Groowe Groowe BETA / Newsroom
⏱ News is delayed by 15 minutes. Sign in for real-time access. Sign in

AbraSilver Reports 2026 La Coipita Project Drill Results; Best Hole Returns 748 Metres of 0.69% Copper, 0.06 g/t Gold and 142 ppm Molybdenum Ready to Announce with Confidence?

newsfilecorp.com

AbraSilver Reports 2026 La Coipita Project Drill Results; Best Hole Returns 748 Metres of 0.69% Copper, 0.06 g/t Gold and 142 ppm Molybdenum Ready to Announce with Confidence? Toronto, Ontario--(Newsfile Corp. - June 15, 2026) - AbraSilver Resource Corp. (TSX: ABRA) (OTCQX: ABBRF) ("AbraSilver" or the "Company") is pleased to report assay results from the 2026 drill program at the La Coipita copper-gold-molybdenum project ("La Coipita" or the "Project") located in the San Juan Province of Argentina.

The drill program is fully funded and operated by a subsidiary of Teck Resources Limited ("Teck") under the terms of the earn-in and joint venture agreement, as per the Company's news release dated January 22, 2024.

The 2026 program comprised 5,248 metres ("m") of diamond drilling across seven holes (DDH-LC26-010 through DDH-LC26-016), designed to test the limits and vertical continuity of known mineralization at the Yaretas target and evaluate new targets generated by the first-ever magnetotelluric ("MT") geophysical survey completed across the property.

Key Highlights

John Miniotis, President and CEO, commented, "The 2026 drill program delivered several important milestones at La Coipita. Most notably, hole DDH-LC26-010 returned the strongest intercept drilled on the property to date, while hole DDH-LC26-011 confirmed the continuity of mineralization across the core Yaretas system. Equally encouraging was the new, shallower discovery at Yaretas Sur, located nearly 2 km south of the main drilling area, which further demonstrates the district-scale potential of this project. We are pleased to have Teck, one of the world's leading mining companies, continuing to advance La Coipita, and we look forward to continued exploration success."

Stuart McCracken, Vice President, Exploration, Teck commented, "These results reinforce our commitment to responsible and sustainable exploration and our long-term interest in the geological potential of the region."

Table 1 - Summary of Key Drill Intercepts

Intercepts greater than 25%-metres copper shown in bolded text:

Note: All results in this news release are rounded. Assays are uncut & undiluted. Widths are drilled widths, not true widths. True widths are unknown

La Coipita Project Overview

La Coipita is a district-scale property covering over 70,000 hectares in the western San Juan Province, adjacent to the Chilean border. Elevation across the property ranges between 3,500 and 4,500 MASL with moderate to high relief.

The property lies within the prolific Miocene porphyry-epithermal belt of Argentina and Chile, host to numerous world-class deposits, including Filo del Sol, Los Azules, El Indio, Veladero, Pascua Lama and El Pachon.

Since commencing the earn-in program in 2024, Teck has completed a total of 11,270 m of diamond drilling across 19 holes at La Coipita, representing approximately US$23 million in expenditures to date against the total earn-in commitment of US$20 million. In addition to Teck completing US$20 million in expenditures, certain cash payments defined in the earn-in and joint venture agreement remain to be completed by Teck. On completion of these obligations, it is anticipated the parties will form a Joint Venture (80% Teck, 20% AbraSilver).

The 2026 program successfully extended known mineralization at Yaretas, confirmed continuity between previously drilled areas and identified a new mineralized centre at Yaretas Sur. Together with the results of the MT survey, these findings support the potential for a large-scale mineralized system extending well beyond the currently drilled footprint.

The 2026 program, which included 5,248 metres of drilling and the first MT survey ever completed on the property, represents a significant step forward in defining the scale and geometry of the system as the project advances toward potential future Mineral Resource delineation.

Figure 1 - Plan Map - Drillhole Locations and Cu Results with MT-Resistivity Survey at 500 m Depth.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11792/301375_fd15b8c2a41daba3_001full.jpg

Figure 2 - A-A' Cross Section: Cu-Grade Results and MT-Resistivity

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11792/301375_fd15b8c2a41daba3_002full.jpg

Figure 3 - B-B' Cross Section: Yaretas (left) and Yaretas Sur (right) Targets, Cu-Grade Results and MT-Resistivity

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11792/301375_fd15b8c2a41daba3_003full.jpg

Collar Data

Note: All results in this news release for La Coipita have been rounded. Assays are uncut and undiluted. Widths are drilled widths, not true widths. True widths cannot be determined due to the uncertain geometry of mineralization.

QA/QC and Core Sampling Protocols

Core samples were taken every 2m, sent to San Juan for cutting (where applicable), and submitted to ALS Labs for sample preparation and for four-acid digestion multi-element analysis with ICP-MS finish (method codes ME-MS61) and with AAS finish for overlimit of Cu, Pb, Ag, As, Zn, Mo (OG62), and for Au by fire assay with ICP-MS finish (Au-ICP21) and with gravimetry finish for overlimit (Au-GRA21). Steps taken to avoid copper loss from drill core of the supergene enrichment zone included: (1) drilling with triple tube core barrels; (2) sampling whole core in zones of supergene mineralization (retaining 15-20cm of representative skeleton core); (3) avoiding interaction with water or core saws; and (4) taking field duplicates with a hydraulic core splitter.

Qualified Persons

David O'Connor P.Geo., Chief Geologist for AbraSilver, is the Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, and he has reviewed and approved the scientific and technical information in this news release.

About AbraSilver

AbraSilver is an advanced-stage exploration company focused on rapidly advancing its 100%-owned Diablillos silver-gold project in the mining-friendly Salta and Catamarca provinces of Argentina. The current Measured and Indicated Mineral Resource estimate for Diablillos (tank leach-only) consists of 102.0 Mt grading 65 g/t Ag and 0.62 g/t Au, containing approximately 213Moz of silver and 2.0Moz of gold, with significant further upside potential based on recent exploration drilling. The Company is led by an experienced management team and has long-term supportive shareholders. In addition, the Company has an earn-in option and joint venture agreement with Teck on the La Coipita project, located in the San Juan province of Argentina. AbraSilver is listed on the Toronto Stock Exchange under the symbol "ABRA" and in the U.S. on the OTCQX under the symbol "ABBRF."

The full Technical Report in respect of the updated MRE estimate is being prepared in accordance with NI 43-101 and will be available on SEDAR+ ( www.sedarplus.ca) under the Company's issuer profile within 45 days from the news release dated May 06, 2026.

For further information please visit the AbraSilver Resource website at www.abrasilver.com, our LinkedIn page at AbraSilver Resource Corp., and follow us on X at www.x.com/abrasilver

Alternatively, please contact:

John Miniotis, President and CEO

info@abrasilver.com

Tel: +1 416-306-8334

Cautionary Statements

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. All statements that address future plans, activities, events or developments that the Company believes, expects or anticipates will or may occur are forward-looking information. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. When considering this forward-looking information, readers should keep in mind the risk factors and other cautionary statements in the Company's disclosure documents filed with the applicable Canadian securities regulatory authorities on SEDAR+ at www.sedarplus.ca. The risk factors and other factors noted in the disclosure documents could cause actual events or results to differ materially from those described in any forward-looking information. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this news release

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/301375

Source: AbraSilver Resource Corp.

Analyst, journalist, or company stakeholder? Sign up to receive news releases by email for AbraSilver Resource Corp. or all companies in the Mining and Metals industry.

AbraSilver Reports 2026 La Coipita Project Drill Results; Best Hole Returns 748 Metres of 0.69% Copper, 0.06 g/t Gold and 142 ppm Molybdenum

2026-06-15 7:30 AM EDT

AbraSilver Expands Diablillos Mineral Resource Estimate to 248 Million Ounces Contained Silver and 2.5 Million Ounces Contained Gold (454 Moz AgEq) in M&I

2026-05-06 5:15 PM EDT

AbraSilver Intersects 68.5 Metres of 343 g/t Silver, Including 17 Metres of 917 g/t Silver

2026-04-30 7:30 AM EDT

Mar 30, 2026

Eligible venture issuers in Canada can now move from quarterly to semi-annual reporting. As of March 19, 2026, the Canadian Securities Administrators (CSA) introduced the Semi-Annual Reporting (SAR) Pilot . Implemented through Coordinated Blanket Order 51-933, it allows certain issuers listed on the TSX Venture Exchange (TSXV) or the Canadian Securities Exchange (CSE) to optionally skip first and third quarter financial filings . This reduces overall reporting burdens and costs. It also...

Economy, Business and Finance

Metal and Mineral

Mining

Mining and Metals