economic analysis presented in this IA considers the processing of these Mineral Resources only.
Sulfide, HLP, and tailings materials are amenable to processing via flotation, with rougher concentrate assumed to be sold or toll treated at an off-site facility. Sulfide processing is not considered in the economic analysis of this IA. The proposed processing for sulfide, HLP, and tailings materials is presented as an opportunity meriting further
evaluation.
14.2
Proposed Process Description
The proposed plant for the initial development case is a conventional crush-agglomerate-heap-leach operation with Merrill-Crowe solution processing.
Merrill-Crowe processing has been selected because recovered Ag:Au ratios are expected to exceed 4:1. ROM material from oxide pits and selected waste sources would be crushed to a coarse target size consistent with the historical McClelland test
programs, approximately P80 19 mm, and agglomerated with cement at approximately 6.2 kg/t and/or lime as required for pH control. Planned crushing throughput is 30,000 tpd and would consist of
primary gyratory crushing followed by secondary cone crushing. Agglomerated material would be conveyor stacked on a lined heap leach pad using a series of conveyors and a radial stacker, with heap lifts constructed at approximately 10 m heights.
Dilute sodium cyanide solution would be applied to the stacked mineralized material using drip emitters at an application rate of approximately 7
L/m²/hr to 8 L/m²/hr. The minimum planned leach cycle is 45 days. Barren solution would be applied to the heap leach pad at a nominal flow rate of approximately 500 m³/hr to 510 m³/hr, with a cyanide concentration of
approximately 300 ppm to 400 ppm NaCN. As the solution percolates through the heap, cyanide-soluble gold and silver would dissolve into solution. Pregnant leach solution would be collected through the pad drainage system and pumped to the
Merrill-Crowe plant for metal recovery.
In the Merrill-Crowe circuit, pregnant solution would be clarified to remove suspended solids, de-aerated to reduce dissolved oxygen, and contacted with zinc dust to precipitate dissolved gold and silver. The precious-metal precipitate would be recovered by filtration, dried, and smelted to produce
doré bars. The barren solution would then be recycled back to the heap leach circuit, with cyanide, lime or pH-control reagents, and make-up water added as
required. Make-up water demand is currently estimated at approximately 40 m³/hr to 50 m³/hr. Figure 14-1 shows the crushing and agglomeration flowsheet, and
Figure 14-2 provides the overall process plant flowsheet.
14.2.1
Defining Sulfides for the Mineral Resources
Although sulfides are not included as part of the Sleeper process recovery in this IA, sulfide material was included in the Mineral Resource estimate, and a
process method was selected. Sulfide, HLP, and tailings materials will be considered separately through a conventional flotation circuit, producing a rougher concentrate. For the definition of Mineral Resources in this IA, the flotation concentrate
is assumed to be sold or toll treated off-site rather than processed through an on-site oxidation or concentrate leach plant. Operating costs and payable recoveries for
this route, therefore, include a 12% discount to flotation recoveries to reflect toll milling and related downstream charges. Additional test work is required to further refine opportunities for processing the sulfide, HLP, and TSF material.
14-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
14.3
Plant Throughput and Design Basis
The available resource base supports evaluation of a nominal 30,000 tpd heap leach operation, equivalent to approximately 11 Mtpa, as a reasonable benchmark
for the conceptual heap leach plant and infrastructure basis. Final throughput should be confirmed against mine scheduling, the proportion of metallurgically supported feed, and the reagent and cycle-time implications of the selected domains.
Major equipment for the heap leach case would include crushing facilities, agglomeration equipment, conveying and stacking systems, lined heap leach cells,
solution collection ponds, Merrill-Crowe clarification and precipitation equipment, refining and doré handling facilities, reagent storage and addition systems, and associated utilities.
14.4
Energy, Water, Process Materials, and Personnel
Projected requirements for energy, water, and process consumables for the heap leach case are typical of a Nevada gold-silver heap leach operation. Estimated
electrical demand for crushing and conveying, heap leach solution pumping, Merrill Crowe processing and refinery circuits is approximately 4.35 MW operating load. Primary water requirements include make-up
water for crushing/agglomeration moisture control, heap leach solution inventory, evaporative losses, and process water make-up. Make-up water is assumed to be provided
by pit-dewatering. Principal process consumables include 0.34 kg/mt sodium cyanide, 6.26 kg/mt cement and/or lime for agglomeration and pH control, zinc dust, lead nitrate, diatomaceous earth or filter aid,
anti-scalant/flocculant as required, and other Merrill Crowe, refinery and laboratory consumables. Personnel requirements would include 42 operators, 10 maintenance/electrical, and 13 supervision and technical support staff.
14.5
Suitability of the Selected Method
Given the oxide and mixed material is consistent with Sleeper’s historical oxide processing history and with the most reliable portions of the
metallurgical database (namely Facilities oxide and selected oxide, mixed, and waste composites), it is the QP’s opinion that the proposed heap leach and Merrill-Crowe route is a suitable processing method. It is a commercially proven
extraction method and does not require special justification as a novel process.
The identified deleterious elements are not currently considered
prohibitive; however, elevated Hg, As, Sb, and total sulfur in selected material groups warrant additional metallurgical, precipitate-quality, and refinery test work in future study phases.
Initial refinery capital allowances include a mercury retort as an IA-level provision for mercury management during
precipitate handling, doré production, and refinery handling. Future test work should confirm mercury behavior, precipitate, and doré quality, and any required mercury-control measures to refine capital and operating cost assumptions.
Sulfide, HLP, and tailings materials may be considered at IA level through conventional flotation, followed by sale or toll treatment of rougher concentrate at an off-site facility. This is also a commercially
used approach, but the current application remains preliminary because concentrate quality, payable terms, impurity penalties, and toll milling costs have not yet been demonstrated by project-specific commercial arrangements.
14-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 14-1: Crushing & Agglomeration Process Flow Sheet
14-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 14-2: Process Plant Flow Sheet
14-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
15.0
Infrastructure
The Project infrastructure has been designed to support a large-scale open pit mining and heap leach operation utilizing conventional, well-established
technologies commonly employed in northern Nevada. Major infrastructure components include site access and internal mine roads, waste rock storage facilities, ROM and crushed mineralized material stockpiles, a single heap leach pad with associated
solution management and storm event ponds, Merrill Crowe Plant for precious metals recovery, electrical power supply and distribution systems, and process and raw water pipelines. The Project benefits from its location within an established mining
district with access to existing regional infrastructure, experienced contractors, grid power, and services. Infrastructure development is planned to be staged in alignment with the mine production schedule and designed to meet regulatory,
environmental, and operational requirements.
15-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 15-1: Infrastructure Layout
15-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
15.1
Access Roads
Existing access to the Project truck shop from Winnemucca, Nevada, is via a combination of paved highway and maintained gravel access roads, with a total one-way distance of approximately 56 km (35 mi). From Winnemucca, proceed north on U.S. Highway 95 for approximately 40 km (25 mi). This segment is fully paved and generally in good condition, providing reliable
year-round access. At approximately Milepost 66 to 68 (measured from Winnemucca), turn west onto a graded dirt access road that serves local ranching and mining activities. After leaving U.S. 95, follow the gravel access road for approximately 10 km
(6 mi) toward the Sleeper Mine site. This road is typically maintained to accommodate mine-related traffic, although conditions can vary with weather and usage, including sections of wash boarding or minor erosion. The route trends generally
west-northwest across gently rolling basin and range terrain. Upon reaching the mine property boundary, continue along internal haul and service roads for an additional 1 to 3 km (1 to 2 miles) to access the main operational area. The current truck
shop is located within the central yard complex, adjacent to maintenance bays, fueling stations, and equipment staging areas.
In total, the route
comprises approximately 40 km (25 mi) of paved highway driving and approximately 16 km (10 mi) of gravel and site roads, with an estimated travel time of 45 to 60 minutes under normal conditions. Seasonal weather, particularly winter precipitation
or spring runoff, may temporarily affect road conditions on the unpaved segments.
15.2
Leach Pad
A synthetically lined Heap Leach Pad (HLP) of approximately 2 Mm2 in size will be constructed near the
open pit crest to accommodate approximately 175 Mt of mineralized material. The heap will have a total height of 60 m (200 ft), lifts will be placed by radial stacker at a thickness of 10 m (33 ft). The pad footprint of 2 Mm2, as shown in Figure 15-1, contains the 175 Mt of heap material at 60 m high and 3H:1V final outslopes at closure.
Mineralized material will be placed on the HLP and irrigated with a cyanide solution. The solution will be recovered from the HLP and stored in the pregnant
solution pond (Preg Pond) before being processed and recirculated to the HLP as barren solution. The HLP and External Ponds, collectively referred to as the Heap Leach Facility (HLF), will be synthetically lined so that the solution is in a closed
system, with the only net solution loss being to evaporation.
SLR identified a conceptual HLF site within the general area that could be sized to contain
the ultimate (175 Mt) HLP capacity, and generally met the following siting constraints:
•
Proximity to mining activities
•
Gently sloping terrain to maintain positive drainage for solution along the pad liner while remaining
geotechnically stable
The leach pad will be synthetically lined with a geomembrane primary liner that is underlain with either a
prepared low permeability subgrade or geosynthetic clay liner (GCL). Both applications are acceptable to the State of Nevada. A network of collection system pipelines will be placed over the liner and embedded in a
1-meter-thick lift of granular drain fill (Overliner Drain Fill (ODF)) The pipes will be sized and placed such that the solution application rate over the leached mineralized material will not allow for head
to build up on the liner. The particle size distribution of the ODF will allow for free draining of the PLS and will be specified to be two orders of magnitude greater permeability than the barren application rate.
15-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The conceptual HLP layout and capital cost estimate assumed the geotechnical and hydrogeological conditions
were suitable. Typical design values were assumed, or values were estimated from previous experience on similar projects, and key criteria were comprised of the following:
•
Storage of approximately 175 Mt
•
An average annual mineralized material loading rate of 30,000 tpd / 11 million tonnes per annum (Mtpa),
resulting in a project life of approximately 16 years (Base Case).
•
Mineralized material will be prepared as described in Section 14.0 (crushed and agglomerated) and placed on
the HLP using conveyors in 10 m lifts in a retreating manner to limit material compaction. A stability analysis was not performed, and SLR assumed that agglomerated mineralized material will be placed at an overall 3H:1V slope to facilitate closure,
a maximum height of approximately 60 m (200 ft), and an average density of 100 pounds per cubic foot (pcf).
•
The HLP was designed as a “zero discharge” facility. Containment for the HLP will be provided with a
composite lining system, comprised of a Geosynthetic Clay Liner (GCL) overlain by a High-Density Polyethylene (HDPE) geomembrane, over a total area of approximately 200 acres. This liner system is acceptable to the state of Nevada;
•
A network of collection system pipelines will be placed over the HDPE geomembrane and embedded in a 2 ft thick
lift of granular drain fill (Overliner Drain Fill [ODF]). The pipes will be sized and placed to minimize the risk of head (i.e., pressure) build-up on the liner
•
Construction of the HLP was assumed to be over five stages (i.e., approximately three-year increments) to reduce
initial capital.
Three external ponds were included in the capital cost estimate, including a pregnant solution pond (Preg Pond),
barren solution pond (Barren Pond), and storm event pond (collectively, the Ponds). The HLP will be connected to the pond system via a solution corridor. Typical design values for the external ponds were assumed, or values were estimated from
previous experience on similar projects, and key criteria were comprised of the following:
•
A water balance was not performed to size the ponds, as pond sizing is based on site specific and operational
based criteria, such as dead storage, emergency draindown, operational volume, freeboard, and a design storm event, which is typically the 100-year, 24-hour storm event.
For the purpose of the IA, storage of approximately 2.5 million gallons, 2.1 million gallons, and 30.9 million gallons were assumed for the Preg, Barren, and Event Ponds, respectively, based on the QP’s previous experience with
similar projects.
•
The Ponds were designed as a “zero discharge” facility. Containment for the Ponds will be provided
with a double liner system with Leak Collection and Recovery System (LCRS), comprised of a Geosynthetic Clay Liner (GCL) overlain by a HDPE Secondary geomembrane, Geonet drainage layer, and a HDPE Primary geomembrane. This liner has been previously
approved by the State of Nevada at similar projects.
•
Construction of the Ponds, in their entirety, is assumed to be performed during initial construction.
•
The ponds will be double lined with integrated leak collection and recovery systems (LCRS) and will be sized to
accommodate:
•
Freeboard (0.6 m)
15-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Operational Volume
•
Emergency Draindown Volume (24-hours of Barren Application Rate)
•
Design Storm Volume
•
Dead Storage for Sedimentation and Pump Priming
The HLP and solution ponds are synthetically lined so that the solution is contained within a closed system, with the only net solution loss due to
evaporation, which will be empirically confirmed during pond design using the sitewide water balance.
15.3
Buildings and Facilities
The buildings and facilities described below are in the main plant and offices area, as shown in Figure 15-1:
•
Truck shop and mobile maintenance warehouse: The Sleeper truck shop complex will be located near the mine
entrance. It is a four-bay shop sized up to 200 t class haul trucks. The shop will contain a tool crib, oil and lubricant bulk storage, multiple offices, locker rooms, a training room, and a warehouse. A
covered warehouse storage yard is located adjacent to the admin building complex.
•
Process building: The mill building, which is currently not operating, consists of facilities supporting the
mineral processing operations, including grinding, gravity separation, flotation, sulfide concentrate filtration and load-out, leach CIP circuit (bypassed), tailings filtration and agglomeration, recovery, and
doré casting, and metallurgical laboratory. Adjacent to the mill building is the thickener water storage tank and the remaining CIL tanks from the 1989 flowsheet.
•
Crushing plant: The crushing plant will produce P80 19 mm
(0.79-in) material for leaching. Stemming for blastholes, road material, and initial material overliner material for the leach pad which will require additional crushing and screening and will be completed
using mobile equipment, not a part of the primary crushing circuit, phased according to construction and development activities.
•
Process Recovery: Merrill-Crowe Circuit, zinc precipitation, doré casting, and solution pumping and
management. The recovery plant will contain analytical and metallurgical laboratories.
•
Wash bay: The wash bay will be located next to the truck shop and consists of one covered bay.
•
Administration buildings: The main administration building encompasses most site-support departments.
•
Assay laboratory: The assay laboratory will support ongoing mine operations, including grade control and gold
solution analysis.
•
Motor control center (MCC): The MCC will house controls for the pumps and boosters for the barren and pregnant
solution ponds.
15-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
15.4
Power Supply and Distribution
Electrical power for the proposed Project is expected to be supplied from the regional electrical grid operated by NV Energy. The project area is situated
within a well-established mining district with existing transmission infrastructure, and grid power is considered available within a reasonable distance of the site. Power would be delivered via a new overhead transmission line, anticipated to be
either 69 kilovolt (kV) or 120 kV, depending on final engineering, load growth considerations, and utility interconnection requirements. For the projected peak demand, a 120 kV supply is preferred to provide additional capacity, improved
voltage stability, and flexibility for future expansion.
The total connected electrical load for the operation is estimated to be approximately 9
megawatts (MW) to 15 MW, with an average operating demand of 10 MW, based on first principles estimates and benchmarking against comparable heap-leach operations in Nevada. The primary contributors to electrical demand include crushing and
conveying, heap leach solution pumping, the Merrill-Crowe recovery plant, pit dewatering, and general site infrastructure, including maintenance facilities, buildings, and lighting. Among these, pit dewatering represents a significant continuous
load, reflecting the need to pump approximately 4,542 m3/hr (20,000 gpm) from the open pit.
Electrical power received at the site would be stepped down through a central substation equipped with a primary transformer rated at approximately 25
megavolt-amperes (MVA). The substation would convert transmission voltage (69 kV or 120 kV) to a primary site distribution voltage of 13.8 kV, which would serve as the backbone of the site-wide electrical system. Distribution from the substation
would be configured in a radial arrangement with looped circuits for critical infrastructure, including the process plant and dewatering systems, to enhance operational reliability.
Power distribution across the site would utilize multiple voltage levels consistent with industry practice. Major process loads, including crushing,
conveying, and high-capacity pumping systems, would operate at 13.8 kV or 4.16 kV, with local step-down transformers where required. The Merrill-Crowe plant, maintenance facilities, warehouse, and ancillary infrastructure would primarily utilize 480-volt (V) systems, while lighting, offices, and control systems would be supplied at 240/120 V. Motor control centers and variable frequency drives would be employed extensively to optimize energy efficiency
and process control.
The crushing and conveying circuit are estimated to require approximately 3 MW to 5 MW, supplied at medium voltage, with large
motors driving the primary crusher and overland conveyors. Heap leach solution handling systems, including pregnant and barren solution pumps, are estimated to require approximately 0.35 MW to 1 MW. The Merrill-Crowe recovery plant, including
clarification, deaeration, zinc precipitation, and refining circuits, is expected to require approximately 1 MW to 2 MW.
Pit dewatering is estimated to
require approximately 2 MW to 3.5 MW, depending on final pump configuration, total dynamic head, and system efficiency. The system would consist of staged pumping installations located on pit benches or in sump areas, supplied via medium-voltage
distribution. Consistent with operational requirements, no electrical infrastructure would be installed within active mining faces beyond the dewatering pump installations.
Site infrastructure, including the truck shop, maintenance facilities, warehouse, assay laboratory, administrative buildings, and site lighting, is estimated
to require approximately 0.5 MW to 1 MW. Additional miscellaneous loads, including reagent handling systems, control systems, and contingency allowances, are estimated at 2 MW to 3 MW.
Emergency and backup power systems would be installed to support critical operations, including process control systems, Merrill-Crowe circuits, and minimum
dewatering capacity. These systems would consist of diesel-powered generators with sufficient capacity to maintain safe shutdown and restart conditions. The electrical system would be monitored and controlled through a supervisory control and data
acquisition (SCADA) system integrated with plant operations.
15-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Overall, the proposed electrical power system is conventional for a Nevada-based heap leach operation of this
scale and is considered technically feasible. The use of grid power supplied by NV Energy, combined with standard substation and distribution infrastructure, provides a reliable and scalable solution to support the planned mining and processing
activities.
Table 15-1: Estimated Power Load by Area
Area
Estimated Load (kW)
Estimated Load (MW)
Crushing and Conveying
3,100
3.10
Heap Leach Solution Pumping
350
0.35
Merrill-Crowe Plant/Recovery/Refining
1250
1.25
Pit Dewatering (20,000 gpm-nominal)
2,400
2.40
Infrastructure, Maintenance & Lab Facilities
1,000
1.00
Miscellaneous and Contingency
2,000
2.00
Total Connected Load
10,100
10.00 – 12.00
15.5
Water
The Project water balance for the proposed 30,000 tpd operation would be dominated by pit dewatering inflows, process solution inventory, heap leach
application losses, and evaporation. Mine dewatering, estimated to average approximately 4,542 m3/hr (20,000 gpm), is expected to provide substantially more water than required for crushing,
possible agglomeration, heap leaching, and Merrill-Crowe recovery, such that excess water would likely be discharged, subject to permitting and water quality requirements, to engineered rapid infiltration basins (RIBs) located several kilometers and
down gradient from the pit.
Process water demand would include dust suppression, ore agglomeration if required, heap leach solution make-up, and plant service water, with solution losses principally associated with heap and pond inventory, evaporation, and residual moisture retained in spent material. No accommodation camp is planned, which
materially reduces domestic water demand, and potable water for personnel would be trucked to the site.
Overall, the operation is expected to be a net
water producer, with site water management focused primarily on collection, storage, reuse where practical, controlled discharge of surplus dewatering water, and maintenance of adequate operational and environmental water controls.
15.5.1
Current Well Network
As of 2022, four interceptor wells remained operational. All bedrock dewatering wells and the remaining interceptor wells have been decommissioned. In 2005,
three of the operational dewatering wells were reported to be completed with line-shaft turbine pumps (WMC 2005a); however, pump reports from 2022 show groundwater discharged from only one of the interceptor wells (New Sleeper Gold 2022). The power
lines servicing any on-site line-shaft turbine pumps are expected to remain in place.
15-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
As of 2005, four monitoring wells installed adjacent to the tails dam were reported to remain operational.
All of the remaining monitoring wells are reported to have been decommissioned (WMC 2005a).
15.5.2
Pit Dewatering Plan
To dewater the Slumber pit lake, infrastructure and service requirements are expected to be as follows:
•
One barge-mounted pump operating in the pit lake having a capacity of 631 L/s (10,000 gpm) and an additional
barge-mounted pump available on-standby if one of the barge-mounted pumps required maintenance
•
Conveyance pipe from the barge pump to the conveyance channel on the west crest of the pit
•
Power to the barge-mounted pump
•
Submersible camera inspection and rehabilitation of the four interceptor wells remaining from previous dewatering
•
A monitoring well network to monitor both groundwater pressures and groundwater quality.
•
Approximately fourteen 50 mm diameter PVC standpipe monitoring wells installed in 200 mm nominal diameter
boreholes.
•
Approximately six monitoring wells can be installed to 90 m below grade in the basal gravel aquifer
•
Three monitoring wells installed in the bedrock DFS at 244 m below grade
•
Five monitoring wells in the compartmentalized bedrock PSF assumed to be at 200 m below grade.
•
Total monitoring well drilling would be 2,280 m.
•
Twenty 350 mm nominal diameter interceptor wells complete with louvered well screens installed in 450 mm nominal
diameter boreholes. As pit lake water level decreases, it is conceivable that as many as 8 additional interceptor wells will be required to lower the head in areas with greater storage capacity.
•
Twelve 350 mm nominal diameter bedrock dewatering wells complete with 450 mm nominal diameter surface casings.
Since the continuity and interconnectedness of the fracture network is unknown, it is conceivable that as many as four additional bedrock wells will be required. Initially, seven bedrock wells will target the DFS 244 m below grade from the crest of
the west wall. Following substantial dewatering of the pit, the remaining bedrock wells will be installed adjacent to compartmentalized zones where groundwater pressures have not been substantially lowered.
•
Ten 350 mm nominal diameter wells installed in 450 mm diameter boreholes from the 1,220 m (4,000 ft) elevation in
the waste rock piles at the based of the pit. These wells could not be installed until the pit has been dewatered to expose the waste rock and access can be developed for the drill rig.
•
Each of the interceptor, bedrock, and waste rock wells completed with a line shaft turbine pump.
15-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Conveyance pipe from each wellhead to the conveyance channel to the artificial wetland.
•
Power to each of the line shaft turbine pumps.
•
Excavation of a conveyance channel from the west crest of the pit to the artificial wetland in the middle of the
Desert Valley.
•
Construction of the impoundment dykes required to develop the artificial wetland.
Generally, installation of functional groundwater dewatering infrastructure is considered to be the critical path that limits the rate at which the pit is
dewatered. To maintain pit wall stability groundwater piezometric pressures must be maintained at a level only slightly higher than the level in the pit lake (WMC 2005d).
15.6
Accommodation Camp
An accommodation camp is not required for the Project due to its proximity to the established community of Winnemucca, located approximately 70 km to 80 km (45
to 50 miles) by road from the site. Winnemucca provides sufficient existing infrastructure to support the workforce, including housing, hotels, dining, medical services, and commercial amenities. The Project is accessible via U.S. Highway 95 and
maintained access roads, enabling reliable daily commuting for employees.
The operation is expected to utilize a local and regional workforce on a drive-in/drive-out basis, consistent with standard practice for mining operations in north central Nevada. This approach reduces capital and operating costs associated with
constructing and maintaining a camp, while also minimizing environmental disturbance and permitting requirements.
15-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
16.0
Market Studies and Contracts
16.1
Markets
Gold is the principal commodity at the Sleeper Gold Mine and is freely traded at prices that are widely known, so that prospects for sale of any production are
virtually assured. Metal prices for the economic analysis were estimated based on recent consensus industry metal price forecasts and compared with those used in other published studies. The metal prices used for the economic analysis, shown in
Table 16-1. These represent the average analyst consensus prices of March 2026.
Table 16-1: Economic Analysis Metal Price Assumptions
Metal Price
Units
Y-1
Y1
Y2
Y3
Y4
Long-
Term
Gold
$
/oz
4,370
4,000
3,600
3,600
3,600
3,600
Silver1
$
/oz
66.00
59.00
48.00
48.00
48.00
48.00
Note 1: Silver was modeled and evaluated in the cash flow; silver is recovered in the Sleeper recovery facilities.
The doré is securely transported by road freight to a refinery where it is refined into gold bullion. The bullion will be sold by reputable gold trader
to banks that specialize in the purchase and sale of gold bullion.
16.2
Contracts
Some of the major contracts that will be negotiated and implemented are discussed below.
•
Mining. Mining operations are expected to be executed by a contract mining firm under a unit-rate
agreement, with costs structured primarily on a volumetric basis (US$/bcm mined) covering drilling, blasting, loading, and haulage activities. The contract would include a schedule of rates for additional “out-of-scope” work, such as road construction, dewatering, and other ancillary services, with provisions for escalation, productivity adjustments, and fuel price variability. Contractor
performance would be managed through standard key performance indicators (KPIs), including productivity, dilution control, and safety compliance.
•
Diesel Fuel Supply Contract. Diesel fuel for mining and mobile equipment would be supplied under a term
supply agreement with a regional fuel distributor, with pricing typically referenced to published rack or index prices (e.g., OPIS), plus a negotiated differential for delivery, handling, and the supplier’s margin. The contract would include
provisions for volume commitments, delivery scheduling, on-site storage and inventory management, and adjustments tied to market fuel price fluctuations. Additional terms may address fuel quality
specifications, winterization requirements, and contingency supply arrangements to ensure continuity of operations.
•
Cyanide Supply Contract. Sodium cyanide would be procured under a supply agreement with a qualified
manufacturer or distributor, with pricing generally based on US$/tonne delivered and indexed to market conditions and potentially adjusted for freight and energy-related cost drivers. The contract would include provisions for delivery in solid
briquette or liquid form, storage and handling requirements, and compliance with applicable safety and environmental regulations (including the International Cyanide Management Code, where applicable). Supplier support services may include technical
assistance, inventory management, and emergency response provisions.
16-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Grinding Media Supply Contract. Grinding media (e.g., steel balls) for the comminution circuit would be
supplied under a contract with an established manufacturer, with pricing based on US$/t delivered and dependent on media specifications, alloy composition, and wear performance guarantees. The agreement would typically include provisions for quality
control, delivery schedules, minimum order quantities, and potential price adjustments linked to steel input costs or indices. Supplier performance may be monitored through consumption rates and wear characteristics to optimize operating costs and
milling efficiency.
•
Smelting and Refining. Gold and silver doré produced on site would be sold under standard refining
agreements with established precious metal refineries, in which the refineries purchase the doré and pay for the contained metal based on agreed payable percentages. The contract would include typical industry terms for refining charges,
treatment fees, assay procedures, and settlement timelines, with deductions for impurities and processing losses as applicable. Final payments are generally based on independently verified assays and prevailing market prices at the time of
settlement.
•
Transportation and Handling. Transportation of doré bullion from site to the refinery would be
conducted by a specialized, insured security logistics provider under a contract covering handling, transport, and custody of the material. The agreement would include provisions for secure packaging, chain-of-custody documentation, insurance coverage based on metal value, and defined responsibilities for loss or damage during transit. Logistics arrangements would be coordinated to align with production
schedules and refinery delivery requirements.
•
Sales, Hedging, Forward Sales. The Project may consider implementing a hedging or forward sales strategy
for a portion of future gold and silver production to support financing requirements or mitigate commodity price volatility. Any such program would be structured in accordance with standard industry practices and may include instruments such as
forward sales, collars, or other price protection mechanisms, subject to market conditions and lender requirements. At this stage, no specific hedging arrangements have been defined.
All contracts described above are expected to be negotiated on commercially reasonable terms consistent with industry norms for comparable Nevada heap leach
operations, and no unusual or non-standard contractual provisions are anticipated.
16-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
17.0
Environmental Studies, Permitting and Plans, and Social or Community Impact
The Project was developed (mined, milled, and heap leached) by AMAX in the 1980s and 1990s. Operation ceased in 1996. Reclamation has occurred on most of the
mine facilities (waste rock dumps, tailing impounds, heap leach pads and ancillary facilities (access and haul roads) and the open pit has been allowed to refill with water. Current activities at the site involve exploration, permit and reclamation
maintenance (including e-cells associated with the former heap leach units), and post-closure environmental monitoring.
17.1
Site Environmental Conditions and Monitoring Programs
The summaries of environmental conditions and studies in this section are based on information documented in environmental impact statement (EIS) and
environmental assessment (EA) baseline reports as well as the water pollution control permit (WPCP) and regulatory submissions required under the various permits and EIS/EA conditions. A Final Permanent Closure Plan (FPCP) for the Sleeper site was
submitted to the Nevada Department of Environmental Protection (NDEP) in 2003 for site-wide closure of the former project. The FPCP included details supporting characterization and stabilization information relative to the various facilities at the
site and the stabilization and closure of remaining process facilities.
17.1.1
Physiography
Sleeper is located in northern Nevada in the Great Basin region of the Basin and Range physiographic province. The Project area is situated in a valley on a
gently west-sloping alluvial plain at an approximate elevation of 1,300 masl (4,265 fasl).
17.1.2
Geology
The Basin and Range is characterized by a series of generally north-trending, fault-bounded mountain ranges separated by broad alluvium or lake sediment-filled
valleys. The Project is at the northwestern flank of the Slumbering Hills within the Desert Valley, which is a typical Basin and Range, fault-bounded valley. The underlying geology is comprised of Mesozoic basement rocks overlain by a sequence of
Tertiary volcanic and volcaniclastic units.
17.1.3
Acid Rock Drainage/Metal Leaching Potential
Acid base accounting (ABA) and meteoric water mobility procedures (MWMP) were performed by Hydrotechnica in 1989 to determine acid rock drainage and metal
leaching potential in support of the initial WPCP. The results have been used to update the pit lake model, with the latest update in 2021 by Piteau. The MWMP analysis for alluvium indicated that arsenic, iron, mercury, and manganese have the
potential for mobility in the alluvial system. In the oxidized volcanic bedrock, analysis conducted to date indicates most metals are immobile; however, the unoxidized volcanic bedrock indicates significant potential exists for mobilizing major
cations and anions, as well as trace metals such as manganese and arsenic. The current updated 2016 pit lake model shows that modelled results of these parameters will remain within Profile III reference ranges for the
104-year model simulation, with the possible exception of fluoride (Piteau 2021).
17-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
To reduce the impact of acid generation and metal leaching, the open pits on site were partially backfilled
with oxidized and unoxidized material and rapid filled through pumping to form a pit lake. Lime slurry was added to the pit lake between July 1996 and November 2001 to increase the pH of the pit lake water. Consistent monitoring of the pit lake and
modeled lake chemistry has shown that most parameters are stable, with a slow increase of alkalinity from alluvial groundwater. The data from monitoring indicates there are no increasing constituent trends and seasonal differences appear to be low.
The main control of future water quality is evapoconcentration; however, the rate of evapoconcentration on the site remains low (NDEP 2017).
Oxide and
sulfide ore was placed on the existing heap leach pads during operations. The heap leach pads were reclaimed in 2000 in accordance with approved closure plans. Solution from heap leach draindown is monitored semi-annually and quarterly, and
indicates the solution is acidic. Draindown solution from the heap leach facilities is managed through passive e-cells. Draindown solution for all pads contain elevated metals and sulfate, with the NROM pad
showing consistently higher concentrations of aluminum, arsenic, iron, sulfate, zinc and total dissolved solids.
The existing waste rock dumps consist of
alluvial material and both oxidized and unoxidized argillized volcanic tuffs. Acid neutralizing potential (ANP) / acid generating potential (AGP) ratios indicate a net acid generating potential. It is unknown where potentially acid-generating
material was placed within the existing waste rock dumps, and no seeps have been observed during quarterly inspections conducted since the completion of reclamation.
17.1.4
Atmospheric Environment
The climate at Sleeper is arid, characterized by warm, dry summers and cold, dry winters. Site-specific data is collected from a meteorological station on the
northern side of the site. Site data collected from 2003 to 2025 indicates an average annual temperature of 10°C with a range of -30°C to 36°C, and 153 mm of average annual precipitation with a
range of 47 mm to 447 mm.
The air quality in the region of the Project is generally good, due to the limited population and industrial activity. Several
mines in the vicinity have the potential to contribute to particulate emissions and industrial pollutants within the Project area. The nearest currently active mine is the Turquoise Ridge-Twin Creeks mine, located approximately 72 km (45 miles) as
the crow flies to the east.
17.1.5
Acoustic Environment
Sleeper is in a remote area with limited human activity, and no substantive anthropogenic noise sources within 42 km (29 mi). The nearest town is Winnemucca,
Nevada, located approximately 42 km (29 mi) south of the Project area. Ranching activities occur in proximity to the site, which contribute limited noise to the surrounding area. Highway 95 is located approximately 19 km (12 mi) east of the project
site, which contributes traffic noise in proximity to the Project area as one of the main travel ways to Idaho and Oregon.
17.1.6
Groundwater and Surface Water
The Project area is located within the Desert Valley (031) groundwater basin. The depth to water in the shallow aquifer before mining activity was
approximately 9 m (30 ft) to 12 m (40 ft) below ground surface (bgs). Several hydrologic and hydrochemical models for the site that have been prepared by Water Management Consultants Inc. (WMC) are listed (WMC 1995):
•
Sleeper Mine Summary of Groundwater Conditions Beneath the Tailings Dam (1994)
•
Preliminary Assessment of Hydrologic and Hydrochemical Conditions in the Final Pit (1994)
17-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Results of Supplemental Pit Lake Modeling and Closure Plan for the Final Pit (1995)
Additionally, the most recent update to the Sleeper project was completed by Piteau in 2021.
There are three hydrogeologic units identified within the Project area:
•
Shallow groundwater zone – lacustrine unit comprised of silty-clay sediments, varying in thickness from
near zero to 30 m (100 ft) in the vicinity of the pit area.
•
Basal Gravel Aquifer – this aquifer largely dominates the regional groundwater flow system in the Project
area and ranges in thickness from near zero to over 152 m (500 ft) west of the pit.
•
Volcanic bedrock aquifer – groundwater movement in this aquifer is a result of fracture flow, with variable
hydraulic conductivity. The thickness ranges from near zero to 52 m (170 ft).
•
Because of the abundant fractures within the rocks, the bedrock complex in the Project area, along with the
overlying Basal Gravel Aquifer, is the principal source of groundwater. Water chemistry in the shallow groundwater zone is believed to represent background conditions. No baseline data exists on the volcanic bedrock aquifer.
There are no surface waters at or near the mine site, with the exception of the pit lake. Groundwater modeling and pit lake monitoring indicate the pit lake
water level has stabilized at an elevation of about 6 m (20 ft) below the pre-mining groundwater level. The latest pit lake model by Piteau in 2021 indicates the pit lake effectively collects groundwater
beneath the mine site facilities and will remain a permanent hydrogeologic sink. Contact stormwater is contained on site and non-contact stormwater (stormwater runoff generated from the closed waste rock
dumps) discharges off site. The site is considered a zero-discharge facility.
17.1.7
Wildlife
There is limited data available for the Project regarding wildlife and biological resources within the area. Big game species, such as mule deer and pronghorn
antelope, small mammals, reptiles, aquatic, and avian species exist within the project area. Several raptor species inhabit the project area, including owls and hawks. It is unknown if golden eagles are present in the project area. No known special
status species or threatened or endangered species occur within the project area. There is evidence of aquatic species within the pit lake.
17.1.8
Cultural Resources
A cultural resources survey was conducted for the 1985 EA resulting in the identification of one obsidian flake within the project area. There is no evidence
of significant cultural or archaeological sites.
17.2
Waste and Tailings Disposal, Site Monitoring, and Water Management
17.2.1
Tailings Storage Facility
The tailings impoundment was designed as a zero-discharge facility. It was constructed as a native clay-lined facility
in accordance with existing standards and was approved by the Nevada Department of Environmental Protection (NDEP). The tailings impoundment was designed to allow for 6.6 million tons of tailings to be deposited over 63 hectares (156 acres).
The facility
17-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
was constructed in four phases from 1985 through 1994. The final thickness of tailings is about 13.7 m (45
ft) in the southeast corner of the impoundment and about 13.1 m (43 ft) in the northwest corner. The present surface area of the tailings is approximately 45 hectares (113 acres). The tailings facility is closed and released, in accordance with the
Closure and Reclamation Plan for the Tailings Impoundment (June 1998) and Final Plan for Permanent Closure (2003), with revegetation remaining as the only remaining activity that has yet to be released. No drain down has been measured since 2009,
and the Tailings Seepage Pond was closed in 2017.
17.2.2
Waste Rock Storage Facilities
There are three existing waste rock storage facilities on the site (North, West, and South dumps) that total approximately 171 hectares (423 acres). The waste
rock storage facilities on site are reclaimed and revegetated, except for a small laydown area on the South Waste Rock Dump, a non-hazardous solid waste landfill within the West Waste Rock Dump, and a portion
of the site access road is located on the North Waste Rock Dump to allow for access to associated collection ponds for processing. Approximately 44.2 metric tons (48.8 million short tons) of oxide and sulfide material was placed onto the heap
leach pads during operations. Leaching or recirculation of solution has not occurred since 1997.
17.2.3
Heap Leach Facilities
The heap leach pads were capped and covered in 2000 in accordance with the closure and reclamation plans approved by the NDEP. Pads were graded and revegetated
to allow for surface water runoff, which is routed to a long-term stormwater diversion channel that runs along the facility, designed for the 100-year, 24-hour storm
event. Process ponds have been closed and in 2023, process ponds for pads 2 (Process Pond #2), 4 (Overflow Pond #4) and NROM (Overflow Pond NROM) were converted to double-lined E-cells with leak detection to
passively manage draindown through evaporative disposal. E-cell conversion was completed in 2024 in accordance with approved plans and designs.
The following ponds were closed between 2017 and 2020:
•
Overflow Pond #2
•
Overflow Pond #3
•
Process Pond #4
•
South Barren Pond
•
Process Pond NROM
The following ponds were closed in 2023:
•
Closure of Process Pond #3
•
Conversion of Process Pond #2 to E-cell #1
•
Conversion of Overflow Pond #4 to E-cell #2
•
Conversion of Overflow Pond NROM to E-cell #3
Flows from heap leach pads 1 and 2 are routed via gravity piping to E-Cell 1, flow from heap leach pad 4 is routed via
gravity piping to E-Cell 2, and flows from heap leach pads 3 and NROM are routed via gravity piping to E-Cell 3.
17-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
17.2.4
Water Management
The project site is considered a zero-discharge facility. All contact stormwater is captured on-site, and facilities have been designed to manage stormwater in diversion channels and features to prevent off-site discharge of contact water. Draindown solution from the
heap leach pads is routed to and managed within the E-cells. The pit lake is passively contained.
17.2.5
Monitoring
Routine monitoring is conducted on a quarterly, semi-annual and annual basis as required in the WPCP. Monitoring includes groundwater, pit lake, heap leach pad
draindown, erosional stability of closed landforms, and identification of seeps. The site is in compliance with all current permits. There are no known Notices of Violation active at the site; however, some erosion has occurred on the North Waste
Rock Dump that is being monitored.
Tailings Storage Facility
The tailings storage facility is reclaimed and released, and monitoring is no longer required.
Waste Rock Dump Facilities
The waste rock dumps are
monitored semi-annually for physical stability and presence of seeps.
Heap Leach Facilities
The heap leach pads are monitored for erosion and stability. Process solution is monitored for weekly fluid in the leak detection systems. The draindown
solution is monitored on a quarterly basis from each pad, as well as combined E-Cell fluid.
Water Management
Seven groundwater wells are located around the perimeter of the facility to monitor any potential impacts to groundwater on a quarterly basis. The pit
lake is monitored continuously for water elevation, quarterly for surface water quality and semi-annually at different depths within the pit. Additionally, meteorological conditions at the site are monitored as required in the WPCP.
17.3
Project Permitting
Current permits for the site exist at the county, state and federal levels, and the Project will be subject to additional permits and amendments to ensure
compliance with regulatory requirements and to mitigate potential environmental impacts. Current permits at the site are referenced in Table 17-1 and include the Record of Decision for exploration and closure
from the Bureau of Land Management, a WPCP, Reclamation Permit, Surface Area Disturbance Permit, and Class III Solid Landfill Waiver from the NDEP, which may require modification for operations as described within this IA.
The Project is within public lands and is authorized under BLM 43 CFR 3809 mining regulations. Mining activities in accordance with the IA would require an
amendment to the current Plan of Operations, which would be submitted to the BLM for National Environmental Policy Act of 1969 (NEPA) determination. Following their review, the BLM will determine whether an EA or an EIS
is required for compliance with NEPA. The EA or EIS would be prepared, and would require additional baseline surveys to be conducted, in accordance with NEPA and BLM guidelines for mining on public lands. Baseline studies and
preparation of a new EA or EIS could take 12 to 36 months to complete for an operating site. Baseline studies would be required to assess current conditions for multiple resources including but not limited to groundwater and surface water,
17-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
flora and fauna, cultural and social environment, air and wildlife. During the NEPA process, baseline studies
will be utilized to facilitate the NEPA process and potential impacts to resources in the EA or EIS. Cultural resources determined to be significant by the Nevada State Historic Preservation Office (SHPO) office will need to be managed through
avoidance or approved mitigation during development.
State permits will need to be obtained from NDEP and other state agencies. The primary permit is the
WPCP in accordance with NAC 445A.350-445A.447, for any mining operation that has a “mine, waste rock piles, ore piles, beneficiation process components, processed ore disposal sites, and all associated
buildings and structures that have the potential to degrade waters of the state”. The Project currently has a WPCP for a closure facility, and a new permit would need to be obtained for mining and processing operations as described in this IA.
The Project would also require a new or modified Reclamation Permit in accordance with NAC519A.010-519A.415, “for any exploration, mining, milling, or other beneficiation process activity that proposes
to create disturbance of greater than five acres, or remove an excess of 36,500 tons of material from the earth in any calendar year.”
Required or
potential permits are included in Table 17-1.
Table 17-1: Required or
Potentially Required Permits
Regulatory Agency
Permit Name
Activity
Status
BLM
Record of Decision resulting from NEPA process
Mine Operation, Exploration
Will require modification through NEPA process
EPA
EPA/RCRA ID
Hazardous waste generation and storage
To be initiated
Federal Bureau of Alcohol. Tobacco, and Firearms
Explosives License
Transport, shipment, receiving, or possessing explosive materials
To be initiated
NDEP-BMRR
Water Pollution Control Permit
Protection for Waters of the State
Amended or new permit to be initiated
NDEP-BMRR
Water Pollution Control Permit (RIBS)
Discharge of water produced from the dewatering of the open pits
New permit to be initiated
NDEP-BMRR
Reclamation Permit
Reclamation Plan and Bond
Amended or New permit to be initiated
NDEP- BAPC
Air Quality Permit
Facilities that emit air pollutants
To be initiated
NDEP- BAPC
Surface Area Disturbance Permit
Surface disturbances of more than 5 acres for dust generation
Amended or New permit to be initiated
NDEP- BWPC
Mining Stormwater Permit
Control of stormwater discharges from mining facilities
To be initiated
NDEP- BWPC
Onsite Sewage Disposal Permit
Disposal of sewage
To be initiated
17-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
NDEP- BSDW
Potable Water Permit
Providing potable and drinking water
To be initiated
NDEP- BWM
Waste management Permit
Generation of waste and determination
To be initiated, Landfill application amended
NDWR
Permit to Appropriate Public Waters
Water rights for use or production
Amended
NDOW
Industrial Artificial Pond Permit
Protection of wildlife from process solutions
Amended
NDOT
Encroachment Permit
Transportation and use of roads to site
To be initiated
NDOM
Mine Registry Form
Registration of mining projects in Nevada
To be initiated
NDIR
Opening of Mine Notification
Business notification of opening a mine
To be initiated
Nevada State Fire Marshall
Emergency Response Plan
Inventory and response plan for hazardous materials
To be initiated
Humboldt County
Building Permits
Mine operations and facilities
To be initiated
Notes:
BAPC Bureau of Air Pollution Control
BLM Bureau of Land Management
BMRR Bureau of Mining Regulation
and Reclamation
BSDW Bureau of Safe Drinking Water
BWPC
Bureau of Water Pollution Control
BWM Bureau of Waste Management
EPA Environmental Protection Agency
NDEP Nevada Division of
Environmental Protection
NDIR Nevada Division of Industrial Relations
NDOM Nevada Division of Minerals
NDOT Nevada Department of
Transportation
NDOW Nevada Department of Wildlife
17.4
Social or Community Requirements
There are no known social or community issues that would have a material impact to the Project. Identified socioeconomic issues (employment, payroll, services
and supply purchases, and State and local tax payments) are anticipated to be positive through the creation of direct and indirect jobs. Hiring practices will include local staff to the extent practicable.
As many new development projects have been identified in the area, community and tribal engagement is a key element to the successful development of a mining
project. As the Project progresses beyond IA, Paramount will engage with the local community and tribal entities to allow an understanding of concerns, opportunities, and goals for the Project leading up to, during, and post operation.
Engagement at this level has not occurred to date but will occur as part of the mine planning and permitting process.
17-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
17.5
Mine Closure Requirements and Summary
The BLM and NDEP-BMRR require a closure plan to be submitted with the submittal of a Plan of Operations, which includes closure and reclamation cost estimate
for bonding as well as reclamation and closure plans for facilities and disturbance. A closure cost estimate is required to provide the BLM and/or NDEP surety bonds in the event the operator is unable to fulfill closure requirements to prevent
unnecessary or undue degradation of the environment. Closure planning is conceptual at this point, as the mine plan has not been fully developed. All facilities will be closed in accordance with applicable closure regulations. Growth media will be
salvaged from existing waste rock dumps and stockpiled for use in reclamation.
The open pit will become a pit lake, and earthen berms will be placed
around the perimeter at closure. Depending on water quality analysis and modeling during the Project, inert backfill or lime may be placed within the pit upon closure. This closure approach mirrors the current successful closed condition of the pit
lake.
The existing TSF is closed, and no additional closure is expected to occur.
The Heap Leach Pad will be recontoured to a final stable slope, and inert cover material or growth media will be placed on the top and slopes. The area will
be revegetated with an approved BLM seed mix. The top will be graded to allow for stormwater runoff. Solution management ponds will be drained and converted to evaporative cells to manage long-term solution. This closure approach mirrors the current
successful closed condition of the existing heap leach pads.
Waste rock dumps will be recontoured to a final stable slope and graded to allow for
stormwater runoff. Inert cover material or growth media will be placed on top and slopes, and the top and slopes will be revegetated with an approved BLM seed mix.
Buildings and facilities will be demolished and disposed of in accordance with applicable waste regulations, at an
on-site non-hazardous landfill. Roads, yards, and other ancillary disturbances will be graded to mirror pre-existing topography
and prevent erosion or ponding and revegetated with an approved BLM seed mix.
Reclamation bonding will be prepared using the State Reclamation Cost
Estimator (SRCE) model and submitted to the BLM and State agencies to provide financial assurance for the Project. The SRCE model was originally developed as a cooperative effort between the NDEP-BMRR, the U.S. Department of the Interior, BLM, and
the Nevada Mining Association (NVMA), to facilitate accuracy, completeness, and consistency in the calculation of costs for mine site closure and reclamation. It is not possible to prepare a SRCE at this stage due to the preliminary nature of the
project development. However, based on the size and processing rate described in this IA, a preliminary closure cost estimate ranges between US$35 million to US$60 million.
17.6
QP Opinion
The SLR QP is of the opinion that the current plans are adequate to address any issues related to environmental compliance, permitting and local individuals or
groups. Plans will be modified as needed to address new issues as they arise.
17-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
18.0
Capital and Operating Costs
The capital and operating costs presented in this section include those required to mine and process Mineral Resources from Sleeper Gold Mine. All capital and
operating costs in this section are expressed in Q2 2026 US dollars, and unit costs are based on metric tonnes.
SLR’s forecast capital and
operating cost estimates for the development of Mineral Resources have been prepared using a combination of first principles estimating, benchmarking against comparable projects, and available contractor quotations.
In accordance with the American Association of Cost Engineers (AACE) classification system, the estimates are predominantly Class 5 (scoping-level),
indicating a preliminary level of project definition. At this stage, the expected accuracy range is approximately -50% to +50%.
A 25% contingency allowance has been applied to the base capital estimate. This contingency is considered appropriate for a Class 5 estimate and is
intended to account for uncertainties associated with limited scope definition, quantities, unit pricing, and execution factors. The contingency does not eliminate the inherent variability in a scoping-level estimate but provides a reasonable
allowance for the identified and anticipated risks consistent with the current level of engineering and project development.
18.1
Capital Costs
Life of mine (LOM) capital costs for the Project are estimated at $596.1 million, and reclamation/closure costs are estimated at $52.4 million, as
summarized in Table 18-1. Initial capital is $201.1 million and is considered reasonable because (i) the mining fleet will not be purchased as the Base Case assumes contract mining, and (ii) the
leach pad will be built in phases.
Costs related to the leach pad are needed to provide additional space for mined process feed. Finishing the Phase 2
construction for the leach pad is estimated to cost approximately $19 million (year 6), Phase 3 is estimated at $19 million (year 9), and Phase 4 will cost $19 million (year 12). These costs have been distributed over time.
As dewatering capital costs will start in year 3, these are considered sustaining capital; the LOM total for dewatering costs is $139 million (excluding
indirect costs).
The Project’s economic analysis includes $52.4 million for Mine Reclamation and Closure, per the updated asset retirement
obligation (ARO) estimate and LOM reclamation spend schedule as of 2026. SLR’s initial estimate for re-permitting the Project is $5.5 million.
Table 18-1: LOM Capital Cost Estimate
Capital Area
LOM Total
($ 000)
Initial Growth and Development Capital
201,085
Sustaining Capital
342,544
Reclamation/Closure Capital
52,432
Total
596,062
18-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 18-2: LOM Capital Cost Estimate by Major Area
Capital Area
Initial Growth and
Development
Capital ($ 000)
Sustaining Capital
($ 000)
LOM Total
($ 000)
(Year -2 to Year -1)
(Year 1 to Year 17)
(Year -2 to Year 17)
Mining – Mine Equipment
(Contract Mining)
—
—
—
Mining – Dewatering
—
138,866
138,866
Processing – Leach Pad / Ponds
40,635
58,132
98,767
Process – Recovery Plant
56,964
2,316
59,280
Infrastructure
23,497
41,007
64,504
Indirects
39,772
33,714
73,486
Contingency
40,217
68,509
108,726
Total Before Closure
201,085
342,544
543,629
Reclamation / Closure Capital
52,432
52,432
Total
201,085
394,977
596,062
18.2
Operating Costs
Table 18-3 presents the average LOM unit operating costs.
Table 18-3: LOM Average Unit Operating Costs
Mining Area
Unit Mining Cost
OP Mining-Base ($/t mined) – typical year of full production
$
2.40/t
OP Mining-Out of Scope Work ($ 000/yr) – LOM annual
average
$
4,867/yr
Total Mining ($/t processed)
$
6.37
Total Dewatering ($/t processed)
$
0.59
Processing ($/t processed)
$
5.55
G&A ($/t processed)
$
0.52
Total ($/t processed)
13.03
18.2.1
Primary Consumable Costs
Power costs are estimated based on NV Energy Northern Nevada tariffs and benchmarked against comparable industrial operations, with an assumed high load factor
typical of continuous mining operations. SLR used US$0.085/kWh for the Base Case.
Diesel fuel costs are based on
off-highway (dyed) diesel pricing in northern Nevada, benchmarked against recent retail prices, less applicable federal and state fuel taxes, and adjusted for bulk supply conditions typical of large mining
operations. SLR used US$3.50 per US gallon ($0.92/L).
Propane costs are based on bulk delivered pricing in northern Nevada, benchmarked against wholesale
propane indices and commercial delivery rates. A base case of approximately $2.25 per US gallon has been assumed.
18-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Sodium cyanide costs are estimated at approximately US$2,650/t (equivalent to approximately US$2,400/st)
delivered to site.
It has been assumed that high-calcium pebble quicklime (CaO) will be used and slaked on site as needed. Costs for the type of lime are
assumed to be US$375/t.
18.2.2
Workforce
Sleeper will be one of the largest employers in Humboldt County, Nevada, and it will contribute significant tax revenue to the State of Nevada. The average
full-time employee count in year 3 of the operation is estimated at 220. PGN anticipates that approximately 75% of the workforce will live in Humboldt County and approximately 12.5% in Elko and Eureka Counties, with the remaining workforce from
other areas. A tabulation of the Project’s workforce is presented in Table 18-4. On average, 75% of the workforce is paid hourly.
The proposed operation would employ a conventional four-crew rotation on 12-hour shifts to support continuous 24-hour-per-day, year-round mining and processing activities. The total workforce is estimated at approximately 220 personnel,
including both hourly and salaried staff. The hourly workforce, comprising approximately 170 personnel, supports mining, maintenance, processing, and site services, while the remaining 55 personnel consist of supervisory, technical, engineering,
geological, and administrative staff.
Mine operations represent the largest component of the workforce, followed by maintenance and processing functions.
Staffing levels reflect the use of a 150 t class truck and shovel fleet, which reduces operator requirements relative to smaller truck configurations, as well as the relatively simple processing flowsheet consisting of crushing, heap leaching, and
Merrill-Crowe recovery. Additional personnel are allocated to support pit dewatering operations, which represent a significant operational component at the site. The absence of an accommodation camp further reduces total staffing requirements, as
all personnel are expected to operate on a drive-in/drive-out basis from nearby communities.
Table 18-4: Sleeper Workforce (Year 3)
Category
Personnel
Mine Operations
80-90
Mine Maintenance
40-50
Processing / Water / Merrill-Crowe
25-35
Geology / Ore Control
8-12
Engineering
8-12
Supervision
12-16
HSE / Environmental
6-10
Warehouse / Admin / Support
20-25
Total
210–220
18-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
19.0
Economic Analysis
The economic analysis presented in this IA considers the processing of the in situ oxide and mixed Mineral Resources and the Mineral Resources in the existing
waste rock dumps only.
The economic analyses contained in this TRS are preliminary in nature and are based, in part, on Inferred Mineral Resources that
are considered too speculative geologically to have modifying factors applied to them that would enable them to be categorized as Mineral Reserves. It is important to note that, unlike Mineral Reserves, Mineral Resources do not have demonstrated
economic viability, and there is no certainty that the economic projections presented in this IA will be realized.
Taxes and revenues are assumed.
Discounted cash flow analyses are based on assumed production rates and revenues from available Mineral Resources.
SLR notes that the economic analysis
presented in this section is based on revenue from gold and silver only. After-tax cash flow projections have been generated from the Base Case and the Alternative Case LOM production schedules and capital and
operating cost estimates, as summarized in the sub-sections that follow.
19.1
Base Case
The Project’s Base Case is based on a production plan with a mine life of 17 years and includes a mineralized material inventory of approximately:
•
Approximately 47 million tonnes (Mt) of waste rock dump material, classified as Inferred Mineral Resources,
grading approximately 0.28 g/t gold (Au)
•
In situ oxide and mixed Mineral Resources, including approximately 2 Mt Measured Resources grading 0.29 g/t Au,
78 Mt Indicated Resources grading 0.26 g/t Au, and 49 Mt Inferred Resources grading 0.24 g/t Au.
The Base Case mineralized
material inventory includes approximately 95.6 Mt of Inferred Mineral Resources containing 788 koz of gold and 6,484 koz of silver, representing approximately:
•
55% of the total Base Case tonnage.
•
54% of the total Base Case gold ounces.
•
41% of the total Base Case silver ounces.
The remaining material in the mined inventory is from Measured and Indicated Mineral Resources. A summary of the Base Case criteria is provided below.
19.1.1
Economic Criteria
19.1.1.1
Revenue
•
Mine life: 17 years.
•
LOM production and processing plans as summarized in Table 13-9 and Table
13-8, respectively.
•
30,000 tpd mineralized material stacked (approximately 10.8 Mt per year), average stacked grade of 0.26 g/t Au
and silver grade of 2.79 g/t Ag (ROM, crushed, and stockpile mine plan).
19-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Mine life averages 65,000 ounces per year of gold recovered and 205,000 ounces per year of silver recovered from
the mine plan, with LOM stacked process gold recovery averaging 75.8% and silver recovery averaging 22.1%.
•
Total 1.11 Moz of gold recovered, and 3.5 Moz of silver recovered over the LOM operation.
•
The summary of the physicals in the financial model is listed in Table
19-1. It has been estimated that 420 koz of gold and 2,952 koz of silver are in waste rock dumps and are accounted for in the financial model over the first five years of Leach Pad operations.
•
Gold and silver payable at the refinery are assumed at 99.95% Au payable and 97.0% Ag payable
•
Gold and silver prices are based on analyst consensus price forecasts from the end of March 2026. For the
economic analysis it was assumed:
•
Y1: US$4,000/oz Au and US$59.00/oz Ag
•
Y2 to Y17: US$3,600/oz Au and US$48.00/oz Ag
•
Resulting in LOM net realized prices of:US$3,618/oz Au and US$48.70/oz Ag
•
Net Smelter Return (NSR) includes doré refining, transport, and insurance costs.
•
NSR royalty assumed at 3%. The property is subject to different royalties between 0.5% and 3%, and for modeling
purposes was assumed at an overall 3%
•
Revenue is recognized at the time of gold and silver production.
•
Non-cash inventory adjustments are not included in the SLR cash flow
model.
•
LOM net revenue is US$4,014 million (after royalty, transportation, and refining charges)
Table 19-1: Sleeper Base Case Production Physicals Summary
Physicals
Value
Total Mineralized Material Stacked (kt)
175,445
Max Process Rate (tpd)
30,000
Au Head Grade (g/t)
0.26
Ag Head Grade (g/t)
2.79
Contained Au (koz)
1,459
Contained Ag (koz)
15,721
Average Recovery, Au
75.8
%
Average Recovery, Ag
22.1
%
Recovered Au (koz)
1,106
Recovered Ag (koz
3,481
Payable Au (koz)
1,101
Payable Ag (koz)
3,376
Avg Annual Au—LOM (koz / yr)
65
Avg Annual Ag Sales—LOM (koz / yr)
199
19-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
19.1.1.2
Costs
•
Pre-production period assumes 24 months (Year -1 to Year -2).
•
Initial (Growth) and development capital costs total US$201 million
•
Mine life sustaining capital totals US$343 million
•
Final reclamation costs from after year 17 total US$52.4 million.
•
Mine life capital totals US$596 million.
•
Average LOM operating cost is US$13.03 per tonne stacked.
•
Open pit operating costs of US$2.53 per tonne mined (US$6.37 per tonne stacked). Includes out-of-scope mining operations.
•
Dewatering operating costs of US$0.59 per tonne stacked.
•
Processing operating costs of US$5.55 per tonne stacked.
•
Site services & general and administrative (G&A) costs of US$5.6 million per year for years of
full production (LOM average of US$0.52 per tonne stacked).
•
Life of Mine production plan as summarized in Table 13-9.
19.1.1.3
Taxation and Royalties
The federal and state income taxes are summarized in Table 19-2.
Table 19-2: Federal and State Tax Summary
Tax Type
Rate
Federal Corporate Income Tax
21.0%
Nevada Corporate Income Tax
5.0% of federal taxable income
Royalties and Severance Fees
Based on ore extracted (state-regulated).
A total of five NSR royalties apply to future mineral production from portions of the Project. These royalties are summarized
in Table 19-3.
Table 19-3: Royalties Summary
Royalty Holder
Royalty Terms
Snyder Syndicate
1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, AL SS, AND ALL BLUE.)
Franco-Nevada U.S. Corporation
2% NSR on minerals produced from all 2,474 claims
Evolving Gold / Quinton Hennigh
2% NSR royalty on all SS and all SP claims.
Dry Lake Placer Association
3% NSR on Dry Lake Placer claims
ICN Resources Ltd.
0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims
For the economic analysis and financial modeling purposes, an overall 3% NSR royalty rate was assumed over the LOM.
19-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
19.1.2
Cash Flow Analysis
SLR has prepared its own unlevered after-tax LOM cash flow model based on the information contained in this TRS to
confirm the physical and economic parameters of the Project.
The Project’s Base Case economics have been evaluated using the discounted cash flow
method, considering annual processed tonnages and the associated gold and silver grades. The process gold and silver recoveries, gold and silver price forecasts, operating costs, refining and transportation charges, royalties, and initial and
sustaining capital expenditures were also considered.
The Project, as currently designed, has variations in the mining and processing amounts over its
planned 17-year life. These variations are shown in Figure 19-1, Figure 19-2, and Figure
19-3.
Figure 19-1: Mine Production Profile by Material Movement
– Base Case
19-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 19-2: Process Production Profile and Head Grade –
Base Case
Figure 19-3: Annual Processing Gold Production and Head Grade Profile –
Base Case
The economic analysis demonstrates that the Project’s Mineral Resources have reasonable prospects for economic
extraction at the LOM net average realized prices of US$3,618/oz Au and US$48.70/oz Ag, and with long-term prices of US$3,600/oz Au and US$48.00/oz Ag, and that further advancement of Project studies is warranted.
A base discount rate of 8% has been applied in this TRS for the Project. This rate is considered reasonable for evaluating a precious metals project at a
preliminary level of project definition, such as Sleeper. Discounted present values of annual cash flows are summed to arrive at the Mine’s Base Case NPV.
19-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Considering the Project’s Base Case on a stand-alone basis, the Project’s pre-tax NPV at an 8% discount rate is approximately US$505 million, and the pre-tax internal rate of return (IRR) is approximately 51.3%. The Project’s after-tax NPV at an 8% discount is approximately US$402 million, the after-tax IRR is approximately 44.5%, and the payback period is approximately 1.4 years from the
start of production.
The LOM undiscounted pre-tax cash flow totals approximately US$1,132 million, and the
LOM undiscounted after-tax cash flow totals approximately US$918 million.
SLR has also run a stand-alone
economic analysis for the Project using flat resource metal prices of US$3,100/oz Au and US$34/oz Ag, and the analysis demonstrates that the Project’s Mineral Resources also have reasonable prospects for economic extraction at these prices.
The Project’s after-tax free cash flow profile and gold payable metal per year are presented in Figure 19-4.
Figure 19-4: Base Case Project
After-Tax Metrics Summary
Table 19-4 shows the LOM total metrics for the Sleeper mine as currently designed.
Due to the length of the mine life, the full annual cash flow model is presented in Appendix 2 Cash Flow Summaries.
Table 19-4: Total Life of Mine Metrics – Base Case
Item
Units
Base Case Values
Realized Market Prices
Au Price
US$
/oz
$
3,618
Ag Price
US$
/oz
$
48.70
Payable Gold
koz
1,101
Payable Silver
koz
3,376
19-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Item
Units
Base Case Values
Total Gross Revenue
US$
million
4,147
Mining Cost
US$
million
(1,117
)
Dewatering Costs
US$
million
(104
)
Process Cost
US$
million
(974
)
G & A Cost
US$
million
(92
)
Refining/Freight
US$
million
(8
)
Royalties
US$
million
(124
)
Total Operating Costs
US$
million
(2,418
)
Operating Margin (EBITDA)
US$
million
1,728
Federal Income Tax
US$
million
(134
)
State Tax—Nevada Mining Tax
US$
million
(80
)
Working Capital
US$
million
0
Operating Cash Flow
US$
million
1,514
Development (Initial) Capital
US$
million
(201
)
Sustaining Capital
US$
million
(343
)
Closure/Reclamation Capital
US$
million
(52
)
Total Capital
US$
million
(596
)
Pre-tax Free Cash Flow
US$
million
1,132
Pre-tax NPV @ 5%
US$
million
670
Pre-tax NPV @ 8%
US$
million
505
Pre-Tax IRR
%
51.3
%
Pre-Tax Payback
years
1.3
After-tax Free Cash Flow
US$
million
918
After-tax NPV @ 5%
US$
million
539
After-tax NPV @ 8%
US$
million
402
After-Tax IRR
%
44.5
%
After-Tax Payback
years
1.4
Note:
Numbers may not add due to rounding.
The Project’s World Gold Council Adjusted Operating Cost (AOC) net of Ag by-product credits is US$2,048/oz Au
payable. The mine life sustaining capital costs are US$359/oz Au payable, for an All-in Sustaining Cost (AISC) net of Ag by-products credits of US$2,407/oz Au payable.
The average annual gold sales during operations are approximately 64,746 payable ounces. Table 19-5 shows the
AISC build-up.
19-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 19-5: Base Case
All-in Sustaining Costs Composition
Item
Total LOM
($ million)
Unit Cost
($/oz Au)
Mining
1,117
1,015
Dewatering
104
94
Process
974
885
Site G&A
92
83
Subtotal Site Costs
2,286
2,077
Refining/Freight
8
8
Mining Royalties
124
113
Total Cash Costs before by-product
credits
2,418
2,197
Ag By-Product Credit
(164
)
(149
)
Total Cash Costs net of by-product
credits
2,254
2,048
Sustaining Capital Cost
343
311
Closure/Reclamation Costs
52
48
Total Sustaining Costs
395
359
Total All-in Sustaining Costs
2,649
2,407
Note:
Numbers may not add due to rounding.
The AISC calculated in the cash flow analysis reflects the benefit of low-cost ounces already stacked on the heap leach
pads, compared to AISC estimated in a steady-state model that assumes current input costs. Much of Sleeper’s near-term production comes from material mined and placed in prior years, when gold prices, fuel, and consumable costs were lower.
These ounces require minimal additional spending to recover, resulting in lower realized cash costs. As these legacy ounces are depleted and replaced with newly mined material, unit costs are expected to gradually normalize toward long-term levels.
19.1.3
Sensitivity Analysis
The Project’s Base Case risks can be identified in both economic and non-economic terms. Key economic risks were
examined by running cash flow sensitivities:
•
Metal prices
•
Head grade
•
Metallurgical Recovery
•
Operating costs
•
Pre-production and sustaining capital costs
19-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Where possible, the after-tax NPV 8% sensitivities relative to the
Base Case have been calculated for -20% to +20% variations in head grade and recovery, and -20% to +30% in metal prices. Operating and capital cost sensitivities have
been calculated at -15% to +35% variations. The sensitivities are shown in Table 19-6 and Figure 19-5
Table 19-6: Base Case After-Tax Sensitivity Analyses
Variance
Head Grade
(g/t Au)
NPV at 8%
(US$ 000)
80%
0.21
91,329
90%
0.23
249,814
100%
0.26
402,353
110%
0.28
554,310
120%
0.31
706,171
Variance
Recovery
(% Au)
NPV at 8%
(US$ 000)
80%
60.7
%
91,329
90%
68.2
%
249,814
100%
75.8
%
402,353
110%
83.4
%
554,310
120%
91.0
%
706,171
Variance
Metal Prices
(US$/oz Au)
NPV at 8%
(US$ 000)
80%
$
2,880
90,637
90%
$
3,240
249,505
100%
$
3,600
402,353
110%
$
3,960
554,614
131%
$
4,700
866,553
Variance
Operating Costs
(US$/t)
NPV at 8%
(US$ 000)
85%
$
11.07
523,205
93%
$
12.05
462,780
100%
$
13.03
402,353
118%
$
15.31
259,020
135%
$
17.59
102,091
Variance
Capital Costs
(US$ 000)
NPV at 8%
(US$ 000)
85%
$
506,652
460,155
93%
$
551,357
431,254
100%
$
596,062
402,353
118%
$
700,372
334,916
135%
$
804,683
267,480
19-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 19-5: Base Case
After-Tax Sensitivity Analysis
19.2
Alternative Case—Measured and Indicated Only
19.2.1
Economic Criteria
The Alternative Case assumes a production schedule based exclusively on Measured and Indicated Mineral Resources, resulting in a mineralized material inventory
of 62.4 Mt and a projected mine life of seven years. A summary of the Measured and Indicated Only Case criteria is provided below.
19.2.1.1
Revenue
•
Mine life: 7 years.
•
30,000 tpd mineralized material stacked (approximately 10.8 Mt per year), average stacked grade of 0.27 g/t Au
and silver grade of 3.83 g/t Ag (ROM, crushed, and stockpile mine plan).
•
Mine life averages 58,500 ounces per year of gold recovered and 200,000 ounces per year of silver recovered from
the mine plan, with LOM stacked process gold recovery averaging 74.3% and silver recovery averaging 18.1%.
•
Total 410 koz of gold recovered, and 1,396 koz of silver recovered over the LOM operation.
•
Gold and silver payable at the refinery are assumed at 99.95% Au payable and 97% Ag payable
•
Gold and silver prices are based on analyst consensus price forecasts from the end of March 2026. For the
economic analysis was assumed:
19-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Y1: US$4,000/oz Au and US$59.00/oz Ag
•
Y2 to Y7: US$3,600/oz Au and US$48.00/oz Ag
•
Resulting in LOM net realized prices of:US$3,622/oz Au and US$48.00/oz Ag
•
Net Smelter Return (NSR) includes doré refining, transport, and insurance costs.
•
NSR royalty assumed at 3%. The property is subject to different royalties between 0.5% and 3%, and for modeling
purposes was assumed at an overall 3%
•
Revenue is recognized at the time of gold and silver production.
•
Non-cash inventory adjustments are not included in the SLR cash flow
model.
•
LOM net revenue is US$1,493 million (after royalty, and transportation, and refining charges).
Table 19-7: Sleeper Alternative Case Production Physicals Summary
Physicals
Value
Total Mineralized Material Stacked (kt)
62,447
Max Process Rate (tpd)
30,000
Au Head Grade (g/t)
0.27
Ag Head Grade (g/t)
3.83
Contained Au (koz)
552
Contained Ag (koz)
7,697
Average Recovery, Au
74.3
%
Average Recovery, Ag
18.1
%
Recovered Au (koz)
410
Recovered Ag (koz
1,396
Payable Au (koz)
408
Payable Ag (koz)
1,354
Avg Annual Au Sales-LOM (koz / yr) – full production
64
Avg Annual Ag Sales-LOM (koz / yr) – Full production
218
19.2.1.2
Costs
•
Pre-production period assumes at 24 months (Year -1 to Year -2).
•
Initial (Growth) and development capital costs total US$335 million.2
•
Mine life sustaining capital totals US$120 million
•
Final reclamation costs from after year 7 total US$18.7 million.
•
Mine life capital totals US$473 million.
2
Note that, in the Alternative Case, only in situ Measured and Indicated Mineral Resources are included in the
mining inventory. The existing waste dumps are not included in the LOM plan for the Alternative Case because they are currently classified as Inferred Mineral Resources. As dewatering of the in situ Mineral Resources must start before mining, the
rapid infiltration basins cost and the dewatering costs are Initial Capital Costs for the Alternative Case rather than Sustaining Capital as in the Base Case.
19-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Average LOM operating cost is US$11.87 per tonne stacked.
•
Open pit operating costs of US$2.59 per tonne mined (US$5.03 per tonne stacked). Includes out-of-scope mining operations.
•
Dewatering operating costs of US$0.73 per tonne stacked.
•
Processing operating costs of US$5.55 per tonne stacked.
•
Site services & general and administrative (G&A) costs of US$5.6 million per year for years of
full production (LOM average of US$0.56 per tonne stacked).
19.2.1.3
Taxation and Royalties
The federal and state income taxes are summarized in Table 19-8
Table 19-8: Federal and State Tax Summary
Tax Type
Rate
Federal Corporate Income Tax
21.0%
Nevada Corporate Income Tax
5.0% of federal taxable income
Royalties and Severance Fees
Based on ore extracted (state-regulated).
A total of five NSR royalties apply to future mineral production from portions of the Project. These royalties are summarized
in Table 19-9.
Table 19-9: Royalties Summary
Royalty Holder
Royalty Terms
Snyder Syndicate
1% NSR on the 1,044 Sleeper Gold Mine claims (All claims, EXCEPT for ALL MIMI, ALL SP, AL SS, AND ALL BLUE.)
Franco-Nevada U.S. Corporation
2% NSR on minerals produced from all 2,474 claims
Evolving Gold / Quinton Hennigh
2% NSR royalty on all SS and all SP claims.
Dry Lake Placer Association
3% NSR on Dry Lake Placer claims
ICN Resources Ltd.
0.5% NSR on all SS and all SP claims; 1.5% NSR on all Blue claims
For the economic analysis and financial modeling purposes, an overall 3% NSR royalty rate was assumed over the LOM.
19.2.2
Cash Flow Analysis
SLR has prepared its own unlevered after-tax LOM cash flow model based on the information contained in this TRS to
confirm the physical and economic parameters of the Project.
The Project’s Alternative Case economics have been evaluated using the discounted cash
flow method, considering annual processed tonnages and the associated gold and silver grades. The process gold and silver recoveries, gold and silver price forecasts, operating costs, refining and transportation charges, royalties, and initial and
sustaining capital expenditures were also considered.
19-12
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
The Project, as currently designed, has variations in the mining and processing amounts over its planned 7-year life. These variations are shown in Figure 19-6, Figure 19-7, and Figure 19-8.
Figure 19-6: Mine Production Profile by Material Movement – Alternative Case
Figure 19-7: Process Production Profile and Head Grade – Alternative Case
19-13
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 19-8: Annual Processing Gold Production and Head Grade
Profile
The economic analysis demonstrates that the Project’s Mineral Resources have reasonable prospects for economic
extraction, at the LOM net average realized prices of US$3,622/oz Au and US$48.40/oz Ag, with long-term prices of US$3,600/oz Au and US$48.00/oz Ag, and that further advancement of Project studies is warranted.
A base discount rate of 8% has been applied in this TRS for the Project. This rate is considered reasonable for evaluating a precious metals project at a
preliminary level of project definition, such as Sleeper. Discounted present values of annual cash flows are summed to arrive at the Mine’s Base Case NPV.
Considering the Project’s Alternative Case on a stand-alone basis, the Project’s pre-tax NPV at an 8%
discount rate is approximately US$59 million, and the pre-tax internal rate of return (IRR) is approximately 11.5%. The Project’s after-tax NPV at an 8%
discount is approximately US$31 million, the after-tax IRR is approximately 9.9%, and the payback period is approximately 4.9 years from the start of production.
The LOM undiscounted pre-tax cash flow totals approximately US$279 million, and the LOM undiscounted after-tax cash flow totals approximately US$232 million.
The Project’s
after-tax free cash flow profile and gold payable metal per year are presented in Figure 19-9.
19-14
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 19-9: Alternative Case Project After-Tax Metrics Summary
Table 19-10 shows the LOM total metrics for the Project’s Alternative Case.
The full annual cash flow model is presented in Appendix 2 Cash Flow Summaries.
Table 19-10: Total Life of
Mine Metrics – Alternative Case (Measured and Indicated Only)
Item
Units
Base Case Values
Realized Market Prices
Au Price
US$/oz
$
3,622
Ag Price
US$/oz
$
48.40
Payable Gold
koz
408
Payable Silver
koz
1,354
Total Gross Revenue
US$ million
1,542
Mining Cost
US$ million
(314
)
Dewatering Costs
US$ million
(45
)
Process Cost
US$ million
(347
)
G & A Cost
US$ million
(35
)
Refining/Freight
US$ million
(3
)
Royalties
US$ million
(46
)
Total Operating Costs
US$ million
(790
)
Operating Margin (EBITDA)
US$ million
752
Federal Income Tax
US$ million
(12
)
19-15
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Item
Units
Base Case Values
State Tax - Nevada Mining Tax
US$ million
(34
)
Working Capital
US$ million
0
Operating Cash Flow
US$ million
705
Development (Initial) Capital
US$ million
(335
)
Sustaining Capital
US$ million
(120
)
Closure/Reclamation Capital
US$ million
(19
)
Total Capital
US$ million
(473
)
Pre-tax Free Cash Flow
US$ million
279
Pre-tax NPV @ 5%
US$ million
124
Pre-tax NPV @ 8%
US$ million
59
Pre-Tax IRR
%
11.5
%
Pre-Tax Payback
years
4.7
After-tax Free Cash Flow
US$ million
232
After-tax NPV @ 5%
US$ million
91
After-tax NPV @ 8%
US$ million
31
After-Tax IRR
%
9.9
%
After-Tax Payback
years
4.9
Note: Numbers may not add due to rounding.
The Project’s World Gold Council Adjusted Operating Cost (AOC) net of Ag by-product credits is US$1,778/oz Au
payable. The mine life sustaining capital costs are US$339/oz Au payable, for an All-in Sustaining Cost (AISC) net of Ag by-products credits of US$2,117/oz Au payable.
The average annual gold sales during operations are approximately 64,267 payable ounces.
Table 19-11 shows the AISC build-up.
Table 19-11: Alternative Case All-in Sustaining Costs Composition
Item
Total LOM
($ million)
Unit Cost
($/oz Au)
Mining
314
770
Dewatering
45
111
Process
347
850
Site G&A
35
86
Subtotal Site Costs
741
1,817
19-16
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Item
Total LOM
($ million)
Unit Cost
($/oz Au)
Refining/Freight
3
8
Mining Royalties
46
113
Total Cash Costs before by-product
credits
790
1,938
Ag By-Product Credit
(65
)
(161
)
Total Cash Costs net of by-product
credits
725
1,778
Sustaining Capital Cost
120
293
Closure/Reclamation Costs
19
46
Total Sustaining Costs
138
339
Total All-in Sustaining Costs
863
2,117
Note: Numbers may not add due to rounding.
19.2.3
Sensitivity Analysis
The project’s Alternative Case risks can be identified in both economic and non-economic terms. Key economic
risks were examined by running cash flow sensitivities:
•
Metal prices
•
Head grade
•
Metallurgical Recovery
•
Operating costs
•
Pre-production and sustaining capital costs
Where possible, the after-tax NPV 8% sensitivities relative to the Alternative Case have been calculated for -20% to +20% variations in head grade and recovery, and -20% to +30% in metal prices. Operating and capital cost sensitivities have been calculated at -15% to +35% variations. The sensitivities are shown in Table 19-12 and Figure 19-10.
19-17
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Table 19-12: Alternative Case
After-Tax Sensitivity Analyses
Variance
Head Grade
(g/t Au)
NPV at 8%
(US$000)
80%
0.22
(140,512)
90%
0.25
(54,187)
100%
0.27
31,106
110%
0.30
106,275
120%
0.33
180,559
Variance
Recovery (%
Au)
NPV at 8%
(US$000)
80%
59.4%
(140,512)
90%
66.9%
(54,187)
100%
74.3%
31,106
110%
81.7%
106,275
120%
89.2%
180,559
Variance
Metal Prices
(US$/oz Au)
NPV at 8%
(US$000)
80%
$2,880
(140,868)
90%
$3,240
(54,363)
100%
$3,600
31,106
110%
$3,960
106,424
131%
$4,700
258,552
Variance
Operating Costs
(US$/t)
NPV at 8%
(US$000)
85%
$10.09
87,662
93%
$10.98
59,481
100%
$11.87
31,106
118%
$13.94
(44,879)
135%
$16.02
(122,212)
Variance
Capital Costs
(US$000)
NPV at 8%
(US$000)
85%
$401,924
90,847
93%
$437,387
60,977
100%
$472,851
31,106
118%
$555,600
(38,591)
135%
$638,349
(108,288)
19-18
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Figure 19-10: Alternative Case
After-Tax Sensitivity Analysis
19-19
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
20.0
Adjacent Properties
The Project is located within the Sleeper Mining District of Humboldt County, Nevada, an area that hosts several past-producing precious-metal deposits and
active exploration properties.
Several exploration properties occur within a 10 km radius of the Project, targeting similar epithermal mineralization
hosted in Miocene volcanic rocks. Historical exploration programs in the district have included geologic mapping, geochemical sampling, geophysical surveys, and drilling.
Publicly available information indicates that these adjacent properties host epithermal gold-silver mineralization genetically related to regional volcanic
and structural systems.
The SLR QP has not independently verified this information, and this information is not necessarily indicative of the
mineralization at the Sleeper Gold Project.
20-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
21.0
Other Relevant Data and Information
21.1
Sleeper PFS - Project Overview and Execution Philosophy
The Project Execution Plan (PEP) defines the strategy for advancing the Project from the current S-K 1300 IA stage
through Pre-Feasibility Study (PFS), permitting, construction, and into operations. The development scenario evaluated in the IA consists of a 30,000 tpd open pit mining operation feeding a probable processing
scenario comprising a crush–agglomerate–heap-leach process with Merrill-Crowe recovery.
The scope of the IA, and therefore this PEP, is
limited to the reprocessing of waste dump material and the mining of in situ oxide and mixed mineralization. Processing will occur on a single-use heap leach pad designed in accordance with Nevada regulatory
requirements.
The execution philosophy is based on a practical and capital-efficient restart strategy, incorporating the following principles:
•
Low initial capital intensity with contractor mining and modular process infrastructure. This approach minimizes
upfront fleet purchases and reduces financing requirements during early project development.
•
Immediate advancement to a PFS, with overlapping technical, environmental, and permitting workstreams to
accelerate the overall project schedule.
•
Maximizing the use of existing disturbed areas, including waste rock dumps and previously impacted process areas,
to streamline permitting and reduce environmental footprint.
•
Parallel advancement of engineering, metallurgical test work, and environmental baseline programs to avoid
sequential delays.
•
Maintaining optionality for future expansion, including potential treatment of sulfide material under a separate
development scenario.
21.2
Project Development Strategy
21.2.1
Development Pathway
The Project will advance through a structured, but overlapping, series of development phases designed to minimize schedule duration while maintaining technical
rigor:
•
PFS Phase (Immediate Initiation): Comprehensive technical evaluation, including updated mine planning,
metallurgical test work, cost estimation, and trade-off studies.
•
Permitting and Baseline Study Advancement: Collection of environmental baseline data and preparation of
regulatory submissions. This phase represents the Project’s critical path.
•
Definitive Engineering: Advancement of engineering design to a level sufficient to support construction,
procurement, and cost certainty.
•
Early Works and Site Preparation: Initial site activities, including relocation of existing infrastructure,
earthworks, and utility installation.
•
Construction and Commissioning: Development of process facilities, heap leach pad, ponds, and supporting
infrastructure, followed by commissioning.
21-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Ramp-up to Steady-State Operations: Progressive increase to the design
throughput of approximately 30,000 tpd.
The Company intends to initiate the PFS immediately and pursue an execution strategy targeting
first production approximately 24 months from initiation, subject to permitting timelines and technical outcomes.
21.3
Workstreams and Scope of Activities
21.3.1
Geological, Resource, and Drilling Programs
A comprehensive drilling and sampling program will be implemented to support resource confidence, metallurgical characterization, and engineering design. The
program is designed to address both waste dump material and in situ oxide and mixed mineralization.
Key programs are listed:
•
Sonic and reverse circulation (RC) drilling of waste dumps, TSF, and heap leach pads to characterize grade
distribution, material variability, and bulk density.
•
RC drilling of in situ oxide and mixed material to support resource classification upgrades and mine planning.
•
Twin drilling and QA/QC validation to confirm historical data reliability and ensure compliance with reporting
standards.
•
Bulk sampling to provide representative material for metallurgical test work and variability analysis of waste
dumps, heap leach pads and TSF.
The outputs of these programs will support updates to the Mineral Resource Estimate, development of a
geometallurgical model, and refinement of mine planning inputs for the PFS.
21.3.2
Metallurgical Test Work
Metallurgical test work is a critical component of technical risk reduction, particularly given the presence of mixed oxides and transition materials, as well
as reprocessed waste rock dumps.
The metallurgical program will include the following:
•
Bottle roll testing across all defined material domains to establish baseline recoveries and reagent consumption.
•
Column leach testing at multiple crush sizes to evaluate heap leach performance and optimize particle size
distribution.
•
Agglomeration optimization to improve permeability and leach kinetics for fine-grained or clay-rich materials.
•
Permeability testing to assess heap stability and solution flow characteristics.
•
Cyanide consumption and reagent optimization to define operating cost inputs.
•
Gold and silver recovery variability testing to establish recovery models by domain.
•
Evaluation of gravity recovery potential, where applicable.
Deliverables will include recovery models by domain, heap leach design criteria, reagent consumption forecasts, and inputs for operating cost estimation.
21-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
21.3.3
Mining and Production Planning
Mining operations will be executed by a contractor to minimize initial capital requirements and provide operational flexibility during the early years of
production.
Key components of the mining plan include:
•
Open pit optimization and shell selection based on updated economic and metallurgical inputs.
•
Mine sequencing to prioritize oxide and mixed material and optimize cash flow.
•
Waste dump reclaim sequencing integrated with in situ mining operations.
•
Haulage design, including process feed haul distances of approximately 1.5 km to 4.5 km and waste haul distances
of approximately 2.5 km.
•
Development of a production schedule supporting approximately 30,000 tpd of material processing.
The mining contractor is expected to supply and operate a fleet comprising 150 t to 200 t class haul trucks, hydraulic excavators,
loaders, and support equipment. The Owner’s team will provide oversight, grade control, and reconciliation.
21.3.4
Process Design and Infrastructure
The process flowsheet is based on conventional and well-established technologies suitable for oxide and mixed gold mineralization.
Process plant components include:
•
Primary crushing to achieve the target particle size for heap leaching.
•
Agglomeration, if required, to improve heap permeability and recovery.
•
Heap leach stacking using conveyor or truck stacking systems.
•
Solution management systems, including pregnant and barren solution circuits.
•
Merrill-Crowe recovery plant for gold and silver extraction.
•
Refining facilities for doré production.
Infrastructure components include:
•
Single-use heap leach pad designed with double-liner systems consistent
with Nevada regulatory requirements.
•
Solution ponds, including pregnant, barren, and stormwater ponds.
•
Recovery/Merrill-Crowe processing facilities.
•
Power supply infrastructure, which may include grid connection or hybrid systems.
•
Water supply and distribution systems.
•
Maintenance facilities, including relocation of the existing truck shop affected by pit expansion.
•
Site access roads, haul roads, and support infrastructure.
21-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
21.3.5
Water Management and Dewatering
SLR considers water management to be a key operational and permitting consideration for the Project. A comprehensive program will be implemented to define
water availability, manage process water, and ensure compliance with regulatory requirements.
Key components include:
•
Groundwater baseline data collection and pump testing to define aquifer characteristics.
•
Development of a groundwater model to support dewatering design and water balance calculations.
•
Evaluation of pit dewatering and discharge requirements.
•
Preparation of a detailed process water balance.
•
Design of heap leach solution management systems, including containment and recycling.
•
Stormwater management systems to control runoff and protect water quality.
Water supply is expected to be sourced from a combination of groundwater and recycled process water, subject to permitting and availability.
21.3.6
Environmental Baseline and Permitting
Permitting represents the critical path for Project development and will be advanced in parallel with technical studies.
The anticipated environmental baseline studies that will be required are listed:
•
Surface water quality and hydrology.
•
Groundwater quality and levels.
•
Air quality and emissions.
•
Flora and fauna surveys.
•
Cultural and archaeological resource assessments.
•
Geochemical characterization, including acid rock drainage and metal leaching potential.
•
Meteorological data collection.
The permitting strategy includes the following steps.
•
Submission of a Notice of Intent (NOI) to the BLM.
•
Advancement through the EA process, or EIS process if required.
•
Modification of existing Plans of Operations and permits.
•
Coordination with relevant agencies, including the BLM, NDEP, and Nevada Division of Water Resources.
A key advantage of the Project is that existing disturbance areas, including waste rock dumps, heap leach pads, and tailings storage
facilities, remain bonded and permitted. This condition is expected to facilitate a brownfields redevelopment pathway and reduce permitting complexity.
21-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
21.3.7
Project Organization and Execution Model
21.3.7.1
Execution Model
The Project will be executed using a combination of Owner’s team oversight, contractor execution, and specialist consulting support.
•
Owner’s Team: Responsible for overall project management, technical oversight, permitting coordination, and
stakeholder engagement.
•
EPCM/EPC Contractor: Responsible for engineering, procurement, and construction management or execution.
•
Mining Contractor: Responsible for all mining operations, including drilling, blasting, loading, and hauling.
•
Specialist Consultants: Provide expertise in metallurgy, geotechnical engineering, environmental studies, and
hydrogeology.
21.3.7.2
Staffing Philosophy
The staffing approach will be scaled to the project phase:
•
Lean Owner’s team during PFS and early development.
•
Increased staffing during construction and commissioning.
•
Transition to steady-state operational staffing levels during production.
No on-site camp is required, as the Project will utilize a local or regional workforce.
21.4
Schedule and Critical Path
21.4.1
Overall Timeline
The Project schedule is structured to allow overlapping activities and accelerated development:
•
PFS initiation: Immediate.
•
Permitting and baseline data collection: Approximately 12 to 36 months.
•
Engineering and procurement: Approximately 12 to 18 months, overlapping with permitting.
•
Construction: Approximately 9 to 12 months.
•
Commissioning and ramp-up: Several months following construction
completion.
The target for first gold production is approximately 24 months from project initiation, subject to permitting approvals
and technical validation.
21-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
21.4.2
Critical Path Elements
The primary critical path elements include:
•
Completion of environmental baseline data collection.
•
Progression through the BLM permitting process, including NOI submission, EA/EIS preparation, and Record of
Decision.
•
Water rights acquisition and discharge permitting.
•
Resolution of metallurgical variability and confirmation of recovery assumptions.
21.5
Procurement and Contracting Strategy
21.5.1
Mining
Mining will be conducted by a contractor under a unit-rate contract, typically expressed in US dollars per cubic meter of mined material. Contracts will
include provisions for standard mining activities and rate schedules for out-of-scope work.
21.5.2
Process and Infrastructure
Major process equipment and infrastructure components will be procured through competitive bidding processes. Key items include crushers, Merrill-Crowe plant
components, pumps, and piping systems.
Anticipated bulk consumables and services contracts and agreements are listed:
•
Diesel fuel supply contracts
•
Cyanide supply agreements
•
Lime and other reagents
•
Grinding media, if required
21.5.3
Refining and Sales
Gold and silver doré will be transported to third-party refineries under standard industry contracts. Transportation, security, and refining
arrangements will be structured to align with industry norms. The potential use of hedging or forward sales will be evaluated during the PFS.
21.6
Sulfide Mineralization – Future Work Programs
Although sulfide mineralization is included within the Mineral Resource inventory, it is explicitly excluded from the economic analysis presented in this
Initial Assessment. The sulfide material represents a potential future development opportunity; however, additional technical studies, test work, and engineering are required to determine an appropriate processing pathway and economic viability.
Sulfides have been identified in the heap leach pads, the TSF, and are found in the in situ material.
The following work programs are recommended to
advance understanding of sulfide mineralization and support future evaluation:
21-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
21.6.1
Geological and Resource Definition
Additional drilling and geological modeling will be required to improve confidence in the sulfide Mineral Resources and support potential conversion to higher
confidence categories. Key activities include:
•
Infill drilling to improve spatial continuity and grade confidence within sulfide domains.
•
Extension drilling to evaluate down-dip and along-strike mineralization
potential.
•
Detailed geological modeling to refine lithological, structural, and alteration controls on sulfide
mineralization.
•
Density measurements and validation to support tonnage estimates.
These efforts will support a future Mineral Resource update and will be instrumental in the conversion to Mineral Reserves and provide a foundation for mine
planning studies specific to sulfide material.
21.6.2
Metallurgical Test Work
Sulfide mineralization at Sleeper is not amenable to conventional heap leaching and will require alternative processing methods. A staged metallurgical program
is required to evaluate viable treatment options.
Recommended test work includes:
•
Mineralogical and deportment studies to define gold association (e.g., refractory vs. free milling
components).
•
Gravity concentration studies.
•
Flotation testing to evaluate concentrate grade, recovery, and mass pull.
•
Diagnostic leach testing to assess gold liberation characteristics.
•
Evaluation of oxidation processes, including pressure oxidation (POX),
bio-oxidation, or roasting, where applicable.
•
Cyanidation testing of flotation concentrates and/or oxidized products.
The objective of this program is to identify a technically viable and economically competitive flowsheet for sulfide processing.
21.6.3
Process and Infrastructure Trade-Off Studies
Development of sulfide mineralization will require significant additional infrastructure compared to the oxide heap-leach scenario. Trade-off studies should evaluate:
•
Standalone sulfide processing facility versus integration with existing oxide infrastructure.
•
Processing options, gravity concentration circuit, including flotation with concentrate sale, flotation with on-site oxidation, or whole ore processing.
•
Consideration of POX Toll Mill for flotation concentrate
•
Capital and operating cost implications of each processing route.
•
Power requirements and supply options for high-energy processing circuits.
•
Water demand and additional permitting requirements.
These studies will define the preferred development pathway and associated capital intensity.
21-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
21.7
Risk Management
21.7.1
Key Risks
Key project risks are listed:
•
Metallurgical variability, particularly within transition material
•
Permitting delays or regulatory challenges
•
Water availability and water management (dewatering) constraints
•
Contractor performance and productivity
•
Cost escalation for fuel, reagents, and construction materials
21.7.2
Mitigation Measures
Risk mitigation strategies include the following:
•
Early and comprehensive metallurgical testing across all material types
•
Parallel advancement of permitting and engineering activities
•
Use of conservative design assumptions and contingency allowances
•
Engagement of experienced contractors with Nevada operating experience
•
Inclusion of appropriate contingency in capital and operating cost estimates
21.7.3
Capital Efficiency Strategy
The Project has been designed to minimize initial capital requirements while maintaining operational flexibility. Key elements of this strategy are listed:
•
Use of contractor mining to eliminate the need for owner-purchased mining fleet.
•
Development within existing disturbed areas to reduce earthworks and permitting requirements.
•
Modular process plant design to allow phased expansion.
•
Deferral of major capital expenditures associated with sulfide processing.
21.7.4
Transition to Pre-Feasibility Study (PFS)
The PFS will build upon the IA and refine all technical and economic assumptions. The study will upgrade cost estimates to an AACE Class 4 level, with an
expected accuracy range of approximately minus 25 percent to plus 25 percent.
Key PFS deliverables will include the following:
•
Development and geotechnical drilling, assaying, and metallurgical test work.
•
Updated mine plan and production schedule.
•
Refined metallurgical recovery models.
•
Detailed capital and operating cost estimates.
•
Permitting plan and status updates.
•
Comprehensive set of trade off studies, yet to be defined.
•
Economic analysis, including net present value and internal rate of return.
21-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
21.7.5
Mining and Scheduling Considerations
Future development of sulfide material will require integration into the overall mine plan. Key considerations include:
•
Sequencing oxide and sulfide material to optimize project economics.
•
Potential stockpiling strategies for sulfide material during oxide operations.
•
Evaluation of cut-off grades specific to sulfide processing costs and
recoveries.
•
Impact on strip ratio and overall mine life.
These factors will be incorporated into future mine planning studies.
21.7.6
Environmental and Permitting Requirements
Processing of sulfide mineralization will likely introduce additional environmental considerations and permitting requirements, including:
•
Expanded process facilities and tailings storage requirements.
•
Increased water usage and potential discharge considerations.
•
Additional air quality permitting, particularly for oxidation processes.
•
Enhanced geochemical characterization to assess acid rock drainage and metal leaching potential.
Early engagement with regulatory agencies is recommended to define permitting pathways and timelines for sulfide development.
21.7.7
Future Sulfide Study Pathway
Advancement of sulfide mineralization is expected to follow a staged study approach, including:
•
Scoping-level evaluation of processing options and economics.
•
Pre-Feasibility Study (PFS) specific to sulfide development, if
warranted.
•
Feasibility Study (FS) and detailed engineering following confirmation of economic viability.
The sulfide resource represents a longer-term opportunity that could materially extend mine life and increase total metal production;
however, it is associated with higher capital intensity and greater technical complexity than the oxide heap leach operation.
21.8
Conclusion
The Project PEP outlines a practical and efficient pathway to develop the Project through the reprocessing of waste rock dumps and the mining of oxide and
mixed material using heap-leach technology. The strategy leverages existing site conditions, proven processing methods, and contractor-based mining to reduce capital intensity and accelerate development.
Permitting remains the critical path, supported by environmental baseline programs and regulatory engagement. With immediate initiation of the PFS and
execution of parallel workstreams, the Project has the potential to achieve first production within approximately two years, subject to permitting timelines and successful completion of technical programs.
21-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
22.0
Interpretation and Conclusions
22.1
Geology and Mineral Resources
•
The geological interpretation and deposit model are appropriate, internally consistent, and aligned with a low-sulfidation epithermal system, with mineralization strongly controlled by fault architecture and lithological contrasts.
•
Mineralization exhibits high spatial variability, with discontinuous high-grade veins embedded within a laterally
and vertically continuous low-grade stockwork domain, which comprises most of the tonnage.
•
The Mineral Resource estimate has been prepared in accordance with S-K
1300 and CIM (2019) Best Practice Guidelines, supported by appropriate domain modeling, compositing, grade capping, interpolation, and validation workflows.
•
The estimate is constrained within optimized open-pit shells
demonstrating Reasonable Prospects for Economic Extraction (RPEE,) based on reasonable mining, processing, and economic assumptions, including a long-term gold price of US$3,100/oz.
•
The drilling database is large and generally adequate (approximately 4,300+ drill holes); however, gaps in
historical metadata, incomplete records, and exclusion of unverifiable data introduce uncertainty, which is appropriately reflected in classification.
•
Historical drilling is predominantly vertical RC, which adequately defines bulk-tonnage mineralization but limits
confidence in true geometry and continuity of steeply dipping high-grade structures.
•
The QA/QC and sampling protocols, while variable in early historical programs, are considered sufficient overall
due to:
•
Exclusion of unreliable or unsupported data from the Mineral Resource Estimate (MRE)
•
Validation of assay datasets through statistical analysis, capping, compositing, and multi-method estimation
checks
•
Use of industry-standard QA/QC review and data screening prior to estimation. Accordingly, the QP considers the
analytical dataset valid and appropriate to support the MRE, with remaining uncertainties reflected in classification.
•
The oxidation model has been reviewed and corrected for inconsistencies and is considered appropriate for current
estimation; however, localized coding issues indicate moderate residual uncertainty where metallurgical assumptions are sensitive.
•
Exploration datasets (geophysical, geochemical, geological) are well integrated and effective for targeting,
defining structural corridors, and mineralized trends extending beyond historically mined areas.
•
Mineralization remains open along strike, at depth, and beneath cover, with identified targets considered
conceptual but supported by integrated datasets.
•
Compared to the 2023 estimate, the 2026 MRE shows a material increase in tonnage and contained metal, driven by:
22-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
Inclusion and delineation of surface materials (existing waste rock dumps, heap leach pads, and tailings storage
facility);
•
Expanded pit shells under higher gold price assumptions (US$3,100/oz versus approximately US$1,800/oz); and
•
Updated geological interpretation and database validation.
•
This increase in tonnage is accompanied by a moderate reduction in average grade, consistent with inclusion of
marginal material and not indicative of estimation bias.
22.2
Mining and Mineral Reserves
•
There is no current geotechnical information for the pit slopes. Current pit slope assumptions may be optimized
once geotechnical information has been collected and incorporated into the pit design.
•
The current Base Case life of mine (LOM) plan includes a significant proportion of Inferred Mineral Resources
(approximately 55%). The next stage of the Project will require converting Inferred Resources to Indicated Resources to reduce the project risk.
•
Pit slope design assumes dry (i.e., dewatered) walls. Pit dewatering needs to start early enough for the open-pit mining operation to begin.
•
There is potential to extend the mine life with the addition of a sulfide pit. To include the sulfide pit in the
LOM plan, additional metallurgical test work and block modeling will be required.
22.3
Mineral Processing
•
Metallurgical test work supports heap leaching with Merrill-Crowe recovery for oxide, mixed, and selected
waste-rock materials, and flotation with off-site toll treatment or concentrate sale for sulfide, existing heap leach pad (HLP), and existing tailings material.
•
The Base Case economic analysis is restricted to the heap-leach scenario, which is supported by the most
complete, representative, and internally consistent metallurgical dataset.
•
The proposed Base Case processing facility is a 30,000 tpd conventional crush–agglomerate–heap-leach
operation employing Merrill-Crowe recovery. Design parameters include crushing to approximately P80 19 mm and agglomeration using cement and/or lime.
•
Facilities oxide material demonstrates the strongest metallurgical response to heap leaching, with additional
oxide, mixed, and selected waste-dump composites also supporting inclusion in the heap-leach feed blend.
•
Gold and silver recovery assumptions for the heap-leach case are derived primarily from column leach testing,
with conservative assumptions applied where only bottle-roll or limited test data exist.
•
Sulfide, HLP, and tailings materials represent future processing opportunities via flotation. Recoveries have
been reduced by 12% to account for toll-milling deductions and downstream treatment charges.
22-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
•
No silver recovery is currently attributed to the flotation scenario; silver is treated as upside potential
pending further metallurgical test work and commercial assessment.
•
The heap leach flowsheet is a commercially proven, low-risk processing route appropriate for IA-level planning.
•
Preliminary test work of the flotation option as a processing method for the sulfide material and existing HLP
and TSF material is sufficient for the declaration of Mineral Resources; however, additional variability testing, concentrate characterization, and commercial evaluation are required to advance this option.
22.4
Infrastructure
•
Access to the mine site is reliable via frequently traveled and maintained public infrastructure from Winnemucca,
Nevada.
•
Access and haul roads constructed on site will be designed and constructed in a manner sufficient to facilitate
required on-site vehicular movement
•
The proposed heap leach pad has been sited based on terrain, environmental, and operational bases and has been
adequately sized to accommodate 175 Mt of agglomerated mineralized material.
•
The pregnant solution and barren solution ponds have been located in proximity to the leach pad to take advantage
to native slopes and have been sized to accommodate operational solution flow rates.
•
The storm event pond has been located adjacent to the process ponds and has been sized to accommodate the 100-year 24-hour storm volume.
•
Rapid infiltration basins have been designed to accommodate infiltration from pit dewatering efforts at an
average rate of 4,542 m3/hr (20,000 US gallons per minute [gpm]).
•
No accommodation camp has been included in the proposed infrastructure as the town of Winnemucca is within
commuting distance and hosts a knowledgeable mining industry labor force.
22.5
Environment
•
There are no known significant environmental issues at the site, and the former mine is in an advanced state of
closure with post-closure monitoring and minor operational and maintenance activities being conducted.
•
The regulatory environment is well developed, and the environmental permitting path forward for the mine plan
presented in this TRS is generally well understood.
22.6
Capital and Operating Costs
•
Preliminary capital and operating cost estimates have been prepared for the proposed mining operation based on a
conceptual processing rate of approximately 30,000 tpd.
•
For the Base Case, initial capital costs required to restart mining operations are estimated to be approximately
US$201 million, with sustaining capital estimated at approximately US$342 million over the life of mine.
•
Life-of-mine operating costs for
the Base Case are estimated to average approximately US$13.03 per tonne processed, resulting in an estimated all-in sustaining cost of approximately US$2,407 per ounce of gold produced.
22-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
22.7
Risks
•
The economic analysis presented in the Base Case as part of this TRS includes a material proportion of Inferred
Mineral Resources within the mine plan and associated cash flow. The Inferred Mineral Resources are included at the beginning of the life-of-mine plan by mining existing
dumps in the economic analysis, which introduces significant uncertainty.
22-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
23.0
Recommendations
The SLR QPs offer the following recommendations by discipline:
23.1
Geology and Mineral Resources
1
Conduct the following drilling and exploration programs:
a)
Infill drilling to support conversion of Inferred to Indicated Mineral Resources (in situ and surface
materials) by conducting systematic infill drilling within pit-constrained in situ domains and within surface material domains (dumps, heap leach pads, and TSF) to increase data density and improve confidence
in grade continuity, tonnage, and material variability, consistent with S-K 1300 classification criteria.
b)
Targeted infill drilling within established mineralization domains to increase drill density within defined
grade domains to better constrain grade variability and continuity, particularly in areas where current spacing limits classification.
c)
Additional drilling and geological logging to improve confidence in oxide, mixed, and sulfide boundaries, which
directly influence metallurgical assumptions applied in the MRE.
2
Geology and Mineral Resource Estimate
a)
Maintain domain-controlled drilling and sampling protocols to ensure all new data collection aligns with the
current geological, mineralization, and estimation domain framework to support direct integration into future MRE updates.
b)
Incorporate new data into updated geological interpretations and block models to support iterative improvement
of the Mineral Resource estimate in accordance with S-K 1300 reporting requirements.
c)
Acquire additional bulk density measurements across in situ and surface material domains where current density
assignments are based on limited data, to improve tonnage estimates.
d)
Focus drilling within the existing Mineral Resource footprint by prioritizing data acquisition in areas where
incremental drilling is most likely to materially improve classification, rather than expanding the resource footprint at this stage.
3
Quality Assurance and Quality Control
a)
Implement consistent QA/QC protocols for future work. Apply standardized QA/QC procedures (sampling, insertion
rates, documentation) to ensure all new data meets S-K 1300 and CIM (2019) requirements and supports classification upgrades.
b)
Recommend investigation of incomplete database information and update the database through investigation of
historic files
To advance the Project, the QP recommends that Paramount Gold undertake a
two-phase exploration and data validation program totaling $8.52 million, as summarized in Table 23-1.
The goal is to support upgrading Inferred Mineral Resources to the Indicated category, validate key project assumptions regarding density and metallurgy, and
continue delineation in underexplored areas.
23-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
This budget reflects a disciplined yet robust investment to de-risk
the MRE, validate key technical assumptions (density, metallurgical recovery), and support a potential future Preliminary Feasibility Study (PFS). The recommended work is expected to materially enhance the geological understanding and economic
viability of the Sleeper Project.
The two phases of the work program are independent of each other.
Table 23-1: Proposed Sleeper 2026-2027 Exploration Budget
Activity
Details
Estimated Cost
(US$ 000)
Phase 1 – Surface and In Situ Resource Definition, QA/QC Implementation, and Metallurgical Studies
ESG Permitting
Exploration and Environmental Permits for Phase 1 drilling
25
Sonic Drilling
Up to 30 holes (4000 ft) of sonic drilling at $90/ft focused on obtaining metallurgical samples from Waste dumps, TSF and HL pads
360
RC Drilling
Up to 500 holes (50,000 ft) of RC drilling in Waste dumps, HL pads at $50/ft
2,500
Core drilling
Confirmation core drilling of up to 10,000 ft at $120/ft (HQ/NQ core)
1,200
Bulk Density Sampling
Collection and testing of up to 200 core and/or pit samples across all domains
12
Geochemical Assays
Assaying of approximately 15,000 samples incl. duplicates, standards, blanks
750
QA/QC Program Implementation
Establish certified sample control and auditing protocols
100
Metallurgical Testing
Leach testing of mineralized core for recovery studies
750
Technical Staff & Supervision
Field geologist, QA/QC lead, database tech
300
Total Phase 1
5,997
Phase 2 – Project Development Scoping
ESG Permitting
Exploration and Environmental Permits for Phase 2 Geotech
25
Ground Support Geotechnical Testing
Geotech and analysis studies for Ground Support
250
Heap Leach Pad Geotechnical Testing and Design
Geotech and design engineering studies for Heap Leach Pad
600
Mining and Process Design & Engineering Analysis
Process design and engineering cost analysis and modeling
400
Environmental Baseline Studies
Hydrogeology, cultural, flora/fauna baseline for mine permitting
600
Stakeholder Engagement & Permitting Prep
Initial outreach, permitting roadmap
100
23-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Activity
Details
Estimated Cost
(US$ 000)
Technical Oversight & Contingency (10%)
Includes legal, overhead, permitting scope prep
198
Reporting and Independent Review
S-K 1300 PFS update and QP sign-off
350
Total Phase 2
2,523
Grand Total
8,520
23.2
Mining and Mineral Reserves
1
Collect geotechnical information and develop geotechnical studies to support the pit design slopes for the next
stage of the project.
2
Ensure the open-pit mining sequence is closely coordinated with the open-pit dewatering plan.
3
Continue the analysis of the sulfide pit as an opportunity after the oxide pit mining.
23.3
Mineral Processing
1.
Complete additional variability column leach testing on oxide, mixed, and waste rock dump domains to confirm
recovery, leach kinetics, and reagent consumption across the planned heap leach feed range.
2.
Confirm provisional recovery assumptions for Sleeper oxide, Sleeper mixed, and West Wood mixed material with
representative column leach test work.
3.
Refine crush-size and agglomeration test work to confirm the selected
coarse-crush heap leach design basis and optimize cement and lime addition by material type.
4.
Expand reagent-consumption testing to better define sodium cyanide, lime, and cement demand for oxide, mixed,
and waste rock dump materials, particularly where existing results indicate variable or elevated consumable requirements.
5.
Complete additional column leach testing on selected waste rock dump materials to refine recovery assumptions
by dump area and improve confidence in domain-based economic modeling.
6.
Complete additional deleterious-element and precipitate-quality testing for Hg, As, Sb, and sulfur to confirm
mercury management requirements and refine refinery and operating cost assumptions.
7.
Complete flotation variability, optimization, and locked-cycle test work on representative sulfide, HLP and
tailings composites to confirm recovery, consumable requirements, concentrate quality, and the suitability of an off-site toll-treatment or concentrate-sale route.
23.4
Infrastructure
1
Evaluate site-wide water balance and discharge requirements.
23-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
2
Perform a hydrogeological evaluation to support PFS level engineering of the rapid infiltration basin.
3
Confirm power requirements and supply availability.
4
Develop site-specific design criteria for the HLP and perform field investigations and laboratory testing to
support advancing the HLP design.
5
Develop a PFS level HLP design that incorporates site specific data into the engineering calculations and
analysis for such items as grading plan, slope stability analysis, water balance, settlement, and closure.
23.5
Environment
1.
Complete updated baseline studies in accordance with National Environmental Policy Act of 1969 (NEPA) and
applicable guidelines.
2.
Engage early with local stakeholders and tribes and develop a stakeholder outreach plan.
3.
Develop a permitting strategy and timeline.
23.6
Capital and Operating Costs
1
Move the dewatering from an “Allowance” to a full ‘Engineered System’, e.g., calibrated
groundwater model; staged dewatering sequencing; pumping lift curves by pit phase; transient inflow modeling; wellfield spacing and drawdown analysis; contingency pumping scenarios; and power demand modeling for peak pumping periods.
2
Re-evaluate the crushing/agglomeration
trade-off, e.g., variability column testing; permeability testing; compaction testing; fines migration testing; cement consumption optimization; lift-height testing; and irrigation optimization.
3
Tighten the heap leach pad phasing strategy, e.g., minimizing initial lined acreage; maximizing early vertical
expansion; deferring later phases; reducing early pond construction; and sequencing underdrain installation.
4
Lock down power infrastructure requirements early, e.g., actual condition of transmission line; substation
rebuild requirements; transformer replacement needs; utility interconnect requirements; and backup generation philosophy.
5
Validate the contractor mining strategy, i.e., obtain budgetary contractor bids; benchmark Nevada owner-mining
versus contractor-mining; validate bank cubic meter (bcm) assumptions; stress-test diesel escalation; and stress-test productivity losses from wet conditions.
6
Refine the estimate by:
a)
Improving mine haulage and re-handle modeling.
b)
Tightening reagent consumption assumptions.
c)
Adding more detailed closure escalation and water management costs.
23-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
24.0
References
Alexander, G. 2005. Pit Dewatering, Internal Memo, New Sleeper Gold, from Glenn Alexander to Jim Smithson, June 1, 2005.
AMAX Gold Inc. 1985. Sleeper Gold Mine Project Development Documentation. Corporate technical release.
AMAX Gold Inc. 1986–1996. Sleeper Mine Production Records and Operating Reports.
Bevan, Peter A. 2002. Sleeper Tailings Project, Winnemucca, Nevada, USA. Confidential report for X-Cal Resources Ltd. Dated October 11, 2002.
Borg, I. and Handin, J. 1966.
Experimental deformation of crystalline rocks: Tectonophysics, v. 3(4), p. 249-368.
Bradley, Mark A. 2005. Progress Report – Sleeper Facilities Area. Confidential report for New Sleeper Gold LLC dated
May 4, 2005.
Bureau of Land Management, Nevada State Office. Mining Claim Regulations and Surface Management
Requirements.
Burke, D.B. and Silberling, N.J. 1973. The Auld Lang Syne Group, of Late Triassic and Jurassic (?) age,
north-central Nevada: U.S. Geol. Sur(?) age. 1394-E, p. E1E14.
Chevillon, Vic.
2006. Internal memo to X-Cal Resources of August 14, 2006.
Code of Federal
Regulations (CFR), Title 43. Public Lands: Interior.
Cooper, J.J., and Vikre, P.G., eds., Bulk Mineable Precious Metal
Deposits of the Western United States: Reno, Nevada, Geological Society of Nevada, Symposium Proceedings, p. 11–34., p. 293-302.
Conrad, J.E., McKee, E.H., Rytuba, J.J., Nash, J.T., and Utterback, W.C., 1993, Geochronology of the Sleeper deposit,
Humboldt County, Nevada: Epithermal gold silver mineralization following emplacement of a silicic flow-dome complex: Econ. Geol., v. 88, p. 317-327.
Cooke, D.R. and Simmons, S.F. 2000, Characteristics and genesis of epithermal gold deposits, in Hagemann, S.G., and Brown,
P.E., eds., Gold in 2000: Reviews in Economic Geology, v. 13, p. 221-244.
Corbett, G. J. 2005. Sleeper, PowerPoint presentation. Presented to New Sleeper Gold LLC staff in April 2005.
Corbett, G.J. 2005. Comments on Continued Exploration at the Sleeper Gold Mine and Environs, Nevada. Confidential report for
New Sleeper Gold LLC dated May 2005.
Crawford, A. E. J. 2007. Geologic Map of Nevada; USGS Data Series, DS-249
Cyprus Amax Minerals Company, 1994–1996. Sleeper Mine Operational
Summaries.
Doerner, Bill, 2005, New Sleeper Gold Corporation Titan – 24 Magnetic Telluric Survey, Data Processing,
Inversion, and Interpretation. Confidential report for New Sleeper Gold LLC by Quantech Consulting Inc, Reno NV dated Sep 2005.
Doucette, John. 2005. Summary of XRF data for Silicic Rocks from Sleeper Mine Area. Confidential memo for New Sleeper Gold
LLC dated Nov 2, 2005.
24-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Even, G., Nur, J., and Gochnour, L. 2012. Mineral Resource Estimation
Sleeper Gold Project, Nevada, USA, SRK Consulting (Chile) S.A. October 2012.
Ferdock, Gregory C., Bradley, M., Ross, K.,
Martin, L., Fleming, A., Wellman, J., and Blair, K. 2005. Mineralogy and mineralization at the New Sleeper Gold project, Awakening Mining District, Slumbering Hills, Humboldt County, Nevada, in Rhoden, H.N., Steininger, R.C., and Vikre, P.G., eds.,
Geological Society of Nevada Symposium 2005: Window to the World, Reno, Nevada, May 2005, pp. 497-510.
Ferdock, Gregory C. 2005. BC-03-03 Target
Generation. Confidential memo for New Sleeper Gold LLC dated May 2005.
Ferdock, Gregory C. 2005. Mineralogical Sample
Evaluation, placer gold collected from OP-01-05and BC-03-03. Confidential memo for New
Sleeper Gold LLC dated Nov 2005.
Fleming, Adrian. 2005. Sleeper Project Nevada 2004 Report. Contributions from: Blair,
K., Bradley, M., Doucette, J., Ferdock, G., Martin, L., O’Donnell, M., Ross, K., Wellman, J. Annual report for year ending 2004, for New Sleeper Gold Corp. and X-Cal Resources Ltd., dated April 2005.
Giroux, G., Kornze, L., and Martin, L.G., and Healy, T.H.A. 2009. Sleeper Gold Property Preliminary Economic Assessment,
effective date November 16, 2009.
Gustin, M.S. and Fleming, J. 2004. Environmental and Geochemical Studies of the
Sleeper Mine Area. University of Nevada, Reno.
Gustin, M.M. and Fleming, A. 2004. Technical Report on the Sleeper Gold
Project, Nevada, USA. Report prepared for New Sleeper Gold Corporation and Upland Resource Corporation by Mine Development Associates and RockWorks Ltd.
Hedenquist, J.W., Arribas, A.R., and Gonzalez-Urien, E. 2000. Exploration for epithermal gold deposits, in Hagemann, S.G.,
and Brown, P.E., eds., Gold in 2000: Reviews in Economic Geology, vol. 13, pp. 245-277.
Hedenquist, J.W. 2005. Observations on the Sleeper Gold Project, Nevada. Confidential memorandum to X-Cal Resources Ltd. dated December 2005.
Histed, Rich. 2005. Trench ICP Analysis.
Confidential report for New Sleeper Gold LLC dated August 2005. Histed, Rich, 2005, Sleeper Range Front Review. Confidential report for New Sleeper Gold LLC dated August 27, 2005.
Histed, Rich. 2005. Range Front South Target Area. Confidential report for New Sleeper Gold LLC dated November 2005.
Hudson, D.M. 2013a. Simplified Sleeper geology and stratigraphy. Internal technical report prepared for Paramount Gold and
Silver dated August 2013, 5 p.
Hudson, D.M. 2013b. “Series of east-west cross sections across the Sleeper deposit
on 25-meter spaced intervals,” internal data with text and stratigraphic column prepared for Paramount Gold and Silver Corporation dated August 2013.
Hudson, D.M. 2014a. Petrography of select samples for diamond drill holes MC-21A, MC-24, MC-26, MC-42-04,
WW-27-04, XW-07-60, and MC-11 from the Sleeper
Project, Humboldt County, Nevada,” 92 p.
24-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Hudson, D.M. 2014b. Geologic observations from core relogging of the Sleeper
Project, Humboldt County, Nevada,” report prepared for Paramount Gold and Silver Corporation, 30 p.
Giroux,
Kornze, and Martin. 2008. Technical Report 2008 on the Sleeper Gold Property, dated September 22, 2008.
Goldstrand,
P.M. and Schmidt, K.W. 2000. Geology, mineralization, and ore controls at the Ken Snyder mine, Elko County, Nevada: Geol. Soc. Nevada, in Geology and Ore Deposits 2000: The Great Basin and Beyond Symposium, May
15-8, 2000, Reno-Sparks, Nevada, Proceedings, p. 265-287.
Jaacks, Jeffrey A. 2005. Review of Sleeper Soil Gas Program. Confidential report for New Sleeper Gold LLC dated Sep 26, 2005.
Jackson, R.G. 2006. Alteration mineralogy 3D model of the Sleeper
low-sulfidation gold system, Nevada. Report prepared for New Sleeper Gold Corporation, 12 p.
Jackson, R.G., and Chevillon, C.V. 2007. 3D geochemical and mineralogical model of the Sleeper low-sulphidation gold system,
Nevada: Exploration 2007: Toronto, Ontario, Canada, International Conference on Mineral Exploration, poster presentation.
John, D.A. 2001. Miocene and Early Pliocene epithermal gold-silver deposits in the Northern Great Basin, Western United
States: characteristics, distribution, and relationship to magmatism: Economic Geology, v. 96, no. 8, p. 1827-1853.
KCA.
1999. Sleeper project sampling and metallurgical test program: Internal report by Kappes, Cassiday & Associates for X-Cal Resources, Ltd., dated 28 February 1999, 25 p.
Kinakin, D. 2012a. Sleeper Gold Project Preliminary Economic Assessment-Open Pit Slope Design Recommendations, Preliminary, a
letter report to Glen van Treek, VP Exploration, Paramount Gold & Silver Corp., from BGC Engineering Inc. , Report No. 1059-001, Vancouver, BC, February 10, 2012.
Kornze, L.D. and Phinisey, J.D. 2002. Geologic due diligence report and Sleeper gold district exploration proposal for X-Cal Resources Ltd., Humboldt County, Nevada: Private report for Dundee Capital, 31 p.
Martin, Larry G. 2005. Trench 03. Confidential report for New Sleeper Gold LLC dated April 2005.
Martin, Larry G. 2005. Targets to the North/Northwest. Confidential memo for New Sleeper Gold LLC dated May 26, 2005.
Martin, Larry G. 2005. Trench Update. Confidential memo for New Sleeper Gold LLC dated July 15, 2005. Martin, Larry
G., 2005, Photo Lineament Study. Confidential report for New Sleeper Gold LLC dated August 05, 2005.
Martin, Larry G.
2005. Trench Study. Confidential report for New Sleeper Gold LLC dated November 05, 2005.
McClelland, G. 2012. Report on
Phase 2 Metallurgical Evaluation – Waste Dump, Westwood and Facilities Composites (“bench” scale tests), a report to Glen van Treek, VP Exploration, Paramount Gold & Silver Corp. , from McClelland Laboratories, Inc.,
Sparks, NV, January 27, 2012.
24-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
McPhie, J., Doyle, M., and Allen, R. 1993. Volcanic Textures, A guide to the
interpretation of textures in volcanic rocks. Centre for ore deposit OD and Exploration Studies, University of Tasmania, 198p.
MRDI. 1997. Modeling and resource estimation of the Facility, Saddle, West Wood, and Silica Cap area, Sleeper Gold property.
Report prepared for Placer Dome U.S. Inc. and X-Cal Resources Ltd. by Mineral Resources Development Inc. Dated August 1997. 155 p.
24-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Nash, J.T., Utterback, W.C., and Saunders, J.A. 1991. Geology and
Geochemistry of the Sleeper Gold Deposits, Humboldt County, Nevada: An Interim Report, in Raines, G.L., Lisle, R.E., Schafer, R.W., and Wilkinson, W.H., eds., Geology and Ore Deposits of the Great Basin, Symposium Proceedings: Reno, Geological
Society of Nevada and U.S. Geological Survey, p. 1063-1084.
Nash, J.T., Utterback, W.C., and Trudel, W.C. 1995. Geology
and geochemistry of Tertiary volcanic host rocks, Sleeper gold-silver deposit, Humboldt County, Nevada: U.S. Geological Survey Bulletin 2090, 63 p.
Nash, J.T. and Trudel, W.S. 1996. Bulk mineable gold ore at the Sleeper mine, Nevada: Importance of extensional faults,
breccia, framboids, and oxidation, in Coyner, A.R., and Fahey, P.L., eds., Geology and Ore Deposits of the American Cordillera: Geological Society of Nevada Symposium Proceedings, Reno, Nevada, April 1995, p.
235-256.
New Sleeper Gold LLC. 2022. Monthly Water Reports to Nevada Department
of Conservation & Natural Resources. Division of Water Resources, January to December.
Nevada Bureau of Mines
and Geology. Regional geologic mapping and mineral resource reports for Humboldt County, Nevada.
Nevada Division of
Environmental Protection. 2017. New Sleeper Gold LLC NEV00500006 Fact Sheet.
Nevada Revised Statutes (NRS). Chapters
512–520. Mining Laws of the State of Nevada.
Nevada Administrative Code (NAC). Chapter 517. Nevada Mining
Regulations.
Nyman, Mark. 2005. Notes Regarding Northwest Sleeper Drill Target. Confidential memo for New Sleeper Gold
LLC dated November 3, 2005.
Oldow, J.S. 1984. Evolution of a Late Mesozoic
back-arc fold and thrust belt, northwestern Great Basin, USA: Tectonophysics, v. 102, p. 245–274.
O’Donnell, Megan. 2005. Red Mercury Concept Test Proposal – Phase I. Confidential memo for New Sleeper Gold LLC
dated November 2005.
Paramount. 2022a. “Amendment Paramount PEA 2017_Section 4_11_REV_mfm_08032022.docx,”
project document received from M. McGinnis of New Sleeper Gold LLC via email on August 29, 2022.
Paramount. 2022b.
“Sleeper Claims Aug 2022.xlsx,” project document received M. McGinnis of New Sleeper Gold LLC via email on August 29, 2022.
Paramount. 2022c. “Sleeper Royalties_mfm_20220829.docx,” project document received from M. McGinnis of New
Sleeper Gold LLC via email on August 29, 2022.
Piteau (Piteau Associates USA). 2021. Sleeper Pit Lake Model, Update
– May 2021.Prepared for Paramount Gold. Project 3938. May 2021.
Proteus. 2002. Information Memorandum: X-Cal Resources Ltd., dated August 6, 2002, by Proteus Capital Corporation, 30 p.
Redfern, R.R. and Rowe, W.A. 2003, “Technical report on the Sleeper Gold property,” report prepared for X-Cal Resources Ltd. dated December 2003, 118 p.
RESPEC. 2023. Technical Report
Summary for the Sleeper Gold Project, Humboldt County, Nevada, USA, SK 1300 Report (RSI(RNO) – MO 144.21001 Rev 7, prepared for Paramount Gold Nevada, August 31, 2023, p. 215
24-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Ressel, M., Christensen, O.D., and Gustin, M.M., 2020, “Evaluation of
the exploration potential at the Sleeper Project, Humboldt County, Nevada,” report prepared for Paramount Gold and Silver Corporation, dated November 17, 2020, 215 p.
Ross, Ken. 2005. Preliminary Report on Mineralization of the West Wood Breccias. Confidential report for New Sleeper Gold LLC
dated December 2005.
Rowe, Winthrop A. 1998. Sleeper Gold Project, internal memo for
X-Cal Resources Ltd, report dated June 1998. 69 p.
Rowe, Winthrop A. 2004.
General Observations on the Deep Core Holes Under the Sleeper Pit. Confidential memo for New Sleeper Gold LLC dated August 2004.
Sierra Mining and Engineering LLC. 1999. Mineral inventory report: Sleeper mine, Humboldt County, Nevada. Report prepared for
X-Cal Resources Ltd. dated November 1999.
Sillitoe, R.H. and Hedenquist, J.W.
2003. Linkages between volcanotectonic setting, ore-fluid compositions and epithermal precious metal deposits. Society of Economic Geologists Special Publication 10. p.
315-343.
Simmons, S.F., White, N.C., and John, D.A. 2005. Geological
characteristics of epithermal precious and base metal deposits. Economic Geology 100th Anniversary Volume, pp. 485-522.
SLR International Corporation. 2023. Water Pollution Control Permit Renewal Application.
Smithson, Jim. 2005. Environmental reports, monitor sampling and observations, compliance documents, regulatory agency
reports, confidential memos to Sleeper Joint Venture.
Snyder, Ken. 2005. Sleeper Exploration Review. Memo dated
May 9, 2005.
Snyder, Ken. 2005. Status of Sleeper Project, Exploration. Memo dated June 27, 2005.
Snyder, Ken. 2005. Sleeper Technical Summit. Memo dated Sep 30, 2005.
Tarnocai, C. 2000. Structural setting of the Sleeper Project, Confidential Memo with maps and plates for Placer Dome, made
available to X-Cal, dated October, 2000, 3p.
Taylor, John D. 2007. Sleeper
Project – Blasthole Modeling Update, Confidential memo to X-Cal Resources Ltd.
Thomason, R.E., Kornze, L., and Rowe, W.A. 2006. Technical Report on the Sleeper Gold Property for X-Cal Resources Ltd., report dated March 12, 2006, 149 p.
Thompson, R. 2012b.
Sleeper Gold Project Preliminary Economic Assessment-Open Pit Depressurization Recommendations, Preliminary, a letter report to Glen van Treek, VP Exploration, Paramount Gold & Silver Corp., from BGC Engineering Inc., Report No. 1059-001, Vancouver, BC, February 10, 2010. Utterback, William C., 2005, Critical Review and Commentary of: “Comments on Continued Exploration at the Sleeper Gold Mine and Environs,
Nevada”, Corbett, G.J., May 2005. Confidential report for New Sleeper Gold LLC dated Sep 18, 2005.
United States
Code (USC). Title 30. Mineral Lands and Mining.
United States Code (USC). Title 43. Public Lands and the Federal Land
Policy and Management Act.
U.S. Geological Survey. Various publications. Geologic studies of the Sleeper gold-silver
deposit and Awakening District.
24-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Utterback, William C. 2005. Conclusions and Recommendations Resulting from
Drill Core Features. Confidential report for New Sleeper Gold LLC dated Aug 18, 2005. Water Management Consultants, Inc. (WMCI). 1996. Sleeper Mine, Results of Supplemental Pit Lake Modeling and Closure Plan for the Final Pit.
White, T.L. 2003. Airborne magnetic survey and IP survey lines for the Sleeper Project. Internal report prepared for X-Cal Resources Ltd., 2 p.
White, N.C. and Hedenquist, J.W. 1995. Epithermal gold
deposits: styles, characteristics and exploration. Society of Economic Geologists Newsletter, No. 23, pp. 1, 9-13.
Willden, R. 1964. Geology and Mineral Deposits of Humboldt County, Nevada: Nevada Bureau of Mines and Geology Bulletin 59,
154 p.
Wilson, S.E. and SRK. 2012. Technical Report and Preliminary Economic Assessment, Sleeper Gold Project, Nevada,
USA, Paramount Gold Nevada Corp., July 30, 2012, 261 p.
Wilson, B. and Pennstrom, R.K. 2012. “Preliminary
economic assessment for the Sleeper Gold Project, Nevada, USA,” report prepared by Scott E. Wilson Consulting, Inc., dated July 2012, 261 p.
Wilson, S.E., Brechtel, C., and Pennstrom, W.J., Jr. 2015. Preliminary economic assessment, Paramount Gold Nevada Corp.
Sleeper Project, Humboldt County, Nevada: report by Metal Mining Consultants Inc., 218 p.
Wilson, S.E. and Brechtel, C.
2017. Technical report and preliminary economic assessment, Paramount Gold Nevada Corp. Sleeper Project, Humboldt County, Nevada, December 10, 2015, amended September 25, 2017: report by Metal Mining Consultants Inc., 215 p.
Wilson, S.E., Pennstrom, W.J., Jr, Brechtel, C.E., and Even, G. 2012, Technical Report and Preliminary Economic Assessment,
Sleeper Gold Project, Nevada, USA, prepared for Paramount Gold and Silver Corp., July 30, 2012, p. 261
Wood, J.D.
1988. Geology of the Sleeper gold deposit, Humboldt County, Nevada, in Schafer, R.W., et al., eds., Bulk mineable precious metal deposits of the Western United States: Reno, Geological Society of Nevada, p.
293-302.
WMC (Water Management Consultants Inc.). 1995. Sleeper Mine,
Preliminary Assessment of Hydrologic and Hydrochemical Conditions in the Final Pit. Prepared for Nevada Gold Mining Inc. – Sleeper Mine. Project 1006/R11. April 1995.
WMC. 2005a. Memorandum to Adrian Fleming – New Sleeper Gold, Pit Dewatering – Reestablishing Historic Cone of
Depression, 1006 Technical Memo. June 20, 2005, 11p.
WMC. 2005b. Memorandum to Adrian Fleming – New Sleeper
Gold, Pit Dewatering – Partial Dewatering, 1006 Technical Memo. June 21, 2005, 2p.
WMC. 2005c. Memorandum to
Adrian Fleming – New Sleeper Gold, Pit Dewatering – Expanded Pit, 1006 Technical Memo. June 22, 2005, 2p.
WMC. 2005d. Technical Memorandum to Adrian Fleming – New Sleeper Gold, Future Sleeper Dewatering, 1006 Technical Memo.
July 8, 2005, 3p.
Wood, J.D. and Hamilton, S.K. 1991. The Sleeper gold-silver deposit: Discovery through
feasibility: Econ. Geol. Monograph 8, p. 289-299.
Wright, James L., 2005.
Sleeper Property Induced Polarization Inverted Sections. Confidential report for New Sleeper Gold LLC dated Jan 15, 2005.
24-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
Wright, James L. 2005. Sleeper Property Gravity and Induced Polarization
Surveys GIS Database. Confidential report for New Sleeper Gold LLC dated Jan 15, 2005.
Wright, James L. 2005. Sleeper
Property Induced Polarization Survey. Confidential report for New Sleeper Gold LLC dated April 25, 2005.
Wright,
James L. 2005. Sleeper Property Magnetic – Telluric Survey GIS Database.
Wright, J.L. 2012. Sleeper project
Evolving Gold data compilation. Report prepared for Paramount Gold. 6 pages.
Wright, J., 2012a. Sleeper project –
induced polarization survey, 2012: internal company report prepared for Paramount Gold, 21 p.
Wright, J. 2012b. Sleeper
project – gravity survey, 2012: internal company report prepared for Paramount Gold, 17 p.
Wright, J. 2015.
Sleeper property airborne magnetic survey, GIS database: internal company report prepared for Paramount Gold Nevada: 15 p.
Wyld, S.J. 2002, Structural evolution of a Mesozoic backarc
fold-and-thrust belt in the U.S. Cordillera: New evidence from northern Nevada: Geological Society of America Bulletin, v. 114; no. 11; p. 1452–1468.
Zamudio, Joe. 2005. ASD mineralogical determinations of selected holes from Sleeper Gold Project. Internal confidential memos
to Sleeper Joint Venture.
Zoutomou, Edouard K. 2007. Sleeper Mine Tailings and Heap Evaluation as Potential Gold
Resources. Confidential report to X-Cal Resources Ltd
24-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
25.0
Reliance on Information Provided by the Registrant
This TRS has been prepared by SLR for PGN. The information, conclusions, opinions, and estimates contained herein are based on:
•
Information available to SLR at the time of preparation of this TRS.
•
Assumptions, conditions, and qualifications as set forth in this TRS.
•
Data, reports, and other information supplied by PGN and other third-party sources.
For the purpose of this TRS, SLR has relied on current ownership information provided by PGN in a Title Report from PGN’s Owner Representative dated
December 1, 2023, entitled “2023 Update of Title Report on Sleeper Project, Humboldt County, Nevada.” SLR has not researched property title or mineral rights for the Property as we consider it reasonable to rely on PGN’s legal
counsel, who is responsible for maintaining this information.
SLR has relied on PGN for guidance on applicable taxes, royalties, and other government
levies or interests, applicable to revenue or income from the Property in the Executive Summary and Sections 4 and 19.
The SLR QP have taken all
appropriate steps, in their professional opinion, to ensure that the above information from PGN is sound.
Except as specifically provided by applicable
laws, any use of this TRS by any third party is at that party’s sole risk.
25-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
26.0
Date and Signature Page
This report titled “S-K 1300 Technical Report Summary, Sleeper Gold Mine, Humboldt County, Nevada” with an
effective date of April 29, 2026, was prepared and signed by:
(Signed) SLR International Corporation
Dated at Lakewood, CO
June 17, 2026
SLR International Corporation
26-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
27.0
Appendix 1 List of Claims
Table 27-1: Sleeper List of Claims
Claim Group
Claim Name
BLM Serial No.
Claim Group
Claim Name
BLM Serial No.
SLEEPER
SLEEPER# 1
NMC250715
MIMI
MIMI 371
NMC1072951
SLEEPER
SLEEPER# 2
NMC250716
MIMI
MIMI 372
NMC1 072952
SLEEPER
SLEEPER# 3
NMC250717
MIMI
MIMI 373
NMC1072953
SLEEPER
SLEEPER# 4
NMC250718
MIMI
MIMI 374
NMC1072954
SLEEPER
SLEEPER# 5
NMC250719
MIMI
MIMI 375
NMC1072955
SLEEPER
SLEEPER# 6
NMC250720
MIMI
MIMI 376
NMC1072956
SLEEPER
SLEEPER# 7
NMC250721
MIMI
MIMI 377
NMC1072957
SLEEPER
SLEEPER# 8
NMC250722
MIMI
MIMI 378
NMC1072958
SLEEPER
SLEEPER# 9
NMC250723
MIMI
MIMI 379
NMC1072959
SLEEPER
SLEEPER# 10
NMC250724
MIMI
MIMI 380
NMC1 072960
SLEEPER
SLEEPER # 11
NMC250725
MIMI
MIMI 381
NMC1072961
SLEEPER
SLEEPER# 12
NMC250726
MIMI
MIMI 382
NMC1072962
SLEEPER
SLEEPER# 13
NMC250727
MIMI
MIMI 383
NMC1072963
SLEEPER
SLEEPER# 14
NMC250728
MIMI
MIMI 384
NMC1072964
SLEEPER
SLEEPER# 15
NMC250729
MIMI
MIMI 385
NMC1072965
SLEEPER
SLEEPER# 16
NMC250730
MIMI
MIMI 386
NMC1072966
SLEEPER
SLEEPER # 17
NMC250731
MIMI
MIMI 387
NMC1072967
SLEEPER
SLEEPER # 18
NMC250732
MIMI
MIMI 388
NMC1072968
SLEEPER
SLEEPER# 19
NMC250733
MIMI
MIMI 389
NMC1072969
SLEEPER
SLEEPER # 20
NMC250734
MIMI
MIMI 390
NMC1072970
SLEEPER
SLEEPER#21
NMC250735
MIMI
MIMI 391
NMC1072971
SLEEPER
SLEEPER # 22
NMC250736
MIMI
MIMI 392
NMC1072972
SLEEPER
SLEEPER # 23
NMC250737
MIMI
MIMI 393
NMC1072973
SLEEPER
SLEEPER # 24
NMC250738
MIMI
MIMI 394
NMC1072974
SLEEPER
SLEEPER # 25
NMC250739
MIMI
MIMI 395
NMC1072975
SLEEPER
SLEEPER # 26
NMC250740
MIMI
MIMI 396
NMC1072976
SLEEPER
SLEEPER # 27
NMC250741
MIMI
MIMI 397
NMC1072977
SLEEPER
SLEEPER # 28
NMC250742
MIMI
MIMI 398
NMC1072978
SLEEPER
SLEEPER # 29
NMC250743
MIMI
MIMI 399
NMC1072979
SLEEPER
SLEEPER#30
NMC250744
MIMI
MIMI 400
NMC1072980
SLEEPER
SLEEPER# 31
NMC250745
MIMI
MIMI 401
NMC1072981
SLEEPER
SLEEPER # 32
NMC250746
MIMI
MIMI 402
NMC1072982
SLEEPER
SLEEPER# 33
NMC250747
MIMI
MIMI 403
NMC1 072983
SLEEPER
SLEEPER # 34
NMC250748
MIMI
MIMI 404
NMC1072984
SLEEPER
SLEEPER#35
NMC250749
MIMI
MIMI 405
NMC1072985
SLEEPER
SLEEPER# 36
NMC250750
MIMI
MIMI 406
NMC1072986
27-1
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
SLEEPER
SLEEPER# 37
NMC250751
MIMI
MIMI 407
NMC1072987
SLEEPER
SLEEPER# 38
NMC250752
MIMI
MIMI 408
NMC1072988
SLEEPER
SLEEPER # 39
NMC250753
MIMI
MIMI 409
NMC1072989
SLEEPER
SLEEPER # 40
NMC250754
MIMI
MIMI 410
NMC1072990
SLEEPER
SLEEPER# 41
NMC250755
MIMI
MIMI 411
NMC1072991
SLEEPER
SLEEPER # 42
NMC250756
MIMI
MIMI 412
NMC1072992
SLEEPER
SLEEPER # 43
NMC250757
MIMI
MIMI 413
NMC1072993
SLEEPER
SLEEPER # 44
NMC250758
MIMI
MIMI 414
NMC1072994
SLEEPER
SLEEPER # 45
NMC250759
MIMI
MIMI 415
NMC1072995
SLEEPER
SLEEPER # 46
NMC250760
MIMI
MIMI 416
NMC1072996
SLEEPER
SLEEPER # 47
NMC250761
MIMI
MIMI 417
NMC1072997
SLEEPER
SLEEPER # 48
NMC250762
MIMI
MIMI 418
NMC1072998
SLEEPER
SLEEPER # 49
NMC250763
MIMI
MIMI 419
NMC1072999
SLEEPER
SLEEPER # 50
NMC250764
MIMI
MIMI 420
NMC1073000
SLEEPER
SLEEPER# 51
NMC250765
MIMI
MIMI 421
NMC1073001
SLEEPER
SLEEPER # 52
NMC250766
MIMI
MIMI 422
NMC1073002
SLEEPER
SLEEPER # 53
NMC250767
MIMI
MIMI 423
NMC1073003
SLEEPER
SLEEPER # 54
NMC250768
MIMI
MIMI 424
NMC1073004
SLEEPER
SLEEPER# 55
NMC250769
MIMI
MIMI 425
NMC1073005
SLEEPER
SLEEPER # 56
NMC250770
MIMI
MIMI 426
NMC1073006
SLEEPER
SLEEPER# 57
NMC250771
MIMI
MIMI 427
NMC1073007
SLEEPER
SLEEPER# 58
NMC250772
MIMI
MIMI 428
NMC1073008
SLEEPER
SLEEPER # 59
NMC250773
MIMI
MIMI 429
NMC1073009
SLEEPER
SLEEPER # 60
NMC250774
MIMI
MIMI 430
NMC1073010
SLEEPER
SLEEPER# 61
NMC250775
MIMI
MIMI 431
NMC1073011
SLEEPER
SLEEPER # 62
NMC250776
MIMI
MIMI 432
NMC1073012
SLEEPER
SLEEPER # 63
NMC250777
MIMI
MIMI 433
NMC1073013
SLEEPER
SLEEPER # 64
NMC250778
MIMI
MIMI 434
NMC1073014
SLEEPER
SLEEPER # 65
NMC250779
MIMI
MIMI 435
NMC1073015
SLEEPER
SLEEPER # 66
NMC250780
MIMI
MIMI 436
NMC1073016
SLEEPER
SLEEPER # 67
NMC250781
MIMI
MIMI 437
NMC1073017
SLEEPER
SLEEPER # 68
NMC250782
MIMI
MIMI 438
NMC1073018
SLEEPER
SLEEPER # 69
NMC250783
MIMI
MIMI 439
NMC1073019
SLEEPER
SLEEPER # 70
NMC250784
MIMI
MIMI 440
NMC1073020
SLEEPER
SLEEPER#71
NMC250785
MIMI
MIMI 441
NMC1073021
SLEEPER
SLEEPER # 72
NMC250786
MIMI
MIMI 442
NMC1073022
SLEEPER
SLEEPER # 73
NMC250787
MIMI
MIMI 443
NMC1073023
SLEEPER
SLEEPER # 74
NMC250788
MIMI
MIMI 444
NMC1073024
SLEEPER
SLEEPER # 75
NMC250789
MIMI
MIMI 445
NMC1073025
SLEEPER
SLEEPER # 76
NMC250790
MIMI
MIMI 446
NMC1073026
27-2
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
SLEEPER
SLEEPER # 77
NMC250791
MIMI
MIMI 447
NMC1073027
SLEEPER
SLEEPER#78
NMC250792
MIMI
MIMI 448
NMC1073028
SLEEPER
SLEEPER # 79
NMC250793
MIMI
MIMI 449
NMC1073029
SLEEPER
SLEEPER # 80
NMC250794
MIMI
MIMI 450
NMC1073030
SLEEPER
SLEEPER# 81
NMC250795
MIMI
MIMI 451
NMC1073031
SLEEPER
SLEEPER # 82
NMC250796
MIMI
MIMI 452
NMC1073032
SLEEPER
SLEEPER # 83
NMC250797
MIMI
MIMI 453
NMC1073033
SLEEPER
SLEEPER # 84
NMC250798
MIMI
MIMI 454
NMC1073034
SLEEPER
SLEEPER # 85
NMC250799
MIMI
MIMI 455
NMC1073035
SLEEPER
SLEEPER # 86
NMC250800
MIMI
MIMI 456
NMC1073036
SLEEPER
SLEEPER # 87
NMC250801
MIMI
MIMI 457
NMC1073037
NA
NA# 1
NMC250802
MIMI
MIMI 458
NMC1073038
NA
NA# 2
NMC250803
MIMI
MIMI 459
NMC1073039
NA
NA# 3
NMC250804
MIMI
MIMI 460
NMC1073040
NA
NA# 4
NMC250805
MIMI
MIMI 461
NMC1073041
NA
NA# 5
NMC250806
MIMI
MIMI 462
NMC1073042
NA
NA# 6
NMC250807
MIMI
MIMI 463
NMC1073043
NA
NA# 7
NMC250808
MIMI
MIMI 464
NMC1 073044
NA
NA# 8
NMC250809
MIMI
MIMI 465
NMC1073045
NA
NA# 9
NMC250810
MIMI
MIMI 466
NMC1073046
NA
NA# 10
NMC250811
MIMI
MIMI 467
NMC1073047
NA
NA# 11
NMC250812
MIMI
MIMI 468
NMC1073048
NA
NA# 12
NMC250813
MIMI
MIMI 469
NMC1073049
NA
NA# 13
NMC250814
MIMI
MIMI 470
NMC1073050
NA
NA# 14
NMC250815
MIMI
MIMI 471
NMC1073051
NA
NA# 15
NMC250816
MIMI
MIMI 472
NMC1073052
NA
NA# 16
NMC250817
MIMI
MIMI 473
NMC1073053
NA
NA# 17
NMC250818
MIMI
MIMI 474
NMC1073054
NA
NA# 18
NMC250819
MIMI
MIMI 475
NMC1073055
NA
NA# 19
NMC250820
MIMI
MIMI 476
NMC1073056
NA
NA#20
NMC250821
MIMI
MIMI 477
NMC1073057
NA
NA#21
NMC250822
MIMI
MIMI 478
NMC1073058
NA
NA#22
NMC250823
MIMI
MIMI 479
NMC1073059
NA
NA#23
NMC250824
MIMI
MIMI 480
NMC1073060
NA
NA#24
NMC250825
MIMI
MIMI 481
NMC1073061
NA
NA#25
NMC250826
MIMI
MIMI 482
NMC1073062
NA
NA#26
NMC250827
MIMI
MIMI 483
NMC1 073063
NA
NA#27
NMC250828
MIMI
MIMI 484
NMC1073064
NA
NA#28
NMC250829
MIMI
MIMI 485
NMC1073065
NA
NA#37
NMC250838
MIMI
MIMI 486
NMC1073066
27-3
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
NA
NA#38
NMC250839
MIMI
MIMI 487
NMC1073067
NA
NA#39
NMC250840
MIMI
MIMI 488
NMC1073068
NA
NA#40
NMC250841
MIMI
MIMI 489
NMC1073069
NA
NA#41
NMC250842
MIMI
MIMI 490
NMC1073070
NA
NA#42
NMC250843
MIMI
MIMI 491
NMC1073071
NA
NA#43
NMC250844
MIMI
MIMI 492
NMC1073072
NA
NA#44
NMC250845
MIMI
MIMI 493
NMC1073073
NA
NA#45
NMC250846
MIMI
MIMI 494
NMC1 073074
NA
NA#46
NMC250847
MIMI
MIMI 495
NMC1073075
NA
NA#47
NMC250848
MIMI
MIMI 496
NMC1073076
NA
NA#48
NMC250849
MIMI
MIMI 497
NMC1073077
NA
NA#49
NMC250850
MIMI
MIMI 498
NMC1073078
NA
NA#50
NMC250851
MIMI
MIMI 499
NMC1073079
NA
NA# 51
NMC250852
MIMI
MIMI 500
NMC1073080
NA
NA#52
NMC250853
MIMI
MIMI 501
NMC1073081
NA
NA#53
NMC250854
MIMI
MIMI 502
NMC 1073082
NA
NA# 54
NMC250855
MIMI
MIMI 503
NMC1073083
NA
NA#55
NMC250856
MIMI
MIMI 504
NMC1073084
NA
NA# 56
NMC250857
MIMI
MIMI 505
NMC1073085
NA
NA#57
NMC250858
MIMI
MIMI 506
NMC1073086
NA
NA# 58
NMC250859
MIMI
MIMI 507
NMC1073087
NA
NA# 59
NMC250860
MIMI
MIMI 508
NMC1073088
NA
NA# 60
NMC250861
MIMI
MIMI 509
NMC1 073089
NA
NA# 61
NMC250862
MIMI
MIMI 510
NMC1073090
NA
NA#62
NMC250863
MIMI
MIMI 511
NMC1073091
DRYLAKE
DRYLAKE# 4
NMC251345
MIMI
MIMI 512
NMC1073092
DRYLAKE
DRYLAKE# 15
NMC251346
MIMI
MIMI 513
NMC1 073093
DRYLAKE
DRYLAKE# 17
NMC251347
MIMI
MIMI 514
NMC1 073094
DRYLAKE
DRYLAKE# 18
NMC251348
MIMI
MIMI 515
NMC1073095
DRYLAKE
DRYLAKE # 20
NMC251350
MIMI
MIMI 516
NMC1073096
DRYLAKE
DRYLAKE# 21
NMC251351
MIMI
MIMI 517
NMC1 073097
DRYLAKE
DRYLAKE # 25
NMC251352
MIMI
MIMI 518
NMC1073098
DRYLAKE
DRYLAKE # 28
NMC251353
MIMI
MIMI 519
NMC1073099
DRYLAKE
DRYLAKE # 40
NMC251354
MIMI
MIMI 520
NMC1073100
NA
NA#63
NMC262286
MIMI
MIMI 521
NMC1073101
NA
NA#64
NMC262287
MIMI
MIMI 522
NMC1073102
NA
NA#65
NMC262288
MIMI
MIMI 523
NMC1073103
NA
NA#66
NMC262289
MIMI
MIMI 524
NMC1073104
NA
NA#67
NMC262290
MIMI
MIMI 525
NMC1073105
NA
NA#68
NMC262291
MIMI
MIMI 526
NMC1073106
27-4
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
NA
NA#69
NMC262292
MIMI
MIMI 527
NMC1073107
NA
NA#70
NMC262293
MIMI
MIMI 528
NMC1073108
NA
NA#71
NMC262294
MIMI
MIMI 529
NMC1073109
NA
NA#72
NMC262295
MIMI
MIMI 530
NMC1073110
NA
NA# 73
NMC262296
MIMI
MIMI 531
NMC1073111
NA
NA#74
NMC262297
MIMI
MIMI 532
NMC1073112
NA
NA# 75
NMC262298
MIMI
MIMI 533
NMC1073113
NA
NA#76
NMC262299
MIMI
MIMI 534
NMC1073114
NA
NA#77
NMC262300
MIMI
MIMI 535
NMC1073115
NA
NA# 78
NMC262301
MIMI
MIMI 536
NMC1073116
NA
NA#79
NMC262302
MIMI
MIMI 537
NMC1073117
NA
NA#80
NMC262303
MIMI
MIMI 538
NMC1073118
NA
NA#81
NMC262304
MIMI
MIMI 539
NMC1073119
NA
NA# 82
NMC262305
MIMI
MIMI 540
NMC1073120
NA
NA# 83
NMC262306
MIMI
MIMI 541
NMC1073121
NA
NA# 84
NMC262307
MIMI
MIMI 542
NMC1073122
NA
NA#85
NMC262308
MIMI
MIMI 543
NMC1073 123
NA
NA# 86
NMC262309
MIMI
MIMI 544
NMC1073124
NA
NA# 87
NMC262310
MIMI
MIMI 545
NMC1073125
NA
NA#88
NMC262311
MIMI
MIMI 546
NMC1073 126
NA
NA# 89
NMC262312
MIMI
MIMI 547
NMC1073127
NA
NA#90
NMC262313
MIMI
MIMI 548
NMC1073128
NA
NA#91
NMC262314
MIMI
MIMI 549
NMC1073129
NA
NA#92
NMC262315
MIMI
MIMI 550
NMC1073130
NA
NA#93
NMC262316
MIMI
MIMI 551
NMC1073131
NA
NA#94
NMC262317
MIMI
MIMI 552
NMC1073132
NA
NA#95
NMC321784
MIMI
MIMI 553
NMC1073133
NA
NA#96
NMC321785
MIMI
MIMI 554
NMC1073134
NA
NA#97
NMC321786
MIMI
MIMI 555
NMC1073135
NA
NA#98
NMC321787
MIMI
MIMI 556
NMC1073136
NA
NA#99
NMC321788
MIMI
MIMI 557
NMC1073137
NA
NA#100
NMC321789
MIMI
MIMI 558
NMC1073138
NA
NA#101
NMC321790
MIMI
MIMI 559
NMC1073139
NA
NA#102
NMC321791
MIMI
MIMI 560
NMC1073 140
NA
NA#103
NMC321792
MIMI
MIMI 561
NMC1073141
NA
NA#104
NMC321793
MIMI
MIMI 562
NMC1073142
NA
NA#105
NMC321794
MIMI
MIMI 563
NMC1073143
NA
NA#106
NMC321795
MIMI
MIMI 564
NMC1073144
NA
NA#107
NMC321796
MIMI
MIMI 565
NMC1073145
NA
NA#108
NMC321797
MIMI
MIMI 566
NMC1073146
27-5
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
NA
NA#109
NMC321798
MIMI
MIMI 567
NMC1073147
NA
NA#110
NMC321799
MIMI
MIMI 568
NMC1073148
NA
NA#111
NMC321800
MIMI
MIMI 569
NMC1073149
NA
NA#112
NMC321801
MIMI
MIMI 570
NMC1073150
NA
NA#113
NMC321802
MIMI
MIMI 571
NMC1073151
NA
NA#115
NMC321803
MIMI
MIMI 572
NMC1073152
NA
NA#116
NMC321804
MIMI
MIMI 573
NMC1073153
NA
NA#117
NMC321805
MIMI
MIMI 574
NMC1073154
NA
NA#118
NMC321806
MIMI
MIMI 575
NMC1073155
NA
NA#119
NMC321807
MIMI
MIMI 576
NMC1073156
NA
NA#120
NMC321808
MIMI
MIMI 577
NMC1073157
NA
NA#121
NMC321809
MIMI
MIMI 578
NMC1073158
NA
NA#122
NMC321810
MIMI
MIMI 579
NMC1073159
NA
NA#123
NMC321811
MIMI
MIMI 580
NMC1073160
NA
NA#124
NMC321812
MIMI
MIMI 581
NMC1073161
NA
NA#125
NMC321813
MIMI
MIMI 582
NMC1073162
NA
NA#126
NMC321814
MIMI
MIMI 583
NMC1073163
NA
NA#127
NMC321815
MIMI
MIMI 584
NMC1073164
NA
NA#128
NMC321816
MIMI
MIMI 585
NMC1073 165
NA
NA#129
NMC321817
MIMI
MIMI 586
NMC1073166
NA
NA#130
NMC321818
MIMI
MIMI 587
NMC1073167
NA
NA#131
NMC321819
MIMI
MIMI 588
NMC1073168
NA
NA#132
NMC321820
MIMI
MIMI 589
NMC1073169
NA
NA#133
NMC321821
MIMI
MIMI 590
NMC1073170
NA
NA#134
NMC321822
MIMI
MIMI 591
NMC1073171
NA
NA#135
NMC321823
MIMI
MIMI 592
NMC1073172
NA
NA#136
NMC321824
MIMI
MIMI 593
NMC1073173
NA
NA#137
NMC321825
MIMI
MIMI 594
NMC1073 174
NA
NA#138
NMC321826
MIMI
MIMI 595
NMC1073175
NA
NA#139
NMC321827
MIMI
MIMI 596
NMC1073176
NA
NA#140
NMC321828
MIMI
MIMI 597
NMC1073177
NA
NA#141
NMC321829
MIMI
MIMI 598
NMC1073 178
NA
NA#142
NMC321830
MIMI
MIMI 599
NMC1073179
NA
NA#143
NMC321831
MIMI
MIMI 600
NMC1073180
NA
NA#144
NMC321832
MIMI
MIMI 601
NMC1073181
NA
NA#145
NMC321833
MIMI
MIMI 602
NMC1073 182
NA
NA#146
NMC321834
MIMI
MIMI 603
NMC1073183
NA
NA#147
NMC321835
MIMI
MIMI 604
NMC1073184
NA
NA#148
NMC321836
MIMI
MIMI 605
NMC1073185
NA
NA#149
NMC321837
MIMI
MIMI 606
NMC1073 186
27-6
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
NA
NA#150
NMC321838
MIMI
MIMI 607
NMC1073187
NA
NA#151
NMC321839
MIMI
MIMI 608
NMC1073188
NA
NA#152
NMC321840
MIMI
MIMI 609
NMC1073189
NA
NA#153
NMC321841
MIMI
MIMI 610
NMC1073190
NA
NA#154
NMC321842
MIMI
MIMI 611
NMC1073191
NA
NA#155
NMC321843
MIMI
MIMI 612
NMC1073192
NA
NA#156
NMC321844
MIMI
MIMI 613
NMC1073193
NA
NA#157
NMC321845
MIMI
MIMI 614
NMC1073194
NA
NA#158
NMC321846
MIMI
MIMI 615
NMC1073195
NA
NA#159
NMC321847
MIMI
MIMI 616
NMC1073196
NA
NA#159A
NMC321848
MIMI
MIMI 617
NMC1073197
NA
NA#165
NMC321854
MIMI
MIMI 618
NMC1073198
NA
NA#166
NMC321855
MIMI
MIMI 619
NMC1073199
NA
NA#167
NMC321856
MIMI
MIMI 620
NMC1073200
NA
NA#168
NMC321857
MIMI
MIMI 621
NMC1073201
NA
NA#169
NMC321858
MIMI
MIMI 622
NMC1073202
NA
NA#170
NMC321859
MIMI
MIMI 623
NMC1073203
NA
NA#171
NMC321860
MIMI
MIMI 624
NMC1073204
NA
NA#172
NMC321861
MIMI
MIMI 625
NMC1 073205
NA
NA#173
NMC321862
MIMI
MIMI 626
NMC1 073206
NA
NA#174
NMC321863
MIMI
MIMI 627
NMC1073207
NA
NA#175
NMC321864
MIMI
MIMI 628
NMC1 073208
NA
NA#182
NMC321871
MIMI
MIMI 629
NMC1073209
NA
NA#183
NMC321872
MIMI
MIMI 630
NMC1073210
NA
NA#184
NMC321873
MIMI
MIMI 631
NMC1073211
NA
NA#185
NMC321874
MIMI
MIMI 632
NMC1073212
NA
NA#186
NMC321875
MIMI
MIMI 633
NMC1073213
NA
NA#187
NMC321876
MIMI
MIMI 634
NMC1073214
NA
NA#188
NMC321877
MIMI
MIMI 635
NMC1073215
NA
NA#189
NMC321878
MIMI
MIMI 636
NMC1073216
NA
NA#190
NMC321879
MIMI
MIMI 637
NMC1073217
NA
NA#191
NMC321880
MIMI
MIMI 638
NMC1073218
NA
NA#192
NMC321881
MIMI
MIMI 639
NMC1073219
NA
NA#193
NMC321882
MIMI
MIMI 640
NMC1073220
NA
NA#194
NMC321883
MIMI
MIMI 641
NMC1073221
NA
NA#195
NMC321884
MIMI
MIMI 642
NMC1 073222
NA
NA#196
NMC321885
MIMI
MIMI 643
NMC1073223
NA
NA#197
NMC321886
MIMI
MIMI 644
NMC1073224
NA
NA#198
NMC321887
MIMI
MIMI 645
NMC1073225
NA
NA#199
NMC321888
MIMI
MIMI 646
NMC1073226
27-7
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
NA
NA#206
NMC321895
MIMI
MIMI 647
NMC1 073227
NA
NA#207
NMC321896
MIMI
MIMI 648
NMC1073228
NA
NA#208
NMC321897
MIMI
MIMI 649
NMC1073229
NA
NA#209
NMC321898
MIMI
MIMI 650
NMC1073230
NA
NA#210
NMC321899
MIMI
MIMI 651
NMC1073231
NA
NA#211
NMC321900
MIMI
MIMI 652
NMC1073232
NA
NA#212
NMC321901
MIMI
MIMI 653
NMC1073233
NA
NA#213
NMC321902
MIMI
MIMI 654
NMC1073234
NA
NA#214
NMC321903
MIMI
MIMI 655
NMC1073235
NA
NA#215
NMC321904
MIMI
MIMI 656
NMC1073236
NA
NA#216
NMC321905
MIMI
MIMI 657
NMC1073237
NA
NA#217
NMC321906
MIMI
MIMI 658
NMC1073238
NA
NA#218
NMC321907
MIMI
MIMI 659
NMC1073239
NA
NA#219
NMC321908
MIMI
MIMI 660
NMC1073240
NA
NA#220
NMC321909
MIMI
MIMI 661
NMC1073241
NA
NA#221
NMC321910
MIMI
MIMI 662
NMC1073242
NA
NA#222
NMC321911
MIMI
MIMI 663
NMC1073243
NA
NA#223
NMC321912
MIMI
MIMI 664
NMC1073244
NA
NA#226
NMC321915
MIMI
MIMI 665
NMC1073245
NA
NA#227
NMC321916
MIMI
MIMI 666
NMC1 073246
SLEEPER
SLEEPER# 88
NMC322017
MIMI
MIMI 667
NMC1073247
SLEEPER
SLEEPER # 89
NMC322018
MIMI
MIMI 668
NMC1073248
SLEEPER
SLEEPER # 90
NMC322019
MIMI
MIMI 669
NMC1 073249
SLEEPER
SLEEPER#91
NMC322020
MIMI
MIMI 670
NMC1073250
SLEEPER
SLEEPER # 92
NMC322021
MIMI
MIMI 671
NMC1073251
SLEEPER
SLEEPER # 93
NMC322022
MIMI
MIMI 672
NMC1073252
SLEEPER
SLEEPER # 94
NMC322023
MIMI
MIMI 673
NMC1073253
SLEEPER
SLEEPER # 95
NMC322024
MIMI
MIMI 674
NMC1073254
SLEEPER
SLEEPER # 96
NMC322025
MIMI
MIMI 675
NMC1073255
SLEEPER
SLEEPER # 97
NMC322026
MIMI
MIMI 676
NMC1073256
SLEEPER
SLEEPER # 98
NMC322027
MIMI
MIMI 677
NMC1073257
SLEEPER
SLEEPER # 99
NMC322028
MIMI
MIMI 678
NMC1073258
SLEEPER
SLEEPER#100
NMC322029
MIMI
MIMI 679
NMC1073259
SLEEPER
SLEEPER#101
NMC322030
MIMI
MIMI 680
NMC1 073260
SLEEPER
SLEEPER#102
NMC322031
MIMI
MIMI 681
NMC1073261
SLEEPER
SLEEPER#103
NMC322032
MIMI
MIMI 682
NMC1073262
SLEEPER
SLEEPER#104
NMC322033
MIMI
MIMI 683
NMC1073263
SLEEPER
SLEEPER#105
NMC322034
MIMI
MIMI 684
NMC1073264
SLEEPER
SLEEPER#106
NMC322035
MIMI
MIMI 685
NMC1073265
SLEEPER
SLEEPER#107
NMC322036
MIMI
MIMI 686
NMC1073266
27-8
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
SLEEPER
SLEEPER#108
NMC322037
MIMI
MIMI 687
NMC1 073267
SLEEPER
SLEEPER#109
NMC322038
MIMI
MIMI 688
NMC1073268
SLEEPER
SLEEPER#110
NMC322039
MIMI
MIMI 689
NMC1073269
SLEEPER
SLEEPER#111
NMC322040
MIMI
MIMI 690
NMC1073270
SLEEPER
SLEEPER#112
NMC322041
MIMI
MIMI 691
NMC1073271
SLEEPER
SLEEPER#113
NMC322042
MIMI
MIMI 692
NMC1 073272
SLEEPER
SLEEPER#114
NMC322043
MIMI
MIMI 693
NMC1073273
SLEEPER
SLEEPER#! 15
NMC322044
MIMI
MIMI 694
NMC1073274
SLEEPER
SLEEPER#116
NMC322045
MIMI
MIMI 695
NMC1 073275
SLEEPER
SLEEPER#117
NMC322046
MIMI
MIMI 696
NMC1 073276
SLEEPER
SLEEPER #118
NMC322047
MIMI
MIMI 697
NMC1 073277
SLEEPER
SLEEPER#119
NMC322048
MIMI
MIMI 698
NMC1073278
SLEEPER
SLEEPER#120
NMC322049
MIMI
MIMI 699
NMC1 073279
SLEEPER
SLEEPER#121
NMC322050
MIMI
MIMI 700
NMC1073280
SLEEPER
SLEEPER#122
NMC322051
MIMI
MIMI 701
NMC1073281
SLEEPER
SLEEPER#123
NMC322052
MIMI
MIMI 702
NMC1073282
SLEEPER
SLEEPER#124
NMC322053
MIMI
MIMI 703
NMC1073283
SLEEPER
SLEEPER#125
NMC322054
MIMI
MIMI 704
NMC1 073284
SLEEPER
SLEEPER#126
NMC322055
MIMI
MIMI 705
NMC1 073285
SLEEPER
SLEEPER#127
NMC322056
MIMI
MIMI 706
NMC1073286
SLEEPER
SLEEPER#128
NMC322057
MIMI
MIMI 707
NMC1073287
SLEEPER
SLEEPER#129
NMC322058
MIMI
MIMI 708
NMC1073288
SLEEPER
SLEEPER#130
NMC322059
MIMI
MIMI 709
NMC1073289
SLEEPER
SLEEPER#131
NMC322060
MIMI
MIMI 710
NMC1 073290
SLEEPER
SLEEPER#132
NMC322061
MIMI
MIMI 711
NMC1073291
SLEEPER
SLEEPER#133
NMC322062
MIMI
MIMI 712
NMC1073292
SLEEPER
SLEEPER#134
NMC322063
MIMI
MIMI 713
NMC1073293
SLEEPER
SLEEPER#135
NMC322064
MIMI
MIMI 714
NMC1073294
SLEEPER
SLEEPER#136
NMC322065
MIMI
MIMI 715
NMC1073295
SLEEPER
SLEEPER#137
NMC322066
MIMI
MIMI 716
NMC1073296
SLEEPER
SLEEPER#138
NMC322067
MIMI
MIMI 717
NMC1073297
SLEEPER
SLEEPER#139
NMC322068
MIMI
MIMI 718
NMC1073298
SLEEPER
SLEEPER#140
NMC322069
MIMI
MIMI 719
NMC1073299
SLEEPER
SLEEPER#141
NMC322070
MIMI
MIMI 720
NMC1073300
SLEEPER
SLEEPER#142
NMC322071
MIMI
MIMI 721
NMC1073301
SLEEPER
SLEEPER#143
NMC322072
MIMI
MIMI 722
NMC1073302
SLEEPER
SLEEPER#144
NMC322073
MIMI
MIMI 723
NMC1073303
SLEEPER
SLEEPER#145
NMC322074
MIMI
MIMI 724
NMC1073304
SLEEPER
SLEEPER#146
NMC322075
MIMI
MIMI 725
NMC1073305
SLEEPER
SLEEPER#147
NMC322076
MIMI
MIMI 726
NMC1073306
27-9
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
SLEEPER
SLEEPER#148
NMC322077
MIMI
MIMI 727
NMC1073307
SLEEPER
SLEEPER#149
NMC322078
MIMI
MIMI 728
NMC1073308
SLEEPER
SLEEPER#150
NMC322079
MIMI
MIMI 729
NMC1073309
SLEEPER
SLEEPER#151
NMC322080
MIMI
MIMI 730
NMC1073310
SLEEPER
SLEEPER#152
NMC322081
MIMI
MIMI 731
NMC1073311
SLEEPER
SLEEPER#153
NMC322082
MIMI
MIMI 732
NMC1073312
SLEEPER
SLEEPER#154
NMC322083
MIMI
MIMI 733
NMC1073313
SLEEPER
SLEEPER#155
NMC322084
MIMI
MIMI 734
NMC1073314
SLEEPER
SLEEPER#156
NMC322085
MIMI
MIMI 735
NMC1073315
SLEEPER
SLEEPER#157
NMC322086
MIMI
MIMI 736
NMC1073316
SLEEPER
SLEEPER#158
NMC322087
MIMI
MIMI 737
NMC1073317
SLEEPER
SLEEPER#159
NMC322088
MIMI
MIMI 738
NMC1073318
SLEEPER
SLEEPER#160
NMC322089
MIMI
MIMI 739
NMC1073319
SLEEPER
SLEEPER#161
NMC322090
MIMI
MIMI 740
NMC1073320
SLEEPER
SLEEPER#162
NMC322091
MIMI
MIMI 741
NMC1073321
SLEEPER
SLEEPER#163
NMC322092
MIMI
MIMI 742
NMC1073322
SLEEPER
SLEEPER#164
NMC322093
MIMI
MIMI 743
NMC1073323
SLEEPER
SLEEPER#165
NMC322094
MIMI
MIMI 744
NMC1073324
SLEEPER
SLEEPER#166
NMC322095
MIMI
MIMI 745
NMC1073325
SLEEPER
SLEEPER#167
NMC322096
MIMI
MIMI 746
NMC1073326
SLEEPER
SLEEPER#168
NMC322097
MIMI
MIMI 747
NMC1073327
SLEEPER
SLEEPER#169
NMC322098
MIMI
MIMI 748
NMC1073328
SLEEPER
SLEEPER#170
NMC322099
MIMI
MIMI 749
NMC1073329
SLEEPER
SLEEPER#171
NMC322100
MIMI
MIMI 750
NMC1073330
SLEEPER
SLEEPER#172
NMC322101
MIMI
MIMI 751
NMC1073331
SLEEPER
SLEEPER#173
NMC322102
MIMI
MIMI 752
NMC1073332
SLEEPER
SLEEPER#174
NMC322103
MIMI
MIMI 753
NMC1073333
SLEEPER
SLEEPER#175
NMC322104
MIMI
MIMI 754
NMC1073334
SLEEPER
SLEEPER#176
NMC322105
MIMI
MIMI 755
NMC1073335
SLEEPER
SLEEPER#177
NMC322106
MIMI
MIMI 756
NMC1073336
SLEEPER
SLEEPER#178
NMC322107
MIMI
MIMI 757
NMC1073337
SLEEPER
SLEEPER#179
NMC322108
MIMI
MIMI 758
NMC1073338
SLEEPER
SLEEPER#180
NMC322109
MIMI
MIMI 759
NMC1073339
SLEEPER
SLEEPER#181
NMC322110
MIMI
MIMI 760
NMC1073340
SLEEPER
SLEEPER#182
NMC322111
MIMI
MIMI 761
NMC1073341
SLEEPER
SLEEPER#183
NMC322112
MIMI
MIMI 762
NMC1 073342
SLEEPER
SLEEPER#184
NMC322113
MIMI
MIMI 763
NMC1073343
SLEEPER
SLEEPER#185
NMC322114
MIMI
MIMI 764
NMC1073344
SLEEPER
SLEEPER#186
NMC322115
MIMI
MIMI 765
NMC1073345
SLEEPER
SLEEPER#187
NMC322116
MIMI
MIMI 766
NMC1073346
27-10
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
SLEEPER
SLEEPER#188
NMC322117
MIMI
MIMI 767
NMC1 073347
SLEEPER
SLEEPER#189
NMC322118
MIMI
MIMI 768
NMC1073348
SLEEPER
SLEEPER#190
NMC322119
MIMI
MIMI 769
NMC1073349
SLEEPER
SLEEPER#191
NMC322120
MIMI
MIMI 770
NMC1073350
SLEEPER
SLEEPER#192
NMC322121
MIMI
MIMI 771
NMC1073351
SLEEPER
SLEEPER#193
NMC322122
MIMI
MIMI 772
NMC1073352
SLEEPER
SLEEPER#194
NMC322123
MIMI
MIMI 773
NMC1073353
SLEEPER
SLEEPER#195
NMC322124
MIMI
MIMI 774
NMC1073354
SLEEPER
SLEEPER#196
NMC322125
MIMI
MIMI 775
NMC1073355
SLEEPER
SLEEPER#197
NMC322126
MIMI
MIMI 776
NMC1073356
SLEEPER
SLEEPER#198
NMC322127
MIMI
MIMI 777
NMC1073357
SLEEPER
SLEEPER#199
NMC322128
MIMI
MIMI 778
NMC1073358
SLEEPER
SLEEPER#200
NMC322129
MIMI
MIMI 779
NMC1073359
SLEEPER
SLEEPER#201
NMC322130
MIMI
MIMI 780
NMC1073360
SLEEPER
SLEEPER#202
NMC322131
MIMI
MIMI 786
NMC1073361
SLEEPER
SLEEPER#203
NMC322132
MIMI
MIMI 787
NMC1073362
SLEEPER
SLEEPER#204
NMC322133
MIMI
MIMI 788
NMC1073363
SLEEPER
SLEEPER#205
NMC322134
MIMI
MIMI 789
NMC1073364
SLEEPER
SLEEPER#206
NMC322135
MIMI
MIMI 790
NMC1073365
SLEEPER
SLEEPER#207
NMC322136
MIMI
MIMI 791
NMC1073366
SLEEPER
SLEEPER#208
NMC322137
MIMI
MIMI 792
NMC1073367
SLEEPER
SLEEPER#209
NMC322138
MIMI
MIMI 793
NMC1073368
SLEEPER
SLEEPER#210
NMC322139
MIMI
MIMI 794
NMC1073369
SLEEPER
SLEEPER#312
NMC405562
MIMI
MIMI 795
NMC1073370
SLEEPER
SLEEPER#317
NMC405567
MIMI
MIMI 796
NMC1073371
SLEEPER
SLEEPER#318
NMC405568
MIMI
MIMI 797
NMC1 073372
SLEEPER
SLEEPER#319
NMC405569
MIMI
MIMI 798
NMC1073373
SLEEPER
SLEEPER#320
NMC405570
MIMI
MIMI 799
NMC1073374
SLEEPER
SLEEPER#321
NMC405571
MIMI
MIMI 800
NMC1073375
SLEEPER
SLEEPER#326
NMC405576
MIMI
MIMI 801
NMC1073376
SLEEPER
SLEEPER#327
NMC405577
MIMI
MIMI 802
NMC1073377
SLEEPER
SLEEPER#328
NMC405578
MIMI
MIMI 803
NMC1073378
SLEEPER
SLEEPER#329
NMC405579
MIMI
MIMI 804
NMC1073379
SLEEPER
SLEEPER#330
NMC405580
MIMI
MIMI 805
NMC1073380
SLEEPER
SLEEPER#335
NMC405585
MIMI
MIMI 806
NMC1073381
SLEEPER
SLEEPER#336
NMC405586
MIMI
MIMI 807
NMC1073382
SLEEPER
SLEEPER#337
NMC405587
MIMI
MIMI 808
NMC1073383
SLEEPER
SLEEPER#338
NMC405588
MIMI
MIMI 809
NMC1073384
SLEEPER
SLEEPER#339
NMC405589
MIMI
MIMI 810
NMC1073385
SLEEPER
SLEEPER#343
NMC405593
MIMI
MIMI 811
NMC1073386
27-11
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
SLEEPER
SLEEPER#344
NMC405594
MIMI
MIMI 812
NMC1073387
SLEEPER
SLEEPER#345
NMC405595
MIMI
MIMI 813
NMC1073388
SLEEPER
SLEEPER#346
NMC405596
MIMI
MIMI 814
NMC1073389
SLEEPER
SLEEPER#347
NMC405597
MIMI
MIMI 815
NMC1 073390
SLEEPER
SLEEPER#348
NMC405598
MIMI
MIMI 816
NMC1073391
SLEEPER
SLEEPER#349
NMC405599
MIMI
MIMI 817
NMC1073392
SLEEPER
SLEEPER#350
NMC405600
MIMI
MIMI 818
NMC1073393
SLEEPER
SLEEPER#351
NMC405601
MIMI
MIMI 819
NMC1073394
SLEEPER
SLEEPER#352
NMC405602
MIMI
MIMI 820
NMC1073395
SLEEPER
SLEEPER#353
NMC405603
MIMI
MIMI 821
NMC1073396
SLEEPER
SLEEPER#354
NMC405604
MIMI
MIMI 822
NMC1073397
SLEEPER
SLEEPER#355
NMC405605
MIMI
MIMI 823
NMC1073398
SLEEPER
SLEEPER#356
NMC405606
MIMI
MIMI 824
NMC1073399
SLEEPER
SLEEPER#357
NMC405607
MIMI
MIMI 825
NMC1073400
SLEEPER
SLEEPER#358
NMC405608
MIMI
MIMI 826
NMC1073401
SLEEPER
SLEEPER#359
NMC405609
MIMI
MIMI 827
NMC1073402
SLEEPER
SLEEPER#360
NMC405610
MIMI
MIMI 828
NMC1073403
SLEEPER
SLEEPER#361
NMC405611
MIMI
MIMI 829
NMC1073404
SLEEPER
SLEEPER#362
NMC405612
MIMI
MIMI 830
NMC1073405
SLEEPER
SLEEPER#363
NMC405613
MIMI
MIMI 831
NMC1073406
SLEEPER
SLEEPER#364
NMC405614
MIMI
MIMI 832
NMC1073407
SLEEPER
SLEEPER#365
NMC405615
MIMI
MIMI 833
NMC1073408
SLEEPER
SLEEPER#366
NMC405616
MIMI
MIMI 834
NMC1 073409
SLEEPER
SLEEPER#367
NMC405617
MIMI
MIMI 835
NMC1073410
SLEEPER
SLEEPER#368
NMC405618
MIMI
MIMI 836
NMC1073411
SLEEPER
SLEEPER#369
NMC405619
MIMI
MIMI 837
NMC1073412
SLEEPER
SLEEPER#370
NMC405620
MIMI
MIMI 838
NMC 1073413
SLEEPER
SLEEPER#371
NMC405621
MIMI
MIMI 839
NMC1073414
SLEEPER
SLEEPER#372
NMC405622
MIMI
MIMI 840
NMC1073415
SLEEPER
SLEEPER#373
NMC405623
MIMI
MIMI 841
NMC1073416
SLEEPER
SLEEPER#374
NMC405624
MIMI
MIMI 842
NMC1073417
SLEEPER
SLEEPER#375
NMC405625
MIMI
MIMI 843
NMC1073418
SLEEPER
SLEEPER#376
NMC405626
MIMI
MIMI 844
NMC1073419
LAM
LAM 90
NMC764009
MIMI
MIMI 845
NMC1073420
LAM
LAM 91
NMC764010
MIMI
MIMI 846
NMC1073421
LAM
LAM 92
NMC764011
MIMI
MIMI 847
NMC1073422
LAM
LAM 93
NMC764012
MIMI
MIMI 848
NMC1073423
LAM
LAM 94
NMC764013
MIMI
MIMI 849
NMC1073424
LAM
LAM 95
NMC764014
MIMI
MIMI 850
NMC1073425
LAM
LAM 96
NMC764015
MIMI
MIMI 851
NMC1073426
27-12
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
LAM
LAM 97
NMC764016
MIMI
MIMI 852
NMC1073427
LAM
LAM 98
NMC764017
MIMI
MIMI 853
NMC1073428
LAM
LAM 99
NMC764018
MIMI
MIMI 854
NMC1073429
LAM
LAM 100
NMC764019
MIMI
MIMI 855
NMC1073430
LAM
LAM 102
NMC764021
MIMI
MIMI 856
NMC1073431
LAM
LAM 104
NMC764023
MIMI
MIMI 857
NMC1073432
LAM
LAM 106
NMC764025
MIMI
MIMI 858
NMC1073433
LAM
LAM 108
NMC764027
MIMI
MIMI 859
NMC1073434
LAM
LAM 110
NMC764029
MIMI
MIMI 860
NMC1073435
LAM
LAM 112
NMC764031
MIMI
MIMI 861
NMC1073436
LAM
LAM 114
NMC764033
MIMI
MIMI 862
NMC1073437
LAM
LAM 116
NMC764035
MIMI
MIMI 863
NMC1073438
LAM
LAM 118
NMC764037
MIMI
MIMI 864
NMC1 073439
LAM
LAM 120
NMC764039
MIMI
MIMI 865
NMC1073440
LAM
LAM 122
NMC764041
MIMI
MIMI 866
NMC1073441
LAM
LAM 124
NMC764043
MIMI
MIMI 867
NMC1073442
LAM
LAM 126
NMC764045
MIMI
MIMI 868
NMC1073443
LAM
LAM 128
NMC764047
MIMI
MIMI 869
NMC1073444
LAM
LAM 130
NMC764049
MIMI
MIMI 870
NMC1 073445
LAM
LAM 132
NMC764051
MIMI
MIMI 871
NMC1073446
LAM
LAM 134
NMC764053
MIMI
MIMI 872
NMC1073447
LAM
LAM 136
NMC764055
MIMI
MIMI 873
NMC1073448
LAM
LAM 138
NMC764057
MIMI
MIMI 874
NMC1073449
LAM
LAM 140
NMC764059
MIMI
MIMI 875
NMC1073450
LAM
LAM 142
NMC764061
MIMI
MIMI 876
NMC1073451
LAM
LAM 144
NMC764063
MIMI
MIMI 877
NMC1 073452
LAM
LAM 146
NMC764065
MIMI
MIMI 878
NMC1073453
LAM
LAM 148
NMC764067
MIMI
MIMI 879
NMC1073454
LAM
LAM 150
NMC764069
MIMI
MIMI 880
NMC1 073455
LAM
LAM 152
NMC764071
MIMI
MIMI 881
NMC1073456
LAM
LAM 153
NMC764072
MIMI
MIMI 882
NMC1073457
LAM
LAM 154
NMC764073
MIMI
MIMI 883
NMC1073458
LAM
LAM 155
NMC764074
MIMI
MIMI 884
NMC1073459
LAM
LAM 156
NMC764075
MIMI
MIMI 885
NMC1073460
LAM
LAM 157
NMC764076
MIMI
MIMI 886
NMC1073461
LAM
LAM 158
NMC764077
MIMI
MIMI 887
NMC1073462
LAM
LAM 159
NMC764078
MIMI
MIMI 888
NMC1073463
LAM
LAM 160
NMC764079
MIMI
MIMI 889
NMC1073464
LAM
LAM 161
NMC764080
MIMI
MIMI 890
NMC1073465
LAM
LAM 162
NMC764081
MIMI
MIMI 891
NMC1073466
27-13
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
LAM
LAM 163
NMC764082
MIMI
MIMI 892
NMC1073467
LAM
LAM 164
NMC764083
MIMI
MIMI 893
NMC1073468
LAM
LAM 165
NMC764084
MIMI
MIMI 894
NMC1073469
LAM
LAM 166
NMC764085
MIMI
MIMI 895
NMC1073470
LAM
LAM 167
NMC764086
MIMI
MIMI 896
NMC1073471
LAM
LAM 168
NMC764087
MIMI
MIMI 897
NMC1073472
LAM
LAM 169
NMC764088
MIMI
MIMI 898
NMC1073473
LAM
LAM 170
NMC764089
MIMI
MIMI 899
NMC1073474
LAM
LAM 171
NMC764090
MIMI
MIMI 900
NMC1073475
LAM
LAM 172
NMC764091
MIMI
MIMI 901
NMC1073476
LAM
LAM 173
NMC764092
MIMI
MIMI 902
NMC 1073477
LAM
LAM 174
NMC764093
MIMI
MIMI 903
NMC1 073478
LAM
LAM 175
NMC764094
MIMI
MIMI 904
NMC1073479
LAM
LAM 176
NMC764095
MIMI
MIMI 905
NMC1073480
LAM
LAM 177
NMC764096
MIMI
MIMI 906
NMC1073481
LAM
LAM 178
NMC771946
MIMI
MIMI 907
NMC1073482
LAM
LAM 180
NMC771947
MIMI
MIMI 908
NMC1073483
LAM
LAM 181
NMC771948
MIMI
MIMI 909
NMC1073484
LAM
LAM 182
NMC771949
MIMI
MIMI 910
NMC1073485
LAM
LAM 183
NMC771950
MIMI
MIMI 911
NMC1073486
LAM
LAM 184
NMC771951
MIMI
MIMI 912
NMC1073487
LAM
LAM 185
NMC771952
MIMI
MIMI 913
NMC1073488
LAM
LAM 186
NMC771953
MIMI
MIMI 914
NMC1073489
LAM
LAM 187
NMC771954
MIMI
MIMI 915
NMC1073490
LAM
LAM 188
NMC771955
MIMI
MIMI 916
NMC1073491
LAM
LAM 189
NMC771956
MIMI
MIMI 917
NMC1073492
LAM
LAM 191
NMC771958
MIMI
MIMI 918
NMC1073493
LAM
LAM 192
NMC771959
MIMI
MIMI 919
NMC1073494
LAM
LAM 193
NMC771960
MIMI
MIMI 920
NMC1073495
LAM
LAM 194
NMC771961
MIMI
MIMI 921
NMC1073496
LAM
LAM 195
NMC771962
MIMI
MIMI 922
NMC1073497
LAM
LAM 196
NMC771963
MIMI
MIMI 923
NMC1073498
LAM
LAM 197
NMC771964
MIMI
MIMI 924
NMC1073499
LAM
LAM 198
NMC771965
MIMI
MIMI 925
NMC1073500
LAM
LAM 199
NMC771966
MIMI
MIMI 926
NMC1073501
LAM
LAM 200
NMC771967
MIMI
MIMI 927
NMC1073502
LAM
LAM 201
NMC771968
MIMI
MIMI 928
NMC1073503
LAM
LAM 202
NMC771969
MIMI
MIMI 929
NMC1073504
LAM
LAM 203
NMC771970
MIMI
MIMI 930
NMC1073505
PDSLP
PDSLP 104
NMC778341
MIMI
MIMI 931
NMC1073506
27-14
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
PDSLP
PDSLP 106
NMC778342
MIMI
MIMI 932
NMC1073507
PDSLP
PDSLP 108
NMC778343
MIMI
MIMI 933
NMC1073508
PDSLP
PDSLP 110
NMC778344
MIMI
MIMI 934
NMC1073509
PDSLP
PDSLP 112
NMC778346
MIMI
MIMI 935
NMC1073510
PDSLP
PDSLP 114
NMC778348
MIMI
MIMI 936
NMC1073511
PDSLP
PDSLP 116
NMC778350
MIMI
MIMI 937
NMC1073512
PDSLP
PDSLP 118
NMC778352
MIMI
MIMI 938
NMC1073513
PDSLP
PDSLP 120
NMC778354
MIMI
MIMI 939
NMC1073514
PDSLP
PDSLP 122
NMC778356
MIMI
MIMI 955
NMC1077567
PDSLP
PDSLP 124
NMC778358
MIMI
MIMI 956
NMC1 077568
PDSLP
PDSLP 126
NMC778360
MIMI
MIMI 957
NMC1077569
PDSLP
PDSLP 128
NMC778362
MIMI
MIMI 958
NMC1077570
PDSLP
PDSLP 130
NMC778364
MIMI
MIMI 959
NMC1077571
PDSLP
PDSLP 132
NMC778366
MIMI
MIMI 960
NMC1077572
PDSLP
PDSLP 134
NMC778368
MIMI
MIMI 961
NMC1077573
PDSLP
PDSLP 136
NMC778370
MIMI
MIMI 962
NMC1077574
PDSLP
PDSLP 138
NMC778372
MIMI
MIMI 963
NMC1077575
PDSLP
PDSLP 140
NMC778374
MIMI
MIMI 964
NMC1077576
PDSLP
PDSLP 142
NMC778376
MIMI
MIMI 965
NMC1077577
PDSLP
PDSLP 144
NMC778378
MIMI
MIMI 966
NMC1077578
PDSLP
PDSLP 146
NMC778380
MIMI
MIMI 940
NMC1080362
PDSLP
PDSLP 148
NMC778382
MIMI
MIMI 941
NMC1080363
PDSLP
PDSLP 177
NMC778383
MIMI
MIMI 942
NMC1 080364
PDSLP
PDSLP 178
NMC778384
MIMI
MIMI 943
NMC1 080365
PDSLP
PDSLP 179
NMC778385
MIMI
MIMI 944
NMC1080366
PDSLP
PDSLP 180
NMC778386
MIMI
MIMI 945
NMC1080367
PDSLP
PDSLP 181
NMC778387
MIMI
MIMI 946
NMC1080368
PDSLP
PDSLP 182
NMC778388
MIMI
MIMI 947
NMC1080369
PDSLP
PDSLP 183
NMC778389
MIMI
MIMI 948
NMC1080370
PDSLP
PDSLP 184
NMC778390
MIMI
MIMI 949
NMC1080371
PDSLP
PDSLP 185
NMC778391
MIMI
MIMI 950
NMC1080372
PDSLP
PDSLP 186
NMC778392
MIMI
MIMI 951
NMC1080373
PDSLP
PDSLP 187
NMC778393
MIMI
MIMI 952
NMC1080374
PDSLP
PDSLP 188
NMC778394
MIMI
MIMI 953
NMC1080375
PDSLP
PDSLP 189
NMC778395
MIMI
MIMI 954
NMC1080376
PDSLP
PDSLP 190
NMC778396
ELECTRUM
ELECTRUM # 11
NMC235675
PDSLP
PDSLP 191
NMC778397
ELECTRUM
ELECTRUM# 12
NMC235676
PDSLP
PDSLP 192
NMC778398
ELECTRUM
ELECTRUM# 13
NMC235677
PDSLP
PDSLP 193
NMC778399
ELECTRUM
ELECTRUM#21
NMC239887
PDSLP
PDSLP 194
NMC778400
ELECTRUM
ELECTRUM # 23
NMC239889
27-15
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
PDSLP
PDSLP 195
NMC778401
FREE GOLD
FREE GOLD# 1
NMC252825
PDSLP
PDSLP 196
NMC778402
FREE GOLD
FREE GOLD# 2
NMC252826
PDSLP
PDSLP 197
NMC778403
FREE GOLD
FREE GOLD# 3
NMC252827
PDSLP
PDSLP 198
NMC778404
FREE GOLD
FREE GOLD # 4
NMC252828
PDSLP
PDSLP 199
NMC778405
FREE GOLD
FREE GOLD# 5
NMC252829
PDSLP
PDSLP 200
NMC778406
FREE GOLD
FREE GOLD# 6
NMC252830
PDSLP
PDSLP 201
NMC778407
FREE GOLD
FREE GOLD# 7
NMC252831
PDSLP
PDSLP 202
NMC778408
FREE GOLD
FREE GOLD# 8
NMC252832
PDSLP
PDSLP 203
NMC778409
FREE GOLD
FREE GOLD# 9
NMC252833
PDSLP
PDSLP 204
NMC778410
FREE GOLD
FREE GOLD# 10
NMC252834
PDSLP
PDSLP 230
NMC778415
DAY
DAYLIGHT FRACTION
NMC269681
PDSLP
PDSLP 231
NMC778416
RR
RR#2
NMC340619
PDSLP
PDSLP 232
NMC778417
RR
RR#13
NMC340630
PDSLP
PDSLP 233
NMC778418
RR
RR#24
NMC340641
PDSLP
PDSLP 234
NMC778419
RR
RR#26
NMC340643
PDSLP
PDSLP 235
NMC778420
RR
RR#28
NMC340645
PDSLP
PDSLP 236
NMC778421
RR
RR#35
NMC340652
PDSLP
PDSLP 237
NMC778422
RR
RR#37
NMC340654
PDSLP
PDSLP 238
NMC778423
RR
RR#38
NMC340655
PDSLP
PDSLP 239
NMC778424
RR
RR#39
NMC340656
PDSLP
PDSLP 240
NMC778425
RR
RR#40
NMC340657
PDSLP
PDSLP 241
NMC778426
ELECTRUM
ELECTRUM# 1
NMC371654
PDSLP
PDSLP 242
NMC778427
ELECTRUM
ELECTRUM# 2
NMC371655
PDSLP
PDSLP 243
NMC778428
ELECTRUM
ELECTRUM# 3
NMC371656
PDSLP
PDSLP 244
NMC778429
LLY
LLY 1
NMC683286
PDSLP
PDSLP 245
NMC778430
LLY
LLY2
NMC683287
PDSLP
PDSLP 246
NMC778431
LLY
LLY 3
NMC683288
PDSLP
PDSLP 247
NMC778432
LLY
LLY 4
NMC683289
PDSLP
PDSLP 248
NMC778433
LLY
LLY 5
NMC683290
PDSLP
PDSLP 249
NMC778434
LLY
LLY 6
NMC683291
PDSLP
PDSLP 250
NMC778435
LLY
LLY 7
NMC683292
PDSLP
PDSLP 251
NMC778436
LLY
LLY 8
NMC683293
PDSLP
PDSLP 252
NMC778437
LLY
LLY 9
NMC683294
PDSLP
PDSLP 253
NMC778438
LLY
LLY 10
NMC683295
PDSLP
PDSLP 254
NMC778439
LLY
LLY 11
NMC683296
PDSLP
PDSLP 279
NMC778448
LLY
LLY 12
NMC683297
PDSLP
PDSLP 280
NMC778449
LLY
LLY 13
NMC683298
PDSLP
PDSLP 281
NMC778450
LLY
LLY 14
NMC683299
PDSLP
PDSLP 282
NMC778451
LLY
LLY 15
NMC683300
PDSLP
PDSLP 283
NMC778452
LLY
LLY 16
NMC683301
27-16
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
PDSLP
PDSLP 284
NMC778453
LLY
LLY 17
NMC683302
PDSLP
PDSLP 285
NMC778454
LLY
LLY 18
NMC683303
PDSLP
PDSLP 286
NMC778455
LLY
LLY 19
NMC683304
PDSLP
PDSLP 287
NMC778456
LLY
LLY 20
NMC683305
PDSLP
PDSLP 288
NMC778457
LLY
LLY 21
NMC683306
PDSLP
PDSLP 289
NMC778458
LLY
LLY 22
NMC683307
PDSLP
PDSLP 290
NMC778459
LLY
LLY 23
NMC683308
PDSLP
PDSLP 291
NMC778460
LLY
LLY 24
NMC683309
PDSLP
PDSLP 292
NMC778461
LLY
LLY 25
NMC683310
PDSLP
PDSLP 293
NMC778462
LLY
LLY 26
NMC683311
PDSLP
PDSLP 294
NMC778463
LLY
LLY 27
NMC683312
PDSLP
PDSLP 295
NMC778464
LLY
LLY 28
NMC683313
PDSLP
PDSLP 296
NMC778465
LLY
LLY 29
NMC683314
PDSLP
PDSLP 297
NMC778466
LLY
LLY 30
NMC683315
PDSLP
PDSLP 298
NMC778467
LLY
LLY 31
NMC683316
PDSLP
PDSLP 299
NMC778468
LLY
LLY 32
NMC683317
PDSLP
PDSLP 300
NMC778469
LLY
LLY 33
NMC683318
PDSLP
PDSLP 325
NMC778478
LLY
LLY 34
NMC683319
PDSLP
PDSLP 326
NMC778479
LLY
LLY 35
NMC683320
PDSLP
PDSLP 327
NMC778480
LLY
LLY36
NMC683321
PDSLP
PDSLP 328
NMC778481
LLY
LLY 37
NMC683322
PDSLP
PDSLP 329
NMC778482
LLY
LLY 38
NMC683323
PDSLP
PDSLP 330
NMC778483
LLY
LLY 39
NMC683324
PDSLP
PDSLP 331
NMC778484
DAY
DAY 1
NMC700996
PDSLP
PDSLP 332
NMC778485
DAY
DAY 2
NMC700997
PDSLP
PDSLP 333
NMC778486
DAY
DAY 3
NMC700998
PDSLP
PDSLP 334
NMC778487
DAY
DAY 4
NMC700999
PDSLP
PDSLP 335
NMC778488
DAY
DAY 5
NMC701000
PDSLP
PDSLP 336
NMC778489
DAY
DAY 6
NMC701001
PDSLP
PDSLP 337
NMC778490
DAY
DAY 7
NMC701002
PDSLP
PDSLP338
NMC778491
DAY
DAY 8
NMC701003
PDSLP
PDSLP 339
NMC778492
DAY
DAY 9
NMC701004
PDSLP
PDSLP 340
NMC778493
DAY
DAY 10
NMC701005
PDSLP
PDSLP 341
NMC778494
DAY
DAY 11
NMC701006
PDSLP
PDSLP 342
NMC778495
DAY
DAY 12
NMC701007
PDSLP
PDSLP 343
NMC778496
DAY
DAY 13
NMC701008
PDSLP
PDSLP 344
NMC778497
DAY
DAY 14
NMC701009
PDSLP
PDSLP 369
NMC778506
DAY
DAY 15
NMC701010
PDSLP
PDSLP 370
NMC778507
DAY
DAY 16
NMC701011
PDSLP
PDSLP 371
NMC778508
DAY
DAY 17
NMC701012
27-17
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
PDSLP
PDSLP 372
NMC778509
DAY
DAY 18
NMC701013
PDSLP
PDSLP 373
NMC778510
DAY
DAY 19
NMC701014
PDSLP
PDSLP 374
NMC77851 1
DAY
DAY 20
NMC701015
PDSLP
PDSLP 375
NMC778512
DAY
DAY 21
NMC701016
PDSLP
PDSLP 376
NMC778513
DAY
DAY 22
NMC701017
PDSLP
PDSLP 377
NMC778514
DAY
DAY 23
NMC701018
PDSLP
PDSLP 378
NMC778515
DAY
DAY 24
NMC701019
PDSLP
PDSLP 379
NMC778516
DAY
DAY 25
NMC701020
PDSLP
PDSLP 380
NMC778517
DAY
DAY 26
NMC701021
PDSLP
PDSLP 381
NMC778518
DAY
DAY 27
NMC701022
PDSLP
PDSLP 382
NMC778519
DAY
DAY 28
NMC701023
PDSLP
PDSLP 383
NMC778520
DAY
DAY 29
NMC701024
PDSLP
PDSLP 384
NMC778521
DAY
DAY 30
NMC701025
PDSLP
PDSLP 409
NMC778530
DAY
DAY 31
NMC701026
PDSLP
PDSLP 410
NMC778531
DAY
DAY 32
NMC701027
PDSLP
PDSLP 411
NMC778532
DAY
DAY 33
NMC701028
PDSLP
PDSLP 412
NMC778533
DAY
DAY 34
NMC701029
PDSLP
PDSLP 413
NMC778534
DAY
DAY 35
NMC701030
PDSLP
PDSLP 414
NMC778535
DAY
DAY 36
NMC701031
PDSLP
PDSLP 415
NMC778536
DAY
DAY 37
NMC701032
PDSLP
PDSLP 416
NMC778537
DAY
DAY 38
NMC701033
PDSLP
PDSLP 417
NMC778538
DAY
DAY 39
NMC701034
PDSLP
PDSLP 418
NMC778539
DAY
DAY 40
NMC701035
PDSLP
PDSLP419
NMC778540
DAY
DAY 41
NMC701036
PDSLP
PDSLP 420
NMC778541
DAY
DAY 42
NMC701037
PDSLP
PDSLP 421
NMC778542
DAY
DAY 43
NMC701038
PDSLP
PDSLP 422
NMC778543
DAY
DAY 44
NMC701039
PDSLP
PDSLP 439
NMC778552
DAY
DAY 45
NMC701040
PDSLP
PDSLP 440
NMC778553
DAY
DAY 46
NMC701041
PDSLP
PDSLP 441
NMC778554
DAY
DAY 47
NMC701042
PDSLP
PDSLP 442
NMC778555
DAY
DAY 48
NMC701043
PDSLP
PDSLP 443
NMC778556
DAY
DAY 49
NMC701044
PDSLP
PDSLP 444
NMC778557
DAY
DAY 50
NMC713671
PDSLP
PDSLP 445
NMC778558
DAY
DAY 51
NMC713672
PDSLP
PDSLP 446
NMC778559
DAY
DAY 52
NMC713673
PDSLP
PDSLP 447
NMC778560
DAY
DAY 53
NMC713674
PDSLP
PDSLP 448
NMC778561
DAY
DAY 54
NMC713675
PDSLP
PDSLP 449
NMC778562
DAY
DAY 55
NMC713676
PDSLP
PDSLP 450
NMC778563
DAY
DAY 56
NMC713677
PDSLP
PDSLP 451
NMC778564
DAY
DAY 57
NMC713678
27-18
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
PDSLP
PDSLP 452
NMC778565
DAY
DAY 58
NMC713679
LAM
LAM#206
NMC785737
DAY
DAY 59
NMC713680
LAM
LAM#207
NMC785738
LAM
LAM 1
NMC730912
LAM
LAM#208
NMC785739
LAM
LAM 2
NMC730913
LAM
LAM#209
NMC785740
LAM
LAM 3
NMC730914
LAM
LAM#210
NMC785741
LAM
LAM 4
NMC730915
SK
SK 1
NMC789774
LAM
LAM 5
NMC730916
SK
SK2
NMC789775
LAM
LAM 6
NMC730917
SK
SK 3
NMC789776
LAM
LAM 7
NMC730918
SK
SK4
NMC789777
LAM
LAM 8
NMC730919
SK
SK5
NMC789778
LAM
LAM 9
NMC730920
SK
SK6
NMC789779
LAM
LAM 10
NMC730921
SK
SK7
NMC789780
LAM
LAM 11
NMC730922
SK
SK8
NMC789781
LAM
LAM 12
NMC730923
SK
SK9
NMC789782
LAM
LAM 13
NMC730924
SK
SK 14
NMC789783
LAM
LAM 14
NMC730925
SK
SK 15
NMC789784
LAM
LAM 15
NMC730926
SK
SK 16
NMC789785
LAM
LAM 16
NMC730927
SK
SK 17
NMC789786
LAM
LAM 17
NMC730928
SK
SK 18
NMC789787
LAM
LAM 18
NMC730929
SK
SK 19
NMC789788
LAM
LAM 19
NMC730930
SK
SK21
NMC789790
LAM
LAM 20
NMC730931
SK
SK 23
NMC789792
LAM
LAM 21
NMC730932
SK
SK25
NMC789794
LAM
LAM 22
NMC730933
SK
SK 27
NMC789796
LAM
LAM 23
NMC730934
AW
AW 1
NMC850604
LAM
LAM 24
NMC730935
AW
AW 2
NMC850605
LAM
LAM 25
NMC730936
AW
AW 3
NMC850606
LAM
LAM 26
NMC730937
AW
AW 4
NMC850607
LAM
LAM 27
NMC730938
AW
AW 5
NMC850608
LAM
LAM 28
NMC730939
AW
AW 6
NMC850609
LAM
LAM 29
NMC730940
AW
AW 7
NMC850610
LAM
LAM 30
NMC730941
AW
AW 8
NMC850611
LAM
LAM 31
NMC730942
AW
AW 9
NMC850612
LAM
LAM 32
NMC730943
AW
AW 10
NMC850613
LAM
LAM 33
NMC730944
AW
AW 11
NMC850614
LAM
LAM 34
NMC730945
AW
AW 12
NMC850615
LAM
LAM 35
NMC730946
AW
AW 13
NMC850616
LAM
LAM 36
NMC730947
AW
AW 14
NMC850617
LAM
LAM 37
NMC730948
AW
AW 15
NMC850618
LAM
LAM 38
NMC730949
27-19
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
AW
AW 16
NMC850619
LAM
LAM 39
NMC730950
AW
AW 17
NMC850620
LAM
LAM 40
NMC730951
AW
AW 18
NMC850621
LAM
LAM 41
NMC730952
AW
AW 19
NMC850622
LAM
LAM 42
NMC730953
AW
AW 20
NMC850623
LAM
LAM 43
NMC730954
AW
AW 21
NMC850624
LAM
LAM 44
NMC730955
AW
AW 22
NMC850625
LAM
LAM 45
NMC730956
AW
AW 23
NMC850626
LAM
LAM 46
NMC730957
AW
AW 24
NMC850627
LAM
LAM 47
NMC730958
AW
AW 25
NMC850628
LAM
LAM 48
NMC730959
AW
AW 26
NMC850629
LAM
LAM 49
NMC730960
AW
AW 27
NMC850630
LAM
LAM 50
NMC730961
AW
AW 28
NMC850631
LAM
LAM 51
NMC730962
AW
AW 29
NMC850632
LAM
LAM 52
NMC730963
SS
SSG 1
NMC909185
LAM
LAM 53
NMC730964
SS
SSG2
NMC909186
LAM
LAM 54
NMC730965
SS
SSG 3
NMC909187
LAM
LAM 55
NMC730966
SS
SSG 4
NMC909188
LAM
LAM 56
NMC730967
SS
SSG 5
NMC909189
LAM
LAM 57
NMC730968
SS
SSG 6
NMC909190
LAM
LAM 58
NMC730969
SS
SSG 7
NMC909191
LAM
LAM 59
NMC730970
SS
SSG 8
NMC909192
LAM
LAM 60
NMC730971
SS
SSG 9
NMC909193
LAM
LAM 61
NMC730972
SS
SSG 10
NMC909194
LAM
LAM 62
NMC730973
SS
SSG 11
NMC909195
LAM
LAM 63
NMC730974
SS
SSG 12
NMC909196
LAM
LAM 64
NMC730975
SS
SSG 13
NMC909197
LAM
LAM 65
NMC730976
SS
SSG 14
NMC909198
LAM
LAM 66
NMC730977
SS
SSG 15
NMC909199
LAM
LAM 67
NMC730978
SS
SSG 16
NMC909200
LAM
LAM 68
NMC730979
SS
SSG 17
NMC909201
LAM
LAM 69
NMC730980
SS
SSG 18
NMC909202
LAM
LAM 70
NMC730981
SS
SSG 19
NMC909203
LAM
LAM 71
NMC730982
SS
SSG 20
NMC909204
LAM
LAM 72
NMC730983
SS
SSG 21
NMC909205
LAM
LAM 73
NMC730984
SS
SSG 22
NMC909206
LAM
LAM 74
NMC730985
SS
SSG 23
NMC909207
LAM
LAM 75
NMC730986
SS
SSG 24
NMC909208
LAM
LAM 80
NMC730991
RO
RO 1
859961
LAM
LAM 82
NMC730993
RO
RO 2
859962
LAM
LAM 84
NMC730995
27-20
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
RO
RO 3
859963
LAM
LAM 85
NMC730996
RO
RO 4
859964
LAM
LAM 86
NMC730997
RO
RO 5
859965
LAM
LAM 87
NMC730998
RO
RO 6
859966
LAM
LAM 88
NMC730999
RO
RO 7
859967
LAM
LAM 89
NMC731000
RO
RO 8
859968
NEW ALMA
NEW ALMA
NMC75273
RO
RO 9
859969
VIRGINIA
VIRGINIA
NMC75274
RO
RO 10
859970
MORNING
MORNING
NMC75275
RO
RO 11
859971
MORNING STAR
MORNING STAR
NMC75276
RO
RO 12
859972
NEW EVENING
NEW EVENING
NMC75277
RO
RO 13
859973
NEW SNOWSTORM
NEW SNOWSTORM
NMC75278
RO
RO 14
859974
LAM
LAM 76
NMC771939
RO
RO 15
859975
LAM
LAM 77
NMC771940
RO
RO 16
859976
LAM
LAM 78
NMC771941
RO
RO 17
859977
LAM
LAM 79
NMC771942
RO
RO 18
859978
LAM
LAM 81
NMC771943
RO
RO 19
859979
LAM
LAM 83
NMC771944
RO
RO 20
859980
YORK
YORK#1
NMC787346
RO
RO 21
859981
YORK
YORK#2
NMC787347
RO
RO 22
859982
YORK
YORK#3
NMC787348
RO
RO 23
859983
YORK
YORK#4
NMC787349
RO
RO 24
859984
YORK
YORK#5
NMC787350
RO
RO 25
859985
BLUE NO.
BLUE NO. 982
NMC1024274
RO
RO 26
859986
BLUE NO.
BLUE NO. 983
NMC1024275
RO
RO 27
859987
BLUE NO.
BLUE NO. 984
NMC1024276
RO
RO 28
859988
BLUE NO.
BLUE NO. 985
NMC1024277
RO
RO 29
859989
BLUE NO.
BLUE NO. 986
NMC1024278
RO
RO 30
859990
BLUE NO.
BLUE NO. 987
NMC1024279
RO
RO 31
859991
BLUE NO.
BLUE NO. 988
NMC1024280
RO
RO 32
859992
BLUE NO.
BLUE NO. 989
NMC1024281
RO
RO 33
859993
BLUE NO.
BLUE NO. 990
NMC1024282
RO
RO 34
859994
BLUE NO.
BLUE NO. 991
NMC1024283
RO
RO 35
859995
BLUE NO.
BLUE NO. 992
NMC1024284
RO
RO 36
859996
BLUE NO.
BLUE NO. 993
NMC1 024285
RO
RO 37
859997
BLUE NO.
BLUE NO. 994
NMC1024286
RO
RO 38
859998
BLUE NO.
BLUE NO. 995
NMC1024287
RO
RO 39
859999
BLUE NO.
BLUE NO. 996
NMC1024288
RO
RO 40
860000
BLUE NO.
BLUE NO. 997
NMC1024289
RO
RO 41
860001
BLUE NO.
BLUE NO. 928
NMC1029648
RO
RO 42
860002
BLUE NO.
BLUE NO. 929
NMC1029649
27-21
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
RO
RO 43
860003
BLUE NO.
BLUE NO. 930
NMC1029650
RO
RO 44
860004
BLUE NO.
BLUE NO. 931
NMC1029651
RO
RO 45
860005
BLUE NO.
BLUE NO. 932
NMC1029652
RO
RO 46
860006
BLUE NO.
BLUE NO. 933
NMC1029653
RO
RO 47
860007
BLUE NO.
BLUE NO. 934
NMC1029654
RO
RO 48
860008
BLUE NO.
BLUE NO. 935
NMC1029655
RO
RO 49
860009
BLUE NO.
BLUE NO. 936
NMC1 029656
RO
RO 50
860010
BLUE NO.
BLUE NO. 937
NMC1029657
RO
RO 51
860011
BLUE NO.
BLUE NO. 938
NMC102965 8
RO
RO 52
860012
BLUE NO.
BLUE NO. 939
NMC1029659
RO
RO 53
860013
BLUE NO.
BLUE NO. 940
NMC1029660
RO
RO 54
860014
BLUE NO.
BLUE NO. 941
NMC1029661
RO
RO 55
860015
BLUE NO.
BLUE NO. 942
NMC1029662
RO
RO 56
860016
BLUE NO.
BLUE NO. 943
NMC1029663
RO
RO 57
860017
BLUE NO.
BLUE NO. 944
NMC1029664
RO
RO 58
860018
BLUE NO.
BLUE NO. 945
NMC1029665
RO
RO 59
860019
BLUE NO.
BLUE NO. 946
NMC1029666
RO
RO 60
860020
BLUE NO.
BLUE NO. 947
NMC1029667
SH
SH 1
1067899
BLUE NO.
BLUE NO. 948
NMC1029668
SH
SH2
1067900
BLUE NO.
BLUE NO. 949
NMC1029669
SH
SH 3
1067901
BLUE NO.
BLUE NO. 950
NMC 1029670
SH
SH4
1067902
BLUE NO.
BLUE NO. 951
NMC1029671
SH
SH5
1067903
BLUE NO.
BLUE NO. 952
NMC1029672
SH
SH6
1067904
BLUE NO.
BLUE NO. 953
NMC1029673
SH
SH7
1067905
BLUE NO.
BLUE NO. 954
NMC1029674
SH
SH 8
1067906
BLUE NO.
BLUE NO. 955
NMC1029675
SH
SH9
1067907
BLUE NO.
BLUE NO. 956
NMC1029676
SH
SH 10
1067908
BLUE NO.
BLUE NO. 957
NMC1029677
SH
SH 11
1067909
BLUE NO.
BLUE NO. 958
NMC1029678
SH
SH 12
1067910
BLUE NO.
BLUE NO. 959
NMC1029679
SH
SH 13
1067911
BLUE NO.
BLUE NO. 960
NMC1029680
SH
SH 14
1067912
BLUE NO.
BLUE NO. 961
NMC 1029681
SH
SH 15
1067913
BLUE NO.
BLUE NO. 962
NMC1029682
SH
SH 16
1067914
BLUE NO.
BLUE NO. 963
NMC1029683
SH
SH 17
1067915
BLUE NO.
BLUE NO. 2000
NMC1029684
SH
SH 18
1067916
BLUE NO.
BLUE NO. 2001
NMC1029685
SH
SH 19
1067917
BLUE NO.
BLUE NO. 2002
NMC1029686
SH
SH 20
1067918
BLUE NO.
BLUE NO. 2003
NMC1029687
SH
SH21
1067919
BLUE NO.
BLUE NO. 2004
NMC1029688
SH
SH22
1067920
BLUE NO.
BLUE NO. 2005
NMC1029689
27-22
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
SH
SH 23
1067921
BLUE NO.
BLUE NO. 2006
NMC1029690
SH
SH 24
1067922
BLUE NO.
BLUE NO. 2007
NMC1029691
SH
SH25
1067923
BLUE NO.
BLUE NO. 2008
NMC1029692
SH
SH26
1067924
BLUE NO.
BLUE NO. 2009
NMC1029693
SH
SH 27
1067925
BLUE NO.
BLUE NO. 2010
NMC1029694
SH
SH43
1067926
BLUE NO.
BLUE NO. 2011
NMC1029695
SH
SH 44
1067927
BLUE NO.
BLUE NO. 2012
NMC1029696
SH
SH51
1067928
BLUE NO.
BLUE NO. 2013
NMC1029697
SH
SH 52
1067929
BLUE NO.
BLUE NO. 2014
NMC1029698
SH
SH 53
1067930
BLUE NO.
BLUE NO. 2015
NMC1029699
SH
SH 54
1067931
BLUE NO.
BLUE NO. 2016
NMC1029700
SH
SH55
1067932
BLUE NO.
BLUE NO. 2017
NMC1029701
SH
SH56
1067933
BLUE NO.
BLUE NO. 2018
NMC1029702
SH
SH57
1067934
BLUE NO.
BLUE NO. 2019
NMC1029703
SH
SH58
1067935
BLUE NO.
BLUE NO. 2020
NMC1029704
SH
SH59
1067936
BLUE NO.
BLUE NO. 2021
NMC1029705
SH
SH 60
1067937
BLUE NO.
BLUE NO. 2022
NMC1029706
SH
SH61
1067938
BLUE NO.
BLUE NO. 2023
NMC1029707
SH
SH 62
1067939
BLUE NO.
BLUE NO. 2024
NMC1029708
SH
SH 63
1067940
BLUE NO.
BLUE NO. 2025
NMC1029709
SH
SH 64
1067941
BLUE NO.
BLUE NO. 2026
NMC1029710
SH
SH 65
1067942
BLUE NO.
BLUE NO. 2027
NMC1029711
SH
SH 66
1067943
BLUE NO.
.BLUE NO. 2028
NMC1029712
SH
SH 67
1067944
BLUE NO.
BLUE NO. 2029
NMC1029713
SH
SH 68
1067945
BLUE NO.
BLUE NO. 2030
NMC1029714
SH
SH 69
1067946
BLUE NO.
BLUE NO. 2031
NMC1029715
SH
SH 70
1067947
BLUE NO.
BLUE NO. 2032
NMC1029716
SH
SH71
1067948
BLUE NO.
BLUE NO. 2033
NMC1029717
SH
SH 72
1067949
BLUE NO.
BLUE NO. 2034
NMC1029718
SH
SH 73
1067950
BLUE NO.
BLUE NO. 2035
NMC1029719
SH
SH 74
1067951
BLUE NO.
BLUE NO. 2036
NMC1029720
SH
SH 75
1067952
BLUE NO.
BLUE NO. 2037
NMC1029721
SH
SH 76
1067953
BLUE NO.
BLUE NO. 2038
NMC1029722
SH
SH77
1067954
BLUE NO.
BLUE NO. 2039
NMC1029723
SH
SH78
1067955
SP
SP 1
NMC955469
SH
SH 79
1067956
SP
SP 2
NMC955470
SH
SH 80
1067957
SP
SP 3
NMC955471
SH
SH 81
1067958
SP
SP 4
NMC955472
SH
SH 82
1067959
SP
SP 5
NMC955473
SH
SH 83
1067960
SP
SP 52
NMC955520
27-23
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
SH
SH 84
1067961
SP
SP 53
NMC955521
SH
SH85
1067962
SP
SP 54
NMC955522
SH
SH 86
1067963
SP
SP 55
NMC955523
SH
SH 87
1067964
SP
SP 56
NMC955524
SH
SH88
1067965
SP
SP 103
NMC955571
SH
SH 89
1067966
SP
SP 104
NMC955572
SH
SH 90
1067967
SP
SP 105
NMC955573
SH
SH91
1067968
SP
SP 106
NMC955574
SH
SH 92
1067969
SP
SP 107
NMC955575
SH
SH 93
1067970
SP
SP 154
NMC955622
SH
SH 94
1067971
SP
SP 155
NMC955623
SH
SH95
1067972
SP
SP 156
NMC955624
SH
SH 96
1067973
SP
SP 157
NMC955625
SH
SH97
1067974
SP
SP 158
NMC955626
SH
SH98
1067975
SP
SP 205
NMC955673
SH
SH 99
1067976
SP
SP 206
NMC955674
SH
SH 100
1067977
SP
SP 207
NMC955675
SH
SH 101
1067978
SP
SP 208
NMC955676
SH
SH 102
1067979
SP
SP 209
NMC955677
SH
SH 103
1067980
SP
SP 256
NMC955724
SH
SH 104
1067981
SP
SP 257
NMC955725
SH
SH 105
1067982
SP
SP 258
NMC955726
SH
SH 106
1067983
SP
SP 259
NMC955727
SH
SH 107
1067984
SP
SP 260
NMC955728
SH
SH 108
1067985
SP
SP 347
NMC955815
SH
SH 109
1067986
SP
SP 348
NMC955816
SH
SH 110
1067987
SP
SP 349
NMC955817
SH
SH 111
1067988
SP
SP 350
NMC955818
SH
SH 112
1067989
SP
SP 351
NMC955819
SH
SH 113
1067990
SP
SP 352
NMC955820
MIMI
MIMI 1
NMC1065272
SP
SP 353
NMC955821
MIMI
MIMI 2
NMC1065273
SP
SP 354
NMC955822
MIMI
MIMI 3
NMC1065274
SP
SP 355
NMC955823
MIMI
MIMI 4
NMC1065275
SP
SP 356
NMC955824
MIMI
MIMI 5
NMC1065276
SP
SP 357
NMC955825
MIMI
MIMI 6
NMC1065277
SP
SP 358
NMC955826
MIMI
MIMI 7
NMC1065278
SP
SP 359
NMC955827
MIMI
MIMI 8
NMC1065279
SP
SP 360
NMC955828
MIMI
MIMI 9
NMC1 065280
SP
SP 361
NMC955829
MIMI
MIMI 10
NMC1065281
SP
SP 362
NMC955830
27-24
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
MIMI
MIMI 11
NMC1065282
SP
SP 363
NMC955831
MIMI
MIMI 12
NMC1065283
SP
SP 364
NMC955832
MIMI
MIMI 13
NMC1065284
SP
SP 365
NMC955833
MIMI
MIMI 14
NMC1065285
SP
SP 366
NMC955834
MIMI
MIMI 15
NMC1065286
SP
SP 367
NMC955835
MIMI
MIMI 16
NMC1065287
SP
SP 368
NMC955836
MIMI
MIMI 17
NMC1065288
SP
SP 369
NMC955837
MIMI
MIMI 18
NMC1065289
SP
SP 370
NMC955838
MIMI
MIMI 19
NMC1065290
SP
SP 371
NMC955839
MIMI
MIMI 20
NMC1065291
SP
SP 372
NMC955840
MIMI
MIMI 21
NMC1065292
SP
SP 373
NMC955841
MIMI
MIMI 22
NMC1065293
SP
SP 374
NMC955842
MIMI
MIMI 23
NMC1065294
SP
SP 375
NMC955843
MIMI
MIMI 24
NMC1065295
SP
SP 376
NMC955844
MIMI
MIMI 25
NMC1065296
SP
SP 377
NMC955845
MIMI
MIMI 26
NMC1065297
SP
SP 378
NMC955846
MIMI
MIMI 27
NMC1065298
SP
SP 379
NMC955847
MIMI
MIMI 28
NMC1065299
SP
SP 380
NMC955848
MIMI
MIMI 29
NMC1 065300
SP
SP 381
NMC955849
MIMI
MIMI 30
NMC1065301
SP
SP 382
NMC955850
MIMI
MIMI 31
NMC1065302
SP
SP 383
NMC955851
MIMI
MIMI 32
NMC1065303
SP
SP 384
NMC955852
MIMI
MIMI 33
NMC1065304
SP
SP 385
NMC955853
MIMI
MIMI 34
NMC1065305
SP
SP 386
NMC955854
MIMI
MIMI 35
NMC1065306
SP
SP 387
NMC955855
MIMI
MIMI 36
NMC1065307
SP
SP 388
NMC955856
MIMI
MIMI 37
NMC1065308
SP
SP 389
NMC955857
MIMI
MIMI 38
NMC1065309
SP
SP 390
NMC955858
MIMI
MIMI 39
NMC1065310
SP
SP 391
NMC955859
MIMI
MIMI 40
NMC10653 11
SP
SP 392
NMC955860
MIMI
MIMI 41
NMC1065312
SP
SP 393
NMC955861
MIMI
MIMI 42
NMC1065313
SP
SP 394
NMC9555862
MIMI
MIMI 43
NMC1065314
SP
SP 395
NMC9555863
MIMI
MIMI 44
NMC1065315
SP
SP 396
NMC9555864
MIMI
MIMI 45
NMC1065316
SP
SP 397
NMC9555865
MIMI
MIMI 46
NMC1065317
SP
SP 398
NMC9555866
MIMI
MIMI 47
NMC1065318
SP
SP 399
NMC9555867
MIMI
MIMI 48
NMC1065319
SP
SP 400
NMC9555868
MIMI
MIMI 49
NMC1065320
SP
SP 401
NMC9555869
MIMI
MIMI 50
NMC1065321
SP
SP 402
NMC9555870
27-25
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
MIMI
MIMI 51
NMC1065322
SP
SP 423
NMC9555891
MIMI
MIMI 52
NMC1065323
SP
SP 424
NMC9555892
MIMI
MIMI 53
NMC1065324
SP
SP 425
NMC9555893
MIMI
MIMI 54
NMC1065325
SP
SP 426
NMC9555894
MIMI
MIMI 55
NMC1065326
SP
SP 427
NMC9555895
MIMI
MIMI 56
NMC1065327
SP
SP 428
NMC9555896
MIMI
MIMI 57
NMC1065328
SP
SP 429
NMC9555897
MIMI
MIMI 58
NMC1065329
SP
SP 430
NMC9555898
MIMI
MIMI 59
NMC1065330
SP
SP 431
NMC9555899
MIMI
MIMI 60
NMC1065331
SP
SP 432
NMC9555900
MIMI
MIMI 61
NMC1065332
SP
SP 433
NMC9555901
MIMI
MIMI 62
NMC1065333
SP
SP 434
NMC9555902
MIMI
MIMI 63
NMC1065334
SP
SP 435
NMC9555903
MIMI
MIMI 64
NMC1065335
SP
SP 436
NMC9555904
MIMI
MIMI 65
NMC1065336
SP
SP 437
NMC9555905
MIMI
MIMI 66
NMC1065337
SP
SP 438
NMC9555906
MIMI
MIMI 67
NMC1065338
SP
SP 439
NMC9555907
MIMI
MIMI 68
NMC1065339
SP
SP 440
NMC9555908
MIMI
MIMI 69
NMC1065340
SP
SP 441
NMC9555909
MIMI
MIMI 70
NMC1065341
SP
SP 442
NMC9555910
MIMI
MIMI 71
NMC1065342
SP
SP 443
NMC9555911
MIMI
MIMI 72
NMC1065343
SP
SP 444
NMC9555912
MIMI
MIMI 73
NMC1065344
SP
SP 445
NMC9555913
MIMI
MIMI 74
NMC1 065345
SP
SP 446
NMC9555914
MIMI
MIMI 75
NMC1065346
SP
SP 447
NMC9555915
MIMI
MIMI 76
NMC1065347
SP
SP 448
NMC9555916
MIMI
MIMI 77
NMC1065348
SP
SP 449
NMC955917
MIMI
MIMI 78
NMC1 065349
SP
SP 450
NMC955918
MIMI
MIMI 79
NMC1065350
SP
SP 451
NMC955919
MIMI
MIMI 80
NMC1065351
SP
SP 452
NMC955920
MIMI
MIMI 81
NMC1065352
SP
SP 453
NMC955921
MIMI
MIMI 82
NMC1065353
SP
SP 454
NMC955922
MIMI
MIMI 83
NMC1065354
SP
SP 455
NMC955923
MIMI
MIMI 84
NMC1065355
SP
SP 456
NMC955924
MIMI
MIMI 103
NMC1065374
SP
SP 457
NMC955925
MIMI
MIMI 104
NMC1065375
SP
SP 458
NMC955926
MIMI
MIMI 110
NMC1065381
SP
SP 486
NMC955954
MIMI
MIMI 111
NMC1065382
SP
SP 487
NMC955955
MIMI
MIMI 112
NMC1065383
SP
SP 488
NMC955956
MIMI
MIMI 113
NMC1065384
SP
SP 489
NMC955957
27-26
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
MIMI
MIMI 114
NMC1065385
SP
SP 490
NMC955958
MIMI
MIMI 115
NMC1065386
SP
SP 491
NMC955959
MIMI
MIMI 118
NMC1065389
SP
SP 492
NMC955960
MIMI
MIMI 119
NMC1065390
SP
SP 493
NMC955961
MIMI
MIMI 120
NMC1065391
SP
SP 494
NMC955962
MIMI
MIMI 121
NMC1065392
SP
SP 495
NMC955963
MIMI
MIMI 122
NMC1065393
SP
SP 496
NMC955964
MIMI
MIMI 123
NMC1065394
SP
SP 497
NMC955965
MIMI
MIMI 124
NMC1065395
SP
SP 498
NMC955966
MIMI
MIMI 125
NMC1065396
SP
SP 499
NMC955967
MIMI
MIMI 126
NMC1065397
SP
SP 500
NMC955968
MIMI
MIMI 127
NMC1065398
SP
SP 501
NMC955969
MIMI
MIMI 128
NMC1065399
SP
SP 502
NMC955970
MIMI
MIMI 129
NMC1065400
SP
SP 503
NMC955971
MIMI
MIMI 130
NMC1065401
SP
SP 504
NMC955972
MIMI
MIMI 131
NMC1065402
SP
SP 505
NMC955973
MIMI
MIMI 132
NMC1065403
SP
SP 506
NMC955974
MIMI
MIMI 133
NMC1065404
SP
SP 507
NMC955975
MIMI
MIMI 134
NMC1065405
SP
SP 508
NMC955976
MIMI
MIMI 137
NMC1065406
SP
SP 509
NMC955977
MIMI
MIMI 138
NMC1065407
SP
SP 510
NMC955978
MIMI
MIMI 139
NMC1065408
SP
SP 511
NMC955979
MIMI
MIMI 140
NMC 1068172
SP
SP 512
NMC955980
MIMI
MIMI 141
NMC1068173
SP
SP 513
NMC955981
MIMI
MIMI 142
NMC1068174
SP
SP 514
NMC955982
MIMI
MIMI 143
NMC1068175
SP
SP 515
NMC955983
MIMI
MIMI 144
NMC1068176
SP
SP 516
NMC955984
MIMI
MIMI 145
NMC1068177
SP
SP 517
NMC955985
MIMI
MIMI 146
NMC1068178
SP
SP 518
NMC955986
MIMI
MIMI 147
NMC1068179
SP
SP 519
NMC955987
MIMI
MIMI 148
NMC1068180
SP
SP 520
NMC955988
MIMI
MIMI 149
NMC1068181
SP
SP 521
NMC955989
MIMI
MIMI 150
NMC1068182
SP
SP 522
NMC955990
MIMI
MIMI 151
NMC1068183
SP
SP 523
NMC955991
MIMI
MIMI 152
NMC1068184
SP
SP 524
NMC955992
MIMI
MIMI 153
NMC1068185
SP
SP 525
NMC955993
MIMI
MIMI 154
NMC1068186
SP
SP 526
NMC955994
MIMI
MIMI 155
NMC1068187
SP
SP 527
NMC955995
MIMI
MIMI 156
NMC1068188
SP
SP 528
NMC955996
MIMI
MIMI 157
NMC1068189
SP
SP 529
NMC955997
27-27
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
MIMI
MIMI 158
NMC1068190
SP
SP 530
NMC955998
MIMI
MIMI 159
NMC1068191
SP
SP 531
NMC955999
MIMI
MIMI 160
NMC1068192
SP
SP 532
NMC956000
MIMI
MIMI 161
NMC1068193
SP
SP 533
NMC956001
MIMI
MIMI 162
NMC1068194
SP
SP 534
NMC956002
MIMI
MIMI 163
NMC1068195
SP
SP 535
NMC956003
MIMI
MIMI 164
NMC1068196
SP
SP 536
NMC956004
MIMI
MIMI 165
NMC1068197
SP
SP 537
NMC956005
MIMI
MIMI 166
NMC1068198
SP
SP 538
NMC956006
MIMI
MIMI 167
NMC1068199
SP
SP 539
NMC956007
MIMI
MIMI 168
NMC1068200
SP
SP 540
NMC956008
MIMI
MIMI 169
NMC1068201
SP
SP 541
NMC956009
MIMI
MIMI 170
NMC1068202
SP
SP 542
NMC956010
MIMI
MIMI 171
NMC1068203
SP
SP 543
NMC956011
MIMI
MIMI 172
NMC1068204
SP
SP 544
NMC956012
MIMI
MIMI 173
NMC1068205
SP
SP 545
NMC956013
MIMI
MIMI 174
NMC1068206
SP
SP 546
NMC956014
MIMI
MIMI 175
NMC1 068207
SP
SP 547
NMC956015
MIMI
MIMI 176
NMC1068208
SP
SP 548
NMC956016
MIMI
MIMI 177
NMC1068209
SP
SP 549
NMC956017
MIMI
MIMI 194
NMC1068226
SP
SP 550
NMC956018
MIMI
MIMI 195
NMC1068227
SP
SP 551
NMC956019
MIMI
MIMI 196
NMC1 068228
SP
SP 552
NMC956020
MIMI
MIMI 197
NMC1068229
SP
SP 553
NMC956021
MIMI
MIMI 198
NMC1068230
SP
SP 554
NMC956022
MIMI
MIMI 199
NMC1 068231
SP
SP 555
NMC956023
MIMI
MIMI 200
NMC1 068232
SP
SP 556
NMC956024
MIMI
MIMI 201
NMC1068233
SP
SP 557
NMC956025
MIMI
MIMI 202
NMC1068234
SP
SP 558
NMC956026
MIMI
MIMI 203
NMC1 068235
SP
SP 559
NMC956027
MIMI
MIMI 204
NMC1068236
SP
SP 560
NMC956028
MIMI
MIMI 205
NMC1068237
SP
SP 561
NMC956029
MIMI
MIMI 206
NMC1068238
SP
SP 562
NMC956030
MIMI
MIMI 207
NMC1068239
SP
SP 563
NMC956031
MIMI
MIMI 208
NMC1068240
SP
SP 564
NMC956032
MIMI
MIMI 209
NMC1068241
SP
SP 565
NMC956033
MIMI
MIMI 210
NMC1068242
SP
SP 566
NMC956034
MIMI
MIMI 211
NMC1068243
SP
SP 567
NMC956035
MIMI
MIMI 212
NMC1068244
SP
SP 568
NMC956036
MIMI
MIMI 213
NMC1068245
SP
SP 569
NMC956037
27-28
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
MIMI
MIMI 214
NMC1068246
SP
SP 570
NMC956038
MIMI
MIMI 215
NMC1068247
SP
SP 571
NMC956039
MIMI
MIMI 216
NMC1068248
SP
SP 572
NMC956040
MIMI
MIMI 217
NMC1068249
SP
SP 573
NMC956041
MIMI
MIMI 218
NMC1068250
SP
SP 574
NMC956042
MIMI
MIMI 219
NMC1068251
SP
SP 575
NMC956043
MIMI
MIMI 225
NMC1068257
SP
SP 576
NMC956044
MIMI
MIMI 226
NMC1068258
SP
SP 577
NMC956045
MIMI
MIMI 227
NMC1 068259
SP
SP 578
NMC956046
MIMI
MIMI 228
NMC1068260
SP
SP 579
NMC956047
MIMI
MIMI 229
NMC1068261
SP
SP 580
NMC956048
MIMI
MIMI 230
NMC1068262
SP
SP 581
NMC956049
MIMI
MIMI 231
NMC1068263
SP
SP 582
NMC956050
MIMI
MIMI 232
NMC1068264
SP
SP 583
NMC956051
MIMI
MIMI 239
NMC1068271
SP
SP 584
NMC956052
MIMI
MIMI 240
NMC1 068272
SP
SP 585
NMC956053
MIMI
MIMI 241
NMC1068273
SP
SP 586
NMC956054
MIMI
MIMI 242
NMC1068274
SP
SP 587
NMC956055
MIMI
MIMI 246
NMC 1068278
SP
SP 588
NMC956056
MIMI
MIMI 247
NMC1068279
SP
SP 589
NMC956057
MIMI
MIMI 248
NMC1068280
SP
SP 590
NMC956058
MIMI
MIMI 257
NMC1072849
SP
SP 591
NMC956059
MIMI
MIMI 258
NMC1072850
SP
SP 592
NMC956060
MIMI
MIMI 259
NMC1072851
SP
SP 593
NMC956061
MIMI
MIMI 260
NMC1072852
SP
SP 594
NMC956062
MIMI
MIMI 261
NMC1072853
SP
SP 595
NMC956063
MIMI
MIMI 262
NMC1072854
SP
SP 596
NMC956064
MIMI
MIMI 263
NMC1072855
SP
SP 597
NMC956065
MIMI
MIMI 264
NMC1072856
SP
SP 598
NMC956066
MIMI
MIMI 265
NMC1072857
SP
SP 599
NMC956067
MIMI
MIMI 266
NMC1072858
SP
SP 600
NMC956068
MIMI
MIMI 267
NMC1072859
SP
SP 601
NMC956069
MIMI
MIMI 268
NMC1072860
SP
SP 602
NMC956070
MIMI
MIMI 269
NMC1072861
SP
SP 612
NMC956080
MIMI
MIMI 270
NMC1072862
SP
SP 613
NMC956081
MIMI
MIMI 271
NMC1 072863
SP
SP 614
NMC956082
MIMI
MIMI 272
NMC1072864
SP
SP 615
NMC956083
MIMI
MIMI 273
NMC1072865
SP
SP 616
NMC956084
MIMI
MIMI 274
NMC1072866
SP
SP 617
NMC956085
MIMI
MIMI 275
NMC1072867
SP
SP 618
NMC956086
27-29
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
MIMI
MIMI 276
NMC1072868
SP
SP 619
NMC956087
MIMI
MIMI 277
NMC1072869
SP
SP 620
NMC956088
MIMI
MIMI 278
NMC1072870
SP
SP 621
NMC956089
MIMI
MIMI 279
NMC1072871
SP
SP 622
NMC956090
MIMI
MIMI 280
NMC1072872
SP
SP 623
NMC956091
MIMI
MIMI 281
NMC1072873
SP
SP 624
NMC956092
MIMI
MIMI 282
NMC1072874
SP
SP 625
NMC956093
MIMI
MIMI 283
NMC1072875
SP
SP 626
NMC956094
MIMI
MIMI 284
NMC1072876
SP
SP 627
NMC956095
MIMI
MIMI 285
NMC1072877
SP
SP 628
NMC956096
MIMI
MIMI 286
NMC1072878
SP
SP 629
NMC956097
MIMI
MIMI 287
NMC1072879
SP
SP 630
NMC956098
MIMI
MIMI 288
NMC1072880
SP
SP 631
NMC956099
MIMI
MIMI 289
NMC1072881
SP
SP 632
NMC956100
MIMI
MIMI 290
NMC1072882
SP
SP 633
NMC956101
MIMI
MIMI 291
NMC1072883
SP
SP 634
NMC956102
MIMI
MIMI 292
NMC1072884
SP
SP 635
NMC956103
MIMI
MIMI 293
NMC1 072885
SP
SP 636
NMC956104
MIMI
MIMI 294
NMC1072886
SP
SP 637
NMC956105
MIMI
MIMI 295
NMC1072887
SP
SP 638
NMC956106
MIMI
MIMI 296
NMC1072888
SS
SS 65
NMC985080
MIMI
MIMI 297
NMC1072889
SS
SS66
NMC985081
MIMI
MIMI 301
NMC1 072890
SS
SS67
NMC985082
MIMI
MIMI 302
NMC1072891
SS
SS68
NMC985083
MIMI
MIMI 303
NMC1072892
SS
SS 69
NMC985084
MIMI
MIMI 304
NMC1072893
SS
SS 70
NMC985085
MIMI
MIMI 305
NMC1 072894
SS
SS71
NMC985086
MIMI
MIMI 315
NMC1072895
SS
SS 72
NMC985087
MIMI
MIMI 316
NMC1072896
SS
SS 73
NMC985088
MIMI
MIMI 317
NMC1072897
SS
SS 74
NMC985089
MIMI
MIMI 318
NMC1072898
SS
SS 75
NMC985090
MIMI
MIMI 319
NMC1072899
SS
SS76
NMC985091
MIMI
MIMI 320
NMC1072900
SS
SS 77
NMC985092
MIMI
MIMI 321
NMC1072901
SS
SS 78
NMC985093
MIMI
MIMI 322
NMC1072902
SS
SS 79
NMC985094
MIMI
MIMI 323
NMC1072903
SS
SS 80
NMC985095
MIMI
MIMI 324
NMC1072904
SS
SS 81
NMC985096
MIMI
MIMI 325
NMC1072905
SS
SS 82
NMC985097
MIMI
MIMI 326
NMC1072906
SS
SS 83
NMC985098
MIMI
MIMI 327
NMC1072907
SS
SS 84
NMC985099
27-30
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
MIMI
MIMI 328
NMC1072908
SS
SS 85
NMC985100
MIMI
MIMI 329
NMC1072909
SS
SS 86
NMC985101
MIMI
MIMI 330
NMC1072910
SS
SS 87
NMC985102
MIMI
MIMI 331
NMC1072911
SS
SS 88
NMC985103
MIMI
MIMI 332
NMC1072912
SS
SS 89
NMC985104
MIMI
MIMI 333
NMC1072913
SS
SS 90
NMC985105
MIMI
MIMI 334
NMC1072914
SS
SS 91
NMC985106
MIMI
MIMI 335
NMC1072915
SS
SS 92
NMC985107
MIMI
MIMI 336
NMC1072916
SS
SS 93
NMC985108
MIMI
MIMI 337
NMC1072917
SS
SS 94
NMC985109
MIMI
MIMI 338
NMC1072918
SS
SS 95
NMC985110
MIMI
MIMI 339
NMC1072919
SS
SS 96
NMC9851 11
MIMI
MIMI 340
NMC1072920
SS
SS 97
NMC985112
MIMI
MIMI 341
NMC1072921
SS
SS 98
NMC985113
MIMI
MIMI 342
NMC1072922
SS
SS 99
NMC9851 14
MIMI
MIMI 343
NMC1072923
SS
SS 100
NMC985115
MIMI
MIMI 344
NMC1072924
LAM
LAM 190
NMC771957
MIMI
MIMI 345
NMC1 072925
LAM
LAM 204
NMC771971
MIMI
MIMI 346
NMC1072926
LAM
LAM 205
NMC771972
MIMI
MIMI 347
NMC1072927
LAM
LAM 0201
NMC833020
MIMI
MIMI 348
NMC1072928
LAM
LAM 0202
NMC833021
MIMI
MIMI 349
NMC1072929
LAM
LAM 0203
NMC833022
MIMI
MIMI 350
NMC1072930
LAM
LAM 0204
NMC833023
MIMI
MIMI 351
NMC1072931
LAM
LAM 0205
NMC833024
MIMI
MIMI 352
NMC1072932
LAM
LAM 0206
NMC833025
MIMI
MIMI 353
NMC1072933
LAM
LAM 0207
NMC833026
MIMI
MIMI 354
NMC1 072934
LAM
LAM 0208
NMC833027
MIMI
MIMI 355
NMC1072935
LAM
LAM 0209
NMC833028
MIMI
MIMI 356
NMC1 072936
LAM
LAM 0210
NMC833029
MIMI
MIMI 357
NMC1072937
CR
CR 1
NMC945647
MIMI
MIMI 358
NMC1072938
CR
CR2
NMC945648
MIMI
MIMI 359
NMC1072939
CR
CR3
NMC945649
MIMI
MIMI 360
NMC1 072940
CR
CR4
NMC945650
MIMI
MIMI 361
NMC1072941
CR
CR5
NMC945651
MIMI
MIMI 362
NMC1072942
CR
CR6
NMC945652
MIMI
MIMI 363
NMC1072943
CR
CR7
NMC945653
MIMI
MIMI 364
NMC1072944
CR
CR8
NMC945654
MIMI
MIMI 365
NMC1072945
CR
CR9
NMC945655
MIMI
MIMI 366
NMC1072946
CR
CR 10
NMC945656
MIMI
MIMI 367
NMC1072947
MIMI
MIMI 368
NMC1072948
MIMI
MIMI 369
NMC1072949
MIMI
MIMI 370
NMC1 072950
27-30
Paramount Gold Nevada Corp. | Sleeper Gold Mine
S-K 1300 Technical Report Summary
June 17, 2026
SLR Project No.: 123.020721.00001
28.0
Appendix 2 Cash Flow Summaries
28-1
GRAPHIC
GRAPHIC
Filename: g161084dsp11.jpg · Sequence: 8
Binary file (76150 bytes)
Download g161084dsp11.jpg
GRAPHIC
GRAPHIC
Filename: g161084dsp115_.jpg · Sequence: 9
Binary file (38414 bytes)
Download g161084dsp115_.jpg
GRAPHIC
GRAPHIC
Filename: g161084g03g18.jpg · Sequence: 10
Binary file (39174 bytes)
Download g161084g03g18.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618052738802.jpg · Sequence: 11
Binary file (5566 bytes)
Download g161084g0618052738802.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074827912.jpg · Sequence: 12
Binary file (45033 bytes)
Download g161084g0618074827912.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074828763.jpg · Sequence: 13
Binary file (47452 bytes)
Download g161084g0618074828763.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074829188.jpg · Sequence: 14
Binary file (47122 bytes)
Download g161084g0618074829188.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074829490.jpg · Sequence: 15
Binary file (41655 bytes)
Download g161084g0618074829490.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074830086.jpg · Sequence: 16
Binary file (41602 bytes)
Download g161084g0618074830086.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074830432.jpg · Sequence: 17
Binary file (33395 bytes)
Download g161084g0618074830432.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074831053.jpg · Sequence: 18
Binary file (34286 bytes)
Download g161084g0618074831053.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074831319.jpg · Sequence: 19
Binary file (38851 bytes)
Download g161084g0618074831319.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074832009.jpg · Sequence: 20
Binary file (39544 bytes)
Download g161084g0618074832009.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618074832495.jpg · Sequence: 21
Binary file (43170 bytes)
Download g161084g0618074832495.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618080058301.jpg · Sequence: 22
Binary file (38851 bytes)
Download g161084g0618080058301.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618080059141.jpg · Sequence: 23
Binary file (39544 bytes)
Download g161084g0618080059141.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618080100184.jpg · Sequence: 24
Binary file (43170 bytes)
Download g161084g0618080100184.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618080102100.jpg · Sequence: 25
Binary file (87385 bytes)
Download g161084g0618080102100.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618110709066.jpg · Sequence: 26
Binary file (50477 bytes)
Download g161084g0618110709066.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618110709620.jpg · Sequence: 27
Binary file (67303 bytes)
Download g161084g0618110709620.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618110709949.jpg · Sequence: 28
Binary file (56984 bytes)
Download g161084g0618110709949.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618110710295.jpg · Sequence: 29
Binary file (90141 bytes)
Download g161084g0618110710295.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618110710642.jpg · Sequence: 30
Binary file (58788 bytes)
Download g161084g0618110710642.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618110710979.jpg · Sequence: 31
Binary file (76060 bytes)
Download g161084g0618110710979.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618131905468.jpg · Sequence: 32
Binary file (35330 bytes)
Download g161084g0618131905468.jpg
GRAPHIC
GRAPHIC
Filename: g161084g0618131905785.jpg · Sequence: 33
Binary file (37800 bytes)
Download g161084g0618131905785.jpg
GRAPHIC
GRAPHIC
Filename: g161084g12g12.jpg · Sequence: 34
Binary file (284108 bytes)
Download g161084g12g12.jpg
GRAPHIC
GRAPHIC
Filename: g161084g13g13.jpg · Sequence: 35
Binary file (280212 bytes)
Download g161084g13g13.jpg
GRAPHIC
GRAPHIC
Filename: g161084g14g14.jpg · Sequence: 36
Binary file (183597 bytes)
Download g161084g14g14.jpg
GRAPHIC
GRAPHIC
Filename: g161084g15g15.jpg · Sequence: 37
Binary file (239129 bytes)
Download g161084g15g15.jpg
GRAPHIC
GRAPHIC
Filename: g161084g16g16.jpg · Sequence: 38
Binary file (196875 bytes)
Download g161084g16g16.jpg
GRAPHIC
GRAPHIC
Filename: g161084g17g17.jpg · Sequence: 39
Binary file (144583 bytes)
Download g161084g17g17.jpg
GRAPHIC
GRAPHIC
Filename: g161084g41r48.jpg · Sequence: 40
Binary file (155236 bytes)
Download g161084g41r48.jpg
GRAPHIC
GRAPHIC
Filename: g161084g76r56.jpg · Sequence: 41
Binary file (158321 bytes)
Download g161084g76r56.jpg
GRAPHIC
GRAPHIC
Filename: g161084g93b33.jpg · Sequence: 42
Binary file (116987 bytes)
Download g161084g93b33.jpg
GRAPHIC
GRAPHIC
Filename: g161084g93p68.jpg · Sequence: 43
Binary file (4006 bytes)
Download g161084g93p68.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap117.jpg · Sequence: 44
Binary file (62836 bytes)
Download g161084snap117.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap118.jpg · Sequence: 45
Binary file (61452 bytes)
Download g161084snap118.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap118a.jpg · Sequence: 46
Binary file (63505 bytes)
Download g161084snap118a.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap119.jpg · Sequence: 47
Binary file (61671 bytes)
Download g161084snap119.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap122.jpg · Sequence: 48
Binary file (74865 bytes)
Download g161084snap122.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap123.jpg · Sequence: 49
Binary file (68404 bytes)
Download g161084snap123.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap124.jpg · Sequence: 50
Binary file (47563 bytes)
Download g161084snap124.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap125.jpg · Sequence: 51
Binary file (50806 bytes)
Download g161084snap125.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap138.jpg · Sequence: 52
Binary file (83659 bytes)
Download g161084snap138.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap139.jpg · Sequence: 53
Binary file (61145 bytes)
Download g161084snap139.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap143.jpg · Sequence: 54
Binary file (99657 bytes)
Download g161084snap143.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap148.jpg · Sequence: 55
Binary file (64658 bytes)
Download g161084snap148.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap150.jpg · Sequence: 56
Binary file (68206 bytes)
Download g161084snap150.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap152.jpg · Sequence: 57
Binary file (47259 bytes)
Download g161084snap152.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap154.jpg · Sequence: 58
Binary file (28402 bytes)
Download g161084snap154.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap163.jpg · Sequence: 59
Binary file (78848 bytes)
Download g161084snap163.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap171.jpg · Sequence: 60
Binary file (70224 bytes)
Download g161084snap171.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap172.jpg · Sequence: 61
Binary file (72315 bytes)
Download g161084snap172.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap174.jpg · Sequence: 62
Binary file (19706 bytes)
Download g161084snap174.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap174a.jpg · Sequence: 63
Binary file (24091 bytes)
Download g161084snap174a.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap174b.jpg · Sequence: 64
Binary file (15034 bytes)
Download g161084snap174b.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap175.jpg · Sequence: 65
Binary file (24221 bytes)
Download g161084snap175.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap175a.jpg · Sequence: 66
Binary file (25271 bytes)
Download g161084snap175a.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap175b.jpg · Sequence: 67
Binary file (15526 bytes)
Download g161084snap175b.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap176.jpg · Sequence: 68
Binary file (54637 bytes)
Download g161084snap176.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap178.jpg · Sequence: 69
Binary file (50334 bytes)
Download g161084snap178.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap189.jpg · Sequence: 70
Binary file (109430 bytes)
Download g161084snap189.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap190.jpg · Sequence: 71
Binary file (103681 bytes)
Download g161084snap190.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap212.jpg · Sequence: 72
Binary file (123223 bytes)
Download g161084snap212.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap236.jpg · Sequence: 73
Binary file (57797 bytes)
Download g161084snap236.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap237.jpg · Sequence: 74
Binary file (60809 bytes)
Download g161084snap237.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap237a.jpg · Sequence: 75
Binary file (60571 bytes)
Download g161084snap237a.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap238.jpg · Sequence: 76
Binary file (49669 bytes)
Download g161084snap238.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap242.jpg · Sequence: 77
Binary file (48410 bytes)
Download g161084snap242.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap245.jpg · Sequence: 78
Binary file (39840 bytes)
Download g161084snap245.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap245a.jpg · Sequence: 79
Binary file (40959 bytes)
Download g161084snap245a.jpg
GRAPHIC
GRAPHIC
Filename: g161084snap9.jpg · Sequence: 80
Binary file (1632 bytes)
Download g161084snap9.jpg
XML — IDEA: XBRL DOCUMENT
XML
Filename: R1.htm · Sequence: 82
v3.26.1
Document and Entity Information
Jun. 17, 2026
Cover [Abstract]
Amendment Flag
false
Entity Central Index Key
0001629210
Document Type
8-K
Document Period End Date
Jun. 17, 2026
Entity Registrant Name
Paramount Gold Nevada Corp.
Entity Incorporation State Country Code
NV
Entity File Number
001-36908
Entity Tax Identification Number
98-0138393
Entity Address, Address Line One
665 Anderson Street
Entity Address, City or Town
Winnemucca
Entity Address, State or Province
NV
Entity Address, Postal Zip Code
89445
City Area Code
775
Local Phone Number
625-3600
Written Communications
false
Soliciting Material
false
Pre Commencement Tender Offer
false
Pre Commencement Issuer Tender Offer
false
Security 12b Title
Common Stock, $0.01 Par Value Per Share
Trading Symbol
PZG
Security Exchange Name
NYSEAMER
Entity Emerging Growth Company
false
X
- Definition
Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.
+ References
No definition available.
+ Details
Name:
dei_AmendmentFlag
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Area code of city
+ References
No definition available.
+ Details
Name:
dei_CityAreaCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Cover page.
+ References
No definition available.
+ Details
Name:
dei_CoverAbstract
Namespace Prefix:
dei_
Data Type:
xbrli:stringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.
+ References
No definition available.
+ Details
Name:
dei_DocumentPeriodEndDate
Namespace Prefix:
dei_
Data Type:
xbrli:dateItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.
+ References
No definition available.
+ Details
Name:
dei_DocumentType
Namespace Prefix:
dei_
Data Type:
dei:submissionTypeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 1 such as Attn, Building Name, Street Name
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine1
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the City or Town
+ References
No definition available.
+ Details
Name:
dei_EntityAddressCityOrTown
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Code for the postal or zip code
+ References
No definition available.
+ Details
Name:
dei_EntityAddressPostalZipCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the state or province.
+ References
No definition available.
+ Details
Name:
dei_EntityAddressStateOrProvince
Namespace Prefix:
dei_
Data Type:
dei:stateOrProvinceItemType
Balance Type:
na
Period Type:
duration
X
- Definition
A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityCentralIndexKey
Namespace Prefix:
dei_
Data Type:
dei:centralIndexKeyItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Indicate if registrant meets the emerging growth company criteria.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityEmergingGrowthCompany
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.
+ References
No definition available.
+ Details
Name:
dei_EntityFileNumber
Namespace Prefix:
dei_
Data Type:
dei:fileNumberItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Two-character EDGAR code representing the state or country of incorporation.
+ References
No definition available.
+ Details
Name:
dei_EntityIncorporationStateCountryCode
Namespace Prefix:
dei_
Data Type:
dei:edgarStateCountryItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityRegistrantName
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityTaxIdentificationNumber
Namespace Prefix:
dei_
Data Type:
dei:employerIdItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Local phone number for entity.
+ References
No definition available.
+ Details
Name:
dei_LocalPhoneNumber
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 13e
-Subsection 4c
+ Details
Name:
dei_PreCommencementIssuerTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14d
-Subsection 2b
+ Details
Name:
dei_PreCommencementTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Title of a 12(b) registered security.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b
+ Details
Name:
dei_Security12bTitle
Namespace Prefix:
dei_
Data Type:
dei:securityTitleItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the Exchange on which a security is registered.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection d1-1
+ Details
Name:
dei_SecurityExchangeName
Namespace Prefix:
dei_
Data Type:
dei:edgarExchangeCodeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14a
-Subsection 12
+ Details
Name:
dei_SolicitingMaterial
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Trading symbol of an instrument as listed on an exchange.
+ References
No definition available.
+ Details
Name:
dei_TradingSymbol
Namespace Prefix:
dei_
Data Type:
dei:tradingSymbolItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Securities Act
-Number 230
-Section 425
+ Details
Name:
dei_WrittenCommunications
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration