Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

Form 8-K

sec.gov

8-K — Riot Platforms, Inc.

Accession: 0001104659-26-093406

Filed: 2026-08-10

Period: 2026-08-10

CIK: 0001167419

SIC: 6199 (FINANCE SERVICES)

Item: Results of Operations and Financial Condition

Item: Other Events

Item: Financial Statements and Exhibits

Documents

8-K — riot-20260810x8k.htm (Primary)

EX-99.1 (riot-20260810xex99d1.htm)

EX-99.2 (riot-20260810xex99d2.htm)

GRAPHIC (riot-20260810xex99d2g001.jpg)

GRAPHIC (riot-20260810xex99d2g002.jpg)

GRAPHIC (riot-20260810xex99d2g003.jpg)

GRAPHIC (riot-20260810xex99d2g004.jpg)

GRAPHIC (riot-20260810xex99d2g005.jpg)

GRAPHIC (riot-20260810xex99d2g006.jpg)

GRAPHIC (riot-20260810xex99d2g007.jpg)

GRAPHIC (riot-20260810xex99d2g008.jpg)

GRAPHIC (riot-20260810xex99d2g009.jpg)

GRAPHIC (riot-20260810xex99d2g010.jpg)

GRAPHIC (riot-20260810xex99d2g011.jpg)

GRAPHIC (riot-20260810xex99d2g012.jpg)

GRAPHIC (riot-20260810xex99d2g013.jpg)

GRAPHIC (riot-20260810xex99d2g014.jpg)

GRAPHIC (riot-20260810xex99d2g015.jpg)

GRAPHIC (riot-20260810xex99d2g016.jpg)

GRAPHIC (riot-20260810xex99d2g017.jpg)

GRAPHIC (riot-20260810xex99d2g018.jpg)

GRAPHIC (riot-20260810xex99d2g019.jpg)

GRAPHIC (riot-20260810xex99d2g020.jpg)

GRAPHIC (riot-20260810xex99d2g021.jpg)

GRAPHIC (riot-20260810xex99d2g022.jpg)

GRAPHIC (riot-20260810xex99d2g023.jpg)

GRAPHIC (riot-20260810xex99d2g024.jpg)

GRAPHIC (riot-20260810xex99d2g025.jpg)

GRAPHIC (riot-20260810xex99d2g026.jpg)

GRAPHIC (riot-20260810xex99d2g027.jpg)

GRAPHIC (riot-20260810xex99d2g028.jpg)

GRAPHIC (riot-20260810xex99d2g029.jpg)

GRAPHIC (riot-20260810xex99d2g030.jpg)

GRAPHIC (riot-20260810xex99d2g031.jpg)

GRAPHIC (riot-20260810xex99d2g032.jpg)

GRAPHIC (riot-20260810xex99d2g033.jpg)

XML — IDEA: XBRL DOCUMENT (R1.htm)

8-K

8-K (Primary)

Filename: riot-20260810x8k.htm · Sequence: 1

Riot Platforms, Inc._August 10, 2026

0001167419false0001167419dei:FormerAddressMember2026-08-102026-08-1000011674192026-08-102026-08-10

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 8-K

CURRENT REPORT

PURSUANT TO SECTION 13 OR 15(D) OF

THE SECURITIES EXCHANGE ACT OF 1934

Date of Report (Date of earliest event reported): August 10, 2026

Riot Platforms, Inc.

(Exact name of registrant as specified in its charter)

Nevada

​ ​ ​

001-33675

​ ​ ​

84-1553387

(State or other jurisdiction of incorporation)

(Commission File Number)

(I.R.S. Employer Identification No.)

85 Rio Grande Drive, Suite 200

Castle Rock, CO 80104

(Address of principal executive offices)

(303) 794-2000

(Registrant’s telephone number, including area code)

3855 Ambrosia Street, Suite 301

Castle Rock, CO 80109

(Former name or former address, if changed since last report)

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

☐  Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

☐  Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

☐  Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

☐  Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

Securities registered pursuant to Section 12(b) of the Exchange Act:

Title of each class

​ ​ ​

Trading Symbol(s)

​ ​ ​

Name of each exchange on which registered

Common Stock, no par value per share

RIOT

Nasdaq Capital Market

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).

Emerging growth company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Item 2.02 - Results of Operations and Financial Condition.

On August 10, 2026, Riot Platforms, Inc. (together with its consolidated subsidiaries, the “Company”) issued a press release (the “Press Release”) announcing an update on the Company’s business and financial results and results of operations for the three months ended June 30, 2026. The Company also published on its website, www.riotplatforms.com, under the “Investor Relations” tab a presentation providing, among other things, an update on the Company’s business and financial results and results of operations for the three months ended June 30, 2026 (the “Q2 2026 Earnings Deck”) and that the Company has entered into a non-binding letter of intent with respect to a proposed lease for the Company’s Corsicana Facility. The full text of the Press Release and the Q2 2026 Earnings Deck are attached to this Current Report on Form 8-K (this “Report”) as Exhibit 99.1 and 99.2, respectively.

The information under this Item 2.02 of this Report, including Exhibits 99.1 and 99.2 attached hereto, is furnished and shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, (the “Exchange Act”) nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933, as amended, or the Exchange Act, except as shall be expressly set forth by specific reference.

Item 8.01 – Other Events.

The information included in Exhibit 99.1 under the heading “191 IT MW Data Center Lease with a Leading Frontier AI Lab at Rockdale” shall be incorporated by reference into this Item 8.01 of this Report.

Item 9.01 – Financial Statements and Exhibits.

(d)Exhibits.

EXHIBIT INDEX

Exhibit No.

​ ​ ​

Description

99.1

Press Release, dated August 10, 2026.

99.2

Q2 2026 Earnings Deck, dated as of August 10, 2026.

104

Cover Page Interactive Data File (embedded within the Inline XBRL document)

S I G N A T U R E

Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

RIOT PLATFORMS, INC.

By:

/s/ Jason Chung

Name:

Jason Chung

Title:

Chief Financial Officer

Date: August 10, 2026

EX-99.1

EX-99.1

Filename: riot-20260810xex99d1.htm · Sequence: 2

Exhibit 99.1

Riot Platforms Reports Second Quarter 2026 Financial Results and Strategic Highlights

Executed 20-year data center lease with a leading frontier AI lab for 191 MW of critical IT capacity at Riot’s Rockdale campus, expected to generate approximately $9.1 billion in total contract revenue over the initial term

Completed delivery of the initial 25 critical IT MW to AMD on time and on budget, with the second 25 critical IT MW expansion under construction

Together with the AMD lease, the Company has contracted 241 MW of critical IT capacity with two of the most significant companies in the AI ecosystem

Quarterly revenue of $174.2 million, a 14% increase year-over-year, including $23.2 million in Data Center revenue

CASTLE ROCK, Colo., August 10, 2026 (GLOBE NEWSWIRE) — Riot Platforms, Inc. (NASDAQ: RIOT) (“Riot” or “the Company”), a vertically-integrated industry leader in digital infrastructure, specializing in the development of large-scale data centers and bitcoin mining applications, reported financial results for the three-month period ended June 30, 2026. The accompanying presentation materials are available on Riot’s website.

“Today's announcement of a landmark 20-year, 191-megawatt data center lease with a leading frontier AI lab marks a defining moment in our evolution into a leading developer of large-scale data centers,” said Jason Les, CEO of Riot. “It builds directly on a strong second quarter, in which we completed delivery of the initial 25 megawatts to AMD on time and on budget. In just over six months, Riot has now executed leases totaling 241 megawatts of capacity, representing approximately $9.8 billion of long-term, contracted revenue with two of the most important companies in the AI ecosystem.

“Our platform stands apart through three elements working together: multi-gigawatt-scale power capacity that is already fully approved and energized, in-house data center development expertise, and the ability to engineer custom infrastructure for computing's most demanding workloads. With all three, and the financial resources to deploy them already secured, we are positioned to convert strong market demand from high-quality tenants into compounding shareholder value.”

191 IT MW Data Center Lease with a Leading Frontier AI Lab at Rockdale

Subsequent to quarter end, Riot announced the execution of a Data Center Lease and Services Agreement (the “Data Center Lease”) with one of the world’s leading frontier AI labs, for 191 MW of critical IT capacity at Riot’s Rockdale campus. The Data Center Lease carries an initial term of 20 years, running through June 2048, and is expected to generate approximately $9.1 billion in total initial contract revenue. The Data Center Lease also includes two five-year extension options at the tenant’s election, representing a total potential contract value of approximately $16.1 billion if both extensions are fully exercised.

This transaction secures the Company’s second tenant at the Rockdale campus, following the lease with Advanced Micro Devices, Inc. (“AMD”) announced on January 16, 2026. Together, the two agreements firmly establish Riot as a leading contracted AI data center developer.

Transaction highlights:

• Capacity Leased: 191 MW critical IT build-to-suit Tier 3 data center at Riot’s Rockdale campus.

• Total Contract Value: $9.1 billion over the initial 20-year term, with a total potential contract value of approximately $16.1 billion if both five-year extension options are exercised.

• NOI Contribution: Estimated cumulative NOI range of $7.3 to $8.2 billion over the base lease term, with an estimated average annual NOI contribution of $365 to $411 million.

• Delivery Schedule: Phased delivery schedule, with the initial 96 IT MW expected in December 2027 and full 191 IT MW deployment expected by June 2028, leveraging Riot’s existing, fully approved interconnection at the Rockdale campus.

• Financing: $573 million interim financing facility provided by Morgan Stanley to fund initial development costs while the investment-grade credit backstop is finalized.

Second Quarter 2026 Financial and Operational Highlights

Key financial and operational highlights for the quarter include:

• Total revenue of $174.2 million, as compared to $153.0 million for the same three-month period in 2025, a 14% increase year-over-year.

• Data Center revenue of $23.2 million for the quarter, comprised of $4.9 million in operating lease revenue and $18.3 million in tenant fit-out services revenue, reflecting the Company’s second quarter of Data Center segment revenue and the completed delivery of the initial 25 MW to AMD.

• Produced 1,587 bitcoin, as compared to 1,426 during the same three-month period in 2025.

• The average cost to mine bitcoin, excluding depreciation, was $49,912 in the quarter, as compared to $48,992 per bitcoin in the same three-month period in 2025. The increase was primarily driven by higher power costs and the expansion at Riot’s Kentucky facilities.

• Bitcoin Mining revenue of $113.7 million for the quarter, as compared to $140.9 million for the same three-month period in 2025, primarily driven by lower average bitcoin prices and an increase in global network hash rate, partially offset by an increase in Riot’s average operating hash rate.

• Engineering revenue of $37.3 million for the quarter, as compared to $10.6 million for the same three-month period in 2025.

• Ended the quarter with over $1.2 billion in liquid assets, including 11,380 bitcoin (of which 5,821 were held as collateral), equating to approximately $666.0 million based on the market price for one bitcoin on June 30, 2026 of $58,527, and $548.9 million in cash (of which $77.5 million is restricted).

AMD Deployment Progress at Rockdale

During the quarter, Riot completed delivery of the final 20 MW of AMD’s initial deployment, bringing the full 25 MW of commissioned capacity online, on time and on budget, and converting the lease to recurring revenue at full initial scale. Construction is now underway on the 25 MW expansion, with the 10 MW Phase 3 on track for delivery in November 2026 and the 15 MW Phase 4 to follow in May 2027, at which point AMD's total contracted capacity of 50 MW will be fully deployed. Riot’s in-house procurement, engineering and construction capabilities continue to underpin this delivery record.

Conference Call

Riot will host a conference call on August 10, 2026 at 4:30 p.m. ET to discuss its financial results.

This conference call will be available through audio-only webcast — please use this link to register: https://edge.media-server.com/mmc/p/xk5hszcg

Participants who choose to dial into the call in the United States or internationally to ask questions, please use this toll-free number: +1 (800) 715-9871 or toll number: +1 (646) 307-1963. For both dial in numbers, the audience passcode is 3868069.

About Riot Platforms, Inc.

Riot Platforms, Inc. (NASDAQ: RIOT) is a leading digital infrastructure company, specializing in the development of large-scale data centers and bitcoin mining applications. The Company operates digital infrastructure and Bitcoin mining facilities in central Texas and Kentucky, and engineering and fabrication facilities in Denver and Houston.

Riot’s vision is to be the world’s most trusted platform for powering and building the next digital world. Its mission is to empower the future of digital infrastructure by positively impacting the sectors, networks, and communities the Company touches.

For more information, visit Riot Platforms.

Safe Harbor

Statements in this press release that are not historical facts are forward-looking statements that reflect management’s current expectations, assumptions, and estimates of future performance and economic conditions. Such statements rely on the safe harbor provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Because such statements are subject to risks and uncertainties, actual results may differ materially from those expressed or implied by such forward-looking statements. Words such as “anticipates,” “believes,” “plans,” “expects,” “intends,” “will,” “potential,” “hope,” similar expressions and their negatives are intended to identify forward-looking statements. These forward-looking statements may include, but are not limited to: plans to develop data centers, projections, objectives, expectations, and intentions about future events; short-term and long-term business operations and objectives and financial needs; the Company’s data center leases at the Rockdale Site; forecasted demand for energy at the sites; the Company’s expansion plans at the site; the Company’s anticipated financing plans, and the Company’s other plans, projections, objectives, expectations, and intentions more generally. These forward-looking statements are subject to a number of risks and uncertainties that may cause results, performance, or achievements to be materially different from those expressed or implied, including, without limitation: risks relating to the Company’s growth and developing the Company’s power capacity for data center purposes, including construction plans, delays, supply chain issues, permitting or regulatory hurdles, and unforeseen technical challenges; the anticipated demand for large data centers; changes in leasing arrangements; risks relating to the financing of new data centers; future economic conditions, performance, or outlooks; future political conditions; the outcome of contingencies; potential acquisitions or divestitures; our ability to maximize the value of our full power portfolio; the number and value of Bitcoin rewards and transaction fees we earn from our ongoing Bitcoin Mining operations; future self-mining hash rate capacity; expected cash flows or capital expenditures; our beliefs or expectations; activities, events or developments that we intend, expect, project, believe, or anticipate will or may occur in the future; unaudited estimates of bitcoin production; risks related to the success, schedule, cost and difficulty of integrating businesses we acquire; and our failure to realize anticipated efficiencies and strategic and financial benefits from our acquisitions. Detailed information regarding the factors identified by the Company’s management which they believe may cause actual results to differ materially from those expressed or implied by such forward-looking statements in this press release may be found in the Company’s filings with the U.S. Securities and Exchange Commission (the “SEC”), including the risks, uncertainties and other factors discussed under the sections entitled “Risk Factors” and “Cautionary Note Regarding Forward-Looking Statements” of the Company’s most recently filed periodic reports on Form 10-K and Form 10-Q, and the other filings the Company makes with the SEC, copies of which may be obtained from the SEC’s website, www.sec.gov. All forward- looking statements included in this press release are made only as of the date of this press release, and the Company disclaims any intention or obligation to update or revise any such forward-looking statements to reflect events or circumstances that subsequently occur, or of which the Company hereafter becomes aware, except as required by law. Persons reading this press release are cautioned not to place undue reliance on such forward-looking statements.

Additional Information and Communications

For important news and information regarding the Company, including presentations and other news and events, visit the Investor Relations section of the Company’s website, riotplatforms.com/investors, and the Company’s social media accounts, including on X and LinkedIn.

Contacts:

Investor Contact:

Joshua Kane

IR@Riotplatforms.com

Media Contact:

Becca Rincon

PR@Riotplatforms.com

Non-U.S. GAAP Measures of Financial Performance

In addition to financial measures presented under generally accepted accounting principles in the United States of America (“GAAP”), we consistently evaluate our use of and calculation of non-GAAP financial measures such as “Adjusted EBITDA.” EBITDA is computed as net income before interest, taxes, depreciation, and amortization. Adjusted EBITDA is a financial measure defined as EBITDA, adjusted to eliminate the effects of certain non-cash and/or non-recurring items that do not reflect our ongoing strategic business operations, which management believes results in a performance measurement that represents a key indicator of the Company’s core business operations of Bitcoin mining. The adjustments include fair value adjustments such as derivative power contract adjustments, equity securities fair value changes, and non-cash stock-based compensation expense, in addition to financing and legacy business income and expense items. We believe Adjusted EBITDA can be an important financial performance measure because it allows management, investors, and our board of directors to evaluate and compare our operating results, including our return on capital and operating efficiencies from period-to-period by making such adjustments. Additionally, Adjusted EBITDA is used as a performance metric for share-based compensation.

Adjusted EBITDA is provided in addition to, and should not be considered a substitute for, or superior to, net income, the most comparable measure under GAAP to Adjusted EBITDA. Further, Adjusted EBITDA should not be considered as an alternative to revenue growth, net income, diluted net income per share or any other performance measure derived in accordance with GAAP, or as an alternative to cash flow from operating activities as a measure of our liquidity. Adjusted EBITDA has limitations as an analytical tool, and you should not consider this financial measure either in isolation or as a substitute for analyzing our results as reported under GAAP.

The following table reconciles Adjusted EBITDA to Net income (loss), the most comparable GAAP financial measure:

Three Months Ended

Six Months Ended

June 30,

June 30,

​ ​ ​

2026

​ ​ ​

2025

​ ​ ​

2026

​ ​ ​

2025

Net income (loss)

$

(237,170)

$

219,454

$

(737,647)

$

(76,913)

Interest income

(3,623)

(3,334)

(5,936)

(6,731)

Interest expense

2,687

6,093

5,305

8,401

Income tax expense (benefit)

(105)

320

186

757

Depreciation and amortization

97,784

83,197

195,518

161,123

EBITDA

(140,427)

305,730

(542,574)

86,637

Adjustments:

Stock-based compensation expense

35,582

30,120

74,748

59,696

Acquisition-related costs

111

187

Change in fair value of derivatives

8,362

42,747

60,214

853

Change in fair value of contingent consideration

(9,390)

(17,642)

Loss (gain) on equity method investment - marketable securities

(6,143)

57,095

Loss (gain) on sale of equipment

350

479

Casualty-related charges (recoveries), net

3

(119)

3

(119)

Loss on contract settlement

158,137

158,137

Gain on acquisition post-close dispute settlement

(26,007)

(26,007)

Impairment of property and equipment

27,972

27,972

Other (income) expense

(1,221)

(244)

(1,209)

(337)

Amortization of license fee revenue

(24)

(24)

Adjusted EBITDA

$

(69,729)

$

495,268

$

(380,846)

$

318,955

The Company defines Cost to Mine as the cost to mine one Bitcoin, excluding Bitcoin miner depreciation, as calculated in the table below.

Three Months Ended

Six Months Ended

June 30,

June 30,

​ ​ ​

2026

2025

2026

​ ​ ​

2025

Cost of power for self-mining operations

$

73,499

$

62,170

$

145,816

$

123,999

Other direct cost of revenue for self-mining operations(1)(2), excluding bitcoin miner depreciation

15,765

16,005

30,210

28,994

Cost of revenue for self-mining operations, excluding bitcoin miner depreciation

89,264

78,175

176,026

152,993

Less: power curtailment credits(3)

(10,054)

(8,313)

(31,077)

(16,114)

Cost of revenue for self-mining operations, net of power curtailment credits, excluding bitcoin miner depreciation

79,210

69,862

144,949

136,879

Bitcoin miner depreciation(4)(5)

64,622

60,252

140,708

117,314

Cost of revenue for self-mining operations, net of power curtailment credits, including bitcoin miner depreciation

$

143,832

$

130,114

$

285,657

$

254,193

Quantity of bitcoin mined

1,587

1,426

3,060

2,956

Production value of one bitcoin mined(6)

$

71,667

$

98,800

$

73,736

$

95,991

Cost to mine one bitcoin, excluding bitcoin miner depreciation

$

49,912

$

48,992

$

47,369

$

46,305

Cost to mine one bitcoin, excluding bitcoin miner depreciation, as a % of production value of one bitcoin mined

69.6

%

49.6

%

64.2

%

48.2

%

Cost to mine one bitcoin, including bitcoin miner depreciation

$

90,631

$

91,244

$

93,352

$

85,992

Cost to mine one bitcoin, including bitcoin miner depreciation, as a % of production value of one bitcoin mined

126.5

%

92.4

%

126.6

%

89.6

%

(1)

Other direct cost of revenue includes compensation, insurance, repairs, and ground lease rent and related property tax.

(2)

For the three months ended June 30, 2026 and 2025, we paid cash of $25.2 million and $71.3 million, respectively, and for the six months ended June 30, 2026 and 2025, we paid cash of $48.7 million and $92.3 million, respectively, in total deposits and payments for the purchase of miners. Costs to finance the purchase of miners were zero in all periods presented as the miners were paid for with cash from the Company’s cash balance. The seller did not provide any financing, nor did the Company borrow from a third-party to purchase the miners.

(3)

Power curtailment credits are credited against our power invoices as a result of temporarily pausing our operations to participate in ERCOT’s Demand Response Service Programs. Our fixed-price power purchase contracts enable us to strategically curtail our mining operations and participate in these programs, which significantly lower our cost to mine bitcoin. These credits are recognized in Power curtailment credits on our Condensed Consolidated Statements of Operations, outside of cost of revenue, but significantly reduce our overall cost to mine bitcoin.

(4)

We capitalize the acquisition cost of our miners and include these costs in Property and equipment, net on our Condensed Consolidated Balance Sheets. The miners are depreciated over an estimated useful life of three years, during which time, they are expected to contribute to the generation of bitcoin revenue. We do not consider depreciation expense in determining whether it is economical to operate our miners because depreciation is a non-cash expense and is not a variable operating cost that can be avoided even if we curtail operations temporarily. Depreciation expense incurred is disclosed for each respective period in the table above.

(5)

The following table presents the future depreciation expense of all of our bitcoin miners:

Remainder of 2026

$

133,593

2027

219,902

2028

99,312

2029

19,258

Total

$

472,065

(6)

Computed as revenue recognized from bitcoin mined divided by the quantity of bitcoin mined during the same period.

EX-99.2

EX-99.2

Filename: riot-20260810xex99d2.htm · Sequence: 3

Exhibit 99.2

Conceptual rendering

RIOT PLATFORMS

Q2 2026 EARNINGS

August 10, 2026 NASDAQ: RIOT

TABLE OF

CONTENTS

S E C T I O N 2 :

BUSINESS UPDATE DATA CENTERS

S E C T I O N 1 :

Q2 2026 KEY HIGHLIGHTS

S E C T I O N 4 :

Q2 2026 FINANCIAL UPDATE

S E C T I O N 3 :

FINANCING UPDATE

3

S E C T I O N 5 :

CLOSING REMARKS

Q2 2026

K E Y H I G H L I G H T S

S E C T I O N 1 :

4

• Executed Data Center Lease with a leading frontier AI lab for 191 MW of

critical IT capacity

• 20-year lease expected to generate $9.1B in total initial contract revenue

with two 5-year extension options, if exercised, would generate $16.1B in

total potential contract revenue

• Commissioned and delivered first 25 MW of capacity in May 2026

• 25 MW expansion exercised by AMD is under construction and scheduled for

full delivery in May 2027

• Advanced commercial and design discussions with full site under non-binding LOI to single tenant

• Continued development and critical path procurement processes to maintain

delivery timelines and derisk future execution

• Continued sale of BTC inventory as primary funding source for equity

component of data center total capital expenditures

• Maintained strong liquidity position with $1.2B in total liquidity consisting of

$666M in BTC and $549M of cash 1

KEY ACCOMPLISHMENTS

5

1.Bitcoin value based on a closing price of $58,527 on June 30, 2026, sourced from Coinbase. Cash balance is as of June 30, 2026, and includes restricted cash of $77.5 million and 5,821 in restricted bitcoin.

Lease Signed with Leading

Frontier AI Lab

Corsicana Site

Under LOI

AMD Deployment

On Track

Strong Financial

Position

BUSINESS

UPDATE

D A T A C E N T E R S

S E C T I O N 2 :

6

191 MW

Critical IT

Capacity

Dec 2027

Initial Deployment and Rent

Commencement

Two 5-Year

Extension

Options

$9.1 Billion

Total Contract

Revenue 1

June 2028

Full Deployment

$11.0-12.0M / IT MW

Illustrative Capex Range4

80% – 90%

Anticipated

NOI Margin Range

20 Year Initial Term

Upon Full Deployment2

1. Contract value for deployment over the entire term of the lease, including phased development starting Dec 2027.

2. Deployment will be delivered in phases, with the full deployment estimated to be delivered on the listed month above.

3. Morgan Stanley interim financing facility of up to $573 million.

4. Represents costs of new construction beyond existing infrastructure.

DEAL HIGHLIGHTS

Morgan Stanley

Interim Financing3

IG-Backstop in Finalization

RIOT SIGNS

$9.1 BILLION DEAL

WITH LEADING

FRONTIER AI LAB AT

ROCKDALE CAMPUS

7

Initial Capacity On-Schedule and De-Risked

for Delivery in December 2027

Signed Lease with

Leading Frontier AI

Lab

Phase 1 96 MW

Delivered

December 2027

Phase 2 95 MW

Delivered

June 2028

96 MW 191 MW

TODAY

Accelerated Design

Strategy Defined

Tenant BoD incorporated to reduce

design timelines and enable rapid

procurement. Full design and internal

architecture completed.

1

Delivery Partners Selected

Preferred partners with

this specific leading frontier

AI lab engaged to support execution

and GMP development.

2

Vertical Integration

Advantage Leveraged

ESS Metron and E4A capabilities

integrated into the delivery plan,

accelerating substation development

and reducing long-lead equipment risk.

3

Power Capacity Confirmed

Required power availability

secured and aligned with

project delivery milestones.

4

Interim Financing Secured

$573M interim financing

provided by Morgan Stanley to

fund procurement of LLE and

maintain delivery milestones.

5

8

P R O G R E S S U P D A T E S

9

• Nearly complete design for second 25 MW deployment, enabling construction

execution.

• Construction is underway, with the initial 10 MW RFS expected in November

2026 and the remaining 15 MW RFS expected in May 2027.

• Leveraging Riot’s vertically integrated engineering capabilities through ESS

Metron to support execution and schedule certainty.

• Strategic general contractor alignment continues to support disciplined project

execution.

Rockdale Campus

Successfully Delivered

Initial 25 MW to AMD

On Schedule and On Budget

AMD – 50 MW

Average

Annual

Revenue1

$63.6 million $457 million $520 million

Average

Annual NOI

Total

Capital

Expenditures3

1. Total Revenue based on contract value of the total length of each lease term, including annual escalators.

Represents 50 MW currently contracted under the AMD lease.

2. Estimation based on an 80 – 90% NOI Margin range.

3. Excludes tenant fit out costs.

4. Represents the expected timeline of full capacity delivery on each respective lease shown.

AMD

(50 IT MW)

Leading Frontier

AI Lab

(191 IT MW)

Total

(241 IT MW)

Rockdale

Pro Forma

Critical IT

MW Leased

$51.0 million $365 – 411 million2 $416 – 462 million

May 2027 June 2028 -

Rockdale

391 IT MW

Contract

Potential

Leading

Frontier

AI Lab

Capacity

191 IT MW

Contracted

AMD

Capacity

50 IT MW

Contracted

AMD

Expansion

Capacity

150 IT MW

In 2026, Riot Has Secured $9.8 Billion of Data Center Revenue

With Leading Players in the AI Ecosystem

Full

Deployment4

$170.2 million $2.1-2.3 billion $2.3-2.5 billion

10

S E C T I O N 3 :

11

FINANCING

UPDATE

Q 2 2 0 2 6

Strong Balance Sheet

Allows Riot to deploy capital into current and future data

center projects

Capital Recycling

Expected debt proceeds from initial 25 MW deployment will

nearly double Riot’s initial equity contribution1

, with

additional capacity for AMD’s second 25 MW deployment

Capital Redeployment

Proceeds from above will be redeployed into funding the

equity requirement under the leading frontier AI lab project,

avoiding any need for new equity issuance, while further

extending the runway of our balance sheet

Capital Recycling & Redeployment

Disciplined Balance Sheet, and Recycling Lower Cost

Proceeds to Fund Higher Return Projects

1.Based on previously announced $89.5 million capex budget

12

CAPITAL

STRATEGY

Riot’s financing strategy drives development growth by leveraging

a strong balance sheet and debt financing proceeds, reducing the

need for external equity

13

1

REFINANCE STABILIZED CAPACITY

INITIAL 25 MW DELIVERED - EXPECTED TERM LOAN

Expected term loan ~$180M

Less: initial 25 MW equity requirement already spent ~$90M

NET NEW PROCEEDS ~$90M

SECOND 25 MW - $69M DELAYED DRAW TERM LOAN (DDTL)

Drawdown facility preserves balance sheet liquidity for new projects

Expected capex ~$81M

Less: DDTL proceeds (@85% LTC) ~$69M

NET EQUITY REQUIREMENT ~$12M

2

FUND NEW LEADING FRONTIER AI LAB PROJECT BUILDOUT

Expected capital expenditures $2.1 – $2.3B

Less: estimated debt (@80% - 90% LTC) $1.7 – $2.1B

Equity requirement $210 – $460M

Less: expected term loan from AMD $180M

NET EQUITY REQUIRED $30 – $280M

T O T A L B A L A N C E SH E E T L IQ U ID IT Y $1.2B

NET EQUITY REQUIRED

Net project equity required for the leading frontier AI lab buildout will be funded primarily through

existing liquidity position and expected debt financing

• $180 million expected gross proceeds to redeploy into the leading

frontier AI lab project

• Net project equity to fund buildout is fully covered by

existing balance sheet and expected term loan from AMD

financing

R E D E P L O Y E D

$30M - $280M

Disciplined

Capital

Recycling

13

FINANCIAL

UPDATE

Q 2 2 0 2 6

S E C T I O N 4 :

14

1. Net income per share figure based on diluted shares outstanding.

2. See Appendix slides 28-29 for definitions, terms, and reconciliations.

3. Bitcoin value based on a closing price of $58,527 on June 30, 2026,

sourced from Coinbase.

4. ‘Global Network Hash Rate’ quarter average sourced from Blockchain.com

as of June 30, 2026.

FINANCIAL

METRICS

POWER

STATISTICS

Net Cost of Power

Represents one of the lowest costs

of power in the industry2

Power Credits Equivalent of

$6,335 per BTC mined

RIOT PLATFORMS

Q2 2026

BY THE

NUMBERS

3.6 c/kWh

$10M

Net Income

Reflects several non-cash

charges and mark to market

pricing on BTC held

Diluted EPS

Includes D&A, SBC,

unrealized loss on BTC held1

Adjusted EBITDA

Adjusted for non-cash and

unusual items2

Total Revenue

14% increase

year-over-year

Approx. Available Total

Power Capacity

1,700 MW in Texas and 300

MW in Kentucky

15

DATA CENTER

STATISTICS

End-of-quarter Critical IT

contracted and delivered

Total Revenue

Reflects RFS of Riot’s first data

center deployment & fit-out

25 MW

$23M

Operating Lease Revenue

Reflects delivery of full 25 MW

AMD deployment in mid-May

$5M

15

BTC MINING

STATISTICS

BTCHeld

Quarter-end value of

$666.0M3

BTC Produced

Production of 17.4 BTC

per day

Hash Rate Deployed

Accounting for ~4.6% of

the global network4

Cost to Mine per Bitcoin

Vertical-integration and

power strategy drive low

cost to mine2

Operating Lease Gross Margin

84%

1,587

11,380

44.4 EH/s

$49,912

$174M

$(237)M

$(0.68)

$(70)M

2.0 GW

DATA CENTER | Q2 2026 Data Center Revenues

16

• Delivered 84% operating lease

gross margin / 91% base rent gross

margin and grew AMD contracted

capacity to 50 MW in Q2

• 25 MW of capacity delivered on

schedule in May, with construction

of next 25 MW underway

• Tenant fit-out services include the

procurement and installation of

customer-specific equipment,

reimbursed by the tenant on

a cost-plus basis

Q2 2026 Q1 2026 Q/Q

Revenue Gross

Profit

Gross

Margin Revenue Gross

Profit

Gross

Margin Revenue Gross

Profit

Operating Lease

(Recurring) $4.9M $4.1M 84% $0.9M $0.8M 91% +428% +389%

Tenant Fit Out

Services $18.3M $2.4M 13% $32.2M $1.5M 5% -43% +56%

Total $23.2M $6.5M 28% $33.2M $2.4M 7% -30% +174%

Base Rent1

(Recurring) $4.5M $4.1M 91% $0.9M $0.8M 94% +405% +389%

1. Base Rent is base rent as defined in the lease and recognized on a GAAP-basis, and excludes power reimbursement and Tenant Fit Out Services revenue and related costs.

Riot Engineering Provides a Key Competitive Advantage in the Delivery

of Critical Data Center Components

17

Riot Engineering provides

significant operational

synergies

• ESS Metron manufactures low and medium voltage

switchgear and power distribution units – critical

long lead-time components

• Riot engineering supporting the procurement

process for our data center strategy

• Drives greater control of the supply chain and

creates cost savings

• Derisksthe delivery of a critical data center

component

• Servicing and maintenance expertise leads to

operational efficiencies

Data center

sector

represents

90% of current

backlog

17

$10.6

$19.1 $21.1 $22.2

$37.3

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

$118.7

$159.6

$227.0

$193.4 $177.1

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

Conversion cycle of backlog to revenue has improved dramatically with a 25%

expansion of manufacturing capacity in 2026

Engineering

Backlog ($M)

Engineering Revenues Continue

to Increase ($M)

CLOSING

REMARKS

S E C T I O N 5 :

18

Riot Maintains

Strong

Development

Momentum

Jan 2026

Announced

Rockdale land

acquisition and

execution of first data

center

Lease with AMD

May 2026

Phased AMD

deployment

of 25 MW

May 2027

Additional

phased AMD

deployment

of 25 MW

Dec 2027

Phase 1 of

leading frontier

AI lab deployment

of 96 MW

241

MW

June 2028

Phase 2 of

leading frontier

AI lab deployment

of 95 MW

Fully developed

portfolio of BTS data

centers

AMD Lease

Phase 1-2

AMD Lease

Phase 3-4

Leading Frontier

AI Lab Lease

Phase 1

146

MW

50

MW

25

MW

~1 GW

Corsicana

Full Campus

LOI signed

Corsicana

LOI

1.3 GW+

Leading Frontier

AI Lab Lease

Phase 2

19

FUTURE

FOCUS &

THEMES

20

DELIVER CONTRACTED MEGAWATTS TO AMD AND ADVANCE THE LEADING FRONTIER

AI LAB BUILDOUT ON SCHEDULE AND ON BUDGET

CONVERT OUR CORSICANA LOI INTO AN EXECUTED LEASE

CLOSE LOWER-COST PROJECT FINANCING THAT REFLECTS

THE HIGH QUALITY OF OUR TENANTS AND OUR SITES

ACTIVELY PURSUE GROWTH OF OUR POWER PIPELINE AND EXECUTE ACCRETIVE

INVESTMENTS THAT COMPOUND VALUE IN OUR PORFOLIO

Q2 2026

DATA

OPERATIONAL

A P P E N D I X

21

$140.9

$160.8

$131.7

$111.9 $113.7

50% 59%

39% 41%

30%

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

35.4 EH/s 36.5 EH/s 38.5 EH/s

42.5 EH/s 44.4 EH/s

87% 86% 89% 90% 87%

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

• Q2 2026 Bitcoin Mining Revenue of

$113.7M and Gross Profit – Bitcoin Mining

of $34.5M

• Industry leading Bitcoin Mining margins

with an Q2 2026 Cost to Mine of $49,912

due to Riot’s power strategy driving an all-in

cost of power of 3.6c/kWh

• Strong hash rate utilization averaging 87% in

Q2 2026, partially impacted by miner

downtime in Kentucky during the month of

May

Metric Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

Avg. Hash Price ($/PH/s/Day) $51 $56 $42 $34 $34

Avg. Network Hash Rate¹ 876 EH/s 948 EH/s 1,071EH/s 994 EH/s 957 EH/s

Cost to Mine² $48,992 $46,324 $60,619 $44,629 $49,912

# of BTC produced 1,426 1,406 1,324 1,473 1,587

Ending

Hash Rate

Capacity /

Uptime (%)

Bitcoin Mining

Increasing Efficiency and Scale of Operations

Bitcoin Mining Revenue /

Gross Margin –

Bitcoin Mining2

(%)

Ending Hash Rate Capacity

Bitcoin Mining Revenue ($ million)

1. Sourced fromBlockchain.comas of June 30, 2026.

2. See Appendix slides 28-29 for definitions, terms, and reconciliations.

3. Three months ended as of June 30, 2026.

22

14% 65%

21%

Bitcoin Mining

Data Centers

Engineering

Riot Revenue

Breakdown Q2

20261

$46,313

$49,912

$9,934 $6,335

Q2 2026

Total Direct

Costs

per BTC

Q2 2026

Power Credits

Per BTC

Q2 2026

Net Direct

Costs

per BTC

$43,597

$48,992

$11,224

$5,829

Q2 2025

Total Direct

Costs

per BTC

Q2 2025

Power Credits

Per BTC

Q2 2025

Net Direct

Costs

per BTC

Q2 2025 vs. Q2 2026 Cost to Mine per BTC

Q2 2025 1

1,426 BTC Mined

Avg. BTC Price of $98,800

Q2 2026 2

1,587 BTC Mined

Avg. BTC Price of $71,667

23 1.Three months ended as of June 30, 2025. See Appendix on slides 28-29 for definitions, terms, and reconciliations.

2.Three months ended as of June 30, 2026. See Appendix on slides 28-29 for definitions, terms, and reconciliations.

Despite BTC Mining Headwinds, Lost Cost to Mine

Drives Continued Profitability • Average global network hash rate up 9%

in Q2 2026 vs Q2 2025

• Global network hash rate avg.

957 EH/s in Q2 2026 versus 876

EH/s in Q2 2025

• ‘Non-Power’ includes direct labor, miner

insurance, miner and miner-related

equipment repair, land lease, property

taxes, network costs and other utilities

expenses

• Riot’s power strategy generated

significant power curtailment credits of

$10.1 million in Q2 2026, driving an all-in

cost of power of 3.6c/kWh

• Equates to $6,335 per BTC for the

quarter

Non-Power

Power

Non-Power

Power

$10.6

$19.1 $21.1 $22.2

$37.3

7%

28%

26% 18%

28%

0%

10%

20%

30%

40%

50%

$-

$10.0

$20.0

$30.0

$40.0

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

• Since the acquisition of ESS Metron in

December of 2021, Riot has already realized

$23.8M in capex savings alone

• Backlog of $177.1M, with 90% of this

backlog originating from the data center

sector

• Strategically holding back capacity for Riot

data center growth and continued

integration of the Riot platform

Cumulative

Capex

Savings to

Riot

Backlog

Revenue /

Gross Margin

(%)

24

Engineering – A Key Component

of Riot’s Vertical Integration Strategy

1. Three months ended as of June 30, 2026.

$12.4

$23.0 $23.2 $23.8 $23.8

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

$118.7

$159.6

$227.0

$193.4 $177.1

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

14% 65%

21%

Bitcoin Mining

Data Centers

Engineering

Riot Revenue

Breakdown Q2

20261

Company Profile

25

COMPANY SNAPSHOT

Headquarters Denver, Colorado – ESS Metron

Houston, Texas – E4A Solutions

Employees 244 – ESS Metron

60 – E4A Solutions

Key Leadership Beck Jonson, CEO – ESS Metron

Alexandre Chacara, CEO – E4A Solutions

Acquisition Dates December 2021 – ESS Metron

December 2024 – E4A Solutions

ESS METRON

KEY OFFERINGS

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026

Revenue $10.6 $19.1 $21.1 $22.2 $37.3

% growth - 80.2% 10.5% 5.2% 68.0%

Gross Profit $0.7 $5.4 $5.6 $4.0 $10.3

% margin 6.8% 28.2% 26.4% 18.2% 27.5%

SUMMARY FINANCIALS ($M)

SELECT CLIENTS

MANUFACTURING

Designs and manufactures power

distribution equipment and engineered-to-order electrical products for large-scale industrial and governmental clients

across the data center, power

generation, utility, water, industrial, and

alternative energy markets

E4A SOLUTIONS

KEY OFFERINGS

SERVICES

Provides electrical engineering

solutions and services

supporting the full lifecycle of

electrical infrastructure, from

design and engineering to

commissioning and ongoing

operations & maintenance

R I O T E N G I N E E R I N G

Utilized by AMD as their Megalab for

testing new products. Site of the first

installation and testing of Helios,

AMD’s next

-generation AI GPU

architecture.

ROCKDALE

DATA CENTER

CAMPUS

26

Q2 2026

DATA

FINANCIAL

A P P E N D I X

27

Definitions, Terms, and Reconciliations (Unaudited)

1.Other direct cost of revenue includes compensation, insurance, repairs, and ground lease rent and related property tax.

2.Costs to finance the purchase of miners were zero in all periods presented as the miners were paid for with cash from the Company’s cash balance. The seller did not provide any financing, nor did the Company borrow from a third-party to purchase the miners.

3.Power curtailment credits are credited against our power invoices as a result of temporarily pausing our operations to participate in ERCOT’s Demand Response Service Programs. Our fixed-price power purchase contracts enable us to strategically curtail our mining operations and participate in these programs,

which significantly lower our cost to mine bitcoin. These credits are recognized in Power Curtailment Credits on our Consolidated Statement of Operations, outside of cost of revenue.

4.Computed as revenue recognized from bitcoin mined divided by the quantity of bitcoin mined during the same period.

28

COST TO MINE

The Company defines Cost to Mine as the

direct cost to mine one Bitcoin, excluding

Bitcoin miner depreciation, as calculated in the

table below

COST OF POWER

The Company defines Cost of Power as the cost of

power directly used in the process of mining Bitcoin,

less power curtailment credits, divided by kilowatt

("kWh") hours used

June 30, September 30, December 31, March 31, June 30,

2025 2025 2025 2026 2026 2026 2025

Total Cost of Power $ 62,170 $ 82,370 $ 75,027 $ 72,317 $ 73,499 $ 145,816 $ 123,999

less: Power curtailment credits (8,313) (30,634) (9,981) (21,023) (10,054) (31,077) (16,114)

Net Cost of Power $ 53,857 $ 51,736 $ 65,046 $ 51,294 $ 63,445 $ 114,739 $ 107,885

kWh used 1,538,273,540 1,592,798,508 1,669,276,467 1,735,496,392 1,785,649,387 3,521,145,779 2,556,632,711

Cost of Power (c/kWh) $ 3.5 $ 3.2 $ 3.9 $ 3.0 $ 3.6 $ 3.3 $ 4.2

Three Months Ended Six Months Ended

June 30,

June 30, September 30, December 31, March 31, June 30,

2025 2025 2025 2026 2026 2026 2025

Cost of power for self-mining operations $ 62,170 $ 82,370 $ 75,027 $ 72,317 $ 73,499 $ 145,816 $ 123,999

Other direct cost of revenue for self-mining operations(1)(2), excluding Bitcoin miner depreciation 16,005 13,395 15,226 14,445 15,765 30,210 28,994

Cost of revenue for self-mining operations, excluding Bitcoin miner depreciation 78,175 95,765 90,253 86,762 89,264 176,026 152,993

Less: power curtailment credits(3)

(8,313) (30,634) (9,981) (21,023) (10,054) (31,077) (16,114)

Cost of revenue for self-mining operations, net of power curtailment credits, excluding Bitcoin miner depreciation 69,862 65,131 80,272 65,739 79,210 144,949 136,879

Bitcoin miner depreciation 60,252 60,106 60,154 76,086 64,622 140,708 117,314

Cost of revenue for self-mining operations, net of power curtailment credits, including Bitcoin miner depreciation $ 130,114 $ 125,237 $ 140,426 $ 141,825 $ 143,832 $ 285,657 $ 254,193

Quantity of Bitcoin mined 1,426 1,406 1,324 1,473 1,587 3,060 2,956

Production value of one Bitcoin mined(4) $ 98,800 $ 114,361 $ 99,482 $ 75,964 $ 71,667 $ 73,736 $ 95,991

Cost to mine one Bitcoin, excluding Bitcoin miner depreciation $ 48,992 $ 46,324 $ 60,619 $ 44,629 $ 49,912 $ 47,369 $ 46,305

Cost to mine one Bitcoin, excluding Bitcoin miner depreciation, as a % of production value of one Bitcoin mined 49.6% 40.5% 60.9% 58.8% 69.6% 64.2% 48.2%

Cost to mine one Bitcoin, including Bitcoin miner depreciation $ 91,244 $ 89,074 $ 106,045 $ 96,283 $ 90,631 $ 93,352 $ 85,992

Cost to mine one Bitcoin, including Bitcoin miner depreciation, as a % of production value of one Bitcoin mined 92.4% 77.9% 106.6% 126.7% 126.5% 126.6% 89.6%

Three Months Ended Six Months Ended

June 30,

Definitions, Terms, and Reconciliations (Unaudited)

29

GROSS PROFIT (NON-GAAP)

The Company defines Gross Profit as Fully Costed Gross

Profit plus Power Curtailment Credits plus Depreciation and

Amortization expense. The Company defines Fully Costed

Gross Profit as Revenue less Cost of Revenue (excluding

Depreciation and Amortization)

GROSS MARGIN (NON-GAAP)

The Company defines Gross Margin as Gross Profit divided

by Revenue

June 30, September 30, December 31, March 31, June 30,

Riot Platforms, Inc.: 2025 2025 2025 2026 2026 2026 2025

Revenue $ 152,988 $ 180,229 $ 152,831 $ 167,219 $ 174,235 $ 341,454 $ 314,375

less Bitcoin Mining Cost of revenue (78,175) (95,765) (90,253) (86,762) (89,264) (176,026) (152,993)

less Data Center Cost of revenue - - - (30,773) (16,700) (47,473) -

less Engineering Cost of revenue (9,858) (13,707) (15,522) (18,141) (27,030) (45,171) (21,664)

less Other Cost of revenue (3,006) - - - - - (11,971)

less Depreciation and amortization expense (83,197) (82,929) (102,759) (97,734) (97,784) (195,518) (161,123)

Fully Costed Gross Profit $ (21,248) $ (12,172) $ (55,703) $ (66,191) $ (56,543) $ (122,734) $ (33,376)

plus Power curtailment credits 8,313 30,634 9,981 21,023 10,054 31,077 16,114

plus Depreciation and amortization 83,197 82,929 102,759 97,734 97,784 195,518 161,123 Gross Profit $ 70,262 $ 101,391 $ 57,037 $ 52,566 $ 51,295 $ 103,861 $ 143,861

Gross Margin 45.9% 56.3% 37.3% 31.4% 29.4% 30.4% 45.8%

Bitcoin Mining:

Bitcoin Mining Revenue $ 140,889 $ 160,792 $ 131,736 $ 111,895 $ 113,736 $ 225,631 $ 283,748

less Bitcoin Mining Cost of revenue (78,175) (95,765) (90,253) (86,762) (89,264) (176,026) (152,993)

less Depreciation and amortization expense of Bitcoin miners (60,252) (60,106) (60,154) (76,086) (64,622) (140,708) (117,314)

Fully Costed Gross Profit - Bitcoin Mining $ 2,462 $ 4,921 $ (18,671) $ (50,953) $ (40,150) $ (91,103) $ 13,441

plus Power curtailment credits 8,313 30,634 9,981 21,023 10,054 31,077 16,114

plus Depreciation and amortization expense of Bitcoin miners 60,252 60,106 60,154 76,086 64,622 140,708 117,314 Gross Profit - Bitcoin Mining $ 71,027 $ 95,661 $ 51,464 $ 46,156 $ 34,526 $ 80,682 $ 146,869

Gross Margin - Bitcoin Mining 50.4% 59.5% 39.1% 41.2% 30.4% 35.8% 51.8%

Data Center:

Data Center Revenue $ - $ - $ - $ 33,150 $ 23,213 $ 56,363 $ -

less Data Center Cost of revenue - - - (30,773) (16,700) (47,473) -

less Depreciation and amortization expense - - - (212) (574) (786) -

Fully Costed Gross Profit - Data Center $ - $ - $ - $ 2,165 $ 5,939 $ 8,104 $ -

plus Depreciation and amortization expense - - - 212 574 786 - Gross Profit - Data Center $ - $ - $ - $ 2,377 $ 6,513 $ 8,890 $ -

Gross Margin - Data Center - - - 7.2% 28.1% 15.8% 0.0%

Data Center - Operating Leases:

Data Center Operating Lease Revenue $ - $ - $ - $ 927 $ 4,895 $ 5,822 $ -

less Data Center Operating Lease Cost of revenue - - - (85) (775) (860) -

less Depreciation and amortization expense - - - (212) (574) (786) -

Fully Costed Gross Profit - Data Center - Operating Leases $ - $ - $ - $ 630 $ 3,546 $ 4,176 $ -

plus Depreciation and amortization expense - - - 212 574 786 - Gross Profit - Data Center - Operating Leases $ - $ - $ - $ 842 $ 4,120 $ 4,962 $ -

Gross Margin - Data Center - Operating Leases - - - 90.8% 84.2% 85.2% 0.0%

Data Center - Tenant Fit-Out Services:

Data Center Tenant Fit-Out Services Revenue $ - $ - $ - $ 32,222 $ 18,318 $ 50,541 $ -

less Data Center Tenant Fit-Out Services Cost of revenue - - - (30,688) (15,925) (46,613) -

less Depreciation and amortization expense - - - - - - -

Fully Costed Gross Profit - Data Center - Tenant Fit-Out Services $ - $ - $ - $ 1,534 $ 2,393 $ 3,928 $ -

plus Depreciation and amortization expense - - - - - - - Gross Profit - Data Center - Tenant Fit-Out Services $ - $ - $ - $ 1,534 $ 2,393 $ 3,928 $ -

Gross Margin - Data Center - Tenant Fit-Out Services - - - 4.8% 13.1% 7.8% 0.0%

Engineering:

Engineering Revenue $ 10,576 $ 19,097 $ 21,095 $ 22,174 $ 37,286 $ 59,460 $ 24,496

less Engineering Cost of revenue (9,858) (13,707) (15,522) (18,141) (27,030) (45,171) (21,664)

less Depreciation and amortization expense (1,237) (1,340) (1,275) (1,305) (1,337) (2,642) (2,562)

Fully Costed Gross Profit - Engineering $ (519) $ 4,050 $ 4,298 $ 2,728 $ 8,919 $ 11,647 $ 270

plus Depreciation and amortization 1,237 1,340 1,275 1,305 1,337 2,642 2,562 Gross Profit - Engineering $ 718 $ 5,390 $ 5,573 $ 4,033 $ 10,256 $ 14,289 $ 2,832

Gross Margin - Engineering 6.8% 28.2% 26.4% 18.2% 27.5% 24.0% 11.6%

Three Months Ended Six Months Ended

June 30,

Q2 2026

Statement

of Operations

(Unaudited)

30

Q2 2026

Balance

Sheet

(Unaudited)

31

Non-GAAP

Adjusted

EBITDA

(Unaudited)

32

* Indicates Non-GAAP measure. We use Adjusted EBITDA to eliminate the effects of certain non-cash and/or non-recurring items, that do not reflect our

ongoing strategic business operations. Adjusted EBITDA is provided in addition to, and not as a substitute for, or as superior to, the comparable GAAP

measure, Net Income. For a full reconciliation of the Non-GAAP measures we use to their comparable GAAP measures, see the discussion under the heading

“Non-GAAP Measures”, under Item 2, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our June 30, 2026, Form

10-Q.

Riot Currently Trades Among the Lowest

EV / MW Multiples in the Sector

$8.9

$7.8

$6.3

$8.6

$5.4

$7.1

$3.7 $3.5 $2.9

EV / 2027 Available MW

$3.5

($M) 1,2

1. Sourced from FactSet as of August 3, 2026. Cash & Cash Equivalents, LT Debt, and BTC value used in calculation as of March 31, 2026.

2. Sourced from company filings, company presentations, press releases, management commentary, and S&P-451 Data Center Knowledge Base (DCKB). Includes only power capacity that is currently operational and under construction in North America.

33

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g001.jpg · Sequence: 4

Binary file (160273 bytes)

Download riot-20260810xex99d2g001.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g002.jpg · Sequence: 5

Binary file (339053 bytes)

Download riot-20260810xex99d2g002.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g003.jpg · Sequence: 6

Binary file (76282 bytes)

Download riot-20260810xex99d2g003.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g004.jpg · Sequence: 7

Binary file (47301 bytes)

Download riot-20260810xex99d2g004.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g005.jpg · Sequence: 8

Binary file (163121 bytes)

Download riot-20260810xex99d2g005.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g006.jpg · Sequence: 9

Binary file (50646 bytes)

Download riot-20260810xex99d2g006.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g007.jpg · Sequence: 10

Binary file (121703 bytes)

Download riot-20260810xex99d2g007.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g008.jpg · Sequence: 11

Binary file (120945 bytes)

Download riot-20260810xex99d2g008.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g009.jpg · Sequence: 12

Binary file (215841 bytes)

Download riot-20260810xex99d2g009.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g010.jpg · Sequence: 13

Binary file (134161 bytes)

Download riot-20260810xex99d2g010.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g011.jpg · Sequence: 14

Binary file (50078 bytes)

Download riot-20260810xex99d2g011.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g012.jpg · Sequence: 15

Binary file (158305 bytes)

Download riot-20260810xex99d2g012.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g013.jpg · Sequence: 16

Binary file (149515 bytes)

Download riot-20260810xex99d2g013.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g014.jpg · Sequence: 17

Binary file (49656 bytes)

Download riot-20260810xex99d2g014.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g015.jpg · Sequence: 18

Binary file (152082 bytes)

Download riot-20260810xex99d2g015.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g016.jpg · Sequence: 19

Binary file (127514 bytes)

Download riot-20260810xex99d2g016.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g017.jpg · Sequence: 20

Binary file (154835 bytes)

Download riot-20260810xex99d2g017.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g018.jpg · Sequence: 21

Binary file (49210 bytes)

Download riot-20260810xex99d2g018.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g019.jpg · Sequence: 22

Binary file (103354 bytes)

Download riot-20260810xex99d2g019.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g020.jpg · Sequence: 23

Binary file (104734 bytes)

Download riot-20260810xex99d2g020.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g021.jpg · Sequence: 24

Binary file (48681 bytes)

Download riot-20260810xex99d2g021.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g022.jpg · Sequence: 25

Binary file (135963 bytes)

Download riot-20260810xex99d2g022.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g023.jpg · Sequence: 26

Binary file (132021 bytes)

Download riot-20260810xex99d2g023.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g024.jpg · Sequence: 27

Binary file (119523 bytes)

Download riot-20260810xex99d2g024.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g025.jpg · Sequence: 28

Binary file (156861 bytes)

Download riot-20260810xex99d2g025.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g026.jpg · Sequence: 29

Binary file (166748 bytes)

Download riot-20260810xex99d2g026.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g027.jpg · Sequence: 30

Binary file (48311 bytes)

Download riot-20260810xex99d2g027.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g028.jpg · Sequence: 31

Binary file (179993 bytes)

Download riot-20260810xex99d2g028.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g029.jpg · Sequence: 32

Binary file (181011 bytes)

Download riot-20260810xex99d2g029.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g030.jpg · Sequence: 33

Binary file (160856 bytes)

Download riot-20260810xex99d2g030.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g031.jpg · Sequence: 34

Binary file (151515 bytes)

Download riot-20260810xex99d2g031.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g032.jpg · Sequence: 35

Binary file (148403 bytes)

Download riot-20260810xex99d2g032.jpg

GRAPHIC

GRAPHIC

Filename: riot-20260810xex99d2g033.jpg · Sequence: 36

Binary file (71582 bytes)

Download riot-20260810xex99d2g033.jpg

XML — IDEA: XBRL DOCUMENT

XML

Filename: R1.htm · Sequence: 42

v3.26.1

Document and Entity Information

Aug. 10, 2026

Document Information [Line Items]

Document Type

8-K

Document Period End Date

Aug. 10, 2026

Entity Registrant Name

Riot Platforms, Inc.

Entity Incorporation, State or Country Code

NV

Securities Act File Number

001-33675

Entity Tax Identification Number

84-1553387

Entity Address, Address Line One

85 Rio Grande Drive

Entity Address, Address Line Two

Suite 200

Entity Address, City or Town

Castle Rock

Entity Address, State or Province

CO

Entity Address, Postal Zip Code

80104

City Area Code

(303)

Local Phone Number

794-2000

Written Communications

false

Soliciting Material

false

Pre-commencement Tender Offer

false

Pre-commencement Issuer Tender Offer

false

Title of 12(b) Security

Common Stock, no par value per share

Trading Symbol

RIOT

Security Exchange Name

NASDAQ

Entity Emerging Growth Company

false

Entity Central Index Key

0001167419

Amendment Flag

false

Former Address [Member]

Document Information [Line Items]

Entity Address, Address Line One

3855 Ambrosia Street

Entity Address, Address Line Two

Suite 301

Entity Address, City or Town

Castle Rock

Entity Address, State or Province

CO

Entity Address, Postal Zip Code

80109

X

- Definition

Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.

+ References

No definition available.

+ Details

Name:

dei_AmendmentFlag

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Area code of city

+ References

No definition available.

+ Details

Name:

dei_CityAreaCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Line items represent financial concepts included in a table. These concepts are used to disclose reportable information associated with domain members defined in one or many axes to the table.

+ References

No definition available.

+ Details

Name:

dei_DocumentInformationLineItems

Namespace Prefix:

dei_

Data Type:

xbrli:stringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.

+ References

No definition available.

+ Details

Name:

dei_DocumentPeriodEndDate

Namespace Prefix:

dei_

Data Type:

xbrli:dateItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.

+ References

No definition available.

+ Details

Name:

dei_DocumentType

Namespace Prefix:

dei_

Data Type:

dei:submissionTypeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 1 such as Attn, Building Name, Street Name

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine1

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Address Line 2 such as Street or Suite number

+ References

No definition available.

+ Details

Name:

dei_EntityAddressAddressLine2

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the City or Town

+ References

No definition available.

+ Details

Name:

dei_EntityAddressCityOrTown

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Code for the postal or zip code

+ References

No definition available.

+ Details

Name:

dei_EntityAddressPostalZipCode

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the state or province.

+ References

No definition available.

+ Details

Name:

dei_EntityAddressStateOrProvince

Namespace Prefix:

dei_

Data Type:

dei:stateOrProvinceItemType

Balance Type:

na

Period Type:

duration

X

- Definition

A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityCentralIndexKey

Namespace Prefix:

dei_

Data Type:

dei:centralIndexKeyItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Indicate if registrant meets the emerging growth company criteria.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityEmergingGrowthCompany

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.

+ References

No definition available.

+ Details

Name:

dei_EntityFileNumber

Namespace Prefix:

dei_

Data Type:

dei:fileNumberItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Two-character EDGAR code representing the state or country of incorporation.

+ References

No definition available.

+ Details

Name:

dei_EntityIncorporationStateCountryCode

Namespace Prefix:

dei_

Data Type:

dei:edgarStateCountryItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityRegistrantName

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b-2

+ Details

Name:

dei_EntityTaxIdentificationNumber

Namespace Prefix:

dei_

Data Type:

dei:employerIdItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Local phone number for entity.

+ References

No definition available.

+ Details

Name:

dei_LocalPhoneNumber

Namespace Prefix:

dei_

Data Type:

xbrli:normalizedStringItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 13e

-Subsection 4c

+ Details

Name:

dei_PreCommencementIssuerTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14d

-Subsection 2b

+ Details

Name:

dei_PreCommencementTenderOffer

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Title of a 12(b) registered security.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection b

+ Details

Name:

dei_Security12bTitle

Namespace Prefix:

dei_

Data Type:

dei:securityTitleItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Name of the Exchange on which a security is registered.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 12

-Subsection d1-1

+ Details

Name:

dei_SecurityExchangeName

Namespace Prefix:

dei_

Data Type:

dei:edgarExchangeCodeItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Exchange Act

-Number 240

-Section 14a

-Subsection 12

+ Details

Name:

dei_SolicitingMaterial

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Trading symbol of an instrument as listed on an exchange.

+ References

No definition available.

+ Details

Name:

dei_TradingSymbol

Namespace Prefix:

dei_

Data Type:

dei:tradingSymbolItemType

Balance Type:

na

Period Type:

duration

X

- Definition

Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.

+ References

Reference 1: http://www.xbrl.org/2003/role/presentationRef

-Publisher SEC

-Name Securities Act

-Number 230

-Section 425

+ Details

Name:

dei_WrittenCommunications

Namespace Prefix:

dei_

Data Type:

xbrli:booleanItemType

Balance Type:

na

Period Type:

duration

X

- Details

Name:

dei_EntityAddressesAddressTypeAxis=dei_FormerAddressMember

Namespace Prefix:

Data Type:

na

Balance Type:

Period Type: