Form 8-K
8-K — FUELCELL ENERGY INC
Accession: 0001104659-26-104498
Filed: 2026-09-02
Period: 2026-09-02
CIK: 0000886128
SIC: 3620 (ELECTRICAL INDUSTRIAL APPARATUS)
Item: Results of Operations and Financial Condition
Item: Regulation FD Disclosure
Item: Financial Statements and Exhibits
Documents
8-K — fcel-20260902x8k.htm (Primary)
EX-99.1 (fcel-20260902xex99d1.htm)
EX-99.2 (fcel-20260902xex99d2.htm)
GRAPHIC (fcel-20260902xex99d1001.jpg)
GRAPHIC (fcel-20260902xex99d2g001.jpg)
GRAPHIC (fcel-20260902xex99d2g002.jpg)
GRAPHIC (fcel-20260902xex99d2g003.jpg)
GRAPHIC (fcel-20260902xex99d2g004.jpg)
GRAPHIC (fcel-20260902xex99d2g005.jpg)
GRAPHIC (fcel-20260902xex99d2g006.jpg)
GRAPHIC (fcel-20260902xex99d2g007.jpg)
GRAPHIC (fcel-20260902xex99d2g008.jpg)
GRAPHIC (fcel-20260902xex99d2g009.jpg)
GRAPHIC (fcel-20260902xex99d2g010.jpg)
GRAPHIC (fcel-20260902xex99d2g011.jpg)
GRAPHIC (fcel-20260902xex99d2g012.jpg)
GRAPHIC (fcel-20260902xex99d2g013.jpg)
GRAPHIC (fcel-20260902xex99d2g014.jpg)
GRAPHIC (fcel-20260902xex99d2g015.jpg)
GRAPHIC (fcel-20260902xex99d2g016.jpg)
GRAPHIC (fcel-20260902xex99d2g017.jpg)
GRAPHIC (fcel-20260902xex99d2g018.jpg)
GRAPHIC (fcel-20260902xex99d2g019.jpg)
GRAPHIC (fcel-20260902xex99d2g020.jpg)
GRAPHIC (fcel-20260902xex99d2g021.jpg)
GRAPHIC (fcel-20260902xex99d2g022.jpg)
GRAPHIC (fcel-20260902xex99d2g023.jpg)
GRAPHIC (fcel-20260902xex99d2g024.jpg)
GRAPHIC (fcel-20260902xex99d2g025.jpg)
GRAPHIC (fcel-20260902xex99d2g026.jpg)
GRAPHIC (fcel-20260902xex99d2g027.jpg)
GRAPHIC (fcel-20260902xex99d2g028.jpg)
XML — IDEA: XBRL DOCUMENT (R1.htm)
8-K
8-K (Primary)
Filename: fcel-20260902x8k.htm · Sequence: 1
FUELCELL ENERGY, INC._September 2, 2026
0000886128false00008861282026-09-022026-09-02
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the
Securities Exchange Act of 1934
Date of report (Date of earliest event reported): September 2, 2026
FUELCELL ENERGY, INC.
(Exact Name of Registrant as Specified in its Charter)
Delaware
1-14204
06-0853042
(State or Other Jurisdiction of
Incorporation)
(Commission
File Number)
(IRS Employer
Identification No.)
3 Great Pasture Road,
Danbury, Connecticut
06810
(Address of Principal Executive Offices)
(Zip Code)
Registrant’s telephone number, including area code: (203) 825-6000
Not Applicable
(Former Name or Former Address, if Changed Since Last Report)
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:
☐ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
☐ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
☐ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
☐ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Trading Symbol(s)
Name of each exchange on which registered
Common Stock, $0.0001 par value per share
FCEL
The Nasdaq Stock Market LLC
(Nasdaq Global Market)
Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging growth company ☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Item 2.02. Results of Operations and Financial Condition.
On September 2, 2026, FuelCell Energy, Inc. (the “Company”) issued a press release announcing its financial results and providing a business update as of and for the three and nine months ended July 31, 2026. A copy of this press release is furnished with this report as Exhibit 99.1 and is incorporated herein by reference.
The information furnished in this Item 2.02, including Exhibit 99.1, is not deemed to be “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liability of that section. This information will not be deemed to be incorporated by reference into any filing under the Securities Act of 1933, as amended (the “Securities Act”), or the Exchange Act, except to the extent that the Company specifically incorporates it by reference.
Item 7.01. Regulation FD Disclosure.
A copy of the investor presentation slides that will be used by the Company during its September 2, 2026 earnings call is furnished with this report as Exhibit 99.2.
The information furnished in this Item 7.01, including Exhibit 99.2, is not deemed to be “filed” for purposes of Section 18 of the Exchange Act, or otherwise subject to the liability of that section. This information will not be deemed to be incorporated by reference into any filing under the Securities Act or the Exchange Act, except to the extent that the Company specifically incorporates it by reference.
By furnishing the information contained herein, the Company makes no admission as to the materiality of any information in this report that is required to be disclosed solely by reason of Regulation FD. The information contained in the investor presentation furnished as Exhibit 99.2 is summary information that is intended to be considered in the context of the Company’s Securities and Exchange Commission (“SEC”) filings and other public announcements that the Company may make, by press release or otherwise, from time to time. The Company undertakes no duty or obligation to publicly update or revise the information contained in this presentation, although it may do so from time to time. Any such updating may be made through the filing of other reports or documents with the SEC, through press releases or through other public disclosure.
Item 9.01. Financial Statements and Exhibits.
(d) Exhibits:
Exhibit No.
Description
99.1
Press Release issued by FuelCell Energy, Inc. on September 2, 2026.
99.2
Investor Presentation, dated September 2, 2026.
104
Cover Page Interactive Data File (embedded within the Inline XBRL document)
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
FUELCELL ENERGY, INC.
Date: September 2, 2026
By:
/s/ Michael S. Bishop
Michael S. Bishop
Executive Vice President, Chief Financial Officer and Treasurer
EX-99.1
EX-99.1
Filename: fcel-20260902xex99d1.htm · Sequence: 2
FuelCell Energy
Exhibit 99.1
FuelCell Energy Reports Third Fiscal Quarter 2026 Results;
Executes First Data Center Power Agreement, Increases Annualized Production Rate & Focuses on Capacity Expansion
DANBURY, Conn., September 2, 2026 (GLOBE NEWSWIRE) — FuelCell Energy, Inc. (“FuelCell Energy” or the “Company”) (NASDAQ: FCEL) today reported financial results for its third quarter ended July 31, 2026.
Third Fiscal Quarter 2026 Operational and Financial Highlights
(All comparisons are year-over-year unless otherwise noted)
● Committed Backlog of $1.3 billion as of July 31, 2026, compared to $1.24 billion as of July 31, 2025, an increase of approximately 4.1% which includes the commitment by Fit Energy USA LP (“Fit Energy”) to purchase fuel cell systems representing generation capacity of 30 MW
● Added $2.4 billion to Awarded Capacity Backlog related to Fit Energy’s option to purchase additional fuel cell systems representing generation capacity of up to 350 MW
● Subsequent to the third quarter, signed the Company’s first Capacity Reservation Agreement with a major data center operator for a planned 75 MW project in Texas, supported by an upfront reservation payment
● Sales pipeline1 in Q3 2026 increased to a total of approximately 10 gigawatts (“GW”) for fiscal year 2026
● Continued work on expansion of Torrington, CT fuel cell manufacturing facility to 500 MW of total annualized production capacity; completion expected by June 2028
● Signed an MOU with Siemens with the goal of supporting faster, lower-cost deployment of 100+ MW commercial projects
● Delivered first two carbon capture modules to ExxonMobil Technology and Engineering Company in Rotterdam, The Netherlands in connection with the companies’ carbon capture collaboration
● Revenue of $33.0 million, compared to $46.7 million, a decrease of approximately 29%
● Gross loss of $(24.5) million, compared to $(5.1) million, an increase of approximately 377%
● Loss from operations of $(46.7) million, compared with $(95.4) million, a decrease of approximately 51%
● Net loss per share attributable to common stockholders was $(0.64), compared with $(3.78)
● Cash, cash equivalents, restricted cash and restricted cash equivalents totaled $737.3 million
"During the third quarter, FuelCell Energy accelerated the commercial execution of our data center strategy while continuing to expand the manufacturing capacity we believe is required to support long-term growth," said Jason Few, President and CEO of FuelCell Energy. "Our capital equipment purchase agreement with Fit Energy for a total aggregate generation capacity of up to 380 MW across four potential phases, intended to supply baseload power for data center applications, represents an important commercial milestone and validates FuelCell Energy’s ability to help meet the growing demand for utility-scale, behind-the-meter power solutions that accelerate time-to-power.
“The expansion of our Committed and Awarded Capacity Backlog to $3.6 billion reflects increasing customer demand for reliable, scalable infrastructure that reduces dependence on constrained transmission systems, simplifies permitting, and enables AI driven compute to be deployed faster.
“Along with the increasing interest in FuelCell Energy’s power solutions, we are investing with discipline to scale our manufacturing capabilities. The expansion of our Torrington facility to accommodate an annualized production
1 Pipeline consists of ongoing commercial discussions that range from solutions discussion through contract negotiation and does not represent signed agreements. There can be no assurance that these discussions will result in executed contracts or actual sales.
rate of 500 MW is underway and will strengthen our ability to convert commercial momentum into revenue while supporting growth.
“Demand for electricity is accelerating, driven by AI, data centers, and the broader electrification of the economy. With a growing commercial pipeline, expanding manufacturing capacity, and differentiated technology, we believe FuelCell Energy is well positioned to capitalize on these long-term market tailwinds."
Business Updates
During the third quarter, FuelCell Energy and Fit Energy entered into a capital equipment purchase agreement, pursuant to which FuelCell Energy agreed to manufacture, sell, and deliver to Fit Energy carbonate fuel cell block systems with a total aggregate generation capacity of up to 380 MW across four potential phases. The fuel cell systems are intended to supply baseload electricity for data center applications. We expect to begin delivery of the initial phase (Phase 0) consisting of 30 MW of generation capacity in the fourth quarter of fiscal year 2026. Fit Energy has the ability to elect, at its sole option, to proceed with the remaining phases for generation capacity of 100 MW in Phase 1, generation capacity of 125 MW in Phase 2 and generation capacity of an additional 125 MW in Phase 3, in each case, with a milestone-based payment obligation with an initial deposit due at election of each phase, upon delivery by Fit of timely election notices.
Subsequent to the end of the third quarter, FuelCell Energy signed its first Capacity Reservation Agreement with a major data center operator for a planned 75 MW project in Texas. The agreement includes an upfront reservation payment that provides the operator with priority access to FuelCell Energy’s manufacturing capacity while the parties finalize definitive project agreements. The planned deployment is expected to consist of six 12.5 MW FuelCell Energy Block systems, providing a modular, scalable power architecture designed to support the planned data center’s power requirements. Under the agreement, FuelCell Energy will reserve manufacturing capacity and initiate procurement of long-lead components to support the planned deployment. Financial terms were not disclosed.
In addition, during the third quarter, the Company advanced its production execution at, and progressed its expansion of, the Torrington, CT fuel cell manufacturing facility on two important fronts:
● The Company continued to increase its annualized production rate, with the goal of achieving its targeted annualized production rate of 100 MW in October 2026. Based on this planned increase in annualized production rate, the Company is now targeting achieving positive Adjusted EBITDA results in the fourth quarter of fiscal 2027, subject to the conversion of Awarded Capacity Backlog into Committed Backlog, customer delivery schedules and continued execution of the Company’s cost reduction initiatives.
● In parallel, the Company made significant progress in resolving constraints to the annualized production capacity increase to 500 MW at the Torrington manufacturing facility, including tape caster installation, factory design engineering, and significant purchase commitments for equipment. The expansion to 500 MW of annualized manufacturing capacity is scheduled for completion by June 2028.
During the quarter, FuelCell Energy also announced a collaboration with Siemens intended to accelerate the growth of fuel cell-based power generation. Formalized in a memorandum of understanding, Siemens will design and supply electrical balance of plant (EBOP) systems for FuelCell Energy installations, supporting faster, lower-cost deployment of fuel cells to 100+ MW commercial projects. The two companies plan to jointly develop integrated distributed energy systems incorporating fuel cells, battery energy storage, microgrid controls, and medium-voltage electrical equipment.
During the third quarter, the Company completed the repowering of the Gyeonggi Green Energy ("GGE") fuel cell park in the Hwaseong Baran Industrial Complex in South Korea, one of the largest fuel cell parks in the world. With the delivery of six fuel cell modules during the quarter, FuelCell Energy has now delivered all 42 of the fuel cell modules committed to GGE since 2024, generating $18 million of product revenue in the quarter, which was in line with prior targets. This project is supported by multi-million-dollar loans from the Export-Import Bank of the United States (EXIM), underscoring the role of U.S. export financing in advancing the Company's international deployments.
Also during the third quarter, the Company reached a pivotal milestone in its multi-year joint development agreement with ExxonMobil Technology and Engineering Company ("EMTEC"), delivering and installing the first two carbonate fuel cell carbon capture modules at Esso Nederland B.V.'s Rotterdam Manufacturing Complex in The Netherlands. This marks the first industrial-scale demonstration of the companies' jointly developed carbon capture technology, advancing it from years of joint research and development into real-world operation. Unlike conventional carbon capture, FuelCell Energy's carbonate fuel cells are capable of capturing CO₂ directly from industrial sources while simultaneously generating power and hydrogen — co-products that can reduce the overall cost of carbon capture. The demonstration is intended to evaluate performance under industrial operating conditions and inform future development of the jointly developed technology.
Committed and Awarded Capacity Backlog
As of July 31,
(Amounts in thousands)
2026
2025
Change
Committed Backlog
Product
$ 108,865
$ 96,183
$ 12,682
Service
263,648
169,384
94,264
Generation
915,725
955,033
(39,308)
Advanced Technologies
7,772
24,254
(16,482)
Total Committed Backlog
$ 1,296,010
$ 1,244,854
$ 51,156
Awarded Capacity Backlog
Product
$ 1,058,750
-
$ 1,058,750
Service
1,291,500
-
1,291,500
Total Awarded Capacity Backlog
$ 2,350,250
-
$ 2,350,250
Total Committed and Awarded Capacity Backlog
$ 3,646,260
$ 1,244,854
$ 2,401,406
Overall, Committed Backlog increased by approximately 4.1% to $1.3 billion as of July 31, 2026, compared to $1.24 billion as of July 31, 2025, primarily as a result of the Capital Equipment Purchase Agreement (“CEPA”) with Fit Energy, partially offset by revenue recognition over the period.
As of July 31, 2026, Awarded Capacity Backlog consisted of the estimated product and service value associated with 350 MW under Phases 1, 2 and 3 of the CEPA with Fit Energy. Fit Energy may elect to proceed with those Phases 1, 2 and 3 at its sole option. No payment obligation for Phases 1, 2 and 3 arises until Fit makes the applicable election, at which time an initial deposit becomes due. Site identification and customer development, permitting, financing, ownership and construction activities may also remain outstanding. As sites are identified, the parties to the CEPA are required to enter into prescribed project-specific commissioning agreements and long-term service agreements at pricing set forth in the CEPA. Awarded Capacity Backlog is not contracted backlog, firm order backlog or a guarantee of future revenue. Amounts may not convert to Committed Backlog or revenue, in whole or in part, and the timing and amount of any conversion may differ materially from current estimates.
Committed Backlog represents definitive, non-cancelable agreements executed by the Company and its customers. Awarded Capacity Backlog represents commercial awards, capacity reservations, or similar customer commitments where the Company has been selected as the supplier and the parties are advancing toward execution of definitive agreements. Awarded Capacity Backlog is not included in Committed Backlog until definitive, non-cancelable agreements have been executed by both parties.
Together, the service and generation portions of Committed Backlog had a weighted average term of approximately 15 years as of July 31, 2026, with weighting based on the dollar amount of backlog and utility service contracts of up to 20 years in duration at inception.
Consolidated Financial Metrics
Three Months Ended July 31,
(Amounts in thousands, except per share data)
2026
2025
Change
Total revenues
$33,001
$46,743
(29%)
Gross loss
(24,503)
(5,134)
377%
Loss from operations
(46,660)
(95,364)
(51%)
Net loss
(45,283)
(91,896)
(51%)
Net loss attributable to common stockholders
(45,267)
(92,456)
(51%)
Net loss per basic and diluted share attributable to common stockholders
$ (0.64)
$ (3.78)
(83%)
EBITDA *
$ (37,273)
$ (85,618)
(56%)
Adjusted EBITDA *
$ (36,738)
$ (16,380)
124%
Adjusted net loss per basic and diluted share attributable to common stockholders *
$ (0.64)
$ (0.95)
(33%)
* Reconciliations of non-GAAP measures EBITDA, Adjusted EBITDA and Adjusted net loss per basic and diluted share attributable to common stockholders are contained in the appendix to this press release.
Third Fiscal Quarter 2026 Financial Results
(All comparisons are between third quarter of fiscal 2026 and third quarter of fiscal 2025 unless otherwise noted)
Third quarter revenue of $33.0 million represents a decrease of 29% from the comparable prior year
quarter. This was primarily due to lower product revenue resulting from fewer module deliveries to customers in Korea compared to the comparable prior year quarter and lower generation revenue due to lower operating output from plants in our generation portfolio, including the 7.4 MW Groton Project at the U.S. Navy’s submarine base in Groton, CT, which was not operating pending an equipment upgrade during the quarter.
Net loss was $(45.3) million in the third quarter of fiscal 2026, compared to net loss of $(91.9) million in the third quarter of fiscal 2025. Decreased net loss in the third quarter of fiscal 2026 was primarily due to the lack of impairment and restructuring expenses which impacted net loss in the prior year period, partially offset by a higher gross loss than the prior year period. The gross loss from product revenues for the three months ended July 31, 2026 reflects product costs and manufacturing overhead that currently exceed the contractual pricing established under the CEPA with Fit Energy. Our per-unit product costs, and the fixed manufacturing overhead absorbed into those costs, reflect the annualized production rate of approximately 37.1 MW at which we operated during the quarter, which remains below the production volume at which we expect our cost structure to align with market-based pricing for orders of this scale. Charges totaling $17.0 million were recorded during the three months ended July 31, 2026 and reflect the impact of contractual pricing provisions associated with specific inventory and firm purchase commitments arising as a result of Phase 0 of the CEPA as of July 31, 2026. The charges are expected to be limited to identified inventory and purchase commitments for Phase 0 of the CEPA with Fit Energy, and do not reflect management’s expectations regarding the overall economic value of the CEPA. As production volumes
increase, we expect improved absorption of fixed manufacturing overhead, greater purchasing scale and continued execution of our cost reduction initiatives to result in product and overhead costs per unit below our current cost profile.
Net loss attributable to common stockholders was $(45.3) million in the third quarter of fiscal 2026, compared to net loss attributable to common stockholders of $(92.5) million in the third quarter of fiscal 2025. The decrease in net loss attributable to common stockholders was primarily due to the decrease in loss from operations for the three months ended July 31, 2026, which was primarily due to the lack of impairment and restructuring expenses that impacted loss from operations for the three months ended July 31, 2025.
Adjusted EBITDA totaled $(36.7) million in the third quarter of fiscal 2026, compared to Adjusted EBITDA of $(16.4) million in the third quarter of fiscal 2025. The negative impact on Adjusted EBITDA is primarily due to the inventory valuation charges described above. Please see the discussion of non-GAAP financial measures, including Adjusted EBITDA, in the appendix at the end of this release.
The net loss per share attributable to common stockholders in the third quarter of fiscal 2026 was $(0.64), compared to $(3.78) in the third quarter of fiscal 2025. The decrease in net loss per share attributable to common stockholders is primarily due to the higher number of weighted average shares outstanding due to share issuances since July 31, 2025.
Cash and Restricted Cash
Cash and cash equivalents and restricted cash and cash equivalents totaled $737.3 million as of July 31, 2026, compared to $341.8 million as of October 31, 2025. Of the $737.3 million as of July 31, 2026, unrestricted cash and cash equivalents totaled $658.1 million and restricted cash and cash equivalents totaled $79.2 million. Of the $341.8 million total as of October 31, 2025, unrestricted cash and cash equivalents totaled $278.1 million and restricted cash and cash equivalents totaled $63.7 million.
Sales of Common Stock
On July 9, 2026, the Company completed the underwritten public offering of 12,321,429 shares of the Company’s common stock (including the full exercise of the underwriters’ option to purchase additional shares) at a price to the public of $21.00 per share. Net proceeds to the Company were approximately $245.5 million after deducting underwriting discounts and commissions of approximately $12.9 million and other offering expenses payable by the Company of approximately $0.4 million. The Company currently intends to use the net proceeds from this offering for capital expenditures related to expansion of manufacturing capacity to support growth, working capital and general corporate purposes.
During the three months ended July 31, 2026, approximately 4.1 million shares of the Company’s common stock were sold under the Company’s Open Market Sale Agreement, as amended, at an average sale price of $13.31 per share, resulting in net proceeds to the Company of approximately $52.9 million after deducting sales commissions totaling approximately $1.1 million. Following these sales, approximately $0.5 million of shares remained available for sale under the Open Market Sale Agreement, as amended.
For further information, please refer to the Company’s Quarterly Report on Form 10-Q for the quarter ended July 31, 2026, which includes the Company’s unaudited interim consolidated financial statements, related notes thereto and management’s discussion and analysis, and is available on the Company's website at www.fuelcellenergy.com and under its profile at www.sec.gov.
Conference Call Information
FuelCell Energy will host a conference call today, September 2, 2026 beginning at 10:00 a.m. ET to discuss third quarter 2026 results as well as key business highlights. Participants can access the live call via webcast on the Company’s website or by telephone as follows:
(1) The live webcast of the call and supporting slide presentation will be available at www.fuelcellenergy.com. To listen to the call, select “Investors” on the home page located under the “Our Company” pull-down menu, proceed to the “Events & Presentations” page and then click on the “Webcast” link listed under the September 2nd earnings call event, or click here.
● Alternatively, participants can dial 888-330-3181 and state FuelCell Energy or the conference ID number 1099808.
The replay of the conference call will be available via webcast on the Company’s Investors’ page at www.fuelcellenergy.com approximately two hours after the conclusion of the call.
Cautionary Language
This news release contains forward-looking statements within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 regarding future events or our future financial performance that involve certain contingencies and uncertainties. The forward-looking statements include, without limitation, statements with respect to the Company’s anticipated financial results and statements regarding the Company’s plans and expectations regarding the continuing development, commercialization and financing of its current and future fuel cell technologies, the Company’s business plans and strategies, the Company’s plan to reduce operating costs, the capabilities of the Company’s products, the Company's plans and ability to achieve positive Adjusted EBITDA, the Company’s potential sales pipeline, opportunities, and partners, and the markets in which the Company expects to operate. Projected and estimated numbers contained herein are not forecasts and may not reflect actual results. These forward-looking statements are not guarantees of future performance, and all forward-looking statements are subject to risks and uncertainties, known and unknown, that could cause actual results and future events to differ materially from those projected. Factors that could cause such a difference include, without limitation: general risks associated with product development and manufacturing; general economic conditions; changes in interest rates, which may impact project financing; supply chain disruptions; changes in the utility regulatory environment; changes in the utility industry and the markets for distributed generation, distributed hydrogen, and fuel cell power plants configured for carbon capture or carbon separation; potential volatility of commodity prices that may adversely affect our projects; availability of government subsidies and economic incentives for alternative energy technologies; our ability to remain in compliance with U.S. federal and state and foreign government laws and regulations; our ability to maintain compliance with the listing rules of The Nasdaq Stock Market; rapid technological change; competition; the risk that our bid awards (or other non-binding commitments) will not convert to contracts or that our contracts will not convert to revenue; market acceptance of our products; changes in accounting policies or practices adopted voluntarily or as required by accounting principles generally accepted in the United States; factors affecting our liquidity position and financial condition; government appropriations; the ability of the government and third parties to terminate their development contracts at any time; the ability of the government to exercise “march-in” rights with respect to certain of our patents; our ability to successfully market and sell our products internationally; delays in our timeline for bringing commercially viable products to market; our ability to develop additional commercially viable products in the future; our ability to implement our strategy; our ability to reduce our levelized cost of energy and deliver on our cost reduction strategy generally; our ability to protect our intellectual property; litigation and other proceedings; the risk that commercialization of our new products will not occur when anticipated or, if it does, that we will not have adequate capacity to satisfy demand; our need for and the availability of additional financing; our ability to generate positive cash flow from operations; our ability to service our long-term debt; our ability to increase the output and longevity of our platforms and to meet the performance requirements of our contracts; our ability to expand our customer base and maintain relationships with our largest customers and strategic business allies; our ability to reduce operating costs; and our ability to achieve positive Adjusted EBITDA in the
future, as well as other risks set forth in the Company’s filings with the Securities and Exchange Commission, including the Company’s Annual Report on Form 10-K for the fiscal year ended October 31, 2025. The forward-looking statements contained herein speak only as of the date of this press release. The Company expressly disclaims any obligation or undertaking to release publicly any updates or revisions to any such statement contained herein to reflect any change in the Company’s expectations or any change in events, conditions or circumstances on which any such statement is based.
About FuelCell Energy
FuelCell Energy, Inc. (Nasdaq: FCEL) is an American clean energy technology company delivering continuous, scalable baseload power for mission-critical applications globally. The Company’s fuel cell systems generate electricity directly at the point of use, enabling reliable, low-emissions power for data centers, industrial facilities, utilities, and distributed generation customers. FuelCell Energy delivers commercially proven, modular, utility-scale systems—backed by global fuel cell deployments. Learn more at www.fuelcellenergy.com.
Contact
Media Relations:
Kathleen Blomquist
kblomquist@fce.com
203.546.5844
Investor Relations:
ir@fce.com
FUELCELL ENERGY, INC.
Consolidated Balance Sheets
(Unaudited)
(Amounts in thousands, except share and per share amounts)
July 31,
2026
October 31,
2025
ASSETS
Current assets:
Cash and cash equivalents, unrestricted
$
658,082
$
278,099
Restricted cash and cash equivalents – short-term
24,911
16,601
Accounts receivable, net
7,172
3,999
Unbilled receivables
39,875
49,008
Inventories
86,376
86,196
Other current assets
16,885
15,907
Total current assets
833,301
449,810
Restricted cash and cash equivalents – long-term
54,327
47,092
Inventories – long-term
-
3,216
Project assets, net
166,588
216,847
Property, plant and equipment, net
94,561
96,436
Operating lease right-of-use assets, net
10,871
11,232
Intangible assets, net
2,918
3,891
Other assets
148,596
103,622
Total assets (1)
$
1,311,162
$
932,146
LIABILITIES AND STOCKHOLDERS’ EQUITY
Current liabilities:
Current portion of long-term debt
$
18,801
$
15,847
Current portion of operating lease liabilities
1,007
932
Accounts payable
16,329
17,009
Accrued liabilities
40,531
31,318
Deferred revenue
19,416
2,733
Total current liabilities
96,084
67,839
Long-term deferred revenue
14,009
5,985
Long-term operating lease liabilities
11,638
11,954
Long-term debt and other liabilities
146,676
115,227
Total liabilities (1)
268,407
201,005
Redeemable Series B preferred stock (liquidation preference of $64,020 as of July 31, 2026 and October 31, 2025)
59,857
59,857
Total equity:
Stockholders’ equity:
Common stock ($0.0001 par value); 1,000,000,000 shares authorized as of July 31, 2026 and October 31, 2025; 79,954,196 and 46,075,237 shares issued and outstanding as of July 31, 2026 and October 31, 2025, respectively)
8
5
Additional paid-in capital
2,951,531
2,493,318
Accumulated deficit
(1,974,683)
(1,829,449)
Accumulated other comprehensive loss
(1,746)
(1,695)
Treasury stock, Common, at cost (61,488 and 44,913 shares as of July 31, 2026 and October 31, 2025, respectively)
(1,577)
(1,406)
Deferred compensation
1,577
1,406
Total stockholders’ equity
975,110
662,179
Noncontrolling interests
7,788
9,105
Total equity
982,898
671,284
Total liabilities, redeemable Series B preferred stock and total equity
$
1,311,162
$
932,146
(1) As of July 31, 2026 and October 31, 2025, the combined assets of the variable interest entities (“VIEs”) were $290,034 and $325,661, respectively, that can only be used to settle obligations of the VIEs. These assets include cash of $2,708, accounts receivable of $643, unbilled accounts receivable of $2,979, operating lease right of use assets of $1,626, other current assets of $174,355, restricted cash and cash equivalents of $1,081, project assets of $92,587, derivative assets of $2,764 and other assets of $11,291 as of July 31, 2026, and cash of $2,490, accounts receivable of $722, unbilled accounts receivable of $12,865, operating lease right of use assets of $1,643, other current assets of $162,005, restricted cash and cash equivalents of $731, project assets of $141,414, derivative assets of $2,047 and other assets of $1,743 as of October 31, 2025. The combined liabilities of the VIEs as of July 31, 2026 include short-term operating lease liabilities of $208, accounts payable of $168,622, accrued liabilities of $2,413, long-term operating lease liability of $2,103 and other non-current liabilities of $369 and, as of October 31, 2025, include short-term operating lease liabilities of $204, accounts payable of $198,736, accrued liabilities of $1,222, derivative liabilities of $21, long-term operating lease liability of $2,123 and other non-current liabilities of $307.
FUELCELL ENERGY, INC.
Consolidated Statements of Operations and Comprehensive Loss
(Unaudited)
(Amounts in thousands, except share and per share amounts)
Three Months Ended
July 31,
2026
2025
Revenues:
Product
$
18,000
$
26,000
Service
2,422
3,130
Generation
8,801
12,355
Advanced Technologies
3,778
5,258
Total revenues
33,001
46,743
Costs of revenues:
Product
37,102
29,083
Service
3,776
3,642
Generation
14,353
15,330
Advanced Technologies
2,273
3,822
Total costs of revenues
57,504
51,877
Gross loss
(24,503)
(5,134)
Operating expenses:
Administrative and selling expenses
13,648
14,066
Research and development expenses
8,509
7,646
Restructuring expense
-
4,051
Impairment expense
-
64,467
Total costs and expenses
22,157
90,230
Loss from operations
(46,660)
(95,364)
Interest expense
(2,903)
(2,548)
Interest income
3,573
2,144
Other income, net
707
3,912
Loss before provision for income taxes
(45,283)
(91,856)
Provision for income taxes
-
(40)
Net loss
(45,283)
(91,896)
Net loss attributable to noncontrolling interest
(816)
(240)
Net loss attributable to FuelCell Energy, Inc.
(44,467)
(91,656)
Series B preferred stock dividends
(800)
(800)
Net loss attributable to common stockholders
$
(45,267)
$
(92,456)
Loss per share basic and diluted:
Net loss per share attributable to common stockholders
$
(0.64)
$
(3.78)
Basic and diluted weighted average shares outstanding
70,405,692
24,441,294
FUELCELL ENERGY, INC.
Consolidated Statements of Operations and Comprehensive Loss
(Unaudited)
(Amounts in thousands, except share and per share amounts)
Nine Months Ended
July 31,
2026
2025
Revenues:
Product
$
48,060
$
39,099
Service
9,786
13,122
Generation
28,470
35,825
Advanced Technologies
12,805
15,100
Total revenues
99,121
103,146
Costs of revenues:
Product
73,779
48,380
Service
10,087
14,377
Generation
50,500
49,035
Advanced Technologies
8,044
11,130
Total costs of revenues
142,410
122,922
Gross loss
(43,289)
(19,776)
Operating expenses:
Administrative and selling expenses
41,826
45,566
Research and development expenses
23,181
28,623
Restructuring expense
-
5,593
Impairment expense
42,567
64,467
Total costs and expenses
107,574
144,249
Loss from operations
(150,863)
(164,025)
Interest expense
(8,520)
(7,703)
Interest income
8,588
6,357
Other income, net
1,782
3,464
Loss before (provision for) income taxes
(149,013)
(161,907)
Benefit from (provision for) income taxes
50
(124)
Net loss
(148,963)
(162,031)
Net loss attributable to noncontrolling interest
(3,729)
(4,000)
Net loss attributable to FuelCell Energy, Inc.
(145,234)
(158,031)
Series B preferred stock dividends
(2,400)
(2,400)
Net loss attributable to common stockholders
$
(147,634)
$
(160,431)
Loss per share basic and diluted:
Net loss per share attributable to common stockholders
$
(2.56)
$
(7.22)
Basic and diluted weighted average shares outstanding
57,649,267
22,233,074
Appendix
Non-GAAP Financial Measures
Financial results are presented in accordance with accounting principles generally accepted in the United States (“GAAP”). Management also uses non-GAAP measures to analyze and make operating decisions on the business. Earnings before interest, taxes, depreciation and amortization (“EBITDA”), Adjusted EBITDA, Adjusted net loss attributable to common stockholders and Adjusted net loss per share attributable to common stockholders are non-GAAP measures of operations and operating performance by the Company.
These supplemental non-GAAP measures are provided to assist readers in assessing operating performance. Management believes EBITDA, Adjusted EBITDA, Adjusted net loss attributable to common stockholders and Adjusted net loss per share attributable to common stockholders are useful in assessing performance and highlighting trends on an overall basis. Management also believes these measures are used by companies in the fuel cell sector and by securities analysts and investors when comparing the results of the Company with those of other companies. EBITDA differs from the most comparable GAAP measure, net loss attributable to the Company, primarily because it does not include finance expense, income taxes and depreciation of property, plant and equipment and project assets. Adjusted EBITDA adjusts EBITDA for stock-based compensation, impairment and restructuring expenses, unrealized non-cash gain on natural gas derivative contracts and other unusual items, which are considered either non-cash or non-recurring. Adjusted net loss attributable to common stockholders and Adjusted net loss per share attributable to common stockholders differ from the most comparable GAAP measures, Net loss attributable to common stockholders and Net loss per share attributable to common stockholders, primarily because they do not include stock-based compensation, impairment and restructuring expenses, unrealized non-cash gain on natural gas derivative contracts and other unusual items, which are considered either non-cash or non-recurring.
While management believes that these non-GAAP financial measures provide useful supplemental information to investors, there are limitations associated with the use of these measures. The measures are not prepared in accordance with GAAP and may not be directly comparable to similarly titled measures of other companies due to differences in the exact method of calculation. The Company’s non-GAAP financial measures are not meant to be considered in isolation or as a substitute for comparable GAAP financial measures and should be read only in conjunction with the Company’s consolidated financial statements prepared in accordance with GAAP.
The following table calculates EBITDA and Adjusted EBITDA and reconciles these figures to the GAAP financial statement measure Net loss.
Three Months Ended July 31,
Nine Months Ended July 31,
(Amounts in thousands)
2026
2025
2026
2025
Net loss
$ (45,283)
$ (91,896)
(148,963)
(162,031)
Depreciation and amortization (1)
9,387
9,746
30,747
30,582
(Benefit from) provision for income taxes
-
40
(50)
124
Other income, net (2)
(707)
(3,912)
(1,782)
(3,464)
Interest income
(3,573)
(2,144)
(8,588)
(6,357)
Interest expense
2,903
2,548
8,520
7,703
EBITDA
$ (37,273)
$ (85,618)
$ (120,116)
$ (133,443)
Stock-based compensation expense
2,452
1,691
7,472
8,657
Unrealized gain on natural gas derivative contracts (3)
(1,917)
(971)
(746)
(2,037)
Impairment expense (4)
-
64,467
42,567
64,467
Restructuring expense
-
4,051
-
5,593
Adjusted EBITDA
$ (36,738)
$ (16,380)
$ (70,823)
$ (56,763)
The following table calculates Adjusted net loss attributable to common stockholders and reconciles that figure to the GAAP financial statement measure Net loss attributable to common stockholders and calculates Adjusted net loss per share attributable to common stockholders.
Three Months Ended July 31,
Nine Months Ended July 31,
(Amounts in thousands except share and per share amounts)
2026
2025
2026
2025
Net loss attributable to common stockholders
$ (45,267)
$ (92,456)
(147,634)
(160,431)
Stock-based compensation expense
2,452
1,691
7,472
8,657
Unrealized gain on natural gas derivative contracts (3)
(1,917)
(971)
(746)
(2,037)
Impairment expense (4)
-
64,467
42,567
64,467
Restructuring expense
-
4,051
-
5,593
Adjusted net loss attributable to common stockholders
$ (44,732)
$ (23,218)
$ (98,341)
$ (83,751)
Net loss per share attributable to common stockholders
$ (0.64)
$ (3.78)
$ (2.56)
$ (7.22)
Adjusted net loss per share attributable to common stockholders
$ (0.64)
$ (0.95)
$ (1.71)
$ (3.77)
Basic and diluted weighted average shares outstanding
70,405,692
24,441,294
57,649,267
22,233,074
(1) Includes depreciation and amortization on our Generation portfolio of $7.0 million and $7.7 million for the three months ended July 31, 2026 and 2025, respectively, and $24.6 million and $24.4 million for the nine months ended July 31, 2026 and 2025, respectively.
(2) Other income, net includes gains and losses from transactions denominated in foreign currencies, interest rate swap income earned from investments and other items incurred periodically, which are not the result of the Company’s normal business operations.
(3) The Company recorded mark-to-market net gains of $1.9 million and $1.0 million for the three months ended July 31, 2026 and 2025, respectively, and mark-to-market net gains of $0.7 million and $2.0 million for the nine months ended July 31, 2026 and 2025, respectively, related to natural gas purchase contracts as a result of net settling certain natural gas purchases under previous normal purchase normal sale contract designations, which resulted in a change to mark-to-market accounting. These gains are classified as Generation cost of sales.
(4) The Company recorded a non-cash impairment expense of $42.6 million for the nine months ended July 31, 2026 related to the Company’s decision to upgrade the equipment at the Groton Project to utilize three of the Company’s standard 2.5 MW FCE Blocks, and a non-cash impairment expense of $64.5 million for the three and nine months ended July 31, 2025 related to the Company's prior investments in solid oxide technology, including related goodwill and in-process research and development intangible assets, property, plant and equipment and solid oxide inventory.
EX-99.2
EX-99.2
Filename: fcel-20260902xex99d2.htm · Sequence: 3
© 2026 FuelCell Energy 1
Third Quarter 2026
Financial Results & Business Update
September 2, 2026
A rendering of a FuelCell Energy data center installation © 2026 FuelCell Energy
Exhibit 99.2
© 2026 FuelCell Energy
This presentation contains forward-looking statements within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 regarding future events or
our future financial performance that involve certain contingencies and uncertainties. The forward-looking statements include, without limitation, statements with respect to the
Company’s anticipated financial results and statements regarding the Company’s plans and expectations regarding the continuing development, commercialization and financing of its
current and future fuel cell technologies, the expected timing of completion of the Company’s ongoing projects, the expected timing of module replacements, the Company’s business
plans and strategies, the Company’s plan to reduce operating costs, the Company’s plans and ability to achieve positive Adjusted EBITDA, the capabilities of the Company’s products,
the Company's potential sales pipeline, opportunities, and partners, and the markets in which the Company expects to operate. Projected and estimated numbers contained herein are
not forecasts and may not reflect actual results. These forward-looking statements are not guarantees of future performance, and all forward-looking statements are subject to risks and
uncertainties, known and unknown, that could cause actual results and future events to differ materially from those projected. Factors that could cause such a difference include, without
limitation: general risks associated with product development and manufacturing; general economic conditions; changes in interest rates, which may impact project financing; supply
chain disruptions; changes in the utility regulatory environment; changes in the utility industry and the markets for distributed generation, distributed hydrogen, and fuel cell power plants
configured for carbon capture or carbon separation; potential volatility of commodity prices that may adversely affect our projects; availability of government subsidies and economic
incentives for alternative energy technologies; our ability to remain in compliance with U.S. federal and state and foreign government laws and regulations; our ability to maintain
compliance with the listing rules of The Nasdaq Stock Market; rapid technological change; competition; the risk that our bid awards (or other non-binding commitments) will not convert
to contracts or that our contracts will not convert to revenue; market acceptance of our products; changes in accounting policies or practices adopted voluntarily or as required by
accounting principles generally accepted in the United States; factors affecting our liquidity position and financial condition; government appropriations; the ability of the government and
third parties to terminate their development contracts at any time; the ability of the government to exercise “march -in” rights with respect to certain of our patents; our ability to
successfully market and sell our products internationally; delays in our timeline for bringing commercially viable products to market; our ability to develop additional commercially viable
products in the future; our ability to implement our strategy; our ability to reduce our levelized cost of energy and deliver on our cost reduction strategy generally; our ability to protect our
intellectual property; litigation and other proceedings; the risk that commercialization of our new products will not occur when anticipated or, if it does, that we will not have adequate
capacity to satisfy demand; our need for and the availability of additional financing; our ability to generate positive cash flow from operations; our ability to service our long-term debt; our
ability to increase the output and longevity of our platforms and to meet the performance requirements of our contracts; our ability to expand our customer base and maintain
relationships with our largest customers and strategic business allies; our ability to reduce operating costs; and our ability to achieve positive Adjusted EBITDA, as well as other risks set
forth in the Company’s filings with the Securities and Exchange Commission (“SEC”), including the Company’s Annual Report on Form 10-K for the fiscal year ended October 31, 2025.
The forward-looking statements contained herein speak only as of the date of this presentation. The Company expressly disclaims any obligation or undertaking to release publicly any
updates or revisions to any such statement contained herein to reflect any change in the Company’s expectations or any change in events, conditions or circumstances on which any
such statement is based.
The Company refers to non-GAAP financial measures in this presentation. The Company believes that this information is useful to understanding its operating results and assessing
performance and highlighting trends on an overall basis. Please refer to Company’s earnings release and the appendix to this presentation for further disclosure and reconciliation of non-GAAP financial measures. (As used herein, the term “GAAP” refers to generally accepted accounting principles in the U.S.)
The information set forth in this presentation is qualified by reference to, and should be read in conjunction with, our Annual Report on Form 10-K for the fiscal year ended October 31,
2025, filed with the SEC on December 18, 2025, our Quarterly Report on Form 10-Q for the fiscal quarter ended July 31, 2026, filed with the SEC on September 2, 2026, and our earnings
release for the third quarter ended July 31, 2026, filed as an exhibit to our Current Report on Form 8-K filed with the SEC on September 2, 2026.
Safe Harbor Statement
2
© 2026 FuelCell Energy 3
1 The metrics provided are as of July 31, 2026, unless otherwise provided.
2 Represents cumulative FCE Block deployments, including replacement modules, since 2003.
3 Patents held by FuelCell Energy, Inc. and FuelCell Energy’s subsidiary Versa Power Systems, Inc. as of October 31, 2025.
4 Based on FY2025 cost data for the 2.5 MW Fuel Cell Energy Block System.
5 Committed Backlog represents definitive, non-cancelable agreements executed by the Company and its customers. Awarded Capacity Backlog represents commercial awards,
capacity reservations, or similar customer commitments where the Company has been selected as the supplier and the parties are advancing toward execution of definitive
agreements. Awarded Capacity Backlog is not included in Committed Backlog until definitive, non-cancelable agreements have been executed by both parties.
Note: The rendering on this page is of a 50 MW FuelCell Energy data center installation.
FuelCell Energy is an American clean energy company delivering continuous, quick-to-deploy, scalable power to support
mission-critical applications and grid resilience1
About FuelCell Energy
$3.6B
© 2026 FuelCell Energy 4
Third Quarter 2026 Highlights
Commercial
Operations
Financial
▪ Strong Liquidity: FuelCell Energy had ~ $737 million in total cash (including restricted cash and equivalents) as of July 31,
2026, supporting ongoing operations and AI-focused growth strategy.
▪ Fully-Funded Expansion: 500 MW Torrington capacity expansion fully funded (total expected cost of $200–$275M).
▪ Path to Profitability: Targeting positive Adjusted EBITDA in Q4 FY2027 subject to conversion of Awarded Capacity Backlog
into Committed Backlog, customer delivery schedules and continued execution of cost reduction initiatives.
▪ Production Rate Increase: Increasing annualized production rate toward 100 MW; expected achievement in October 2026.
▪ Expansion Progress: 500 MW Torrington capacity expansion advancing — tape caster installation, factory design
engineering, and equipment purchase commitments; completion anticipated by June 2028.
▪ Korean Fuel Cell Deliveries: Delivered $18 million in fuel cell products in Q3, in-line with previous targets.
▪ Carbon Capture Milestone: First two carbon capture modules delivered and installed at ExxonMobil's Rotterdam complex
— the first industrial-scale demonstration of FuelCell Energy and ExxonMobil's jointly developed technology.
▪ 75 MW Capacity Reservation: Secured the Company’s first capacity reservation agreement with a major data center
operator for a planned 75 MW project in Texas, subsequent to the end of Q3.
▪ First Data Center Order: Up to 380 MW under the Fit Energy agreement; deposit received for 30 MW initial order.
▪ Pipeline Strength: Growth to ~10 GW of total FY2026 proposals across data centers, digital infrastructure, and utilities.
▪ MOU with Siemens to support faster, lower-cost deployment of 100 MW+ commercial projects.
▪ Backlog: Increased to $1.3B of Committed Backlog and $2.4B of Awarded Capacity Backlog resulting in $3.6B of total
Committed and Awarded Capacity Backlog as of July 31, 2026. 1
1 Committed Backlog represents definitive, non-cancelable agreements executed by the Company and its customers. Awarded Capacity Backlog represents commercial
awards, capacity reservations, or similar customer commitments where the Company has been selected as the supplier and the parties are advancing toward execution of
definitive agreements. Awarded Capacity Backlog is not included in Committed Backlog until definitive, non-cancelable agreements have been executed by both parties.
© 2026 FuelCell Energy
Technology and AI/Data
Center Strategy
5
© 2026 FuelCell Energy 6
Power Built for AI and Mission-Critical Loads
Carbonate fuel cells: clean, continuous, combustion-free power
Carbonate fuel cells convert
diverse fuels into electricity
and heat through a chemical
process that involves no
combustion
How it works
Repeatable and
scalable product
1.25 MW building blocks
Natural gas,
biogas, or
H2 blends
Ambient air
+
Exhaust heat for
absorption chilling
Water recapture
Carbon capture ready
Reliable,
continuous DC power
converted to AC
1.25 MW FuelCell Energy Block
Cell package Cell stack
400 cell packages
100 MW System
8 x 12.5 MW FCE Block Systems
Operational efficiencies enabled by shared balance of plant
2.5 MW FCE Block System
2 x 1.25 MW FCE Blocks
12.5 MW FCE Block System
5 x 2.5 MW FCE Block Systems
1.25 MW FCE Block
4 x cell stacks
© 2026 FuelCell Energy 7
FuelCell Energy’s Unique Value Proposition for AI Data Centers
▪ Negligible criteria air pollutants
▪ Quiet, near-silent operations
▪ Land-efficient (up to 33 MW/ acre)
▪ Water neutral capable
▪ Carbon capture ready
Community Friendly
AI-Native Architecture
▪ DC-native power backbone
▪ Designed for high density compute
▪ Compatible with rack-level
architecture
▪ Next-gen data center design-ready
Accelerated Time to Power Reliability at Utility Scale
▪ Continuous 24/7 baseload power
▪ Redundancy= maintenance without
downtime
▪ Proven at multiple 10 MW+ sites for
> 10 years
▪ 90% U.S.-based supplier network
▪ No reliance on rare earth elements
Infrastructure Grade Scalability
▪ Behind-the-meter, grid parallel,
or microgrid
▪ Modular 1.25 MW building
blocks scalable to GWs
▪ Thermal exhaust powers cooling
for more IT load
▪ Layered architecture manages
AI workload swings
Designed to support a scalable DC-native power backbone for AI data centers — with potential capital-efficiency from day one
Attractive Cost of Energy
1 Company estimate based on standard configuration and LCOE basis (Project term 20 years, WACC 8.0%, ITC 30%; Excludes utility interconnect, permitting, and taxes; included
cost of fuel at $4.50/MMBtu). Source: Scaling Data Center Power With Carbonate Fuel Cells (On-Demand Webinar)
2 Up to 85% overall efficiency with CHP. Availability and efficiency metrics are based on FuelCell Energy operating experience and design targets under specified conditions.
Actual performance may vary by system configuration, fuel, load profile, ambient conditions, maintenance, and Combined Heat and Power (CHP) utilization.
▪ ~$0.09/kWh estimated cost1
▪ 30% Fuel Cell Investment Tax Credit
▪ Lower fuel cost through2
:
▪ 50% electrical efficiency
▪ up to 85% overall efficiency
▪ Absorption chilling: up to 10% cost
savings
▪ Deployable today
▪ No Title V permitting trigger
▪ Avoid grid delays
© 2026 FuelCell Energy 8
Bypassing Grid Bottlenecks: Time-to-Power in Few Months
FuelCell Energy Blocks can start shipping within 90 days following order
1 https://insidelines.pjm.com/pjm-board-directs-action-on-resource-adequacy-affordability-and-large-loads/
2 https://emp.lbl.gov/queues
3 https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/052025-us-gas-fired-turbine-wait-times-as-much-as-seven-years-costs-up-sharplyUS
4 Project dependent
“During capacity shortages, new Large Loads
that do not bring their own generation by June 1,
2027, and have not otherwise secured supply,
will be subject to curtailment prior to
deployment of Pre-Emergency Load
Management.1
"
FuelCell Energy can provide direct
behind-the-meter power to data centers
Solves “bring your own generation” requirement Delivers faster than the alternatives
Delivery:
▪ First FuelCell Energy Block can ship 90
days after signing, enabling full on-site
power commissioning in under 1 year
▪ Rollout phased to customer needs
Typical Time to Available Power:
Production capacity growth:
▪ 500 MW/year by June 2028,
expansion in progress
▪ A 1 GW+ plant is in the planning
stage
© 2026 FuelCell Energy 9
Supply Chain Resilience
Designed around globally abundant industrial materials with diversified sourcing across multiple regions
Engineered for Scale with >90% U.S.-Based Supply Chain
93% of the FuelCell Energy Block
by weight is recyclable or
reusable
Designed for easy recycling and reuse
Cradle-to-cradle take-back program maintains chain of custody
across the FCE Block life cycle — components refurbished,
reused or recycled at end of life.
What we DON'T depend on
No reliance on rare earth elements
No Scandium, Lanthanum, Yttrium, Cerium,
Ytterbium, Samarium, Gadolinium —
common in competing fuel cells
No high-risk critical minerals; only minimal
lithium in electrolyte (<0.1% of weight)
What we build from
Abundant commodity materials
Core electrochemical materials supported
by abundant global supply:
Nickel | Steel | Aluminum | Ceramics
Where it comes from
Secure U.S. & allied sourcing
Diversified across U.S. and allied nations
Low geopolitical supply-chain risk
© 2026 FuelCell Energy 10
Capable of managing the full spectrum of AI power variability — token generation minutes to microseconds
Note: Availability metrics are based on FuelCell Energy operating experience and design targets under specified conditions. Actual performance may vary by
system configuration, fuel, load profile, ambient conditions, maintenance, and CHP utilization.
Illustrative architecture. FuelCell Energy participates in the flexible baseload layer by providing continuous on-site primary power; the other layers may be
supported by third-party or customer-selected solutions.
Layered Architecture for AI Workloads
Power flow
The Challenge
AI loads swing across every
timescale at once. No single
device absorbs it all —
forcing one point to do
everything oversizes the
system and cuts
reliability.
Our Solution
Four layers — each turned to
a load timescale and placed
where it works best.
Built with Partners
To be engineered with
blue-chip leaders
like Siemens.
Developing end-to-end
integrated data center
solutions with Siemens.
Seconds-minutes
Battery Energy
2 Storage System
Absorbs step
loads, stabilizes
the microgrid
▪ Grid-forming inverter
▪ EMS-managed state
of charge
▪ Supports step loads
Minutes & beyond
Carbonate Fuel
Cell Block 1
Continuous,
dispatchable
on-site power
▪ Bulk MW for the
campus
▪ 50% electrical
efficiency
▪ Up to 99.9% plant
availability
▪ Combustion-free
negligible NOx
Milliseconds-seconds
UPS &
3 Supercaps
Smooths
sub-second
transients at the rack
▪ Close-couples to IT
racks
▪ AI-dynamic-load
ready
Milliseconds
The dynamic
workload driving
the design
▪ 50% swings in <100 ms
▪ Rapid load changes in
large MW blocks
GPU/IT Racks
(The AI Factory)
© 2026 FuelCell Energy
Commercial & Operations
Update
11
© 2026 FuelCell Energy
High-density data center proposals make up 97% of our pipeline
AI & Data Center Momentum Is Driving Pipeline Growth
Demand growth: pipeline1 by type
97%
2%
1%
Data centers Utilities Commercial & Industrial Other
1.5 GW 4.4 GW
▪ Hyperscalers
▪ Data Center Developers
▪ Colocation Providers
▪ Neocloud Providers
Sales pipeline highlights
▪ 4.4 GW of proposals delivered in Q3 2026, bringing YTD total
to ~10 GW (FY2026)
▪ >6x increase in total pipeline from Q1 2026 to Q3 2026
▪ Data center pipeline grew significantly quarter over quarter
accounting for ~ 97% of Q3 pipeline
▪ 3x increase in average proposal size from Q1 2026 to Q3 2026
1 Pipeline consists of ongoing commercial discussions that range from solutions discussion through contract negotiation and does
not represent signed agreements. There can be no assurance that these discussions will result in executed contracts or actual sales.
Feb 1, 2026 August 1, 2026
12
81%
8%
6%
6%
Data Center Pipeline Mix:
65
130
204
1-Feb 1-May 1-Aug
Average Proposal Size, MW (FY2026)
© 2026 FuelCell Energy 13
Up to 380 MW Order: Clean Power for Data Centers
30 MW initial order underway + additional phases with milestones tied to strategic warrants
Strategic Agreement: Fit Energy + FuelCell Energy
Up to 380 MW1 across four phases:
▪ 30 MW initial phase of product + service
(deposit received)
▪ Three further phases of 100, 125 and 125
MW, at Fit Energy's election
▪ Warrants for up to 12 million shares at
$26.44 per share
▪ Vesting in three separate phases tied
to deposits and deployment
milestones
▪ None currently vested or exercisable
▪ Structure aligns value creation with
project execution
Clean Power
▪ Distributed utility-grade
fuel cell platform — no
combustion, low water
use, quiet & compact
▪ Long-term operations
and service provider
Energy
Infrastructure
Long-term
ownership of
generation assets
for the digital
economy
Compute Power
HPC & AI
infrastructure and
high-performance
hardware.
NVIDIA Canadian
Partner of the Year2
Data Center
Capacity
Hosts HPC, AI &
cloud workloads
at scale
Delivering end-to-end high-performance
infrastructure across HPC, AI & Cloud
Proven utility-grade
fuel cell platform
Fit Ventures’ portfolio companies operate
across FuelCell Energy’s value chain
1
Includes Edge and Cloud/Large Learning data centers.
2 For 2025.
© 2026 FuelCell Energy
1 Including investments in machinery, equipment, plant reconfigurations and related construction, tooling, labor, outsourcing of certain processes and inventory.
2
Investments to be made when supported by market demand
Expansion to GW-Scale Manufacturing
Expansion of Torrington facility to 500 MW underway now; GW-scale planning advancing as demand supports it
14
Expansion to 500 MW: Execution in Progress
▪ New high-volume tape caster
installation on track
▪ Factory updated production layout
design close to being finalized
▪ Plant flow / space optimization and
automation upgrades underway
▪ Significant equipment RFQ and
hiring in progress
1 GW+ New Factory: Planning in Progress2
Progress
We have done this before: South Korea & Germany — we know how to localize final assembly, condition product in-market and scale manufacturing beyond our current footprint.
Torrington expansion supports path to 500 MW of annualized production
capacity.¹
▪ Expedited annualized production rate to 100 MW.
▪ $200-$275 million in total spending planned by June 2028 to
expand capacity to 500 MW.
▪ 90% U.S.-based supplier network; no rare-earth element reliance.
Capital committed as market demand supports it; long-lead items already
in the FY2026 plan.
U.S.-based site
selection in
progress
Distributed final-assembly
centers near demand
▪ Torrington factory optimization
▪ Global assembly footprint
▪ Centralized core
▪ Replicable scale
1 GW+
annualized cell
capacity target
High volume
centralized cell
manufacturing core
Automation first
Replicable,
scalable, line
design
© 2026 FuelCell Energy 15
Global Execution: South Korea Repowering Revenues
Korea Repowering: Deliveries and Revenue
An established player in South Korea, FuelCell Energy is strongly positioned to support growing data center demand
Full GGE Repowering Completed in Q3
FY2026
▪ Customer: Gyeonggi Green Energy
(GGE)
▪ Location: Hwaseong Baran Industrial
Complex in South Korea
▪ Scope: 42 modules have been delivered
to GGE since 2024, including the 6
modules in Q3 FY 2026
▪ Financing: Supported by multi-million-dollar loans from the Export-Import Bank
of the United States (EXIM) GGE, South Korea - one of the largest fuel cell parks in the
world, established in 2013
FY ‘24 & 25 FY ‘26
Customer Prior 6 Quarters Actual Q1 Actual Q2 Actual Q3 Actual Q4 Estimate
GGE # of modules 28 2 6 6 0
CGN1 # of modules - 2 0 0 6
Revenue $84M $12M $18M $18M $18M
Celebrating completion of all 42 modules installed at
GGE, South Korea
1 CGN: CGN-Yulchon Generation Co., Ltd.
© 2026 FuelCell Energy
Project Pipeline Statistics Market Feedback trends
▪ Reached a pivotal milestone in FuelCell Energy's multi-year joint development agreement
with ExxonMobil Technology and Engineering Company (EMTEC) — the first two carbon
capture modules are now installed at ExxonMobil's Rotterdam, The Netherlands complex.
▪ Marks the first industrial-scale demonstration of the companies' jointly developed carbonate
fuel cell carbon capture technology, advancing it from years of R&D into real-world operation.
▪ Expected to validate performance under commercial operating conditions, and support
scalable solutions for hard-to-abate industries.
▪ Modular design supports GW-scale capacity
▪ Target market: large-scale industrial emitters and power producers.
▪ CO2
to be stored permanently under the North Sea via the Porthos project (operational
2027*).
External Source Carbon Capture: ExxonMobil Rotterdam Demonstration
* Source: https://www.porthosco2.nl/en/project 16
Unlike other carbon capture technologies, FuelCell Energy’s carbonate fuel cells natively capture CO 2 while simultaneously
generating power, heat, and hydrogen — co-products that can lower the cost of capture
Advancing Carbon Capture With ExxonMobil
© 2026 FuelCell Energy
Financial
Update
17
© 2026 FuelCell Energy
(Amounts in millions, except per share amounts) 2026 2025
Total revenue $33.0 $46.7
Loss from Operations $(46.7) $(95.4)
Net loss $(45.3) $(91.9)
Net loss attributable to common stockholders $(45.3) $(92.5)
Net loss per share attributable to common stockholders $(0.64) $(3.78)
Adjusted EBITDA 1 $(36.7) $(16.4)
Adjusted net loss per share attributable to common
stockholders 1 $(0.64) $(0.95)
18
(FYE = 10/31)
(Q3)
Three Months Ended
July 31
1 Reconciliations of Adjusted EBITDA and Adjusted net loss per share attributable to common stockholders to most
directly comparable GAAP financial measures is included in the appendix.
Q3 Fiscal 2026 Operating Performance
© 2026 FuelCell Energy
$(5.1)
$(24.5)
$(90.2)
$(22.2)
Q3 2025 Q3 2026
19
54.5%
7.3%
26.7%
11.4%
Product Service
Generation Advanced Technologies
$2.4
$3.8
$8.8
Gross Loss and Operating Expenses ($M)
$18.0
Revenue ($M)
Q3 Fiscal 2026 Financial Performance
Gross Loss Operating Expenses
© 2026 FuelCell Energy 20
Committed and Awarded Capacity Backlog Total Backlog ($B)
As of July 31,
1.24 1.29
2.35
2025 2026
Awarded Capacity Backlog
Committed Backlog
3.6
1.24
Note: Committed Backlog represents definitive, non-cancelable agreements executed by the Company and its customers. Awarded Capacity Backlog represents
commercial awards, capacity reservations, or similar customer commitments where the Company has been selected as the supplier and the parties are advancing
toward execution of definitive agreements. Awarded Capacity Backlog is not included in Committed Backlog until definitive, non-cancelable agreements have been
executed by both parties. Awarded Capacity Backlog is not contracted backlog, firm order backlog or a guarantee of future revenue.
Q3 Fiscal 2026 Committed and Awarded Capacity Backlog
© 2026 FuelCell Energy
▪ $737.3M in total cash (including restricted cash and
equivalents) as of July 31, 2026
▪ Net proceeds of ~$245.5M from sale of ~ 12.3M
shares of the Company’s common stock in an
underwritten offering that closed on July 9, 20261
▪ Net proceeds of ~$52.9M from sales of ~ 4.1 million
shares of the Company’s common stock under the
Company’s Open Market Sale Agreement 2
Takeaway: manufacturing expansion plan is fully
funded
373.2
658.1
67.7
79.2
4/30/26 7/31/26
Cash and Equivalents ($M)
Restricted Unrestricted
$737.3
$440.9
Sequential Quarters
1 Shares were sold at a sale price to the public of $21.00 per share.
2The shares were sold under the Company’s Open Market Sale Agreement, as amended, at an average sale price of $13.31 per share . 21
Cash and Liquidity
Strong cash balance allows significant runway to pursue FuelCell Energy’s AI/Data Center strategy
© 2026 FuelCell Energy
Appendix
22
© 2026 FuelCell Energy
Non-GAAP Financial Measures
Financial results are presented in accordance with accounting principles generally accepted in the United States (“GAAP”). Ma nagement also uses non-GAAP
measures to analyze and make operating decisions on the business. Earnings before interest, taxes, depreciation and amortization (“EBITDA”), Adjusted
EBITDA, Adjusted net loss attributable to common stockholders and Adjusted net loss per share attributable to common stockholders are non-GAAP
measures of operations and operating performance by the Company.
These supplemental non-GAAP measures are provided to assist readers in assessing operating performance. Management believes EBITDA, Adjusted
EBITDA, Adjusted net loss attributable to common stockholders and Adjusted net loss per share attributable to common stockholders are useful in assessing
performance and highlighting trends on an overall basis. Management also believes these measures are used by companies in the fuel cell sector and by
securities analysts and investors when comparing the results of the Company with those of other companies. EBITDA differs from the most comparable
GAAP measure, net loss attributable to the Company, primarily because it does not include finance expense, income taxes and depreciation of property, plant
and equipment and project assets. Adjusted EBITDA adjusts EBITDA for stock-based compensation, impairment and restructuring expenses, unrealized non-cash gain on natural gas derivative contracts and other unusual items, which are considered either non-cash or non-recurring. Adjusted net loss attributable
to common stockholders and Adjusted net loss per share attributable to common stockholders differ from the most comparable GAAP measures, Net loss
attributable to common stockholders and Net loss per share attributable to common stockholders, primarily because they do not include stock-based
compensation, impairment and restructuring expenses, unrealized non-cash gain on natural gas derivative contracts and other unusual items, which are
considered either non-cash or non-recurring.
While management believes that these non-GAAP financial measures provide useful supplemental information to investors, there are limitations associated
with the use of these measures. The measures are not prepared in accordance with GAAP and may not be directly comparable to similarly titled measures of
other companies due to differences in the exact method of calculation. The Company’s non -GAAP financial measures are not meant to be considered in
isolation or as a substitute for comparable GAAP financial measures and should be read only in conjunction with the Company’s consolidated financial
statements prepared in accordance with GAAP.
23
© 2026 FuelCell Energy 24
(1) Includes depreciation and amortization on our Generation portfolio of $7.0 million and $7.7 million for the three months ended July 31, 2026 and 2025, respectively, and $24.6 million and $24.4 million for the nine months ended July 31, 2026 and 2025, respectively.
(2) Other income, net includes gains and losses from transactions denominated in foreign currencies, interest rate swap income earned from investments and other items incurred periodically, which are not the result of the Company’s normal business opera tions.
(3) The Company recorded mark-to-market net gains of $1.9 million and $1.0 million for the three months ended July 31, 2026 and 2025, respectively, and mark-to-market net gains of $0.7 million and $2.0 million for the nine months ended July 31, 2026 and 2025,
respectively, related to natural gas purchase contracts as a result of net settling certain natural gas purchases under previous normal purchase normal sale contract designations, which resulted in a change to mark-to-market accounting. These gains are classified as
Generation cost of sales.
(4) The Company recorded a non-cash impairment expense of $42.6 million for the nine months ended July 31, 2026 related to the Company’s decision to upgrade the equipment at the Groton Project to utilize three of the Company’s standard 2.5 MW FCE Blocks ,
and a non-cash impairment expense of $64.5 million for the three and nine months ended July 31, 2025 related to the Company's prior investments in solid oxide technology, related goodwill and in-process research and development intangible assets, property, plant
and equipment and solid oxide inventory.
GAAP to Non-GAAP Reconciliation
The following table calculates EBITDA and Adjusted EBITDA and reconciles these figures to the GAAP financial statement measure Net loss
© 2026 FuelCell Energy 25
(1) The Company recorded mark-to-market net gains of $1.9 million and $1.0 million for the three months ended July 31, 2026 and 2025, respectively, and mark-to-market net gains of $0.7 million and $2.0 million for the nine months ended
July 31, 2026 and 2025, respectively, related to natural gas purchase contracts as a result of net settling certain natural gas purchases under previous normal purchase normal sale contract designations, which resulted in a change to mark-to-market accounting. These gains are classified as Generation cost of sales.
(2) The Company recorded a non-cash impairment expense of $42.6 million for nine months ended July 31, 2026 related to the Company’s decision to upgrade the equipment at the Groton Project to utilize three of the Company’s standard
2.5 MW FCE Blocks, and a non-cash impairment expense of $64.5 million for the three and nine months ended July 31, 2025 related to the Company's prior investments in solid oxide technology, related goodwill and in-process research
and development intangible assets, property, plant and equipment and solid oxide inventory.
The following table calculates Adjusted net loss attributable to common stockholders and reconciles that figure to the GAAP financial statement
measure Net loss attributable to common stockholders and calculates Adjusted net loss per share attributable to common stockholders.
GAAP to Non-GAAP Reconciliation
© 2026 FuelCell Energy Note: Quarters shown are fiscal quarters for fiscal years ending October 31st
.
Service Business Profile for Module Replacement
Projects with LTSA Size of Plant
(MW)
Module
Replacement
Quantity
Est. Date of Next
Module Replacement
United Illuminating - Glastonbury 2.8 2 Q4-2026
United Illuminating - Seaside 2.8 2 Q1-2027
E.ON - Friatec 1.4 1 Q1-2027
E.ON - Radisson 0.4 1 Q1-2028
Pepperidge Farm - 1 1.4 1 Q2-2028
Pepperidge Farm - 2 1.4 1 Q3-2028
KOSPO 2.5 2 Q2-2028
KOSPO 2.5 2 Q1-2029
KOSPO 2.5 2 Q3-2029
United Illuminating - Woodbridge 2.2 2 Q1-2030
KOSPO 2.5 2 Q1-2030
KOSPO 10 8 Q2-2030
Trinity College 1.4 1 Q2-2030
KOSPO 2.5 2 Q3-2030
Noeul Green Energy 20 16 Q4-2030
Total under LTSA 56.3 45
▪ Near term replacement activities
remain limited before 2028
▪ Module life cycles around mid-life
driving expectation of ramped
replacement activities in next 3-4
years
▪ Utility scale Korea installs maintain
projection of 34 restacks between
mid-2028 and Q4 2030
26
© 2026 FuelCell Energy 27
1 Rated capacity is the platform’s design rated output as of the date of initiation of commercial operations, except with respe ct to the Groton Project which did not achieve its design
rated output of 7.4 MW until December 2023. As of July 31, 2026, the Groton Project was not operating pending an equipment upgrade. The Company has elected to upgrade the
equipment at the Groton Project to utilize three of its 2.5 MW FCE blocks. It is expected that such upgrade will be completed in fiscal year 2027.
2 Quarters for Actual Commercial Operation Date refer to FuelCell Energy fiscal quarters.
3 The Company began operating the Toyota project in the first quarter of fiscal year 2024 under a 20-year hydrogen production and power purchase agreement with Toyota (the
"Toyota HPPA"), which provides for the sale of hydrogen and power to Toyota's Long Beach site and remains in effect. Power was also delivered to the California grid under a
separate PPA with Southern California Edison ("SCE") under California's Bioenergy Market Adjusting Tariff ("BioMAT") program. This PPA was replaced, effective July 1, 2026 with a
new PPA with SCE on the standard offer contract form for qualifying facilities of 20 MW or less. The term of the new PPA with SCE is 84 months. No termination consideration was
paid or received in connection with the termination of the prior PPA. The seven-year term reflected in the table above is the term of the SCE PPA; the Toyota HPPA term is 20 years.
Central CT State University (”CCSU”)
Riverside Regional Water Quality Control Plant
Pfizer, Inc.
Santa Rita Jail
Bridgeport Fuel Cell Project
Tulare BioMAT
San Bernardino
LIPA Yaphank Project
Groton Project1
Toyota
Derby - CT RFP-2
Derby (SCEF)
CCSU (CT University)
City of Riverside (CA Municipality)
Pfizer, Inc.
Alameda County, California
Connecticut Light and Power (CT Utility)
Southern California Edison (CA Utility)
San Bernardino Municipal Water Dept.
PSEG/LIPA, LI NY (Utility)
CMEEC (CT Electric Co-op)
Toyota, Southern California Edison
Eversource/United Illuminating (CT Utilities)
Eversource/United Illuminating (CT Utilities)
New Britain, CT
Riverside, CA
Groton, CT
Dublin, CA
Bridgeport, CT
Tulare, CA
San Bernardino, CA
Long Island, NY
Groton, CT
Long Beach , CA
Derby, CT
Derby, CT
1.4
1.4
5.6
1.4
14.9
2.8
1.4
7.4
7.4
2.3
14.0
2.8
Q2 ’12
Q4 ‘16
Q4 ‘16
Q1 ‘17
Q1 ‘13
Q1 ‘20
Q3 ‘21
Q1 ‘22
Q1 ’23
Q1’ 24
Q1’ 24
Q1’ 24
15
20
20
20
15
20
20
20
20
20/73
20
20
62.8
Project Name Power Off-Taker Location Rated Capacity1
(MW)
Actual Commercial
Operation Date 2
PPA Term
(Years)
Total MW Operating
FuelCell Energy Owned U.S. Generation Portfolio Overview
On-Balance Sheet Generation Operating Portfolio as of July 31, 2026
© 2026 FuelCell Energy
Thank You
Investor Relations:
ir@fce.com
28
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d1001.jpg · Sequence: 4
Binary file (8212 bytes)
Download fcel-20260902xex99d1001.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g001.jpg · Sequence: 5
Binary file (366760 bytes)
Download fcel-20260902xex99d2g001.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g002.jpg · Sequence: 6
Binary file (351082 bytes)
Download fcel-20260902xex99d2g002.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g003.jpg · Sequence: 7
Binary file (212462 bytes)
Download fcel-20260902xex99d2g003.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g004.jpg · Sequence: 8
Binary file (233258 bytes)
Download fcel-20260902xex99d2g004.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g005.jpg · Sequence: 9
Binary file (76131 bytes)
Download fcel-20260902xex99d2g005.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g006.jpg · Sequence: 10
Binary file (140350 bytes)
Download fcel-20260902xex99d2g006.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g007.jpg · Sequence: 11
Binary file (193561 bytes)
Download fcel-20260902xex99d2g007.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g008.jpg · Sequence: 12
Binary file (158785 bytes)
Download fcel-20260902xex99d2g008.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g009.jpg · Sequence: 13
Binary file (134641 bytes)
Download fcel-20260902xex99d2g009.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g010.jpg · Sequence: 14
Binary file (166762 bytes)
Download fcel-20260902xex99d2g010.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g011.jpg · Sequence: 15
Binary file (69795 bytes)
Download fcel-20260902xex99d2g011.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g012.jpg · Sequence: 16
Binary file (131608 bytes)
Download fcel-20260902xex99d2g012.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g013.jpg · Sequence: 17
Binary file (164743 bytes)
Download fcel-20260902xex99d2g013.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g014.jpg · Sequence: 18
Binary file (184777 bytes)
Download fcel-20260902xex99d2g014.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g015.jpg · Sequence: 19
Binary file (222048 bytes)
Download fcel-20260902xex99d2g015.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g016.jpg · Sequence: 20
Binary file (197083 bytes)
Download fcel-20260902xex99d2g016.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g017.jpg · Sequence: 21
Binary file (56525 bytes)
Download fcel-20260902xex99d2g017.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g018.jpg · Sequence: 22
Binary file (88125 bytes)
Download fcel-20260902xex99d2g018.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g019.jpg · Sequence: 23
Binary file (65180 bytes)
Download fcel-20260902xex99d2g019.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g020.jpg · Sequence: 24
Binary file (108273 bytes)
Download fcel-20260902xex99d2g020.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g021.jpg · Sequence: 25
Binary file (104275 bytes)
Download fcel-20260902xex99d2g021.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g022.jpg · Sequence: 26
Binary file (51833 bytes)
Download fcel-20260902xex99d2g022.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g023.jpg · Sequence: 27
Binary file (236060 bytes)
Download fcel-20260902xex99d2g023.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g024.jpg · Sequence: 28
Binary file (163215 bytes)
Download fcel-20260902xex99d2g024.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g025.jpg · Sequence: 29
Binary file (163678 bytes)
Download fcel-20260902xex99d2g025.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g026.jpg · Sequence: 30
Binary file (111326 bytes)
Download fcel-20260902xex99d2g026.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g027.jpg · Sequence: 31
Binary file (200008 bytes)
Download fcel-20260902xex99d2g027.jpg
GRAPHIC
GRAPHIC
Filename: fcel-20260902xex99d2g028.jpg · Sequence: 32
Binary file (79393 bytes)
Download fcel-20260902xex99d2g028.jpg
XML — IDEA: XBRL DOCUMENT
XML
Filename: R1.htm · Sequence: 37
v3.26.1
Document and Entity Information
Sep. 02, 2026
Cover [Abstract]
Entity Registrant Name
FUELCELL ENERGY, INC.
Entity Central Index Key
0000886128
Document Type
8-K
Document Period End Date
Sep. 02, 2026
Amendment Flag
false
Entity Emerging Growth Company
false
Entity File Number
1-14204
Entity Incorporation, State or Country Code
DE
Entity Tax Identification Number
06-0853042
Entity Address, Address Line One
3 Great Pasture Road
Entity Address, City or Town
Danbury
Entity Address, State or Province
CT
Entity Address, Postal Zip Code
06810
City Area Code
203
Local Phone Number
825-6000
Written Communications
false
Soliciting Material
false
Pre-commencement Tender Offer
false
Pre-commencement Issuer Tender Offer
false
Title of 12(b) Security
Common Stock, $0.0001 par value per share
Security Exchange Name
NASDAQ
Trading Symbol
FCEL
X
- Definition
Boolean flag that is true when the XBRL content amends previously-filed or accepted submission.
+ References
No definition available.
+ Details
Name:
dei_AmendmentFlag
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Area code of city
+ References
No definition available.
+ Details
Name:
dei_CityAreaCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Cover page.
+ References
No definition available.
+ Details
Name:
dei_CoverAbstract
Namespace Prefix:
dei_
Data Type:
xbrli:stringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
For the EDGAR submission types of Form 8-K: the date of the report, the date of the earliest event reported; for the EDGAR submission types of Form N-1A: the filing date; for all other submission types: the end of the reporting or transition period. The format of the date is YYYY-MM-DD.
+ References
No definition available.
+ Details
Name:
dei_DocumentPeriodEndDate
Namespace Prefix:
dei_
Data Type:
xbrli:dateItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The type of document being provided (such as 10-K, 10-Q, 485BPOS, etc). The document type is limited to the same value as the supporting SEC submission type, or the word 'Other'.
+ References
No definition available.
+ Details
Name:
dei_DocumentType
Namespace Prefix:
dei_
Data Type:
dei:submissionTypeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Address Line 1 such as Attn, Building Name, Street Name
+ References
No definition available.
+ Details
Name:
dei_EntityAddressAddressLine1
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the City or Town
+ References
No definition available.
+ Details
Name:
dei_EntityAddressCityOrTown
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Code for the postal or zip code
+ References
No definition available.
+ Details
Name:
dei_EntityAddressPostalZipCode
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the state or province.
+ References
No definition available.
+ Details
Name:
dei_EntityAddressStateOrProvince
Namespace Prefix:
dei_
Data Type:
dei:stateOrProvinceItemType
Balance Type:
na
Period Type:
duration
X
- Definition
A unique 10-digit SEC-issued value to identify entities that have filed disclosures with the SEC. It is commonly abbreviated as CIK.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityCentralIndexKey
Namespace Prefix:
dei_
Data Type:
dei:centralIndexKeyItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Indicate if registrant meets the emerging growth company criteria.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityEmergingGrowthCompany
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Commission file number. The field allows up to 17 characters. The prefix may contain 1-3 digits, the sequence number may contain 1-8 digits, the optional suffix may contain 1-4 characters, and the fields are separated with a hyphen.
+ References
No definition available.
+ Details
Name:
dei_EntityFileNumber
Namespace Prefix:
dei_
Data Type:
dei:fileNumberItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Two-character EDGAR code representing the state or country of incorporation.
+ References
No definition available.
+ Details
Name:
dei_EntityIncorporationStateCountryCode
Namespace Prefix:
dei_
Data Type:
dei:edgarStateCountryItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The exact name of the entity filing the report as specified in its charter, which is required by forms filed with the SEC.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityRegistrantName
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
The Tax Identification Number (TIN), also known as an Employer Identification Number (EIN), is a unique 9-digit value assigned by the IRS.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b-2
+ Details
Name:
dei_EntityTaxIdentificationNumber
Namespace Prefix:
dei_
Data Type:
dei:employerIdItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Local phone number for entity.
+ References
No definition available.
+ Details
Name:
dei_LocalPhoneNumber
Namespace Prefix:
dei_
Data Type:
xbrli:normalizedStringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 13e
-Subsection 4c
+ Details
Name:
dei_PreCommencementIssuerTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14d
-Subsection 2b
+ Details
Name:
dei_PreCommencementTenderOffer
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Title of a 12(b) registered security.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection b
+ Details
Name:
dei_Security12bTitle
Namespace Prefix:
dei_
Data Type:
dei:securityTitleItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Name of the Exchange on which a security is registered.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 12
-Subsection d1-1
+ Details
Name:
dei_SecurityExchangeName
Namespace Prefix:
dei_
Data Type:
dei:edgarExchangeCodeItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as soliciting material pursuant to Rule 14a-12 under the Exchange Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Exchange Act
-Number 240
-Section 14a
-Subsection 12
+ Details
Name:
dei_SolicitingMaterial
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Trading symbol of an instrument as listed on an exchange.
+ References
No definition available.
+ Details
Name:
dei_TradingSymbol
Namespace Prefix:
dei_
Data Type:
dei:tradingSymbolItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Boolean flag that is true when the Form 8-K filing is intended to satisfy the filing obligation of the registrant as written communications pursuant to Rule 425 under the Securities Act.
+ References
Reference 1: http://www.xbrl.org/2003/role/presentationRef
-Publisher SEC
-Name Securities Act
-Number 230
-Section 425
+ Details
Name:
dei_WrittenCommunications
Namespace Prefix:
dei_
Data Type:
xbrli:booleanItemType
Balance Type:
na
Period Type:
duration